Economy Informatics, 1-4/2005                                                                      27



                Agile Software Project Management Methodologies
                         Prof. Constanţa-Nicoleta BODEA, PhD
        Economic Informatics Department, Academy of Economic Studies, Bucharest


Successfully project planning, coordinating and controlling in order to deal effectively with
projects sponsors, customers, unexpected risks and changing scope are difficult tasks even for
the most experienced project managers. Different surveys indicated that about half of the
software projects were considered total failures and only a few of them were successful. The
tight deadlines, volatile requirements and emerging technologies are the main reasons for
this lake of performance. This agile project environment requires an agile project manage-
ment. The paper presents the main characteristics of the agile software project management
approaches such as: MSF for Agile Software Development, Extreme Programming, Scrum,
Crystal, Feature Driven Development, DSDM.
Keywords: software development, project management methodology, agile project manage-
ment, XP, MSF for Agile Software Development.

                                                        able and more efficient. We can consider a
1  Software project management meth-
   odologies
Methodologies impose a disciplined process
                                                        methodology containing ten basic elements:
                                                        techniques, tools, deliverables, teams, roles,
upon software development with the aim of               skills, activities standards, quality measures
making software development more predict-               and project values [1].
                                           Activities        Milestones
                                                  Planning
                                                   Testing                Team Values


                             Quality             Processes           Teams

                 Regression tests                                            Project manager
                Object model                                                 Analyst
                                                    MBWA
                Project plan                        Use cases                Designer
                Use cases                           CRC cards                Tester
                             Deliverable
                                               Techniques                 Roles

                                       Envy/Dev.             JAD facilitation
                   Microsoft Project                          Java programming
                       UML/ C++        STP                      Modeling
                                       MS Project
                          OMT                                                 Personality
                                  Standards
                                               Tools                Skills

                   Fig. 1. Components of a project management methodology
A specific methodology is needed depending              mized quality. A larger methodology (with
on the project size (number of people being             more control elements) is needed when more
coordinated), the criticality of the systems            people are involved. Communication load
being created and the priorities of the project.        raises as the number of people involved in-
For any point in the size/criticality space, a          creases. Since methodology is a matter of
scope of concerns to address is selected                coordinating the people and managing the
(which project roles, activities, deliverables,         communication, its size must also rise, as the
and standards to cover) and optimization cri-           number of roles and deliverables types in-
teria are selected. Methodologies therefore             crease [2].
differ by the size, criticality, scope and opti-        Considering the project deliverables critical-
28                                                                   Economy Informatics, 1-4/2005


ity the following four zones we can identify:     problem than a large team. It does mean
• Loss of comfort means that with a system        there may be an area of overlap, where a
failure, people will have to go and do more       small team with a light methodology can
work by hand, or call each other and repair a     solve the same problem as a larger team with
miscommunication. Examples might include          a heavier methodology (figure 2).
purchase support systems and corporate in-        2. The Agile Approach
frastructure programs.                            The agile approach started in 1994 with some
• Loss of discretionary moneys zone if the        trials of semi-formal agile methodologies,
loss of money or related valuables is merely      such as RAD, DSDM, XP, Crystal, Scrum.
uncomfortable                                     These methodologies are based on agile
• Loss of irreplaceable moneys zone if the        methods. Agile methods are adaptive rather
loss of moneys or related valuables has effect    than predictive. Engineering methods tend to
corresponding to going bankrupt.                  try to plan out a large part of the software
• Loss of life zone if people are likely to die   process in great detail for a long span of
from a system malfunction.                        time, this works well until things change. So
For a project with higher criticality more        their nature is to resist change. The agile
visible correctness (greater density) is re-      methods, however, are waiting for change.
quired. Density means more precision in the       Agile methods are people-oriented rather
artifacts, with tighter reviews and less toler-   than process-oriented. The goal of engineer-
ance.                                             ing methods is to define a process that will
                                                  work well whoever happens to be using it.
                                                  Agile methods assert that no process will
                                                  ever make up the skill of the development
                                                  team, so the role of a process is to support the
                                                  development team in their work.
                                                  The declaration of principles and values in
                                                  the agile approach is known as the Agile
                                                  Software Development Manifesto, launched
                                                  in 2001, after a two day workshop at Snow-
                                                  bird Utah (figure 3). A non-profit organiza-
                                                  tion the Agile Alliance was set up to promote
     Fig. 2. Methodology weight and problem       knowledge and discussion of all the agile
                      size                        methods.
"Weight is cost": a relatively small increase     Applying these principles creates the founda-
in methodology size or specific density adds      tion for managing IT projects in an agile ap-
a relatively large amount to the cost of the      proach. The basic characteristics of this ap-
project. With fewer people, less methodology      proach are the following:
is needed; with less methodology, the people      • Assume simplicity. As the project evolves
work more efficiently. Working more effi-         it should be assumed that the simplest solu-
ciently, they can successfully address a larger   tion is the best solution. Overbuilding the
problem. When more people are put onto a          system or any artifact of the project must be
project, they need a heavier methodology to       avoided.
coordinate their work. The heavier method-        • Embrace change. Since The stakeholder
ology lowers their productivity, so more peo-     understanding of the requirements will
ple are needed on the project. Since method-      change over time. Project stakeholders them-
ology size grows slower than project size,        selves may change as the project makes pro-
eventually they get to a point where they can     gress. Project stakeholders may change their
solve the problem and manage the coordina-        point of view, which in turn will change the
tion activities. This does not mean that a        goals and success criteria of the project man-
small team can necessarily solve a larger         agement effort.
Economy Informatics, 1-4/2005                                                                           29


• Incremental change – the pressure to get it               time. Or simply discard it when you no
right the first time can overwhelm the best                 longer need it in an incremental manner.
project manager. Instead of futilely trying to              • Maximize stakeholder value. The project
develop an all encompassing project plan                    stakeholders are investing resources (time,
from the start, put a stake in the ground by                money, facilities) to have a system deployed
developing a small portion of the system, or                that meets their needs. Stakeholders expect
even a high–level model of a larger portion                 that their investment to be applied in the best
of the system, and evolves this portion over                way.
     “We are uncovering better ways of developing software by doing it and helping others do it.
                               Through this work we have come to value:
                  :             Individuals and interactions over Processes and Tools.
                 :             Working software over Comprehensive documentation.
                    :             Customer collaboration over Contract negotiation.
                       :            Responding to change over Following a plan.
      That is, while there is value in the items on the right, we value the items on the left more.”
                             Fig. 3. Agile Software Development Manifesto
• Manage with a purpose Identify a valid                    the project stakeholders. The goal is not to
purpose for creating the artifact and the audi-             produce extraneous documentation, man-
ence for that artifact. This principle also ap-             agement artifacts or models of these artifacts.
plies to a change to existing artifacts.                    3. Some Agile Software Project Manage-
• Rapid feedback. The time between an ac-                   ment Methodologies
tion and the feedback on that action must be                The agile approach focuses on: talent & skill
minimized. Work closely with the stake-                     (fewer better people), proximity (direct and
holders, to understand the requirements, to                 face-to-face communication), less paper,
analyze those requirements, and develop an                  more tacit / verbal communication, just-in-
actionable plan, which provides numerous                    time requirements and design, frequent De-
opportunities for feedback.                                 livery (incremental development), reflection,
• Working software is the primary goal of                   quality in work. So, the people are very close
the project. The goal of any software project               related to the agile methodologies (figure 4).
is to produce software that meets the needs of



                                 Activities        Milestones
                                                                                         Personality
                                        Planning
                                         Testing                Team Values


                   Quality             Processes         Teams
                                                                                             People
       Regression tests                                           Project manager
      Object model                                                Analyst
                                          MBWA
      Project plan                                                Designer
                                          Use cases
      Use cases                           CRC cards               Tester
                   Deliverable
                   s                 Techniques                 Roles

                             Envy/Dev.             JAD facilitation
         Microsoft Project                          Java programming
             UML/ C++        STP                      Modeling
                             MS Project
                OMT
                        Standards
                                     Tools               Skills



                 Fig. 4. Components of an agile project management methodology
30                                                                    Economy Informatics, 1-4/2005


3.1 Extreme Programming (XP) method-              jects require different kinds of methodolo-
ology                                             gies. The Crystals share a human orientation
The roots of XP lie in the Smalltalk commu-       with XP, but this people-centeredness is done
nity, in the close collaboration of Kent Beck     in a different way. Alistair considers that
and Ward Cunningham in the late 1980's.           people find it hard to follow a disciplined
Both of them refined their practices on nu-       process, thus rather than follow XP's high
merous projects during the early 90's, extend-    discipline; Alistair explores the least disci-
ing their ideas of a software development ap-     plined methodology that could still succeed,
proach that was both adaptive and people-         consciously trading off productivity for ease
oriented. The crucial step from informal          of execution. He thus considers that although
practice to a methodology occurred in the         Crystal is less productive than XP, more
spring of 1996. Kent was asked to review the      people will be able to follow it.
progress of the C3 payroll project for Chrys-     Alistair also puts a lot of weight in end of it-
ler. The project was being carried out in         eration reviews, thus encouraging the process
Smalltalk by a contracting company and was        to be self-improving. His assertion is that it-
in trouble. Due to the low quality of the code    erative development is there to find problems
base, Kent recommended throwing out the           early, and then to enable people to correct
entire code base and starting from scratch.       them. This places more emphasis on people
The project then restarted under his leader-      monitoring their process and tuning it as they
ship. XP begins with four values: Communi-        develop.
cation, Feedback, Simplicity, and Courage. It     3.3 Scrum
then builds up to a dozen practices which XP      Scrum has been around for a while in object-
projects should follow. Many of these prac-       oriented circles. It focuses on the fact that de-
tices are old, tried and tested techniques, yet   fined and repeatable processes only work for
often forgotten by many, including most           tackling defined and repeatable problems
planned processes. As well as resurrecting        with defined and repeatable people in defined
these techniques, XP weaves them into a           and repeatable environments.
synergistic whole where each one is rein-         Scrum divides a project into iterations (which
forced by the others. It is a strong emphasis     they call sprints) of 30 days. Before you be-
on testing. While all processes mention test-     gin a sprint you define the functionality re-
ing, most do so with a pretty low emphasis.       quired for that sprint and then leave the team
However XP puts testing at the foundation of      to deliver it. The point is to stabilize the re-
development, with every programmer writing        quirements during the sprint.
tests as they write their production code. The    However management does not disengage
tests are integrated into a continuous integra-   during the sprint. Every day the team holds a
tion and build process which yields a highly      short (fifteen minute) meeting, called a
stable platform for future development.           scrum, where the team runs through what it
On this platform XP builds an evolutionary        will do in the next day. In particular they sur-
design process that relies on refactoring a       face to the management blocks: impediments
simple base system with every iteration. All      to progress that are getting in the way that
design is centered on the current iteration       management needs to resolve. They also re-
with no design done for anticipated future        port on what's been done so management
needs. The result is a design process that is     gets a daily update of where the project is.
disciplined, yet startling, combining disci-      Scrum literature focuses mainly on the itera-
pline with adaptivity in a way that arguably      tive planning and tracking process. It's very
makes it the most well developed of all the       close to the other agile in many respects and
adaptive methodologies.                           should work well with the coding practices
3.2 Crystal methodologies                         from XP.
Alistair developed this family of methodolo-      3.4 MSF for Agile Software Development
gies considering that different kinds of pro-     MSF provides a customized and scalable set
Economy Informatics, 1-4/2005                                                                    31


of software development guidelines for ap-          • Source check-in policies
plication development improvement ([5]).            • Role clusters and security groups
MSF incorporates both agile and formal ap-          • Document templates (Excel and Word)
proaches, and then allows the user to select        • Microsoft Project templates
the most suitable path. MSF's flexible              • Reports
framework can be adapted to meet the needs          • Project portal /SharePoint site template
of any project, regardless of size or complex-      MSF uses methodology templates to define
ity.                                                the process that individual projects follow.
The MSF philosophy holds that there is no           There is no universal process that works for
single structure or process that optimally ap-      all organizations, or even all projects within
plies to the requirements and environments          an organization. To address this, MSF pro-
for all projects. MSF provides this guidance        vides a flexible toolset that works with both
without imposing prescriptive detail and al-        agile and formal processes. Microsoft's
lows the user to customize the content pro-         Global Solution Integrator partners provide
vided. MSF components can be applied indi-          their own product consumable methodology
vidually or collectively to improve success         templates; or, you can create your own. Proc-
rates for the many types of projects. MSF           ess extensibility allows customization of
guidance focuses on managing the "people            work item types, check-in policies, custom
and process." Because the needs and prac-           reports and project management templates.
tices of software development teams are con-
stantly evolving, the materials gathered into       Conclusions
MSF are continually changing and expanding          Getting projects faster is a universal desire of
to keep pace. Additionally, MSF interacts           management. The reality of project manage-
with Microsoft Operations Framework                 ment is that we never really have the time to
(MOF) to provide a smooth transition to the         create perfect plans, to analyze all the op-
operational environment, which is a require-        tions. Agile approach provides some methods
ment for long-term project success.                 for project management to become more ef-
With MSF, process is not just documenta-            fective. These methods need to be taken and
tion. It also manifests itself as actual tool be-   customized to the unique business environ-
havior changes. When you chose the process          ment of the project.
at project inception, you are also choosing
the workflow and work products, which then          References
drive how the system behaves. Support for           1. Alistair C. A Methodology Per Project,
the software development life cycle process         (arc@acm.org), Humans and Technology.
(SDLC) is built-in, which makes for seamless        2. Harrison, N., Coplien, J, "Patterns of pro-
workflow support. By integrating process            ductive software organizations", Bell Labs
into the tools team members use on a daily          Technical Journal, summer, 1996.
basis, MSF lowers the barrier to adopting           3. Jeffries, R., Beck, K., Extreme Program-
process and enables the automatic collection        ming, http://armaties.com/extreme.html.
of cross-functional project metrics without         4. Fowler M, The New Methodology, Martin
the overhead associated with manual report-         Fowler.com
ing.                                                5. Microsoft, Visual Studio 2005 Team Sys-
The following elements of MSF are custom-           tem: Microsoft Solutions Framework, 2004,
izable:                                             www.Microsoft.com .
• Process Guidance                                  6. http://crystalmethodologies.org/
• Iteration structure
• Entry criteria and exit criteria views
• Work item type definitions and rules (ac-
tivities and work products)
• Work item queries

Mais conteúdo relacionado

Mais procurados

What is this thing called Agile?
What is this thing called Agile?What is this thing called Agile?
What is this thing called Agile?John Goodpasture
 
Changemanagement2004 100831155540-phpapp01
Changemanagement2004 100831155540-phpapp01Changemanagement2004 100831155540-phpapp01
Changemanagement2004 100831155540-phpapp01Raymond Vanhaeften
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjeePMI_IREP_TP
 
Todd williams
Todd williamsTodd williams
Todd williamsNASAPMC
 
Pc final pahlavani_ctc_talk_dec_2011
Pc final pahlavani_ctc_talk_dec_2011Pc final pahlavani_ctc_talk_dec_2011
Pc final pahlavani_ctc_talk_dec_2011NASAPMC
 
System Development
System DevelopmentSystem Development
System Developmentintuitiv.de
 
Lowering business costs: Mitigating risk in the software delivery lifecycle
Lowering business costs: Mitigating risk in the software delivery lifecycleLowering business costs: Mitigating risk in the software delivery lifecycle
Lowering business costs: Mitigating risk in the software delivery lifecycleIBM Rational software
 
Agile Metrics article
Agile Metrics articleAgile Metrics article
Agile Metrics articledheimann5
 
Ashwin Kumar_MSE 697 Final
Ashwin Kumar_MSE 697 FinalAshwin Kumar_MSE 697 Final
Ashwin Kumar_MSE 697 FinalAshwin Kumar M N
 
Agile Project Management Part 2 Final V1.5
Agile Project Management Part 2   Final V1.5Agile Project Management Part 2   Final V1.5
Agile Project Management Part 2 Final V1.5Mia Horrigan
 
Management 3.0 applied at lean experience
Management 3.0 applied at lean experienceManagement 3.0 applied at lean experience
Management 3.0 applied at lean experienceJohan Oskarsson
 
Agile adoption julen c. mohanty
Agile adoption   julen c. mohantyAgile adoption   julen c. mohanty
Agile adoption julen c. mohantyJulen Mohanty
 
Understanding Successful Project Portfolio Delivery
Understanding Successful Project Portfolio DeliveryUnderstanding Successful Project Portfolio Delivery
Understanding Successful Project Portfolio DeliveryJohn Hall
 
Success mgt client april 12 (2)
Success mgt client april 12 (2)Success mgt client april 12 (2)
Success mgt client april 12 (2)Roy Dunster
 
Project Management Case Studies Terry Hall, Project Manager
Project Management Case Studies Terry Hall, Project ManagerProject Management Case Studies Terry Hall, Project Manager
Project Management Case Studies Terry Hall, Project ManagerTerry Hall, PMP
 
Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.Mindtree Ltd.
 

Mais procurados (20)

MCP1
MCP1MCP1
MCP1
 
What is this thing called Agile?
What is this thing called Agile?What is this thing called Agile?
What is this thing called Agile?
 
Changemanagement2004 100831155540-phpapp01
Changemanagement2004 100831155540-phpapp01Changemanagement2004 100831155540-phpapp01
Changemanagement2004 100831155540-phpapp01
 
Presentation by somdatta banerjee
Presentation by somdatta banerjeePresentation by somdatta banerjee
Presentation by somdatta banerjee
 
JAD Guidelines
JAD GuidelinesJAD Guidelines
JAD Guidelines
 
Todd williams
Todd williamsTodd williams
Todd williams
 
Pc final pahlavani_ctc_talk_dec_2011
Pc final pahlavani_ctc_talk_dec_2011Pc final pahlavani_ctc_talk_dec_2011
Pc final pahlavani_ctc_talk_dec_2011
 
A littlebook about agile
A littlebook about agileA littlebook about agile
A littlebook about agile
 
System Development
System DevelopmentSystem Development
System Development
 
Lowering business costs: Mitigating risk in the software delivery lifecycle
Lowering business costs: Mitigating risk in the software delivery lifecycleLowering business costs: Mitigating risk in the software delivery lifecycle
Lowering business costs: Mitigating risk in the software delivery lifecycle
 
Why Agile?
Why Agile?Why Agile?
Why Agile?
 
Agile Metrics article
Agile Metrics articleAgile Metrics article
Agile Metrics article
 
Ashwin Kumar_MSE 697 Final
Ashwin Kumar_MSE 697 FinalAshwin Kumar_MSE 697 Final
Ashwin Kumar_MSE 697 Final
 
Agile Project Management Part 2 Final V1.5
Agile Project Management Part 2   Final V1.5Agile Project Management Part 2   Final V1.5
Agile Project Management Part 2 Final V1.5
 
Management 3.0 applied at lean experience
Management 3.0 applied at lean experienceManagement 3.0 applied at lean experience
Management 3.0 applied at lean experience
 
Agile adoption julen c. mohanty
Agile adoption   julen c. mohantyAgile adoption   julen c. mohanty
Agile adoption julen c. mohanty
 
Understanding Successful Project Portfolio Delivery
Understanding Successful Project Portfolio DeliveryUnderstanding Successful Project Portfolio Delivery
Understanding Successful Project Portfolio Delivery
 
Success mgt client april 12 (2)
Success mgt client april 12 (2)Success mgt client april 12 (2)
Success mgt client april 12 (2)
 
Project Management Case Studies Terry Hall, Project Manager
Project Management Case Studies Terry Hall, Project ManagerProject Management Case Studies Terry Hall, Project Manager
Project Management Case Studies Terry Hall, Project Manager
 
Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.Integrated methodology for testing and quality management.
Integrated methodology for testing and quality management.
 

Destaque

Estimation Techniques V1.0
Estimation Techniques V1.0Estimation Techniques V1.0
Estimation Techniques V1.0Uday K Bhatt
 
Functional point analysis
Functional point analysisFunctional point analysis
Functional point analysisDestinationQA
 
extreme Programming
extreme Programmingextreme Programming
extreme ProgrammingBilal Shah
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process ModelsAtul Karmyal
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniqueskamal
 
Agile Project Management - An introduction to Agile and the new PMI-ACP
Agile Project Management - An introduction to Agile and the new PMI-ACPAgile Project Management - An introduction to Agile and the new PMI-ACP
Agile Project Management - An introduction to Agile and the new PMI-ACPDimitri Ponomareff
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management pptAndreea Usatenco
 

Destaque (10)

Estimation Techniques V1.0
Estimation Techniques V1.0Estimation Techniques V1.0
Estimation Techniques V1.0
 
Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
 
Functional point analysis
Functional point analysisFunctional point analysis
Functional point analysis
 
extreme Programming
extreme Programmingextreme Programming
extreme Programming
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
Software Estimation Techniques
Software Estimation TechniquesSoftware Estimation Techniques
Software Estimation Techniques
 
Spm unit 3
Spm unit 3Spm unit 3
Spm unit 3
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
Agile Project Management - An introduction to Agile and the new PMI-ACP
Agile Project Management - An introduction to Agile and the new PMI-ACPAgile Project Management - An introduction to Agile and the new PMI-ACP
Agile Project Management - An introduction to Agile and the new PMI-ACP
 
Software Project Management ppt
Software Project Management pptSoftware Project Management ppt
Software Project Management ppt
 

Semelhante a Agile Project Management Methodologies

Ieee sw small_projects
Ieee sw small_projectsIeee sw small_projects
Ieee sw small_projectsmanoharbalu
 
System Development Overview Assignment 3
System Development Overview Assignment 3System Development Overview Assignment 3
System Development Overview Assignment 3Ashley Fisher
 
Improvement opportunity in agile methodology and a survey on the adoption rat...
Improvement opportunity in agile methodology and a survey on the adoption rat...Improvement opportunity in agile methodology and a survey on the adoption rat...
Improvement opportunity in agile methodology and a survey on the adoption rat...Alexander Decker
 
Agile project management
Agile project managementAgile project management
Agile project managementsaili mane
 
Changing landscape of software project management
Changing landscape of software project managementChanging landscape of software project management
Changing landscape of software project managementPramesh Vaidya
 
Managing Agile Software Development Projects
Managing Agile Software Development ProjectsManaging Agile Software Development Projects
Managing Agile Software Development ProjectsMartina Šimičić
 
Software engineering project management
Software engineering project managementSoftware engineering project management
Software engineering project managementjhudyne
 
Agile Project Management for IT Projects
Agile Project Management for IT ProjectsAgile Project Management for IT Projects
Agile Project Management for IT Projectsrachna_nainani
 
From Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsFrom Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsBjörn Jónsson
 
Waterfall And Agile Methodology Coexistence 2011
Waterfall And Agile Methodology Coexistence 2011Waterfall And Agile Methodology Coexistence 2011
Waterfall And Agile Methodology Coexistence 2011Tim Morris ★
 
Technology Integration Pattern For Distributed Scrum of Scrum
Technology Integration Pattern For Distributed Scrum of ScrumTechnology Integration Pattern For Distributed Scrum of Scrum
Technology Integration Pattern For Distributed Scrum of ScrumIOSR Journals
 
Project Requriement Management Vs Agile software development
Project Requriement Management Vs  Agile software developmentProject Requriement Management Vs  Agile software development
Project Requriement Management Vs Agile software developmentbizpresenter
 
Mindtree distributed agile journey and guiding principles
Mindtree distributed agile journey and guiding principlesMindtree distributed agile journey and guiding principles
Mindtree distributed agile journey and guiding principlesMindtree Ltd.
 
Paradigm Shift for Project Managers in Agile Projects
Paradigm Shift for Project Managers in Agile ProjectsParadigm Shift for Project Managers in Agile Projects
Paradigm Shift for Project Managers in Agile ProjectsBharani M
 
Agile Project Management Methods of IT Projects
Agile Project Management Methods of IT ProjectsAgile Project Management Methods of IT Projects
Agile Project Management Methods of IT ProjectsGlen Alleman
 

Semelhante a Agile Project Management Methodologies (20)

Agile development
Agile developmentAgile development
Agile development
 
An Introduction to Project management(project management tutorials)
An Introduction to Project management(project management tutorials)An Introduction to Project management(project management tutorials)
An Introduction to Project management(project management tutorials)
 
ETPM5
ETPM5ETPM5
ETPM5
 
Ieee sw small_projects
Ieee sw small_projectsIeee sw small_projects
Ieee sw small_projects
 
System Development Overview Assignment 3
System Development Overview Assignment 3System Development Overview Assignment 3
System Development Overview Assignment 3
 
Improvement opportunity in agile methodology and a survey on the adoption rat...
Improvement opportunity in agile methodology and a survey on the adoption rat...Improvement opportunity in agile methodology and a survey on the adoption rat...
Improvement opportunity in agile methodology and a survey on the adoption rat...
 
Agile project management
Agile project managementAgile project management
Agile project management
 
Changing landscape of software project management
Changing landscape of software project managementChanging landscape of software project management
Changing landscape of software project management
 
Managing Agile Software Development Projects
Managing Agile Software Development ProjectsManaging Agile Software Development Projects
Managing Agile Software Development Projects
 
5 5-norbert jastroch
5 5-norbert jastroch5 5-norbert jastroch
5 5-norbert jastroch
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
 
Software engineering project management
Software engineering project managementSoftware engineering project management
Software engineering project management
 
Agile Project Management for IT Projects
Agile Project Management for IT ProjectsAgile Project Management for IT Projects
Agile Project Management for IT Projects
 
From Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methodsFrom Waterfall to Agile - from predictive to adaptive methods
From Waterfall to Agile - from predictive to adaptive methods
 
Waterfall And Agile Methodology Coexistence 2011
Waterfall And Agile Methodology Coexistence 2011Waterfall And Agile Methodology Coexistence 2011
Waterfall And Agile Methodology Coexistence 2011
 
Technology Integration Pattern For Distributed Scrum of Scrum
Technology Integration Pattern For Distributed Scrum of ScrumTechnology Integration Pattern For Distributed Scrum of Scrum
Technology Integration Pattern For Distributed Scrum of Scrum
 
Project Requriement Management Vs Agile software development
Project Requriement Management Vs  Agile software developmentProject Requriement Management Vs  Agile software development
Project Requriement Management Vs Agile software development
 
Mindtree distributed agile journey and guiding principles
Mindtree distributed agile journey and guiding principlesMindtree distributed agile journey and guiding principles
Mindtree distributed agile journey and guiding principles
 
Paradigm Shift for Project Managers in Agile Projects
Paradigm Shift for Project Managers in Agile ProjectsParadigm Shift for Project Managers in Agile Projects
Paradigm Shift for Project Managers in Agile Projects
 
Agile Project Management Methods of IT Projects
Agile Project Management Methods of IT ProjectsAgile Project Management Methods of IT Projects
Agile Project Management Methods of IT Projects
 

Mais de Ram Srivastava

Michigan enterprise architecture framework
Michigan enterprise architecture frameworkMichigan enterprise architecture framework
Michigan enterprise architecture frameworkRam Srivastava
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklistRam Srivastava
 
Research Report Future CRM Technology 2010 to 2013
Research Report Future CRM Technology 2010 to 2013Research Report Future CRM Technology 2010 to 2013
Research Report Future CRM Technology 2010 to 2013Ram Srivastava
 
Technological Hpothesis Research Plan In The CRM Future1
Technological Hpothesis Research Plan In The CRM Future1Technological Hpothesis Research Plan In The CRM Future1
Technological Hpothesis Research Plan In The CRM Future1Ram Srivastava
 
Atithi Devo Bhav - Guest is God (Incredible India)
Atithi  Devo  Bhav - Guest is God (Incredible India)Atithi  Devo  Bhav - Guest is God (Incredible India)
Atithi Devo Bhav - Guest is God (Incredible India)Ram Srivastava
 
Sprint Backlog Quick Start
Sprint Backlog Quick StartSprint Backlog Quick Start
Sprint Backlog Quick StartRam Srivastava
 
Sprint Backlog Template Multiple Burndowns(2)
Sprint Backlog Template Multiple Burndowns(2)Sprint Backlog Template Multiple Burndowns(2)
Sprint Backlog Template Multiple Burndowns(2)Ram Srivastava
 
Project Initiation Presentation Template
Project Initiation Presentation TemplateProject Initiation Presentation Template
Project Initiation Presentation TemplateRam Srivastava
 
Product Backlog Priority Overview
Product Backlog Priority OverviewProduct Backlog Priority Overview
Product Backlog Priority OverviewRam Srivastava
 
Measuring The Reliability Of An Agile Software Development Team
Measuring The Reliability Of An Agile Software Development TeamMeasuring The Reliability Of An Agile Software Development Team
Measuring The Reliability Of An Agile Software Development TeamRam Srivastava
 
Product Sprint Backlog 0 03
Product Sprint Backlog 0 03Product Sprint Backlog 0 03
Product Sprint Backlog 0 03Ram Srivastava
 
Measuring The Quality Of An Agile Software Development Team
Measuring The Quality Of An Agile Software Development TeamMeasuring The Quality Of An Agile Software Development Team
Measuring The Quality Of An Agile Software Development TeamRam Srivastava
 
Measuring Operational Cost Savings Associated With Going Agile
Measuring Operational Cost Savings Associated With Going AgileMeasuring Operational Cost Savings Associated With Going Agile
Measuring Operational Cost Savings Associated With Going AgileRam Srivastava
 
Introducing Agile User Stories
Introducing Agile User StoriesIntroducing Agile User Stories
Introducing Agile User StoriesRam Srivastava
 
Agile Epic Card Template
Agile Epic Card TemplateAgile Epic Card Template
Agile Epic Card TemplateRam Srivastava
 
Cmmi Ior Agile Why Not Embrace Both
Cmmi Ior Agile Why Not Embrace BothCmmi Ior Agile Why Not Embrace Both
Cmmi Ior Agile Why Not Embrace BothRam Srivastava
 

Mais de Ram Srivastava (20)

Michigan enterprise architecture framework
Michigan enterprise architecture frameworkMichigan enterprise architecture framework
Michigan enterprise architecture framework
 
Project audit & review checklist
Project audit & review checklistProject audit & review checklist
Project audit & review checklist
 
Research Report Future CRM Technology 2010 to 2013
Research Report Future CRM Technology 2010 to 2013Research Report Future CRM Technology 2010 to 2013
Research Report Future CRM Technology 2010 to 2013
 
Technological Hpothesis Research Plan In The CRM Future1
Technological Hpothesis Research Plan In The CRM Future1Technological Hpothesis Research Plan In The CRM Future1
Technological Hpothesis Research Plan In The CRM Future1
 
Atithi Devo Bhav - Guest is God (Incredible India)
Atithi  Devo  Bhav - Guest is God (Incredible India)Atithi  Devo  Bhav - Guest is God (Incredible India)
Atithi Devo Bhav - Guest is God (Incredible India)
 
Sprint Backlog Quick Start
Sprint Backlog Quick StartSprint Backlog Quick Start
Sprint Backlog Quick Start
 
Template Backlog
Template BacklogTemplate Backlog
Template Backlog
 
Agile User Story
Agile User StoryAgile User Story
Agile User Story
 
Sprint Backlog Template Multiple Burndowns(2)
Sprint Backlog Template Multiple Burndowns(2)Sprint Backlog Template Multiple Burndowns(2)
Sprint Backlog Template Multiple Burndowns(2)
 
Project Initiation Presentation Template
Project Initiation Presentation TemplateProject Initiation Presentation Template
Project Initiation Presentation Template
 
Product Backlog Priority Overview
Product Backlog Priority OverviewProduct Backlog Priority Overview
Product Backlog Priority Overview
 
Measuring The Reliability Of An Agile Software Development Team
Measuring The Reliability Of An Agile Software Development TeamMeasuring The Reliability Of An Agile Software Development Team
Measuring The Reliability Of An Agile Software Development Team
 
Product Sprint Backlog 0 03
Product Sprint Backlog 0 03Product Sprint Backlog 0 03
Product Sprint Backlog 0 03
 
Measuring The Quality Of An Agile Software Development Team
Measuring The Quality Of An Agile Software Development TeamMeasuring The Quality Of An Agile Software Development Team
Measuring The Quality Of An Agile Software Development Team
 
Measuring Operational Cost Savings Associated With Going Agile
Measuring Operational Cost Savings Associated With Going AgileMeasuring Operational Cost Savings Associated With Going Agile
Measuring Operational Cost Savings Associated With Going Agile
 
Introducing Agile User Stories
Introducing Agile User StoriesIntroducing Agile User Stories
Introducing Agile User Stories
 
Lets Talk Agile
Lets Talk AgileLets Talk Agile
Lets Talk Agile
 
Agile Epic Card Template
Agile Epic Card TemplateAgile Epic Card Template
Agile Epic Card Template
 
Forrester Agile
Forrester AgileForrester Agile
Forrester Agile
 
Cmmi Ior Agile Why Not Embrace Both
Cmmi Ior Agile Why Not Embrace BothCmmi Ior Agile Why Not Embrace Both
Cmmi Ior Agile Why Not Embrace Both
 

Último

From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 

Último (20)

From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 

Agile Project Management Methodologies

  • 1. Economy Informatics, 1-4/2005 27 Agile Software Project Management Methodologies Prof. Constanţa-Nicoleta BODEA, PhD Economic Informatics Department, Academy of Economic Studies, Bucharest Successfully project planning, coordinating and controlling in order to deal effectively with projects sponsors, customers, unexpected risks and changing scope are difficult tasks even for the most experienced project managers. Different surveys indicated that about half of the software projects were considered total failures and only a few of them were successful. The tight deadlines, volatile requirements and emerging technologies are the main reasons for this lake of performance. This agile project environment requires an agile project manage- ment. The paper presents the main characteristics of the agile software project management approaches such as: MSF for Agile Software Development, Extreme Programming, Scrum, Crystal, Feature Driven Development, DSDM. Keywords: software development, project management methodology, agile project manage- ment, XP, MSF for Agile Software Development. able and more efficient. We can consider a 1 Software project management meth- odologies Methodologies impose a disciplined process methodology containing ten basic elements: techniques, tools, deliverables, teams, roles, upon software development with the aim of skills, activities standards, quality measures making software development more predict- and project values [1]. Activities Milestones Planning Testing Team Values Quality Processes Teams Regression tests Project manager Object model Analyst MBWA Project plan Use cases Designer Use cases CRC cards Tester Deliverable Techniques Roles Envy/Dev. JAD facilitation Microsoft Project Java programming UML/ C++ STP Modeling MS Project OMT Personality Standards Tools Skills Fig. 1. Components of a project management methodology A specific methodology is needed depending mized quality. A larger methodology (with on the project size (number of people being more control elements) is needed when more coordinated), the criticality of the systems people are involved. Communication load being created and the priorities of the project. raises as the number of people involved in- For any point in the size/criticality space, a creases. Since methodology is a matter of scope of concerns to address is selected coordinating the people and managing the (which project roles, activities, deliverables, communication, its size must also rise, as the and standards to cover) and optimization cri- number of roles and deliverables types in- teria are selected. Methodologies therefore crease [2]. differ by the size, criticality, scope and opti- Considering the project deliverables critical-
  • 2. 28 Economy Informatics, 1-4/2005 ity the following four zones we can identify: problem than a large team. It does mean • Loss of comfort means that with a system there may be an area of overlap, where a failure, people will have to go and do more small team with a light methodology can work by hand, or call each other and repair a solve the same problem as a larger team with miscommunication. Examples might include a heavier methodology (figure 2). purchase support systems and corporate in- 2. The Agile Approach frastructure programs. The agile approach started in 1994 with some • Loss of discretionary moneys zone if the trials of semi-formal agile methodologies, loss of money or related valuables is merely such as RAD, DSDM, XP, Crystal, Scrum. uncomfortable These methodologies are based on agile • Loss of irreplaceable moneys zone if the methods. Agile methods are adaptive rather loss of moneys or related valuables has effect than predictive. Engineering methods tend to corresponding to going bankrupt. try to plan out a large part of the software • Loss of life zone if people are likely to die process in great detail for a long span of from a system malfunction. time, this works well until things change. So For a project with higher criticality more their nature is to resist change. The agile visible correctness (greater density) is re- methods, however, are waiting for change. quired. Density means more precision in the Agile methods are people-oriented rather artifacts, with tighter reviews and less toler- than process-oriented. The goal of engineer- ance. ing methods is to define a process that will work well whoever happens to be using it. Agile methods assert that no process will ever make up the skill of the development team, so the role of a process is to support the development team in their work. The declaration of principles and values in the agile approach is known as the Agile Software Development Manifesto, launched in 2001, after a two day workshop at Snow- bird Utah (figure 3). A non-profit organiza- tion the Agile Alliance was set up to promote Fig. 2. Methodology weight and problem knowledge and discussion of all the agile size methods. "Weight is cost": a relatively small increase Applying these principles creates the founda- in methodology size or specific density adds tion for managing IT projects in an agile ap- a relatively large amount to the cost of the proach. The basic characteristics of this ap- project. With fewer people, less methodology proach are the following: is needed; with less methodology, the people • Assume simplicity. As the project evolves work more efficiently. Working more effi- it should be assumed that the simplest solu- ciently, they can successfully address a larger tion is the best solution. Overbuilding the problem. When more people are put onto a system or any artifact of the project must be project, they need a heavier methodology to avoided. coordinate their work. The heavier method- • Embrace change. Since The stakeholder ology lowers their productivity, so more peo- understanding of the requirements will ple are needed on the project. Since method- change over time. Project stakeholders them- ology size grows slower than project size, selves may change as the project makes pro- eventually they get to a point where they can gress. Project stakeholders may change their solve the problem and manage the coordina- point of view, which in turn will change the tion activities. This does not mean that a goals and success criteria of the project man- small team can necessarily solve a larger agement effort.
  • 3. Economy Informatics, 1-4/2005 29 • Incremental change – the pressure to get it time. Or simply discard it when you no right the first time can overwhelm the best longer need it in an incremental manner. project manager. Instead of futilely trying to • Maximize stakeholder value. The project develop an all encompassing project plan stakeholders are investing resources (time, from the start, put a stake in the ground by money, facilities) to have a system deployed developing a small portion of the system, or that meets their needs. Stakeholders expect even a high–level model of a larger portion that their investment to be applied in the best of the system, and evolves this portion over way. “We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value: : Individuals and interactions over Processes and Tools. : Working software over Comprehensive documentation. : Customer collaboration over Contract negotiation. : Responding to change over Following a plan. That is, while there is value in the items on the right, we value the items on the left more.” Fig. 3. Agile Software Development Manifesto • Manage with a purpose Identify a valid the project stakeholders. The goal is not to purpose for creating the artifact and the audi- produce extraneous documentation, man- ence for that artifact. This principle also ap- agement artifacts or models of these artifacts. plies to a change to existing artifacts. 3. Some Agile Software Project Manage- • Rapid feedback. The time between an ac- ment Methodologies tion and the feedback on that action must be The agile approach focuses on: talent & skill minimized. Work closely with the stake- (fewer better people), proximity (direct and holders, to understand the requirements, to face-to-face communication), less paper, analyze those requirements, and develop an more tacit / verbal communication, just-in- actionable plan, which provides numerous time requirements and design, frequent De- opportunities for feedback. livery (incremental development), reflection, • Working software is the primary goal of quality in work. So, the people are very close the project. The goal of any software project related to the agile methodologies (figure 4). is to produce software that meets the needs of Activities Milestones Personality Planning Testing Team Values Quality Processes Teams People Regression tests Project manager Object model Analyst MBWA Project plan Designer Use cases Use cases CRC cards Tester Deliverable s Techniques Roles Envy/Dev. JAD facilitation Microsoft Project Java programming UML/ C++ STP Modeling MS Project OMT Standards Tools Skills Fig. 4. Components of an agile project management methodology
  • 4. 30 Economy Informatics, 1-4/2005 3.1 Extreme Programming (XP) method- jects require different kinds of methodolo- ology gies. The Crystals share a human orientation The roots of XP lie in the Smalltalk commu- with XP, but this people-centeredness is done nity, in the close collaboration of Kent Beck in a different way. Alistair considers that and Ward Cunningham in the late 1980's. people find it hard to follow a disciplined Both of them refined their practices on nu- process, thus rather than follow XP's high merous projects during the early 90's, extend- discipline; Alistair explores the least disci- ing their ideas of a software development ap- plined methodology that could still succeed, proach that was both adaptive and people- consciously trading off productivity for ease oriented. The crucial step from informal of execution. He thus considers that although practice to a methodology occurred in the Crystal is less productive than XP, more spring of 1996. Kent was asked to review the people will be able to follow it. progress of the C3 payroll project for Chrys- Alistair also puts a lot of weight in end of it- ler. The project was being carried out in eration reviews, thus encouraging the process Smalltalk by a contracting company and was to be self-improving. His assertion is that it- in trouble. Due to the low quality of the code erative development is there to find problems base, Kent recommended throwing out the early, and then to enable people to correct entire code base and starting from scratch. them. This places more emphasis on people The project then restarted under his leader- monitoring their process and tuning it as they ship. XP begins with four values: Communi- develop. cation, Feedback, Simplicity, and Courage. It 3.3 Scrum then builds up to a dozen practices which XP Scrum has been around for a while in object- projects should follow. Many of these prac- oriented circles. It focuses on the fact that de- tices are old, tried and tested techniques, yet fined and repeatable processes only work for often forgotten by many, including most tackling defined and repeatable problems planned processes. As well as resurrecting with defined and repeatable people in defined these techniques, XP weaves them into a and repeatable environments. synergistic whole where each one is rein- Scrum divides a project into iterations (which forced by the others. It is a strong emphasis they call sprints) of 30 days. Before you be- on testing. While all processes mention test- gin a sprint you define the functionality re- ing, most do so with a pretty low emphasis. quired for that sprint and then leave the team However XP puts testing at the foundation of to deliver it. The point is to stabilize the re- development, with every programmer writing quirements during the sprint. tests as they write their production code. The However management does not disengage tests are integrated into a continuous integra- during the sprint. Every day the team holds a tion and build process which yields a highly short (fifteen minute) meeting, called a stable platform for future development. scrum, where the team runs through what it On this platform XP builds an evolutionary will do in the next day. In particular they sur- design process that relies on refactoring a face to the management blocks: impediments simple base system with every iteration. All to progress that are getting in the way that design is centered on the current iteration management needs to resolve. They also re- with no design done for anticipated future port on what's been done so management needs. The result is a design process that is gets a daily update of where the project is. disciplined, yet startling, combining disci- Scrum literature focuses mainly on the itera- pline with adaptivity in a way that arguably tive planning and tracking process. It's very makes it the most well developed of all the close to the other agile in many respects and adaptive methodologies. should work well with the coding practices 3.2 Crystal methodologies from XP. Alistair developed this family of methodolo- 3.4 MSF for Agile Software Development gies considering that different kinds of pro- MSF provides a customized and scalable set
  • 5. Economy Informatics, 1-4/2005 31 of software development guidelines for ap- • Source check-in policies plication development improvement ([5]). • Role clusters and security groups MSF incorporates both agile and formal ap- • Document templates (Excel and Word) proaches, and then allows the user to select • Microsoft Project templates the most suitable path. MSF's flexible • Reports framework can be adapted to meet the needs • Project portal /SharePoint site template of any project, regardless of size or complex- MSF uses methodology templates to define ity. the process that individual projects follow. The MSF philosophy holds that there is no There is no universal process that works for single structure or process that optimally ap- all organizations, or even all projects within plies to the requirements and environments an organization. To address this, MSF pro- for all projects. MSF provides this guidance vides a flexible toolset that works with both without imposing prescriptive detail and al- agile and formal processes. Microsoft's lows the user to customize the content pro- Global Solution Integrator partners provide vided. MSF components can be applied indi- their own product consumable methodology vidually or collectively to improve success templates; or, you can create your own. Proc- rates for the many types of projects. MSF ess extensibility allows customization of guidance focuses on managing the "people work item types, check-in policies, custom and process." Because the needs and prac- reports and project management templates. tices of software development teams are con- stantly evolving, the materials gathered into Conclusions MSF are continually changing and expanding Getting projects faster is a universal desire of to keep pace. Additionally, MSF interacts management. The reality of project manage- with Microsoft Operations Framework ment is that we never really have the time to (MOF) to provide a smooth transition to the create perfect plans, to analyze all the op- operational environment, which is a require- tions. Agile approach provides some methods ment for long-term project success. for project management to become more ef- With MSF, process is not just documenta- fective. These methods need to be taken and tion. It also manifests itself as actual tool be- customized to the unique business environ- havior changes. When you chose the process ment of the project. at project inception, you are also choosing the workflow and work products, which then References drive how the system behaves. Support for 1. Alistair C. A Methodology Per Project, the software development life cycle process (arc@acm.org), Humans and Technology. (SDLC) is built-in, which makes for seamless 2. Harrison, N., Coplien, J, "Patterns of pro- workflow support. By integrating process ductive software organizations", Bell Labs into the tools team members use on a daily Technical Journal, summer, 1996. basis, MSF lowers the barrier to adopting 3. Jeffries, R., Beck, K., Extreme Program- process and enables the automatic collection ming, http://armaties.com/extreme.html. of cross-functional project metrics without 4. Fowler M, The New Methodology, Martin the overhead associated with manual report- Fowler.com ing. 5. Microsoft, Visual Studio 2005 Team Sys- The following elements of MSF are custom- tem: Microsoft Solutions Framework, 2004, izable: www.Microsoft.com . • Process Guidance 6. http://crystalmethodologies.org/ • Iteration structure • Entry criteria and exit criteria views • Work item type definitions and rules (ac- tivities and work products) • Work item queries