SIR EDWARD DEMING’S
WORK ON QUALITY
THE 14 POINTS ON QUALITY
1. Constancy of purpose
2. The new philosophy
3. Cease dependence on inspection
4. End “lowest tender” contracts
5. Improve every process
6. Institute training on the job
7. Institute leadership
THE 14 POINTS ON QUALITY
8. Drive out fear
9. Break down barriers
10.Eliminate exhortations
11.Eliminate arbitrary numerical targets
12.Permit pride of workmanship
13.Encourage education
14.Top management’s commitment
THE DEMING CHAIN
REACTION
PDCA CYCLE
PDCA is a continuous improvement tool
PLAN
Identify the problem
1. Identify the problem to be
examined.
2. Formulate a specific problem
statement to clearly define the
problem
3. Set measurable and attainable
goals
4. Identify stakeholders and develop
necessary communication channels
to communicate and gain approval
AnalyseThe Problem
1. Divide overall system into individual
processes -map the process
2. Brainstorm potential causes for the
problem
3. Collect and analyse data to validate
the root cause
4. Formulate a hypothesis
5. Verify or revise the original problem
statement
TOOLS USED FOR
PLANNING
1. Direct observation of process
2. Process mapping
3. Flowcharting
4. Cause and Effect diagrams
5. Pareto analysis
DO
Develop Solutions
1. Establish experimental success
criteria
2. Design experiment to test
hypothesis
3. Gain stakeholder approval and
support for the chosen solution
Implement a Solution Implement the experiment/solution on a
trial or pilot basis
TOOLS USED FOR DOING
1. Design of Experiment (DOE)
2. On job training
3. Stakeholder management & communication
CHECK
EvaluateThe Results
1. Gather/analyse data on the solution
2. Validate hypothesis
Achieve the desired goal
1. IfYES go to act
2. Else go to plan, revise
hypothesis/problem statement
TOOLS USED FOR
CHECKING
1. Direct observation of process
2. Graphical analysis
3. Control charts
4. Key performance indicators
ACT
Implement the full scale solution
1. Identify systemic changes and
training needs for full
implementation
2. Plan ongoing monitoring of the
solution
3. Continuous improvement
4. Look other improvement
opportunities
TOOLS USEDTO ACT
1. Process mapping (new process)
2. Standardization of work and process
3. Visual management
4. Error proofing
5. Formal training
THANKYOU

Mais conteúdo relacionado

Mais procurados

Competency Snapshot: Controlled Work Approach
Competency Snapshot: Controlled Work ApproachCompetency Snapshot: Controlled Work Approach
Competency Snapshot: Controlled Work ApproachTalent Management LLC
 
Backstage 2019 - How to find friends and influence product - Rebecca Nackson
Backstage 2019 - How to find friends and influence product - Rebecca NacksonBackstage 2019 - How to find friends and influence product - Rebecca Nackson
Backstage 2019 - How to find friends and influence product - Rebecca NacksonAmplitude
 
10 good reasons for using the solution focused approach
10 good reasons for using the solution focused approach10 good reasons for using the solution focused approach
10 good reasons for using the solution focused approachBRIEF
 
Keith Osborne Management Experience
Keith Osborne Management ExperienceKeith Osborne Management Experience
Keith Osborne Management ExperienceKeith Osborne
 
Webinar: Experimentation & Product Management by Indeed Product Lead
Webinar: Experimentation & Product Management by Indeed Product LeadWebinar: Experimentation & Product Management by Indeed Product Lead
Webinar: Experimentation & Product Management by Indeed Product LeadProduct School
 

Mais procurados (9)

Competency Snapshot: Controlled Work Approach
Competency Snapshot: Controlled Work ApproachCompetency Snapshot: Controlled Work Approach
Competency Snapshot: Controlled Work Approach
 
The Toyota Way
The Toyota WayThe Toyota Way
The Toyota Way
 
Backstage 2019 - How to find friends and influence product - Rebecca Nackson
Backstage 2019 - How to find friends and influence product - Rebecca NacksonBackstage 2019 - How to find friends and influence product - Rebecca Nackson
Backstage 2019 - How to find friends and influence product - Rebecca Nackson
 
10 good reasons for using the solution focused approach
10 good reasons for using the solution focused approach10 good reasons for using the solution focused approach
10 good reasons for using the solution focused approach
 
Keith Osborne Management Experience
Keith Osborne Management ExperienceKeith Osborne Management Experience
Keith Osborne Management Experience
 
Clear Concept Overview
Clear Concept OverviewClear Concept Overview
Clear Concept Overview
 
Webinar: Experimentation & Product Management by Indeed Product Lead
Webinar: Experimentation & Product Management by Indeed Product LeadWebinar: Experimentation & Product Management by Indeed Product Lead
Webinar: Experimentation & Product Management by Indeed Product Lead
 
Design Sprints
Design SprintsDesign Sprints
Design Sprints
 
Chapter 3 leadership
Chapter 3 leadershipChapter 3 leadership
Chapter 3 leadership
 

Destaque

Mgt420 team a_week4 Copyright 2013 Edward F. T. Charfauros. Reference, www.Yo...
Mgt420 team a_week4 Copyright 2013 Edward F. T. Charfauros. Reference, www.Yo...Mgt420 team a_week4 Copyright 2013 Edward F. T. Charfauros. Reference, www.Yo...
Mgt420 team a_week4 Copyright 2013 Edward F. T. Charfauros. Reference, www.Yo...Edward F. T. Charfauros
 
Deming’s 14 Points for Management
Deming’s 14 Points for ManagementDeming’s 14 Points for Management
Deming’s 14 Points for ManagementLarry W Dennis Sr
 
Deming’s 14 Points on Total Quality Management - TQM - W. Edwards Deming
Deming’s 14 Points on Total Quality Management - TQM - W. Edwards DemingDeming’s 14 Points on Total Quality Management - TQM - W. Edwards Deming
Deming’s 14 Points on Total Quality Management - TQM - W. Edwards DemingM Obai Seif Kılıç
 
Deming’s 14 Points for Management
Deming’s 14 Points for ManagementDeming’s 14 Points for Management
Deming’s 14 Points for ManagementJeanie Arnoco
 

Destaque (6)

Mgt420 team a_week4 Copyright 2013 Edward F. T. Charfauros. Reference, www.Yo...
Mgt420 team a_week4 Copyright 2013 Edward F. T. Charfauros. Reference, www.Yo...Mgt420 team a_week4 Copyright 2013 Edward F. T. Charfauros. Reference, www.Yo...
Mgt420 team a_week4 Copyright 2013 Edward F. T. Charfauros. Reference, www.Yo...
 
Deming’s 14 Points for Management
Deming’s 14 Points for ManagementDeming’s 14 Points for Management
Deming’s 14 Points for Management
 
Deming’s 14 points
Deming’s 14 pointsDeming’s 14 points
Deming’s 14 points
 
Quality gurus
Quality gurusQuality gurus
Quality gurus
 
Deming’s 14 Points on Total Quality Management - TQM - W. Edwards Deming
Deming’s 14 Points on Total Quality Management - TQM - W. Edwards DemingDeming’s 14 Points on Total Quality Management - TQM - W. Edwards Deming
Deming’s 14 Points on Total Quality Management - TQM - W. Edwards Deming
 
Deming’s 14 Points for Management
Deming’s 14 Points for ManagementDeming’s 14 Points for Management
Deming’s 14 Points for Management
 

Semelhante a SIR EDWARD DEMING’S WORK ON QUALITY

OODA loop problem solving
OODA loop problem solvingOODA loop problem solving
OODA loop problem solvingGlen Alleman
 
Deming juran-crosby-130813100340-phpapp01
Deming juran-crosby-130813100340-phpapp01Deming juran-crosby-130813100340-phpapp01
Deming juran-crosby-130813100340-phpapp01trungminhphan
 
Quality management
Quality management Quality management
Quality management RidaRao4
 
Quality Gurus (TOTAL QUALITY MANGEMENT SYSTEM) Food Technology
Quality Gurus (TOTAL QUALITY MANGEMENT SYSTEM) Food TechnologyQuality Gurus (TOTAL QUALITY MANGEMENT SYSTEM) Food Technology
Quality Gurus (TOTAL QUALITY MANGEMENT SYSTEM) Food TechnologyZargiya
 
6.1 Continuous Performance Improvement
6.1 Continuous Performance Improvement6.1 Continuous Performance Improvement
6.1 Continuous Performance Improvementpassuby
 
Chapter3 demingjurancrosbyphilosophy
Chapter3 demingjurancrosbyphilosophyChapter3 demingjurancrosbyphilosophy
Chapter3 demingjurancrosbyphilosophyhwilson14889
 
Continuous Improvement using the Toyota Way
Continuous Improvement using the Toyota WayContinuous Improvement using the Toyota Way
Continuous Improvement using the Toyota WayAnita Rao
 
487589124-W-Edwards-Deming-s-14-Points-pptx.pptx
487589124-W-Edwards-Deming-s-14-Points-pptx.pptx487589124-W-Edwards-Deming-s-14-Points-pptx.pptx
487589124-W-Edwards-Deming-s-14-Points-pptx.pptxamna61529
 
Bridge Knowle Workshop - Developing Effective KPIs (Companion Workbook)
Bridge Knowle Workshop - Developing Effective KPIs (Companion Workbook)Bridge Knowle Workshop - Developing Effective KPIs (Companion Workbook)
Bridge Knowle Workshop - Developing Effective KPIs (Companion Workbook)Kenny Ong
 
Ken Sandy - Ten tips to lead as a PM through influence
Ken Sandy - Ten tips to lead as a PM through influenceKen Sandy - Ten tips to lead as a PM through influence
Ken Sandy - Ten tips to lead as a PM through influenceProduct Anonymous
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCAhandbook
 
5's principles & 8'd methods
5's principles & 8'd methods5's principles & 8'd methods
5's principles & 8'd methodsKalpana Udhaya
 
Employee Training and Development: How to Measure Effectiveness and Impact - ...
Employee Training and Development: How to Measure Effectiveness and Impact - ...Employee Training and Development: How to Measure Effectiveness and Impact - ...
Employee Training and Development: How to Measure Effectiveness and Impact - ...BizLibrary
 
Optimizely Under the Hood Series: Managing Experimentation at Scale
Optimizely Under the Hood  Series: Managing Experimentation at ScaleOptimizely Under the Hood  Series: Managing Experimentation at Scale
Optimizely Under the Hood Series: Managing Experimentation at ScaleOptimizely
 

Semelhante a SIR EDWARD DEMING’S WORK ON QUALITY (20)

OODA loop problem solving
OODA loop problem solvingOODA loop problem solving
OODA loop problem solving
 
Deming juran-crosby-130813100340-phpapp01
Deming juran-crosby-130813100340-phpapp01Deming juran-crosby-130813100340-phpapp01
Deming juran-crosby-130813100340-phpapp01
 
Deming juran-crosby
Deming juran-crosbyDeming juran-crosby
Deming juran-crosby
 
Quality management
Quality management Quality management
Quality management
 
Quality Gurus (TOTAL QUALITY MANGEMENT SYSTEM) Food Technology
Quality Gurus (TOTAL QUALITY MANGEMENT SYSTEM) Food TechnologyQuality Gurus (TOTAL QUALITY MANGEMENT SYSTEM) Food Technology
Quality Gurus (TOTAL QUALITY MANGEMENT SYSTEM) Food Technology
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
 
TQM - DEMING CONTRIBUTION
TQM - DEMING CONTRIBUTIONTQM - DEMING CONTRIBUTION
TQM - DEMING CONTRIBUTION
 
6.1 Continuous Performance Improvement
6.1 Continuous Performance Improvement6.1 Continuous Performance Improvement
6.1 Continuous Performance Improvement
 
Chapter3 demingjurancrosbyphilosophy
Chapter3 demingjurancrosbyphilosophyChapter3 demingjurancrosbyphilosophy
Chapter3 demingjurancrosbyphilosophy
 
Continuous Improvement using the Toyota Way
Continuous Improvement using the Toyota WayContinuous Improvement using the Toyota Way
Continuous Improvement using the Toyota Way
 
487589124-W-Edwards-Deming-s-14-Points-pptx.pptx
487589124-W-Edwards-Deming-s-14-Points-pptx.pptx487589124-W-Edwards-Deming-s-14-Points-pptx.pptx
487589124-W-Edwards-Deming-s-14-Points-pptx.pptx
 
Bridge Knowle Workshop - Developing Effective KPIs (Companion Workbook)
Bridge Knowle Workshop - Developing Effective KPIs (Companion Workbook)Bridge Knowle Workshop - Developing Effective KPIs (Companion Workbook)
Bridge Knowle Workshop - Developing Effective KPIs (Companion Workbook)
 
Ken Sandy - Ten tips to lead as a PM through influence
Ken Sandy - Ten tips to lead as a PM through influenceKen Sandy - Ten tips to lead as a PM through influence
Ken Sandy - Ten tips to lead as a PM through influence
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
QM-021-PDCA
QM-021-PDCAQM-021-PDCA
QM-021-PDCA
 
PDCA
PDCAPDCA
PDCA
 
Management Essentials #2
Management Essentials #2Management Essentials #2
Management Essentials #2
 
5's principles & 8'd methods
5's principles & 8'd methods5's principles & 8'd methods
5's principles & 8'd methods
 
Employee Training and Development: How to Measure Effectiveness and Impact - ...
Employee Training and Development: How to Measure Effectiveness and Impact - ...Employee Training and Development: How to Measure Effectiveness and Impact - ...
Employee Training and Development: How to Measure Effectiveness and Impact - ...
 
Optimizely Under the Hood Series: Managing Experimentation at Scale
Optimizely Under the Hood  Series: Managing Experimentation at ScaleOptimizely Under the Hood  Series: Managing Experimentation at Scale
Optimizely Under the Hood Series: Managing Experimentation at Scale
 

SIR EDWARD DEMING’S WORK ON QUALITY

  • 2.
  • 3. THE 14 POINTS ON QUALITY 1. Constancy of purpose 2. The new philosophy 3. Cease dependence on inspection 4. End “lowest tender” contracts 5. Improve every process 6. Institute training on the job 7. Institute leadership
  • 4. THE 14 POINTS ON QUALITY 8. Drive out fear 9. Break down barriers 10.Eliminate exhortations 11.Eliminate arbitrary numerical targets 12.Permit pride of workmanship 13.Encourage education 14.Top management’s commitment
  • 6. PDCA CYCLE PDCA is a continuous improvement tool
  • 7. PLAN Identify the problem 1. Identify the problem to be examined. 2. Formulate a specific problem statement to clearly define the problem 3. Set measurable and attainable goals 4. Identify stakeholders and develop necessary communication channels to communicate and gain approval AnalyseThe Problem 1. Divide overall system into individual processes -map the process 2. Brainstorm potential causes for the problem 3. Collect and analyse data to validate the root cause 4. Formulate a hypothesis 5. Verify or revise the original problem statement
  • 8. TOOLS USED FOR PLANNING 1. Direct observation of process 2. Process mapping 3. Flowcharting 4. Cause and Effect diagrams 5. Pareto analysis
  • 9. DO Develop Solutions 1. Establish experimental success criteria 2. Design experiment to test hypothesis 3. Gain stakeholder approval and support for the chosen solution Implement a Solution Implement the experiment/solution on a trial or pilot basis
  • 10. TOOLS USED FOR DOING 1. Design of Experiment (DOE) 2. On job training 3. Stakeholder management & communication
  • 11. CHECK EvaluateThe Results 1. Gather/analyse data on the solution 2. Validate hypothesis Achieve the desired goal 1. IfYES go to act 2. Else go to plan, revise hypothesis/problem statement
  • 12. TOOLS USED FOR CHECKING 1. Direct observation of process 2. Graphical analysis 3. Control charts 4. Key performance indicators
  • 13. ACT Implement the full scale solution 1. Identify systemic changes and training needs for full implementation 2. Plan ongoing monitoring of the solution 3. Continuous improvement 4. Look other improvement opportunities
  • 14. TOOLS USEDTO ACT 1. Process mapping (new process) 2. Standardization of work and process 3. Visual management 4. Error proofing 5. Formal training