INTRODUCTION
 An escalator is a power-driven, continuous moving
stairway designed to transport passengers up and
down short vertical distances.
 Escalators are used around the world to move
pedestrian traffic in places where elevators would be
impractical.
The manufacturing process
There are two types of companies that supply
escalators:
 Primary manufacturers who actually build the
equipment
 Secondary suppliers that design and install the
equipment.
 In most cases, the secondary suppliers obtain the necessary
equipment from the primary manufacturers and make
necessary modifications for installation.
 Therefore, most escalators are actually assembled at the
primary manufacturer. The tracks, step chains, stair
assembly, and motorized gears and pulleys are all bolted into
place on the truss before shipping.
 The first stage of escalator construction is to establish the
design and accordingly the manufacturer constructs the
appropriately customized equipment.
 Prior to installation,
the landing areas
must be prepared
to connect to the
escalator.
For example,
concrete fittings must
be poured, and the
steel framework that
will hold the truss in
place must be attached.
 After the escalator is
delivered, the entire assembly is uncrated and jockeyed
into position between the top and bottom landing holes.
components
Landing platforms
 An escalator consists of top and bottom landing
platforms connected by a metal truss.
TOP PLATFORM BOTTOM PLATFORM
The top platform
contains the
motor assembly and the
main drive gear.
The bottom platform
holds the step
return idler
sprockets
The platforms contain a floor and comb plate.
COMB PLATE
FLOOR PLATE
FLOOR PLATE
The floor plate provides
a place for the passengers
to stand before they step
onto the moving stairs.
This plate is flush with the finished floor and is either
hinged or removable to allow easy access to the
machinery below.
COMB PLATE
 The comb plate is the
piece between the
stationary floor plate
and the moving step.
 It is so named because its edge
has a series of cleats that
resemble the teeth of a comb.
 These teeth mesh with matching cleats on the edges of the
steps.
 This design is necessary to minimize the gap between the
stair and the landing, which helps prevent objects from
getting caught in the gap.
THE TRUSS
 The truss is a hollow metal structure that bridges the
lower and upper landings.
 It is composed of two side
sections joined together with
cross braces across the bottom
and just below the top.
 The ends of the truss are attached to the top and bottom
landing platforms via steel or concrete supports.
The truss carries all the straight track sections
connecting the upper and lower sections.
THE TRACKS
The track system is built into the truss to guide the step
chain, which continuously pulls the steps from the
bottom platform and back to the top in an endless loop.
 There are actually two tracks: one for the front wheels of
the steps (called the step-wheel track) and one for the
back wheels of the steps (called the trailer-wheel track).
 The relative positions of these tracks cause the steps to
form a staircase as they move out from under the comb
plate.
THE STEPS
 The steps themselves are solid, one-piece, die-cast
aluminum.
Rubber mats may be affixed to their surface to
reduce slippage, and yellow demarcation lines may
be added to clearly indicate their edges.
The steps are linked by a continuous metal chain so they form a
closed loop with each step able to bend in relation to its
neighbors.
The front and back edges of the steps are each connected to two
wheels.
The rear wheels are
set further apart to
fit into the back
track and the front
wheels have shorter
axles to fit into the
narrower front
track.
As described
above, the position
of the tracks controls
the orientation of
the steps.
Escalator design
PHYSICAL FACTORS:
Physical factors like the vertical and horizontal distance to be
spanned must be considered.
These factors will determine the pitch of the escalator and its
actual length.
LOCATION:
Escalators should be situated where they can be easily seen by the
general public.
In department stores, customers should be able to view the
merchandise easily.
Furthermore, up and down escalator traffic should be physically
separated and should not lead into confined spaces.
TRAFFIC PATTERNS
 Traffic patterns must also be anticipated in escalator
design.
 In some buildings the objective is simply to move
people from one floor to another, but in others there
may be a more specific requirement, such as funneling
visitors towards a main exit or exhibit.
 The number of passengers is important because
escalators are designed to carry a certain maximum
number of people.
For example, a single width escalator traveling at
about 1.5 feet (0.45 m) per second can move an
estimated 170 persons per five-minute period.
SAFETY
 Safety is also major concern in escalator design.
 Fire protection of an escalator floor-opening may
be provided by adding automatic sprinklers or
fireproof shutters to the opening, or by installing the
escalator in an enclosed fire-protected hall.
 To limit the danger of overheating, adequate
ventilation for the spaces that contain the motors
and gears must be provided.
 It is preferred that a traditional staircase be located
adjacent to the escalator if the escalator is the
primary means of transport between floors.
WORKING
An escalator is a continuously moving staircase. Each stair
has a pair of wheels on each side, one at the front of the
step and one at the rear. The wheels run on two rails. At
the top and bottom of the escalator, the inner rail dips
beneath the outer rail, so that the bottom of the stair
flattens, making it easier for riders to get on and off.
TYPES:
Escalator typical configurations:
PARALLEL CRISS CROSS LAYOUT
WIDTH OF ESCALATOR CROSS-SECTION OF AN ESCALATOR
ESCALATOR WIDTH
In accordance with a worldwide standard,the
width of the step to be used is 60 cm
(for one person), 80cm (for one-to-two people)
and 100cm (for two people width)
ESCALATOR ANGLE
Escalator angle can be between
30-35 degrees.
The 35 degree escalator is more
economical, as it takes up less
surface area if viewed in plan, but
for large ascents, the 30 degree
escalator is preferred both on
psychological as well as safety
grounds.
The transportation capacity is same
BENEFITS
 Capacity to move large
numbers of people.
 Can be placed in
the same physical
space as stairs.
 Have no waiting
interval,
except during
very heavy traffic.
 Used to guide
people towards
main exits
or special exhibits.
Thankyou

Mais conteúdo relacionado

Mais procurados

Elevators and its types
Elevators and its typesElevators and its types
Elevators and its typesRajat Nainwal
 
Vertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaVertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaMr. Ramesh Nayaka
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalatorsKethees Waran
 
Sun Shading Devices
Sun Shading DevicesSun Shading Devices
Sun Shading DevicesPrabal Dahal
 
LITERATURE REVIEW AND CASE STUDY FOR RESIDENCE DESIGN
LITERATURE REVIEW AND CASE STUDY FOR RESIDENCE DESIGNLITERATURE REVIEW AND CASE STUDY FOR RESIDENCE DESIGN
LITERATURE REVIEW AND CASE STUDY FOR RESIDENCE DESIGNritikchaudhary15
 
Vertical transporation systems in building
Vertical transporation systems in buildingVertical transporation systems in building
Vertical transporation systems in buildingSelva Architect
 
Shell structures- advanced building construction
Shell structures- advanced building constructionShell structures- advanced building construction
Shell structures- advanced building constructionShweta Modi
 
7. Shading devices
7. Shading devices7. Shading devices
7. Shading devicesRohit Kumar
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsGrace Henry
 
Vertical transportation important
Vertical transportation importantVertical transportation important
Vertical transportation importantMuhammad Muhyuddin
 

Mais procurados (20)

Elevators and its types
Elevators and its typesElevators and its types
Elevators and its types
 
Vertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaVertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh Nayaka
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalators
 
Lift
LiftLift
Lift
 
Presentation on building service
Presentation on building servicePresentation on building service
Presentation on building service
 
Lifts
LiftsLifts
Lifts
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Walkalator
WalkalatorWalkalator
Walkalator
 
Sun Shading Devices
Sun Shading DevicesSun Shading Devices
Sun Shading Devices
 
Lifts & escalators
Lifts & escalators Lifts & escalators
Lifts & escalators
 
LITERATURE REVIEW AND CASE STUDY FOR RESIDENCE DESIGN
LITERATURE REVIEW AND CASE STUDY FOR RESIDENCE DESIGNLITERATURE REVIEW AND CASE STUDY FOR RESIDENCE DESIGN
LITERATURE REVIEW AND CASE STUDY FOR RESIDENCE DESIGN
 
Parking final
Parking finalParking final
Parking final
 
Vertical transporation systems in building
Vertical transporation systems in buildingVertical transporation systems in building
Vertical transporation systems in building
 
Shell structures- advanced building construction
Shell structures- advanced building constructionShell structures- advanced building construction
Shell structures- advanced building construction
 
Lifts
LiftsLifts
Lifts
 
7. Shading devices
7. Shading devices7. Shading devices
7. Shading devices
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Elevators and Escalators
 Elevators and Escalators Elevators and Escalators
Elevators and Escalators
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
Vertical transportation important
Vertical transportation importantVertical transportation important
Vertical transportation important
 

Semelhante a Everything You Need to Know About Escalators

Escalators uol (1)
Escalators uol (1)Escalators uol (1)
Escalators uol (1)Hashimammar
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2Est
 
Escalators
EscalatorsEscalators
Escalatorssound10
 
BMC S5 - MODULE 02 - ESCALATORS.pptx
BMC S5 - MODULE 02 - ESCALATORS.pptxBMC S5 - MODULE 02 - ESCALATORS.pptx
BMC S5 - MODULE 02 - ESCALATORS.pptxAnoHossey
 
ESCALATOR_211310140508_HSM.pptx
ESCALATOR_211310140508_HSM.pptxESCALATOR_211310140508_HSM.pptx
ESCALATOR_211310140508_HSM.pptxJayChaudhari42
 
LECTURE WEEK 13.pdf
LECTURE WEEK 13.pdfLECTURE WEEK 13.pdf
LECTURE WEEK 13.pdfSaadSohail54
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611VATSAL PATEL
 
Powered turntable conveyor 90 degree
Powered turntable conveyor 90 degreePowered turntable conveyor 90 degree
Powered turntable conveyor 90 degreeMohamed Ibrahim
 
Powered turntable conveyor
Powered turntable conveyorPowered turntable conveyor
Powered turntable conveyorMohamed Ibrahim
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONMasudul Robin
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...Hossam Shafiq I
 
Mae[577] final project_mandeep_singh
Mae[577] final project_mandeep_singhMae[577] final project_mandeep_singh
Mae[577] final project_mandeep_singhMandeep Singh
 
Types of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionTypes of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionEr.Karan Chauhan
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptxMayuriPatel90
 

Semelhante a Everything You Need to Know About Escalators (20)

Escalators uol (1)
Escalators uol (1)Escalators uol (1)
Escalators uol (1)
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
Escalators
EscalatorsEscalators
Escalators
 
Escalator
EscalatorEscalator
Escalator
 
BMC S5 - MODULE 02 - ESCALATORS.pptx
BMC S5 - MODULE 02 - ESCALATORS.pptxBMC S5 - MODULE 02 - ESCALATORS.pptx
BMC S5 - MODULE 02 - ESCALATORS.pptx
 
ESCALATOR_211310140508_HSM.pptx
ESCALATOR_211310140508_HSM.pptxESCALATOR_211310140508_HSM.pptx
ESCALATOR_211310140508_HSM.pptx
 
LECTURE WEEK 13.pdf
LECTURE WEEK 13.pdfLECTURE WEEK 13.pdf
LECTURE WEEK 13.pdf
 
Esaclators
EsaclatorsEsaclators
Esaclators
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611
 
Powered turntable conveyor 90 degree
Powered turntable conveyor 90 degreePowered turntable conveyor 90 degree
Powered turntable conveyor 90 degree
 
Powered turntable conveyor
Powered turntable conveyorPowered turntable conveyor
Powered turntable conveyor
 
Rail System
Rail SystemRail System
Rail System
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
 
Mae[577] final project_mandeep_singh
Mae[577] final project_mandeep_singhMae[577] final project_mandeep_singh
Mae[577] final project_mandeep_singh
 
Types of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building ConstructionTypes of Stairs & Staircase in Building Construction
Types of Stairs & Staircase in Building Construction
 
1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx1. Introduction to Railway engg..pptx
1. Introduction to Railway engg..pptx
 
P.way
P.wayP.way
P.way
 

Mais de Sarthak Kaura

Acoustic & Materials
Acoustic & MaterialsAcoustic & Materials
Acoustic & MaterialsSarthak Kaura
 
Deconstructivism by Sarthak Kaura
Deconstructivism by Sarthak KauraDeconstructivism by Sarthak Kaura
Deconstructivism by Sarthak KauraSarthak Kaura
 
Earth architecture by sarthak kaura
Earth architecture by sarthak kauraEarth architecture by sarthak kaura
Earth architecture by sarthak kauraSarthak Kaura
 
Man’s relationship with nature
Man’s relationship with natureMan’s relationship with nature
Man’s relationship with natureSarthak Kaura
 
Eco Earth Architecture
Eco Earth ArchitectureEco Earth Architecture
Eco Earth ArchitectureSarthak Kaura
 
Final report by sarthak kaura
Final report by sarthak kauraFinal report by sarthak kaura
Final report by sarthak kauraSarthak Kaura
 
Louis sullivan- "father of skyscrapers” "father of modernism“
Louis sullivan- "father of skyscrapers” "father of modernism“Louis sullivan- "father of skyscrapers” "father of modernism“
Louis sullivan- "father of skyscrapers” "father of modernism“Sarthak Kaura
 
BUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLINGBUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLINGSarthak Kaura
 
Case study/ Literature of a School
Case study/ Literature of a SchoolCase study/ Literature of a School
Case study/ Literature of a SchoolSarthak Kaura
 
Museum case study by Sarthak
Museum case study by SarthakMuseum case study by Sarthak
Museum case study by SarthakSarthak Kaura
 
Bill gates, The Most Successful Entrepreneur of 20th Century
Bill gates, The Most Successful Entrepreneur of 20th CenturyBill gates, The Most Successful Entrepreneur of 20th Century
Bill gates, The Most Successful Entrepreneur of 20th CenturySarthak Kaura
 
Case study sangathan
Case study sangathanCase study sangathan
Case study sangathanSarthak Kaura
 
Manufacturing of bricks
Manufacturing of bricksManufacturing of bricks
Manufacturing of bricksSarthak Kaura
 

Mais de Sarthak Kaura (20)

Acoustic & Materials
Acoustic & MaterialsAcoustic & Materials
Acoustic & Materials
 
Deconstructivism by Sarthak Kaura
Deconstructivism by Sarthak KauraDeconstructivism by Sarthak Kaura
Deconstructivism by Sarthak Kaura
 
Earth architecture by sarthak kaura
Earth architecture by sarthak kauraEarth architecture by sarthak kaura
Earth architecture by sarthak kaura
 
Man’s relationship with nature
Man’s relationship with natureMan’s relationship with nature
Man’s relationship with nature
 
Eco Earth Architecture
Eco Earth ArchitectureEco Earth Architecture
Eco Earth Architecture
 
Final report by sarthak kaura
Final report by sarthak kauraFinal report by sarthak kaura
Final report by sarthak kaura
 
Maya lin
Maya linMaya lin
Maya lin
 
Louis sullivan- "father of skyscrapers” "father of modernism“
Louis sullivan- "father of skyscrapers” "father of modernism“Louis sullivan- "father of skyscrapers” "father of modernism“
Louis sullivan- "father of skyscrapers” "father of modernism“
 
User Interface
User InterfaceUser Interface
User Interface
 
BUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLINGBUILDING INFORMATION MODELLING
BUILDING INFORMATION MODELLING
 
Hydrolic lift
Hydrolic liftHydrolic lift
Hydrolic lift
 
Illumination
IlluminationIllumination
Illumination
 
Flyash bricks
Flyash bricksFlyash bricks
Flyash bricks
 
Case study/ Literature of a School
Case study/ Literature of a SchoolCase study/ Literature of a School
Case study/ Literature of a School
 
Flooring
FlooringFlooring
Flooring
 
Museum case study by Sarthak
Museum case study by SarthakMuseum case study by Sarthak
Museum case study by Sarthak
 
Bill gates, The Most Successful Entrepreneur of 20th Century
Bill gates, The Most Successful Entrepreneur of 20th CenturyBill gates, The Most Successful Entrepreneur of 20th Century
Bill gates, The Most Successful Entrepreneur of 20th Century
 
Case study sangathan
Case study sangathanCase study sangathan
Case study sangathan
 
Manufacturing of bricks
Manufacturing of bricksManufacturing of bricks
Manufacturing of bricks
 
Design for homeless
Design for homelessDesign for homeless
Design for homeless
 

Último

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxsomshekarkn64
 

Último (20)

Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
lifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptxlifi-technology with integration of IOT.pptx
lifi-technology with integration of IOT.pptx
 

Everything You Need to Know About Escalators

  • 2. INTRODUCTION  An escalator is a power-driven, continuous moving stairway designed to transport passengers up and down short vertical distances.  Escalators are used around the world to move pedestrian traffic in places where elevators would be impractical.
  • 4. There are two types of companies that supply escalators:  Primary manufacturers who actually build the equipment  Secondary suppliers that design and install the equipment.  In most cases, the secondary suppliers obtain the necessary equipment from the primary manufacturers and make necessary modifications for installation.  Therefore, most escalators are actually assembled at the primary manufacturer. The tracks, step chains, stair assembly, and motorized gears and pulleys are all bolted into place on the truss before shipping.
  • 5.  The first stage of escalator construction is to establish the design and accordingly the manufacturer constructs the appropriately customized equipment.  Prior to installation, the landing areas must be prepared to connect to the escalator. For example, concrete fittings must be poured, and the steel framework that will hold the truss in place must be attached.  After the escalator is delivered, the entire assembly is uncrated and jockeyed into position between the top and bottom landing holes.
  • 7. Landing platforms  An escalator consists of top and bottom landing platforms connected by a metal truss. TOP PLATFORM BOTTOM PLATFORM
  • 8. The top platform contains the motor assembly and the main drive gear. The bottom platform holds the step return idler sprockets
  • 9. The platforms contain a floor and comb plate. COMB PLATE FLOOR PLATE
  • 10. FLOOR PLATE The floor plate provides a place for the passengers to stand before they step onto the moving stairs. This plate is flush with the finished floor and is either hinged or removable to allow easy access to the machinery below.
  • 11. COMB PLATE  The comb plate is the piece between the stationary floor plate and the moving step.  It is so named because its edge has a series of cleats that resemble the teeth of a comb.  These teeth mesh with matching cleats on the edges of the steps.  This design is necessary to minimize the gap between the stair and the landing, which helps prevent objects from getting caught in the gap.
  • 12. THE TRUSS  The truss is a hollow metal structure that bridges the lower and upper landings.  It is composed of two side sections joined together with cross braces across the bottom and just below the top.  The ends of the truss are attached to the top and bottom landing platforms via steel or concrete supports. The truss carries all the straight track sections connecting the upper and lower sections.
  • 13. THE TRACKS The track system is built into the truss to guide the step chain, which continuously pulls the steps from the bottom platform and back to the top in an endless loop.
  • 14.  There are actually two tracks: one for the front wheels of the steps (called the step-wheel track) and one for the back wheels of the steps (called the trailer-wheel track).  The relative positions of these tracks cause the steps to form a staircase as they move out from under the comb plate.
  • 15. THE STEPS  The steps themselves are solid, one-piece, die-cast aluminum. Rubber mats may be affixed to their surface to reduce slippage, and yellow demarcation lines may be added to clearly indicate their edges.
  • 16. The steps are linked by a continuous metal chain so they form a closed loop with each step able to bend in relation to its neighbors. The front and back edges of the steps are each connected to two wheels. The rear wheels are set further apart to fit into the back track and the front wheels have shorter axles to fit into the narrower front track. As described above, the position of the tracks controls the orientation of the steps.
  • 18. PHYSICAL FACTORS: Physical factors like the vertical and horizontal distance to be spanned must be considered. These factors will determine the pitch of the escalator and its actual length. LOCATION: Escalators should be situated where they can be easily seen by the general public. In department stores, customers should be able to view the merchandise easily. Furthermore, up and down escalator traffic should be physically separated and should not lead into confined spaces.
  • 19. TRAFFIC PATTERNS  Traffic patterns must also be anticipated in escalator design.  In some buildings the objective is simply to move people from one floor to another, but in others there may be a more specific requirement, such as funneling visitors towards a main exit or exhibit.  The number of passengers is important because escalators are designed to carry a certain maximum number of people. For example, a single width escalator traveling at about 1.5 feet (0.45 m) per second can move an estimated 170 persons per five-minute period.
  • 20. SAFETY  Safety is also major concern in escalator design.  Fire protection of an escalator floor-opening may be provided by adding automatic sprinklers or fireproof shutters to the opening, or by installing the escalator in an enclosed fire-protected hall.  To limit the danger of overheating, adequate ventilation for the spaces that contain the motors and gears must be provided.  It is preferred that a traditional staircase be located adjacent to the escalator if the escalator is the primary means of transport between floors.
  • 21.
  • 22. WORKING An escalator is a continuously moving staircase. Each stair has a pair of wheels on each side, one at the front of the step and one at the rear. The wheels run on two rails. At the top and bottom of the escalator, the inner rail dips beneath the outer rail, so that the bottom of the stair flattens, making it easier for riders to get on and off.
  • 24. WIDTH OF ESCALATOR CROSS-SECTION OF AN ESCALATOR
  • 25. ESCALATOR WIDTH In accordance with a worldwide standard,the width of the step to be used is 60 cm (for one person), 80cm (for one-to-two people) and 100cm (for two people width)
  • 26. ESCALATOR ANGLE Escalator angle can be between 30-35 degrees. The 35 degree escalator is more economical, as it takes up less surface area if viewed in plan, but for large ascents, the 30 degree escalator is preferred both on psychological as well as safety grounds. The transportation capacity is same