• Risk assessment scenario and approaches for nuclear
power ..Project Structuring

• Challenges and issues in control and monitoring
existing proposed reactor designs for project structuring

• Consideration of high level uncertainties in the risk
study of a nuclear power plant: Project Cost Risks

• Small reactors and risk dispersion, Small Reactor
Advantages


Himadri Banerji, Former CEO, Reliance Energy –
Chairman & Managing Director, EcoUrja, India
                  Presented by Dr. Himadri Banerji 2nd
                  Annual Nuclear Power June 21st to
                         24th 2011 Singapore                1
Stakeholders in Nuclear Power Project

Government - which is responsible for overall energy policy and, in some
cases, financing

Market - formed by electricity customers wanting electricity at a competitive
price

Utility (generator) - which is ultimately responsible for developing the complete
project

EPC contractors - engineering, procurement and construction companies
which are responsible to the owner for delivery according to schedule and budget

Vendors - which are responsible for supplying equipment and technology to
either the owner, the EPC contractor or as part of a joint venture or consortium,
according to schedule and budget

Safety Authority - which is responsible for addressing all matters related to
protecting public safety and the environment, from the design stage to plant
operation and fuel management. Nuclear Power June 21st2nd
                             Presented by Dr. Himadri Banerji
                             Annual                           to
                                  24th 2011 Singapore                               2
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             3
Table 2: Risk control and monitoring in nuclear power projects




                                        Presented by Dr. Himadri Banerji 2nd
Table 2 shows ways in which the risks of Annual Nuclear Powerbe monitored and controlled, to match Table 1.
                                         nuclear projects can June 21st to
                                               24th 2011 Singapore                                            4
In today’s global energy environment, nuclear power plant project (NPPP)
managers need to consider many dimensions of risk in addition to nuclear
safety-related risk.

In order to stay competitive in modern energy markets, NPPP managers
must integrate management of project, safety-related, and economic risks
in an effective way.


Project structuring is to achieve the most efficient application of capital and
resources.

Project risks must be assigned to the party most capable of handing their
control.
.

                            Presented by Dr. Himadri Banerji 2nd
                            Annual Nuclear Power June 21st to
                                   24th 2011 Singapore                            5
This integrated risk management (RM) approach generates benefits that
include the following:

•Clearer criteria for decision making.

• Making effective use of investments already made in probabilistic safety
analysis (PSA) programs by applying these analyses to other areas and
contexts.

• Cost consciousness and innovation in achieving nuclear safety and
production goals.

• Communication improvement — more effective internal communication
among all levels of the NPP operating organization, and clearer communication
between the organization and its stakeholders.

• Focus on safety — ensuring an integrated focus on safety, production, and
economics during times of change in the energy environment
                          Presented by Dr. Himadri Banerji 2nd
                          Annual Nuclear Power June 21st to
                                 24th 2011 Singapore                       6
COST INDEX




                 SAFETY INDEX
             Presented by Dr. Himadri Banerji 2nd
             Annual Nuclear Power June 21st to
                    24th 2011 Singapore             7
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             8
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             9
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             10
Probabilistic Risk Assessment (PSA)

Comprehensive, structured, and logical analysis method

aimed at
Identifying   and   assessing                     risks   in   complex
technological systems

for the purpose of

Cost-effectively     improving                    their   safety   and
performance.       Presented by Dr. Himadri Banerji 2nd
                   Annual Nuclear Power June 21st to
                          24th 2011 Singapore                        11
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             12
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             13
Contd from previous slide




            Presented by Dr. Himadri Banerji 2nd
            Annual Nuclear Power June 21st to
                   24th 2011 Singapore             14
There are eight primary sources of nuclear costs which
pose major project risks:
  The cost of the land upon which the nuclear power plant (NPP) is built.

  Costs related to designing the NPP

  Cost related to the materials from which the NPP is built.

  Labour costs related to manufacture and construction.

  The cost of obtaining regulatory approval AND PERMITS LIKE WATER ETC

  Investment related costs (interest, etc.)

  Transportation and Access related costs

  The cost of the electrical transmission system that connects the NPP to the
grid

  Lost Opportunities for CombiningDr. Himadri Banerji Improving Efficiencies
                          Presented by Cycles and 2nd
                             Annual Nuclear Power June 21st to
                                   24th 2011 Singapore                          15
The cost of the land upon which the
                  nuclear power plant (NPP) is built

Land related costs can be lowered if the investor already owns the land. In the
case of NPPs, land costs can be lowered if the NPP is built on a pre-existing NPP
site.

Other, for example transportation related investments may not be required, and
access to water is very likely to be available.

NPPs can also be located on the site of obsolete coal fired power plants slated
to be shut down for technological or environmental reasons.

The same advantages of the NPP location would apply to the coal powered site,
and additional facilities – for example the turbine hall, parking lots,
administrative buildings, workshops, transformer farms, etc. - can potentially be
recycled.

The layout and size of an existing coal fired power plant may not be
appropriate for adaptation for a large nuclear plant, but a cluster of small
reactor approach would allow for far greater flexibility in facility layout,
and would be far more easy to accommodate. 2nd
                           Presented by Dr. Himadri Banerji
                           Annual Nuclear Power June 21st to
                                  24th 2011 Singapore                             16
Costs related to designing the NPP



Small reactors, especially advanced technology small reactors, offer
advancements in siting flexibility.

For example, clusters of small reactors can be located in former salt mines.

Serial production lowers design costs.

         Design costs are largely fixed.
         Design costs can be divided among all of the units produced.

If one reactor of a particular design is produced, then the recovery of the
cost of that design would be through sale of that unit.

If hundreds of units are produced, the recovery of the design cost can be
divided between all of the units.


                        Presented by Dr. Himadri Banerji 2nd
                        Annual Nuclear Power June 21st to
                               24th 2011 Singapore                            17
Costs related to designing the NPP
                        Clusters of Small Reactors




                         Presented by Dr. Himadri Banerji 2nd
                         Annual Nuclear Power June 21st to
                                24th 2011 Singapore             18
Costs related to designing the NPP


Finally, design simplification can lower nuclear costs.

The Generation IV Molten Salt Reactor design offers revolutionary design
simplification. In the Molten Salt Reactor the fuel is dissolved in the
coolant.

Thus much of the core structure is eliminated. Because the Molten Salt
Reactor features a negative coefficient of reactivity, the reactor is highly
stable without operator control input.

Control rods can be partially or completely eliminated.

These simple features lower manufacturing costs. And lessen
manufacturing time.



                           Presented by Dr. Himadri Banerji 2nd
                           Annual Nuclear Power June 21st to
                                  24th 2011 Singapore                          19
Cost related to the materials from which the NPP is built



The material input into a NPP per watt of output typically decreases as
total reactor output rises.

Traditionally this has lead to the economies of scales argument, which
maintains that the larger the reactor output, the lower the per watt cost.

There are, however, problems with this assessment.

While it is true that larger size usually means lower material costs per unit
of electrical output, there are exceptions to this rule, especially with
respect to advanced nuclear technology.




                           Presented by Dr. Himadri Banerji 2nd
                           Annual Nuclear Power June 21st to
                                  24th 2011 Singapore                           20
Cost related to the materials from which the NPP is built




For example:

The greater thermal efficiency of a reactor of similar core size might lower output
cost per unit of heat, compared to that of a similar sized, but less efficient design.

Reactor safety issues may effect materials input.

Light Water Reactor cores and heat exchanges operate under very high pressure.

They require significant amounts of material to prevent steam explosions.

LWR outer containment structures are typically massive, and thus require large




                              Presented by Dr. Himadri Banerji 2nd
                              Annual Nuclear Power June 21st to
                                     24th 2011 Singapore                           21
Cost related to the materials from which the NPP is built


A more compact reactor core may lower material requirements.

Thus if two reactors have the same output, the one with the smaller core
is likely to require fewer materials.

Underground reactor siting could potentially lower reactor structural
costs, by offering protection against terrorist attacks from aircraft and at
surface levels with lower materials inputs.

.




                          Presented by Dr. Himadri Banerji 2nd
                          Annual Nuclear Power June 21st to
                                 24th 2011 Singapore                           22
Cost related to the materials from which the NPP is built


Small generation components can lower material requirements.

Thus supercritical carbon dioxide turbines are much smaller than steam
turbines used in conventional reactors.

Small turbines require fewer materials, and can be housed in smaller
turbine halls, which in turn require less material and labour input to
build.

Thus a small advanced technology reactor with a compact core and
high thermal efficiency, that operates at a one atmosphere pressure
level, and can be sited underground might require fewer materials
inputs per unit of electrical output than a much larger conventional
reactor




                        Presented by Dr. Himadri Banerji 2nd
                        Annual Nuclear Power June 21st to
                               24th 2011 Singapore                       23
Reactor Design Lowers Manufacturing Costs



In addition manufacturing costs can be lowered by simplifying reactor
design. Passive safety features can in some instances lower nuclear
costs.

For example thermo-siphoning of reactor coolant, may save the cost of
manufacturing and installing coolant pumps.

Gravity feed emergency coolant systems save on manufacturing costs
in several ways,

They do not require backup generators or pumps, thus many of the
expenses of older emergency coolant systems can be saved.




                        Presented by Dr. Himadri Banerji 2nd
                        Annual Nuclear Power June 21st to
                               24th 2011 Singapore                      24
mPower Reactors from B&W


The B&W mPower reactor, with its scalable, modular design, has the
capacity to provide 125 MWe to 750 MWe or more for a 4.5-year operating
cycle without refuelling, and is designed to produce clean, zero-emission
operations.

Babcock & Wilcox Nuclear Energy, Inc. will lead the development, licensing
and delivery of B&W mPower reactor projects.

Features of the B&W mPower reactor include:

 Integral nuclear system design
 Passive safety systems
 Underground containment
 4.5-year operating cycle between refueling
 Scalable, modular design is flexible for local needs
 Multi-unit (1 to 10+) plant
 Used fuel stored in spent fuel pool for life of the reactor (60 years)
 Country shop-manufactured
                      Presented by Dr. Himadri Banerji 2nd
                      Annual Nuclear Power June 21st to
                             24th 2011 Singapore                          25
Labour costs related to manufacture and construction.


Labour costs can be lowered by shifting work from the field to a
factory. The more labor which can be performed in a factory, the lower
the over all costs.

Modular production is consistent with factory manufacture. Factory
manufacture lowers labor costs in several ways.

First serial production leads to the division of labor, which in turn
typically increases labor productivity.

The division of labor decreases the skill set required from individual
workers.

Decreased labor skill sets decrease labor wage expectations.

Factory work settings, as opposed to field work settings also decrease
wage expectations.
                          Presented by Dr. Himadri Banerji 2nd
                          Annual Nuclear Power June 21st to
                                 24th 2011 Singapore                     26
The cost of obtaining regulatory approval and permits like for
                               water




The current nuclear regulatory environment favour serial
manufacture.

Once an example of a particular nuclear design is approved by the
NRC is approved, the approval of all subsequent reactors using the
design is automatic.

Environmental aspects of subsequent application, however, receive
the same attention, since they vary from facility to facility.




                        Presented by Dr. Himadri Banerji 2nd
                        Annual Nuclear Power June 21st to
                               24th 2011 Singapore                      27
The cost of obtaining regulatory approval and permits like for water

In addition to NRC license requirements, other licenses or permits may be
required.

For example, the use of cooling water from rivers and lakes is not automatic,
and usually requires regulatory approval.

One of the advantages of recycling coal fired power plant sites, is that water
access permits may already exist, and potentially can be transferred.

But what if obtaining a water use permit is not possible?

With small reactor designs air rather water cooling is practical, with
relatively modest efficiency penalties.

With efficient advanced reactors, the efficiency benefits may far outweigh
the efficiency losses related to air cooling.



                          Presented by Dr. Himadri Banerji 2nd
                          Annual Nuclear Power June 21st to
                                 24th 2011 Singapore                             28
Investment related costs (interest, etc.)

Interest accrues as nuclear power plant construction, and accrued interest may
amount to a significant percentage of NPP capital costs, especially if the
construction project stretches to half a decade or more.

Small factory built reactors are expected to have shortened construction times,
compared to large conventional reactors.

Simplified advanced reactor designs are also expected to shorten NPP
construction time.

These shortening construction time can decrease the interest component of
capital costs significantly.




                          Presented by Dr. Himadri Banerji 2nd
                          Annual Nuclear Power June 21st to
                                 24th 2011 Singapore                        29
Investment related costs (interest, etc.)


Interest charges may reflect the market's assessment of project risks.

The greater a projects assumed risk, the higher the interest premium the
market will assess.

By decreasing a project's size, and lowering projected
manufacturing/construction time, nuclear project builders can offer the
market lower perceived risks.

Lower perceived risks, will lead to interest discounts compared to higher risk
large nuclear projects.




                          Presented by Dr. Himadri Banerji 2nd
                          Annual Nuclear Power June 21st to
                                 24th 2011 Singapore                        30
Transportation and Access Related Costs

 Small, factory manufactured reactors offer advantages in transportation costs.

 Conventional reactors include a number of very large and heavy components,
 that present transportation challenges.

 Components such as pressure vessels and steam generators may require
 special and highly unusual transportation arrangements if they are transported
 overland.

 Special huge road transportation vehicles, some capable of moving no more
 than three miles an hour may disrupt highway uses in large areas over several
 weeks as they transported conventional reactor steam generators and pressure
 vessels to reactor sites.

 In contrast, small reactor cores may be moved by trucks or by rail as ordinary
 freight.

In areas where water shortages represent acute problems, small reactor access to
reliable water supplies is unnecessary. Air cooling will enable small reactors to
operate with out a reliable water supply. Himadri Banerji 2nd
                              Presented by Dr.
                             Annual Nuclear Power June 21st to
                                   24th 2011 Singapore                            31
The cost of the electrical transmission system that connects the NPP
                                 to the grid


Small reactor clusters located at recycled coal fire power plant locations
potentially have greatly simplified grid connections.

Not only can they be located near to the cities they are intended to serve, but
grid hook-up is facilitated by existing transformer farms, and grid
connections.

Because they can be located close to served cities new transmission lines will
not cover long distances, thus lowering grid expansion costs.

Large reactors may require new transmission lines that are hundreds of miles
long, in order to move surplus electricity to market.




                            Presented by Dr. Himadri Banerji 2nd
                            Annual Nuclear Power June 21st to
                                   24th 2011 Singapore                            32
Small reactor clusters located at recycled coal fire power plant




                   Presented by Dr. Himadri Banerji 2nd
                   Annual Nuclear Power June 21st to
                          24th 2011 Singapore                      33
Lost Opportunities for Combining Cycles and Improving Efficiencies



In addition to the above savings, and potential savings mentioned above there
are other potential savings that may be available with small reactors.

For example, with advanced nuclear technology, for example molten salt
reactors, combined Rankine (steam) and Brayton (gas) cycles are possible.

A bottoming desalinization cycle could be offered to the system, thus offering
formidable efficiency from small reactor packages.

A high temperature reactor can provide top cycle heat for industrial processes,
as well as producing middle cycle electricity generation, and bottom cycle heat
for electrical generation.

By adding a second generating cycle, small reactors can lower their electrical
generation costs.

Desalination would add a further revenue stream from the reactors operation
through the sale of portable water.Nuclear Power June 21st2nd
                             Presented by Dr. Himadri Banerji
                              Annual                          to
                                  24th 2011 Singapore                            34
Benefits in Risk Management By shifting to Small Reactors


Shifts from conventional nuclear technology, to some advanced nuclear
technologies, also offer significant potential savings.

‘Some advanced technology savings are available to both large and small
nuclear power plants, but the flexibility of small NPPs may mean that at
least in certain situations

Small advanced nuclear power plants may offer very significant potential
savings in comparison to large conventional NPPs.




                       Presented by Dr. Himadri Banerji 2nd
                       Annual Nuclear Power June 21st to
                              24th 2011 Singapore                          35
Status of Development of Small Reactors




           Presented by Dr. Himadri Banerji 2nd
           Annual Nuclear Power June 21st to
                  24th 2011 Singapore             36
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             37
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             38
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             39
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             40
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             41
Presented by Dr. Himadri Banerji 2nd
Annual Nuclear Power June 21st to
       24th 2011 Singapore             42

Mais conteúdo relacionado

Mais procurados

Michael Hsieh (UC Berkley Extension) - Conférence TechnoArk 2013
Michael Hsieh (UC Berkley Extension) - Conférence TechnoArk 2013Michael Hsieh (UC Berkley Extension) - Conférence TechnoArk 2013
Michael Hsieh (UC Berkley Extension) - Conférence TechnoArk 2013TechnoArk
 
US Department of Energy FY2013 Proposed Budget
US Department of Energy FY2013 Proposed BudgetUS Department of Energy FY2013 Proposed Budget
US Department of Energy FY2013 Proposed BudgetUS Department of Energy
 
A study on charanka solar park and kudankulam nuclear power plant in india
A study on charanka solar park and kudankulam nuclear power plant in indiaA study on charanka solar park and kudankulam nuclear power plant in india
A study on charanka solar park and kudankulam nuclear power plant in indiaKetan Vador
 
Secretary Moniz's FY 2016 Budget Presentation
Secretary Moniz's FY 2016 Budget PresentationSecretary Moniz's FY 2016 Budget Presentation
Secretary Moniz's FY 2016 Budget PresentationUS Department of Energy
 
So Cal Edison Smart Grid Strategyand Roadmap
So Cal Edison Smart Grid Strategyand RoadmapSo Cal Edison Smart Grid Strategyand Roadmap
So Cal Edison Smart Grid Strategyand Roadmapbrucetotty
 
2nd annual nuclear power uprate conference
2nd annual nuclear power uprate conference 2nd annual nuclear power uprate conference
2nd annual nuclear power uprate conference Dean Murphy
 
South Africa: Biodiesel and Renewable Energy Technologies For Poverty Allevia...
South Africa: Biodiesel and Renewable Energy Technologies For Poverty Allevia...South Africa: Biodiesel and Renewable Energy Technologies For Poverty Allevia...
South Africa: Biodiesel and Renewable Energy Technologies For Poverty Allevia...QZ1
 
Ukrainian solar market report 2011 eng
Ukrainian solar market report 2011 engUkrainian solar market report 2011 eng
Ukrainian solar market report 2011 engDmitry Lukomskiy
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
50 MW solar-thermal-dpr
50 MW solar-thermal-dpr50 MW solar-thermal-dpr
50 MW solar-thermal-dprExergy
 
7th Power & Electricity Conference
7th Power & Electricity Conference7th Power & Electricity Conference
7th Power & Electricity ConferenceKahren Navarro
 
Development of 'State-of-Art' Building Energy Dashboard: The C3 Dashboard
Development of 'State-of-Art' Building Energy Dashboard: The C3 DashboardDevelopment of 'State-of-Art' Building Energy Dashboard: The C3 Dashboard
Development of 'State-of-Art' Building Energy Dashboard: The C3 Dashboardruchiek
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010Headway Solar
 
Module 4 - Funding mechanisms for energy efficiency
Module 4 - Funding mechanisms for energy efficiencyModule 4 - Funding mechanisms for energy efficiency
Module 4 - Funding mechanisms for energy efficiencyPaul Brown
 
Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesExergy
 
Intern Report - Le Xuan Dat
Intern Report - Le Xuan DatIntern Report - Le Xuan Dat
Intern Report - Le Xuan DatDat Le Xuan
 
EDEN - Lucis Project
EDEN - Lucis ProjectEDEN - Lucis Project
EDEN - Lucis Projecth2portugal
 

Mais procurados (20)

Michael Hsieh (UC Berkley Extension) - Conférence TechnoArk 2013
Michael Hsieh (UC Berkley Extension) - Conférence TechnoArk 2013Michael Hsieh (UC Berkley Extension) - Conférence TechnoArk 2013
Michael Hsieh (UC Berkley Extension) - Conférence TechnoArk 2013
 
US Department of Energy FY2013 Proposed Budget
US Department of Energy FY2013 Proposed BudgetUS Department of Energy FY2013 Proposed Budget
US Department of Energy FY2013 Proposed Budget
 
A study on charanka solar park and kudankulam nuclear power plant in india
A study on charanka solar park and kudankulam nuclear power plant in indiaA study on charanka solar park and kudankulam nuclear power plant in india
A study on charanka solar park and kudankulam nuclear power plant in india
 
Secretary Moniz's FY 2016 Budget Presentation
Secretary Moniz's FY 2016 Budget PresentationSecretary Moniz's FY 2016 Budget Presentation
Secretary Moniz's FY 2016 Budget Presentation
 
So Cal Edison Smart Grid Strategyand Roadmap
So Cal Edison Smart Grid Strategyand RoadmapSo Cal Edison Smart Grid Strategyand Roadmap
So Cal Edison Smart Grid Strategyand Roadmap
 
2nd annual nuclear power uprate conference
2nd annual nuclear power uprate conference 2nd annual nuclear power uprate conference
2nd annual nuclear power uprate conference
 
South Africa: Biodiesel and Renewable Energy Technologies For Poverty Allevia...
South Africa: Biodiesel and Renewable Energy Technologies For Poverty Allevia...South Africa: Biodiesel and Renewable Energy Technologies For Poverty Allevia...
South Africa: Biodiesel and Renewable Energy Technologies For Poverty Allevia...
 
Eecs Cert Report
Eecs Cert ReportEecs Cert Report
Eecs Cert Report
 
Ukrainian solar market report 2011 eng
Ukrainian solar market report 2011 engUkrainian solar market report 2011 eng
Ukrainian solar market report 2011 eng
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
50 MW solar-thermal-dpr
50 MW solar-thermal-dpr50 MW solar-thermal-dpr
50 MW solar-thermal-dpr
 
The ecowas small scale hydro power program
The ecowas small scale hydro power programThe ecowas small scale hydro power program
The ecowas small scale hydro power program
 
7th Power & Electricity Conference
7th Power & Electricity Conference7th Power & Electricity Conference
7th Power & Electricity Conference
 
Development of 'State-of-Art' Building Energy Dashboard: The C3 Dashboard
Development of 'State-of-Art' Building Energy Dashboard: The C3 DashboardDevelopment of 'State-of-Art' Building Energy Dashboard: The C3 Dashboard
Development of 'State-of-Art' Building Energy Dashboard: The C3 Dashboard
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
Module 4 - Funding mechanisms for energy efficiency
Module 4 - Funding mechanisms for energy efficiencyModule 4 - Funding mechanisms for energy efficiency
Module 4 - Funding mechanisms for energy efficiency
 
Overview of Clean Energy Community resources
Overview of Clean Energy Community resourcesOverview of Clean Energy Community resources
Overview of Clean Energy Community resources
 
Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
 
Intern Report - Le Xuan Dat
Intern Report - Le Xuan DatIntern Report - Le Xuan Dat
Intern Report - Le Xuan Dat
 
EDEN - Lucis Project
EDEN - Lucis ProjectEDEN - Lucis Project
EDEN - Lucis Project
 

Destaque

Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureHIMADRI BANERJI
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...HIMADRI BANERJI
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012HIMADRI BANERJI
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerjiHIMADRI BANERJI
 
Energy Intelligence Analytics and Optimization
Energy Intelligence Analytics and OptimizationEnergy Intelligence Analytics and Optimization
Energy Intelligence Analytics and OptimizationHIMADRI BANERJI
 
Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...HIMADRI BANERJI
 
Feedstock for biofuels status and market trends asia
Feedstock for biofuels status and market trends asiaFeedstock for biofuels status and market trends asia
Feedstock for biofuels status and market trends asiaHIMADRI BANERJI
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...HIMADRI BANERJI
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure HIMADRI BANERJI
 

Destaque (9)

Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructure
 
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
Thermal coal upgradation and conversion in india ibc asia, jakarta april 25, ...
 
Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012Lng project risk and appraisal 2012 final 03092012
Lng project risk and appraisal 2012 final 03092012
 
Risk management FSRU himadri banerji
Risk management FSRU himadri banerjiRisk management FSRU himadri banerji
Risk management FSRU himadri banerji
 
Energy Intelligence Analytics and Optimization
Energy Intelligence Analytics and OptimizationEnergy Intelligence Analytics and Optimization
Energy Intelligence Analytics and Optimization
 
Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...Risk management during start up and commissioning of super critical once thro...
Risk management during start up and commissioning of super critical once thro...
 
Feedstock for biofuels status and market trends asia
Feedstock for biofuels status and market trends asiaFeedstock for biofuels status and market trends asia
Feedstock for biofuels status and market trends asia
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...
 
World Class Manufacturing:Plant Start Up and Commissioning Procedure
World  Class Manufacturing:Plant Start Up and Commissioning Procedure World  Class Manufacturing:Plant Start Up and Commissioning Procedure
World Class Manufacturing:Plant Start Up and Commissioning Procedure
 

Semelhante a NPP Risks

Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...HIMADRI BANERJI
 
Renewable Energy Technologies for sustainable Development of Energy Effective...
Renewable Energy Technologies for sustainable Development of Energy Effective...Renewable Energy Technologies for sustainable Development of Energy Effective...
Renewable Energy Technologies for sustainable Development of Energy Effective...IRJET Journal
 
Session3 re situation_in_palestine
Session3 re situation_in_palestineSession3 re situation_in_palestine
Session3 re situation_in_palestineRCREEE
 
Dennis_Allen_External-CV_January2016
Dennis_Allen_External-CV_January2016Dennis_Allen_External-CV_January2016
Dennis_Allen_External-CV_January2016Dennis Allen
 
Simultaneous Generation Expansion Planning and Natural Gas Expansion Planning
Simultaneous Generation Expansion Planning and Natural Gas Expansion PlanningSimultaneous Generation Expansion Planning and Natural Gas Expansion Planning
Simultaneous Generation Expansion Planning and Natural Gas Expansion PlanningIDES Editor
 
Nuclear power plant - IV Semester PGE Module 3- VTU
Nuclear power plant  - IV Semester PGE Module 3- VTUNuclear power plant  - IV Semester PGE Module 3- VTU
Nuclear power plant - IV Semester PGE Module 3- VTUDrCVMOHAN
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Comit Projects Ltd
 
Bamboo pannel used for construction Seminar-I.pdf
Bamboo pannel used for construction Seminar-I.pdfBamboo pannel used for construction Seminar-I.pdf
Bamboo pannel used for construction Seminar-I.pdfRaviSartape1
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantKrishna Teja
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plantKrishna Teja
 
Hydrogen storage for micro-grid application: a framework for ranking fuel ce...
Hydrogen storage for micro-grid application: a framework for  ranking fuel ce...Hydrogen storage for micro-grid application: a framework for  ranking fuel ce...
Hydrogen storage for micro-grid application: a framework for ranking fuel ce...IJECEIAES
 
A Review Paper On Nuclear S Power Plants Safety
A Review Paper On Nuclear S Power Plants SafetyA Review Paper On Nuclear S Power Plants Safety
A Review Paper On Nuclear S Power Plants SafetyDaphne Smith
 
Value of CSP with TES november 2014
Value of CSP with TES november 2014Value of CSP with TES november 2014
Value of CSP with TES november 2014Daniel Schwab
 
Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ankit Kumar
 

Semelhante a NPP Risks (20)

Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
 
Renewable Energy Technologies for sustainable Development of Energy Effective...
Renewable Energy Technologies for sustainable Development of Energy Effective...Renewable Energy Technologies for sustainable Development of Energy Effective...
Renewable Energy Technologies for sustainable Development of Energy Effective...
 
bca
bcabca
bca
 
Session3 re situation_in_palestine
Session3 re situation_in_palestineSession3 re situation_in_palestine
Session3 re situation_in_palestine
 
Summary fcne
Summary fcneSummary fcne
Summary fcne
 
Dennis_Allen_External-CV_January2016
Dennis_Allen_External-CV_January2016Dennis_Allen_External-CV_January2016
Dennis_Allen_External-CV_January2016
 
Simultaneous Generation Expansion Planning and Natural Gas Expansion Planning
Simultaneous Generation Expansion Planning and Natural Gas Expansion PlanningSimultaneous Generation Expansion Planning and Natural Gas Expansion Planning
Simultaneous Generation Expansion Planning and Natural Gas Expansion Planning
 
Nuclear power plant - IV Semester PGE Module 3- VTU
Nuclear power plant  - IV Semester PGE Module 3- VTUNuclear power plant  - IV Semester PGE Module 3- VTU
Nuclear power plant - IV Semester PGE Module 3- VTU
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
 
Bamboo pannel used for construction Seminar-I.pdf
Bamboo pannel used for construction Seminar-I.pdfBamboo pannel used for construction Seminar-I.pdf
Bamboo pannel used for construction Seminar-I.pdf
 
Energy Storage Solutions
Energy Storage SolutionsEnergy Storage Solutions
Energy Storage Solutions
 
Energy Storage Solutions
Energy Storage SolutionsEnergy Storage Solutions
Energy Storage Solutions
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Renewable Energy Innovation
Renewable Energy InnovationRenewable Energy Innovation
Renewable Energy Innovation
 
Hydrogen storage for micro-grid application: a framework for ranking fuel ce...
Hydrogen storage for micro-grid application: a framework for  ranking fuel ce...Hydrogen storage for micro-grid application: a framework for  ranking fuel ce...
Hydrogen storage for micro-grid application: a framework for ranking fuel ce...
 
A Review Paper On Nuclear S Power Plants Safety
A Review Paper On Nuclear S Power Plants SafetyA Review Paper On Nuclear S Power Plants Safety
A Review Paper On Nuclear S Power Plants Safety
 
Value of CSP with TES november 2014
Value of CSP with TES november 2014Value of CSP with TES november 2014
Value of CSP with TES november 2014
 
offshore.pptx
offshore.pptxoffshore.pptx
offshore.pptx
 
Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)Ntpc LNCT training report (autosaved)
Ntpc LNCT training report (autosaved)
 

Mais de HIMADRI BANERJI

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfHIMADRI BANERJI
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...HIMADRI BANERJI
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxHIMADRI BANERJI
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfHIMADRI BANERJI
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeHIMADRI BANERJI
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning HIMADRI BANERJI
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdfHIMADRI BANERJI
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfHIMADRI BANERJI
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLHIMADRI BANERJI
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics HIMADRI BANERJI
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal HIMADRI BANERJI
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji HIMADRI BANERJI
 
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...HIMADRI BANERJI
 
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...HIMADRI BANERJI
 
Geothermal Power for the Entrepreneur in India with EcoUrja
Geothermal Power for the Entrepreneur in India with EcoUrjaGeothermal Power for the Entrepreneur in India with EcoUrja
Geothermal Power for the Entrepreneur in India with EcoUrjaHIMADRI BANERJI
 
Commisioning of Supercritical Power Units: Risks to an EPC Contractor
Commisioning of Supercritical Power Units: Risks to an EPC ContractorCommisioning of Supercritical Power Units: Risks to an EPC Contractor
Commisioning of Supercritical Power Units: Risks to an EPC ContractorHIMADRI BANERJI
 
Performance Based Regulation, Implementing an Asset Management Standards and ...
Performance Based Regulation, Implementing an Asset Management Standards and ...Performance Based Regulation, Implementing an Asset Management Standards and ...
Performance Based Regulation, Implementing an Asset Management Standards and ...HIMADRI BANERJI
 

Mais de HIMADRI BANERJI (18)

Workshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdfWorkshop on Plant Commissioning and Seamless Startup final.pdf
Workshop on Plant Commissioning and Seamless Startup final.pdf
 
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
Brochure on Two Day Workshop on Plant Commissioning and Seamless Start Up By ...
 
Gas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptxGas Turbines Failures Applications & Root Cause Analysis.pptx
Gas Turbines Failures Applications & Root Cause Analysis.pptx
 
Gas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdfGas Turbines O&M-Trainer Rev 01.pdf
Gas Turbines O&M-Trainer Rev 01.pdf
 
Making Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing ChangeMaking Artificial Intelligence Work in Managing Change
Making Artificial Intelligence Work in Managing Change
 
Case Studies IN Machine Learning
Case Studies IN Machine Learning Case Studies IN Machine Learning
Case Studies IN Machine Learning
 
Program Link to Workshop AI.pdf
Program Link to Workshop AI.pdfProgram Link to Workshop AI.pdf
Program Link to Workshop AI.pdf
 
Brochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdfBrochure for 2022 Webinar Dr.Himadri AI.pdf
Brochure for 2022 Webinar Dr.Himadri AI.pdf
 
FSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROLFSRU RISK MANAGEMENT AND CONTROL
FSRU RISK MANAGEMENT AND CONTROL
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics
 
Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal Liquefied Natural Gas project risk and appraisal
Liquefied Natural Gas project risk and appraisal
 
Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji Clean Coal Technology:Indian Perspective by Himadri Banerji
Clean Coal Technology:Indian Perspective by Himadri Banerji
 
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
Start Up and Commissioning of Supercritical Power Stations: Risk Management P...
 
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
Challenges in Building the 21st Century Energy infrastructure in a Low Carbon...
 
Geothermal Power for the Entrepreneur in India with EcoUrja
Geothermal Power for the Entrepreneur in India with EcoUrjaGeothermal Power for the Entrepreneur in India with EcoUrja
Geothermal Power for the Entrepreneur in India with EcoUrja
 
Commisioning of Supercritical Power Units: Risks to an EPC Contractor
Commisioning of Supercritical Power Units: Risks to an EPC ContractorCommisioning of Supercritical Power Units: Risks to an EPC Contractor
Commisioning of Supercritical Power Units: Risks to an EPC Contractor
 
Performance Based Regulation, Implementing an Asset Management Standards and ...
Performance Based Regulation, Implementing an Asset Management Standards and ...Performance Based Regulation, Implementing an Asset Management Standards and ...
Performance Based Regulation, Implementing an Asset Management Standards and ...
 
Cymi Ecourja
Cymi EcourjaCymi Ecourja
Cymi Ecourja
 

Último

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 

Último (20)

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 

NPP Risks

  • 1. • Risk assessment scenario and approaches for nuclear power ..Project Structuring • Challenges and issues in control and monitoring existing proposed reactor designs for project structuring • Consideration of high level uncertainties in the risk study of a nuclear power plant: Project Cost Risks • Small reactors and risk dispersion, Small Reactor Advantages Himadri Banerji, Former CEO, Reliance Energy – Chairman & Managing Director, EcoUrja, India Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 1
  • 2. Stakeholders in Nuclear Power Project Government - which is responsible for overall energy policy and, in some cases, financing Market - formed by electricity customers wanting electricity at a competitive price Utility (generator) - which is ultimately responsible for developing the complete project EPC contractors - engineering, procurement and construction companies which are responsible to the owner for delivery according to schedule and budget Vendors - which are responsible for supplying equipment and technology to either the owner, the EPC contractor or as part of a joint venture or consortium, according to schedule and budget Safety Authority - which is responsible for addressing all matters related to protecting public safety and the environment, from the design stage to plant operation and fuel management. Nuclear Power June 21st2nd Presented by Dr. Himadri Banerji Annual to 24th 2011 Singapore 2
  • 3. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 3
  • 4. Table 2: Risk control and monitoring in nuclear power projects Presented by Dr. Himadri Banerji 2nd Table 2 shows ways in which the risks of Annual Nuclear Powerbe monitored and controlled, to match Table 1. nuclear projects can June 21st to 24th 2011 Singapore 4
  • 5. In today’s global energy environment, nuclear power plant project (NPPP) managers need to consider many dimensions of risk in addition to nuclear safety-related risk. In order to stay competitive in modern energy markets, NPPP managers must integrate management of project, safety-related, and economic risks in an effective way. Project structuring is to achieve the most efficient application of capital and resources. Project risks must be assigned to the party most capable of handing their control. . Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 5
  • 6. This integrated risk management (RM) approach generates benefits that include the following: •Clearer criteria for decision making. • Making effective use of investments already made in probabilistic safety analysis (PSA) programs by applying these analyses to other areas and contexts. • Cost consciousness and innovation in achieving nuclear safety and production goals. • Communication improvement — more effective internal communication among all levels of the NPP operating organization, and clearer communication between the organization and its stakeholders. • Focus on safety — ensuring an integrated focus on safety, production, and economics during times of change in the energy environment Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 6
  • 7. COST INDEX SAFETY INDEX Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 7
  • 8. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 8
  • 9. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 9
  • 10. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 10
  • 11. Probabilistic Risk Assessment (PSA) Comprehensive, structured, and logical analysis method aimed at Identifying and assessing risks in complex technological systems for the purpose of Cost-effectively improving their safety and performance. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 11
  • 12. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 12
  • 13. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 13
  • 14. Contd from previous slide Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 14
  • 15. There are eight primary sources of nuclear costs which pose major project risks: The cost of the land upon which the nuclear power plant (NPP) is built. Costs related to designing the NPP Cost related to the materials from which the NPP is built. Labour costs related to manufacture and construction. The cost of obtaining regulatory approval AND PERMITS LIKE WATER ETC Investment related costs (interest, etc.) Transportation and Access related costs The cost of the electrical transmission system that connects the NPP to the grid Lost Opportunities for CombiningDr. Himadri Banerji Improving Efficiencies Presented by Cycles and 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 15
  • 16. The cost of the land upon which the nuclear power plant (NPP) is built Land related costs can be lowered if the investor already owns the land. In the case of NPPs, land costs can be lowered if the NPP is built on a pre-existing NPP site. Other, for example transportation related investments may not be required, and access to water is very likely to be available. NPPs can also be located on the site of obsolete coal fired power plants slated to be shut down for technological or environmental reasons. The same advantages of the NPP location would apply to the coal powered site, and additional facilities – for example the turbine hall, parking lots, administrative buildings, workshops, transformer farms, etc. - can potentially be recycled. The layout and size of an existing coal fired power plant may not be appropriate for adaptation for a large nuclear plant, but a cluster of small reactor approach would allow for far greater flexibility in facility layout, and would be far more easy to accommodate. 2nd Presented by Dr. Himadri Banerji Annual Nuclear Power June 21st to 24th 2011 Singapore 16
  • 17. Costs related to designing the NPP Small reactors, especially advanced technology small reactors, offer advancements in siting flexibility. For example, clusters of small reactors can be located in former salt mines. Serial production lowers design costs. Design costs are largely fixed. Design costs can be divided among all of the units produced. If one reactor of a particular design is produced, then the recovery of the cost of that design would be through sale of that unit. If hundreds of units are produced, the recovery of the design cost can be divided between all of the units. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 17
  • 18. Costs related to designing the NPP Clusters of Small Reactors Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 18
  • 19. Costs related to designing the NPP Finally, design simplification can lower nuclear costs. The Generation IV Molten Salt Reactor design offers revolutionary design simplification. In the Molten Salt Reactor the fuel is dissolved in the coolant. Thus much of the core structure is eliminated. Because the Molten Salt Reactor features a negative coefficient of reactivity, the reactor is highly stable without operator control input. Control rods can be partially or completely eliminated. These simple features lower manufacturing costs. And lessen manufacturing time. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 19
  • 20. Cost related to the materials from which the NPP is built The material input into a NPP per watt of output typically decreases as total reactor output rises. Traditionally this has lead to the economies of scales argument, which maintains that the larger the reactor output, the lower the per watt cost. There are, however, problems with this assessment. While it is true that larger size usually means lower material costs per unit of electrical output, there are exceptions to this rule, especially with respect to advanced nuclear technology. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 20
  • 21. Cost related to the materials from which the NPP is built For example: The greater thermal efficiency of a reactor of similar core size might lower output cost per unit of heat, compared to that of a similar sized, but less efficient design. Reactor safety issues may effect materials input. Light Water Reactor cores and heat exchanges operate under very high pressure. They require significant amounts of material to prevent steam explosions. LWR outer containment structures are typically massive, and thus require large Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 21
  • 22. Cost related to the materials from which the NPP is built A more compact reactor core may lower material requirements. Thus if two reactors have the same output, the one with the smaller core is likely to require fewer materials. Underground reactor siting could potentially lower reactor structural costs, by offering protection against terrorist attacks from aircraft and at surface levels with lower materials inputs. . Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 22
  • 23. Cost related to the materials from which the NPP is built Small generation components can lower material requirements. Thus supercritical carbon dioxide turbines are much smaller than steam turbines used in conventional reactors. Small turbines require fewer materials, and can be housed in smaller turbine halls, which in turn require less material and labour input to build. Thus a small advanced technology reactor with a compact core and high thermal efficiency, that operates at a one atmosphere pressure level, and can be sited underground might require fewer materials inputs per unit of electrical output than a much larger conventional reactor Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 23
  • 24. Reactor Design Lowers Manufacturing Costs In addition manufacturing costs can be lowered by simplifying reactor design. Passive safety features can in some instances lower nuclear costs. For example thermo-siphoning of reactor coolant, may save the cost of manufacturing and installing coolant pumps. Gravity feed emergency coolant systems save on manufacturing costs in several ways, They do not require backup generators or pumps, thus many of the expenses of older emergency coolant systems can be saved. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 24
  • 25. mPower Reactors from B&W The B&W mPower reactor, with its scalable, modular design, has the capacity to provide 125 MWe to 750 MWe or more for a 4.5-year operating cycle without refuelling, and is designed to produce clean, zero-emission operations. Babcock & Wilcox Nuclear Energy, Inc. will lead the development, licensing and delivery of B&W mPower reactor projects. Features of the B&W mPower reactor include: Integral nuclear system design Passive safety systems Underground containment 4.5-year operating cycle between refueling Scalable, modular design is flexible for local needs Multi-unit (1 to 10+) plant Used fuel stored in spent fuel pool for life of the reactor (60 years) Country shop-manufactured Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 25
  • 26. Labour costs related to manufacture and construction. Labour costs can be lowered by shifting work from the field to a factory. The more labor which can be performed in a factory, the lower the over all costs. Modular production is consistent with factory manufacture. Factory manufacture lowers labor costs in several ways. First serial production leads to the division of labor, which in turn typically increases labor productivity. The division of labor decreases the skill set required from individual workers. Decreased labor skill sets decrease labor wage expectations. Factory work settings, as opposed to field work settings also decrease wage expectations. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 26
  • 27. The cost of obtaining regulatory approval and permits like for water The current nuclear regulatory environment favour serial manufacture. Once an example of a particular nuclear design is approved by the NRC is approved, the approval of all subsequent reactors using the design is automatic. Environmental aspects of subsequent application, however, receive the same attention, since they vary from facility to facility. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 27
  • 28. The cost of obtaining regulatory approval and permits like for water In addition to NRC license requirements, other licenses or permits may be required. For example, the use of cooling water from rivers and lakes is not automatic, and usually requires regulatory approval. One of the advantages of recycling coal fired power plant sites, is that water access permits may already exist, and potentially can be transferred. But what if obtaining a water use permit is not possible? With small reactor designs air rather water cooling is practical, with relatively modest efficiency penalties. With efficient advanced reactors, the efficiency benefits may far outweigh the efficiency losses related to air cooling. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 28
  • 29. Investment related costs (interest, etc.) Interest accrues as nuclear power plant construction, and accrued interest may amount to a significant percentage of NPP capital costs, especially if the construction project stretches to half a decade or more. Small factory built reactors are expected to have shortened construction times, compared to large conventional reactors. Simplified advanced reactor designs are also expected to shorten NPP construction time. These shortening construction time can decrease the interest component of capital costs significantly. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 29
  • 30. Investment related costs (interest, etc.) Interest charges may reflect the market's assessment of project risks. The greater a projects assumed risk, the higher the interest premium the market will assess. By decreasing a project's size, and lowering projected manufacturing/construction time, nuclear project builders can offer the market lower perceived risks. Lower perceived risks, will lead to interest discounts compared to higher risk large nuclear projects. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 30
  • 31. Transportation and Access Related Costs Small, factory manufactured reactors offer advantages in transportation costs. Conventional reactors include a number of very large and heavy components, that present transportation challenges. Components such as pressure vessels and steam generators may require special and highly unusual transportation arrangements if they are transported overland. Special huge road transportation vehicles, some capable of moving no more than three miles an hour may disrupt highway uses in large areas over several weeks as they transported conventional reactor steam generators and pressure vessels to reactor sites. In contrast, small reactor cores may be moved by trucks or by rail as ordinary freight. In areas where water shortages represent acute problems, small reactor access to reliable water supplies is unnecessary. Air cooling will enable small reactors to operate with out a reliable water supply. Himadri Banerji 2nd Presented by Dr. Annual Nuclear Power June 21st to 24th 2011 Singapore 31
  • 32. The cost of the electrical transmission system that connects the NPP to the grid Small reactor clusters located at recycled coal fire power plant locations potentially have greatly simplified grid connections. Not only can they be located near to the cities they are intended to serve, but grid hook-up is facilitated by existing transformer farms, and grid connections. Because they can be located close to served cities new transmission lines will not cover long distances, thus lowering grid expansion costs. Large reactors may require new transmission lines that are hundreds of miles long, in order to move surplus electricity to market. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 32
  • 33. Small reactor clusters located at recycled coal fire power plant Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 33
  • 34. Lost Opportunities for Combining Cycles and Improving Efficiencies In addition to the above savings, and potential savings mentioned above there are other potential savings that may be available with small reactors. For example, with advanced nuclear technology, for example molten salt reactors, combined Rankine (steam) and Brayton (gas) cycles are possible. A bottoming desalinization cycle could be offered to the system, thus offering formidable efficiency from small reactor packages. A high temperature reactor can provide top cycle heat for industrial processes, as well as producing middle cycle electricity generation, and bottom cycle heat for electrical generation. By adding a second generating cycle, small reactors can lower their electrical generation costs. Desalination would add a further revenue stream from the reactors operation through the sale of portable water.Nuclear Power June 21st2nd Presented by Dr. Himadri Banerji Annual to 24th 2011 Singapore 34
  • 35. Benefits in Risk Management By shifting to Small Reactors Shifts from conventional nuclear technology, to some advanced nuclear technologies, also offer significant potential savings. ‘Some advanced technology savings are available to both large and small nuclear power plants, but the flexibility of small NPPs may mean that at least in certain situations Small advanced nuclear power plants may offer very significant potential savings in comparison to large conventional NPPs. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 35
  • 36. Status of Development of Small Reactors Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 36
  • 37. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 37
  • 38. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 38
  • 39. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 39
  • 40. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 40
  • 41. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 41
  • 42. Presented by Dr. Himadri Banerji 2nd Annual Nuclear Power June 21st to 24th 2011 Singapore 42