CALTRANS San Francisco-Oakland Bay Bridge Construction
Large, defining, signature bridges are always a sight to behold but so too are
the construction efforts and innovation to successfully turn concept into reality.
The newly released video at:
http://www.fluor.com/about_fluor/Pages/videos.aspx?channel=4&videoid=314
describes one such endeavor entering its final stages. The East Span of the San
Francisco-Oakland Bay Bridge is the largest public infrastructure project in
California’s history.
I hope you enjoy the video and as always I appreciate your feedback!


                                             FACT SHEET
CALTRANS San Francisco-Oakland Bay Bridge Construction
Client: California Department of Transportation (CALTRANS)

Location: San Francisco, CA, U.S.

The American Bridge/Fluor Joint Venture (ABFJV) is constructing the $1.43-billion, 625-meter-long
East Span of the San Francisco-Oakland Bay Bridge. This first-ever, single-tower, self-anchored
suspension (SAS) bridge is the largest public infrastructure project in California’s history.

The project team has met major construction milestones, including erecting the world’s largest cable
saddle on top of the steel tower at 495 feet (151 meters) and installing the final, main cable strand on
the SAS bridge five weeks ahead of schedule.

The ABFJV team designed a cable hauling system to install the strands from the deck anchorage on the
eastside, over the tower saddle, around the west cap beam, back through the tower saddle, and finally
into the cable anchorage on the eastside. The cable erection equipment includes a primary strand
hauling system or tramway and secondary hauling systems with transfer arms to float and install the
strands into the deviation saddles on the westside and through the tower saddle.

Next the installed 137 strands will be compacted into a bundle and wrapped with zinc paste and
stainless steel S-wire before being painted.




Client's Challenge

The eastern span of the Bay Bridge was damaged during the 1989 Loma Prieta earthquake when a
section of the bridge’s upper deck collapsed onto the lower deck. While the damage to the bridge was
relatively minor, its structural failure underscored the seismic vulnerability of this major transportation
link for the San Francisco area. The California Department of Transportation (Caltrans) specified the
bridge withstand major seismic activity. Additionally, in an area known for its signature bridges, the
aesthetics of the bridge also demanded construction excellence.

The suspension cable system is a major construction challenge with a single cable anchored on one end
of the bridge crossing over the top of the single tower, looping under the span’s opposite end, and
crossing back over the tower top to the other side. Additional challenges include construction of the
falsework supporting the new road deck and the single tower, followed by the transfer of the road decks
to the suspension cable system and incorporation of elements that will provide seismic stability.
Our Solution

The American Bridge/Fluor joint venture (ABFJV) began construction on the SAS portion of the bridge in
2006. When finished in 2013, the SAS, together with the Skyway and Oakland Touchdown, will complete
the East Span of the Bay Bridge. Initial construction activities included logistics planning and long-range
procurement. A 400-foot-long, 1,700-metric-ton-capacity shear leg crane barge was constructed to lift
the massive segments of the deck and tower. Bridge components are being fabricated in the United
States, Europe, and Asia. A secondary office was established in Shanghai, People’s Republic of China, to
oversee production of the main structural steel fabrication and supply.

ABFJV erected a falsework structure to support the new road deck. Bridge components shipped via eight
shipments, arriving every two months from China. Road deck segments are lifted from the barges onto
the falsework by the shear leg crane barge, with the road deck in-place after 28 lifts. The 160-meter tall
single tower from which the bridge is suspended will complete concurrently. After installing the 800-mm
diameter main cable and suspender cables, the deck weight will be transferred from the temporary
falsework to the main cable.




Conclusion

The completion of the SAS Bridge will provide the San Francisco Bay area with not only a breathtaking
bridge but also a sound structure that will withstand major seismic events and serve as an emergency
lifeline route for disaster responses. ABFJV is providing new levels of innovation and an exacting
precision in work performance and construction quality to deliver a signature bridge that meets these
requirements.

This project exemplifies the high-level coordination required between contractors, agencies, and the
public to make sure all elements of this highly complex, multi-segmented, mega project come together
as planned.

More Related Content

What's hot

Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
IJSRD
 

What's hot (20)

I-64 Kanawha River Bridge
I-64 Kanawha River BridgeI-64 Kanawha River Bridge
I-64 Kanawha River Bridge
 
Failure of chauras bridge
Failure of chauras bridgeFailure of chauras bridge
Failure of chauras bridge
 
Types of bridge(concept)
Types of bridge(concept)Types of bridge(concept)
Types of bridge(concept)
 
Essentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designersEssentials slide in bridge construction a guide for bridge designers
Essentials slide in bridge construction a guide for bridge designers
 
Bridges in hilly areas
Bridges in hilly areasBridges in hilly areas
Bridges in hilly areas
 
Finalest final report
Finalest final reportFinalest final report
Finalest final report
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009
 
challanges made for construction of bridge in hilly areas
challanges made for construction of bridge in hilly areaschallanges made for construction of bridge in hilly areas
challanges made for construction of bridge in hilly areas
 
Inspection,Repair and Strengthening of PSC Bridge.
Inspection,Repair and Strengthening of PSC  Bridge.Inspection,Repair and Strengthening of PSC  Bridge.
Inspection,Repair and Strengthening of PSC Bridge.
 
Bridge Lecture Slide by Micotol
Bridge Lecture Slide by MicotolBridge Lecture Slide by Micotol
Bridge Lecture Slide by Micotol
 
Construction of bridges
Construction of bridgesConstruction of bridges
Construction of bridges
 
Modelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension BridgeModelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension Bridge
 
Deh Cho Bridge
Deh Cho BridgeDeh Cho Bridge
Deh Cho Bridge
 
Construction challenge of bridge in hilly areas
 Construction challenge of bridge in hilly areas Construction challenge of bridge in hilly areas
Construction challenge of bridge in hilly areas
 
Construction of a High Level Bridge
Construction of a High Level BridgeConstruction of a High Level Bridge
Construction of a High Level Bridge
 
Cable suspension bridge pdf
Cable suspension bridge pdfCable suspension bridge pdf
Cable suspension bridge pdf
 
Veterans' Glass City Skyway Bridge
Veterans' Glass City Skyway BridgeVeterans' Glass City Skyway Bridge
Veterans' Glass City Skyway Bridge
 
Bridges
BridgesBridges
Bridges
 
Construction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasConstruction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly Areas
 
BRIDGE OVERVIEW
BRIDGE OVERVIEWBRIDGE OVERVIEW
BRIDGE OVERVIEW
 

Viewers also liked (13)

Stan Shipley Folio 11jly01
Stan Shipley   Folio 11jly01Stan Shipley   Folio 11jly01
Stan Shipley Folio 11jly01
 
2016 11 17 DougBurch_2 page residential project list
2016 11  17  DougBurch_2 page residential project list2016 11  17  DougBurch_2 page residential project list
2016 11 17 DougBurch_2 page residential project list
 
Dorthy Pautz Resume
Dorthy Pautz ResumeDorthy Pautz Resume
Dorthy Pautz Resume
 
Chandler Eason Projects 2010
Chandler Eason Projects 2010Chandler Eason Projects 2010
Chandler Eason Projects 2010
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
 
Terri Brown Resume 7-28-15
Terri Brown Resume 7-28-15Terri Brown Resume 7-28-15
Terri Brown Resume 7-28-15
 
RESUME PCA
RESUME PCARESUME PCA
RESUME PCA
 
Catherine Railey Resume - 2015
Catherine Railey Resume - 2015Catherine Railey Resume - 2015
Catherine Railey Resume - 2015
 
Mandy D. Dougherty - Resume
Mandy D. Dougherty - ResumeMandy D. Dougherty - Resume
Mandy D. Dougherty - Resume
 
RichardChauvetShortResume2015
RichardChauvetShortResume2015RichardChauvetShortResume2015
RichardChauvetShortResume2015
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
Francisco Quintana Resume
Francisco Quintana Resume Francisco Quintana Resume
Francisco Quintana Resume
 

Similar to San francisco oakland bay bridge

Golden gate bridge 2
Golden gate bridge 2Golden gate bridge 2
Golden gate bridge 2
caltec
 
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedInCalifornia Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
Alfred Mangus
 
Hoover dam bypass_bridge
Hoover dam bypass_bridgeHoover dam bypass_bridge
Hoover dam bypass_bridge
Dusan Oravec
 
Hoover dam bypass_bridge2
Hoover dam bypass_bridge2Hoover dam bypass_bridge2
Hoover dam bypass_bridge2
George Martin
 

Similar to San francisco oakland bay bridge (20)

Golden gate bridge 2
Golden gate bridge 2Golden gate bridge 2
Golden gate bridge 2
 
golden gate bridge
golden gate bridgegolden gate bridge
golden gate bridge
 
Suspension Bridges
Suspension BridgesSuspension Bridges
Suspension Bridges
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
BDE80_p10
BDE80_p10BDE80_p10
BDE80_p10
 
Lane ave bridge report
Lane ave bridge reportLane ave bridge report
Lane ave bridge report
 
Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Bridges by the Numbers
Bridges by the NumbersBridges by the Numbers
Bridges by the Numbers
 
Bridge and its types
Bridge and its types Bridge and its types
Bridge and its types
 
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedInCalifornia Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
California Orthotropic-October-2005 & Millau Normandie France Mangus LinkedIn
 
Susppension bridges
Susppension bridges Susppension bridges
Susppension bridges
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Golden gate bridge, San Francisco
Golden gate bridge, San Francisco Golden gate bridge, San Francisco
Golden gate bridge, San Francisco
 
Hoover dam bypass_bridge25
Hoover dam bypass_bridge25Hoover dam bypass_bridge25
Hoover dam bypass_bridge25
 
Hoover dam bypass_bridge
Hoover dam bypass_bridgeHoover dam bypass_bridge
Hoover dam bypass_bridge
 
Hoover dam bypass_bridge2
Hoover dam bypass_bridge2Hoover dam bypass_bridge2
Hoover dam bypass_bridge2
 

More from Bob Prieto

More from Bob Prieto (20)

Application of system life cycle processes to large complex engineering and c...
Application of system life cycle processes to large complex engineering and c...Application of system life cycle processes to large complex engineering and c...
Application of system life cycle processes to large complex engineering and c...
 
Engineering and construction project startup
Engineering and construction project startupEngineering and construction project startup
Engineering and construction project startup
 
Deeper look at the physics of projects
Deeper look at the physics of projectsDeeper look at the physics of projects
Deeper look at the physics of projects
 
Systems nature of large complex projects
Systems nature of large complex projectsSystems nature of large complex projects
Systems nature of large complex projects
 
Governance of mega and giga programs
Governance of mega and giga programsGovernance of mega and giga programs
Governance of mega and giga programs
 
Strengthen outcome based capital project delivery
Strengthen outcome based capital project deliveryStrengthen outcome based capital project delivery
Strengthen outcome based capital project delivery
 
Rethinking Interface Management
Rethinking Interface ManagementRethinking Interface Management
Rethinking Interface Management
 
Rework in Engineering & Construction Projects
Rework in Engineering & Construction ProjectsRework in Engineering & Construction Projects
Rework in Engineering & Construction Projects
 
Reversing Global Warming
Reversing Global WarmingReversing Global Warming
Reversing Global Warming
 
Improving infrastructure project success
Improving infrastructure project successImproving infrastructure project success
Improving infrastructure project success
 
Large complex project success
Large complex project successLarge complex project success
Large complex project success
 
Impact of correlation on risks in programs and projects
Impact of correlation on risks in programs and projects Impact of correlation on risks in programs and projects
Impact of correlation on risks in programs and projects
 
Decision Making Under Uncertainty
Decision Making Under UncertaintyDecision Making Under Uncertainty
Decision Making Under Uncertainty
 
Post Dorian Engineering & Construction in the Bahamas
Post Dorian Engineering & Construction in the BahamasPost Dorian Engineering & Construction in the Bahamas
Post Dorian Engineering & Construction in the Bahamas
 
Debating project decisions in an ai enabled environment
Debating project decisions in an ai enabled environmentDebating project decisions in an ai enabled environment
Debating project decisions in an ai enabled environment
 
Chapters 11 12 13
Chapters 11  12  13Chapters 11  12  13
Chapters 11 12 13
 
Chapter 10
Chapter 10Chapter 10
Chapter 10
 
Chapter 9
Chapter 9Chapter 9
Chapter 9
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
Theory of Management of Large Complex Projects - Chapter 7
Theory of Management of Large Complex Projects - Chapter 7Theory of Management of Large Complex Projects - Chapter 7
Theory of Management of Large Complex Projects - Chapter 7
 

Recently uploaded

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 

San francisco oakland bay bridge

  • 1. CALTRANS San Francisco-Oakland Bay Bridge Construction Large, defining, signature bridges are always a sight to behold but so too are the construction efforts and innovation to successfully turn concept into reality. The newly released video at: http://www.fluor.com/about_fluor/Pages/videos.aspx?channel=4&videoid=314 describes one such endeavor entering its final stages. The East Span of the San Francisco-Oakland Bay Bridge is the largest public infrastructure project in California’s history. I hope you enjoy the video and as always I appreciate your feedback! FACT SHEET CALTRANS San Francisco-Oakland Bay Bridge Construction Client: California Department of Transportation (CALTRANS) Location: San Francisco, CA, U.S. The American Bridge/Fluor Joint Venture (ABFJV) is constructing the $1.43-billion, 625-meter-long East Span of the San Francisco-Oakland Bay Bridge. This first-ever, single-tower, self-anchored suspension (SAS) bridge is the largest public infrastructure project in California’s history. The project team has met major construction milestones, including erecting the world’s largest cable saddle on top of the steel tower at 495 feet (151 meters) and installing the final, main cable strand on the SAS bridge five weeks ahead of schedule. The ABFJV team designed a cable hauling system to install the strands from the deck anchorage on the eastside, over the tower saddle, around the west cap beam, back through the tower saddle, and finally
  • 2. into the cable anchorage on the eastside. The cable erection equipment includes a primary strand hauling system or tramway and secondary hauling systems with transfer arms to float and install the strands into the deviation saddles on the westside and through the tower saddle. Next the installed 137 strands will be compacted into a bundle and wrapped with zinc paste and stainless steel S-wire before being painted. Client's Challenge The eastern span of the Bay Bridge was damaged during the 1989 Loma Prieta earthquake when a section of the bridge’s upper deck collapsed onto the lower deck. While the damage to the bridge was relatively minor, its structural failure underscored the seismic vulnerability of this major transportation link for the San Francisco area. The California Department of Transportation (Caltrans) specified the bridge withstand major seismic activity. Additionally, in an area known for its signature bridges, the aesthetics of the bridge also demanded construction excellence. The suspension cable system is a major construction challenge with a single cable anchored on one end of the bridge crossing over the top of the single tower, looping under the span’s opposite end, and crossing back over the tower top to the other side. Additional challenges include construction of the falsework supporting the new road deck and the single tower, followed by the transfer of the road decks to the suspension cable system and incorporation of elements that will provide seismic stability.
  • 3. Our Solution The American Bridge/Fluor joint venture (ABFJV) began construction on the SAS portion of the bridge in 2006. When finished in 2013, the SAS, together with the Skyway and Oakland Touchdown, will complete the East Span of the Bay Bridge. Initial construction activities included logistics planning and long-range procurement. A 400-foot-long, 1,700-metric-ton-capacity shear leg crane barge was constructed to lift the massive segments of the deck and tower. Bridge components are being fabricated in the United States, Europe, and Asia. A secondary office was established in Shanghai, People’s Republic of China, to oversee production of the main structural steel fabrication and supply. ABFJV erected a falsework structure to support the new road deck. Bridge components shipped via eight shipments, arriving every two months from China. Road deck segments are lifted from the barges onto the falsework by the shear leg crane barge, with the road deck in-place after 28 lifts. The 160-meter tall single tower from which the bridge is suspended will complete concurrently. After installing the 800-mm diameter main cable and suspender cables, the deck weight will be transferred from the temporary falsework to the main cable. Conclusion The completion of the SAS Bridge will provide the San Francisco Bay area with not only a breathtaking bridge but also a sound structure that will withstand major seismic events and serve as an emergency lifeline route for disaster responses. ABFJV is providing new levels of innovation and an exacting precision in work performance and construction quality to deliver a signature bridge that meets these requirements. This project exemplifies the high-level coordination required between contractors, agencies, and the public to make sure all elements of this highly complex, multi-segmented, mega project come together as planned.