SlideShare uma empresa Scribd logo
1 de 43
Baixar para ler offline
Corporate	
  Presenta,on	
  
August	
  2011	
  
Cau,onary	
  Statement	
  
The information in this document has been prepared as of February 9, 2011. Certain statements contained in this document constitute “forward-looking statements”
within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information under the provisions of Canadian provincial
securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned”, and similar expressions are intended to
identify forward-looking statements or information.

Specifically, this presentation contains forward looking statements regarding the results and projections contained in the February 2011 technical report of the
Haile Gold project, including the expected mine life, recovery, capital costs, cash operating costs and other costs and anticipated production of the described open
pit mine, the projected internal rate of return, the projected payback period, the availability of capital for development, sensitivity to metal prices, ore grade, the
reserve and resource estimates on the project, the financial analysis, the timing for completion of the revised feasibility study on the Haile Gold project, the timing
and amount of future production, the timing of construction of the proposed mine and process facilities, capital and operating expenditures, the timing of the receipt
of permits, rights and authorizations, communications with local stakeholders and community relations, availability of financing and any and all other timing,
development, operational, financial, economic, legal, regulatory and political factors that may influence future events or conditions and expected drilling activities.
In addition, this presentation also contains updated resource estimates contained in the February 2011 technical reports.

Scientific and technical information referred herein has been extracted from and are hereby qualified in their entirety by reference to the aforementioned technical
reports (“Technical Reports”). Joshua Snider, P.E., Thomas L. Drielick, P.E., Lee “Pat” Gochnour, M.M.S.A., John Marek, P.E. and Derek Wittwer, P.E. are
responsible for preparing the Technical Reports. Each of the above referenced persons is a “qualified person” as defined in National Instrument 43-101 —
Standards of Disclosure for Mineral Projects.

Such forward‐looking statements are based on a number of material factors and assumptions, including, but not limited in any manner, those disclosed in any
aother of Romarco’s public filings, and include the ultimate determination of mineral reserves and resources, availability and final receipt of required approvals,
licenses and permits, sufficient working capital to develop and operate the proposed mine, access to adequate services and supplies, economic conditions,
commodity prices, foreign currency exchange rates, interest rates, access to capital and debt markets and associated cost of funds, availability of a qualified work
force, lack of social opposition and legal challenges, and the ultimate ability to mine, process and sell mineral products on economically favorable terms. While
Romarco considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Actual results may vary from
such forward‐looking information for a variety of reasons, including but not limited to risks and uncertainties disclosed in other Romarco filings at www.sedar.com.
Forward‐looking statements are based upon management’s beliefs, estimate and opinions on the date the statements are made and, other than as required by law,
Romarco does not intend, and undertakes no obligation to update any forward‐looking information to reflect, among other things, new information or future events

Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources:
Certain tables may use the terms “Measured”, “Indicated” and “Inferred” Resources. United States investors are advised that while such terms are recognized and
required by Canadian regulations, however, the United States Securities and Exchange Commission does not recognize them. “Inferred Mineral Resources” have a
great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral
Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or other
economic studies. United States investors are cautioned not to assume that all or any part of Measured or Indicated Mineral Resources will ever be converted into
Mineral Reserves. United States investors are also cautioned not to assume that all or any part of a Mineral Resource is economically or legally mineable.

2	
                                                         All figures are US$ unless otherwise indicated
History	
  of	
  Carolina	
  Gold	
  Mining	
  /	
  
     Support	
  for	
  the	
  Project	
  
HAILE	
  GOLD	
  MINE	
  –	
  Mining	
  History	
  

                             CAROLINA	
  SLATE	
  BELT	
                                                   §  First	
  Gold	
  rush	
  before	
  California	
  
Kentucky	
  
                                                                                                           §  Carolinas	
  led	
  US	
  Gold	
  produc,on	
  un,l	
  
                           West	
  Virginia	
  
                                                                                                               1848	
  
                                                                                                           §  Second	
  US	
  Mint	
  in	
  CharloMe,	
  NC	
  
 Tennessee	
  
                                                                                                           §  Original	
  49’ers	
  came	
  from	
  East	
  Coast	
  
                                                       Russell	
  Mine	
  
                                                                                                           §  Significant	
  gold	
  produc,on	
  in	
  80’s-­‐90’s	
  
                                                 Hickory	
  
                                                                             Ironwood	
  
                                              Reed	
  Mine	
  
                                    Howie	
  Mine	
  
                                                                                                           §  Mining	
  part	
  of	
  local	
  history/community	
  	
  
                                      Locust	
                                       North	
  Carolina	
   §  500	
  ac,ve	
  mines	
  in	
  South	
  Carolina	
  today	
  
                         Haile	
  Mine	
                          Brewer	
  Mine	
  

                                       Bayberry	
                       Buzzard	
  
                                                                Ridgeway	
  Mine	
  
                    Dorn	
  Mine	
  
                                                            Elm	
  
     Magruder	
  Mine	
                Bante	
  Mine	
  
                                  Tathom	
  Mine	
  
  Columbia	
  Mine	
  
                                                           South	
  Carolina	
  

               Georgia	
  
Located	
  in	
  Mining	
  Friendly	
  Jurisdic,on	
  
                                                                                                      Ongoing	
  Community	
  Involvement	
  
          §  Romarco	
  con,nues	
  to	
  build	
  strong	
  local	
  
              rela,onships	
  and	
  support	
  
                       ê  High	
  local	
  unemployment	
  
                       ê  Romarco	
  hires	
  locally	
  
                            • 113	
  employees	
  +	
  30	
  contractors	
  
                       ê  $1	
  million/month	
  spent	
  locally	
  


                                                                Awards	
                                  Strong	
  Community	
  Support	
  




        From	
  le(	
  to	
  right:	
  
        •  2010	
  OUTSTANDING	
  BUSINESS	
  AWARD	
  presented	
  to	
  HAILE	
  GOLD	
  MINE	
  
              by	
  Kershaw	
  Chamber	
  of	
  Commerce	
  
        •  2011	
  CITIZEN	
  OF	
  THE	
  YEAR	
  presented	
  to	
  DIANE	
  GARRETT	
  
              by	
  Kershaw	
  Chamber	
  of	
  Commerce	
  
        •  2011	
  COMMUNITY	
  CITIZENSHIP	
  AWARD	
  presented	
  to	
  DAVID	
  THOMAS	
  
              by	
  Mining	
  Associa:on	
  of	
  South	
  Carolina	
  	
  
5	
  
Romarco	
  Overview	
  
Romarco	
  –	
  Company	
  Overview	
  
         Company	
  Descrip,on	
  
         § Romarco	
  is	
  a	
  gold	
  development	
  company	
  focused	
                                                                                 Project	
  Loca,on	
  
            on	
  produc,on	
  primarily	
  in	
  the	
  U.S.	
  
                                                                                                                                            NORTH
                                                                                                                                                                      Charlotte
         § The	
  Company’s	
  flagship	
  project	
  is	
  the	
  Haile	
  Gold	
                                                          CAROLINA
            Mine	
  in	
  South	
  Carolina	
                                                                                                                                Haile Mine
                                                                                                                                                                                               Myrtle
             ê  Feasibility	
  study	
  completed	
                                                                                                         SOUTH            Columbia
                                                                                                                                                                                               Beach

             ê  Permits	
  pending	
                                                                                                                        CAROLINA

             ê  System	
  remains	
  open	
  in	
  all	
  direcOons	
  at	
  depth	
  
         § Experienced	
  board,	
  management	
  &	
  technical	
  team	
  
         Capitaliza,on	
  Summary	
                                                                                                                             GEORGIA                         Atlantic Ocean

        Exchange/	
  Symbol	
                                                                    TSX:R	
  
        Share	
  Price(1)	
                                                                      C$1.64	
  
        Shares	
  Outstanding	
  (Basic)	
                                                       503.3M	
  
                                                                                                                                          •  Romarco	
  controls	
  11,000+	
  acres	
  of	
  
        FD	
  Shares	
  Outstanding	
  (TSM)(2)	
                                                520.7M	
  
                                                                                                                                             100%	
  private	
  land	
  
        Market	
  CapitalizaOon(1)	
                                                             C$825M	
  
                                                                                                                                               •  Surface,	
  mineral	
  and	
  water	
  rights	
  
        52	
  Week	
  High	
  /	
  Low(1)	
                                                      C$2.88	
  /	
  C$1.30	
  
                                                                                                                                               •  ~	
  9,900	
  acres	
  owned	
  fee	
  simple	
  
        Cash	
  Balance	
  (June	
  30,	
  2011)	
                                               US$63M	
  
        (1)	
  As	
  at	
  close	
  on	
  June	
  30,	
  2011	
  
        (2)	
  Calculated	
  using	
  treasury	
  stock	
  method.	
  Includes	
  5.6mm	
  “in-­‐the-­‐money”	
  op:ons	
  at	
  an	
  
           average	
  strike	
  price	
  of	
  C$0.53	
  as	
  of	
  June	
  30,	
  2011	
  

7	
              181	
  Bay	
  St.	
  Suite	
  3630,	
  Toronto,	
  ON,	
  M5J	
  2T3	
  │Email:	
  info@romarco.com	
  │Office:	
  416.367.5500	
  │Fax:	
  	
  416.367.5505	
  	
  │Website:	
  www.romarco.com	
  
Strong	
  Board,	
  Management	
  and	
  Technical	
  Team	
  
         §  Proven	
  gold	
  mine	
  development,	
  finance,	
  perming	
  and	
  opera,ons	
  experience	
  
                 ê  Romarco	
  has	
  the	
  team	
  in	
  place	
  to	
  bring	
  Haile	
  into	
  producOon	
  
         Experienced	
  Board	
  of	
  Directors	
                                           Strong	
  Management	
  &	
  Technical	
  Team	
  
        Edward	
  A.	
  van	
  Ginkel,	
  Chairman	
                                        Diane	
  R.	
  GarreM,	
  Ph.D.,	
  President	
  &	
  CEO	
  
        §  Consultant,	
  former	
  Noranda,	
  Dayton	
  Mining	
                         §  Former	
  Dayton	
  Mining,	
  US	
  Global	
  Investors	
  
        Diane	
  R.	
  GarreM	
                                                             James	
  R.	
  Arnold,	
  Sr.	
  VP,	
  COO	
  
        §  Former	
  Dayton	
  Mining,	
  US	
  Global	
  Investors	
                      §  Former	
  Freeport,	
  Gold	
  Fields	
  –	
  Richards	
  Award	
  Winner	
  
        James	
  R.	
  Arnold	
                                                             Stan	
  Rideout,	
  Sr.	
  VP,	
  CFO	
  
        §  Former	
  Freeport,	
  Gold	
  Fields	
  –	
  Richards	
  Award	
  Winner	
     §  Former	
  Phelps	
  Dodge	
  
        Leendert	
  Krol	
                                                                  James	
  Berry,	
  Chief	
  Geologist	
  &	
  Regional	
  Explora,on	
  Manager	
  
        §  Former	
  Brazuro,	
  Newmont	
                                                 §  Former	
  Barrick	
  
        Don	
  MacDonald	
                                                                  Brent	
  Anderson,	
  Mine	
  Manager	
  
        §  CFO	
  QuadraFNX,	
  former	
  NovaGold,	
  DeBeers,	
  Dayton	
  Mining	
      §  Former	
  Quadra,	
  Freeport	
  
        John	
  Marsden	
                                                                   Kevin	
  Russell,	
  Regional	
  Geologist	
  
        §  Consultant,	
  former	
  Freeport	
  –	
  Richards	
  Award	
  Winner	
         §  Former	
  Barrick	
  
        Patrick	
  Michaels	
                                                               Jim	
  Wickens,	
  Process	
  Manager	
  
        §  Porgolio	
  Manager	
  –	
  Zuri-­‐invest,	
  Switzerland	
                     §  Former	
  Barrick	
  
        Robert	
  van	
  Doorn	
                                                            OM	
  Jackson,	
  Health	
  &	
  Safety	
  
        §  Former	
  Mundoro,	
  Rio	
  Narcea,	
  Morgan	
  Stanley	
                     §  Former	
  Freeport	
  
                                                                                            Johnny	
  Pappas,	
  Director	
  of	
  Environmental	
  Affairs	
  
                                                                                            §  Former	
  Freeport	
  
                                                                                            Ramona	
  Schneider,	
  Environmental	
  Manager	
  
                                                                                            §  Former	
  Kinross	
  
                                                                                            Dan	
  Symons,	
  Manager	
  Investor	
  Rela,ons	
  
                                                                                            §  Former	
  Renmark	
  Financial	
  
8	
  
Introduc,on	
  to	
  the	
  Haile	
  	
  Gold	
  Mine	
  Project	
  



          FEBRUARY 2011             §  Feasibility completed



           $275 million             §  One of lowest capital cost projects in industry



          $379/oz                   §  One of lowest operating cost projects in industry
          ($347/oz first 5 years)




          2.06 g/t                  §  One of highest grade open-pit projects in industry




9	
  
Low	
  Capital	
  Cost	
  




                                                                                                Development	
  Capex	
  for	
  Primary	
  Open	
  Pit	
  Asset	
  (US$mm)	
  (1)	
  




         *	
  All	
  figures	
  are	
  in	
  millions	
  of	
  dollars	
  
         (1)	
   	
  Source:	
  Company	
  Disclosure	
  
10	
                 Peers	
  include	
  direct	
  and	
  indirect	
  costs,	
  con:ngency	
  funding	
  and	
  previously	
  sunk	
  development	
  capital	
  (sustaining	
  capital	
  not	
  included)	
  
         	
  
Low	
  Cash	
  Cost	
  


                            $600!                                                                            LOWEST QUARTILE AVERAGE CASH
                                                                   $559!
                                                                                                             COST IN 2010 (1)	


                            $500!
                                                                                           $379!                      $426!

                            $400!



                            $300!



                            $200!



                            $100!



                                $0!
                                                           Industry Average (1)	

       ROMARCO           Lowest Quartile (1)	

                                                                                        LOM Average (2)	





         (1)  Source:	
  GFMS	
  presenta:on,	
  Gold	
  Survey	
  2010	
  Update	
  
11	
     (2)  Announced	
  February	
  9,	
  2011	
  
High	
  Reserve	
  Grade	
  for	
  Open	
  Pit	
  




                                                                Reserve	
  Grade	
  for	
  Primary	
  Open	
  Pit	
  Asset	
  (g/t	
  Au)	
  (1)	
  




         (1)	
   	
  Source:	
  BMO	
  Capital	
  Markets	
  
12	
     	
  
Environmental	
  /	
  Perming	
  
Environmental	
  Opera,ons	
  Team	
  
                                                                                                                                                                                                                                  Consultants	
  
                                                                                                                                                                                                                    •  Gochnour	
  	
  Associates	
  
                                                                                                                                                                                                                        Pat	
  Gochnour	
  

                                                                                                                                                                                                                    •  Kennedy	
  ConsulMng	
  Services	
  
                                                                                                                                                                                                                        Craig	
  Kennedy	
  
                                                                                                                                                                                                                    •  AMEC	
  Earth	
  and	
  Environmental	
  

         JIM	
  ARNOLD	
                                                           JOHNNY	
  PAPPAS	
                                                RAMONA	
  SCHNEIDER	
                                          •  Tetra	
  Tech	
  
         Sr.	
  VP.,	
  COO	
  	
  Director	
                                     Director	
  of	
  Environmental	
  Affairs	
                       Environmental	
  Manager	
                                     •  Schlumberger	
  Water	
  Services	
  
         P.E.,	
  B.Sc.	
  Metallurgical	
  Engineering	
                          	
                                                                	
  
         	
  James	
  R.	
  Arnold	
  is	
  the	
  current	
  Senior	
  Vice	
                                                                                                                                      •  Schafer	
  Limited	
  
                                                                                   Johnny	
  Pappas	
  has	
  a	
  disOnguished	
  career	
          Ramona	
  Schneider	
  has	
  been	
  with	
  the	
  
         President	
  and	
  Chief	
  OperaOng	
  Officer	
  of	
                    in	
  the	
  field	
  of	
  environmental	
  management	
          Haile	
  Gold	
  Mine	
  since	
  1990	
  working	
  for	
     •  Arcadis	
  
         Romarco.	
  Mr.	
  Arnold	
  was	
  recently	
  Vice	
                    and	
  perminng.	
  Mr.	
  Pappas	
  recently	
  held	
           Piedmont	
  Mining	
  Company,	
  AMAX	
  Gold,	
  
         President,	
  Colorado	
  OperaOons	
  for	
  Freeport-­‐                 the	
  posiOon	
  of	
  Environmental	
  Manager	
  of	
          and	
  Kinross	
  Gold.	
  As	
  Environmental	
               •  Genesis	
  ConsulMng	
  Group	
  
         McMoRan	
  where	
  he	
  led	
  the	
  Climax	
  re-­‐start	
            the	
  Climax	
  Mine	
  and	
  was	
  Permit	
                   Manager,	
  Ms.	
  Schneider	
  is	
  responsible	
  for	
  
         project	
  through	
  feasibility,	
  engineering,	
  
                                                                                   Coordinator	
  for	
  Barrick’s	
  Cortez	
  Gold	
  
                                                                                                                                                                                                                    •  Ecological	
  Resources	
  Consultants	
  
         staffing	
  and	
  construcOon.	
  Prior	
  to	
  there	
  he	
                                                                               perminng,	
  maintaining	
  current	
  permits	
  
                                                                                   Mines.	
  In	
  addiOon,	
  he	
  has	
  held	
  several	
        and	
  regulatory	
  compliance,	
  organizing	
               •  Environmental	
  Banc	
  and	
  Exchange	
  
         was	
  V.P.	
  Technical	
  Services	
  for	
  Coeur	
  
                                                                                   Senior	
  Environmental	
  Engineer	
  posiOons	
                 closure	
  sampling	
  programs,	
  preparing	
  
         d’Alene	
  Mines	
  Corp.	
  and	
  also	
  held	
  the	
                                                                                                                                                     (EBX)	
  
                                                                                   with	
  Pacificorp,	
  Plateau	
  Mining,	
  and	
  Santa	
        regulatory	
  reporOng	
  documents,	
  
         posiOon	
  of	
  General	
  Manager	
  for	
  Kinross’	
  
                                                                                   Fe	
  Pacific	
  Gold.	
  Mr.	
  Pappas	
  is	
  recognized	
  
         Goldbanks	
  Project	
  and	
  Manager	
  of	
  Santa	
  Fe	
                                                                               monitoring	
  reclamaOon	
  projects,	
  and	
                 •  McNair	
  Law	
  Firm	
  
         Pacific	
  Gold’s	
  Twin	
  Creeks	
  project	
  in	
  Nevada.	
          as	
  a	
  leader	
  in	
  his	
  field	
  and	
  has	
  won	
     managing	
  the	
  baseline	
  programs.	
  
         Mr.	
  Arnold	
  holds	
  a	
  degree	
  in	
  Metallurgical	
            numerous	
  awards	
  including	
  the	
  2003	
                                                                                 •  C.A.	
  Clark	
  ConsulMng,	
  LLC	
  
         Engineering	
  from	
  University	
  of	
  Idaho	
  and	
  an	
           “Best	
  of	
  the	
  Best”	
  Award	
  –	
  awarded	
  by	
  
                                                                                                                                                                                                                        Catherine	
  Clark	
  
         M.S.	
  degree	
  in	
  Engineering	
  Management.	
                      the	
  Department	
  of	
  Interior’s	
  Office	
  of	
  
                                                                                   Surface	
  Mining	
  in	
  recogniOon	
  for	
  
                                                                                   extraordinary	
  personal	
  commitment	
  and	
  
                                                                                   outstanding	
  contribuOon	
  for	
  the	
  
                                                                                   reclamaOon	
  success	
  at	
  the	
  Castle	
  Gate	
  
                                                                                   Mine	
  and	
  the	
  2003	
  “Excellence	
  in	
  Surface	
  
                                                                                   Coal	
  Mining	
  ReclamaOon”	
  Award.	
  


14	
  
Environmental	
  Impact	
  Statement	
  Process	
  

         §    EIS	
  is	
  common	
  place	
  in	
  mining	
  
         §    No,ce	
  of	
  Intent	
  to	
  prepare	
  an	
  EIS	
  published	
  in	
  the	
  Federal	
  Register	
  
         §    90	
  day	
  public	
  comment	
  period	
  
         §    Agency	
  and	
  public	
  scoping	
  mee,ng	
  –	
  one	
  or	
  more	
  
         §    Dran	
  EIS	
  
         §    90	
  day	
  public	
  review	
  and	
  comment	
  period	
  
         §    Romarco	
  responds	
  to	
  comments	
  
         §    Final	
  EIS	
  includes	
  comments,	
  amendments	
  if	
  necessary	
  
         §    30	
  day	
  minimum	
  comment	
  period	
  
         §    Record	
  of	
  Decision	
  (ROD)	
  




15	
  
EIS	
  Posi,ves	
  

         §    Eliminates	
  poten,al	
  challenge	
  to	
  EA	
  decision	
  	
  
         §    Approximate	
  12	
  month	
  delay	
  of	
  start-­‐up	
  
         §    Analysts	
  es,mate	
  4-­‐12%	
  NAV	
  impact	
  to	
  project	
  due	
  to	
  cash	
  flow	
  ,ming	
  
         §    Explora,on	
  con,nues	
  
                ê PotenOal	
  to	
  increase	
  reserves	
  and	
  grade	
  
                ê Reduce	
  strip	
  raOo	
  
                        ê  Further	
  define	
  mineralizaOon	
  between	
  deposits	
  
                ê AddiOonal	
  Ome	
  to	
  opOmize	
  mine	
  plan	
  with	
  new	
  resources	
  	
  reserve	
  model	
  
                        ê  Within	
  exisOng	
  permit	
  area	
  and	
  7,000	
  tpd	
  mill	
  
             ê More	
  Ome	
  to	
  define	
  and	
  study	
  underground	
  targets	
  
         §  More	
  ,me	
  to	
  value	
  engineer	
  plant	
  design	
  



16	
  
EIS	
  Decision	
  Drivers	
  

         §  Large	
  volumes	
  of	
  technical	
  data	
  submiMed	
  by	
  Romarco	
  
              ê WETLANDS	
  
                      ê  Avoidance	
  	
  minimizaOon	
  
                      ê  Studies	
  completed	
  
                      ê  Minor	
  modificaOons	
  may	
  occur	
  
             ê  TAILINGS	
  SITE	
  FACILITY	
  
                      ê  Leak	
  detecOon	
  system	
  
                      ê  CN	
  Distruct	
  Circuit	
  
                      ê  Any	
  potenOal	
  wildlife	
  issues	
  
                      ê  Studies	
  completed	
  
             ê  CUMULATIVE	
  IMPACTS	
  




17	
  
EIS	
  Decision	
  Drivers	
  

         §  No	
  ,me	
  has	
  been	
  lost	
  
         §  All	
  review	
  and	
  comment	
  periods	
  since	
  January	
  2011	
  were	
  a	
  
             required	
  process	
  for	
  both	
  EIS	
  and	
  EA	
  
         §  Addi,onal	
  dollar	
  costs	
  associated	
  with	
  EIS	
  
                     ê  $2	
  million	
  
                     ê  Consultants	
  legal	
  
         §  Next	
  Steps:	
  
                     ê  SelecOon	
  of	
  contractor	
  
                     ê  Preparing	
  schedule	
  
                     ê  Begin	
  scoping	
  work	
  




18	
  
Streams	
  Mi,ga,on	
  Plan	
  SubmiMed	
  


         §  38,775	
  linear	
  feet	
  of	
  streams	
  impacted	
  (296,396	
  stream	
  credits*)	
  
                  •  	
  MiOgaOon	
  Plan:	
  
                     	
         	
  68,271	
  linear	
  feet	
  of	
  streams	
  Restored	
  
                     	
         	
  151,692	
  linear	
  feet	
  of	
  streams	
  Preserved	
  
                     	
         	
  219,963	
  linear	
  feet	
  of	
  streams	
  MiOgated	
  
                  	
  

         §  314,646	
  total	
  stream	
  credits	
  (106%)	
  
         §  MiOgaOng	
  567%	
  of	
  impact	
  




           * Credits are determined in accordance with USACE’s procedures	

19	
  
Wetlands	
  Mi,ga,on	
  Plan	
  SubmiMed	
  


         §  161	
  acres	
  of	
  wetlands	
  impacted	
  (1,842	
  credits*)	
  
                  • MiOgaOon	
  plan	
  submiwed	
  (credit	
  for	
  credit)	
  
                     	
  MiOgaOon	
  Plan:	
  
                     	
          	
  297	
  acres	
  Restored	
  
                     	
          	
  621	
  acres	
  Preserved	
  
                     	
          	
  918	
  acres	
  MiOgated	
  

         §  1,932	
  acres	
  total	
  credits	
  (105%)	
  
         §  MiOgaOng	
  571%	
  of	
  impact	
  




           * Credits are determined in accordance with USACE’s procedures	

20	
  
Wetlands	
  at	
  Haile	
  Property	
  
                                Typical	
  Palustrine	
  Emergent	
  Wetland	
  




21	
  
Wetlands	
  at	
  Haile	
  Property	
  
                            Typical	
  Palustrine	
  Forested	
  Wetland	
  (saturated)	
  




22	
  
Wetlands	
  at	
  Haile	
  Property	
  
                            Typical	
  Palustrine	
  Forested	
  Wetland	
  (inundated)	
  




23	
  
Streams	
  at	
  Haile	
  Property	
  
                      Non-­‐RelaOvely	
  Permanent	
  Waters	
  (intermiwent	
  stream	
  channel)	
  




24	
  
Streams	
  at	
  Haile	
  Property	
  
                                   Typical	
  Riverine	
  (stream	
  channel)	
  




25	
  
Clear	
  Plan	
  to	
  Bring	
  Haile	
  Into	
  Produc,on	
  
                       §  Strong	
  balance	
  sheet	
  with	
  approximately	
  $63M	
  in	
  cash	
  and	
  no	
  debt(1)	
  
                       §  Well	
  defined	
  project	
  schedules	
  and	
  clear	
  development	
  milestones	
  


           Project	
  Schedule	
  for	
  EIS	
                                                                                                                           Haile	
  Milestones	
  and	
  Status	
  Report	
  

                                                              2011	
                       2012	
                      2013	
                      2014	
               Milestone	
  /	
  AcOvity	
               Status	
  
                                                      Q1	
   Q2	
   Q3	
   Q4	
   Q1	
   Q2	
   Q3	
   Q4	
   Q1	
   Q2	
   Q3	
   Q4	
   Q1	
   Q2	
   Q3	
   Q4	
     Complete	
  feasibility	
  study	
           P	
  
         Feasibility	
  Study	
                                                                                                                                         State	
  operaOng	
  permit	
  
                                                                                                                                                                                                                     P	
  
         OpOmizaOon	
                                                                                                                                                   submiwed	
  
         Perminng	
                                                                                                                                                     401/404	
  permit	
  submiwed	
              P	
  
         ConstrucOon	
                                                                                                                                                  Resource	
  /	
  reserve	
  report	
         P	
  
         ProducOon	
                                                                                                                                                    Expand	
  Haile	
  	
  Horseshoe	
        2011	
  
         ExploraOon	
                                                                                                                                                   Acquire	
  other	
  properOes	
            2011	
  
                                                                                                                                                                        Explore	
  regional	
  targets	
           2011	
  




26	
     (1)	
  As	
  at	
  June	
  30,	
  2011	
  
Explora,on	
  Upside	
  
Significant	
  Remaining	
  Explora,on	
  Upside	
  Poten,al	
  
         §  2010	
  drill	
  program	
  of	
  108,000m	
  confirmed	
  resource	
  at	
  Haile	
  remains	
  open	
  along	
  
             strike	
  and	
  at	
  depth	
  
                             ê  40%	
  of	
  2010	
  drilling	
  focused	
  on	
  condemnaOon	
  drilling	
  to	
  locate	
  suitable	
  tailings	
  site	
  
                                 #!!$!!!
                                                                              ()$$$%                                 §  MI resources increased 44%
                                 ('!$!!!
                                                                                                                       §  MI grade increased 21% (to 1.82 g/t)
                                 (!$!!!                                                                              §  MI tonnes increased 20%
                                                                                                  2010
                                                                                                                       §  Inferred resources declined 46%
                                 (%!$!!!                                                         Highlights
                                                                                                                             ê  Conversion to indicated
           *+,+-.%/0%1-233245%




                                 (#!$!!!                                                                              §  Inferred grade increased 33% (to 1.34 g/t)
                                                                  ($!$$$%
                                                                                                                       §  2P reserves increased 54%
                                 (!!$!!!
                                                       '$$$%
                                  '!$!!!

                                  !$!!!

                                  %!$!!!

                                  #!$!!!
                                            !#$$%
                                       !
                                            2008	
     2009	
      2010	
       2011	
  




28	
  
Significant	
  Remaining	
  Explora,on	
  Upside	
  Poten,al	
  

           2010	
  Explora,on	
  Findings	
                         Upside	
  From	
  Mineraliza,on	
  Not	
  Captured	
  

                            §  Confirms underground potential                      §  Zone not yet drill defined along strike and
           Horseshoe                                                Deep                down dip
                            §  Highest grade                       Horseshoe
           Discovery                                                                §  Potential new zone may exist south of
                            §  Underground economic study (2011)   Zone
                                                                                        main Horseshoe/Snake trend

                            §  Extending to west and south                         §  Mineralization encountered in down dip
           South Pit
                            §  Higher grades encountered           Snake               extensions of Snake deposit
                                                                    Deep
                                                                                    §  Areas lie beneath the resource shell
                                                                    Zone
                                                                                    §  Additional drilling is planned
                            §  Extending to west and at depth
           Ledbetter
                            §  Higher grades
                                                                                    §  Drill hole intercepts lie below the resource
                                                                    Mustang             shell
                            §  Extending at depth                                  §  Additional drilling is planned
           Snake
                            §  Higher grades


           Haile            §  Remains open                                        §  Strike extends beyond the resource shell
                                                                    Mill Zone
           Corridor         §  Connecting Horseshoe                                §  Step-out drilling is planned to test extent




29	
  
Resource	
  Growth	
  
                                                          3.5 KM	

    2 0 1 0	

   US$950 PITS	





    PLAN VIEW	



                    601	

   CHAMPION	

       SMALL	

   SOUTH PIT	

   LEDBETTER	

   SNAKE	

   HORSESHOE	



     HAILE	

     LONG	

     SECTION	


                               US$950 PIT LIMITS	

30	
  
New	
  Regional	
  Explora,on	
  Targets	
  
§  3	
  in	
  South	
  Carolina	
  
         ê  Bayberry	
  –	
  currently	
  drilling	
                                                 Kentucky	
  
             ê  Similar	
  host	
  rocks,	
  alteraOon	
  and	
  mineralizaOon	
  as	
                                                West	
  Virginia	
  
                 observed	
  at	
  Haile	
  
             ê  74	
  shallow	
  rotary	
  holes,	
  8	
  RC	
  holes,	
  and	
  8	
  core	
  holes	
  
                 previously	
  drilled	
  on	
  the	
  property	
                                        Tennessee	
  
             ê  Historical	
  Reported,	
  highlighted	
  intercepts	
  include:	
  
                              ê    7.0	
  meters	
  of	
  4.3	
  g/t	
  
                              ê    26.0	
  meters	
  of	
  1.8	
  g/t	
  
                              ê    12.0	
  meters	
  of	
  1.2	
  g/t	
  
                              ê    7.3	
  meters	
  of	
  1.8	
  g/t	
                                                                                             Hickory	
                 Ironwood	
  
                                    	
  

         ê  Locust	
  –	
  drill	
  ready	
                                                                                                                              Locust	
  
                                                                                                                                                                                                  North	
  Carolina	
  
             ê  Small	
  historical	
  oxide	
  resource	
  (pre	
  43-­‐101)	
                                                         Haile	
  Mine	
  
             ê  34	
  RC	
  and	
  27	
  core	
  holes	
  have	
  been	
  drilled	
  on	
  the	
                                              Bayberry	
                       Buzzard	
  
                 property	
  
                                                                                                                                                                Elm	
  
             ê  Historical	
  Reported,	
  highlighted	
  intercepts	
  include:	
  
                              ê    71.5	
  meters	
  of	
  2.9	
  g/t	
  
                              ê    5.1	
  meters	
  of	
  1.5	
  	
  g/t	
  
                              ê    74.6	
  meters	
  of	
  1.5	
  	
  g/t	
                                                                                  South	
  Carolina	
  
                              ê    65.0	
  meters	
  of	
  1.9	
  	
  g/t	
  

         ê  Elm	
                                                                                                       Georgia	
  
             ê  Property	
  is	
  ready	
  for	
  soil	
  and	
  rock	
  chip	
  sampling	
  
             ê  Preliminary	
  rock	
  chip	
  sampling	
  has	
  yielded	
  8.6	
  g/t	
  	
  

                       	
  
31	
  
New	
  Regional	
  Explora,on	
  Targets	
  
§  2	
  in	
  North	
  Carolina	
  
         ê  Hickory	
  –	
  mobilizing	
  rig	
                                                   Kentucky	
  
           ê  Historical	
  producOon	
  during	
  1800s	
                                                                      West	
  Virginia	
  

           ê  Historical	
  drilling	
  consists	
  of	
  11	
  core	
  holes	
  and	
  130	
  
                   RC	
  holes	
  
           ê  Historical	
  Reported,	
  highlighted	
  intercepts	
  include:	
                  Tennessee	
  
                            ê  19.8	
  meters	
  of	
  4.7	
  g/t	
  
                            ê  21.3	
  meters	
  of	
  4.0	
  g/t	
  
                            ê  22.9	
  meters	
  of	
  3.4	
  g/t	
  
                            ê  17.0	
  meters	
  of	
  2.1	
  g/t	
  
              	
                                                                                                                                              Hickory	
                 Ironwood	
  

         ê  Ironwood	
  –	
  drill	
  ready	
                                                                                                                                              North	
  Carolina	
  
          ê  The	
  highest	
  grade	
  encountered	
  in	
  the	
  trenching	
  was	
                                                                             Locust	
  
                   9.1	
  g/t	
  
                                                                                                                                   Haile	
  Mine	
  
                                                                                                                                         Bayberry	
                       Buzzard	
  
          ê  Twelve	
  shallow	
  RC	
  holes	
  and	
  	
  two	
  core	
  holes	
  have	
  
                   been	
  drilled	
  	
                                                                                                                  Elm	
  
          ê  Historical	
  Reported,	
  highlighted	
  intercepts	
  include:	
  
                                 ê  3.0	
  meters	
  of	
  4.4	
  g/t	
  
              	
                                                                                                                                        South	
  Carolina	
  

                                                                                                                   Georgia	
  




32	
  
Feasibility	
  
Near	
  Term,	
  Low	
  Cost	
  Gold	
  Producer	
  
         §  Posi,ve	
  feasibility	
  study	
  on	
  Haile	
                  Summary	
  of	
  Haile	
  Feasibility	
  Study	
  (US$950	
  Gold)	
  
             announced	
  on	
  Feb.	
  9,	
  2011	
  
                                                                              2	
  P	
  Gold	
  Reserves	
  ( 000	
  oz)	
                           2,018	
  
         §  Strong	
  project	
  economics	
  with	
  robust	
  
                                                                              Recovery	
  Rate	
  (%)	
                                              83.7	
  
             IRR	
  and	
  NPV	
  at	
  conserva,ve	
  gold	
                 Net	
  Recoverable	
  Gold	
  ( 000	
  oz)	
                           1,681	
  
             prices	
                                                         Annual	
  Mill	
  Throughput	
  ( 000	
  t)	
                          2,555	
  
              ê  Low	
  cash	
  cost	
  operaOon	
  
                                                                              Daily	
  Mill	
  Throughput	
  (tpd)	
                                 7,000	
  
              ê  Manageable,	
  low	
  cost	
  capital	
  requirements	
  
                                                                              Mine	
  Life	
  (years)	
                                              13.25	
  
         §  Posi,ve	
  feasibility	
  study	
  does	
  not	
                 Overall	
  Strip	
  RaOo	
  (waste:ore)	
                              7.2:1	
  
             include	
                                                        Average	
  Feed	
  Grade	
  to	
  Mill	
  (LOM)	
  (g/t)	
             2.06	
  
              ê  Horseshoe	
                                                 Average	
  ProducOon	
  (year	
  1)	
  ( 000	
  oz)	
                   172	
  
              ê  Snake	
  Deep	
                                             Average	
  ProducOon	
  (years	
  1	
  -­‐	
  5)	
  ( 000	
  oz)	
      150	
  
              ê  Mustang	
                                                   Cash	
  Costs	
  (year	
  1-­‐5)	
  (US$/oz)	
                          347	
  
              ê  Mill	
  Zone	
  extensions	
                                Cash	
  Costs	
  (LOM)	
  (US$/oz)	
                                    379	
  
              ê  601	
                                                       IniOal	
  Capital	
  Expenditures	
  (US$M)	
                          275.5	
  
              ê  Inferred	
  resources	
  within	
  US$950	
  Pit	
          Sustaining	
  Capital	
  Expenditures	
  (US$M)	
                      119.2	
  
                                                                              Net	
  Present	
  Value	
  (5%	
  discount)	
  
         §  Open	
  all	
  direc,ons	
  and	
  at	
  depth	
  
                                                                                  Pre-­‐Tax	
  (US$M)	
                                               279	
  
         §  2011	
  economic	
  studies	
                                    Internal	
  Rate	
  of	
  Return	
  
              ê  Underground	
  PEA	
                                            Pre-­‐Tax	
  (%)	
                                                 19.6	
  


34	
  
NPV	
  	
  IRR	
  Sensi,vity	
  to	
  Gold	
  Price	
  	
  
                                                                   Pre-­‐tax	
  NPV	
  and	
  IRR	
  Sensi,vity	
  to	
  Gold	
  Price	
  (1)	
  
                                                                                       ($	
  Millions,	
  except	
  gold	
  price)	
  

                              Gold	
  Price	
                                                                                                            PAYBACK	
  
                                                    NPV	
  @0%	
                 NPV	
  @	
  5%	
                  NPV	
  @	
  10%	
      IRR	
  %	
  
                               Per	
  oz.	
                                                                                                               YEARS	
  

                                 $2000	
              $2,261	
                      $1,521	
                           $1,058	
          69.3%	
            1.4	
  

                                 $1900	
              $2,094	
                      $1,403	
                             $970	
          64.9%	
            1.5	
  

                                $1800	
              $1,927	
                      $1,285	
                             $883	
           60.5%	
            1.6	
  
                                 $1700	
              $1,760	
                      $1,166	
                             $796	
          56.1%	
            1.7	
  

                                 $1600	
              $1,593	
                      $1,048	
                             $708	
          51.6%	
            1.8	
  

                                 $1500	
              $1,426	
                       $930	
                              $621	
          47.0%	
            2.0	
  

                                 $1400	
              $1,259	
                       $811	
                              $534	
          42.3%	
            2.2	
  

                                 $1300	
              $1,092	
                       $693	
                              $447	
          37.6%	
            2.4	
  

                                 $1200	
               $925	
                        $575	
                              $359	
          32.7%	
            2.7	
  

                                 $1100	
               $758	
                        $457	
                              $272	
          27.6%	
            3.1	
  

                                 $1000	
               $591	
                        $339	
                              $185	
          22.3%	
            3.8	
  

                                 $950	
               $507	
                        $279	
                              $141	
           19.6%	
            4.2	
  
                                  $800	
               $257	
                        $102	
                               $10	
          10.7%	
            7.6	
  

                                  $700	
                $90	
                        ($16)	
                             ($77)	
          4.0%	
            9.4	
  


         (1) As   per parameters used in February 9, 2011 Feasibility Technical Report
35	
  
Clear	
  Plan	
  to	
  Bring	
  Haile	
  Into	
  Produc,on	
  

         Design	
  Overflow	
  	
  Process	
  Descrip,on	
  

                                                                                                      §  Conven,onal	
  opera,on	
  
              Design	
  Overflow	
                                 Process	
  Descrip,on	
  
                                                                                                      §  Simple	
  flowsheet	
  
         § Robust	
  “Simple”	
                                                                      §  Off-­‐the-­‐shelf	
  
                                                Crush	
  	
  Grind	
  	
  Flota,on	
  
            Flowsheet	
  
                                                                                                          technology	
  
         § Proven	
  Technologies	
            Regrind	
  Flot	
  Con	
  	
  Leach	
  Con	
         §  Ability	
  to	
  expand	
  
                                                                                                          project	
  scale	
  to	
  include	
  
         § Flexible,	
  Expandable	
           Leach	
  Flot	
  Tail	
  	
  Recover	
  both	
           addi,onal	
  resource	
  
                                                                                                          discoveries	
  
         § Non-­‐Refractory	
                  CN	
  Detox	
  	
  Tail	
  Storage	
  Facility	
  

         § Off-­‐The-­‐Shelf	
  
                                                Standard	
  Carbon	
  Elu,ons,	
  EW	
  
            Technology	
  
         § No	
  Long	
  Lead	
  Time	
  
            Units	
  




36	
  
Clear	
  Plan	
  to	
  Bring	
  Haile	
  Into	
  Produc,on	
  
         Mill	
  Plant	
  Facility	
  Rendering	
  

                                                                                                                           PRIMARY	
  CRUSHER	
  
                                                                                               OVERLAND	
  CONVEYOR	
  


                                                                     MILL	
  BUILDING	
  
                                                                                                                                                              HAUL	
  TRUCK	
  
                                                                                                                                                              FUELING	
  STATION	
  


                                                      LEACHING	
                                                 STOCKPILE	
  




                 TAILING	
  


                                                                                                                                               TRUCK	
  WASH	
  




                                                                                        ADMINISTRATION	
  
                                                                                              BUILDING	
  




37	
  
Valua,on	
  
Analyst	
  Coverage	
  

         §  6	
  Analysts	
  Covering	
  Romarco	
  

                    ANALYSTS	
                          12	
  Month	
  Target	
  Price	
  

                   Paradigm	
  Capital	
                           $3.10	
  

                   BMO	
  Capital	
  Markets	
                     $3.00	
  

                   GMP	
  SecuriOes	
                              $2.50	
  

                   NBF	
                                           $2.50	
  

                   RBC	
  Capital	
  Markets	
                     $2.25	
  

                   CIBC	
  World	
  Markets	
                      $1.95	
  


39	
  
P/NAV	
  vs	
  Peer	
  Group	
  
         §  Romarco	
  trades	
  at	
  a	
  discount	
  to	
  its	
  developer	
  peers	
  on	
  a	
  P/NAV	
  basis(1)	
  
           July 4, 2011                                                                                                                    Romarco Minerals Inc.
           !
           #$%%'!()!*+,,-.'!/0123!4+5'%65-7)!8-,9%.9!:;5!/,;+=-,7!

            '%#

            '%!#

            '$%#

            '!!#

            !%#

            !%!#

            !$%#

            !!!#
                       ()*+,-./*0   1*+/*)   234)536+   738).93    5:;)*)      :.3-=)* 8=.0/*0 ?.=6)@*=;   7)/*;   5.=;,A).    5)B./=6   21C?/=.CDDD   F=A3:.   21C?/=.CDD
                                                                  536+/=6+,   56+6+,    140                7/4=.                7=,       E.3+C140      536+    E.3+C140


           (3:.9=GC7HICI)-/A)6CJ).K=A,CD*9C


           #$%%'!)!?;,-=@7'!A6-,@'%;.7)!B@%5-!4%.-!/,;C-='!

                      300,000                                                                                    $600

         Source: RBC Capital Markets Inc., as at July 5, 2011
40	
                  250,000                                                                                    $500
                                                                                                                        S$/oz)
               (oz)




                      200,000                                                                                    $400
EV / Oz (US$/o

                         P/NAV	
  vs	
  Peer	
  Group	
  




                                                                                                                                                                                                                                                                    5.0
                   $150




                                                                                                                                                                                                                  5.0
                                                                                                                                                                                                                 5.0
                                               Detour




                                                                                                                                                                                    5.0
                                                                                                                       Keegan
                                                                                              Detour
                                                                                               Total Resources                                Fronteer                  Geography
                                                                                                                                                                    Keegan




                                                                                                                                                                                                                                                                    4.5
                                                                                   Goldstone                                                                                                           Fronteer




                                                                                                                                                                                                                 4.5
                                                                                                                                                                                                                 4.5
                                                                                                                                                                                                                           Fronteer




                                                                                                                                                                                    4.5
                   $100 Tower Hill
                      Int.
                                                                                                                       Goldstone
                                                Orezone                            Victoria
                                                                                                                                       Russia, E. Europe,        BC, Alaska,          Ontario, Quebec, Chile,                                               Australia, West/South
                                                             Int. Tower Hill
                                                                         50 Mozs                20 Mozs 10 Mozs 5 Mozs                      N. Africa              Other              Nevada, Brazil, Guyana                                                   Africa, Mexico




                                                                                                                                                                                    4.0
                                                                                               Orezone           Victoria




                                                                                                                                                                                                                  4.0
                                                                  1.5x




                                                                                                                                                                                                                 4.0
                                                                                    Grayd
                      Volta Resources              Belo Sun




                                                                                                                                                                                                                                                                    4.0
                                                                                Amarillo
                                                                                            Riverstone Resources
e Patch                                                                                                                  Grayd




                                                                                                                                                                                    3.5
                    $50
                     Exeter                             Volta Resources                            Belo Sun
                                                                                                                            Average EV / In Situ                 Oz (US$ 000s): $97/oz




                                                                                                                                                                                                                   3.5
                                          Pediment                    Midway
                                                                                                                     Amarillo
                                                                                                                          Cassidy




                                                                                                                                                                                                                 3.5
                                         Northern Freegold                                             Vior                   Riverstone Resources                              PMI
                                       Rye Patch
                                                                                          Temex
                                                      Exeter
                                                          1.3x




                                                                                                                                                                                    3.0
                                                        Northern Gold                Pediment                           Midway
                                                                                                                                                                        Cassidy




                                                                                                                                                                                          Gold Grade (g/t)
                                                                                                                                              Vior                                                                                                                    PMI




                                                                                                                                                                                                                                                                    3.5
                                                                                                                                                                                                                 3.0 3.0
                                                                                    Northern Freegold
        Coral
                                        0.8                                          1.3                                 1.8
                                                                                                                           Temex            2.3




                                                                                                                                                                                                                               Gold Grade (g/t)
                              Andina
                                                                                                       Northern Gold           Detour Gold




                                                                                                                                                                                    2.5
                      $0                                                                                                      Gold Grade (g/t)




                                                                                                                                                                                                                                       Gold Grade (g/t)
                                              Coral




                                                                                                                                                                                                                 2.0 2.5 2.5
                                                                                                                                                                                                                                                          Gabriel
                               0.3                                1.1x
                                                                    Andina        0.8                                     1.3                                           1.8                    2.3




                                                                                                                                                                                    2.0
                                                                                                                                                                                 Gold Grade (g/t)




                                                                                                                                                                                                                                                                    3.0
                                                        P / NAV




                                                                               Greystar
                                                                                                                                                          Rainy River




                                                                                                                                                                                                                                                                            Gold Grade (g/t)
                                                                                                                                                                                    1.5
                                                                                                                                                                                Trelawney
                                                                  0.9x




                                                                                                                                                                                                                 1.52.0
                                                                                                                                                                                                             Average P / NAV: 0.8x




                                                                                                                                                                                                                                                                    2.5
                                                                                                                                Guyana GF




                                                                                                                                                                                    1.0
                                                                                                                                                European Goldfields




                                                                                                                                                                                                                   1.5
                                                                                                                                                                                                                                                          Romarco




                                                                                                                                                                                                                 1.0
                                                                                                                                                                                    0.5
                                                                  0.7x
                                                                                  Andina




                                                                                                                                                                                                                                                                    2.0
                                                                                                                   NovaGold

                                                                                                                                                                                    0.0




                                                                                                                                                                                                                 1.0
                                                                                                                                                                                    Premier Gold

                                                                                                                                                                                 2.0                                                                                  4.0                      6.0
                                                                                                                                                                                                                 0.5
                                                                     200




                                                                                                     150




                                                                                                                          100




                                                                                                                                                     50




                                                                                                                                                                                0



                                                                  0.5x
                                                                                                                  AMC / Oz (US$/oz)
                                                                         0.0                               40.0                        80.0                             120.0                                                  160.0                                           200.0
                                                                                                                                                                                                                  0.0
                                                                                                                                                                                                                 0.5
                                                                                                                                       EV / In Situ (US$ 000s / oz)




                                                                                                                                                                                                                                                                    1.5
                                                                    200




                                                                                                       150




                                                                                                                                 100




                                                                                                                                                               50




                                                                                                                                                                                                             0


                       Source: RBC Equity Research, Company Information as at July 5, 2011
      41	
             Note:   Average figures include Romarco
                                                                                                                    AMC / Oz (US$/oz)
                                                                                                                                                                                                                   0.0
                                                                                                                                                                                                             0
                                                                                                                                                            50
                                                   00




                                                                                              50




                                                                                                                          00
Summary	
  

         §  Near	
  term,	
  low	
  cost	
  gold	
  producer	
  with	
  strong	
  project	
  economics	
  

         §  Located	
  in	
  a	
  mining	
  friendly	
  jurisdicOon	
  with	
  excellent	
  infrastructure	
  

         §  Large	
  resource	
  with	
  significant	
  remaining	
  exploraOon	
  upside	
  potenOal	
  

         §  Strong	
  board,	
  management	
  and	
  technical	
  team	
  

         §  Clean	
  plan	
  to	
  bring	
  Haile	
  into	
  producOon	
  

         §  Solid	
  cash	
  posiOon	
  (~	
  US$63	
  million),	
  no	
  debt	
  –	
  as	
  of	
  June	
  30,	
  2011
                                                                                                                      	
  




         §  11	
  drill	
  rigs	
  –	
  172,000	
  meters	
  drilling	
  scheduled	
  for	
  2011	
  (~US$30	
  million)	
  

         §  Haile	
  system	
  remains	
  open	
  in	
  all	
  direcOons	
  at	
  depth	
  

42	
  
Contact	
  Informa,on	
                Head	
  Office	
  Informa,on	
  

         Dan	
  Symons	
                            Romarco	
  Minerals	
  Inc.
                                                                              	
  
         Manager,	
  Investor	
  RelaOons	
              Brookfield	
  Place   	
  
         dsymons@romarco.com	
                   181	
  Bay	
  Street,	
  Suite	
  3630	
  
                                                  Toronto,	
  Ontario	
  M5J	
  2T3    	
  
                                                              Tel:	
  416.367.5500     	
  
                                                             Fax:	
  416.367.5505      	
  
                                                 Email:	
  info@romarco.com            	
  
                                                Website:	
  www.romarco.com	
  


43	
  

Mais conteúdo relacionado

Destaque

ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012Romarco Minerals Inc.
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate PresentationRomarco Minerals Inc.
 
Romarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals Inc.
 
ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013Romarco Minerals Inc.
 
ROMARCO Corporate Presentation - October 2012
ROMARCO Corporate Presentation - October 2012ROMARCO Corporate Presentation - October 2012
ROMARCO Corporate Presentation - October 2012Romarco Minerals Inc.
 
ROMARCO Corporate Presentation - December 2012
ROMARCO Corporate Presentation - December 2012ROMARCO Corporate Presentation - December 2012
ROMARCO Corporate Presentation - December 2012Romarco Minerals Inc.
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate PresentationRomarco Minerals Inc.
 
ROMARCO - Corporate Presentation APRIL 2012
ROMARCO - Corporate Presentation APRIL 2012ROMARCO - Corporate Presentation APRIL 2012
ROMARCO - Corporate Presentation APRIL 2012Romarco Minerals Inc.
 
ROMARCO - Corporate Presentation MAY 2012
ROMARCO - Corporate Presentation MAY 2012ROMARCO - Corporate Presentation MAY 2012
ROMARCO - Corporate Presentation MAY 2012Romarco Minerals Inc.
 

Destaque (14)

ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012ROMARCO - Corporate Presentation JANUARY 2012
ROMARCO - Corporate Presentation JANUARY 2012
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate Presentation
 
Romarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate PresentationRomarco Minerals March 2015 Corporate Presentation
Romarco Minerals March 2015 Corporate Presentation
 
Romarco feb10 print
Romarco feb10 printRomarco feb10 print
Romarco feb10 print
 
May Corporate Presentation
May Corporate PresentationMay Corporate Presentation
May Corporate Presentation
 
ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013ROMARCO Corporate Presentation - March 2013
ROMARCO Corporate Presentation - March 2013
 
ROMARCO Corporate Presentation - October 2012
ROMARCO Corporate Presentation - October 2012ROMARCO Corporate Presentation - October 2012
ROMARCO Corporate Presentation - October 2012
 
ROMARCO Corporate Presentation - December 2012
ROMARCO Corporate Presentation - December 2012ROMARCO Corporate Presentation - December 2012
ROMARCO Corporate Presentation - December 2012
 
December 2014 Corporate Presentation
December 2014 Corporate PresentationDecember 2014 Corporate Presentation
December 2014 Corporate Presentation
 
Corporate presentation agm-show
Corporate presentation agm-showCorporate presentation agm-show
Corporate presentation agm-show
 
ROMARCO - Corporate Presentation APRIL 2012
ROMARCO - Corporate Presentation APRIL 2012ROMARCO - Corporate Presentation APRIL 2012
ROMARCO - Corporate Presentation APRIL 2012
 
August 2015 Corporate Presentation
August 2015 Corporate PresentationAugust 2015 Corporate Presentation
August 2015 Corporate Presentation
 
ROMARCO - Corporate Presentation MAY 2012
ROMARCO - Corporate Presentation MAY 2012ROMARCO - Corporate Presentation MAY 2012
ROMARCO - Corporate Presentation MAY 2012
 
Romarco mar22 web
Romarco mar22 webRomarco mar22 web
Romarco mar22 web
 

Semelhante a Romarco Corporate Presentation - AUGUST 2011

ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011Romarco Minerals Inc.
 
Amarillo Gold Corporate Presentation-Prefeasibility Updates
Amarillo Gold Corporate Presentation-Prefeasibility UpdatesAmarillo Gold Corporate Presentation-Prefeasibility Updates
Amarillo Gold Corporate Presentation-Prefeasibility UpdatesAmarillo Gold Corp.
 
Northern Gold Investor Presentation
Northern Gold Investor PresentationNorthern Gold Investor Presentation
Northern Gold Investor PresentationCompany Spotlight
 
Lomiko Metals Inc.25 June09
Lomiko Metals Inc.25 June09Lomiko Metals Inc.25 June09
Lomiko Metals Inc.25 June09APaulGill
 
Colibri presentation-december-3-2019
Colibri presentation-december-3-2019Colibri presentation-december-3-2019
Colibri presentation-december-3-2019MomentumPR
 
Colibri presentation-december-3-2019
Colibri presentation-december-3-2019Colibri presentation-december-3-2019
Colibri presentation-december-3-2019MomentumPR
 
WestMountain Gold, Inc Corporate Presentation
WestMountain Gold, Inc Corporate PresentationWestMountain Gold, Inc Corporate Presentation
WestMountain Gold, Inc Corporate Presentationwestmountaingold
 
Seafield Corporate Presentation - February 2012
Seafield Corporate Presentation - February 2012Seafield Corporate Presentation - February 2012
Seafield Corporate Presentation - February 2012sffresources
 
Seafield Resources Ltd. - Corporate Presentation
Seafield Resources Ltd. - Corporate PresentationSeafield Resources Ltd. - Corporate Presentation
Seafield Resources Ltd. - Corporate Presentationsffresources
 
ROMARCO Corporate Presentation - NOVEMBER 2012
ROMARCO Corporate Presentation - NOVEMBER 2012ROMARCO Corporate Presentation - NOVEMBER 2012
ROMARCO Corporate Presentation - NOVEMBER 2012Romarco Minerals Inc.
 
Latin American Mining M&A
Latin American Mining M&ALatin American Mining M&A
Latin American Mining M&Aantiochian
 
OAU Presentation
OAU PresentationOAU Presentation
OAU PresentationOremexGold
 
Mayo Gold Presentation November 2009
Mayo Gold  Presentation November 2009Mayo Gold  Presentation November 2009
Mayo Gold Presentation November 2009mayogold
 
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011Viral Network Inc
 

Semelhante a Romarco Corporate Presentation - AUGUST 2011 (20)

ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011ROMARCO AGM Presentation - June 8, 2011
ROMARCO AGM Presentation - June 8, 2011
 
Amarillo Gold Corporate Presentation-Prefeasibility Updates
Amarillo Gold Corporate Presentation-Prefeasibility UpdatesAmarillo Gold Corporate Presentation-Prefeasibility Updates
Amarillo Gold Corporate Presentation-Prefeasibility Updates
 
Northern Gold Investor Presentation
Northern Gold Investor PresentationNorthern Gold Investor Presentation
Northern Gold Investor Presentation
 
Lomiko Metals Inc.25 June09
Lomiko Metals Inc.25 June09Lomiko Metals Inc.25 June09
Lomiko Metals Inc.25 June09
 
Pan Am March Boca 2011 power point
Pan Am March Boca 2011 power pointPan Am March Boca 2011 power point
Pan Am March Boca 2011 power point
 
Colibri presentation-december-3-2019
Colibri presentation-december-3-2019Colibri presentation-december-3-2019
Colibri presentation-december-3-2019
 
Colibri presentation-december-3-2019
Colibri presentation-december-3-2019Colibri presentation-december-3-2019
Colibri presentation-december-3-2019
 
Dna inves pre_november_2011
Dna  inves pre_november_2011Dna  inves pre_november_2011
Dna inves pre_november_2011
 
WestMountain Gold, Inc Corporate Presentation
WestMountain Gold, Inc Corporate PresentationWestMountain Gold, Inc Corporate Presentation
WestMountain Gold, Inc Corporate Presentation
 
Seafield Corporate Presentation - February 2012
Seafield Corporate Presentation - February 2012Seafield Corporate Presentation - February 2012
Seafield Corporate Presentation - February 2012
 
Seafield Resources Ltd. - Corporate Presentation
Seafield Resources Ltd. - Corporate PresentationSeafield Resources Ltd. - Corporate Presentation
Seafield Resources Ltd. - Corporate Presentation
 
Rare Element Resources - June 2010
Rare Element Resources - June 2010Rare Element Resources - June 2010
Rare Element Resources - June 2010
 
ROMARCO Corporate Presentation - NOVEMBER 2012
ROMARCO Corporate Presentation - NOVEMBER 2012ROMARCO Corporate Presentation - NOVEMBER 2012
ROMARCO Corporate Presentation - NOVEMBER 2012
 
Latin American Mining M&A
Latin American Mining M&ALatin American Mining M&A
Latin American Mining M&A
 
OAU Presentation
OAU PresentationOAU Presentation
OAU Presentation
 
Slideshare
SlideshareSlideshare
Slideshare
 
Mayo Gold Presentation November 2009
Mayo Gold  Presentation November 2009Mayo Gold  Presentation November 2009
Mayo Gold Presentation November 2009
 
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
Smash Minerals (TSX.V - SSH) Corporate Presentation 2011
 
Silver Verde May Presentation
Silver Verde May PresentationSilver Verde May Presentation
Silver Verde May Presentation
 
Ethos factsheet
Ethos factsheetEthos factsheet
Ethos factsheet
 

Mais de Romarco Minerals Inc.

Mais de Romarco Minerals Inc. (12)

April Corporate Presentation
April Corporate PresentationApril Corporate Presentation
April Corporate Presentation
 
March Corporate Presentation
March Corporate PresentationMarch Corporate Presentation
March Corporate Presentation
 
February Corporate Presentation
February Corporate PresentationFebruary Corporate Presentation
February Corporate Presentation
 
November Presentation 2014
November Presentation 2014November Presentation 2014
November Presentation 2014
 
July 2013 corporate ppt
July 2013  corporate pptJuly 2013  corporate ppt
July 2013 corporate ppt
 
ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013ROMARCO Corporate Presentation - May 2013
ROMARCO Corporate Presentation - May 2013
 
ROMARCO Corporate Presentation - April 2013
ROMARCO Corporate Presentation - April 2013ROMARCO Corporate Presentation - April 2013
ROMARCO Corporate Presentation - April 2013
 
ROMARCO Corporate Presentation - February 2013
ROMARCO Corporate Presentation - February 2013ROMARCO Corporate Presentation - February 2013
ROMARCO Corporate Presentation - February 2013
 
ROMARCO - Corporate Presentation September 2012
ROMARCO - Corporate Presentation September 2012ROMARCO - Corporate Presentation September 2012
ROMARCO - Corporate Presentation September 2012
 
ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012ROMARCO Corporate Presentation - AUGUST 2012
ROMARCO Corporate Presentation - AUGUST 2012
 
ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012ROMARCO Corporate Presentation - July 2012
ROMARCO Corporate Presentation - July 2012
 
EIS Schedule Presentation
EIS Schedule PresentationEIS Schedule Presentation
EIS Schedule Presentation
 

Último

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 

Último (20)

Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 

Romarco Corporate Presentation - AUGUST 2011

  • 2. Cau,onary  Statement   The information in this document has been prepared as of February 9, 2011. Certain statements contained in this document constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward looking information under the provisions of Canadian provincial securities laws. When used in this document, the words “anticipate”, “expect”, “estimate”, “forecast”, “will”, “planned”, and similar expressions are intended to identify forward-looking statements or information. Specifically, this presentation contains forward looking statements regarding the results and projections contained in the February 2011 technical report of the Haile Gold project, including the expected mine life, recovery, capital costs, cash operating costs and other costs and anticipated production of the described open pit mine, the projected internal rate of return, the projected payback period, the availability of capital for development, sensitivity to metal prices, ore grade, the reserve and resource estimates on the project, the financial analysis, the timing for completion of the revised feasibility study on the Haile Gold project, the timing and amount of future production, the timing of construction of the proposed mine and process facilities, capital and operating expenditures, the timing of the receipt of permits, rights and authorizations, communications with local stakeholders and community relations, availability of financing and any and all other timing, development, operational, financial, economic, legal, regulatory and political factors that may influence future events or conditions and expected drilling activities. In addition, this presentation also contains updated resource estimates contained in the February 2011 technical reports. Scientific and technical information referred herein has been extracted from and are hereby qualified in their entirety by reference to the aforementioned technical reports (“Technical Reports”). Joshua Snider, P.E., Thomas L. Drielick, P.E., Lee “Pat” Gochnour, M.M.S.A., John Marek, P.E. and Derek Wittwer, P.E. are responsible for preparing the Technical Reports. Each of the above referenced persons is a “qualified person” as defined in National Instrument 43-101 — Standards of Disclosure for Mineral Projects. Such forward‐looking statements are based on a number of material factors and assumptions, including, but not limited in any manner, those disclosed in any aother of Romarco’s public filings, and include the ultimate determination of mineral reserves and resources, availability and final receipt of required approvals, licenses and permits, sufficient working capital to develop and operate the proposed mine, access to adequate services and supplies, economic conditions, commodity prices, foreign currency exchange rates, interest rates, access to capital and debt markets and associated cost of funds, availability of a qualified work force, lack of social opposition and legal challenges, and the ultimate ability to mine, process and sell mineral products on economically favorable terms. While Romarco considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Actual results may vary from such forward‐looking information for a variety of reasons, including but not limited to risks and uncertainties disclosed in other Romarco filings at www.sedar.com. Forward‐looking statements are based upon management’s beliefs, estimate and opinions on the date the statements are made and, other than as required by law, Romarco does not intend, and undertakes no obligation to update any forward‐looking information to reflect, among other things, new information or future events Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Resources: Certain tables may use the terms “Measured”, “Indicated” and “Inferred” Resources. United States investors are advised that while such terms are recognized and required by Canadian regulations, however, the United States Securities and Exchange Commission does not recognize them. “Inferred Mineral Resources” have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of Measured or Indicated Mineral Resources will ever be converted into Mineral Reserves. United States investors are also cautioned not to assume that all or any part of a Mineral Resource is economically or legally mineable. 2   All figures are US$ unless otherwise indicated
  • 3. History  of  Carolina  Gold  Mining  /   Support  for  the  Project  
  • 4. HAILE  GOLD  MINE  –  Mining  History   CAROLINA  SLATE  BELT   §  First  Gold  rush  before  California   Kentucky   §  Carolinas  led  US  Gold  produc,on  un,l   West  Virginia   1848   §  Second  US  Mint  in  CharloMe,  NC   Tennessee   §  Original  49’ers  came  from  East  Coast   Russell  Mine   §  Significant  gold  produc,on  in  80’s-­‐90’s   Hickory   Ironwood   Reed  Mine   Howie  Mine   §  Mining  part  of  local  history/community     Locust   North  Carolina   §  500  ac,ve  mines  in  South  Carolina  today   Haile  Mine   Brewer  Mine   Bayberry   Buzzard   Ridgeway  Mine   Dorn  Mine   Elm   Magruder  Mine   Bante  Mine   Tathom  Mine   Columbia  Mine   South  Carolina   Georgia  
  • 5. Located  in  Mining  Friendly  Jurisdic,on   Ongoing  Community  Involvement   §  Romarco  con,nues  to  build  strong  local   rela,onships  and  support   ê  High  local  unemployment   ê  Romarco  hires  locally   • 113  employees  +  30  contractors   ê  $1  million/month  spent  locally   Awards   Strong  Community  Support   From  le(  to  right:   •  2010  OUTSTANDING  BUSINESS  AWARD  presented  to  HAILE  GOLD  MINE   by  Kershaw  Chamber  of  Commerce   •  2011  CITIZEN  OF  THE  YEAR  presented  to  DIANE  GARRETT   by  Kershaw  Chamber  of  Commerce   •  2011  COMMUNITY  CITIZENSHIP  AWARD  presented  to  DAVID  THOMAS   by  Mining  Associa:on  of  South  Carolina     5  
  • 7. Romarco  –  Company  Overview   Company  Descrip,on   § Romarco  is  a  gold  development  company  focused   Project  Loca,on   on  produc,on  primarily  in  the  U.S.   NORTH Charlotte § The  Company’s  flagship  project  is  the  Haile  Gold   CAROLINA Mine  in  South  Carolina   Haile Mine Myrtle ê  Feasibility  study  completed   SOUTH Columbia Beach ê  Permits  pending   CAROLINA ê  System  remains  open  in  all  direcOons  at  depth   § Experienced  board,  management  &  technical  team   Capitaliza,on  Summary   GEORGIA Atlantic Ocean Exchange/  Symbol   TSX:R   Share  Price(1)   C$1.64   Shares  Outstanding  (Basic)   503.3M   •  Romarco  controls  11,000+  acres  of   FD  Shares  Outstanding  (TSM)(2)   520.7M   100%  private  land   Market  CapitalizaOon(1)   C$825M   •  Surface,  mineral  and  water  rights   52  Week  High  /  Low(1)   C$2.88  /  C$1.30   •  ~  9,900  acres  owned  fee  simple   Cash  Balance  (June  30,  2011)   US$63M   (1)  As  at  close  on  June  30,  2011   (2)  Calculated  using  treasury  stock  method.  Includes  5.6mm  “in-­‐the-­‐money”  op:ons  at  an   average  strike  price  of  C$0.53  as  of  June  30,  2011   7   181  Bay  St.  Suite  3630,  Toronto,  ON,  M5J  2T3  │Email:  info@romarco.com  │Office:  416.367.5500  │Fax:    416.367.5505    │Website:  www.romarco.com  
  • 8. Strong  Board,  Management  and  Technical  Team   §  Proven  gold  mine  development,  finance,  perming  and  opera,ons  experience   ê  Romarco  has  the  team  in  place  to  bring  Haile  into  producOon   Experienced  Board  of  Directors   Strong  Management  &  Technical  Team   Edward  A.  van  Ginkel,  Chairman   Diane  R.  GarreM,  Ph.D.,  President  &  CEO   §  Consultant,  former  Noranda,  Dayton  Mining   §  Former  Dayton  Mining,  US  Global  Investors   Diane  R.  GarreM   James  R.  Arnold,  Sr.  VP,  COO   §  Former  Dayton  Mining,  US  Global  Investors   §  Former  Freeport,  Gold  Fields  –  Richards  Award  Winner   James  R.  Arnold   Stan  Rideout,  Sr.  VP,  CFO   §  Former  Freeport,  Gold  Fields  –  Richards  Award  Winner   §  Former  Phelps  Dodge   Leendert  Krol   James  Berry,  Chief  Geologist  &  Regional  Explora,on  Manager   §  Former  Brazuro,  Newmont   §  Former  Barrick   Don  MacDonald   Brent  Anderson,  Mine  Manager   §  CFO  QuadraFNX,  former  NovaGold,  DeBeers,  Dayton  Mining   §  Former  Quadra,  Freeport   John  Marsden   Kevin  Russell,  Regional  Geologist   §  Consultant,  former  Freeport  –  Richards  Award  Winner   §  Former  Barrick   Patrick  Michaels   Jim  Wickens,  Process  Manager   §  Porgolio  Manager  –  Zuri-­‐invest,  Switzerland   §  Former  Barrick   Robert  van  Doorn   OM  Jackson,  Health  &  Safety   §  Former  Mundoro,  Rio  Narcea,  Morgan  Stanley   §  Former  Freeport   Johnny  Pappas,  Director  of  Environmental  Affairs   §  Former  Freeport   Ramona  Schneider,  Environmental  Manager   §  Former  Kinross   Dan  Symons,  Manager  Investor  Rela,ons   §  Former  Renmark  Financial   8  
  • 9. Introduc,on  to  the  Haile    Gold  Mine  Project   FEBRUARY 2011 §  Feasibility completed $275 million §  One of lowest capital cost projects in industry $379/oz §  One of lowest operating cost projects in industry ($347/oz first 5 years) 2.06 g/t §  One of highest grade open-pit projects in industry 9  
  • 10. Low  Capital  Cost   Development  Capex  for  Primary  Open  Pit  Asset  (US$mm)  (1)   *  All  figures  are  in  millions  of  dollars   (1)    Source:  Company  Disclosure   10   Peers  include  direct  and  indirect  costs,  con:ngency  funding  and  previously  sunk  development  capital  (sustaining  capital  not  included)    
  • 11. Low  Cash  Cost   $600! LOWEST QUARTILE AVERAGE CASH $559! COST IN 2010 (1) $500! $379! $426! $400! $300! $200! $100! $0! Industry Average (1) ROMARCO Lowest Quartile (1) LOM Average (2) (1)  Source:  GFMS  presenta:on,  Gold  Survey  2010  Update   11   (2)  Announced  February  9,  2011  
  • 12. High  Reserve  Grade  for  Open  Pit   Reserve  Grade  for  Primary  Open  Pit  Asset  (g/t  Au)  (1)   (1)    Source:  BMO  Capital  Markets   12    
  • 14. Environmental  Opera,ons  Team   Consultants   •  Gochnour    Associates   Pat  Gochnour   •  Kennedy  ConsulMng  Services   Craig  Kennedy   •  AMEC  Earth  and  Environmental   JIM  ARNOLD   JOHNNY  PAPPAS   RAMONA  SCHNEIDER   •  Tetra  Tech   Sr.  VP.,  COO    Director   Director  of  Environmental  Affairs   Environmental  Manager   •  Schlumberger  Water  Services   P.E.,  B.Sc.  Metallurgical  Engineering        James  R.  Arnold  is  the  current  Senior  Vice   •  Schafer  Limited   Johnny  Pappas  has  a  disOnguished  career   Ramona  Schneider  has  been  with  the   President  and  Chief  OperaOng  Officer  of   in  the  field  of  environmental  management   Haile  Gold  Mine  since  1990  working  for   •  Arcadis   Romarco.  Mr.  Arnold  was  recently  Vice   and  perminng.  Mr.  Pappas  recently  held   Piedmont  Mining  Company,  AMAX  Gold,   President,  Colorado  OperaOons  for  Freeport-­‐ the  posiOon  of  Environmental  Manager  of   and  Kinross  Gold.  As  Environmental   •  Genesis  ConsulMng  Group   McMoRan  where  he  led  the  Climax  re-­‐start   the  Climax  Mine  and  was  Permit   Manager,  Ms.  Schneider  is  responsible  for   project  through  feasibility,  engineering,   Coordinator  for  Barrick’s  Cortez  Gold   •  Ecological  Resources  Consultants   staffing  and  construcOon.  Prior  to  there  he   perminng,  maintaining  current  permits   Mines.  In  addiOon,  he  has  held  several   and  regulatory  compliance,  organizing   •  Environmental  Banc  and  Exchange   was  V.P.  Technical  Services  for  Coeur   Senior  Environmental  Engineer  posiOons   closure  sampling  programs,  preparing   d’Alene  Mines  Corp.  and  also  held  the   (EBX)   with  Pacificorp,  Plateau  Mining,  and  Santa   regulatory  reporOng  documents,   posiOon  of  General  Manager  for  Kinross’   Fe  Pacific  Gold.  Mr.  Pappas  is  recognized   Goldbanks  Project  and  Manager  of  Santa  Fe   monitoring  reclamaOon  projects,  and   •  McNair  Law  Firm   Pacific  Gold’s  Twin  Creeks  project  in  Nevada.   as  a  leader  in  his  field  and  has  won   managing  the  baseline  programs.   Mr.  Arnold  holds  a  degree  in  Metallurgical   numerous  awards  including  the  2003   •  C.A.  Clark  ConsulMng,  LLC   Engineering  from  University  of  Idaho  and  an   “Best  of  the  Best”  Award  –  awarded  by   Catherine  Clark   M.S.  degree  in  Engineering  Management.   the  Department  of  Interior’s  Office  of   Surface  Mining  in  recogniOon  for   extraordinary  personal  commitment  and   outstanding  contribuOon  for  the   reclamaOon  success  at  the  Castle  Gate   Mine  and  the  2003  “Excellence  in  Surface   Coal  Mining  ReclamaOon”  Award.   14  
  • 15. Environmental  Impact  Statement  Process   §  EIS  is  common  place  in  mining   §  No,ce  of  Intent  to  prepare  an  EIS  published  in  the  Federal  Register   §  90  day  public  comment  period   §  Agency  and  public  scoping  mee,ng  –  one  or  more   §  Dran  EIS   §  90  day  public  review  and  comment  period   §  Romarco  responds  to  comments   §  Final  EIS  includes  comments,  amendments  if  necessary   §  30  day  minimum  comment  period   §  Record  of  Decision  (ROD)   15  
  • 16. EIS  Posi,ves   §  Eliminates  poten,al  challenge  to  EA  decision     §  Approximate  12  month  delay  of  start-­‐up   §  Analysts  es,mate  4-­‐12%  NAV  impact  to  project  due  to  cash  flow  ,ming   §  Explora,on  con,nues   ê PotenOal  to  increase  reserves  and  grade   ê Reduce  strip  raOo   ê  Further  define  mineralizaOon  between  deposits   ê AddiOonal  Ome  to  opOmize  mine  plan  with  new  resources    reserve  model   ê  Within  exisOng  permit  area  and  7,000  tpd  mill   ê More  Ome  to  define  and  study  underground  targets   §  More  ,me  to  value  engineer  plant  design   16  
  • 17. EIS  Decision  Drivers   §  Large  volumes  of  technical  data  submiMed  by  Romarco   ê WETLANDS   ê  Avoidance    minimizaOon   ê  Studies  completed   ê  Minor  modificaOons  may  occur   ê  TAILINGS  SITE  FACILITY   ê  Leak  detecOon  system   ê  CN  Distruct  Circuit   ê  Any  potenOal  wildlife  issues   ê  Studies  completed   ê  CUMULATIVE  IMPACTS   17  
  • 18. EIS  Decision  Drivers   §  No  ,me  has  been  lost   §  All  review  and  comment  periods  since  January  2011  were  a   required  process  for  both  EIS  and  EA   §  Addi,onal  dollar  costs  associated  with  EIS   ê  $2  million   ê  Consultants  legal   §  Next  Steps:   ê  SelecOon  of  contractor   ê  Preparing  schedule   ê  Begin  scoping  work   18  
  • 19. Streams  Mi,ga,on  Plan  SubmiMed   §  38,775  linear  feet  of  streams  impacted  (296,396  stream  credits*)   •   MiOgaOon  Plan:      68,271  linear  feet  of  streams  Restored      151,692  linear  feet  of  streams  Preserved      219,963  linear  feet  of  streams  MiOgated     §  314,646  total  stream  credits  (106%)   §  MiOgaOng  567%  of  impact   * Credits are determined in accordance with USACE’s procedures 19  
  • 20. Wetlands  Mi,ga,on  Plan  SubmiMed   §  161  acres  of  wetlands  impacted  (1,842  credits*)   • MiOgaOon  plan  submiwed  (credit  for  credit)    MiOgaOon  Plan:      297  acres  Restored      621  acres  Preserved      918  acres  MiOgated   §  1,932  acres  total  credits  (105%)   §  MiOgaOng  571%  of  impact   * Credits are determined in accordance with USACE’s procedures 20  
  • 21. Wetlands  at  Haile  Property   Typical  Palustrine  Emergent  Wetland   21  
  • 22. Wetlands  at  Haile  Property   Typical  Palustrine  Forested  Wetland  (saturated)   22  
  • 23. Wetlands  at  Haile  Property   Typical  Palustrine  Forested  Wetland  (inundated)   23  
  • 24. Streams  at  Haile  Property   Non-­‐RelaOvely  Permanent  Waters  (intermiwent  stream  channel)   24  
  • 25. Streams  at  Haile  Property   Typical  Riverine  (stream  channel)   25  
  • 26. Clear  Plan  to  Bring  Haile  Into  Produc,on   §  Strong  balance  sheet  with  approximately  $63M  in  cash  and  no  debt(1)   §  Well  defined  project  schedules  and  clear  development  milestones   Project  Schedule  for  EIS   Haile  Milestones  and  Status  Report   2011   2012   2013   2014   Milestone  /  AcOvity   Status   Q1   Q2   Q3   Q4   Q1   Q2   Q3   Q4   Q1   Q2   Q3   Q4   Q1   Q2   Q3   Q4   Complete  feasibility  study   P   Feasibility  Study   State  operaOng  permit   P   OpOmizaOon   submiwed   Perminng   401/404  permit  submiwed   P   ConstrucOon   Resource  /  reserve  report   P   ProducOon   Expand  Haile    Horseshoe   2011   ExploraOon   Acquire  other  properOes   2011   Explore  regional  targets   2011   26   (1)  As  at  June  30,  2011  
  • 28. Significant  Remaining  Explora,on  Upside  Poten,al   §  2010  drill  program  of  108,000m  confirmed  resource  at  Haile  remains  open  along   strike  and  at  depth   ê  40%  of  2010  drilling  focused  on  condemnaOon  drilling  to  locate  suitable  tailings  site   #!!$!!! ()$$$% §  MI resources increased 44% ('!$!!! §  MI grade increased 21% (to 1.82 g/t) (!$!!! §  MI tonnes increased 20% 2010 §  Inferred resources declined 46% (%!$!!! Highlights ê  Conversion to indicated *+,+-.%/0%1-233245% (#!$!!! §  Inferred grade increased 33% (to 1.34 g/t) ($!$$$% §  2P reserves increased 54% (!!$!!! '$$$% '!$!!! !$!!! %!$!!! #!$!!! !#$$% ! 2008   2009   2010   2011   28  
  • 29. Significant  Remaining  Explora,on  Upside  Poten,al   2010  Explora,on  Findings   Upside  From  Mineraliza,on  Not  Captured   §  Confirms underground potential §  Zone not yet drill defined along strike and Horseshoe Deep down dip §  Highest grade Horseshoe Discovery §  Potential new zone may exist south of §  Underground economic study (2011) Zone main Horseshoe/Snake trend §  Extending to west and south §  Mineralization encountered in down dip South Pit §  Higher grades encountered Snake extensions of Snake deposit Deep §  Areas lie beneath the resource shell Zone §  Additional drilling is planned §  Extending to west and at depth Ledbetter §  Higher grades §  Drill hole intercepts lie below the resource Mustang shell §  Extending at depth §  Additional drilling is planned Snake §  Higher grades Haile §  Remains open §  Strike extends beyond the resource shell Mill Zone Corridor §  Connecting Horseshoe §  Step-out drilling is planned to test extent 29  
  • 30. Resource  Growth   3.5 KM 2 0 1 0 US$950 PITS PLAN VIEW 601 CHAMPION SMALL SOUTH PIT LEDBETTER SNAKE HORSESHOE HAILE LONG SECTION US$950 PIT LIMITS 30  
  • 31. New  Regional  Explora,on  Targets   §  3  in  South  Carolina   ê  Bayberry  –  currently  drilling   Kentucky   ê  Similar  host  rocks,  alteraOon  and  mineralizaOon  as   West  Virginia   observed  at  Haile   ê  74  shallow  rotary  holes,  8  RC  holes,  and  8  core  holes   previously  drilled  on  the  property   Tennessee   ê  Historical  Reported,  highlighted  intercepts  include:   ê  7.0  meters  of  4.3  g/t   ê  26.0  meters  of  1.8  g/t   ê  12.0  meters  of  1.2  g/t   ê  7.3  meters  of  1.8  g/t   Hickory   Ironwood     ê  Locust  –  drill  ready   Locust   North  Carolina   ê  Small  historical  oxide  resource  (pre  43-­‐101)   Haile  Mine   ê  34  RC  and  27  core  holes  have  been  drilled  on  the   Bayberry   Buzzard   property   Elm   ê  Historical  Reported,  highlighted  intercepts  include:   ê  71.5  meters  of  2.9  g/t   ê  5.1  meters  of  1.5    g/t   ê  74.6  meters  of  1.5    g/t   South  Carolina   ê  65.0  meters  of  1.9    g/t   ê  Elm   Georgia   ê  Property  is  ready  for  soil  and  rock  chip  sampling   ê  Preliminary  rock  chip  sampling  has  yielded  8.6  g/t       31  
  • 32. New  Regional  Explora,on  Targets   §  2  in  North  Carolina   ê  Hickory  –  mobilizing  rig   Kentucky   ê  Historical  producOon  during  1800s   West  Virginia   ê  Historical  drilling  consists  of  11  core  holes  and  130   RC  holes   ê  Historical  Reported,  highlighted  intercepts  include:   Tennessee   ê  19.8  meters  of  4.7  g/t   ê  21.3  meters  of  4.0  g/t   ê  22.9  meters  of  3.4  g/t   ê  17.0  meters  of  2.1  g/t     Hickory   Ironwood   ê  Ironwood  –  drill  ready   North  Carolina   ê  The  highest  grade  encountered  in  the  trenching  was   Locust   9.1  g/t   Haile  Mine   Bayberry   Buzzard   ê  Twelve  shallow  RC  holes  and    two  core  holes  have   been  drilled     Elm   ê  Historical  Reported,  highlighted  intercepts  include:   ê  3.0  meters  of  4.4  g/t     South  Carolina   Georgia   32  
  • 34. Near  Term,  Low  Cost  Gold  Producer   §  Posi,ve  feasibility  study  on  Haile   Summary  of  Haile  Feasibility  Study  (US$950  Gold)   announced  on  Feb.  9,  2011   2  P  Gold  Reserves  ( 000  oz)   2,018   §  Strong  project  economics  with  robust   Recovery  Rate  (%)   83.7   IRR  and  NPV  at  conserva,ve  gold   Net  Recoverable  Gold  ( 000  oz)   1,681   prices   Annual  Mill  Throughput  ( 000  t)   2,555   ê  Low  cash  cost  operaOon   Daily  Mill  Throughput  (tpd)   7,000   ê  Manageable,  low  cost  capital  requirements   Mine  Life  (years)   13.25   §  Posi,ve  feasibility  study  does  not   Overall  Strip  RaOo  (waste:ore)   7.2:1   include   Average  Feed  Grade  to  Mill  (LOM)  (g/t)   2.06   ê  Horseshoe   Average  ProducOon  (year  1)  ( 000  oz)   172   ê  Snake  Deep   Average  ProducOon  (years  1  -­‐  5)  ( 000  oz)   150   ê  Mustang   Cash  Costs  (year  1-­‐5)  (US$/oz)   347   ê  Mill  Zone  extensions   Cash  Costs  (LOM)  (US$/oz)   379   ê  601   IniOal  Capital  Expenditures  (US$M)   275.5   ê  Inferred  resources  within  US$950  Pit   Sustaining  Capital  Expenditures  (US$M)   119.2   Net  Present  Value  (5%  discount)   §  Open  all  direc,ons  and  at  depth   Pre-­‐Tax  (US$M)   279   §  2011  economic  studies   Internal  Rate  of  Return   ê  Underground  PEA   Pre-­‐Tax  (%)   19.6   34  
  • 35. NPV    IRR  Sensi,vity  to  Gold  Price     Pre-­‐tax  NPV  and  IRR  Sensi,vity  to  Gold  Price  (1)   ($  Millions,  except  gold  price)   Gold  Price   PAYBACK   NPV  @0%   NPV  @  5%   NPV  @  10%   IRR  %   Per  oz.   YEARS   $2000   $2,261   $1,521   $1,058   69.3%   1.4   $1900   $2,094   $1,403   $970   64.9%   1.5   $1800   $1,927   $1,285   $883   60.5%   1.6   $1700   $1,760   $1,166   $796   56.1%   1.7   $1600   $1,593   $1,048   $708   51.6%   1.8   $1500   $1,426   $930   $621   47.0%   2.0   $1400   $1,259   $811   $534   42.3%   2.2   $1300   $1,092   $693   $447   37.6%   2.4   $1200   $925   $575   $359   32.7%   2.7   $1100   $758   $457   $272   27.6%   3.1   $1000   $591   $339   $185   22.3%   3.8   $950   $507   $279   $141   19.6%   4.2   $800   $257   $102   $10   10.7%   7.6   $700   $90   ($16)   ($77)   4.0%   9.4   (1) As per parameters used in February 9, 2011 Feasibility Technical Report 35  
  • 36. Clear  Plan  to  Bring  Haile  Into  Produc,on   Design  Overflow    Process  Descrip,on   §  Conven,onal  opera,on   Design  Overflow   Process  Descrip,on   §  Simple  flowsheet   § Robust  “Simple”   §  Off-­‐the-­‐shelf   Crush    Grind    Flota,on   Flowsheet   technology   § Proven  Technologies   Regrind  Flot  Con    Leach  Con   §  Ability  to  expand   project  scale  to  include   § Flexible,  Expandable   Leach  Flot  Tail    Recover  both   addi,onal  resource   discoveries   § Non-­‐Refractory   CN  Detox    Tail  Storage  Facility   § Off-­‐The-­‐Shelf   Standard  Carbon  Elu,ons,  EW   Technology   § No  Long  Lead  Time   Units   36  
  • 37. Clear  Plan  to  Bring  Haile  Into  Produc,on   Mill  Plant  Facility  Rendering   PRIMARY  CRUSHER   OVERLAND  CONVEYOR   MILL  BUILDING   HAUL  TRUCK   FUELING  STATION   LEACHING   STOCKPILE   TAILING   TRUCK  WASH   ADMINISTRATION   BUILDING   37  
  • 39. Analyst  Coverage   §  6  Analysts  Covering  Romarco   ANALYSTS   12  Month  Target  Price   Paradigm  Capital   $3.10   BMO  Capital  Markets   $3.00   GMP  SecuriOes   $2.50   NBF   $2.50   RBC  Capital  Markets   $2.25   CIBC  World  Markets   $1.95   39  
  • 40. P/NAV  vs  Peer  Group   §  Romarco  trades  at  a  discount  to  its  developer  peers  on  a  P/NAV  basis(1)   July 4, 2011 Romarco Minerals Inc. ! #$%%'!()!*+,,-.'!/0123!4+5'%65-7)!8-,9%.9!:;5!/,;+=-,7! '%# '%!# '$%# '!!# !%# !%!# !$%# !!!# ()*+,-./*0 1*+/*) 234)536+ 738).93 5:;)*) :.3-=)* 8=.0/*0 ?.=6)@*=; 7)/*; 5.=;,A). 5)B./=6 21C?/=.CDDD F=A3:. 21C?/=.CDD 536+/=6+, 56+6+, 140 7/4=. 7=, E.3+C140 536+ E.3+C140 (3:.9=GC7HICI)-/A)6CJ).K=A,CD*9C #$%%'!)!?;,-=@7'!A6-,@'%;.7)!B@%5-!4%.-!/,;C-='! 300,000 $600 Source: RBC Capital Markets Inc., as at July 5, 2011 40   250,000 $500 S$/oz) (oz) 200,000 $400
  • 41. EV / Oz (US$/o P/NAV  vs  Peer  Group   5.0 $150 5.0 5.0 Detour 5.0 Keegan Detour Total Resources Fronteer Geography Keegan 4.5 Goldstone Fronteer 4.5 4.5 Fronteer 4.5 $100 Tower Hill Int. Goldstone Orezone Victoria Russia, E. Europe, BC, Alaska, Ontario, Quebec, Chile, Australia, West/South Int. Tower Hill 50 Mozs 20 Mozs 10 Mozs 5 Mozs N. Africa Other Nevada, Brazil, Guyana Africa, Mexico 4.0 Orezone Victoria 4.0 1.5x 4.0 Grayd Volta Resources Belo Sun 4.0 Amarillo Riverstone Resources e Patch Grayd 3.5 $50 Exeter Volta Resources Belo Sun Average EV / In Situ Oz (US$ 000s): $97/oz 3.5 Pediment Midway Amarillo Cassidy 3.5 Northern Freegold Vior Riverstone Resources PMI Rye Patch Temex Exeter 1.3x 3.0 Northern Gold Pediment Midway Cassidy Gold Grade (g/t) Vior PMI 3.5 3.0 3.0 Northern Freegold Coral 0.8 1.3 1.8 Temex 2.3 Gold Grade (g/t) Andina Northern Gold Detour Gold 2.5 $0 Gold Grade (g/t) Gold Grade (g/t) Coral 2.0 2.5 2.5 Gabriel 0.3 1.1x Andina 0.8 1.3 1.8 2.3 2.0 Gold Grade (g/t) 3.0 P / NAV Greystar Rainy River Gold Grade (g/t) 1.5 Trelawney 0.9x 1.52.0 Average P / NAV: 0.8x 2.5 Guyana GF 1.0 European Goldfields 1.5 Romarco 1.0 0.5 0.7x Andina 2.0 NovaGold 0.0 1.0 Premier Gold 2.0 4.0 6.0 0.5 200 150 100 50 0 0.5x AMC / Oz (US$/oz) 0.0 40.0 80.0 120.0 160.0 200.0 0.0 0.5 EV / In Situ (US$ 000s / oz) 1.5 200 150 100 50 0 Source: RBC Equity Research, Company Information as at July 5, 2011 41   Note: Average figures include Romarco AMC / Oz (US$/oz) 0.0 0 50 00 50 00
  • 42. Summary   §  Near  term,  low  cost  gold  producer  with  strong  project  economics   §  Located  in  a  mining  friendly  jurisdicOon  with  excellent  infrastructure   §  Large  resource  with  significant  remaining  exploraOon  upside  potenOal   §  Strong  board,  management  and  technical  team   §  Clean  plan  to  bring  Haile  into  producOon   §  Solid  cash  posiOon  (~  US$63  million),  no  debt  –  as  of  June  30,  2011   §  11  drill  rigs  –  172,000  meters  drilling  scheduled  for  2011  (~US$30  million)   §  Haile  system  remains  open  in  all  direcOons  at  depth   42  
  • 43. Contact  Informa,on   Head  Office  Informa,on   Dan  Symons   Romarco  Minerals  Inc.   Manager,  Investor  RelaOons   Brookfield  Place   dsymons@romarco.com   181  Bay  Street,  Suite  3630   Toronto,  Ontario  M5J  2T3   Tel:  416.367.5500   Fax:  416.367.5505   Email:  info@romarco.com   Website:  www.romarco.com   43