1© 2012 Eaton Corporation. All rights reserved.
CYME Distributed Generation Screening Tool
PV Distribution System Modeling Workshop
May 6th, 2013. Jean-Sébastien Lacroix ing./Eng.
2© 2012 Eaton Corporation. All rights reserved.
Agenda
• Utility Context
• CYME DG Screening Tool
• Pre-Application
• Generator Interconnection Procedures (GIP)
• California Rule-21 (Fast Track)
• Federal Energy Regulatory Commission (FERC)
• DG Screening Tool Demo
• Conclusion
3© 2012 Eaton Corporation. All rights reserved.
Utility Context
Renewables Energy Facts
• California Objective – 33% Renewables by 2020
• California Solar Initiative – 3 GW of PV by 2017
• Over 17 000 Solar Rooftops (130 MW)
• Over 1.5 GW for SDG&E
• More than 1000 PV interconnection applications in
California, Hawaii and New Jersey each month
Net Energy Metering Program
• Over 120,000 residential and non-residential accounts
enrolled in California's NEM program (< 1 MW)
4© 2012 Eaton Corporation. All rights reserved.
Utility Context
Interconnection Procedures Standard
• In 1999, the California Public Utilities Commission
(CPUC) adopted the Rule 21 to increase the
efficiency of the review of small generation
interconnection. Revised in 2012
• In 2003, IEEE-1547 Standard for Interconnection of
Distributed Resources with Power Systems
• In 2005, FERC adopted small generation
interconnection procedures called the Small
Generator Interconnection Procedures (SGIP).
5© 2012 Eaton Corporation. All rights reserved.
Utility Context
Interconnection Procedures Flow Example
• Step 1 – Pre-Application Report Request
• Step 2 – Pre-Application Report
• Step 3 – Interconnection Request Process
Study Process - Fast Track
Non Exporting/Net Energy Metered
Exporting < 3 MW on a 12kV system
Detailed Study Process
Large impact on grid is anticipated
Projects that have failed in Fast Track
• Step 4 – Application Review & Initial Review
• Step 5 – Supplemental Review & Detail Interconnection Study
• Step 6 – Generating Facility Interconnection Agreement
• Step 7 – Execution of the Generator Inter. Agreement
6© 2012 Eaton Corporation. All rights reserved.
Utility Context
Proposed IT Solution
• New Window Desktop Application
• Dashboard-type interface
• Manages and assesses various DG interconnection
requests
• Three Types of Screening
Pre-Application
Initial Screening – California Rule 21
Initial Screening – FERC
• Connected to CYME DB and enterprise DB
© 2013 Eaton Corporation. All rights reserved.
CYME DG Screening Tool
© 2013 Eaton, All Rights Reserved.
CYME Products and Services Overview
Best-in-Class System Analysis Tools and Services From Transmission to Distribution to Industrial
Power Engineering
Software
Integration Projects and Solutions Operations Solutions
Decision Support
for Network
Planning Analysis Engineering Consulting Services
Decision Support
for Real-Time
Applications
State Estimator
DG Impacts
Reliability
Harmonics
Volt/PF optimization
CYME Power System Analysis
Distribution
Transmission
Industrial
CYMCAP Cables
CYMTCC Protection
CYMGRD Substation Grounding
web
Utility
.
CYME
Network Model
DMS
Volt/Var Control
Feeder
Automation
Studies & Services
CYME Gateway
CYME Server
GIS
SCADA
OMS
AMI
9© 2012 Eaton Corporation. All rights reserved.
CYME DG Screening Tool
NEW
CYME DG
Screening Tool
CYME
CYME
DG Screening
Database
DGSimulation
Study
Distribution Engineer’s Desktop
CYME Server
DG Applications
Server
CYME
Database
Network Model
Application Architecture
• Based on CYME Server and CYME DB
• New DB for DG Screening application
10© 2012 Eaton Corporation. All rights reserved.
Pre-Application
Screens a-d
a. Total Capacity (MW) of substation/area bus or bank and circuit
b. Allocated Capacity (MW) of substation/area bus or bank and circuit
c. Queued Capacity (MW) of substation/area bus or bank and circuit
d. Available Capacity (MW) of substation/area bus or bank and circuit
Summary – Screens a,b,c,d
Device A (MW) B (MW) C (MW) D (MW)
Bank 50.5 15.4 28.1 7.0
Breaker 9.5 3.2 5.6 0.7
11© 2012 Eaton Corporation. All rights reserved.
Pre-Application
Screens e-I
e. Substation nominal distribution voltage (e.g. 12 kV)
f. Nominal distribution circuit voltage (e.g. 12 kV)
g. Approximate circuit distance between the proposed site and the substation.
(e.g. 56,000 ft)
h. Relevant Line Section(s) peak load estimate, and minimum load data, when
available.
i. Number of protective devices and number of voltage regulating devices
between the proposed site and the substation/area. (e.g. 3 Protective Devices
and 1 regulating devices)
Device Peak (kW) Min (kW)
Bank 5,200 3,800
Breaker 2,500 1,000
Fuse 185 45
12© 2012 Eaton Corporation. All rights reserved.
Pre-Application
Screens j-l
j. Whether or not three-phase power is
available at the site. (e.g. No)
k. Limiting conductor rating from proposed
Point of Interconnection to distribution
substation. (e.g. 120 Amps)
l. Based on proposed Point of Interconnection,
existing or known constraints such as, but
not limited to, electrical dependencies at that
location, short circuit interrupting capacity
issues, power quality or stability issues on
the circuit, capacity constraints, or
secondary networks. (e.g. Existent
Synchronous machines)
13© 2012 Eaton Corporation. All rights reserved.
Pre-Application
Report
• Automated
• WORD Format
• Customizable
14© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
CYME DG Interconnection Application
California Rule-21
• Dashboard
• Step-by-Step
• Colors
• Pass – Green
• Failed – Red
• Arrows to guide
through screens
15© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
DG Application
Properties
- Project General Info
- Nominal Ratings
- Feeder and Bank Id
- Installation Type
- Dates
16© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Global Parameters
- FERC Limits
- Rule 21 Limits
- All limits are then user-
defined
- Default values are
found in FERC and
Rule 21 documentation
17© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
DG List Manager
- Retrieved from enterprise database
- Status – Active, Widthdrawn…
- Possibility of adding projects (DG)
18© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Pre-Screens – 1 through 4
• Screens 1-4
• Screen 1: Complete/Valid Interconnection Request
• Checks if DB connection and data is correct
• Screen 2: Does the Applicant choose to go directly to
Detailed Studies? Yes or No
• Screen 3: Non Export/Net Energy Metering (NEM) or
Export?
• Screen 4: Fast Track Eligibility
19© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Initial Review – A through H
• If Screens A through H fails, solutions to mitigate the
impact of failed screens:
• Replace an overloaded distribution transformer
• Replace overloaded secondary conductors
• If no quick solutions can be adopted, then
supplemental review is required
20© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Initial Review – A through H
• Screen A : Is the PCC on a Network Secondary
System. Yes or No
• Screen B: Is Certified Equipment used? Yes or No
• Screen C: Is the Starting Voltage Drop within
acceptable limits?
• Calculation for Induction Machines based on Starting In-
Rush current vs. Nominal Transformer Current
• Screen D: Transformer Rating
• Compares transformer rating with aggregated gross
nameplate rating of the installation
21© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Initial Review – A through H
• Screen E : Does the Single-Phase Generator cause
unacceptable imbalance? Yes or No
• Screen F: Is the Short Circuit Current Contribution
Ratio within acceptable limits?
• Short-Circuit Current Ratio (SSCR) Calculation
Where SCCR (%) = Short Circuit Contribution of DG / Short Circuit Current at PCC
22© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Initial Review – A through H
• Screen G : Is the Short Circuit Interrupting Capability
Exceeded?
• Screen H : Is the line configuration compatible with the
Interconnection type?
Primary Distribution
Line Type
Type of Interconnection to
Primary Distribution Line
Result/Criteria
Three-phase,
three wire
3-phase or single phase, phase-
to-phase
Pass screen
Three-phase,
four wire
Effectively-grounded 3 phase or
Single-phase, line-to-neutral
Pass screen
Three-phase,
four wire
All Others To Pass, aggregate DG Capacity must be
less than or equal to 10% of Line Section
Peak Load
23© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Quick Review
Continue the Initial Review
or
Go to Supplemental Review
24© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Initial Review – I through M
• Screen I : Will power be exported across the PCC?
If no, Generating Facility must incorporate one of the following:
• Reverse Power Protection
• Minimum Power Protection
• Certified Non-Islanding Protection
• Relative Generating Facility Rating
• Inadvertent Export
• Screen J : Is the Gross Rating of the Generating
Facility 11 kVA or less?
25© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Initial Review – I through M
• Screen K : Is NEM project whose nameplate capacity is <=
500kW?
• Screen L : Transmission Dependency and Transmission
Stability Test. Yes or No
• Screen M: Is the aggregate Generating Facility capacity on the
Line Section less than 15% of Line Section peak load for all line
sections bounded by automatic sectionalizing devices?
26© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Supplemental Review – N through P
• Screen N : Penetration Test
• Similar to test M
• Screen O : Power Quality and Voltage Tests
• A) Voltage regulation
• B) Voltage fluctuation/flicker under limits IEEE 1453
• C) Harmonics levels meets IEEE 519 limits
• Screen P: Safety and Reliability Tests
• 1. Generation energy source
• 2. Modes of synchronization
• 3. Unique system topology
• 4. Possible impacts to critical load customers
27© 2012 Eaton Corporation. All rights reserved.
GIP California Rule 21
Report
• Automated
• WORD Format
• Customizable
• 10-12 page report
• Introduction
• Project Information
• Initial Review Process
• Summary
• Required Information to
conduct a supp. Review
• Next Steps
28© 2012 Eaton Corporation. All rights reserved.
GIP FERC
CYME DG Interconnection Application
FERC
• Dashboard
• Step-by-Step
• Colors
• Pass – Green
• Failed – Red
29© 2012 Eaton Corporation. All rights reserved.
GIP FERC
CYME DG Interconnection Application-FERC
• Similar to California Rule 21
• DG Application Properties
• Global Parameters
• DG List Manager
• Differences with California Rule 21
• Labels and screens title
• Global parameters default values
30© 2012 Eaton Corporation. All rights reserved.
GIP FERC
Initial Review – 1 through 10
• Screen 1: Complete/Valid Interconnection Request
Same as Screen 1 of Rule 21
• Screen 2: Aggregate generation <= 15% of line
section peak load? Same as Screen M of Rule 21
• Screen 3: Is the PCC on a Network Secondary
System. Same as Screen A of Rule 21
• Screen 4: Is the Short Circuit Current Contribution
Ratio within acceptable limits? Same as Screen F of Rule 21
• Screen 5: Is the Short Circuit Interrupting Capability
Exceeded? Same as Screen G of Rule 21
31© 2012 Eaton Corporation. All rights reserved.
GIP FERC
Initial Review – 1 through 10
• Screen 6: Is the line configuration compatible with the
Interconnection type? Same as Screen H of Rule 21
• Screen 7: Single Phase Generating Facility <=
20kW? Similar as Screen J of Rule 21 (only for single phase)
• Screen 8: Single Phase Generator with Center Tap ?
For single phase generator,
comparison with gross nameplate
rating with distribution transformer
nameplate rating. The ratio must
be less than maximum distribution
transformer nameplate rating ratio
32© 2012 Eaton Corporation. All rights reserved.
GIP FERC
Initial Review – 1 through 10
• Screen 9: Aggregate Generating Facility at
Transmission <= 10MW
• Screen 10: No Construction of Facility Required
Comparison with gross nameplate
rating with maximum aggregate
generating facilities at
transmission.
33© 2012 Eaton Corporation. All rights reserved.
GIP FERC
Report
• Automated
• WORD Format
• Customizable
• 10-12 page report
• Introduction
• Project Information
• Initial Review Process
• Summary
• Required Information to
conduct a supp. Review
• Next Steps
34© 2012 Eaton Corporation. All rights reserved.
Conclusion
CYME DG Screening Tool
• New software desktop application
• Facilitate generator interconnection review
• Connected to CYME DB through CYME Server
• Customize enterprise DB connection
35© 2012 Eaton Corporation. All rights reserved.
Q&A / Discussion

More Related Content

What's hot

Reverse engineering
Reverse  engineeringReverse  engineering
Reverse engineeringYuffie Valen
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary Amr Miqdadi
 
ITIL Service Operation 2011
ITIL Service Operation 2011ITIL Service Operation 2011
ITIL Service Operation 2011Marvin Sirait
 
Project Tracker App - Model Driven Apps
Project Tracker App - Model Driven AppsProject Tracker App - Model Driven Apps
Project Tracker App - Model Driven AppsSachchin Annam
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration ManagementArunnima B S
 
Reliability growth models for quality management
Reliability growth models for quality managementReliability growth models for quality management
Reliability growth models for quality managementRoy Antony Arnold G
 
SDPM - Lecture 9 - Managing people and organizing teams
SDPM - Lecture 9 - Managing people and organizing teamsSDPM - Lecture 9 - Managing people and organizing teams
SDPM - Lecture 9 - Managing people and organizing teamsOpenLearningLab
 
Itil v3 release and deployment management
Itil v3 release and deployment managementItil v3 release and deployment management
Itil v3 release and deployment managementkunaljoy11
 
Agenda for Project Status Meeting
Agenda for Project Status MeetingAgenda for Project Status Meeting
Agenda for Project Status Meetingdmdk12
 
Application Management Framework
Application Management FrameworkApplication Management Framework
Application Management FrameworkRory Mackay
 
Production-Cutover-Strategy1-1qvnpnh.ppt
Production-Cutover-Strategy1-1qvnpnh.pptProduction-Cutover-Strategy1-1qvnpnh.ppt
Production-Cutover-Strategy1-1qvnpnh.pptJohnRichard90
 
Requirement change management
Requirement change managementRequirement change management
Requirement change managementAbdul Basit
 
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre..."Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...SN Panigrahi, PMP
 
ITIL Foundation V2 200 Sample Questions
ITIL Foundation V2 200 Sample QuestionsITIL Foundation V2 200 Sample Questions
ITIL Foundation V2 200 Sample QuestionsRoberto Pena
 

What's hot (20)

Reverse engineering
Reverse  engineeringReverse  engineering
Reverse engineering
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary
 
ITIL Service Operation 2011
ITIL Service Operation 2011ITIL Service Operation 2011
ITIL Service Operation 2011
 
Project Tracker App - Model Driven Apps
Project Tracker App - Model Driven AppsProject Tracker App - Model Driven Apps
Project Tracker App - Model Driven Apps
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
 
Agile model
Agile modelAgile model
Agile model
 
Reliability growth models for quality management
Reliability growth models for quality managementReliability growth models for quality management
Reliability growth models for quality management
 
Kick Off Meeting Presentation
Kick Off Meeting PresentationKick Off Meeting Presentation
Kick Off Meeting Presentation
 
Requirements Engineering
Requirements EngineeringRequirements Engineering
Requirements Engineering
 
SDPM - Lecture 9 - Managing people and organizing teams
SDPM - Lecture 9 - Managing people and organizing teamsSDPM - Lecture 9 - Managing people and organizing teams
SDPM - Lecture 9 - Managing people and organizing teams
 
Itil v3 release and deployment management
Itil v3 release and deployment managementItil v3 release and deployment management
Itil v3 release and deployment management
 
Agenda for Project Status Meeting
Agenda for Project Status MeetingAgenda for Project Status Meeting
Agenda for Project Status Meeting
 
Application Management Framework
Application Management FrameworkApplication Management Framework
Application Management Framework
 
Production-Cutover-Strategy1-1qvnpnh.ppt
Production-Cutover-Strategy1-1qvnpnh.pptProduction-Cutover-Strategy1-1qvnpnh.ppt
Production-Cutover-Strategy1-1qvnpnh.ppt
 
Embedded C
Embedded CEmbedded C
Embedded C
 
Cc unit 3 updated version
Cc unit 3 updated versionCc unit 3 updated version
Cc unit 3 updated version
 
Case tools
Case tools Case tools
Case tools
 
Requirement change management
Requirement change managementRequirement change management
Requirement change management
 
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre..."Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
"Project Management Concepts - Ready Reckoner" By SN Panigrahi, A QUick Refre...
 
ITIL Foundation V2 200 Sample Questions
ITIL Foundation V2 200 Sample QuestionsITIL Foundation V2 200 Sample Questions
ITIL Foundation V2 200 Sample Questions
 

Viewers also liked

Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)open-e
 
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...idescitation
 
Power quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSPower quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSMOHANASUNDARAM ANTHONY
 

Viewers also liked (20)

2014 PV Distribution System Modeling Workshop: IEEE Test Feeders for Advanced...
2014 PV Distribution System Modeling Workshop: IEEE Test Feeders for Advanced...2014 PV Distribution System Modeling Workshop: IEEE Test Feeders for Advanced...
2014 PV Distribution System Modeling Workshop: IEEE Test Feeders for Advanced...
 
11 reno sandia_dgi_reno_sand2016-4701 pe
11 reno sandia_dgi_reno_sand2016-4701 pe11 reno sandia_dgi_reno_sand2016-4701 pe
11 reno sandia_dgi_reno_sand2016-4701 pe
 
17 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v117 mohit epri-sandia symposium_v1
17 mohit epri-sandia symposium_v1
 
5.1_Empowering Clean Energy_Nasle_EPRI/SNL Microgrid
5.1_Empowering Clean Energy_Nasle_EPRI/SNL Microgrid5.1_Empowering Clean Energy_Nasle_EPRI/SNL Microgrid
5.1_Empowering Clean Energy_Nasle_EPRI/SNL Microgrid
 
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
Open-E DSS V7 Active-Active Load Balanced iSCSI HA Cluster (without bonding)
 
2014 PV Distribution System Modeling Workshop: Modeling as a Community with M...
2014 PV Distribution System Modeling Workshop: Modeling as a Community with M...2014 PV Distribution System Modeling Workshop: Modeling as a Community with M...
2014 PV Distribution System Modeling Workshop: Modeling as a Community with M...
 
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
Modeling and Simulation of Wind Energy Conversion System Interconnected with ...
 
2014 PV Distribution System Modeling Workshop: Interaction and Coordination w...
2014 PV Distribution System Modeling Workshop: Interaction and Coordination w...2014 PV Distribution System Modeling Workshop: Interaction and Coordination w...
2014 PV Distribution System Modeling Workshop: Interaction and Coordination w...
 
Dishant ppt
Dishant pptDishant ppt
Dishant ppt
 
2014 PV Distribution System Modeling Workshop: Modeling Effective Grounding f...
2014 PV Distribution System Modeling Workshop: Modeling Effective Grounding f...2014 PV Distribution System Modeling Workshop: Modeling Effective Grounding f...
2014 PV Distribution System Modeling Workshop: Modeling Effective Grounding f...
 
4.2_Microgrid Design Toolkit_Eddy_EPRI/SNL Microgrid
4.2_Microgrid Design Toolkit_Eddy_EPRI/SNL Microgrid4.2_Microgrid Design Toolkit_Eddy_EPRI/SNL Microgrid
4.2_Microgrid Design Toolkit_Eddy_EPRI/SNL Microgrid
 
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
2014 PV Distribution System Modeling Workshop: Determining Recommended Settin...
 
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
4.4_Micro Grid Design_Bello_EPRI/SNL Microgrid
 
Power quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUSPower quality unit i ANNA UNIVERSITY SYALLABUS
Power quality unit i ANNA UNIVERSITY SYALLABUS
 
2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
2014 PV Distribution System Modeling Workshop: Hosting Capacity Analysis and ...
 
4.1_Simulation & Analysis Tools for Microgrids_Weng and Cortes_EPRI/SNL Micro...
4.1_Simulation & Analysis Tools for Microgrids_Weng and Cortes_EPRI/SNL Micro...4.1_Simulation & Analysis Tools for Microgrids_Weng and Cortes_EPRI/SNL Micro...
4.1_Simulation & Analysis Tools for Microgrids_Weng and Cortes_EPRI/SNL Micro...
 
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
2014 PV Distribution System Modeling Workshop: Data and Models for High Penet...
 
3.5_Microgrid Market Operations with Distribution System Operators_Shahidehpo...
3.5_Microgrid Market Operations with Distribution System Operators_Shahidehpo...3.5_Microgrid Market Operations with Distribution System Operators_Shahidehpo...
3.5_Microgrid Market Operations with Distribution System Operators_Shahidehpo...
 
ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
 
Paper battery in IEEE format
Paper battery in IEEE formatPaper battery in IEEE format
Paper battery in IEEE format
 

Similar to 2014 PV Distribution System Modeling Workshop: DG Screening Tool: Jean-Sebastien Lacroix, CYME

Local Generation Workshop - Powering Sydney
Local Generation Workshop - Powering SydneyLocal Generation Workshop - Powering Sydney
Local Generation Workshop - Powering SydneyTransGrid AU
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_oAllan Lewis
 
vss102_lewis_2015_o
vss102_lewis_2015_ovss102_lewis_2015_o
vss102_lewis_2015_oAllan Lewis
 
vss102_lewis_2014_o
vss102_lewis_2014_ovss102_lewis_2014_o
vss102_lewis_2014_oAllan Lewis
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringAnil Kumar Bohra
 
Day-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challDay-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challIPPAI
 
Navigating I T
Navigating I  TNavigating I  T
Navigating I Trpeters
 
Navigating Interconnecion and Transmission in the Major US Markets
Navigating Interconnecion and Transmission in the Major US MarketsNavigating Interconnecion and Transmission in the Major US Markets
Navigating Interconnecion and Transmission in the Major US Marketsbrokish
 
Draft Article - V1
Draft Article - V1Draft Article - V1
Draft Article - V1Ajay Nanda
 
Agent based Load Management for Microgrid
Agent based Load Management for MicrogridAgent based Load Management for Microgrid
Agent based Load Management for MicrogridMohamed Abbas
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerSchneider Electric
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfJose Morales
 
Its bordeuax 2015_pr09_ombach_qualcom
Its bordeuax 2015_pr09_ombach_qualcomIts bordeuax 2015_pr09_ombach_qualcom
Its bordeuax 2015_pr09_ombach_qualcomGrzegorzOmbach
 
IRJET- Control for Grid Connected and Intentional Islanding Operation of ...
IRJET-  	  Control for Grid Connected and Intentional Islanding Operation of ...IRJET-  	  Control for Grid Connected and Intentional Islanding Operation of ...
IRJET- Control for Grid Connected and Intentional Islanding Operation of ...IRJET Journal
 

Similar to 2014 PV Distribution System Modeling Workshop: DG Screening Tool: Jean-Sebastien Lacroix, CYME (20)

Local Generation Workshop - Powering Sydney
Local Generation Workshop - Powering SydneyLocal Generation Workshop - Powering Sydney
Local Generation Workshop - Powering Sydney
 
vss102_lewis_2013_o
vss102_lewis_2013_ovss102_lewis_2013_o
vss102_lewis_2013_o
 
vss102_lewis_2015_o
vss102_lewis_2015_ovss102_lewis_2015_o
vss102_lewis_2015_o
 
12 dessai epri sandia - pge vvo pilot
12 dessai epri sandia - pge vvo pilot12 dessai epri sandia - pge vvo pilot
12 dessai epri sandia - pge vvo pilot
 
vss102_lewis_2014_o
vss102_lewis_2014_ovss102_lewis_2014_o
vss102_lewis_2014_o
 
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net MeteringPresentation by A. K. Bohra on Issues & Challenges in Net Metering
Presentation by A. K. Bohra on Issues & Challenges in Net Metering
 
seminar1.ppt
seminar1.pptseminar1.ppt
seminar1.ppt
 
Sgcp13ansell
Sgcp13ansellSgcp13ansell
Sgcp13ansell
 
Day-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans challDay-3, Mr. Devendra Chaudhry trans chall
Day-3, Mr. Devendra Chaudhry trans chall
 
Navigating I T
Navigating I  TNavigating I  T
Navigating I T
 
Navigating Interconnecion and Transmission in the Major US Markets
Navigating Interconnecion and Transmission in the Major US MarketsNavigating Interconnecion and Transmission in the Major US Markets
Navigating Interconnecion and Transmission in the Major US Markets
 
Draft Article - V1
Draft Article - V1Draft Article - V1
Draft Article - V1
 
IPA Power Scotland Conference
IPA Power Scotland ConferenceIPA Power Scotland Conference
IPA Power Scotland Conference
 
Agent based Load Management for Microgrid
Agent based Load Management for MicrogridAgent based Load Management for Microgrid
Agent based Load Management for Microgrid
 
Microgrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & powerMicrogrid & renewable integration at burbank water & power
Microgrid & renewable integration at burbank water & power
 
coned-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdfconed-presentation-in-pdf-final.pdf
coned-presentation-in-pdf-final.pdf
 
Its bordeuax 2015_pr09_ombach_qualcom
Its bordeuax 2015_pr09_ombach_qualcomIts bordeuax 2015_pr09_ombach_qualcom
Its bordeuax 2015_pr09_ombach_qualcom
 
Standards for Autonomous and Secure Microgrids
Standards for Autonomous and Secure Microgrids 	Standards for Autonomous and Secure Microgrids
Standards for Autonomous and Secure Microgrids
 
Emerging Tech Speed Pitch
Emerging Tech Speed PitchEmerging Tech Speed Pitch
Emerging Tech Speed Pitch
 
IRJET- Control for Grid Connected and Intentional Islanding Operation of ...
IRJET-  	  Control for Grid Connected and Intentional Islanding Operation of ...IRJET-  	  Control for Grid Connected and Intentional Islanding Operation of ...
IRJET- Control for Grid Connected and Intentional Islanding Operation of ...
 

More from Sandia National Laboratories: Energy & Climate: Renewables

More from Sandia National Laboratories: Energy & Climate: Renewables (20)

M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339rM4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
M4 sf 18sn010303061 8th us german 020918 lac reduced sand2018-1339r
 
Sand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lacSand2018 0581 o metadata for presentations 011918 lac
Sand2018 0581 o metadata for presentations 011918 lac
 
11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt11 Testing Shear Strength and Deformation along Discontinuities in Salt
11 Testing Shear Strength and Deformation along Discontinuities in Salt
 
10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS10 Current status of research in the Joint Project WEIMOS
10 Current status of research in the Joint Project WEIMOS
 
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...26 Current research on deep borehole disposal of nuclear spent fuel and high-...
26 Current research on deep borehole disposal of nuclear spent fuel and high-...
 
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
 
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
 
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
23 Sandia’s Salt Design Concept for High Level Waste and Defense Spent Nuclea...
 
22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety22 WIPP Future Advancements and Operational Safety
22 WIPP Future Advancements and Operational Safety
 
21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety
 
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
20 EPA Review of DOE’s 2014 Compliance Recertification Application for WIPP
 
19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project19 Repository designs in bedded salt, the KOSINA-Project
19 Repository designs in bedded salt, the KOSINA-Project
 
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
18 Interaction between Operational Safety and Long-Term Safety (Project BASEL)
 
17 Salt Reconsolidation
17 Salt Reconsolidation17 Salt Reconsolidation
17 Salt Reconsolidation
 
16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)16 Reconsolidation of granular salt (DAEF report)
16 Reconsolidation of granular salt (DAEF report)
 
15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project15 Outcome of the Repoperm Project
15 Outcome of the Repoperm Project
 
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
14 Radiological Consequences Analysis for a HLW Repository in Bedded Salt in ...
 
13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...13 "New results of the KOSINA project - Generic geological models / Integrity...
13 "New results of the KOSINA project - Generic geological models / Integrity...
 
12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data12 Salt testing: Low deviatoric stress data
12 Salt testing: Low deviatoric stress data
 
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress09 Invited Lecture: Salt Creep at Low Deviatoric Stress
09 Invited Lecture: Salt Creep at Low Deviatoric Stress
 

Recently uploaded

call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfCharlynTorres1
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...saminamagar
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25JSchaus & Associates
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxTechSoupConnectLondo
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Christina Parmionova
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 

Recently uploaded (20)

call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.Earth Day 2024 - AMC "COMMON GROUND'' movie night.
Earth Day 2024 - AMC "COMMON GROUND'' movie night.
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...call girls in DLF Phase 1  gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
call girls in DLF Phase 1 gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝...
 
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Kirti Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25
 
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Narela DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
How to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptxHow to design healthy team dynamics to deliver successful digital projects.pptx
How to design healthy team dynamics to deliver successful digital projects.pptx
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...Enhancing Indigenous Peoples' right to self-determination in the context of t...
Enhancing Indigenous Peoples' right to self-determination in the context of t...
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 

2014 PV Distribution System Modeling Workshop: DG Screening Tool: Jean-Sebastien Lacroix, CYME

  • 1. 1© 2012 Eaton Corporation. All rights reserved. CYME Distributed Generation Screening Tool PV Distribution System Modeling Workshop May 6th, 2013. Jean-Sébastien Lacroix ing./Eng.
  • 2. 2© 2012 Eaton Corporation. All rights reserved. Agenda • Utility Context • CYME DG Screening Tool • Pre-Application • Generator Interconnection Procedures (GIP) • California Rule-21 (Fast Track) • Federal Energy Regulatory Commission (FERC) • DG Screening Tool Demo • Conclusion
  • 3. 3© 2012 Eaton Corporation. All rights reserved. Utility Context Renewables Energy Facts • California Objective – 33% Renewables by 2020 • California Solar Initiative – 3 GW of PV by 2017 • Over 17 000 Solar Rooftops (130 MW) • Over 1.5 GW for SDG&E • More than 1000 PV interconnection applications in California, Hawaii and New Jersey each month Net Energy Metering Program • Over 120,000 residential and non-residential accounts enrolled in California's NEM program (< 1 MW)
  • 4. 4© 2012 Eaton Corporation. All rights reserved. Utility Context Interconnection Procedures Standard • In 1999, the California Public Utilities Commission (CPUC) adopted the Rule 21 to increase the efficiency of the review of small generation interconnection. Revised in 2012 • In 2003, IEEE-1547 Standard for Interconnection of Distributed Resources with Power Systems • In 2005, FERC adopted small generation interconnection procedures called the Small Generator Interconnection Procedures (SGIP).
  • 5. 5© 2012 Eaton Corporation. All rights reserved. Utility Context Interconnection Procedures Flow Example • Step 1 – Pre-Application Report Request • Step 2 – Pre-Application Report • Step 3 – Interconnection Request Process Study Process - Fast Track Non Exporting/Net Energy Metered Exporting < 3 MW on a 12kV system Detailed Study Process Large impact on grid is anticipated Projects that have failed in Fast Track • Step 4 – Application Review & Initial Review • Step 5 – Supplemental Review & Detail Interconnection Study • Step 6 – Generating Facility Interconnection Agreement • Step 7 – Execution of the Generator Inter. Agreement
  • 6. 6© 2012 Eaton Corporation. All rights reserved. Utility Context Proposed IT Solution • New Window Desktop Application • Dashboard-type interface • Manages and assesses various DG interconnection requests • Three Types of Screening Pre-Application Initial Screening – California Rule 21 Initial Screening – FERC • Connected to CYME DB and enterprise DB
  • 7. © 2013 Eaton Corporation. All rights reserved. CYME DG Screening Tool
  • 8. © 2013 Eaton, All Rights Reserved. CYME Products and Services Overview Best-in-Class System Analysis Tools and Services From Transmission to Distribution to Industrial Power Engineering Software Integration Projects and Solutions Operations Solutions Decision Support for Network Planning Analysis Engineering Consulting Services Decision Support for Real-Time Applications State Estimator DG Impacts Reliability Harmonics Volt/PF optimization CYME Power System Analysis Distribution Transmission Industrial CYMCAP Cables CYMTCC Protection CYMGRD Substation Grounding web Utility . CYME Network Model DMS Volt/Var Control Feeder Automation Studies & Services CYME Gateway CYME Server GIS SCADA OMS AMI
  • 9. 9© 2012 Eaton Corporation. All rights reserved. CYME DG Screening Tool NEW CYME DG Screening Tool CYME CYME DG Screening Database DGSimulation Study Distribution Engineer’s Desktop CYME Server DG Applications Server CYME Database Network Model Application Architecture • Based on CYME Server and CYME DB • New DB for DG Screening application
  • 10. 10© 2012 Eaton Corporation. All rights reserved. Pre-Application Screens a-d a. Total Capacity (MW) of substation/area bus or bank and circuit b. Allocated Capacity (MW) of substation/area bus or bank and circuit c. Queued Capacity (MW) of substation/area bus or bank and circuit d. Available Capacity (MW) of substation/area bus or bank and circuit Summary – Screens a,b,c,d Device A (MW) B (MW) C (MW) D (MW) Bank 50.5 15.4 28.1 7.0 Breaker 9.5 3.2 5.6 0.7
  • 11. 11© 2012 Eaton Corporation. All rights reserved. Pre-Application Screens e-I e. Substation nominal distribution voltage (e.g. 12 kV) f. Nominal distribution circuit voltage (e.g. 12 kV) g. Approximate circuit distance between the proposed site and the substation. (e.g. 56,000 ft) h. Relevant Line Section(s) peak load estimate, and minimum load data, when available. i. Number of protective devices and number of voltage regulating devices between the proposed site and the substation/area. (e.g. 3 Protective Devices and 1 regulating devices) Device Peak (kW) Min (kW) Bank 5,200 3,800 Breaker 2,500 1,000 Fuse 185 45
  • 12. 12© 2012 Eaton Corporation. All rights reserved. Pre-Application Screens j-l j. Whether or not three-phase power is available at the site. (e.g. No) k. Limiting conductor rating from proposed Point of Interconnection to distribution substation. (e.g. 120 Amps) l. Based on proposed Point of Interconnection, existing or known constraints such as, but not limited to, electrical dependencies at that location, short circuit interrupting capacity issues, power quality or stability issues on the circuit, capacity constraints, or secondary networks. (e.g. Existent Synchronous machines)
  • 13. 13© 2012 Eaton Corporation. All rights reserved. Pre-Application Report • Automated • WORD Format • Customizable
  • 14. 14© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 CYME DG Interconnection Application California Rule-21 • Dashboard • Step-by-Step • Colors • Pass – Green • Failed – Red • Arrows to guide through screens
  • 15. 15© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 DG Application Properties - Project General Info - Nominal Ratings - Feeder and Bank Id - Installation Type - Dates
  • 16. 16© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Global Parameters - FERC Limits - Rule 21 Limits - All limits are then user- defined - Default values are found in FERC and Rule 21 documentation
  • 17. 17© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 DG List Manager - Retrieved from enterprise database - Status – Active, Widthdrawn… - Possibility of adding projects (DG)
  • 18. 18© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Pre-Screens – 1 through 4 • Screens 1-4 • Screen 1: Complete/Valid Interconnection Request • Checks if DB connection and data is correct • Screen 2: Does the Applicant choose to go directly to Detailed Studies? Yes or No • Screen 3: Non Export/Net Energy Metering (NEM) or Export? • Screen 4: Fast Track Eligibility
  • 19. 19© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Initial Review – A through H • If Screens A through H fails, solutions to mitigate the impact of failed screens: • Replace an overloaded distribution transformer • Replace overloaded secondary conductors • If no quick solutions can be adopted, then supplemental review is required
  • 20. 20© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Initial Review – A through H • Screen A : Is the PCC on a Network Secondary System. Yes or No • Screen B: Is Certified Equipment used? Yes or No • Screen C: Is the Starting Voltage Drop within acceptable limits? • Calculation for Induction Machines based on Starting In- Rush current vs. Nominal Transformer Current • Screen D: Transformer Rating • Compares transformer rating with aggregated gross nameplate rating of the installation
  • 21. 21© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Initial Review – A through H • Screen E : Does the Single-Phase Generator cause unacceptable imbalance? Yes or No • Screen F: Is the Short Circuit Current Contribution Ratio within acceptable limits? • Short-Circuit Current Ratio (SSCR) Calculation Where SCCR (%) = Short Circuit Contribution of DG / Short Circuit Current at PCC
  • 22. 22© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Initial Review – A through H • Screen G : Is the Short Circuit Interrupting Capability Exceeded? • Screen H : Is the line configuration compatible with the Interconnection type? Primary Distribution Line Type Type of Interconnection to Primary Distribution Line Result/Criteria Three-phase, three wire 3-phase or single phase, phase- to-phase Pass screen Three-phase, four wire Effectively-grounded 3 phase or Single-phase, line-to-neutral Pass screen Three-phase, four wire All Others To Pass, aggregate DG Capacity must be less than or equal to 10% of Line Section Peak Load
  • 23. 23© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Quick Review Continue the Initial Review or Go to Supplemental Review
  • 24. 24© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Initial Review – I through M • Screen I : Will power be exported across the PCC? If no, Generating Facility must incorporate one of the following: • Reverse Power Protection • Minimum Power Protection • Certified Non-Islanding Protection • Relative Generating Facility Rating • Inadvertent Export • Screen J : Is the Gross Rating of the Generating Facility 11 kVA or less?
  • 25. 25© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Initial Review – I through M • Screen K : Is NEM project whose nameplate capacity is <= 500kW? • Screen L : Transmission Dependency and Transmission Stability Test. Yes or No • Screen M: Is the aggregate Generating Facility capacity on the Line Section less than 15% of Line Section peak load for all line sections bounded by automatic sectionalizing devices?
  • 26. 26© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Supplemental Review – N through P • Screen N : Penetration Test • Similar to test M • Screen O : Power Quality and Voltage Tests • A) Voltage regulation • B) Voltage fluctuation/flicker under limits IEEE 1453 • C) Harmonics levels meets IEEE 519 limits • Screen P: Safety and Reliability Tests • 1. Generation energy source • 2. Modes of synchronization • 3. Unique system topology • 4. Possible impacts to critical load customers
  • 27. 27© 2012 Eaton Corporation. All rights reserved. GIP California Rule 21 Report • Automated • WORD Format • Customizable • 10-12 page report • Introduction • Project Information • Initial Review Process • Summary • Required Information to conduct a supp. Review • Next Steps
  • 28. 28© 2012 Eaton Corporation. All rights reserved. GIP FERC CYME DG Interconnection Application FERC • Dashboard • Step-by-Step • Colors • Pass – Green • Failed – Red
  • 29. 29© 2012 Eaton Corporation. All rights reserved. GIP FERC CYME DG Interconnection Application-FERC • Similar to California Rule 21 • DG Application Properties • Global Parameters • DG List Manager • Differences with California Rule 21 • Labels and screens title • Global parameters default values
  • 30. 30© 2012 Eaton Corporation. All rights reserved. GIP FERC Initial Review – 1 through 10 • Screen 1: Complete/Valid Interconnection Request Same as Screen 1 of Rule 21 • Screen 2: Aggregate generation <= 15% of line section peak load? Same as Screen M of Rule 21 • Screen 3: Is the PCC on a Network Secondary System. Same as Screen A of Rule 21 • Screen 4: Is the Short Circuit Current Contribution Ratio within acceptable limits? Same as Screen F of Rule 21 • Screen 5: Is the Short Circuit Interrupting Capability Exceeded? Same as Screen G of Rule 21
  • 31. 31© 2012 Eaton Corporation. All rights reserved. GIP FERC Initial Review – 1 through 10 • Screen 6: Is the line configuration compatible with the Interconnection type? Same as Screen H of Rule 21 • Screen 7: Single Phase Generating Facility <= 20kW? Similar as Screen J of Rule 21 (only for single phase) • Screen 8: Single Phase Generator with Center Tap ? For single phase generator, comparison with gross nameplate rating with distribution transformer nameplate rating. The ratio must be less than maximum distribution transformer nameplate rating ratio
  • 32. 32© 2012 Eaton Corporation. All rights reserved. GIP FERC Initial Review – 1 through 10 • Screen 9: Aggregate Generating Facility at Transmission <= 10MW • Screen 10: No Construction of Facility Required Comparison with gross nameplate rating with maximum aggregate generating facilities at transmission.
  • 33. 33© 2012 Eaton Corporation. All rights reserved. GIP FERC Report • Automated • WORD Format • Customizable • 10-12 page report • Introduction • Project Information • Initial Review Process • Summary • Required Information to conduct a supp. Review • Next Steps
  • 34. 34© 2012 Eaton Corporation. All rights reserved. Conclusion CYME DG Screening Tool • New software desktop application • Facilitate generator interconnection review • Connected to CYME DB through CYME Server • Customize enterprise DB connection
  • 35. 35© 2012 Eaton Corporation. All rights reserved. Q&A / Discussion