RE Project Ingredients
• Environmentally-permittable
• Technically-feasible
• Financially-viable

… and the linchpin of any utility-scale project
 is TRANSMISSION of energy to the end-
 user market


       Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
       the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580               2
Market Drivers
• U.S. electricity demand, coal
    consumption, & electricity
    prices
• Renewable resource location
• Federal direction
• State renewable portfolio standards
• Price convergence
• Transmission use and constraints
      Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
      the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580               3
U.S. Electricity Demand, Coal
Consumption, & Electricity Prices
• Key electricity consuming areas:
    Texas, California, Midwest
• Key coal consuming areas for
    electricity: Texas, Midwest, Southeast
• Highest prices for electricity: Northeast,
    California, Texas

These key criteria define the “target market”
  for future renewable energy destinations
      Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
      the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580               4
Electricity Consumption




                                                                        High energy
                                                                        demand areas

                                            Source: National Priorities Project Database


    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580               5
Coal Consumption




                                                                        High coal,
                                                                        NOX, SOX,
                                                                        CO2
                                            Source: National Priorities Project Database


    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580               6
Average 2008 Residential
Electricity Price in U.S.


                                                                               High
                                                                               energy
                                                                               price
                                                                               areas




    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580               7
U.S. Residential Electricity Price
 Historical Trend




Growing energy use/price, even with DSM/energy efficiency
          Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
          the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580               8
Renewable Resource Location
• Wind in Intermountain / Great
   Plains area, California
• Solar in desert Southwest
• Geothermal in Nevada, California
• Best resources tend to be in
   more remote locations, not
   near major population centers, areas of
   highest coal use, or areas with highest
   electricity prices
      Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
      the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580               9
U.S. Wind Resources




                                                                 Source: NREL




    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             10
U.S. Wind Potential




    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             11
U.S. Solar Resources




    Source: NREL

     Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
     the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             12
U.S. Geothermal Resources




  Source: NREL

     Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
     the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             13
Federal Direction
• Ensure that 10 percent of the nation's
    electricity comes from renewable
    sources by 2012 and 25 percent by 2025
• Implement an economy-wide cap-and-trade
    program to reduce greenhouse gas
    emissions 80 percent by 2050
• Reduced GHG in tandem with retiring coal
    plants opens a window for alternative
    sources for energy mix, if it can be
    delivered to the end-user market
      Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
      the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             14
Renewable Portfolio Standards




    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             15
Price Convergence




    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             16
Grid Use
• Grid built to handle transmission &
    distribution needs for a utility’s service
    territory with ties to only adjoining
    utilities
• Never intended to handle cross-country
    transmission of energy
• Transmission investment and rate of
    return have historically lagged generation


       Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
       the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             17
Current U.S. Grid




       Source: Global Energy Decisions, LLC, June, 2008
    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             18
National Extra High-Voltage
Overlay Proposal




    Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
    the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             19
Transmission Issues
• According to North American Reliability
    Council new generation supplies are
    forecast to outpace transmission,
    constraining wind development with a
    planned 145,000 megawatts of capacity
    over the next 10 years
• Generation growth over 10 years: 21%
• Transmission line growth over 10 years:
    10% with 1,700 circuit miles

      Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
      the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             20
Transmission Solutions
• Texas approved a $4.9 billion transmission
    system upgrade moving power from West
    Texas to major population centers.
    Capable of transmitting 18,500 MW of
    wind power. Cost: $4/month/retail
    customer
• National upsurge in transmission investment
    due to Congressional action to increase
    transmission project allowed rate of return

       Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
       the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             21
Our Problem




High energy demand
& prices
Renewable resources
         Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
         the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             22
One Possible Future Solution




High voltage transmission
High energy demand & prices
Renewable resources
          Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
          the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             23
Value
• North / South grid allows leveraging
    natural variability of wind throughout
    Great Plains and complementary solar,
    just as a portfolio of different stocks
    lowers overall volatility
• East / West grid allows delivery to the
    target markets with greatest value to
    producers and producing states


       Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
       the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             24
Kinder Morgan Rockies Express




• Natural gas pipeline from Cheyenne, WY to
    Clarington, OH
• Limited “off-ramp” to deliver gas to
    ultimate destination, connecting market
    with discounted gas prices (CO) to one
    with premium prices (East Coast)
       Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
       the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             25
Kinder Morgan Northeast Express




Natural gas pipeline Clarington, OH to
 Linden, NJ
       Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
       the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             26
Summary
• Environmental concerns are leading
    generation source changes
• Renewable resources need connections
    to end-user electric markets which offer
    higher prices to spur renewable growth
• Price convergence will multiply the need for
    transmission to accommodate renewable
    energy generation
• Energy storage will dampen RE variability,
    adding greater reliability and value to its
    generation
       Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
       the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             27
Summary, cont’d.
• Choice between less-productive, local
   renewable resources vs. highly-productive
   resources connected to high-demand,
   high-priced markets
• Currently, intermediate states can derail
   renewable generation and its multi-state
   transmission to demand centers
• Need to incent the intermediate states to
   gain from transmission, not just producer
   and end user
      Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
      the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             28
Summary, cont’d.
• To harvest best resources with economies
    of scale, national extra-high voltage
    transmission system similar to interstate
    highway & natural gas pipeline system
    is needed
• Combine different RE technologies whose
    energy production profiles are
    complementary to improve transmission
    asset utilization and project rate of return

       Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
       the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             29
Contact Information

Ron Miller, P.E.
303-723-5465
303-748-3441 cell
ronmiller74@comcast.net




      Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
      the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             30
Questions and Answers




 Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to
 the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580             31

Mais conteúdo relacionado

Mais procurados

Striking the Balance between Policy and Development of New Generation in Toda...
Striking the Balance between Policy and Development of New Generation in Toda...Striking the Balance between Policy and Development of New Generation in Toda...
Striking the Balance between Policy and Development of New Generation in Toda...Energy Network marcus evans
 
Kansas Environmental Forum presentation
Kansas Environmental Forum presentationKansas Environmental Forum presentation
Kansas Environmental Forum presentationThe Far Shore, LLC
 
Multivariate Analysis Of Energy Policy Options Using Lindo
Multivariate Analysis Of Energy Policy Options Using LindoMultivariate Analysis Of Energy Policy Options Using Lindo
Multivariate Analysis Of Energy Policy Options Using LindoBrian Bissett
 
Document- "DOE Chemical Industry Response to President Bush's Global Climate ...
Document- "DOE Chemical Industry Response to President Bush's Global Climate ...Document- "DOE Chemical Industry Response to President Bush's Global Climate ...
Document- "DOE Chemical Industry Response to President Bush's Global Climate ...Obama White House
 
Hydrogen 101 September
Hydrogen 101  SeptemberHydrogen 101  September
Hydrogen 101 Septemberscottgreenway
 
Solar Energy in the Military
Solar Energy in the MilitarySolar Energy in the Military
Solar Energy in the MilitaryRick Borry
 
Letter from American Chemistry Council 1.23.03
Letter from American Chemistry Council 1.23.03Letter from American Chemistry Council 1.23.03
Letter from American Chemistry Council 1.23.03Obama White House
 
Canadian Chemical Producers Association
Canadian Chemical Producers AssociationCanadian Chemical Producers Association
Canadian Chemical Producers AssociationJennifer Hindorff
 
Vt h2 dev_plan_041012
Vt h2 dev_plan_041012Vt h2 dev_plan_041012
Vt h2 dev_plan_041012Thomas Wolak
 
COP15, The Deal Sabotage At Copenhagen CE 82
COP15, The  Deal  Sabotage At  Copenhagen  CE 82COP15, The  Deal  Sabotage At  Copenhagen  CE 82
COP15, The Deal Sabotage At Copenhagen CE 82Sandip Sen
 
Western Energy Corridor -- Full Study
Western Energy Corridor -- Full StudyWestern Energy Corridor -- Full Study
Western Energy Corridor -- Full StudyPorts-To-Plains Blog
 
APAC LNG PDF
APAC LNG PDFAPAC LNG PDF
APAC LNG PDFPaul Lim
 
Us Energy Market Investment Opportunities
Us Energy Market Investment OpportunitiesUs Energy Market Investment Opportunities
Us Energy Market Investment OpportunitiesKW Miller
 
African Energy Project Development Challenges Power Gen Africa 092012
African Energy Project Development Challenges   Power Gen Africa 092012African Energy Project Development Challenges   Power Gen Africa 092012
African Energy Project Development Challenges Power Gen Africa 092012ronmiller74
 

Mais procurados (18)

Striking the Balance between Policy and Development of New Generation in Toda...
Striking the Balance between Policy and Development of New Generation in Toda...Striking the Balance between Policy and Development of New Generation in Toda...
Striking the Balance between Policy and Development of New Generation in Toda...
 
Kansas Environmental Forum presentation
Kansas Environmental Forum presentationKansas Environmental Forum presentation
Kansas Environmental Forum presentation
 
Multivariate Analysis Of Energy Policy Options Using Lindo
Multivariate Analysis Of Energy Policy Options Using LindoMultivariate Analysis Of Energy Policy Options Using Lindo
Multivariate Analysis Of Energy Policy Options Using Lindo
 
Maryland Offshore Wind FAQ
Maryland Offshore Wind FAQMaryland Offshore Wind FAQ
Maryland Offshore Wind FAQ
 
Regional Energy Clusters
Regional Energy ClustersRegional Energy Clusters
Regional Energy Clusters
 
Document- "DOE Chemical Industry Response to President Bush's Global Climate ...
Document- "DOE Chemical Industry Response to President Bush's Global Climate ...Document- "DOE Chemical Industry Response to President Bush's Global Climate ...
Document- "DOE Chemical Industry Response to President Bush's Global Climate ...
 
Hydrogen 101 September
Hydrogen 101  SeptemberHydrogen 101  September
Hydrogen 101 September
 
Solar Energy in the Military
Solar Energy in the MilitarySolar Energy in the Military
Solar Energy in the Military
 
Letter from American Chemistry Council 1.23.03
Letter from American Chemistry Council 1.23.03Letter from American Chemistry Council 1.23.03
Letter from American Chemistry Council 1.23.03
 
Canadian Chemical Producers Association
Canadian Chemical Producers AssociationCanadian Chemical Producers Association
Canadian Chemical Producers Association
 
Vt h2 dev_plan_041012
Vt h2 dev_plan_041012Vt h2 dev_plan_041012
Vt h2 dev_plan_041012
 
COP15, The Deal Sabotage At Copenhagen CE 82
COP15, The  Deal  Sabotage At  Copenhagen  CE 82COP15, The  Deal  Sabotage At  Copenhagen  CE 82
COP15, The Deal Sabotage At Copenhagen CE 82
 
Western Energy Corridor -- Full Study
Western Energy Corridor -- Full StudyWestern Energy Corridor -- Full Study
Western Energy Corridor -- Full Study
 
CENIC Green IT
CENIC Green ITCENIC Green IT
CENIC Green IT
 
APAC LNG PDF
APAC LNG PDFAPAC LNG PDF
APAC LNG PDF
 
2016 02 Power Engineering
2016 02 Power Engineering2016 02 Power Engineering
2016 02 Power Engineering
 
Us Energy Market Investment Opportunities
Us Energy Market Investment OpportunitiesUs Energy Market Investment Opportunities
Us Energy Market Investment Opportunities
 
African Energy Project Development Challenges Power Gen Africa 092012
African Energy Project Development Challenges   Power Gen Africa 092012African Energy Project Development Challenges   Power Gen Africa 092012
African Energy Project Development Challenges Power Gen Africa 092012
 

Semelhante a Drivers Of The New Transmission System 031910

Renewable Energy Technology Overview
Renewable Energy Technology OverviewRenewable Energy Technology Overview
Renewable Energy Technology Overviewronmiller74
 
Should Vermont's Ridges Be Developed For Wind Power?
Should Vermont's Ridges Be Developed For Wind Power?Should Vermont's Ridges Be Developed For Wind Power?
Should Vermont's Ridges Be Developed For Wind Power?Energize Vermont
 
Eco green group utility overview presentation final
Eco green group utility overview presentation finalEco green group utility overview presentation final
Eco green group utility overview presentation finalTony Green
 
FireRiskModel_Phillips_John
FireRiskModel_Phillips_JohnFireRiskModel_Phillips_John
FireRiskModel_Phillips_JohnJohn Phillips
 
World-Wide Electrical Vehicle Market: all you need to know
World-Wide Electrical Vehicle Market:  all you need to knowWorld-Wide Electrical Vehicle Market:  all you need to know
World-Wide Electrical Vehicle Market: all you need to knowpaul young cpa, cga
 
Michigan Energy Forum - February 6, 2014 - A Pragmatic Approach to Climate Ch...
Michigan Energy Forum - February 6, 2014 - A Pragmatic Approach to Climate Ch...Michigan Energy Forum - February 6, 2014 - A Pragmatic Approach to Climate Ch...
Michigan Energy Forum - February 6, 2014 - A Pragmatic Approach to Climate Ch...AnnArborSPARK
 
Camps U Sv.2
Camps U Sv.2Camps U Sv.2
Camps U Sv.2clroxin
 
Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectMitchellDong
 
Solar and Wind Manufacturing
Solar and Wind ManufacturingSolar and Wind Manufacturing
Solar and Wind Manufacturingroxinsolutions
 
Electric utility fuel sources and prices
Electric utility fuel sources and pricesElectric utility fuel sources and prices
Electric utility fuel sources and pricesElectricityMatch.com
 
Renewable Energy in Canada
Renewable Energy in Canada Renewable Energy in Canada
Renewable Energy in Canada Serene Zawaydeh
 
Wave of the future - Electrical Car Market - September 2017
Wave of the future - Electrical Car Market - September 2017Wave of the future - Electrical Car Market - September 2017
Wave of the future - Electrical Car Market - September 2017paul young cpa, cga
 
Eco Green Group Utility Overview Presentation FINAL
Eco Green Group Utility Overview Presentation FINALEco Green Group Utility Overview Presentation FINAL
Eco Green Group Utility Overview Presentation FINALTony Green
 
Electrical Vehicles| Analysis and Commentary|
Electrical Vehicles| Analysis and Commentary| Electrical Vehicles| Analysis and Commentary|
Electrical Vehicles| Analysis and Commentary| paul young cpa, cga
 

Semelhante a Drivers Of The New Transmission System 031910 (20)

Renewable Energy Technology Overview
Renewable Energy Technology OverviewRenewable Energy Technology Overview
Renewable Energy Technology Overview
 
Home
Home
Home
Home
 
Gdc
GdcGdc
Gdc
 
Should Vermont's Ridges Be Developed For Wind Power?
Should Vermont's Ridges Be Developed For Wind Power?Should Vermont's Ridges Be Developed For Wind Power?
Should Vermont's Ridges Be Developed For Wind Power?
 
Transmission Summit 2014
Transmission Summit 2014Transmission Summit 2014
Transmission Summit 2014
 
Eco green group utility overview presentation final
Eco green group utility overview presentation finalEco green group utility overview presentation final
Eco green group utility overview presentation final
 
FireRiskModel_Phillips_John
FireRiskModel_Phillips_JohnFireRiskModel_Phillips_John
FireRiskModel_Phillips_John
 
World-Wide Electrical Vehicle Market: all you need to know
World-Wide Electrical Vehicle Market:  all you need to knowWorld-Wide Electrical Vehicle Market:  all you need to know
World-Wide Electrical Vehicle Market: all you need to know
 
SoCo Today
SoCo TodaySoCo Today
SoCo Today
 
Michigan Energy Forum - February 6, 2014 - A Pragmatic Approach to Climate Ch...
Michigan Energy Forum - February 6, 2014 - A Pragmatic Approach to Climate Ch...Michigan Energy Forum - February 6, 2014 - A Pragmatic Approach to Climate Ch...
Michigan Energy Forum - February 6, 2014 - A Pragmatic Approach to Climate Ch...
 
Camps U Sv.2
Camps U Sv.2Camps U Sv.2
Camps U Sv.2
 
Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar Project
 
Solar and Wind Manufacturing
Solar and Wind ManufacturingSolar and Wind Manufacturing
Solar and Wind Manufacturing
 
Electric utility fuel sources and prices
Electric utility fuel sources and pricesElectric utility fuel sources and prices
Electric utility fuel sources and prices
 
Renewable Energy in Canada
Renewable Energy in Canada Renewable Energy in Canada
Renewable Energy in Canada
 
Wave of the future - Electrical Car Market - September 2017
Wave of the future - Electrical Car Market - September 2017Wave of the future - Electrical Car Market - September 2017
Wave of the future - Electrical Car Market - September 2017
 
Eco Green Group Utility Overview Presentation FINAL
Eco Green Group Utility Overview Presentation FINALEco Green Group Utility Overview Presentation FINAL
Eco Green Group Utility Overview Presentation FINAL
 
Electrical Vehicles| Analysis and Commentary|
Electrical Vehicles| Analysis and Commentary| Electrical Vehicles| Analysis and Commentary|
Electrical Vehicles| Analysis and Commentary|
 
SURA Meeting Washington
SURA Meeting WashingtonSURA Meeting Washington
SURA Meeting Washington
 
Surf utrecht nov 10
Surf utrecht nov 10Surf utrecht nov 10
Surf utrecht nov 10
 

Drivers Of The New Transmission System 031910

  • 1. Drivers of the New Transmission System CLE International Ritz Carlton, Denver March 19, 2010 by: Ron Miller, P.E.
  • 2. RE Project Ingredients • Environmentally-permittable • Technically-feasible • Financially-viable … and the linchpin of any utility-scale project is TRANSMISSION of energy to the end- user market Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 2
  • 3. Market Drivers • U.S. electricity demand, coal consumption, & electricity prices • Renewable resource location • Federal direction • State renewable portfolio standards • Price convergence • Transmission use and constraints Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 3
  • 4. U.S. Electricity Demand, Coal Consumption, & Electricity Prices • Key electricity consuming areas: Texas, California, Midwest • Key coal consuming areas for electricity: Texas, Midwest, Southeast • Highest prices for electricity: Northeast, California, Texas These key criteria define the “target market” for future renewable energy destinations Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 4
  • 5. Electricity Consumption High energy demand areas Source: National Priorities Project Database Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 5
  • 6. Coal Consumption High coal, NOX, SOX, CO2 Source: National Priorities Project Database Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 6
  • 7. Average 2008 Residential Electricity Price in U.S. High energy price areas Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 7
  • 8. U.S. Residential Electricity Price Historical Trend Growing energy use/price, even with DSM/energy efficiency Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 8
  • 9. Renewable Resource Location • Wind in Intermountain / Great Plains area, California • Solar in desert Southwest • Geothermal in Nevada, California • Best resources tend to be in more remote locations, not near major population centers, areas of highest coal use, or areas with highest electricity prices Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 9
  • 10. U.S. Wind Resources Source: NREL Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 10
  • 11. U.S. Wind Potential Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 11
  • 12. U.S. Solar Resources Source: NREL Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 12
  • 13. U.S. Geothermal Resources Source: NREL Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 13
  • 14. Federal Direction • Ensure that 10 percent of the nation's electricity comes from renewable sources by 2012 and 25 percent by 2025 • Implement an economy-wide cap-and-trade program to reduce greenhouse gas emissions 80 percent by 2050 • Reduced GHG in tandem with retiring coal plants opens a window for alternative sources for energy mix, if it can be delivered to the end-user market Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 14
  • 15. Renewable Portfolio Standards Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 15
  • 16. Price Convergence Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 16
  • 17. Grid Use • Grid built to handle transmission & distribution needs for a utility’s service territory with ties to only adjoining utilities • Never intended to handle cross-country transmission of energy • Transmission investment and rate of return have historically lagged generation Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 17
  • 18. Current U.S. Grid Source: Global Energy Decisions, LLC, June, 2008 Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 18
  • 19. National Extra High-Voltage Overlay Proposal Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 19
  • 20. Transmission Issues • According to North American Reliability Council new generation supplies are forecast to outpace transmission, constraining wind development with a planned 145,000 megawatts of capacity over the next 10 years • Generation growth over 10 years: 21% • Transmission line growth over 10 years: 10% with 1,700 circuit miles Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 20
  • 21. Transmission Solutions • Texas approved a $4.9 billion transmission system upgrade moving power from West Texas to major population centers. Capable of transmitting 18,500 MW of wind power. Cost: $4/month/retail customer • National upsurge in transmission investment due to Congressional action to increase transmission project allowed rate of return Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 21
  • 22. Our Problem High energy demand & prices Renewable resources Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 22
  • 23. One Possible Future Solution High voltage transmission High energy demand & prices Renewable resources Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 23
  • 24. Value • North / South grid allows leveraging natural variability of wind throughout Great Plains and complementary solar, just as a portfolio of different stocks lowers overall volatility • East / West grid allows delivery to the target markets with greatest value to producers and producing states Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 24
  • 25. Kinder Morgan Rockies Express • Natural gas pipeline from Cheyenne, WY to Clarington, OH • Limited “off-ramp” to deliver gas to ultimate destination, connecting market with discounted gas prices (CO) to one with premium prices (East Coast) Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 25
  • 26. Kinder Morgan Northeast Express Natural gas pipeline Clarington, OH to Linden, NJ Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 26
  • 27. Summary • Environmental concerns are leading generation source changes • Renewable resources need connections to end-user electric markets which offer higher prices to spur renewable growth • Price convergence will multiply the need for transmission to accommodate renewable energy generation • Energy storage will dampen RE variability, adding greater reliability and value to its generation Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 27
  • 28. Summary, cont’d. • Choice between less-productive, local renewable resources vs. highly-productive resources connected to high-demand, high-priced markets • Currently, intermediate states can derail renewable generation and its multi-state transmission to demand centers • Need to incent the intermediate states to gain from transmission, not just producer and end user Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 28
  • 29. Summary, cont’d. • To harvest best resources with economies of scale, national extra-high voltage transmission system similar to interstate highway & natural gas pipeline system is needed • Combine different RE technologies whose energy production profiles are complementary to improve transmission asset utilization and project rate of return Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 29
  • 30. Contact Information Ron Miller, P.E. 303-723-5465 303-748-3441 cell ronmiller74@comcast.net Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 30
  • 31. Questions and Answers Copyright© 2010 Ronald L. Miller. Material can be shared or copied with attribution to the copyright holder. http://www.linkedin.com/pub/ron-miller-p-e/4/842/580 31