SlideShare uma empresa Scribd logo
1 de 42
Baixar para ler offline
CORPORATE PRESENTATION
MAY 2012




                         WWW .R O MA R C O .C O M
Cautionary Statement
	
  
The	
  informa-on	
  in	
  this	
  document	
  has	
  been	
  prepared	
  as	
  of	
  March	
  13,	
  2012.	
  Certain	
  statements	
  contained	
  in	
  this	
  document	
  cons-tute	
  “forward-­‐looking	
  statements”	
  
within	
  the	
  meaning	
  of	
  the	
  United	
  States	
  Private	
  Securi-es	
  Li-ga-on	
  Reform	
  Act	
  of	
  1995	
  and	
  forward	
  looking	
  informa-on	
  under	
  the	
  provisions	
  of	
  Canadian	
  provincial	
  
securi-es	
  laws.	
  When	
  used	
  in	
  this	
  document,	
  the	
  words	
  “an-cipate”,	
  “expect”,	
  “es-mate”,	
  “forecast”,	
  “will”,	
  “planned”,	
  and	
  similar	
  expressions	
  are	
  intended	
  to	
  
iden-fy	
  forward-­‐looking	
  statements	
  or	
  informa-on.	
  
	
  
Specifically,	
  this	
  presenta-on	
  contains	
  forward	
  looking	
  statements	
  regarding	
  the	
  results	
  and	
  projec-ons	
  contained	
  in	
  the	
  March	
  13,	
  2012	
  technical	
  report	
  of	
  the	
  	
  




                                                                                                                                                                                                                                                                        TSX : R
Haile	
  Gold	
  project,	
  including	
  the	
  expected	
  mine	
  life,	
  recovery,	
  capital	
  costs,	
  cash	
  opera-ng	
  costs	
  and	
  other	
  costs	
  and	
  an-cipated	
  produc-on	
  of	
  the	
  described	
  open	
  
pit	
  mine,	
  the	
  projected	
  internal	
  rate	
  of	
  return,	
  the	
  projected	
  payback	
  period,	
  the	
  availability	
  of	
  capital	
  for	
  development,	
  sensi-vity	
  to	
  metal	
  prices,	
  ore	
  grade,	
  the	
  
reserve	
  and	
  resource	
  es-mates	
  on	
  the	
  project,	
  the	
  financial	
  analysis,	
  the	
  -ming	
  for	
  comple-on	
  of	
  the	
  revised	
  feasibility	
  study	
  on	
  the	
  	
  Haile	
  Gold	
  	
  project,	
  	
  the	
  -ming	
  
and	
  amount	
  of	
  future	
  produc-on,	
  the	
  -ming	
  of	
  construc-on	
  of	
  the	
  proposed	
  mine	
  and	
  process	
  facili-es,	
  capital	
  and	
  opera-ng	
  expenditures,	
  the	
  -ming	
  of	
  the	
  
receipt	
  	
  of	
  permits,	
  rights	
  and	
  authoriza-ons,	
  communica-ons	
  with	
  local	
  stakeholders	
  and	
  community	
  rela-ons,	
  availability	
  of	
  financing	
  and	
  any	
  and	
  all	
  other	
  -ming,	
  
development,	
  opera-onal,	
  financial,	
  economic,	
  legal,	
  regulatory	
  and	
  poli-cal	
  factors	
  that	
  may	
  influence	
  future	
  events	
  or	
  condi-ons	
  and	
  expected	
  drilling	
  ac-vi-es.	
  	
  
In	
  addi-on,	
  this	
  presenta-on	
  also	
  contains	
  updated	
  resource	
  es-mates	
  contained	
  in	
  the	
  March	
  13,	
  2012	
  technical	
  reports.	
  




                                                                                                                                                                                                                                                                        WWW .R O MA R C O .C O M
	
  
Scien-fic	
  and	
  technical	
  informa-on	
  referred	
  herein	
  has	
  been	
  extracted	
  from	
  and	
  are	
  hereby	
  qualified	
  in	
  their	
  en-rety	
  by	
  reference	
  to	
  the	
  aforemen-oned	
  technical	
  
reports	
  (“Technical	
  Reports”).	
  	
  Joshua	
  Snider,	
  P.E.,	
  Thomas	
  L.	
  Drielick,	
  P.E.,	
  Lee	
  “Pat”	
  Gochnour,	
  M.M.S.A.,	
  John	
  Marek,	
  P.E.	
  and	
  Derek	
  Wiwer,	
  P.E.	
  are	
  responsible	
  
for	
  preparing	
  the	
  Technical	
  Reports.	
  	
  Each	
  of	
  the	
  above	
  referenced	
  persons	
  is	
  a	
  “qualified	
  person”	
  as	
  defined	
  in	
  Na-onal	
  Instrument	
  43-­‐101	
  —	
  Standards	
  of	
  
Disclosure	
  for	
  Mineral	
  Projects.	
  
	
  
Such	
  forward-­‐looking	
  statements	
  are	
  based	
  on	
  a	
  number	
  of	
  material	
  factors	
  and	
  assump-ons,	
  including,	
  but	
  not	
  limited	
  in	
  any	
  manner,	
  those	
  disclosed	
  in	
  any	
  
another	
  of	
  Romarco’s	
  public	
  filings,	
  and	
  include	
  the	
  ul-mate	
  determina-on	
  of	
  mineral	
  reserves	
  and	
  resources,	
  availability	
  and	
  final	
  receipt	
  of	
  required	
  approvals,	
  
licenses	
  and	
  permits,	
  sufficient	
  working	
  capital	
  to	
  develop	
  and	
  operate	
  the	
  proposed	
  mine,	
  access	
  to	
  adequate	
  services	
  and	
  supplies,	
  economic	
  condi-ons,	
  
commodity	
  prices,	
  foreign	
  currency	
  exchange	
  rates,	
  interest	
  rates,	
  access	
  to	
  capital	
  and	
  debt	
  markets	
  and	
  associated	
  cost	
  of	
  funds,	
  availability	
  of	
  a	
  qualified	
  work	
  
force,	
  lack	
  of	
  social	
  opposi-on	
  and	
  legal	
  challenges,	
  and	
  the	
  ul-mate	
  ability	
  to	
  mine,	
  process	
  and	
  sell	
  mineral	
  products	
  on	
  economically	
  favorable	
  terms.	
  While	
  
Romarco	
  considers	
  these	
  assump-ons	
  to	
  be	
  reasonable	
  based	
  on	
  informa-on	
  currently	
  available	
  to	
  it,	
  they	
  may	
  prove	
  to	
  be	
  incorrect.	
  Actual	
  results	
  may	
  vary	
  from	
  
such	
  forward-­‐looking	
  informa-on	
  for	
  a	
  variety	
  of	
  reasons,	
  including	
  but	
  not	
  limited	
  to	
  risks	
  and	
  uncertain-es	
  disclosed	
  in	
  other	
  Romarco	
  filings	
  at	
  www.sedar.com.	
  
Forward-­‐looking	
  statements	
  are	
  based	
  upon	
  management’s	
  beliefs,	
  es-mate	
  and	
  opinions	
  on	
  the	
  date	
  the	
  statements	
  are	
  made	
  and,	
  other	
  than	
  as	
  required	
  by	
  law,	
  
Romarco	
  does	
  not	
  intend,	
  and	
  undertakes	
  no	
  obliga-on	
  to	
  update	
  any	
  forward-­‐looking	
  informa-on	
  to	
  reflect,	
  among	
  other	
  things,	
  new	
  informa-on	
  or	
  future	
  events	
  
	
  	
  
Cau-onary	
  Note	
  to	
  United	
  States	
  Investors	
  Concerning	
  Es-mates	
  of	
  Measured,	
  Indicated	
  and	
  Inferred	
  Resources:	
  
Certain	
  tables	
  may	
  use	
  the	
  terms	
  “Measured”,	
  “Indicated”	
  and	
  “Inferred”	
  Resources.	
  United	
  States	
  investors	
  are	
  advised	
  that	
  while	
  such	
  terms	
  are	
  recognized	
  and	
  
required	
  by	
  Canadian	
  regula-ons,	
  however,	
  the	
  United	
  States	
  Securi-es	
  and	
  Exchange	
  Commission	
  does	
  not	
  recognize	
  them.	
  “Inferred	
  Mineral	
  Resources”	
  have	
  a	
  
great	
  amount	
  of	
  uncertainty	
  as	
  to	
  their	
  existence,	
  and	
  as	
  to	
  their	
  economic	
  and	
  legal	
  feasibility.	
  It	
  cannot	
  be	
  assumed	
  that	
  all	
  or	
  any	
  part	
  of	
  an	
  Inferred	
  Mineral	
  
Resource	
  will	
  ever	
  be	
  upgraded	
  to	
  a	
  higher	
  category.	
  Under	
  Canadian	
  rules,	
  es-mates	
  of	
  Inferred	
  Mineral	
  Resources	
  may	
  not	
  form	
  the	
  basis	
  of	
  feasibility	
  or	
  other	
  
economic	
  studies.	
  United	
  States	
  investors	
  are	
  cau-oned	
  not	
  to	
  assume	
  that	
  all	
  or	
  any	
  part	
  of	
  Measured	
  or	
  Indicated	
  Mineral	
  Resources	
  will	
  ever	
  be	
  converted	
  into	
  
Mineral	
  Reserves.	
  United	
  States	
  investors	
  are	
  also	
  cau-oned	
  not	
  to	
  assume	
  that	
  all	
  or	
  any	
  part	
  of	
  a	
  Mineral	
  Resource	
  is	
  economically	
  or	
  legally	
  mineable.	
  
	
  
All	
  figures	
  are	
  US$	
  unless	
  otherwise	
  indicated	
  
 	

                                                                                                                                                                                                                                                            2	
  
 
2011 HIGHLIGHTS




                                                                                               TSX : R
u  Completed Feasibility Study              u  Acquired 5 regional targets,
                                                 initiated drilling at 3
u  Filed for all State & Federal permits




                                                                                               WWW .R O MA R C O .C O M
                                             u  Permitted regional drilling projects in
u  Completed 179,000 meters drill program       less than 30 days
     •  Discovered 2 mineralized zones
         - Mustang & Palomino                u  Permitted and built assay lab
u  Ordered key long lead-time equipment          •  $5 million state of the art lab
     u  Locked in pricing

u  Completed C$92mm bought-deal
    financing



                                                                                       3	
  
Why own ROMARCO?
Near term, low cost gold producer with strong project economics




                                                                              TSX : R
Located in a mining friendly jurisdiction with excellent infrastructure

Private land – 100% ownership of surface, minerals, water




                                                                              WWW .R O MA R C O .C O M
No royalties

Solid cash position (~ US$93 million), no debt

70% Institutionally held

Significant exploration upside – open pit and at depth

One federal permit – all others issued by the State of SC - pending

                                                                      4	
  
HAILE GOLD MINE
MINING HISTORY
                  CAROLINA SLATE BELT                                   §  First Gold rush before California
                                                                        §  Carolinas led US Gold production until
Kentucky             West Virginia                                          1848




                                                                                                                       TSX : R
                                                                        §  Second US Mint in Charlotte, NC
Tennessee
                                                                        §  Original 49ers came from East Coast
                                                                        §  Significant gold production in 80s-90s




                                                                                                                       WWW .R O MA R C O .C O M
                                      Russell Mine
                                     Hickory                            §  Mining part of local history/community
                                 Reed Mine
                                                      Ironwood

                                                         North Carolina §  500 active mines in South Carolina today
                           Howie Mine
                             Locust
                  Haile Mine                 Brewer Mine

                       Bayberry              Buzzard
                                      Ridgeway Mine
             Dorn Mine
                                     Elm
    Magruder Mine     Bante Mine
                     Tathom Mine
  Columbia Mine
                                   South Carolina

           Georgia




                                                                                                             5	
  
HAILE GOLD MINE
HISTORY
                  •  First discovery by Colonel
                    Benjamin Haile




                                                       TSX : R
                  •  Beginning with placer
                    mining “panning” in 1827




                                                       WWW .R O MA R C O .C O M
                  •  Mining continued with
                    trenching, underground and
                    open pit methods through
                    the early 1990s



                                               6	
  
LOCAL COMMUNITY
TOWN OF KERSHAW




                          TSX : R
                          WWW .R O MA R C O .C O M
                  7	
  
AERIAL OF HAILE




8	
  




        WWW .R O MA R C O .C O M   TSX : R
WETLANDS AT
HAILE PROPERTY - wetlands




                                                                                            TSX : R
                                                                                            WWW .R O MA R C O .C O M
  Typical Palustrine        Typical Palustrine                  Non-Relatively
  Emergent Wetland     Forested Wetland (inundated)            Permanent Waters
                                                         (intermittent stream channel)




                                                      Duckwood
                                                      (location of Tailings Facility)




                                                                                    9	
  
HAILE GOLD MINE PERMITTING

      ALL BASELINE STUDIES REVEAL    No threatened or endangered species




                                                                                        TSX : R
                                               No historical sites




                                                                                        WWW .R O MA R C O .C O M
                                          No fish or protected wildlife


                                       No impact on local water supplies


                                         No impact on recreation areas


                                    Property impacted by 200 years of mining
                                                                               10	
  
PROVEN RECLAMATION
TECHNIQUES




                              TSX : R
                              WWW .R O MA R C O .C O M
                     11	
  
HGM PERMITTING




                                                                                                                TSX : R
                  Federal – USACE*                                                State – DHEC**
     •    404 Wetlands Permit only                                    •    401 Water Quality Certification
             USACE is sole deciding                                   •    Mining Permit




                                                                                                                WWW .R O MA R C O .C O M
          • 
             regulatory body                                          •    Operating Permit
          •  All other agencies are
                                                                      •    Air Quality Permit
             cooperating or commenting
             agencies only – EPA, US Fish                             •    Others
             and Wildlife, etc.
          •  Schedule pending




* US Army Corps of Engineers
** South Carolina Department of Health and Environmental Control	

                                    12	
  
ENVIRONMENTAL IMPACT
STATEMENT PROCESS
          þ Contractor	
  (3rd	
  Party)	
  SelecFon	
  –	
  Sept.	
  2,	
  2011	
  (announced	
  Sept.	
  26,	
  2011)

          þ                 NoFce	
  of	
  Intent	
  Federal	
  Register	
  –	
  Sept.	
  23,	
  2011	
  




                                                                                                                                    TSX : R
          þ                                       30	
  day	
  noFce	
  period	
  

          þ                         Public	
  Scoping	
  MeeFng	
  –	
  Oct.	
  27,	
  2011	
  




                                                                                                                                    WWW .R O MA R C O .C O M
          þ                  Scoping	
  Comment	
  Period	
  Closed	
  –	
  Nov.	
  28,	
  2011	
  
CURRENT
 STAGE                                        PreparaFon	
  of	
  DraD	
  EIS	
  
                                                        DraD	
  EIS	
  filed	
  

                                                  45	
  day	
  Review	
  Period	
  

                                Prepare	
  Final	
  EIS	
  and	
  Response	
  to	
  Comments	
  

                         Final	
  EIS	
  includes	
  comments,	
  amendments	
  if	
  necessary	
  

                                         30	
  day	
  minimum	
  comment	
  period	
  
                                                                                                                           13	
  
                                               Record	
  of	
  Decision	
  (ROD)	
  
CLEAR PLAN TO BRING
 HAILE INTO PRODUCTION
    •    Strong balance sheet with approximately $93M in cash and no debt(1)
    •    Well defined project schedules and clear development milestones




                                                                                                                           TSX : R
 Project Schedule for EIS                                                       Haile Milestones and Status Report	


                                      2011       2012   2013        2014       Milestone / Activity               Status




                                                                                                                           WWW .R O MA R C O .C O M
                             Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
                                                                               Complete feasibility study             P
                                                                               State operating permit submitted       P
Feasibility Study
                                                                               401/404 permit submitted               P
Optimization                                                                   Resource / reserve report              P
                                                                               Expand Haile  Horseshoe               P
Permitting
                                                                               Identify new targets                   P
Construction                                                                   Acquire other properties               P
                                                                               Explore regional targets               P
Production
                                                                               Update Resource                        P
Exploration                                                                    Draft EIS                           2012




                                                                                                                  14	
  
    (1) As disclosed in Q1 MDA May 7, 2012
…… in the meantime….
Preparing for Production

   People         §  Operating team in place




                                                                             TSX : R
                                                                             WWW .R O MA R C O .C O M
   Construction   §  Engineering work 40% complete


                  §  Caterpillar trucks – warehoused in SC
   Equipment
                  §  Mills, shovels, ancillary equipment ordered

                  §  Continue studies on underground system
   Exploration
                  §  85,000 meters of drilling in 2012


                                                                    15	
  
STRONG BOARD, MANAGEMENT
  TECHNICAL TEAM
 Proven gold mine development, finance, permitting and operations experience	

                              Romarco has the team in place to bring Haile into production	





                                                                                                                                  TSX : R
 Experienced Board of Directors                                   Strong Management  Technical Team
Leendert Krol, acting Chairman                             Diane R. Garrett, Ph.D., President  CEO
§  Former Newmont                                         §  Former Dayton Mining, US Global Investors
                                                           James R. Arnold, Sr. VP, COO
Diane R. Garrett                                           §  Former Freeport, Gold Fields – Richards Award Winner




                                                                                                                                  WWW .R O MA R C O .C O M
§  Former Dayton Mining, US Global Investors
                                                           Stan Rideout, Sr. VP, CFO
James R. Arnold                                            §  Former Phelps Dodge
§  Former Freeport, Gold Fields – Richards Award Winner
                                                           David Thomas, VP, General Manager
Don MacDonald                                              James Berry, Chief Geologist  Regional Exploration Manager
§  CFO KGHM International (formerly QuadraFNX), former    §  Former Barrick
    NovaGold, DeBeers, Dayton Mining
                                                           Brent Anderson, Mine Manager
John Marsden                                               §  Former Quadra, Freeport
§  Consultant, former Freeport – Richards Award Winner
                                                           Mike Gleason, Construction Manager
Patrick Michaels                                           §  Former Freeport
§  Portfolio Manager – Zuri-invest, Switzerland           Jim Wickens, Process Manager
                                                           §  Former Barrick
Gary A. Sugar
§  Former RBC Capital Markets                             Johnny Pappas, Director of Environmental Affairs
                                                           §  Former Freeport
Robert van Doorn
§  Former Mundoro, Rio Narcea, Morgan Stanley             Ramona Schneider, Environmental Manager
                                                           §  Former Kinross
                                                           Dan Symons, Vice President, Investor Relations
                                                           §  Former Renmark Financial                                  16	
  
DETAILED ENGINEERING
                                                 EP	
  CompleFon	
  Graph	
  
   100%	
  




                                                                                                                                                             TSX : R
    80%	
  



    60%	
  




                                                                                                                                                             WWW .R O MA R C O .C O M
    40%	
  



    20%	
  



      0%	
  
          Start	
      7/1/11	
            12/30/11	
                6/29/12	
           12/28/12	
             6/28/13	
          12/27/13	
  


                         Planned	
  	
             Fee	
  at	
  Risk	
  Milestones	
           Earned	
  Hours	
              Burned	
  Hours	
  



                      •  44% complete at March 31, 2012
                      •  Targeting 75% complete by end of 2012
                                                                                                                                                    17	
  
HAILE EQUIPMENT
                                              •  Equipment is being warehoused
                                                 in South Carolina




                                                                                    TSX : R
                                              •  Pricing is locked in ($32mm)




                                                                                    WWW .R O MA R C O .C O M
 Mills and shovels have been ordered with fixed pricing ($11mm)
 Equipment balance ($55mm) – purchase orders in process –
 price substantially negotiated                                            18	
  
RESOURCE GROWTH
At year end 2011                                                              2011
PLAN VIEW




                                                                                                   TSX : R
                                                                                                   WWW .R O MA R C O .C O M
                    CHAMPION      SMALL   SOUTH PIT       LEDBETTER   SNAKE

HAILE
LONG
SECTION

                                                MUSTANG
                                                                              HORSESHOE
     2010 GOLD MINERALIZATION
                                                                                          19	
  
     2011 GOLD MINERALIZATION GROWTH                  PALOMINO
RESOURCE GROWTH
At year end 2011                                                                                         2011
PLAN VIEW
                                                           3.5 KM
                                                                                             LEDBETTER




                                                                                                                                   TSX : R
                                                         MUSTANG

                           CHAMPION
                                                                                                              HORSESHOE




                                                                                                                                   WWW .R O MA R C O .C O M
                                      SMALL
                                                                                                          SNAKE




                                                    SOUTH PIT                               PALOMINO




                        CHAMPION	

      SMALL	

          SOUTH PIT	

      LEDBETTER	

     SNAKE	


HAILE
LONG
SECTION

                                                                    MUSTANG	

                                                                                                         HORSESHOE
          US$950 RESERVE PIT LIMITS                                                                                       20	
  
                                                                       PALOMINO
RESOURCE GROWTH	

At year end 2011	

                                                                               2011
PLAN VIEW

                                                                                      LEDBETTER




                                                                                                                            TSX : R
                                                      MUSTANG

                           CHAMPION
                                                                                                       HORSESHOE




                                                                                                                            WWW .R O MA R C O .C O M
                                      SMALL
                                                                                                   SNAKE




                                                 SOUTH PIT                           PALOMINO




                        CHAMPION         SMALL          SOUTH PIT        LEDBETTER     SNAKE

HAILE
LONG
SECTION

                                                                MUSTANG	

          US$950 RESERVE PIT LIMITS                                                               HORSESHOE
          US$1200 RESOURCE SHELL                                                                                   21	
  
                                                                    PALOMINO
RESOURCE GROWTH	

                                                                                              85,000 meters of
At year end 2011	

                                                                                              drilling in 2012


                                                                                                               LEDBETTER




                                                                                                                                                         TSX : R
                                                                     MUSTANG

                               CHAMPION                                                                                            HORSESHOE




                                                                                                                                                         WWW .R O MA R C O .C O M
                                          SMALL
                                                                                                                           SNAKE




                                                                SOUTH PIT
                                                                                                    PALOMINO




                           CHAMPION          SMALL                     SOUTH PIT           LEDBETTER            SNAKE
HAILE LONG SECTION




         US$950 RESERVE PIT LIMITS
                                                                                                                                   HORSESHOE
                                                                            MUSTANG	

        US$1200 RESOURCE SHELL
        DISCOVERY HOLE
                                                  RC-1816                                                                                       22	
  
                                                                                    RCT-129                                     RC-1724
        2012 EXPLORATION TARGETS              77.7m of 8.0 g/t Au                                              PALOMINO
                                                                               70.1m @ 5.5 g/t Au                           62.5m @9.6 g/t Au
RESOURCES  RESERVES
                        OPEN PIT  UNDERGROUND
      2011              MEASURED + INDICATED RESOURCES AT US$1,200 GOLD (1)
                                                         METRIC TONNES                 g/t    CONTAINED oz




                                                                                                                       TSX : R
                                                             (000s)                             Au (000s)
   MEASURED                                                                   36,894   1.79           2,125
   INDICATED                                                                  34,277   1.74           1,914




                                                                                                                       WWW .R O MA R C O .C O M
   MEASURED + INDICATED                                                       71,171   1.77           4,039


   INFERRED                                                                   20,125   1.24             801

      2010              RESERVES AT US$950 GOLD (1)

                                                         METRIC TONNES                 g/t    CONTAINED oz
                                                             (000s)                             Au (000s)
   PROVEN RESERVE                                                             19,592   2.19           1,382
   PROBABLE RESERVE                                                           10,917   1.82             636
   PROVEN  PROBABLE                                                          30,509   2.06           2,018
   RESERVE
  (1)  From March 13, 2012 Technical Report filed on www.sedar.com on March 19, 2012
                                                                                                              23	
  
INTRODUCTION TO THE
  HAILE GOLD MINE PROJECT

                 FEBRUARY 2011                                             §  Feasibility completed




                                                                                                                                               TSX : R
                                                                                                                                               WWW .R O MA R C O .C O M
                  $320 million (1)                                         §  One of lowest capital cost projects in industry


                                                                           §  One of highest grade open-pit projects in
                  2.06 g/t (2)
                                                                             industry

                  $379/oz (2)(3)
                 ($347/oz first 5 years)
                                                                          §  One of lowest operating cost projects in industry



(1) Capital cost estimate from December 31, 2011 MDA (includes $30 million for contingency and $17 million for inflation)
(2) As per February 2011 Feasibility Study results included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com   24	
  
(3) Includes silver byproduct credit
LOW CAPITAL COST
                 Development Capex per ounce of Measured  Indicated Resources (inclusive) (US$/oz Au Eq.)(1)

                $156




                                                                                                                                                                   TSX : R
                                           $83                                                                                     Average: $85
                                                                    $81
                                                                                              $78




                                                                                                                                                                   WWW .R O MA R C O .C O M
                                                                                                                     $70
                                                                                                                             $66
                                                                                                                                              $63




                Torex                 Rainy River                 Extorre          International Tower Guyana Goldfields   Romarco        Victoria Gold
                                                                                            Hill

                                                                                                                                                          25	
  
Source: BMO Capital Markets, as at April 30, 2012
(1) Includes precious metals only calculated at long term consensus prices of Au US$1,200/oz and Ag of US$21.35/oz
LOW CAPITAL COST
                                   Unfunded Development Capex(1) for Primary Open Pit Asset (US$mm)

                                        Financing Risk – Unfunded Development Capex as % of Current Market Capitalization
               517%                       148%                    76%                       194%           440%       65%                 42%




                                                                                                                                                           TSX : R
               $1,704              $632


                                          $632                                                                                Average: $629

                                                                  $582




                                                                                                                                                           WWW .R O MA R C O .C O M
                                                                                           $511


                                                                                                         $434




                                                                                                                       $283
                                                                                                                                         $256




       International Tower           Rainy River                  Torex           Guyana Goldfields   Victoria Gold   Extorre           Romarco
                Hill

                                                                                                                                                  26	
  
Source: BMO Capital Markets, as at April 30, 2012
(1) Development capex plus US$25mm per annum until production start, less current cash balance
HIGH GRADE FOR OPEN PIT




                                                                                                                                              TSX : R
3.50!            3.17!
3.00!

2.50!
                                            2.09!        2.06!




                                                                                                                                              WWW .R O MA R C O .C O M
2.00!
                                                                              1.46!
1.50!
                                                                                                1.03!
1.00!                                                                                                              0.78!         0.73!
0.50!

0.00!
         Guyana Goldfields!               NovaGold!      ROMARCO!        Gabriel Resources!   Detour Gold!      Victoria Gold!   Andina!




                                                       Reserve Grade for Primary Open Pit Asset (g/t Au) (1)




                                                                                                                                     27	
  
    (1) Source: Company Disclosure at March 31, 2012
LOW CASH COST




                                                                                                                                                                           TSX : R
                         $700!
                                                      $617!                                                                            LOWEST QUARTILE AVERAGE CASH
                         $600!                                                                                                         COST IN Q4 2011 (1)




                                                                                                                                                                           WWW .R O MA R C O .C O M
                         $500!
                                                                                                  $379!                                    $428!

                         $400!


                         $300!


                         $200!


                         $100!


                            $0!
                                         Industry Average (1)                                 ROMARCO                                   Lowest Quartile (1)
                                                                                             LOM Average (2)




                                                                                                                                                                  28	
  
(1)  Source: Brook Hunt estimates
(2)  As per February 2011 Feasibility Study results included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com
NPV  IRR SENSITIVITY
TO GOLD PRICE

                                                                    Pre-tax NPV and IRR Sensitivity to Gold Price (1)




                                                                                                                                                                                                                 TSX : R
                                                                                             ($ Millions, except gold price)

                                         Gold
                                                                                                                                                                       PAYBACK	

                                         Price	

           NPV @0%	

                NPV @ 5%	

               NPV @ 10%	

                   IRR %	

                                                                                                                                                                        YEARS	

                                        Per oz.	





                                                                                                                                                                                                                 WWW .R O MA R C O .C O M
                                          $1500	

              $1,426	

                   $930	

                   $621	

                   47.0%	

                     2.0	


                                          $1400	

              $1,259	

                   $811	

                   $534	

                   42.3%	

                     2.2	


                                          $1300	

              $1,092	

                   $693	

                   $447	

                   37.6%	

                     2.4	


                                          $1200	

               $925	

                    $575	

                   $359	

                   32.7%	

                     2.7	


                                          $1100	

               $758	

                    $457	

                   $272	

                   27.6%	

                     3.1	


                                          $1000	

               $591	

                    $339	

                   $185	

                   22.3%	

                     3.8	


              BASE CASE                  $950	

               $507	

                   $279	

                    $141	

                   19.6%	

                      4.2	

                                           $800	

               $257	

                    $102	

                    $10	

                   10.7%	

                     7.6	


                                           $700	

                $90	

                   ($16)	

                   ($77)	

                   4.0%	

                     9.4	





                                                                                                                                                                                                        29	
  
(1) As per February 2011 Feasibility Study included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com - based on capital costs of $275 million not updated capital cost of $320
million from December 31, 2011 MDA
HAILE GOLD MINE
FEASIBILITY STUDY HIGHLIGHTS


u  Feasibility Study does not include deep




                                                        TSX : R
    mineralization:




                                                        WWW .R O MA R C O .C O M
    u  Horseshoe, Mustang, Palomino and Snake
        Deep deposits
u  Opportunities for reducing strip ratio by
    removing saddles between pits
u  Opportunities to expand operation through
    open pit  underground – system remains
    open along strike and at depth             30	
  
HAILE GOLD MINE
FEASIBILITY STUDY HIGHLIGHTS

u    7,000 tpd throughput
u    Designed for 14,000 tpd




                                                                                 TSX : R
u    Recovery: 83.7 %
u    Avg. annual Au production: 150k oz/yr initially




                                                                                 WWW .R O MA R C O .C O M
u    Strip Ratio: 7.2:1 (LOM)

                                                 REGRIND
                                                 FLOTATION
       CRUSH           GRIND       FLOTATION     CONCENTRATE
                                                 •  12 – 16% max pull
                                                 •  13 – 15 micron




                                                                        31	
  
PROPOSED                      Ore Processing,
                         Process Water Recycling 
HAILE PROCESSING PLANT       Water Treatment




                                                     TSX : R
                                                     WWW .R O MA R C O .C O M
                                            32	
  
KERSHAW MINERAL LAB




33	
  




         WWW .R O MA R C O .C O M   TSX : R
LAB OPERATIONS




34	
  




         WWW .R O MA R C O .C O M   TSX : R
CAROLINA SLATE BELT
     Ironwood
                                                  Hickory




                                                                     TSX : R
                                                                     WWW .R O MA R C O .C O M
                                  Haile



                30	
  Miles	
             North
                                                            35	
  
NEW REGIONAL
 EXPLORATION TARGETS
•  2 in North Carolina                                          Kentucky	
  
   •  Hickory – currently drilling                                                            West	
  Virginia	
  




                                                                                                                                                                                TSX : R
     •  Historical production during 1800s
     •  Historical drilling consists of 11 core holes and 130
                                                                Tennessee	
  
        RC holes
      •  Completed 25 core hole phase one program
             •  HKDH-11-002 encountered 10.7m of 4.5 g/t




                                                                                                                                                                                WWW .R O MA R C O .C O M
      •  Currently drilling a 17 core hole follow-up
         program                                                                                                           Hickory	
                 Ironwood	
  


                                                                                                                                 Locust	
               North	
  Carolina	
  
                                                                                              Haile	
  Mine	
  
                                                                                                     Bayberry	
                        Buzzard	
  
   •  Ironwood – currently drilling                                                                                    Elm	
  
    •  The highest grade encountered in the trenching was
       9.1 g/t
    •  Twelve shallow RC holes and two core holes have                                                               South	
  Carolina	
  
       been historically drilled
    •  Completed 11 core hole phase one program
    •  Completed 7 core hole follow-up program                                  Georgia	
  

            •  Results pending




                                                                                                                                                                    36	
  
NEW REGIONAL
 EXPLORATION TARGETS
•  3 in South Carolina                                         Kentucky	
  
   •  Bayberry – currently drilling                                                          West	
  Virginia	
  




                                                                                                                                                                               TSX : R
     •  Similar host rocks, alteration and mineralization as
        observed at Haile
                                                               Tennessee	
  
     •  74 shallow rotary holes, 8 RC holes, and 8 core
        holes historically drilled on the property
     •  Romarco completed 15-hole phase one program




                                                                                                                                                                               WWW .R O MA R C O .C O M
        (RC and core)
     •  Currently drilling an 11-hole follow up program                                                                   Hickory	
                 Ironwood	
  
        (RC and core)
            •  RC-2033 encountered 13.7m of 2.3 g/t,
               including 4.6m of 5.5 g/t                                                                                        Locust	
               North	
  Carolina	
  
                                                                                             Haile	
  Mine	
  
   •  Locust – drill ready                                                                          Bayberry	
                        Buzzard	
  
     •  Small historical oxide resource (pre 43-101)                                                                  Elm	
  
     •  34 RC and 27 core holes have been drilled on the
        property
     •  Historical reported, highlighted intercepts include:                                                        South	
  Carolina	
  
              •    71.5 meters of 2.9 g/t
              •    5.1 meters of 1.5 g/t
              •    74.6 meters of 1.5 g/t                                      Georgia	
  
              •    65.0 meters of 1.9 g/t

   •  Elm – drill ready
     •  Soil and rock chip sampling completed
     •  Rock chip sampling has yielded 8.6 g/t
                                                                                                                                                                   37	
  
70% Institutional Ownership
                         BlackRock

                         Sun Valley Gold




                                                                                  TSX : R
                         Franklin Templeton Investments
   TOP 15 SHAREHOLDERS


                         Van Eck

                         Oppenheimer Funds




                                                                                  WWW .R O MA R C O .C O M
                         Norges Bank

                         Tocqueville

                         Colonial First State

                         US Global Investors

                         Fidelity Investments
                                                          OF OUR SHARES ARE
                         Baker Steel Capital Managers      INSTITUTIONALLY
                         Ruffer                                OWNED
                         TD

                         URAM

                         Investec                                        38	
  
ANALYST COVERAGE




                                             TSX : R
             TARGET PRICE
  Paradigm                  $2.75




                                             WWW .R O MA R C O .C O M
  GMP                       $2.50
  NBF                       $2.10
  BMO                       $2.00
  RBC                       $1.25



                                    39	
  
CAPITAL STRUCTURE

                                                                       Capitalization Summary




                                                                                                                                TSX : R
          Exchange/ Symbol                                                                           TSX:R
          Share Price(1)                                                                             C$1.01




                                                                                                                                WWW .R O MA R C O .C O M
          Shares Outstanding (Basic)                                                                 584.3M
          FD Shares Outstanding (TSM)(2)                                                             589.2M
          Market Capitalization(1)                                                                   C$590M
          52 Week High / Low(1)                                                                      C$2.15 / C$0.79
          Cash Balance (May 7, 2012)                                                                 US$93M




(1) As at close on April 30, 2012                                                                                      40	
  
(2) Includes 4.9M “in-the-money” options at an average strike price of C$0.52 as of April 30, 2012
SUMMARY
Emerging gold producer




                                                                    TSX : R
Significant exploration remains – open pit  underground

Optimize the underground potential




                                                                    WWW .R O MA R C O .C O M
Completing engineering

$93M cash – no debt

70% Institutionally held

Permits pending – targeted by year end 2012

Extremely undervalued in today’s Market vs. Peers          41	
  
CONTACT INFORMATION

Dan Symons
Vice President, Investor Relations
dsymons@romarco.com




Brookfield Place
181 Bay Street, Suite 3630
Toronto, Ontario M5J 2T3
Tel: 416.367.5500
Fax: 416.367.5505
Email: info@romarco.com




               WWW .R O MA R C O .C O M

Mais conteúdo relacionado

Mais procurados

2018 09-06 great panther silver limited corporate presentation
2018 09-06 great panther silver limited corporate presentation2018 09-06 great panther silver limited corporate presentation
2018 09-06 great panther silver limited corporate presentationAlex Heath, CFA
 
Rainy river site visit presentation v final
Rainy river site visit presentation v finalRainy river site visit presentation v final
Rainy river site visit presentation v finalnewgold2011
 
Largo corporate presentation july 2017
Largo corporate presentation july 2017Largo corporate presentation july 2017
Largo corporate presentation july 2017Alex Guthrie
 
2015 q3 earnings webcast v final (webcast)
2015 q3 earnings webcast v final (webcast)2015 q3 earnings webcast v final (webcast)
2015 q3 earnings webcast v final (webcast)newgold2011
 
2018 08-01 great panther silver limited corporate presentation
2018 08-01 great panther silver limited corporate presentation2018 08-01 great panther silver limited corporate presentation
2018 08-01 great panther silver limited corporate presentationAlex Heath, CFA
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015newgold2011
 
Rubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate PresentationRubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate PresentationRubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate PresentationRubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate PresentationRubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate PresentationRubicon Minerals Corporation
 
Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017Rubicon Minerals Corporation
 
Josemaria Resources Focused on Development - Denver Gold Forum September 16, ...
Josemaria Resources Focused on Development - Denver Gold Forum September 16, ...Josemaria Resources Focused on Development - Denver Gold Forum September 16, ...
Josemaria Resources Focused on Development - Denver Gold Forum September 16, ...Adnet Communications
 
Rubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate PresentationRubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate PresentationRubicon Minerals Corporation
 
Fourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
Fourth Quarter and Full Year 2014 Operational Results and 2015 GuidanceFourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
Fourth Quarter and Full Year 2014 Operational Results and 2015 Guidancenewgold2011
 
Solaris Resources May 2021 IR Deck
Solaris Resources  May 2021 IR DeckSolaris Resources  May 2021 IR Deck
Solaris Resources May 2021 IR DeckJacquelineWagenaar1
 
Denver corporate presentation - september 2015
Denver   corporate presentation - september 2015Denver   corporate presentation - september 2015
Denver corporate presentation - september 2015newgold2011
 

Mais procurados (20)

Corporate presentation
Corporate presentationCorporate presentation
Corporate presentation
 
2018 09-06 great panther silver limited corporate presentation
2018 09-06 great panther silver limited corporate presentation2018 09-06 great panther silver limited corporate presentation
2018 09-06 great panther silver limited corporate presentation
 
Rainy river site visit presentation v final
Rainy river site visit presentation v finalRainy river site visit presentation v final
Rainy river site visit presentation v final
 
Largo corporate presentation july 2017
Largo corporate presentation july 2017Largo corporate presentation july 2017
Largo corporate presentation july 2017
 
2015 q3 earnings webcast v final (webcast)
2015 q3 earnings webcast v final (webcast)2015 q3 earnings webcast v final (webcast)
2015 q3 earnings webcast v final (webcast)
 
2018 08-01 great panther silver limited corporate presentation
2018 08-01 great panther silver limited corporate presentation2018 08-01 great panther silver limited corporate presentation
2018 08-01 great panther silver limited corporate presentation
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
April Corporate Presentation
April Corporate PresentationApril Corporate Presentation
April Corporate Presentation
 
Corporate Presentation - September 2015
Corporate Presentation - September 2015Corporate Presentation - September 2015
Corporate Presentation - September 2015
 
Rubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate PresentationRubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate Presentation
 
Rubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate PresentationRubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate Presentation
 
Rubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate PresentationRubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate Presentation
 
Rubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate PresentationRubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate Presentation
 
Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017
 
Josemaria Resources Focused on Development - Denver Gold Forum September 16, ...
Josemaria Resources Focused on Development - Denver Gold Forum September 16, ...Josemaria Resources Focused on Development - Denver Gold Forum September 16, ...
Josemaria Resources Focused on Development - Denver Gold Forum September 16, ...
 
Rubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate PresentationRubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate Presentation
 
Fourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
Fourth Quarter and Full Year 2014 Operational Results and 2015 GuidanceFourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
Fourth Quarter and Full Year 2014 Operational Results and 2015 Guidance
 
Solaris Resources May 2021 IR Deck
Solaris Resources  May 2021 IR DeckSolaris Resources  May 2021 IR Deck
Solaris Resources May 2021 IR Deck
 
Ur-Energy October 12, 2012 Webcast Presentation
Ur-Energy October 12, 2012 Webcast PresentationUr-Energy October 12, 2012 Webcast Presentation
Ur-Energy October 12, 2012 Webcast Presentation
 
Denver corporate presentation - september 2015
Denver   corporate presentation - september 2015Denver   corporate presentation - september 2015
Denver corporate presentation - september 2015
 

Destaque

Career builder
Career builderCareer builder
Career builderWill Rossi
 
박승호1997 초인지교수 학습자료 중재프로그램효과연구 (2)
박승호1997 초인지교수 학습자료 중재프로그램효과연구 (2)박승호1997 초인지교수 학습자료 중재프로그램효과연구 (2)
박승호1997 초인지교수 학습자료 중재프로그램효과연구 (2)혜원 정
 
하정은 2000 음악 학습장애 개선방안
하정은 2000 음악 학습장애 개선방안하정은 2000 음악 학습장애 개선방안
하정은 2000 음악 학습장애 개선방안혜원 정
 
Online volunteering презентація
Online volunteering презентаціяOnline volunteering презентація
Online volunteering презентаціяGURT Resource Centre
 
Celebrating 1st 2011 milestone
Celebrating 1st 2011 milestoneCelebrating 1st 2011 milestone
Celebrating 1st 2011 milestoneAnnie Choy
 
Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Minerals Inc.
 
ELES NETWORK HOW TO JOIN
ELES NETWORK HOW TO JOINELES NETWORK HOW TO JOIN
ELES NETWORK HOW TO JOINMERLOT
 
Prior 2012 Mexican Presidential Election
Prior 2012 Mexican Presidential ElectionPrior 2012 Mexican Presidential Election
Prior 2012 Mexican Presidential Electioningenia_pro
 
Go Blue Marketing Strategy 2013
Go Blue Marketing Strategy 2013Go Blue Marketing Strategy 2013
Go Blue Marketing Strategy 2013Matt Humke
 
Senkaku Islands Disputes: Maritime Security Challenges for the Asia Pacific R...
Senkaku Islands Disputes: Maritime Security Challenges for the Asia Pacific R...Senkaku Islands Disputes: Maritime Security Challenges for the Asia Pacific R...
Senkaku Islands Disputes: Maritime Security Challenges for the Asia Pacific R...Rommel Banlaoi
 

Destaque (13)

Career builder
Career builderCareer builder
Career builder
 
박승호1997 초인지교수 학습자료 중재프로그램효과연구 (2)
박승호1997 초인지교수 학습자료 중재프로그램효과연구 (2)박승호1997 초인지교수 학습자료 중재프로그램효과연구 (2)
박승호1997 초인지교수 학습자료 중재프로그램효과연구 (2)
 
하정은 2000 음악 학습장애 개선방안
하정은 2000 음악 학습장애 개선방안하정은 2000 음악 학습장애 개선방안
하정은 2000 음악 학습장애 개선방안
 
Online volunteering презентація
Online volunteering презентаціяOnline volunteering презентація
Online volunteering презентація
 
Celebrating 1st 2011 milestone
Celebrating 1st 2011 milestoneCelebrating 1st 2011 milestone
Celebrating 1st 2011 milestone
 
Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011
 
ELES NETWORK HOW TO JOIN
ELES NETWORK HOW TO JOINELES NETWORK HOW TO JOIN
ELES NETWORK HOW TO JOIN
 
Script with storyboard
Script with storyboardScript with storyboard
Script with storyboard
 
Prior 2012 Mexican Presidential Election
Prior 2012 Mexican Presidential ElectionPrior 2012 Mexican Presidential Election
Prior 2012 Mexican Presidential Election
 
Go Blue Marketing Strategy 2013
Go Blue Marketing Strategy 2013Go Blue Marketing Strategy 2013
Go Blue Marketing Strategy 2013
 
Excel 2
Excel 2Excel 2
Excel 2
 
Evaluation
EvaluationEvaluation
Evaluation
 
Senkaku Islands Disputes: Maritime Security Challenges for the Asia Pacific R...
Senkaku Islands Disputes: Maritime Security Challenges for the Asia Pacific R...Senkaku Islands Disputes: Maritime Security Challenges for the Asia Pacific R...
Senkaku Islands Disputes: Maritime Security Challenges for the Asia Pacific R...
 

Semelhante a ROMARCO - Corporate Presentation MAY 2012

ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013Romarco Minerals Inc.
 
ROMARCO Corporate Presentation - April 2013
ROMARCO Corporate Presentation - April 2013ROMARCO Corporate Presentation - April 2013
ROMARCO Corporate Presentation - April 2013Romarco Minerals Inc.
 
ROMARCO Corporate Presentation - February 2013
ROMARCO Corporate Presentation - February 2013ROMARCO Corporate Presentation - February 2013
ROMARCO Corporate Presentation - February 2013Romarco Minerals Inc.
 
ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012Romarco Minerals Inc.
 
ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012Romarco Minerals Inc.
 
ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013Romarco Minerals Inc.
 
Romarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals Inc.
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate PresentationRomarco Minerals Inc.
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate PresentationRomarco Minerals Inc.
 
Silverton Metals Investor Presentation V_4.pdf
Silverton Metals Investor Presentation V_4.pdfSilverton Metals Investor Presentation V_4.pdf
Silverton Metals Investor Presentation V_4.pdfAdnet Communications
 
2014 Annual & Special Meeting of Shareholders
2014 Annual & Special Meeting of Shareholders2014 Annual & Special Meeting of Shareholders
2014 Annual & Special Meeting of ShareholdersNOVAGOLD
 

Semelhante a ROMARCO - Corporate Presentation MAY 2012 (20)

ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013
 
ROMARCO Corporate Presentation - April 2013
ROMARCO Corporate Presentation - April 2013ROMARCO Corporate Presentation - April 2013
ROMARCO Corporate Presentation - April 2013
 
ROMARCO Corporate Presentation - February 2013
ROMARCO Corporate Presentation - February 2013ROMARCO Corporate Presentation - February 2013
ROMARCO Corporate Presentation - February 2013
 
ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012
 
November Presentation 2014
November Presentation 2014November Presentation 2014
November Presentation 2014
 
ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012
 
August 2015 Corporate Presentation
August 2015 Corporate PresentationAugust 2015 Corporate Presentation
August 2015 Corporate Presentation
 
May Corporate Presentation
May Corporate PresentationMay Corporate Presentation
May Corporate Presentation
 
ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013
 
July 2013 corporate ppt
July 2013  corporate pptJuly 2013  corporate ppt
July 2013 corporate ppt
 
Corporate presentation agm-show
Corporate presentation agm-showCorporate presentation agm-show
Corporate presentation agm-show
 
Romarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate Presentation
 
February Corporate Presentation
February Corporate PresentationFebruary Corporate Presentation
February Corporate Presentation
 
March Corporate Presentation
March Corporate PresentationMarch Corporate Presentation
March Corporate Presentation
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate Presentation
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate Presentation
 
Silverton Metals Investor Presentation V_4.pdf
Silverton Metals Investor Presentation V_4.pdfSilverton Metals Investor Presentation V_4.pdf
Silverton Metals Investor Presentation V_4.pdf
 
2014 Annual & Special Meeting of Shareholders
2014 Annual & Special Meeting of Shareholders2014 Annual & Special Meeting of Shareholders
2014 Annual & Special Meeting of Shareholders
 
Solaris Resources - May 2021
Solaris Resources -  May 2021Solaris Resources -  May 2021
Solaris Resources - May 2021
 
Solaris Resources - May 2021
Solaris Resources - May 2021Solaris Resources - May 2021
Solaris Resources - May 2021
 

Mais de Romarco Minerals Inc.

ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012Romarco Minerals Inc.
 
ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012Romarco Minerals Inc.
 
Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Minerals Inc.
 
Romarco Corporate Presentation - AUGUST 2011
Romarco Corporate Presentation - AUGUST 2011Romarco Corporate Presentation - AUGUST 2011
Romarco Corporate Presentation - AUGUST 2011Romarco Minerals Inc.
 
ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011Romarco Minerals Inc.
 
Romarco Minerals - Corporate Presentation MAY 2011
Romarco Minerals - Corporate Presentation MAY 2011Romarco Minerals - Corporate Presentation MAY 2011
Romarco Minerals - Corporate Presentation MAY 2011Romarco Minerals Inc.
 

Mais de Romarco Minerals Inc. (6)

ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
ROMARCO - CORPORATE PRESENTATION FEBRUARY 2012
 
ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012
 
Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011Romarco Corporate Presentation - September 2011
Romarco Corporate Presentation - September 2011
 
Romarco Corporate Presentation - AUGUST 2011
Romarco Corporate Presentation - AUGUST 2011Romarco Corporate Presentation - AUGUST 2011
Romarco Corporate Presentation - AUGUST 2011
 
ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011
 
Romarco Minerals - Corporate Presentation MAY 2011
Romarco Minerals - Corporate Presentation MAY 2011Romarco Minerals - Corporate Presentation MAY 2011
Romarco Minerals - Corporate Presentation MAY 2011
 

Último

The CBR Covered Bond Investor Roundtable 2024
The CBR Covered Bond Investor Roundtable 2024The CBR Covered Bond Investor Roundtable 2024
The CBR Covered Bond Investor Roundtable 2024Neil Day
 
The unequal battle of inflation and the appropriate sustainable solution | Eu...
The unequal battle of inflation and the appropriate sustainable solution | Eu...The unequal battle of inflation and the appropriate sustainable solution | Eu...
The unequal battle of inflation and the appropriate sustainable solution | Eu...Antonis Zairis
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfAdnet Communications
 
Taipei, A Hidden Jewel in East Asia - PR Strategy for Tourism
Taipei, A Hidden Jewel in East Asia - PR Strategy for TourismTaipei, A Hidden Jewel in East Asia - PR Strategy for Tourism
Taipei, A Hidden Jewel in East Asia - PR Strategy for TourismBrian Lin
 
Solution manual for Intermediate Accounting, 11th Edition by David Spiceland...
Solution manual for  Intermediate Accounting, 11th Edition by David Spiceland...Solution manual for  Intermediate Accounting, 11th Edition by David Spiceland...
Solution manual for Intermediate Accounting, 11th Edition by David Spiceland...mwangimwangi222
 
Stock Market Brief Deck for March 26.pdf
Stock Market Brief Deck for March 26.pdfStock Market Brief Deck for March 26.pdf
Stock Market Brief Deck for March 26.pdfMichael Silva
 
Monthly Market Risk Update: March 2024 [SlideShare]
Monthly Market Risk Update: March 2024 [SlideShare]Monthly Market Risk Update: March 2024 [SlideShare]
Monthly Market Risk Update: March 2024 [SlideShare]Commonwealth
 
The Power Laws of Bitcoin: How can an S-curve be a power law?
The Power Laws of Bitcoin: How can an S-curve be a power law?The Power Laws of Bitcoin: How can an S-curve be a power law?
The Power Laws of Bitcoin: How can an S-curve be a power law?Stephen Perrenod
 
Work and Pensions report into UK corporate DB funding
Work and Pensions report into UK corporate DB fundingWork and Pensions report into UK corporate DB funding
Work and Pensions report into UK corporate DB fundingHenry Tapper
 
Sarlat Advisory - Corporate Brochure - 2024
Sarlat Advisory - Corporate Brochure - 2024Sarlat Advisory - Corporate Brochure - 2024
Sarlat Advisory - Corporate Brochure - 2024Guillaume Ⓥ Sarlat
 
India Economic Survey Complete for the year of 2022 to 2023
India Economic Survey Complete for the year of 2022 to 2023India Economic Survey Complete for the year of 2022 to 2023
India Economic Survey Complete for the year of 2022 to 2023SkillCircle
 
What Key Factors Should Risk Officers Consider When Using Generative AI
What Key Factors Should Risk Officers Consider When Using Generative AIWhat Key Factors Should Risk Officers Consider When Using Generative AI
What Key Factors Should Risk Officers Consider When Using Generative AI360factors
 
ACCOUNTING FOR BUSINESS.II BRANCH ACCOUNTS NOTES
ACCOUNTING FOR BUSINESS.II BRANCH ACCOUNTS NOTESACCOUNTING FOR BUSINESS.II BRANCH ACCOUNTS NOTES
ACCOUNTING FOR BUSINESS.II BRANCH ACCOUNTS NOTESKumarJayaraman3
 
MARKET FAILURE SITUATION IN THE ECONOMY.
MARKET FAILURE SITUATION IN THE ECONOMY.MARKET FAILURE SITUATION IN THE ECONOMY.
MARKET FAILURE SITUATION IN THE ECONOMY.Arifa Saeed
 
Buy and Sell Urban Tots unlisted shares.pptx
Buy and Sell Urban Tots unlisted shares.pptxBuy and Sell Urban Tots unlisted shares.pptx
Buy and Sell Urban Tots unlisted shares.pptxPrecize Formely Leadoff
 
Contracts with Interdependent Preferences
Contracts with Interdependent PreferencesContracts with Interdependent Preferences
Contracts with Interdependent PreferencesGRAPE
 
RWA Report 2024: Rise of Real-World Assets in Crypto | CoinGecko
RWA Report 2024: Rise of Real-World Assets in Crypto | CoinGeckoRWA Report 2024: Rise of Real-World Assets in Crypto | CoinGecko
RWA Report 2024: Rise of Real-World Assets in Crypto | CoinGeckoCoinGecko
 

Último (20)

The CBR Covered Bond Investor Roundtable 2024
The CBR Covered Bond Investor Roundtable 2024The CBR Covered Bond Investor Roundtable 2024
The CBR Covered Bond Investor Roundtable 2024
 
The unequal battle of inflation and the appropriate sustainable solution | Eu...
The unequal battle of inflation and the appropriate sustainable solution | Eu...The unequal battle of inflation and the appropriate sustainable solution | Eu...
The unequal battle of inflation and the appropriate sustainable solution | Eu...
 
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdfLundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
Lundin Gold March 2024 Corporate Presentation - PDAC v1.pdf
 
Taipei, A Hidden Jewel in East Asia - PR Strategy for Tourism
Taipei, A Hidden Jewel in East Asia - PR Strategy for TourismTaipei, A Hidden Jewel in East Asia - PR Strategy for Tourism
Taipei, A Hidden Jewel in East Asia - PR Strategy for Tourism
 
Solution manual for Intermediate Accounting, 11th Edition by David Spiceland...
Solution manual for  Intermediate Accounting, 11th Edition by David Spiceland...Solution manual for  Intermediate Accounting, 11th Edition by David Spiceland...
Solution manual for Intermediate Accounting, 11th Edition by David Spiceland...
 
Stock Market Brief Deck for March 26.pdf
Stock Market Brief Deck for March 26.pdfStock Market Brief Deck for March 26.pdf
Stock Market Brief Deck for March 26.pdf
 
Monthly Market Risk Update: March 2024 [SlideShare]
Monthly Market Risk Update: March 2024 [SlideShare]Monthly Market Risk Update: March 2024 [SlideShare]
Monthly Market Risk Update: March 2024 [SlideShare]
 
The Power Laws of Bitcoin: How can an S-curve be a power law?
The Power Laws of Bitcoin: How can an S-curve be a power law?The Power Laws of Bitcoin: How can an S-curve be a power law?
The Power Laws of Bitcoin: How can an S-curve be a power law?
 
Digital Financial Services Taxation in Africa
Digital Financial Services Taxation in AfricaDigital Financial Services Taxation in Africa
Digital Financial Services Taxation in Africa
 
Work and Pensions report into UK corporate DB funding
Work and Pensions report into UK corporate DB fundingWork and Pensions report into UK corporate DB funding
Work and Pensions report into UK corporate DB funding
 
Sarlat Advisory - Corporate Brochure - 2024
Sarlat Advisory - Corporate Brochure - 2024Sarlat Advisory - Corporate Brochure - 2024
Sarlat Advisory - Corporate Brochure - 2024
 
India Economic Survey Complete for the year of 2022 to 2023
India Economic Survey Complete for the year of 2022 to 2023India Economic Survey Complete for the year of 2022 to 2023
India Economic Survey Complete for the year of 2022 to 2023
 
What Key Factors Should Risk Officers Consider When Using Generative AI
What Key Factors Should Risk Officers Consider When Using Generative AIWhat Key Factors Should Risk Officers Consider When Using Generative AI
What Key Factors Should Risk Officers Consider When Using Generative AI
 
ACCOUNTING FOR BUSINESS.II BRANCH ACCOUNTS NOTES
ACCOUNTING FOR BUSINESS.II BRANCH ACCOUNTS NOTESACCOUNTING FOR BUSINESS.II BRANCH ACCOUNTS NOTES
ACCOUNTING FOR BUSINESS.II BRANCH ACCOUNTS NOTES
 
MARKET FAILURE SITUATION IN THE ECONOMY.
MARKET FAILURE SITUATION IN THE ECONOMY.MARKET FAILURE SITUATION IN THE ECONOMY.
MARKET FAILURE SITUATION IN THE ECONOMY.
 
Buy and Sell Urban Tots unlisted shares.pptx
Buy and Sell Urban Tots unlisted shares.pptxBuy and Sell Urban Tots unlisted shares.pptx
Buy and Sell Urban Tots unlisted shares.pptx
 
Contracts with Interdependent Preferences
Contracts with Interdependent PreferencesContracts with Interdependent Preferences
Contracts with Interdependent Preferences
 
E-levy and Merchant Payment Exemption in Ghana
E-levy and Merchant Payment Exemption in GhanaE-levy and Merchant Payment Exemption in Ghana
E-levy and Merchant Payment Exemption in Ghana
 
Mobile Money Taxes: Knowledge, Perceptions and Politics: The Case of Ghana
Mobile Money Taxes: Knowledge, Perceptions and Politics: The Case of GhanaMobile Money Taxes: Knowledge, Perceptions and Politics: The Case of Ghana
Mobile Money Taxes: Knowledge, Perceptions and Politics: The Case of Ghana
 
RWA Report 2024: Rise of Real-World Assets in Crypto | CoinGecko
RWA Report 2024: Rise of Real-World Assets in Crypto | CoinGeckoRWA Report 2024: Rise of Real-World Assets in Crypto | CoinGecko
RWA Report 2024: Rise of Real-World Assets in Crypto | CoinGecko
 

ROMARCO - Corporate Presentation MAY 2012

  • 1. CORPORATE PRESENTATION MAY 2012 WWW .R O MA R C O .C O M
  • 2. Cautionary Statement   The  informa-on  in  this  document  has  been  prepared  as  of  March  13,  2012.  Certain  statements  contained  in  this  document  cons-tute  “forward-­‐looking  statements”   within  the  meaning  of  the  United  States  Private  Securi-es  Li-ga-on  Reform  Act  of  1995  and  forward  looking  informa-on  under  the  provisions  of  Canadian  provincial   securi-es  laws.  When  used  in  this  document,  the  words  “an-cipate”,  “expect”,  “es-mate”,  “forecast”,  “will”,  “planned”,  and  similar  expressions  are  intended  to   iden-fy  forward-­‐looking  statements  or  informa-on.     Specifically,  this  presenta-on  contains  forward  looking  statements  regarding  the  results  and  projec-ons  contained  in  the  March  13,  2012  technical  report  of  the     TSX : R Haile  Gold  project,  including  the  expected  mine  life,  recovery,  capital  costs,  cash  opera-ng  costs  and  other  costs  and  an-cipated  produc-on  of  the  described  open   pit  mine,  the  projected  internal  rate  of  return,  the  projected  payback  period,  the  availability  of  capital  for  development,  sensi-vity  to  metal  prices,  ore  grade,  the   reserve  and  resource  es-mates  on  the  project,  the  financial  analysis,  the  -ming  for  comple-on  of  the  revised  feasibility  study  on  the    Haile  Gold    project,    the  -ming   and  amount  of  future  produc-on,  the  -ming  of  construc-on  of  the  proposed  mine  and  process  facili-es,  capital  and  opera-ng  expenditures,  the  -ming  of  the   receipt    of  permits,  rights  and  authoriza-ons,  communica-ons  with  local  stakeholders  and  community  rela-ons,  availability  of  financing  and  any  and  all  other  -ming,   development,  opera-onal,  financial,  economic,  legal,  regulatory  and  poli-cal  factors  that  may  influence  future  events  or  condi-ons  and  expected  drilling  ac-vi-es.     In  addi-on,  this  presenta-on  also  contains  updated  resource  es-mates  contained  in  the  March  13,  2012  technical  reports.   WWW .R O MA R C O .C O M   Scien-fic  and  technical  informa-on  referred  herein  has  been  extracted  from  and  are  hereby  qualified  in  their  en-rety  by  reference  to  the  aforemen-oned  technical   reports  (“Technical  Reports”).    Joshua  Snider,  P.E.,  Thomas  L.  Drielick,  P.E.,  Lee  “Pat”  Gochnour,  M.M.S.A.,  John  Marek,  P.E.  and  Derek  Wiwer,  P.E.  are  responsible   for  preparing  the  Technical  Reports.    Each  of  the  above  referenced  persons  is  a  “qualified  person”  as  defined  in  Na-onal  Instrument  43-­‐101  —  Standards  of   Disclosure  for  Mineral  Projects.     Such  forward-­‐looking  statements  are  based  on  a  number  of  material  factors  and  assump-ons,  including,  but  not  limited  in  any  manner,  those  disclosed  in  any   another  of  Romarco’s  public  filings,  and  include  the  ul-mate  determina-on  of  mineral  reserves  and  resources,  availability  and  final  receipt  of  required  approvals,   licenses  and  permits,  sufficient  working  capital  to  develop  and  operate  the  proposed  mine,  access  to  adequate  services  and  supplies,  economic  condi-ons,   commodity  prices,  foreign  currency  exchange  rates,  interest  rates,  access  to  capital  and  debt  markets  and  associated  cost  of  funds,  availability  of  a  qualified  work   force,  lack  of  social  opposi-on  and  legal  challenges,  and  the  ul-mate  ability  to  mine,  process  and  sell  mineral  products  on  economically  favorable  terms.  While   Romarco  considers  these  assump-ons  to  be  reasonable  based  on  informa-on  currently  available  to  it,  they  may  prove  to  be  incorrect.  Actual  results  may  vary  from   such  forward-­‐looking  informa-on  for  a  variety  of  reasons,  including  but  not  limited  to  risks  and  uncertain-es  disclosed  in  other  Romarco  filings  at  www.sedar.com.   Forward-­‐looking  statements  are  based  upon  management’s  beliefs,  es-mate  and  opinions  on  the  date  the  statements  are  made  and,  other  than  as  required  by  law,   Romarco  does  not  intend,  and  undertakes  no  obliga-on  to  update  any  forward-­‐looking  informa-on  to  reflect,  among  other  things,  new  informa-on  or  future  events       Cau-onary  Note  to  United  States  Investors  Concerning  Es-mates  of  Measured,  Indicated  and  Inferred  Resources:   Certain  tables  may  use  the  terms  “Measured”,  “Indicated”  and  “Inferred”  Resources.  United  States  investors  are  advised  that  while  such  terms  are  recognized  and   required  by  Canadian  regula-ons,  however,  the  United  States  Securi-es  and  Exchange  Commission  does  not  recognize  them.  “Inferred  Mineral  Resources”  have  a   great  amount  of  uncertainty  as  to  their  existence,  and  as  to  their  economic  and  legal  feasibility.  It  cannot  be  assumed  that  all  or  any  part  of  an  Inferred  Mineral   Resource  will  ever  be  upgraded  to  a  higher  category.  Under  Canadian  rules,  es-mates  of  Inferred  Mineral  Resources  may  not  form  the  basis  of  feasibility  or  other   economic  studies.  United  States  investors  are  cau-oned  not  to  assume  that  all  or  any  part  of  Measured  or  Indicated  Mineral  Resources  will  ever  be  converted  into   Mineral  Reserves.  United  States  investors  are  also  cau-oned  not  to  assume  that  all  or  any  part  of  a  Mineral  Resource  is  economically  or  legally  mineable.     All  figures  are  US$  unless  otherwise  indicated     2    
  • 3. 2011 HIGHLIGHTS TSX : R u  Completed Feasibility Study u  Acquired 5 regional targets, initiated drilling at 3 u  Filed for all State & Federal permits WWW .R O MA R C O .C O M u  Permitted regional drilling projects in u  Completed 179,000 meters drill program less than 30 days •  Discovered 2 mineralized zones - Mustang & Palomino u  Permitted and built assay lab u  Ordered key long lead-time equipment •  $5 million state of the art lab u  Locked in pricing u  Completed C$92mm bought-deal financing 3  
  • 4. Why own ROMARCO? Near term, low cost gold producer with strong project economics TSX : R Located in a mining friendly jurisdiction with excellent infrastructure Private land – 100% ownership of surface, minerals, water WWW .R O MA R C O .C O M No royalties Solid cash position (~ US$93 million), no debt 70% Institutionally held Significant exploration upside – open pit and at depth One federal permit – all others issued by the State of SC - pending 4  
  • 5. HAILE GOLD MINE MINING HISTORY CAROLINA SLATE BELT §  First Gold rush before California §  Carolinas led US Gold production until Kentucky West Virginia 1848 TSX : R §  Second US Mint in Charlotte, NC Tennessee §  Original 49ers came from East Coast §  Significant gold production in 80s-90s WWW .R O MA R C O .C O M Russell Mine Hickory §  Mining part of local history/community Reed Mine Ironwood North Carolina §  500 active mines in South Carolina today Howie Mine Locust Haile Mine Brewer Mine Bayberry Buzzard Ridgeway Mine Dorn Mine Elm Magruder Mine Bante Mine Tathom Mine Columbia Mine South Carolina Georgia 5  
  • 6. HAILE GOLD MINE HISTORY •  First discovery by Colonel Benjamin Haile TSX : R •  Beginning with placer mining “panning” in 1827 WWW .R O MA R C O .C O M •  Mining continued with trenching, underground and open pit methods through the early 1990s 6  
  • 7. LOCAL COMMUNITY TOWN OF KERSHAW TSX : R WWW .R O MA R C O .C O M 7  
  • 8. AERIAL OF HAILE 8   WWW .R O MA R C O .C O M TSX : R
  • 9. WETLANDS AT HAILE PROPERTY - wetlands TSX : R WWW .R O MA R C O .C O M Typical Palustrine Typical Palustrine Non-Relatively Emergent Wetland Forested Wetland (inundated) Permanent Waters (intermittent stream channel) Duckwood (location of Tailings Facility) 9  
  • 10. HAILE GOLD MINE PERMITTING ALL BASELINE STUDIES REVEAL No threatened or endangered species TSX : R No historical sites WWW .R O MA R C O .C O M No fish or protected wildlife No impact on local water supplies No impact on recreation areas Property impacted by 200 years of mining 10  
  • 11. PROVEN RECLAMATION TECHNIQUES TSX : R WWW .R O MA R C O .C O M 11  
  • 12. HGM PERMITTING TSX : R Federal – USACE* State – DHEC** •  404 Wetlands Permit only •  401 Water Quality Certification USACE is sole deciding •  Mining Permit WWW .R O MA R C O .C O M •  regulatory body •  Operating Permit •  All other agencies are •  Air Quality Permit cooperating or commenting agencies only – EPA, US Fish •  Others and Wildlife, etc. •  Schedule pending * US Army Corps of Engineers ** South Carolina Department of Health and Environmental Control 12  
  • 13. ENVIRONMENTAL IMPACT STATEMENT PROCESS þ Contractor  (3rd  Party)  SelecFon  –  Sept.  2,  2011  (announced  Sept.  26,  2011) þ NoFce  of  Intent  Federal  Register  –  Sept.  23,  2011   TSX : R þ 30  day  noFce  period   þ Public  Scoping  MeeFng  –  Oct.  27,  2011   WWW .R O MA R C O .C O M þ Scoping  Comment  Period  Closed  –  Nov.  28,  2011   CURRENT STAGE PreparaFon  of  DraD  EIS   DraD  EIS  filed   45  day  Review  Period   Prepare  Final  EIS  and  Response  to  Comments   Final  EIS  includes  comments,  amendments  if  necessary   30  day  minimum  comment  period   13   Record  of  Decision  (ROD)  
  • 14. CLEAR PLAN TO BRING HAILE INTO PRODUCTION •  Strong balance sheet with approximately $93M in cash and no debt(1) •  Well defined project schedules and clear development milestones TSX : R Project Schedule for EIS Haile Milestones and Status Report 2011 2012 2013 2014 Milestone / Activity Status WWW .R O MA R C O .C O M Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Complete feasibility study P State operating permit submitted P Feasibility Study 401/404 permit submitted P Optimization Resource / reserve report P Expand Haile Horseshoe P Permitting Identify new targets P Construction Acquire other properties P Explore regional targets P Production Update Resource P Exploration Draft EIS 2012 14   (1) As disclosed in Q1 MDA May 7, 2012
  • 15. …… in the meantime…. Preparing for Production People §  Operating team in place TSX : R WWW .R O MA R C O .C O M Construction §  Engineering work 40% complete §  Caterpillar trucks – warehoused in SC Equipment §  Mills, shovels, ancillary equipment ordered §  Continue studies on underground system Exploration §  85,000 meters of drilling in 2012 15  
  • 16. STRONG BOARD, MANAGEMENT TECHNICAL TEAM Proven gold mine development, finance, permitting and operations experience Romarco has the team in place to bring Haile into production TSX : R Experienced Board of Directors Strong Management Technical Team Leendert Krol, acting Chairman Diane R. Garrett, Ph.D., President CEO §  Former Newmont §  Former Dayton Mining, US Global Investors James R. Arnold, Sr. VP, COO Diane R. Garrett §  Former Freeport, Gold Fields – Richards Award Winner WWW .R O MA R C O .C O M §  Former Dayton Mining, US Global Investors Stan Rideout, Sr. VP, CFO James R. Arnold §  Former Phelps Dodge §  Former Freeport, Gold Fields – Richards Award Winner David Thomas, VP, General Manager Don MacDonald James Berry, Chief Geologist Regional Exploration Manager §  CFO KGHM International (formerly QuadraFNX), former §  Former Barrick NovaGold, DeBeers, Dayton Mining Brent Anderson, Mine Manager John Marsden §  Former Quadra, Freeport §  Consultant, former Freeport – Richards Award Winner Mike Gleason, Construction Manager Patrick Michaels §  Former Freeport §  Portfolio Manager – Zuri-invest, Switzerland Jim Wickens, Process Manager §  Former Barrick Gary A. Sugar §  Former RBC Capital Markets Johnny Pappas, Director of Environmental Affairs §  Former Freeport Robert van Doorn §  Former Mundoro, Rio Narcea, Morgan Stanley Ramona Schneider, Environmental Manager §  Former Kinross Dan Symons, Vice President, Investor Relations §  Former Renmark Financial 16  
  • 17. DETAILED ENGINEERING EP  CompleFon  Graph   100%   TSX : R 80%   60%   WWW .R O MA R C O .C O M 40%   20%   0%   Start   7/1/11   12/30/11   6/29/12   12/28/12   6/28/13   12/27/13   Planned     Fee  at  Risk  Milestones   Earned  Hours   Burned  Hours   •  44% complete at March 31, 2012 •  Targeting 75% complete by end of 2012 17  
  • 18. HAILE EQUIPMENT •  Equipment is being warehoused in South Carolina TSX : R •  Pricing is locked in ($32mm) WWW .R O MA R C O .C O M Mills and shovels have been ordered with fixed pricing ($11mm) Equipment balance ($55mm) – purchase orders in process – price substantially negotiated 18  
  • 19. RESOURCE GROWTH At year end 2011 2011 PLAN VIEW TSX : R WWW .R O MA R C O .C O M CHAMPION SMALL SOUTH PIT LEDBETTER SNAKE HAILE LONG SECTION MUSTANG HORSESHOE 2010 GOLD MINERALIZATION 19   2011 GOLD MINERALIZATION GROWTH PALOMINO
  • 20. RESOURCE GROWTH At year end 2011 2011 PLAN VIEW 3.5 KM LEDBETTER TSX : R MUSTANG CHAMPION HORSESHOE WWW .R O MA R C O .C O M SMALL SNAKE SOUTH PIT PALOMINO CHAMPION SMALL SOUTH PIT LEDBETTER SNAKE HAILE LONG SECTION MUSTANG HORSESHOE US$950 RESERVE PIT LIMITS 20   PALOMINO
  • 21. RESOURCE GROWTH At year end 2011 2011 PLAN VIEW LEDBETTER TSX : R MUSTANG CHAMPION HORSESHOE WWW .R O MA R C O .C O M SMALL SNAKE SOUTH PIT PALOMINO CHAMPION SMALL SOUTH PIT LEDBETTER SNAKE HAILE LONG SECTION MUSTANG US$950 RESERVE PIT LIMITS HORSESHOE US$1200 RESOURCE SHELL 21   PALOMINO
  • 22. RESOURCE GROWTH 85,000 meters of At year end 2011 drilling in 2012 LEDBETTER TSX : R MUSTANG CHAMPION HORSESHOE WWW .R O MA R C O .C O M SMALL SNAKE SOUTH PIT PALOMINO CHAMPION SMALL SOUTH PIT LEDBETTER SNAKE HAILE LONG SECTION US$950 RESERVE PIT LIMITS HORSESHOE MUSTANG US$1200 RESOURCE SHELL DISCOVERY HOLE RC-1816 22   RCT-129 RC-1724 2012 EXPLORATION TARGETS 77.7m of 8.0 g/t Au PALOMINO 70.1m @ 5.5 g/t Au 62.5m @9.6 g/t Au
  • 23. RESOURCES RESERVES OPEN PIT UNDERGROUND 2011 MEASURED + INDICATED RESOURCES AT US$1,200 GOLD (1) METRIC TONNES g/t CONTAINED oz TSX : R (000s) Au (000s) MEASURED 36,894 1.79 2,125 INDICATED 34,277 1.74 1,914 WWW .R O MA R C O .C O M MEASURED + INDICATED 71,171 1.77 4,039 INFERRED 20,125 1.24 801 2010 RESERVES AT US$950 GOLD (1) METRIC TONNES g/t CONTAINED oz (000s) Au (000s) PROVEN RESERVE 19,592 2.19 1,382 PROBABLE RESERVE 10,917 1.82 636 PROVEN PROBABLE 30,509 2.06 2,018 RESERVE (1)  From March 13, 2012 Technical Report filed on www.sedar.com on March 19, 2012 23  
  • 24. INTRODUCTION TO THE HAILE GOLD MINE PROJECT FEBRUARY 2011 §  Feasibility completed TSX : R WWW .R O MA R C O .C O M $320 million (1) §  One of lowest capital cost projects in industry §  One of highest grade open-pit projects in 2.06 g/t (2) industry $379/oz (2)(3) ($347/oz first 5 years) §  One of lowest operating cost projects in industry (1) Capital cost estimate from December 31, 2011 MDA (includes $30 million for contingency and $17 million for inflation) (2) As per February 2011 Feasibility Study results included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com 24   (3) Includes silver byproduct credit
  • 25. LOW CAPITAL COST Development Capex per ounce of Measured Indicated Resources (inclusive) (US$/oz Au Eq.)(1) $156 TSX : R $83 Average: $85 $81 $78 WWW .R O MA R C O .C O M $70 $66 $63 Torex Rainy River Extorre International Tower Guyana Goldfields Romarco Victoria Gold Hill 25   Source: BMO Capital Markets, as at April 30, 2012 (1) Includes precious metals only calculated at long term consensus prices of Au US$1,200/oz and Ag of US$21.35/oz
  • 26. LOW CAPITAL COST Unfunded Development Capex(1) for Primary Open Pit Asset (US$mm) Financing Risk – Unfunded Development Capex as % of Current Market Capitalization 517% 148% 76% 194% 440% 65% 42% TSX : R $1,704 $632 $632 Average: $629 $582 WWW .R O MA R C O .C O M $511 $434 $283 $256 International Tower Rainy River Torex Guyana Goldfields Victoria Gold Extorre Romarco Hill 26   Source: BMO Capital Markets, as at April 30, 2012 (1) Development capex plus US$25mm per annum until production start, less current cash balance
  • 27. HIGH GRADE FOR OPEN PIT TSX : R 3.50! 3.17! 3.00! 2.50! 2.09! 2.06! WWW .R O MA R C O .C O M 2.00! 1.46! 1.50! 1.03! 1.00! 0.78! 0.73! 0.50! 0.00! Guyana Goldfields! NovaGold! ROMARCO! Gabriel Resources! Detour Gold! Victoria Gold! Andina! Reserve Grade for Primary Open Pit Asset (g/t Au) (1) 27   (1) Source: Company Disclosure at March 31, 2012
  • 28. LOW CASH COST TSX : R $700! $617! LOWEST QUARTILE AVERAGE CASH $600! COST IN Q4 2011 (1) WWW .R O MA R C O .C O M $500! $379! $428! $400! $300! $200! $100! $0! Industry Average (1) ROMARCO Lowest Quartile (1) LOM Average (2) 28   (1)  Source: Brook Hunt estimates (2)  As per February 2011 Feasibility Study results included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com
  • 29. NPV IRR SENSITIVITY TO GOLD PRICE Pre-tax NPV and IRR Sensitivity to Gold Price (1) TSX : R ($ Millions, except gold price) Gold PAYBACK Price NPV @0% NPV @ 5% NPV @ 10% IRR % YEARS Per oz. WWW .R O MA R C O .C O M $1500 $1,426 $930 $621 47.0% 2.0 $1400 $1,259 $811 $534 42.3% 2.2 $1300 $1,092 $693 $447 37.6% 2.4 $1200 $925 $575 $359 32.7% 2.7 $1100 $758 $457 $272 27.6% 3.1 $1000 $591 $339 $185 22.3% 3.8 BASE CASE $950 $507 $279 $141 19.6% 4.2 $800 $257 $102 $10 10.7% 7.6 $700 $90 ($16) ($77) 4.0% 9.4 29   (1) As per February 2011 Feasibility Study included in March 13, 2012 Technical Report filed on March 19, 2012 on sedar.com - based on capital costs of $275 million not updated capital cost of $320 million from December 31, 2011 MDA
  • 30. HAILE GOLD MINE FEASIBILITY STUDY HIGHLIGHTS u  Feasibility Study does not include deep TSX : R mineralization: WWW .R O MA R C O .C O M u  Horseshoe, Mustang, Palomino and Snake Deep deposits u  Opportunities for reducing strip ratio by removing saddles between pits u  Opportunities to expand operation through open pit underground – system remains open along strike and at depth 30  
  • 31. HAILE GOLD MINE FEASIBILITY STUDY HIGHLIGHTS u  7,000 tpd throughput u  Designed for 14,000 tpd TSX : R u  Recovery: 83.7 % u  Avg. annual Au production: 150k oz/yr initially WWW .R O MA R C O .C O M u  Strip Ratio: 7.2:1 (LOM) REGRIND FLOTATION CRUSH GRIND FLOTATION CONCENTRATE •  12 – 16% max pull •  13 – 15 micron 31  
  • 32. PROPOSED Ore Processing, Process Water Recycling HAILE PROCESSING PLANT Water Treatment TSX : R WWW .R O MA R C O .C O M 32  
  • 33. KERSHAW MINERAL LAB 33   WWW .R O MA R C O .C O M TSX : R
  • 34. LAB OPERATIONS 34   WWW .R O MA R C O .C O M TSX : R
  • 35. CAROLINA SLATE BELT Ironwood Hickory TSX : R WWW .R O MA R C O .C O M Haile 30  Miles   North 35  
  • 36. NEW REGIONAL EXPLORATION TARGETS •  2 in North Carolina Kentucky   •  Hickory – currently drilling West  Virginia   TSX : R •  Historical production during 1800s •  Historical drilling consists of 11 core holes and 130 Tennessee   RC holes •  Completed 25 core hole phase one program •  HKDH-11-002 encountered 10.7m of 4.5 g/t WWW .R O MA R C O .C O M •  Currently drilling a 17 core hole follow-up program Hickory   Ironwood   Locust   North  Carolina   Haile  Mine   Bayberry   Buzzard   •  Ironwood – currently drilling Elm   •  The highest grade encountered in the trenching was 9.1 g/t •  Twelve shallow RC holes and two core holes have South  Carolina   been historically drilled •  Completed 11 core hole phase one program •  Completed 7 core hole follow-up program Georgia   •  Results pending 36  
  • 37. NEW REGIONAL EXPLORATION TARGETS •  3 in South Carolina Kentucky   •  Bayberry – currently drilling West  Virginia   TSX : R •  Similar host rocks, alteration and mineralization as observed at Haile Tennessee   •  74 shallow rotary holes, 8 RC holes, and 8 core holes historically drilled on the property •  Romarco completed 15-hole phase one program WWW .R O MA R C O .C O M (RC and core) •  Currently drilling an 11-hole follow up program Hickory   Ironwood   (RC and core) •  RC-2033 encountered 13.7m of 2.3 g/t, including 4.6m of 5.5 g/t Locust   North  Carolina   Haile  Mine   •  Locust – drill ready Bayberry   Buzzard   •  Small historical oxide resource (pre 43-101) Elm   •  34 RC and 27 core holes have been drilled on the property •  Historical reported, highlighted intercepts include: South  Carolina   •  71.5 meters of 2.9 g/t •  5.1 meters of 1.5 g/t •  74.6 meters of 1.5 g/t Georgia   •  65.0 meters of 1.9 g/t •  Elm – drill ready •  Soil and rock chip sampling completed •  Rock chip sampling has yielded 8.6 g/t 37  
  • 38. 70% Institutional Ownership BlackRock Sun Valley Gold TSX : R Franklin Templeton Investments TOP 15 SHAREHOLDERS Van Eck Oppenheimer Funds WWW .R O MA R C O .C O M Norges Bank Tocqueville Colonial First State US Global Investors Fidelity Investments OF OUR SHARES ARE Baker Steel Capital Managers INSTITUTIONALLY Ruffer OWNED TD URAM Investec 38  
  • 39. ANALYST COVERAGE TSX : R TARGET PRICE Paradigm $2.75 WWW .R O MA R C O .C O M GMP $2.50 NBF $2.10 BMO $2.00 RBC $1.25 39  
  • 40. CAPITAL STRUCTURE Capitalization Summary TSX : R Exchange/ Symbol TSX:R Share Price(1) C$1.01 WWW .R O MA R C O .C O M Shares Outstanding (Basic) 584.3M FD Shares Outstanding (TSM)(2) 589.2M Market Capitalization(1) C$590M 52 Week High / Low(1) C$2.15 / C$0.79 Cash Balance (May 7, 2012) US$93M (1) As at close on April 30, 2012 40   (2) Includes 4.9M “in-the-money” options at an average strike price of C$0.52 as of April 30, 2012
  • 41. SUMMARY Emerging gold producer TSX : R Significant exploration remains – open pit underground Optimize the underground potential WWW .R O MA R C O .C O M Completing engineering $93M cash – no debt 70% Institutionally held Permits pending – targeted by year end 2012 Extremely undervalued in today’s Market vs. Peers 41  
  • 42. CONTACT INFORMATION Dan Symons Vice President, Investor Relations dsymons@romarco.com Brookfield Place 181 Bay Street, Suite 3630 Toronto, Ontario M5J 2T3 Tel: 416.367.5500 Fax: 416.367.5505 Email: info@romarco.com WWW .R O MA R C O .C O M