SOLAR POWER
OPPORTUNITIES IN THE
PHILIPPINES
RUTH P BRIONES
Chairman/CEO, Greenergy Solutions Inc.
TOPICS
 Assessment of Philippines’s solar energy potential
 Best practice examples of solar generation and investment

returns in the Philippines
 Outlining the project application process to secure approval
 Foreign investment opportunities and project finance
PART I:
Assessment of the Philippine
Solar Energy Potential
4

Solar Energy Potential in Asia

PHILIPPINES: 4.5-5.0 kWh/m2/day
5

The Renewable Energy Map Potential in the Philippines

LUZON

VISAYAS

MINDANAO
6

Sites/ Areas
with solar
energy
Potentials in
the Philippines
792,147,408 MWhr/year
Rank No 68 globally, 2008
Second country in Southeast
Asia in terms of irradiation
and insolation.
Solar irradiation: 1900
kilowatts a square meter
7

Solar Energy
Investment
Potential
for the
Philippines

SECOND COUNTRY
IN ASIAIRRADIATION AND
ISOLATION

PHILIIPPINES

Most
comprehensive
Renewable Energy
Law in Asia

Has all the foundation to
become a renewable
energy leader in the region
owing to the strong semiconductor industry and the
manpower base
8

Solar Energy projects registered under
DOE as of December 2013
AWARDED SOLAR PROJECTS

PENDING PROJECTS UNDER RE
LAW

GRID USE

56

GRID USE

4

OWN USE

5

33.0 MW

POTENTIAL
CAPACITY
 Grid use
 Own use

POTENTIAL
CAPACITY

1,012.0 MW
1.594 MW
PART II.
Best practice examples of solar
generation and investment
returns in the Philippines
10

Best practice examples of solar generation
and investment returns in the Philippines
Asian Development Bank
Rooftop Project

CEPALCO 1.1 MW Photovoltaic
Power Plant

 Funded by Asian Development Bank

 Installed in 2003

 Commissioned in 2012

 133rd largest solar power plant

 574-kW

worldwide , 2008
 Consist of 6,480 Sharp
ND-Q7E6Z Photovoltaic modules
 Designed to provide 1,500 MWhr
of electricity annually

capacity located
in its
Ortigas headquarters;
 Installed by Suntech with integration
by Propmech
 About 600 MWhr/year of solar
electricity.
 Largest rooftop installation in the
country.

•
11

Best practice examples of solar
generation and investment returns in the
Philippines

• Starbucks , St. Charge store, Quezon City,

Philippines
1. Size: 20.58 kWp solar PV System designed
2.

3.

4.
5.

6.
Source: www.tuscsolar.com

with 84 Monocrystalline panel;
Produced 3,671 kWh displacing 10.6% of
electricity sourced from grid – ten months
operation;
Savings of Php 34,000.00 in ten months
The system has a 25-year year economic
life;
Installed to replace expensive electricity
sourced from grid and as cooling the
temperature of the roof and interior;
Promotes green advocacy of Starbucks
PART III.
Outlining the project application
process to secure approval of a
Solar Renewable Energy Project
13

Outlining the project application process to secure approval
of a Solar Renewable Energy Project
The Development Stages
Site and project
assessment
II.
Design and
optimization
III. Procurement
IV. Installation and
commissioning
V. Operation and
maintenance
VI. Customer
enablement
I.

Technical and Regulatory
Requirements
• Track Record/Experience

• Work Program
• Key Personnel Experience
• List of Existing company owned

equipment available for RE projects
operations

Financial Requirements:
i. Audited Financial Statement
ii. Bank Certification to substantiate
the Cash Balance
iii. Projected Cash Flow for two
years
iv. List of existing company owned
equipment for the project
14

The Department of Energy Renewable
Energy Developer License Processes
DOE DC2009-07-0011)

Pre-development
Stages

RE Developer
procure permits

Service contract as
RE Developer

• Preliminary Assessment
• Feasibility Study
• Financial Closing
• Declaration of
Commerciality

• Environmental
Compliance Certificate
• Free and Prior Informed
Consent
• Certificate of NonOverlap
• Local Government
Endorsements
• Other government
permits

• Individual Filipino
• Corporation: 60%
Filipino; 40 % Foreign
• 100% Foreign owned –
shall register under the
Philippine Laws for
Technical and Financial
Assistance
PART IV.
Foreign investment
opportunities and project
finance for solar power
16

Legal and Regulatory Institutional Frameworks For
Foreign Investments in Solar Projects in the Philippines
• Republic Act No 9513 -Renewable Energy Law
• Executive Order No. 226-Omnibus Foreign Investment

Code of 1987
 Republic Act No. 7042- Foreign Investment Code of 1991
 Republic Act No.7721- Foreign Banks Act
 Republic Act No.7652 – Investors Lease Act

 Republic Act No. 7718- Build- Operate- Transfer Law
 Investment Priority Projects of 2014
 Philippine Millennium Development Goals
17

Sources and Manner of Financing
A. Public Sector Loans – Government Banks ( Land Bank of the Philippines,

Development Bank of the Philippines)
B. Private Sector Loans ( World Bank, International Financing Corporation,

Asian Development Bank)
C. Short Term Loans
D. Domestic Borrowings – local banks
E. Other Financing Institutions – international and local
18

Solar electric power has a great deal of appeal for investors looking
at opportunities in the renewable energy market in the Philippines
Easy to assess and forecast the availability of the resource.
No variability associated with the cost of the main fuel,

sunshine.
 Compared to other renewable sources of energy, solar PV
is quick to deploy.
A utility scale solar PV plant can be developed in 1.5 years as
compared to an average of 2 years for onshore wind and up
to 7 years for a geothermal power plant.

Rapid deployment makes solar an attractive solution in the
Philippines in order to meet the country’s renewable portfolio
standards and keep up with increasing energy demand.
19

INVESTMENT PROPOSAL
AND APPROVAL
• Any investment proposal

shall comply with certain
requirements under
Philippine laws.

Project Funding
Scheme

Merger - must comply with the legal
requirements under the Corporation Code of
the Philippines;

Acquisition - must comply with Section 40
of the Corporation Code and subject to the
restrictions
regarding
foreign
equity
ownership under the 1987 Constitution.

Management Contract - must comply with
Section 44 of the Corporation Code.

Joint Venture - may be entered into without
legal restriction on registration unless the
parties thereto form another business
organization requiring registration such as a
corporation or partnership
20

INVESTMENT PROPOSAL AND APPROVAL
PROJECT INFORMATION
REQUIRED

BASIC INFORMATION USUALLY
SOUGHT BY AN INVESTOR/FUNDER
• Name of proponent, Physical address, Postal

address, Telephone number, Fax Number, Email address, name of contact person,
Mobile Phone Number of contact person.
• Brief description of investment proposal
• Proposed Value of Investment
• Proposed Corporate status of the proponent
• Proposed capital of investment entity and

• Site of proposed investment
• Basis of access to site
• Proposed duration of investment
• Anticipated rate of return on investment
• Environmental Impact of the investment
• Amelioration and remediation of environment
•
•

timing of capital take up
• Name and references of the EPC contractor

•
•
•
•

impact
Proposed employment impact
Number, grades and source of any proposed
expatriate staff and proposed duration of their
employment
Anticipated benefits of the investment to the
economy and infrastructure
Audited balance sheet for proponent
organization
Due diligence certificate for proponent
Company profile of proponent
21

Technology: is it proven?

The Solar
Power
investment
bankability
challenge

Can the EPC provide references and has
capability to deliver the project on time?
What is the anticipated ROI?

Will it be viable commercially with the
Feed-in-tariff rate of Php9.68 per kWhr?

When is the facility generate a good
return?
22

KEY DRIVERS IN
SOLAR PROJECT
FINANCE
Project Analysis
— Completion
Risk
Contractors

Manufacturers

Transmission

Construction
Contract Terms

Construction
Technology
Risk

Project Analysis
— Operation
Risk

Operator

Operating
Costs
FOREIGN INVESTMENT OPPORTUNITIES AND
PROJECT FINANCE
Solar projects can be complex and funding sources fickle.
It is important for developers to complete the solar project
while funding is still available and to ensure investors the
project will operate as planned.
24

Foreign investment
Opportunities and
Project finance
Foreign and local solar technology developers are pushing for a massive installation of
solar panels on rooftops of households, commercial establishments and buildings in the
country.
Potential market for solar industry players : estimated at about $450 million, or P19 billion,
yearly. Based on the 50,000 households (representing 10 per cent of the half a million
constructions yearly) that can install solar panels with a capacity of 2 kilowatts.
To produce a kilowatt of solar power from these rooftop panels, one would need to invest
about $4,500 for the actual components and installation works.

Investment can be recovered in about seven years;

Solar panels usually last for at least 25 years.
25

Please Contact:
• Ruth P Briones
• Email: hrpbriones@gmail.com
• Phone Nos: +632 430 1725
• Mobile No: +63 916 627 0910

Mais conteúdo relacionado

Mais procurados

abb micro-grids and-renewable_energy_integration
abb micro-grids and-renewable_energy_integrationabb micro-grids and-renewable_energy_integration
abb micro-grids and-renewable_energy_integrationSteve Wittrig
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfPaul374728
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsGensol Engineering Limited
 
POWER PURCHASE AGREEMENTS(PPA)
POWER PURCHASE AGREEMENTS(PPA)POWER PURCHASE AGREEMENTS(PPA)
POWER PURCHASE AGREEMENTS(PPA)Munira Abubakari
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesPuneet Jaggi
 
Latest in energy storage
Latest in energy storageLatest in energy storage
Latest in energy storageLoic Charmoille
 
Solar Power Plant System Sizing
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizingfirstgreen
 
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...OECD Environment
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenanceLeonardo ENERGY
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantL'Obel Solar Power System
 
Battery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBattery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBushveld Energy
 
Hydroelectric power , dam and turbines
Hydroelectric power , dam and turbinesHydroelectric power , dam and turbines
Hydroelectric power , dam and turbinesZain Ali
 

Mais procurados (20)

abb micro-grids and-renewable_energy_integration
abb micro-grids and-renewable_energy_integrationabb micro-grids and-renewable_energy_integration
abb micro-grids and-renewable_energy_integration
 
BESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdfBESS - Battery Energy Storage System.pdf
BESS - Battery Energy Storage System.pdf
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
POWER PURCHASE AGREEMENTS(PPA)
POWER PURCHASE AGREEMENTS(PPA)POWER PURCHASE AGREEMENTS(PPA)
POWER PURCHASE AGREEMENTS(PPA)
 
Solar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best PracticesSolar Photovoltaic Power Plant: Best Practices
Solar Photovoltaic Power Plant: Best Practices
 
Latest in energy storage
Latest in energy storageLatest in energy storage
Latest in energy storage
 
The MBA of Solar O&M
The MBA of Solar O&MThe MBA of Solar O&M
The MBA of Solar O&M
 
Economics of Solar Park
Economics of Solar ParkEconomics of Solar Park
Economics of Solar Park
 
Solar Power Plant System Sizing
Solar Power Plant System SizingSolar Power Plant System Sizing
Solar Power Plant System Sizing
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
National Renewable Energy Program (NREP) 2020-2040 and sector updates, Ruby G...
 
Proposal solar
Proposal solarProposal solar
Proposal solar
 
Photovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant MaintenancePhotovoltaic Training - Session 4 - Plant Maintenance
Photovoltaic Training - Session 4 - Plant Maintenance
 
Lobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plantLobel proposal for 1 mw crystalline pv solar power plant
Lobel proposal for 1 mw crystalline pv solar power plant
 
Battery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basicsBattery energy storage systems (BESS) – an overview of the basics
Battery energy storage systems (BESS) – an overview of the basics
 
Hydroelectric power , dam and turbines
Hydroelectric power , dam and turbinesHydroelectric power , dam and turbines
Hydroelectric power , dam and turbines
 
Energy Transition(s): where are we?
Energy Transition(s): where are we?Energy Transition(s): where are we?
Energy Transition(s): where are we?
 
Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013
 
Solar Power Purchase Agreement Contracts
Solar Power Purchase Agreement ContractsSolar Power Purchase Agreement Contracts
Solar Power Purchase Agreement Contracts
 

Destaque

Solar energy power point presentation
Solar energy power point presentation Solar energy power point presentation
Solar energy power point presentation Shrijeet Modi
 
Project on Solar Energy
Project on Solar EnergyProject on Solar Energy
Project on Solar Energygagneeshkaur
 
Solar energy ppt
Solar energy pptSolar energy ppt
Solar energy pptshubhajit_b
 
conservation of solar energy
conservation of solar energyconservation of solar energy
conservation of solar energyAditi Bhushan
 
Understanding the Science behind Solar Energy
Understanding the Science behind Solar EnergyUnderstanding the Science behind Solar Energy
Understanding the Science behind Solar EnergyArturo Pelayo
 
A Business Model for Solar Energy - SunEdison
A Business Model for Solar Energy - SunEdisonA Business Model for Solar Energy - SunEdison
A Business Model for Solar Energy - SunEdisonAlexander Osterwalder
 
Solar energy
Solar energySolar energy
Solar energyAmeenah
 
Solar energy by hadi @bau
Solar energy by hadi @bauSolar energy by hadi @bau
Solar energy by hadi @bauMd Abdul Hai
 
Solar energy and Environment
Solar energy and Environment Solar energy and Environment
Solar energy and Environment Mohammad AlKour
 
Solar energy presentation what factors does neeed to it
Solar energy presentation what factors does neeed to itSolar energy presentation what factors does neeed to it
Solar energy presentation what factors does neeed to itMurali Krishna B
 
SOLAR ENERGY TECHNOLOGY
SOLAR ENERGY TECHNOLOGYSOLAR ENERGY TECHNOLOGY
SOLAR ENERGY TECHNOLOGYVanita Thakkar
 
Photovoltaic Solar Energy Alicia
Photovoltaic  Solar  Energy  AliciaPhotovoltaic  Solar  Energy  Alicia
Photovoltaic Solar Energy AliciaRosalmara
 
Presentation on Solar energy, Wind energy and Nuclear energy.
Presentation on Solar energy, Wind energy and Nuclear energy.Presentation on Solar energy, Wind energy and Nuclear energy.
Presentation on Solar energy, Wind energy and Nuclear energy.Ishan Trivedi
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaAkash Jauhari
 
Overview of climate change
Overview of climate changeOverview of climate change
Overview of climate changeMarho Realty
 
Tracxn Research - Solar Energy Landscape, February 2017
Tracxn Research - Solar Energy Landscape, February 2017Tracxn Research - Solar Energy Landscape, February 2017
Tracxn Research - Solar Energy Landscape, February 2017Tracxn
 
Solar photovoltaic systems
Solar photovoltaic systemsSolar photovoltaic systems
Solar photovoltaic systemsanish_hercules
 
Solar photovoltaic powerpoint
Solar photovoltaic powerpointSolar photovoltaic powerpoint
Solar photovoltaic powerpointWilliam Wallace
 

Destaque (20)

Solar energy power point presentation
Solar energy power point presentation Solar energy power point presentation
Solar energy power point presentation
 
Project on Solar Energy
Project on Solar EnergyProject on Solar Energy
Project on Solar Energy
 
Solar energy ppt
Solar energy pptSolar energy ppt
Solar energy ppt
 
Solar Energy
Solar EnergySolar Energy
Solar Energy
 
conservation of solar energy
conservation of solar energyconservation of solar energy
conservation of solar energy
 
Understanding the Science behind Solar Energy
Understanding the Science behind Solar EnergyUnderstanding the Science behind Solar Energy
Understanding the Science behind Solar Energy
 
A Business Model for Solar Energy - SunEdison
A Business Model for Solar Energy - SunEdisonA Business Model for Solar Energy - SunEdison
A Business Model for Solar Energy - SunEdison
 
Solar energy
Solar energySolar energy
Solar energy
 
Solar power.ppt
Solar power.pptSolar power.ppt
Solar power.ppt
 
Solar energy by hadi @bau
Solar energy by hadi @bauSolar energy by hadi @bau
Solar energy by hadi @bau
 
Solar energy and Environment
Solar energy and Environment Solar energy and Environment
Solar energy and Environment
 
Solar energy presentation what factors does neeed to it
Solar energy presentation what factors does neeed to itSolar energy presentation what factors does neeed to it
Solar energy presentation what factors does neeed to it
 
SOLAR ENERGY TECHNOLOGY
SOLAR ENERGY TECHNOLOGYSOLAR ENERGY TECHNOLOGY
SOLAR ENERGY TECHNOLOGY
 
Photovoltaic Solar Energy Alicia
Photovoltaic  Solar  Energy  AliciaPhotovoltaic  Solar  Energy  Alicia
Photovoltaic Solar Energy Alicia
 
Presentation on Solar energy, Wind energy and Nuclear energy.
Presentation on Solar energy, Wind energy and Nuclear energy.Presentation on Solar energy, Wind energy and Nuclear energy.
Presentation on Solar energy, Wind energy and Nuclear energy.
 
Financial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in IndiaFinancial Feasibility of Solar Power Plant in India
Financial Feasibility of Solar Power Plant in India
 
Overview of climate change
Overview of climate changeOverview of climate change
Overview of climate change
 
Tracxn Research - Solar Energy Landscape, February 2017
Tracxn Research - Solar Energy Landscape, February 2017Tracxn Research - Solar Energy Landscape, February 2017
Tracxn Research - Solar Energy Landscape, February 2017
 
Solar photovoltaic systems
Solar photovoltaic systemsSolar photovoltaic systems
Solar photovoltaic systems
 
Solar photovoltaic powerpoint
Solar photovoltaic powerpointSolar photovoltaic powerpoint
Solar photovoltaic powerpoint
 

Semelhante a March 5 solar energy investment opportunities in the philippines ruth p briones

Philippines | Jun-16 | PHILIPPINE RENEWABLE ENERGY SITUATIONER
Philippines | Jun-16 | PHILIPPINE RENEWABLE ENERGY SITUATIONERPhilippines | Jun-16 | PHILIPPINE RENEWABLE ENERGY SITUATIONER
Philippines | Jun-16 | PHILIPPINE RENEWABLE ENERGY SITUATIONERSmart Villages
 
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...OECD Environment
 
Mr. Kapila Subasinghe: RENEWABLE ENERGY DEVELOPMENT –ROLE OF FINANCIERS
Mr. Kapila Subasinghe: RENEWABLE ENERGY DEVELOPMENT –ROLE OF FINANCIERSMr. Kapila Subasinghe: RENEWABLE ENERGY DEVELOPMENT –ROLE OF FINANCIERS
Mr. Kapila Subasinghe: RENEWABLE ENERGY DEVELOPMENT –ROLE OF FINANCIERScosti2014
 
DOE Loan Programs Office by Wayne Killen
DOE Loan Programs Office by Wayne KillenDOE Loan Programs Office by Wayne Killen
DOE Loan Programs Office by Wayne KillenForth
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Akhilesh Upadhyay
 
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...ACX
 
Natural group corporate profile 2013
Natural group corporate profile 2013Natural group corporate profile 2013
Natural group corporate profile 2013Ritesh Pothan
 
PIPPA's Perspective on Challenges and Opportunities in Scaling Renewable Ener...
PIPPA's Perspective on Challenges and Opportunities in Scaling Renewable Ener...PIPPA's Perspective on Challenges and Opportunities in Scaling Renewable Ener...
PIPPA's Perspective on Challenges and Opportunities in Scaling Renewable Ener...OECD Environment
 
Solar Power Asia Conference in Singapore
Solar Power Asia Conference in SingaporeSolar Power Asia Conference in Singapore
Solar Power Asia Conference in SingaporeLei Ching Y.
 
Current Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBPCurrent Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBPOECD Environment
 
Project Finance Conference Feb 2016
Project Finance Conference Feb 2016Project Finance Conference Feb 2016
Project Finance Conference Feb 2016Niamh McGrath
 
Corporate Profile 2023.pptx
Corporate Profile 2023.pptxCorporate Profile 2023.pptx
Corporate Profile 2023.pptxMayurHiwarkar4
 
Feasibility study of setting of solar plant in Philippines
Feasibility study of setting of solar plant in Philippines Feasibility study of setting of solar plant in Philippines
Feasibility study of setting of solar plant in Philippines Siddharth Kundu
 
pitchdeck ORPC 2019 data info turine.pdf
pitchdeck ORPC 2019 data info turine.pdfpitchdeck ORPC 2019 data info turine.pdf
pitchdeck ORPC 2019 data info turine.pdflebob12
 
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdfSatish Nair
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...Fresh Energy
 
NRGFS Finance Information
NRGFS Finance InformationNRGFS Finance Information
NRGFS Finance Informationhunter111
 

Semelhante a March 5 solar energy investment opportunities in the philippines ruth p briones (20)

Philippines | Jun-16 | PHILIPPINE RENEWABLE ENERGY SITUATIONER
Philippines | Jun-16 | PHILIPPINE RENEWABLE ENERGY SITUATIONERPhilippines | Jun-16 | PHILIPPINE RENEWABLE ENERGY SITUATIONER
Philippines | Jun-16 | PHILIPPINE RENEWABLE ENERGY SITUATIONER
 
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
Climargy Innovative Energy Efficiency Financing through ESCO Project Aggregat...
 
Mr. Kapila Subasinghe: RENEWABLE ENERGY DEVELOPMENT –ROLE OF FINANCIERS
Mr. Kapila Subasinghe: RENEWABLE ENERGY DEVELOPMENT –ROLE OF FINANCIERSMr. Kapila Subasinghe: RENEWABLE ENERGY DEVELOPMENT –ROLE OF FINANCIERS
Mr. Kapila Subasinghe: RENEWABLE ENERGY DEVELOPMENT –ROLE OF FINANCIERS
 
DOE Loan Programs Office by Wayne Killen
DOE Loan Programs Office by Wayne KillenDOE Loan Programs Office by Wayne Killen
DOE Loan Programs Office by Wayne Killen
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park
 
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...Sizing Renewable Energy Systems for Different Facilities and Translation to C...
Sizing Renewable Energy Systems for Different Facilities and Translation to C...
 
Natural group corporate profile 2013
Natural group corporate profile 2013Natural group corporate profile 2013
Natural group corporate profile 2013
 
PIPPA's Perspective on Challenges and Opportunities in Scaling Renewable Ener...
PIPPA's Perspective on Challenges and Opportunities in Scaling Renewable Ener...PIPPA's Perspective on Challenges and Opportunities in Scaling Renewable Ener...
PIPPA's Perspective on Challenges and Opportunities in Scaling Renewable Ener...
 
Solar Power Asia Conference in Singapore
Solar Power Asia Conference in SingaporeSolar Power Asia Conference in Singapore
Solar Power Asia Conference in Singapore
 
Current Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBPCurrent Green Energy Financing Programs - Noli Cruz, DBP
Current Green Energy Financing Programs - Noli Cruz, DBP
 
Project Finance Conference Feb 2016
Project Finance Conference Feb 2016Project Finance Conference Feb 2016
Project Finance Conference Feb 2016
 
Corporate Profile 2023.pptx
Corporate Profile 2023.pptxCorporate Profile 2023.pptx
Corporate Profile 2023.pptx
 
Feasibility study of setting of solar plant in Philippines
Feasibility study of setting of solar plant in Philippines Feasibility study of setting of solar plant in Philippines
Feasibility study of setting of solar plant in Philippines
 
pitchdeck ORPC 2019 data info turine.pdf
pitchdeck ORPC 2019 data info turine.pdfpitchdeck ORPC 2019 data info turine.pdf
pitchdeck ORPC 2019 data info turine.pdf
 
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
2.-Aditya-Birla-Group-Odisha-Presentation-31-Oct-2014.pdf
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
November 21, 2013 | Next Steps: Financing solar for your business | Victor Ro...
 
NRGFS Finance Information
NRGFS Finance InformationNRGFS Finance Information
NRGFS Finance Information
 

Último

Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSpanmisemningshen123
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...pujan9679
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 

Último (20)

Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 

March 5 solar energy investment opportunities in the philippines ruth p briones

  • 1. SOLAR POWER OPPORTUNITIES IN THE PHILIPPINES RUTH P BRIONES Chairman/CEO, Greenergy Solutions Inc.
  • 2. TOPICS  Assessment of Philippines’s solar energy potential  Best practice examples of solar generation and investment returns in the Philippines  Outlining the project application process to secure approval  Foreign investment opportunities and project finance
  • 3. PART I: Assessment of the Philippine Solar Energy Potential
  • 4. 4 Solar Energy Potential in Asia PHILIPPINES: 4.5-5.0 kWh/m2/day
  • 5. 5 The Renewable Energy Map Potential in the Philippines LUZON VISAYAS MINDANAO
  • 6. 6 Sites/ Areas with solar energy Potentials in the Philippines 792,147,408 MWhr/year Rank No 68 globally, 2008 Second country in Southeast Asia in terms of irradiation and insolation. Solar irradiation: 1900 kilowatts a square meter
  • 7. 7 Solar Energy Investment Potential for the Philippines SECOND COUNTRY IN ASIAIRRADIATION AND ISOLATION PHILIIPPINES Most comprehensive Renewable Energy Law in Asia Has all the foundation to become a renewable energy leader in the region owing to the strong semiconductor industry and the manpower base
  • 8. 8 Solar Energy projects registered under DOE as of December 2013 AWARDED SOLAR PROJECTS PENDING PROJECTS UNDER RE LAW GRID USE 56 GRID USE 4 OWN USE 5 33.0 MW POTENTIAL CAPACITY  Grid use  Own use POTENTIAL CAPACITY 1,012.0 MW 1.594 MW
  • 9. PART II. Best practice examples of solar generation and investment returns in the Philippines
  • 10. 10 Best practice examples of solar generation and investment returns in the Philippines Asian Development Bank Rooftop Project CEPALCO 1.1 MW Photovoltaic Power Plant  Funded by Asian Development Bank  Installed in 2003  Commissioned in 2012  133rd largest solar power plant  574-kW worldwide , 2008  Consist of 6,480 Sharp ND-Q7E6Z Photovoltaic modules  Designed to provide 1,500 MWhr of electricity annually capacity located in its Ortigas headquarters;  Installed by Suntech with integration by Propmech  About 600 MWhr/year of solar electricity.  Largest rooftop installation in the country. •
  • 11. 11 Best practice examples of solar generation and investment returns in the Philippines • Starbucks , St. Charge store, Quezon City, Philippines 1. Size: 20.58 kWp solar PV System designed 2. 3. 4. 5. 6. Source: www.tuscsolar.com with 84 Monocrystalline panel; Produced 3,671 kWh displacing 10.6% of electricity sourced from grid – ten months operation; Savings of Php 34,000.00 in ten months The system has a 25-year year economic life; Installed to replace expensive electricity sourced from grid and as cooling the temperature of the roof and interior; Promotes green advocacy of Starbucks
  • 12. PART III. Outlining the project application process to secure approval of a Solar Renewable Energy Project
  • 13. 13 Outlining the project application process to secure approval of a Solar Renewable Energy Project The Development Stages Site and project assessment II. Design and optimization III. Procurement IV. Installation and commissioning V. Operation and maintenance VI. Customer enablement I. Technical and Regulatory Requirements • Track Record/Experience • Work Program • Key Personnel Experience • List of Existing company owned equipment available for RE projects operations Financial Requirements: i. Audited Financial Statement ii. Bank Certification to substantiate the Cash Balance iii. Projected Cash Flow for two years iv. List of existing company owned equipment for the project
  • 14. 14 The Department of Energy Renewable Energy Developer License Processes DOE DC2009-07-0011) Pre-development Stages RE Developer procure permits Service contract as RE Developer • Preliminary Assessment • Feasibility Study • Financial Closing • Declaration of Commerciality • Environmental Compliance Certificate • Free and Prior Informed Consent • Certificate of NonOverlap • Local Government Endorsements • Other government permits • Individual Filipino • Corporation: 60% Filipino; 40 % Foreign • 100% Foreign owned – shall register under the Philippine Laws for Technical and Financial Assistance
  • 15. PART IV. Foreign investment opportunities and project finance for solar power
  • 16. 16 Legal and Regulatory Institutional Frameworks For Foreign Investments in Solar Projects in the Philippines • Republic Act No 9513 -Renewable Energy Law • Executive Order No. 226-Omnibus Foreign Investment Code of 1987  Republic Act No. 7042- Foreign Investment Code of 1991  Republic Act No.7721- Foreign Banks Act  Republic Act No.7652 – Investors Lease Act  Republic Act No. 7718- Build- Operate- Transfer Law  Investment Priority Projects of 2014  Philippine Millennium Development Goals
  • 17. 17 Sources and Manner of Financing A. Public Sector Loans – Government Banks ( Land Bank of the Philippines, Development Bank of the Philippines) B. Private Sector Loans ( World Bank, International Financing Corporation, Asian Development Bank) C. Short Term Loans D. Domestic Borrowings – local banks E. Other Financing Institutions – international and local
  • 18. 18 Solar electric power has a great deal of appeal for investors looking at opportunities in the renewable energy market in the Philippines Easy to assess and forecast the availability of the resource. No variability associated with the cost of the main fuel, sunshine.  Compared to other renewable sources of energy, solar PV is quick to deploy. A utility scale solar PV plant can be developed in 1.5 years as compared to an average of 2 years for onshore wind and up to 7 years for a geothermal power plant. Rapid deployment makes solar an attractive solution in the Philippines in order to meet the country’s renewable portfolio standards and keep up with increasing energy demand.
  • 19. 19 INVESTMENT PROPOSAL AND APPROVAL • Any investment proposal shall comply with certain requirements under Philippine laws. Project Funding Scheme Merger - must comply with the legal requirements under the Corporation Code of the Philippines; Acquisition - must comply with Section 40 of the Corporation Code and subject to the restrictions regarding foreign equity ownership under the 1987 Constitution. Management Contract - must comply with Section 44 of the Corporation Code. Joint Venture - may be entered into without legal restriction on registration unless the parties thereto form another business organization requiring registration such as a corporation or partnership
  • 20. 20 INVESTMENT PROPOSAL AND APPROVAL PROJECT INFORMATION REQUIRED BASIC INFORMATION USUALLY SOUGHT BY AN INVESTOR/FUNDER • Name of proponent, Physical address, Postal address, Telephone number, Fax Number, Email address, name of contact person, Mobile Phone Number of contact person. • Brief description of investment proposal • Proposed Value of Investment • Proposed Corporate status of the proponent • Proposed capital of investment entity and • Site of proposed investment • Basis of access to site • Proposed duration of investment • Anticipated rate of return on investment • Environmental Impact of the investment • Amelioration and remediation of environment • • timing of capital take up • Name and references of the EPC contractor • • • • impact Proposed employment impact Number, grades and source of any proposed expatriate staff and proposed duration of their employment Anticipated benefits of the investment to the economy and infrastructure Audited balance sheet for proponent organization Due diligence certificate for proponent Company profile of proponent
  • 21. 21 Technology: is it proven? The Solar Power investment bankability challenge Can the EPC provide references and has capability to deliver the project on time? What is the anticipated ROI? Will it be viable commercially with the Feed-in-tariff rate of Php9.68 per kWhr? When is the facility generate a good return?
  • 22. 22 KEY DRIVERS IN SOLAR PROJECT FINANCE Project Analysis — Completion Risk Contractors Manufacturers Transmission Construction Contract Terms Construction Technology Risk Project Analysis — Operation Risk Operator Operating Costs
  • 23. FOREIGN INVESTMENT OPPORTUNITIES AND PROJECT FINANCE Solar projects can be complex and funding sources fickle. It is important for developers to complete the solar project while funding is still available and to ensure investors the project will operate as planned.
  • 24. 24 Foreign investment Opportunities and Project finance Foreign and local solar technology developers are pushing for a massive installation of solar panels on rooftops of households, commercial establishments and buildings in the country. Potential market for solar industry players : estimated at about $450 million, or P19 billion, yearly. Based on the 50,000 households (representing 10 per cent of the half a million constructions yearly) that can install solar panels with a capacity of 2 kilowatts. To produce a kilowatt of solar power from these rooftop panels, one would need to invest about $4,500 for the actual components and installation works. Investment can be recovered in about seven years; Solar panels usually last for at least 25 years.
  • 25. 25 Please Contact: • Ruth P Briones • Email: hrpbriones@gmail.com • Phone Nos: +632 430 1725 • Mobile No: +63 916 627 0910