Why This Study ?



• How to improve operations and plan reliability
  in a large laboratory replacement project?
  (In San Diego with the concept of going &
  seeing concern)
How they researched
• Analyzing root causes the team realized the two
  categories that reduced reliability were over-
  committing and revising the plan.
• Tools employed to track the data included value
  stream maps and employee feedback to inform
  project planning.
• The counter measures employed improved
  performance in these categories, which improved
  reliability of meeting scheduled commitments.
• But the concrete walls pours increase.
• Thus making them use Going & seeing concern.
Results
• “Going and seeing” brought the team closer to
  managing the project as a production line.
• data collected provided insight to the
  contributing factors to production cycle times
  including
  – wait time,
  – inventory, and
  – rework
• Thus providing necessary balance to complement
  the implementation of last planner on this
  project.
• Limitations: data were collected from a single
  project.
• Implications: Real time data collected directly
  from field observations and feedback from
  workers was used to make adjustments every
  week.
• Value for practitioners: examples from a project
  that used the principle of going and seeing to
  continuously improve production and increase
  the reliability of weekly work plans.
Introduction
• A general contractor team’s journey from
  learning about the main production problems to
  going and seeing in the field.
• How to improve operations and plan reliability on
  a large laboratory replacement project in San
  Diego, CA.
• The data collected from “going and seeing”
  provided valuable insight to the contributing
  factors to production cycle times including, wait
  time, inventory, and rework.
• This helped the team to understand where did
  they needed to improve
The Case
• The case refers to Ohno & Shingo with their team
  who observed the productions .
• This process became famous by the name of
  “Gemba walks” (gemba Actual Place) as
  observing production gives more details and
  insights.
• In doing so you look at the minimal details
  scientifically & how they impact the production.
• Making TPS very sucessful
VSM
• The term going and seeing is recognized in the Lean
  Production literature relates to the action of verifying
  data at the source through personal observation.
• The glasses sign in the Value stream maps refers to the
  Go & See the field by direct observation.
• VSMs are maps that show the sequence of tasks in a
  value stream using symbols that have been
  standardized and popularized by the Lean Enterprise
• Institute, based on the work developed at Toyota.
  VSMs depict data related to each activity (value-
  added, non-value added and supporting) while
  simultaneously illustrating the flows of material and
  information to deliver a product or service to the client
Plan-Do-Check-Act (PDCA)
• Going and seeing is one step
• PDCA cycle (Deming/Shewhart Cycle) provides a
  structured way to improve production through a
  series of structured observations, test, and
  documentations.
• The Last Planner System of Production Control™
  (LPS™) is an example of a system that uses the
  basic tenets of the PDCA cycle and the going and
  seeing principle to shield construction operations
  against uncertainty
• Ideally last planners make ready process
  during the lookahead plan preparation.
• in reality production pressures bring some
  tension to the planning process.
• There are times when managers choose to
  push tasks ,which have not been completely
  screened through the make ready process.
• After the end of each planning cycle, the
  completion of work packages is tracked and
  causes for non-completion are recorded.
• actions to prevent recurrence of problems are
  defined.
• The planning and control cycle continues as
  the plan for the following week addresses the
  shortcomings of the previous week and
  defines new work packages.
• The planning and control cycle continues as the plan
  for the following week addresses the shortcomings of
  the previous week and defines new work packages.
• Work on it by cycle namely
   –   plan,
   –   try,
   –   reflect, and
   –   Standardize
• “standardize” means that uniform ground rules are set
  based on the way operations are currently executed
• Standardization also allows small continuous
  improvement activities (kaizen) to depart from
  a common ground (standard) which is used as
  a step to the next level
The project and the work methods
• The new $60 million facility will provide
  oceanic research to assist in the management
  and maintenance of the marine ecosystems in
  the Pacific Ocean.
• The total constructed area will be 287,000
  square feet, which includes
  – new parking, offices and laboratory areas.
  – an extensive aquaria area, necropsy lab, biology
    labs, chemistry labs
  – Class 100 clean room and a new 1-million-liter
    seawater ocean technology development tank
• The project is funded by the American
  Recovery and Reinvestment Act and is seeking
  LEED Gold certification through numerous
  sustainable features, including
  – a 250KW rooftop photovoltaic system, vegetative
    roofs for storm water management, recycled
    andregionally sourced building materials, and
    natural ventilation systems
• The contract structure is a firm-fixed price
  based solely upon project solicitation
  instructions, plans and specifications
Work Method – Going and seeing
• The use of LPS™ was employed from the start of
  the project and was familiar to a good percentage
  of the project team management staff.
• LPS™ was a new process to the self-performed
  concrete personnel assigned to the project.
• two major factors were contributing to reducing
  reliability
  – over-committing and design changes
• the team employed two countermeasures to help
  address the causes of these problems
  – Preplanning meetings and constraint analysis
• To address the over-committing, early on the team
  initiated a weekly concrete production pre-planning
  meeting to discuss activities for the week related to
  self performed concrete.
• The intent of this meeting was to thoroughly analyze
  the plan for self-performed work and confirm the
  commitments that would be shared in the weekly
  subcontractor foremen planning meeting.
• This effort helped to increase reliability and affirm
  realistic commitments for the week.
• Data told that this meeting helped to reduce the
  incidence of over-committing as a problem that
  contributed to unreliable plans
• Anticipation
   – a contributing factor toreducing plan reliability would be
     the impact of design and constructability issues
• Being a traditional design-bid-build project, there was
  no cross-functional team during the development of
  the design documents.
• a thorough constraint analysis effort was developed
  and employed as a part of owner architect contract
• A constraint log was used to document the items that
  needed attention and make them visible to all involved
• The constraint log was updated weekly and
  summarized a variety of constraint types in a concise
  one-page report
• The list was prioritized by importance and employed
  visual categorization to improve communication. Since
  this report was a “work plan” for the Design team and
  Owner, reliability was measured to track performance.
Going & seeing in construction

Mais conteúdo relacionado

Mais procurados

Quality Management
Quality ManagementQuality Management
Quality ManagementAldo Arecco
 
EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy SmithAndy Smith
 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & MonitoringJawad Ahmad
 
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...IRJET Journal
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaJoshua Render
 
Black Belt Project Storyboard Template Example
Black Belt Project Storyboard Template ExampleBlack Belt Project Storyboard Template Example
Black Belt Project Storyboard Template ExampleGoLeanSixSigma.com
 
Overview Of Major Project Efforts
Overview Of Major Project EffortsOverview Of Major Project Efforts
Overview Of Major Project Effortsskvanbibber
 
Procurement Management Knowledge Area
Procurement Management Knowledge AreaProcurement Management Knowledge Area
Procurement Management Knowledge AreaJoshua Render
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Agus Suhanto
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost ManagementBhuWan Khadka
 
Project Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaProject Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaJoshua Render
 
Change management
Change managementChange management
Change managementmehak1990
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 

Mais procurados (19)

Quality Management
Quality ManagementQuality Management
Quality Management
 
EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy Smith
 
Project control & Monitoring
Project control & MonitoringProject control & Monitoring
Project control & Monitoring
 
Girish Mishra-R
Girish Mishra-RGirish Mishra-R
Girish Mishra-R
 
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
Project Planning, Scheduling and Preparation of Quality Assurance Control Doc...
 
Project Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge AreaProject Management: Project Schedule Management Knowledge Area
Project Management: Project Schedule Management Knowledge Area
 
Black Belt Project Storyboard Template Example
Black Belt Project Storyboard Template ExampleBlack Belt Project Storyboard Template Example
Black Belt Project Storyboard Template Example
 
Overview Of Major Project Efforts
Overview Of Major Project EffortsOverview Of Major Project Efforts
Overview Of Major Project Efforts
 
Procurement Management Knowledge Area
Procurement Management Knowledge AreaProcurement Management Knowledge Area
Procurement Management Knowledge Area
 
Project scope management
Project scope managementProject scope management
Project scope management
 
08 project quality management
08 project quality management08 project quality management
08 project quality management
 
Project Quality Management - PMBOK6
Project Quality Management - PMBOK6Project Quality Management - PMBOK6
Project Quality Management - PMBOK6
 
PM FrameWork: Module 3
PM FrameWork: Module 3PM FrameWork: Module 3
PM FrameWork: Module 3
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 
Project Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge AreaProject Management: Integration Management Knowledge Area
Project Management: Integration Management Knowledge Area
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Dulan_Resume_QE
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
 
Change management
Change managementChange management
Change management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 

Destaque

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum VitaePURAN RAWAT
 
Conclusiones del VII Congreso Ibérico de la FNCA
Conclusiones del VII Congreso Ibérico de la FNCA Conclusiones del VII Congreso Ibérico de la FNCA
Conclusiones del VII Congreso Ibérico de la FNCA Nueva Cultura del Agua
 
Financial models & going & seeing in construction kartik
Financial models & going & seeing in construction kartikFinancial models & going & seeing in construction kartik
Financial models & going & seeing in construction kartikKartikeya Pandey
 
Final rural-development-in-india
Final rural-development-in-indiaFinal rural-development-in-india
Final rural-development-in-indiaKartikeya Pandey
 

Destaque (6)

Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Conclusiones del VII Congreso Ibérico de la FNCA
Conclusiones del VII Congreso Ibérico de la FNCA Conclusiones del VII Congreso Ibérico de la FNCA
Conclusiones del VII Congreso Ibérico de la FNCA
 
Financial models & going & seeing in construction kartik
Financial models & going & seeing in construction kartikFinancial models & going & seeing in construction kartik
Financial models & going & seeing in construction kartik
 
Final rural-development-in-india
Final rural-development-in-indiaFinal rural-development-in-india
Final rural-development-in-india
 
Rural employment schemes
Rural employment schemesRural employment schemes
Rural employment schemes
 
Water and sanitation
Water and sanitationWater and sanitation
Water and sanitation
 

Semelhante a Going & seeing in construction

Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in constructionKartikeya Pandey
 
Chapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxChapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxssusercf695b
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxkiranroy6777
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric Stemen
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management Qussay Karam
 
Khan Project Scope Creep Presentationin Pdf
Khan   Project Scope Creep Presentationin PdfKhan   Project Scope Creep Presentationin Pdf
Khan Project Scope Creep Presentationin PdfZahidKhan007
 
Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6
Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6
Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6PrescienceTechnology
 
Project Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesProject Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesThink For A Change
 
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementUsing Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementQuantitative Software Management, Inc.
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.pptFirasAlhilu
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
Rework Reduction in Construction Project
Rework Reduction in Construction ProjectRework Reduction in Construction Project
Rework Reduction in Construction ProjectDr. Firdaus Basbeth
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02Durga Prasad Mishra
 
EPA Presentation - Andy Smith
EPA Presentation - Andy SmithEPA Presentation - Andy Smith
EPA Presentation - Andy SmithAndy Smith
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last PlanningThomas Almore
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoffJohn Napier
 

Semelhante a Going & seeing in construction (20)

Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 
MandC.pdf
MandC.pdfMandC.pdf
MandC.pdf
 
Chapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxChapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptx
 
D22MB040_Unit_6.pptx
D22MB040_Unit_6.pptxD22MB040_Unit_6.pptx
D22MB040_Unit_6.pptx
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16Eric_Stemen_Resume_07MAY16
Eric_Stemen_Resume_07MAY16
 
3 scope Management
3 scope Management 3 scope Management
3 scope Management
 
Khan Project Scope Creep Presentationin Pdf
Khan   Project Scope Creep Presentationin PdfKhan   Project Scope Creep Presentationin Pdf
Khan Project Scope Creep Presentationin Pdf
 
Session 22 4th edition PMP
Session 22 4th edition PMPSession 22 4th edition PMP
Session 22 4th edition PMP
 
Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6
Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6
Webinar - Integrating InEight Hard Dollar and Oracle Primavera P6
 
Project Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management ProcessesProject Management Foundations Series Course 102 - Project Management Processes
Project Management Foundations Series Course 102 - Project Management Processes
 
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementUsing Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process Improvement
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
Rework Reduction in Construction Project
Rework Reduction in Construction ProjectRework Reduction in Construction Project
Rework Reduction in Construction Project
 
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
SYSTEM LIFE CYCLE_DurgaPrasad_TA Assignemnt 02
 
EPA Presentation - Andy Smith
EPA Presentation - Andy SmithEPA Presentation - Andy Smith
EPA Presentation - Andy Smith
 
Intergrated baseline reviews as a tool in assurance
Intergrated baseline reviews as a tool in assurance Intergrated baseline reviews as a tool in assurance
Intergrated baseline reviews as a tool in assurance
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last Planning
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoff
 

Mais de Kartikeya Pandey

Mais de Kartikeya Pandey (20)

Water and sanitation
Water and sanitationWater and sanitation
Water and sanitation
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminaries
 
Supplementary benefits
Supplementary benefitsSupplementary benefits
Supplementary benefits
 
Property tax
Property taxProperty tax
Property tax
 
Metros summary by Kartikeya Pandey
Metros summary by Kartikeya PandeyMetros summary by Kartikeya Pandey
Metros summary by Kartikeya Pandey
 
Marketing product placement strategies
Marketing product placement strategiesMarketing product placement strategies
Marketing product placement strategies
 
seven cs
seven csseven cs
seven cs
 
Indian ports (1)
Indian ports (1)Indian ports (1)
Indian ports (1)
 
Human resource planning ppt.
Human resource planning ppt.Human resource planning ppt.
Human resource planning ppt.
 
Gis
GisGis
Gis
 
Fire d project
Fire d projectFire d project
Fire d project
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arun
 
24 x7 water in three states of karnataka
24 x7 water in three states of karnataka24 x7 water in three states of karnataka
24 x7 water in three states of karnataka
 
4
44
4
 
Land adjustment Land value capture
Land adjustment Land value captureLand adjustment Land value capture
Land adjustment Land value capture
 
Solid waste management practices in dehradun under jn nurm
Solid waste management practices in dehradun under jn nurmSolid waste management practices in dehradun under jn nurm
Solid waste management practices in dehradun under jn nurm
 
Infrastructure unbundling in south africa
Infrastructure unbundling in south africaInfrastructure unbundling in south africa
Infrastructure unbundling in south africa
 
Indian accounting standard (ind as) 27
Indian accounting standard (ind as) 27Indian accounting standard (ind as) 27
Indian accounting standard (ind as) 27
 
Hr presentation
Hr presentationHr presentation
Hr presentation
 
Concrete technology
Concrete technologyConcrete technology
Concrete technology
 

Going & seeing in construction

  • 1. Financial models & going & seeing in construction MBA Infrastructure Jaskaran singh saini Kartikeya Pandey Manisha minu
  • 2. Why This Study ? • How to improve operations and plan reliability in a large laboratory replacement project? (In San Diego with the concept of going & seeing concern)
  • 3. How they researched • Analyzing root causes the team realized the two categories that reduced reliability were over- committing and revising the plan. • Tools employed to track the data included value stream maps and employee feedback to inform project planning. • The counter measures employed improved performance in these categories, which improved reliability of meeting scheduled commitments. • But the concrete walls pours increase. • Thus making them use Going & seeing concern.
  • 4. Results • “Going and seeing” brought the team closer to managing the project as a production line. • data collected provided insight to the contributing factors to production cycle times including – wait time, – inventory, and – rework • Thus providing necessary balance to complement the implementation of last planner on this project.
  • 5. • Limitations: data were collected from a single project. • Implications: Real time data collected directly from field observations and feedback from workers was used to make adjustments every week. • Value for practitioners: examples from a project that used the principle of going and seeing to continuously improve production and increase the reliability of weekly work plans.
  • 6. Introduction • A general contractor team’s journey from learning about the main production problems to going and seeing in the field. • How to improve operations and plan reliability on a large laboratory replacement project in San Diego, CA. • The data collected from “going and seeing” provided valuable insight to the contributing factors to production cycle times including, wait time, inventory, and rework. • This helped the team to understand where did they needed to improve
  • 7. The Case • The case refers to Ohno & Shingo with their team who observed the productions . • This process became famous by the name of “Gemba walks” (gemba Actual Place) as observing production gives more details and insights. • In doing so you look at the minimal details scientifically & how they impact the production. • Making TPS very sucessful
  • 8. VSM • The term going and seeing is recognized in the Lean Production literature relates to the action of verifying data at the source through personal observation. • The glasses sign in the Value stream maps refers to the Go & See the field by direct observation. • VSMs are maps that show the sequence of tasks in a value stream using symbols that have been standardized and popularized by the Lean Enterprise • Institute, based on the work developed at Toyota. VSMs depict data related to each activity (value- added, non-value added and supporting) while simultaneously illustrating the flows of material and information to deliver a product or service to the client
  • 9. Plan-Do-Check-Act (PDCA) • Going and seeing is one step • PDCA cycle (Deming/Shewhart Cycle) provides a structured way to improve production through a series of structured observations, test, and documentations. • The Last Planner System of Production Control™ (LPS™) is an example of a system that uses the basic tenets of the PDCA cycle and the going and seeing principle to shield construction operations against uncertainty
  • 10. • Ideally last planners make ready process during the lookahead plan preparation. • in reality production pressures bring some tension to the planning process. • There are times when managers choose to push tasks ,which have not been completely screened through the make ready process.
  • 11. • After the end of each planning cycle, the completion of work packages is tracked and causes for non-completion are recorded. • actions to prevent recurrence of problems are defined. • The planning and control cycle continues as the plan for the following week addresses the shortcomings of the previous week and defines new work packages.
  • 12. • The planning and control cycle continues as the plan for the following week addresses the shortcomings of the previous week and defines new work packages. • Work on it by cycle namely – plan, – try, – reflect, and – Standardize • “standardize” means that uniform ground rules are set based on the way operations are currently executed
  • 13. • Standardization also allows small continuous improvement activities (kaizen) to depart from a common ground (standard) which is used as a step to the next level
  • 14. The project and the work methods • The new $60 million facility will provide oceanic research to assist in the management and maintenance of the marine ecosystems in the Pacific Ocean. • The total constructed area will be 287,000 square feet, which includes – new parking, offices and laboratory areas. – an extensive aquaria area, necropsy lab, biology labs, chemistry labs – Class 100 clean room and a new 1-million-liter seawater ocean technology development tank
  • 15. • The project is funded by the American Recovery and Reinvestment Act and is seeking LEED Gold certification through numerous sustainable features, including – a 250KW rooftop photovoltaic system, vegetative roofs for storm water management, recycled andregionally sourced building materials, and natural ventilation systems • The contract structure is a firm-fixed price based solely upon project solicitation instructions, plans and specifications
  • 16. Work Method – Going and seeing • The use of LPS™ was employed from the start of the project and was familiar to a good percentage of the project team management staff. • LPS™ was a new process to the self-performed concrete personnel assigned to the project. • two major factors were contributing to reducing reliability – over-committing and design changes • the team employed two countermeasures to help address the causes of these problems – Preplanning meetings and constraint analysis
  • 17. • To address the over-committing, early on the team initiated a weekly concrete production pre-planning meeting to discuss activities for the week related to self performed concrete. • The intent of this meeting was to thoroughly analyze the plan for self-performed work and confirm the commitments that would be shared in the weekly subcontractor foremen planning meeting. • This effort helped to increase reliability and affirm realistic commitments for the week. • Data told that this meeting helped to reduce the incidence of over-committing as a problem that contributed to unreliable plans
  • 18. • Anticipation – a contributing factor toreducing plan reliability would be the impact of design and constructability issues • Being a traditional design-bid-build project, there was no cross-functional team during the development of the design documents. • a thorough constraint analysis effort was developed and employed as a part of owner architect contract • A constraint log was used to document the items that needed attention and make them visible to all involved • The constraint log was updated weekly and summarized a variety of constraint types in a concise one-page report • The list was prioritized by importance and employed visual categorization to improve communication. Since this report was a “work plan” for the Design team and Owner, reliability was measured to track performance.

Notas do Editor

  1. In this concept they started observing the complete production line and making informed decisions
  2. The use of a standard allows results to be compared and deviations from plans to be quickly detected