Now, More Than Ever…
 Even in “low-tech industries,” 95% of all capital
  projects have an IT component…
 50% of all capital spending is technology-related

                                                Where we need to
                                                     be…
                   IT is always in the
                           way
                        (again…)
    We are here…




                                         @RealGeneKim, genek@realgenekim.me
Comparison Of Turnover For CEOs and
    CFOs…
         When firms with IT-related material weaknesses are
          compared with the other two groups, there are some
          startling differences in executive turnover…
      N=184                  Material weakness                   Material weakness
      “Clean” vs.           (no IT related issues)             (with IT related issues)
      CEO                         2.0x higher                        8.0x higher*

      CFO                         1.7x higher                         3.6x higher

      CIO                         2.2x higher                         2.2x higher


            * These firms also 2.6 less likely to be profitable than “clean” firms

Source: Forthcoming Paper: Richardson, Masli, Watson, Zmud, Sarbanes-Oxley Information Technology
Material Weaknesses And The Disciplining Of The CEO, CFO And CIO
                                                         @RealGeneKim, genek@realgenekim.me
There’s a hidden gas, that we can’t see, taste,
touch, smell, and it’s killing CEOs everywhere.

                 It’s called IT.

   Or more precisely, unplanned work in IT.




                        6
                             @RealGeneKim, genek@realgenekim.me
it.fail() == business.fail()




                  @RealGeneKim, genek@realgenekim.me
Where Did The High Performers Come From?




                        @RealGeneKim, genek@realgenekim.me
Over Ten Years, We Benchmarked 1500+ IT
Orgs




                        @RealGeneKim, genek@realgenekim.me
High Performing IT Organizations
 High performers maintain a posture of compliance
    Fewest number of repeat audit findings
    One-third amount of audit preparation effort
 High performers find and fix security breaches faster
    5 times more likely to detect breaches by automated control
    5 times less likely to have breaches result in a loss event
 When high performers implement changes…
      14 times more changes
      One-half the change failure rate
      One-quarter the first fix failure rate
      10x faster MTTR for Sev 1 outages
 When high performers manage IT resources…
    One-third the amount of unplanned work
    8 times more projects and IT services
    6 times more applications
                                                            Source: IT Process Institute, 2008


                                            @RealGeneKim, genek@realgenekim.me
Tough Love From Ari Balogh




                       @RealGeneKim, genek@realgenekim.me
The Downward Spiral
 Operations Sees…                           Dev Sees…
    Too many fragile and insecure             More urgent, date-driven projects
     applications in production                 put into the queue
    Too much time required to restore         Even more fragile code (less
     service                                    secure) put into production
    Too much firefighting and unplanned       More releases have increasingly
     work                                       “turbulent installs”
    Planned project work cannot complete      Release cycles lengthen to
                                                amortize “cost of deployments”
    Frustrated customers leave
                                               Bigger deployment failures
    Market share goes down
                                               More time spent on firefighting
    Business misses Wall Street
     commitments                               Ever increasing backlog of work
                                                that cold help the business win
    Business makes even larger promises
     to Wall Street                            Ever increasing amount of
                                                tension between IT Ops,
                                                Development, Design…

                These aren’t ITSM or IT Operations problems…
                        These are business problems!
                                            @RealGeneKim, genek@realgenekim.me
My Mission
 Chronicle the Hero’s Journey For IT ("When IT
  Fails: A Business Novel”) so that everyone can
  gain a shared understanding of how and why IT
  fails, so they can fix it




                        13
                             @RealGeneKim, genek@realgenekim.me
14
     @RealGeneKim, genek@realgenekim.me
15
     @RealGeneKim, genek@realgenekim.me
16
     @RealGeneKim, genek@realgenekim.me
17
     @RealGeneKim, genek@realgenekim.me
18
     @RealGeneKim, genek@realgenekim.me
19
     @RealGeneKim, genek@realgenekim.me
The State Of The Business




                       @RealGeneKim, genek@realgenekim.me
Project Phoenix




                  @RealGeneKim, genek@realgenekim.me
Day 1: Payroll Outage




                        @RealGeneKim, genek@realgenekim.me
@RealGeneKim, genek@realgenekim.me
Day 2: PMO Meeting




                     @RealGeneKim, genek@realgenekim.me
@RealGeneKim, genek@realgenekim.me
Day 3: The SOX-404 Audit Meeting




                       @RealGeneKim, genek@realgenekim.me
@RealGeneKim, genek@realgenekim.me
@RealGeneKim, genek@realgenekim.me
@RealGeneKim, genek@realgenekim.me
@RealGeneKim, genek@realgenekim.me
My Mission: Figure Out How Break The IT Core
     Chronic Conflict

      Every IT organization is pressured to
       simultaneously:
        Respond more quickly to urgent business needs
        Provide stable, secure and predictable IT service




                   Words often used to describe process improvement:
        “hysterical, irrelevant, bureaucratic, bottleneck, difficult to understand, not
       aligned with the business, immature, shrill, perpetually focused on irrelevant
                                     technical minutiae…”



                            Source: The authors acknowledge Dr. Eliyahu Goldratt, creator of the Theory of Constraints and
                            author of The Goal, has written extensively on the theory and practice of identifying and resolving
                            core, chronic conflicts.
31
                                                                    @RealGeneKim, genek@realgenekim.me
2007: Three Controls Predict 60% Of
Performance

 To what extent does an organization define,
  monitor and enforce the following?
   Standardized configuration strategy
   Process discipline
   Controlled access to production systems




                                @RealGeneKim, genek@realgenekim.me
                                                 Source: IT Process Institute, 2008
Visible Ops: Playbook of High Performers

 The IT Process Institute has
  been studying high-performing
  organizations since 1999
   What is common to all the high
    performers?
   What is different between them
    and average and low
    performers?
   How did they become great?
 Answers have been codified in
  the Visible Ops Methodology


                                                   www.ITPI.org
                                @RealGeneKim, genek@realgenekim.me
Visible Ops Security: Linking Security and IT
      Operations Objectives In 4 Practical Steps
                                                             Service Design & Management
                                       Security Management           Service Level Management         Capacity Management
                                     Availability & Contingency          Service Reporting            Financial Management
                                            Management
                                                                      Control Processes                                           Phase 2
                                                                  Asset & Configuration Management
  Phase 3                             Release Processes                 Change Management
                                                                                                     Supplier Processes
                                                                                                                                 Catch and
  Establish                             Release Management
                                                                   Resolution Processes               Customer Relationship     release, find
                                                                       Incident Management                Management
 repeatable                                                            Problem Management             Supplier Management     fragile artifacts
 build library                                                           Automation



                                                                      Phase 1
                                                                  Electrify fence,
               Phase 4                                              modify first
          Continually improve                                        response




Sources: ITPI Visible Ops & IT Infrastructure Library (ITIL) / BS 15000
                                                                                                 @RealGeneKim, genek@realgenekim.me
Source: John Allspaw
                       @RealGeneKim, genek@realgenekim.me
Source: John Allspaw
                       @RealGeneKim, genek@realgenekim.me
The First Way:
Systems Thinking




                   @RealGeneKim, genek@realgenekim.me
The First Way:
Systems Thinking



(Business)                             (Customer)




                   @RealGeneKim, genek@realgenekim.me
The Second Way:
Amplify Feedback Loops




                         @RealGeneKim, genek@realgenekim.me
The Third Way:
Culture Of Continual Experimentation And
Learning




                         @RealGeneKim, genek@realgenekim.me
Good News: It Can Be Done

Bad News: You Can’t Do It Alone




                         @RealGeneKim, genek@realgenekim.me
Ops




      @RealGeneKim, genek@realgenekim.me
QA And Test




 Source: Flickr: vandyll
                           @RealGeneKim, genek@realgenekim.me
Development




              @RealGeneKim, genek@realgenekim.me
Process And Controls




                       @RealGeneKim, genek@realgenekim.me
Product Management And Design




 Source: Flickr: birdsandanchors
                                   @RealGeneKim, genek@realgenekim.me
What Does Transformation Feel Like?




                  47
                       @RealGeneKim, genek@realgenekim.me
Find What’s Most Important First




                        @RealGeneKim, genek@realgenekim.me
Quickly Find What Is Different…




                        @RealGeneKim, genek@realgenekim.me
Before Something Bad Happens…




                     @RealGeneKim, genek@realgenekim.me
Find Risk Early…




                   @RealGeneKim, genek@realgenekim.me
Communicate It Effectively To Peers…




                       @RealGeneKim, genek@realgenekim.me
Hold People Accountable…




                      @RealGeneKim, genek@realgenekim.me
Based On Objective Evidence…




                      @RealGeneKim, genek@realgenekim.me
Answer Important Questions…




                      @RealGeneKim, genek@realgenekim.me
Recognize Compounding Technical Debt…




                      @RealGeneKim, genek@realgenekim.me
That Gets Worse…




                   @RealGeneKim, genek@realgenekim.me
And Fixing It…




 Source: Pingdom
                   @RealGeneKim, genek@realgenekim.me
Have What We Need, When We Need It…




                     @RealGeneKim, genek@realgenekim.me
Big Things Get Done Quickly…




                         @RealGeneKim, genek@realgenekim.me
Ever Increasing Situational Mastery…




                        @RealGeneKim, genek@realgenekim.me
Help The Business Win…




                         @RealGeneKim, genek@realgenekim.me
With Support From Your Peers…




                      @RealGeneKim, genek@realgenekim.me
And Do More With Less Effort…




                       @RealGeneKim, genek@realgenekim.me
This Is An Important Problem
 Operations Sees…                            Dev Sees…
  Fragile applications are prone to          More urgent, date-driven projects
   failure                                     put into the queue
  Long time required to figure out “which    Even more fragile code (less
   bit got flipped”                            secure) put into production
  Detective control is a salesperson         More releases have increasingly
                                               “turbulent installs”
  Too much time required to restore
   service                                    Release cycles lengthen to
                                               amortize “cost of deployments”
  Too much firefighting and unplanned
   work                                       Failing bigger deployments more
                                               difficult to diagnose
  Urgent security rework and
   remediation                                Most senior and constrained IT
                                               ops resources have less time to
  Planned project work cannot complete        fix underlying process problems
  Frustrated customers leave                 Ever increasing backlog of work
  Market share goes down                      that cold help the business win
  Business misses Wall Street                Ever increasing amount of
   commitments                                 tension between IT Ops,
                                               Development, Design…
  Business makes even larger promises
   to Wall Street


                                              @RealGeneKim, genek@realgenekim.me
66
     @RealGeneKim, genek@realgenekim.me
@RealGeneKim, genek@realgenekim.me
When IT Fails: A Business Novel and
  The DevOps Cookbook


                               Coming in Winter 2012/2013


                               “In the tradition of the best MBA case studies, this
                                book should be mandatory reading for business
                                and IT graduates alike.”
                                Paul Muller, VP Software Marketing, Hewlett-
                                Packard


Gene Kim, Tripwire founder,
                               “The greatest IT management book of our
Visible Ops co-author           generation.”
                                Branden Williams, CTO Marketing, RSA




                                                  @RealGeneKim, genek@realgenekim.me
When IT Fails: The Novel and The DevOps
  Cookbook

                               Our mission is to positively affect the
                                lives of 1 million IT workers by 2017

                               If you would like the novel excerpts, “Top
                                10 Things You Needs To Know About
                                DevOps,” and updates on the book:

                                  Sign up at http://itrevolution.com
Gene Kim, Tripwire founder,
Visible Ops co-author             Email genek@realgenekim.me
                                  Hand me a business card




                                                 @RealGeneKim, genek@realgenekim.me
If you’d like the slides from today’s
presentation…

                     Text your first name, email
                      address and “68383” to:
                          +1 (858) 598-3980

                     Or visit:
                      http://www.instantcustomer.c
                      om/go/68383

                     Or scan this QR Code:



                       70
                            @RealGeneKim, genek@realgenekim.me

More Related Content

What's hot

Winnipeg ISACA Security is Dead, Rugged DevOps
Winnipeg ISACA Security is Dead, Rugged DevOpsWinnipeg ISACA Security is Dead, Rugged DevOps
Winnipeg ISACA Security is Dead, Rugged DevOpsGene Kim
 
When IT Fails: A Business Novel - ITSM Academy Webinar
When IT Fails: A Business Novel - ITSM Academy WebinarWhen IT Fails: A Business Novel - ITSM Academy Webinar
When IT Fails: A Business Novel - ITSM Academy WebinarITSM Academy, Inc.
 
2011 06 15 velocity conf from visible ops to dev ops final
2011 06 15 velocity conf   from visible ops to dev ops final2011 06 15 velocity conf   from visible ops to dev ops final
2011 06 15 velocity conf from visible ops to dev ops finalGene Kim
 
Leading A DevOps Transformation: Lessons Learned
Leading A DevOps Transformation: Lessons LearnedLeading A DevOps Transformation: Lessons Learned
Leading A DevOps Transformation: Lessons LearnedGene Kim
 
How Can We Better Sell DevOps?
How Can We Better Sell DevOps?How Can We Better Sell DevOps?
How Can We Better Sell DevOps?Gene Kim
 
DevOps Kanban Meet Up 3/22/12
DevOps Kanban Meet Up 3/22/12DevOps Kanban Meet Up 3/22/12
DevOps Kanban Meet Up 3/22/12Gene Kim
 
Keeping The Auditor Away: DevOps Audit Compliance Case Studies
Keeping The Auditor Away: DevOps Audit Compliance Case StudiesKeeping The Auditor Away: DevOps Audit Compliance Case Studies
Keeping The Auditor Away: DevOps Audit Compliance Case StudiesGene Kim
 
2013 Velocity DevOps Metrics -- It's Not Just For WebOps Any More!
2013 Velocity DevOps Metrics -- It's Not Just For WebOps Any More!2013 Velocity DevOps Metrics -- It's Not Just For WebOps Any More!
2013 Velocity DevOps Metrics -- It's Not Just For WebOps Any More!Gene Kim
 
2014 State Of DevOps Findings! Velocity Conference
2014 State Of DevOps Findings! Velocity Conference2014 State Of DevOps Findings! Velocity Conference
2014 State Of DevOps Findings! Velocity ConferenceGene Kim
 
2019 12 Clojure/conj: Love Letter To Clojure, and A Datomic Experience Report
2019 12 Clojure/conj: Love Letter To Clojure, and A Datomic Experience Report2019 12 Clojure/conj: Love Letter To Clojure, and A Datomic Experience Report
2019 12 Clojure/conj: Love Letter To Clojure, and A Datomic Experience ReportGene Kim
 
DevOps: Who Will Create $2.6 Trillion In Business Value Per Year?
DevOps: Who Will Create $2.6 Trillion In Business Value Per Year?DevOps: Who Will Create $2.6 Trillion In Business Value Per Year?
DevOps: Who Will Create $2.6 Trillion In Business Value Per Year?Gene Kim
 
2012 SxSW When IT Says No by Gene Kim
2012 SxSW When IT Says No by Gene Kim2012 SxSW When IT Says No by Gene Kim
2012 SxSW When IT Says No by Gene KimGene Kim
 
GitHub Universe: 2019: Exemplars, Laggards, and Hoarders A Data-driven Look a...
GitHub Universe: 2019: Exemplars, Laggards, and Hoarders A Data-driven Look a...GitHub Universe: 2019: Exemplars, Laggards, and Hoarders A Data-driven Look a...
GitHub Universe: 2019: Exemplars, Laggards, and Hoarders A Data-driven Look a...Gene Kim
 
SecureWorld: Security is Dead, Rugged DevOps 1f
SecureWorld:  Security is Dead, Rugged DevOps 1fSecureWorld:  Security is Dead, Rugged DevOps 1f
SecureWorld: Security is Dead, Rugged DevOps 1fGene Kim
 
DevOps State of the Union 2015
DevOps State of the Union 2015DevOps State of the Union 2015
DevOps State of the Union 2015Ernest Mueller
 
2012 Velocity London: DevOps Patterns Distilled
2012 Velocity London: DevOps Patterns Distilled2012 Velocity London: DevOps Patterns Distilled
2012 Velocity London: DevOps Patterns DistilledGene Kim
 
Tui the phoenix project book review
Tui the phoenix project book reviewTui the phoenix project book review
Tui the phoenix project book reviewRudiger Wolf
 
The Unicorn Project and The Five Ideals (Updated Dec 2019)
The Unicorn Project and The Five Ideals (Updated Dec 2019)The Unicorn Project and The Five Ideals (Updated Dec 2019)
The Unicorn Project and The Five Ideals (Updated Dec 2019)Gene Kim
 
The Unicorn Project and The Five Ideals (older: see notes for newer version)
The Unicorn Project and The Five Ideals (older: see notes for newer version)The Unicorn Project and The Five Ideals (older: see notes for newer version)
The Unicorn Project and The Five Ideals (older: see notes for newer version)Gene Kim
 

What's hot (20)

Winnipeg ISACA Security is Dead, Rugged DevOps
Winnipeg ISACA Security is Dead, Rugged DevOpsWinnipeg ISACA Security is Dead, Rugged DevOps
Winnipeg ISACA Security is Dead, Rugged DevOps
 
When IT Fails: A Business Novel - ITSM Academy Webinar
When IT Fails: A Business Novel - ITSM Academy WebinarWhen IT Fails: A Business Novel - ITSM Academy Webinar
When IT Fails: A Business Novel - ITSM Academy Webinar
 
2011 06 15 velocity conf from visible ops to dev ops final
2011 06 15 velocity conf   from visible ops to dev ops final2011 06 15 velocity conf   from visible ops to dev ops final
2011 06 15 velocity conf from visible ops to dev ops final
 
Leading A DevOps Transformation: Lessons Learned
Leading A DevOps Transformation: Lessons LearnedLeading A DevOps Transformation: Lessons Learned
Leading A DevOps Transformation: Lessons Learned
 
How Can We Better Sell DevOps?
How Can We Better Sell DevOps?How Can We Better Sell DevOps?
How Can We Better Sell DevOps?
 
DevOps Kanban Meet Up 3/22/12
DevOps Kanban Meet Up 3/22/12DevOps Kanban Meet Up 3/22/12
DevOps Kanban Meet Up 3/22/12
 
Keeping The Auditor Away: DevOps Audit Compliance Case Studies
Keeping The Auditor Away: DevOps Audit Compliance Case StudiesKeeping The Auditor Away: DevOps Audit Compliance Case Studies
Keeping The Auditor Away: DevOps Audit Compliance Case Studies
 
2013 Velocity DevOps Metrics -- It's Not Just For WebOps Any More!
2013 Velocity DevOps Metrics -- It's Not Just For WebOps Any More!2013 Velocity DevOps Metrics -- It's Not Just For WebOps Any More!
2013 Velocity DevOps Metrics -- It's Not Just For WebOps Any More!
 
2014 State Of DevOps Findings! Velocity Conference
2014 State Of DevOps Findings! Velocity Conference2014 State Of DevOps Findings! Velocity Conference
2014 State Of DevOps Findings! Velocity Conference
 
2019 12 Clojure/conj: Love Letter To Clojure, and A Datomic Experience Report
2019 12 Clojure/conj: Love Letter To Clojure, and A Datomic Experience Report2019 12 Clojure/conj: Love Letter To Clojure, and A Datomic Experience Report
2019 12 Clojure/conj: Love Letter To Clojure, and A Datomic Experience Report
 
DevOps: Who Will Create $2.6 Trillion In Business Value Per Year?
DevOps: Who Will Create $2.6 Trillion In Business Value Per Year?DevOps: Who Will Create $2.6 Trillion In Business Value Per Year?
DevOps: Who Will Create $2.6 Trillion In Business Value Per Year?
 
2012 SxSW When IT Says No by Gene Kim
2012 SxSW When IT Says No by Gene Kim2012 SxSW When IT Says No by Gene Kim
2012 SxSW When IT Says No by Gene Kim
 
GitHub Universe: 2019: Exemplars, Laggards, and Hoarders A Data-driven Look a...
GitHub Universe: 2019: Exemplars, Laggards, and Hoarders A Data-driven Look a...GitHub Universe: 2019: Exemplars, Laggards, and Hoarders A Data-driven Look a...
GitHub Universe: 2019: Exemplars, Laggards, and Hoarders A Data-driven Look a...
 
SecureWorld: Security is Dead, Rugged DevOps 1f
SecureWorld:  Security is Dead, Rugged DevOps 1fSecureWorld:  Security is Dead, Rugged DevOps 1f
SecureWorld: Security is Dead, Rugged DevOps 1f
 
DevOps and Audit
DevOps and AuditDevOps and Audit
DevOps and Audit
 
DevOps State of the Union 2015
DevOps State of the Union 2015DevOps State of the Union 2015
DevOps State of the Union 2015
 
2012 Velocity London: DevOps Patterns Distilled
2012 Velocity London: DevOps Patterns Distilled2012 Velocity London: DevOps Patterns Distilled
2012 Velocity London: DevOps Patterns Distilled
 
Tui the phoenix project book review
Tui the phoenix project book reviewTui the phoenix project book review
Tui the phoenix project book review
 
The Unicorn Project and The Five Ideals (Updated Dec 2019)
The Unicorn Project and The Five Ideals (Updated Dec 2019)The Unicorn Project and The Five Ideals (Updated Dec 2019)
The Unicorn Project and The Five Ideals (Updated Dec 2019)
 
The Unicorn Project and The Five Ideals (older: see notes for newer version)
The Unicorn Project and The Five Ideals (older: see notes for newer version)The Unicorn Project and The Five Ideals (older: see notes for newer version)
The Unicorn Project and The Five Ideals (older: see notes for newer version)
 

Viewers also liked

Faculty instructional technology
Faculty instructional technologyFaculty instructional technology
Faculty instructional technologyPatricia Hetu
 
Itpi metricon 0906a final
Itpi metricon 0906a finalItpi metricon 0906a final
Itpi metricon 0906a finalGene Kim
 
Transpaz 010710 pintor americano contemporaneo
Transpaz 010710 pintor americano contemporaneoTranspaz 010710 pintor americano contemporaneo
Transpaz 010710 pintor americano contemporaneoASHENRIQUES
 
Equipo 3 tema 3 diseño y planeación de estrategia corporativa
Equipo 3 tema 3 diseño y planeación de estrategia corporativaEquipo 3 tema 3 diseño y planeación de estrategia corporativa
Equipo 3 tema 3 diseño y planeación de estrategia corporativaJose Manuel de la Cruz Castro
 
GAIT value network 2005 06
GAIT value network 2005 06GAIT value network 2005 06
GAIT value network 2005 06Gene Kim
 
Bailey advertisement
Bailey advertisementBailey advertisement
Bailey advertisementbbkett
 
секреты научного текста
секреты научного текстасекреты научного текста
секреты научного текстаekaterina7
 
Message#4 for ICF Conference 2012 campaign
Message#4 for ICF Conference 2012 campaignMessage#4 for ICF Conference 2012 campaign
Message#4 for ICF Conference 2012 campaignPaul Dumitru
 
Mecanismes de transmissio circular
Mecanismes de transmissio circularMecanismes de transmissio circular
Mecanismes de transmissio circularSusana Valls Andreu
 
2일차 20140402
2일차 201404022일차 20140402
2일차 20140402Jake Yoon
 
G+ Summer C Study 20130716(6일차)
G+ Summer C Study 20130716(6일차)G+ Summer C Study 20130716(6일차)
G+ Summer C Study 20130716(6일차)Jake Yoon
 
United2012 Rugged DevOps Rocks
United2012 Rugged DevOps RocksUnited2012 Rugged DevOps Rocks
United2012 Rugged DevOps RocksGene Kim
 

Viewers also liked (19)

Análisis de pareto
Análisis de paretoAnálisis de pareto
Análisis de pareto
 
Faculty instructional technology
Faculty instructional technologyFaculty instructional technology
Faculty instructional technology
 
Itpi metricon 0906a final
Itpi metricon 0906a finalItpi metricon 0906a final
Itpi metricon 0906a final
 
1872 6291-1-pb
1872 6291-1-pb1872 6291-1-pb
1872 6291-1-pb
 
Transpaz 010710 pintor americano contemporaneo
Transpaz 010710 pintor americano contemporaneoTranspaz 010710 pintor americano contemporaneo
Transpaz 010710 pintor americano contemporaneo
 
아이애드
아이애드아이애드
아이애드
 
Equipo 3 tema 3 diseño y planeación de estrategia corporativa
Equipo 3 tema 3 diseño y planeación de estrategia corporativaEquipo 3 tema 3 diseño y planeación de estrategia corporativa
Equipo 3 tema 3 diseño y planeación de estrategia corporativa
 
GAIT value network 2005 06
GAIT value network 2005 06GAIT value network 2005 06
GAIT value network 2005 06
 
Bailey advertisement
Bailey advertisementBailey advertisement
Bailey advertisement
 
Kisah nanokarbon
Kisah nanokarbonKisah nanokarbon
Kisah nanokarbon
 
секреты научного текста
секреты научного текстасекреты научного текста
секреты научного текста
 
Message#4 for ICF Conference 2012 campaign
Message#4 for ICF Conference 2012 campaignMessage#4 for ICF Conference 2012 campaign
Message#4 for ICF Conference 2012 campaign
 
MuBu MCG June 2010
MuBu MCG June 2010MuBu MCG June 2010
MuBu MCG June 2010
 
Problemasdolor
ProblemasdolorProblemasdolor
Problemasdolor
 
Mecanismes de transmissio circular
Mecanismes de transmissio circularMecanismes de transmissio circular
Mecanismes de transmissio circular
 
2일차 20140402
2일차 201404022일차 20140402
2일차 20140402
 
G+ Summer C Study 20130716(6일차)
G+ Summer C Study 20130716(6일차)G+ Summer C Study 20130716(6일차)
G+ Summer C Study 20130716(6일차)
 
United2012 Rugged DevOps Rocks
United2012 Rugged DevOps RocksUnited2012 Rugged DevOps Rocks
United2012 Rugged DevOps Rocks
 
Exposición proyecto Ensilaje de Maiz
Exposición proyecto Ensilaje de MaizExposición proyecto Ensilaje de Maiz
Exposición proyecto Ensilaje de Maiz
 

Similar to When IT Fails The Business Fails...

2011 09 18 United "Platitudes, reality and promise"
2011 09 18 United "Platitudes, reality and promise"2011 09 18 United "Platitudes, reality and promise"
2011 09 18 United "Platitudes, reality and promise"Gene Kim
 
How Do We Better Sell DevOps? - PuppetConf 2013
How Do We Better Sell DevOps? - PuppetConf 2013How Do We Better Sell DevOps? - PuppetConf 2013
How Do We Better Sell DevOps? - PuppetConf 2013Puppet
 
2011 09 19 LSPE Dev Ops Cookbook 1a
2011 09 19 LSPE Dev Ops Cookbook 1a2011 09 19 LSPE Dev Ops Cookbook 1a
2011 09 19 LSPE Dev Ops Cookbook 1aGene Kim
 
2011 03 14 dev ops meetup - top lessons creating dev-ops super-tribes 2b
2011 03 14   dev ops meetup - top lessons creating dev-ops super-tribes 2b2011 03 14   dev ops meetup - top lessons creating dev-ops super-tribes 2b
2011 03 14 dev ops meetup - top lessons creating dev-ops super-tribes 2bGene Kim
 
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...Kathy (Kat) Mandelstein
 
121211 depfac ulb_master_presentation_v5_1
121211 depfac ulb_master_presentation_v5_1121211 depfac ulb_master_presentation_v5_1
121211 depfac ulb_master_presentation_v5_1Thibaut De Vylder
 
Requirements Capabilities, Alignment, and Software Success - Kappelman ASEE 2015
Requirements Capabilities, Alignment, and Software Success - Kappelman ASEE 2015Requirements Capabilities, Alignment, and Software Success - Kappelman ASEE 2015
Requirements Capabilities, Alignment, and Software Success - Kappelman ASEE 2015Leon Kappelman
 
Relating Enterprise Strategy
Relating Enterprise StrategyRelating Enterprise Strategy
Relating Enterprise StrategyToby_Vivek
 
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...SilverStormSolutions
 
Cloud scars: Lessons from the Enterprise Pioneers
Cloud scars: Lessons from the Enterprise PioneersCloud scars: Lessons from the Enterprise Pioneers
Cloud scars: Lessons from the Enterprise PioneersServiceMesh
 
Cloud Scars: Lessons from the Enterprise Pioneers
Cloud Scars: Lessons from the Enterprise PioneersCloud Scars: Lessons from the Enterprise Pioneers
Cloud Scars: Lessons from the Enterprise PioneersDave Roberts
 
My Top Five DevOps Learnings
My Top Five DevOps LearningsMy Top Five DevOps Learnings
My Top Five DevOps LearningsPredix
 
Why is project management so hard?
Why is project management so hard?Why is project management so hard?
Why is project management so hard?Glen Alleman
 
2010 06 gartner avoiding audit fatigue in nine steps 1d
2010 06 gartner   avoiding audit fatigue in nine steps 1d2010 06 gartner   avoiding audit fatigue in nine steps 1d
2010 06 gartner avoiding audit fatigue in nine steps 1dGene Kim
 
Change data capture
Change data captureChange data capture
Change data captureJames Deppen
 
Smarter Analytics giver dig indsigt i hele forretningen, Rich Holada, IBM US
Smarter Analytics giver dig indsigt i hele forretningen, Rich Holada, IBM USSmarter Analytics giver dig indsigt i hele forretningen, Rich Holada, IBM US
Smarter Analytics giver dig indsigt i hele forretningen, Rich Holada, IBM USIBM Danmark
 
3 Reasons Why IT puts Us at Risk by Phil Godwin
3 Reasons Why IT puts Us at Risk by Phil Godwin3 Reasons Why IT puts Us at Risk by Phil Godwin
3 Reasons Why IT puts Us at Risk by Phil GodwinClear Technologies
 
ITSM Conference, Dubai, UAE 2009
ITSM Conference, Dubai, UAE   2009ITSM Conference, Dubai, UAE   2009
ITSM Conference, Dubai, UAE 2009Tariq Elsadik
 
Presentation Business Agility On Ms Platform
Presentation Business Agility On Ms PlatformPresentation Business Agility On Ms Platform
Presentation Business Agility On Ms PlatformRene van Ommen
 
Indranil Guha - It transformation challenges & choices...
Indranil Guha - It transformation challenges & choices...Indranil Guha - It transformation challenges & choices...
Indranil Guha - It transformation challenges & choices...Global Business Events
 

Similar to When IT Fails The Business Fails... (20)

2011 09 18 United "Platitudes, reality and promise"
2011 09 18 United "Platitudes, reality and promise"2011 09 18 United "Platitudes, reality and promise"
2011 09 18 United "Platitudes, reality and promise"
 
How Do We Better Sell DevOps? - PuppetConf 2013
How Do We Better Sell DevOps? - PuppetConf 2013How Do We Better Sell DevOps? - PuppetConf 2013
How Do We Better Sell DevOps? - PuppetConf 2013
 
2011 09 19 LSPE Dev Ops Cookbook 1a
2011 09 19 LSPE Dev Ops Cookbook 1a2011 09 19 LSPE Dev Ops Cookbook 1a
2011 09 19 LSPE Dev Ops Cookbook 1a
 
2011 03 14 dev ops meetup - top lessons creating dev-ops super-tribes 2b
2011 03 14   dev ops meetup - top lessons creating dev-ops super-tribes 2b2011 03 14   dev ops meetup - top lessons creating dev-ops super-tribes 2b
2011 03 14 dev ops meetup - top lessons creating dev-ops super-tribes 2b
 
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
IBM Rational Software Conference 2009: Enterprise Architecture Management Tra...
 
121211 depfac ulb_master_presentation_v5_1
121211 depfac ulb_master_presentation_v5_1121211 depfac ulb_master_presentation_v5_1
121211 depfac ulb_master_presentation_v5_1
 
Requirements Capabilities, Alignment, and Software Success - Kappelman ASEE 2015
Requirements Capabilities, Alignment, and Software Success - Kappelman ASEE 2015Requirements Capabilities, Alignment, and Software Success - Kappelman ASEE 2015
Requirements Capabilities, Alignment, and Software Success - Kappelman ASEE 2015
 
Relating Enterprise Strategy
Relating Enterprise StrategyRelating Enterprise Strategy
Relating Enterprise Strategy
 
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
SilverStorm "Credibility and Collaboration to achieve excellence in IT Govern...
 
Cloud scars: Lessons from the Enterprise Pioneers
Cloud scars: Lessons from the Enterprise PioneersCloud scars: Lessons from the Enterprise Pioneers
Cloud scars: Lessons from the Enterprise Pioneers
 
Cloud Scars: Lessons from the Enterprise Pioneers
Cloud Scars: Lessons from the Enterprise PioneersCloud Scars: Lessons from the Enterprise Pioneers
Cloud Scars: Lessons from the Enterprise Pioneers
 
My Top Five DevOps Learnings
My Top Five DevOps LearningsMy Top Five DevOps Learnings
My Top Five DevOps Learnings
 
Why is project management so hard?
Why is project management so hard?Why is project management so hard?
Why is project management so hard?
 
2010 06 gartner avoiding audit fatigue in nine steps 1d
2010 06 gartner   avoiding audit fatigue in nine steps 1d2010 06 gartner   avoiding audit fatigue in nine steps 1d
2010 06 gartner avoiding audit fatigue in nine steps 1d
 
Change data capture
Change data captureChange data capture
Change data capture
 
Smarter Analytics giver dig indsigt i hele forretningen, Rich Holada, IBM US
Smarter Analytics giver dig indsigt i hele forretningen, Rich Holada, IBM USSmarter Analytics giver dig indsigt i hele forretningen, Rich Holada, IBM US
Smarter Analytics giver dig indsigt i hele forretningen, Rich Holada, IBM US
 
3 Reasons Why IT puts Us at Risk by Phil Godwin
3 Reasons Why IT puts Us at Risk by Phil Godwin3 Reasons Why IT puts Us at Risk by Phil Godwin
3 Reasons Why IT puts Us at Risk by Phil Godwin
 
ITSM Conference, Dubai, UAE 2009
ITSM Conference, Dubai, UAE   2009ITSM Conference, Dubai, UAE   2009
ITSM Conference, Dubai, UAE 2009
 
Presentation Business Agility On Ms Platform
Presentation Business Agility On Ms PlatformPresentation Business Agility On Ms Platform
Presentation Business Agility On Ms Platform
 
Indranil Guha - It transformation challenges & choices...
Indranil Guha - It transformation challenges & choices...Indranil Guha - It transformation challenges & choices...
Indranil Guha - It transformation challenges & choices...
 

Recently uploaded

business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Associazione Digital Days
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 

Recently uploaded (20)

business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
Lucia Ferretti, Lead Business Designer; Matteo Meschini, Business Designer @T...
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 

When IT Fails The Business Fails...

  • 1. When IT Fails… The Business Fails… Gene Kim Author, Visible Ops Handbook ProKarma Seminar August 20, 2012 Session ID: @RealGeneKim, genek@realgenekim.me
  • 3. Now, More Than Ever…  Even in “low-tech industries,” 95% of all capital projects have an IT component…  50% of all capital spending is technology-related Where we need to be… IT is always in the way (again…) We are here… @RealGeneKim, genek@realgenekim.me
  • 4. Comparison Of Turnover For CEOs and CFOs…  When firms with IT-related material weaknesses are compared with the other two groups, there are some startling differences in executive turnover… N=184 Material weakness Material weakness “Clean” vs. (no IT related issues) (with IT related issues) CEO 2.0x higher 8.0x higher* CFO 1.7x higher 3.6x higher CIO 2.2x higher 2.2x higher * These firms also 2.6 less likely to be profitable than “clean” firms Source: Forthcoming Paper: Richardson, Masli, Watson, Zmud, Sarbanes-Oxley Information Technology Material Weaknesses And The Disciplining Of The CEO, CFO And CIO @RealGeneKim, genek@realgenekim.me
  • 5. There’s a hidden gas, that we can’t see, taste, touch, smell, and it’s killing CEOs everywhere. It’s called IT. Or more precisely, unplanned work in IT. 6 @RealGeneKim, genek@realgenekim.me
  • 6. it.fail() == business.fail() @RealGeneKim, genek@realgenekim.me
  • 7. Where Did The High Performers Come From? @RealGeneKim, genek@realgenekim.me
  • 8. Over Ten Years, We Benchmarked 1500+ IT Orgs @RealGeneKim, genek@realgenekim.me
  • 9. High Performing IT Organizations  High performers maintain a posture of compliance  Fewest number of repeat audit findings  One-third amount of audit preparation effort  High performers find and fix security breaches faster  5 times more likely to detect breaches by automated control  5 times less likely to have breaches result in a loss event  When high performers implement changes…  14 times more changes  One-half the change failure rate  One-quarter the first fix failure rate  10x faster MTTR for Sev 1 outages  When high performers manage IT resources…  One-third the amount of unplanned work  8 times more projects and IT services  6 times more applications Source: IT Process Institute, 2008 @RealGeneKim, genek@realgenekim.me
  • 10. Tough Love From Ari Balogh @RealGeneKim, genek@realgenekim.me
  • 11. The Downward Spiral Operations Sees… Dev Sees…  Too many fragile and insecure  More urgent, date-driven projects applications in production put into the queue  Too much time required to restore  Even more fragile code (less service secure) put into production  Too much firefighting and unplanned  More releases have increasingly work “turbulent installs”  Planned project work cannot complete  Release cycles lengthen to amortize “cost of deployments”  Frustrated customers leave  Bigger deployment failures  Market share goes down  More time spent on firefighting  Business misses Wall Street commitments  Ever increasing backlog of work that cold help the business win  Business makes even larger promises to Wall Street  Ever increasing amount of tension between IT Ops, Development, Design… These aren’t ITSM or IT Operations problems… These are business problems! @RealGeneKim, genek@realgenekim.me
  • 12. My Mission  Chronicle the Hero’s Journey For IT ("When IT Fails: A Business Novel”) so that everyone can gain a shared understanding of how and why IT fails, so they can fix it 13 @RealGeneKim, genek@realgenekim.me
  • 13. 14 @RealGeneKim, genek@realgenekim.me
  • 14. 15 @RealGeneKim, genek@realgenekim.me
  • 15. 16 @RealGeneKim, genek@realgenekim.me
  • 16. 17 @RealGeneKim, genek@realgenekim.me
  • 17. 18 @RealGeneKim, genek@realgenekim.me
  • 18. 19 @RealGeneKim, genek@realgenekim.me
  • 19. The State Of The Business @RealGeneKim, genek@realgenekim.me
  • 20. Project Phoenix @RealGeneKim, genek@realgenekim.me
  • 21. Day 1: Payroll Outage @RealGeneKim, genek@realgenekim.me
  • 23. Day 2: PMO Meeting @RealGeneKim, genek@realgenekim.me
  • 25. Day 3: The SOX-404 Audit Meeting @RealGeneKim, genek@realgenekim.me
  • 30. My Mission: Figure Out How Break The IT Core Chronic Conflict  Every IT organization is pressured to simultaneously:  Respond more quickly to urgent business needs  Provide stable, secure and predictable IT service Words often used to describe process improvement: “hysterical, irrelevant, bureaucratic, bottleneck, difficult to understand, not aligned with the business, immature, shrill, perpetually focused on irrelevant technical minutiae…” Source: The authors acknowledge Dr. Eliyahu Goldratt, creator of the Theory of Constraints and author of The Goal, has written extensively on the theory and practice of identifying and resolving core, chronic conflicts. 31 @RealGeneKim, genek@realgenekim.me
  • 31. 2007: Three Controls Predict 60% Of Performance  To what extent does an organization define, monitor and enforce the following?  Standardized configuration strategy  Process discipline  Controlled access to production systems @RealGeneKim, genek@realgenekim.me Source: IT Process Institute, 2008
  • 32. Visible Ops: Playbook of High Performers  The IT Process Institute has been studying high-performing organizations since 1999  What is common to all the high performers?  What is different between them and average and low performers?  How did they become great?  Answers have been codified in the Visible Ops Methodology www.ITPI.org @RealGeneKim, genek@realgenekim.me
  • 33. Visible Ops Security: Linking Security and IT Operations Objectives In 4 Practical Steps Service Design & Management Security Management Service Level Management Capacity Management Availability & Contingency Service Reporting Financial Management Management Control Processes Phase 2 Asset & Configuration Management Phase 3 Release Processes Change Management Supplier Processes Catch and Establish Release Management Resolution Processes Customer Relationship release, find Incident Management Management repeatable Problem Management Supplier Management fragile artifacts build library Automation Phase 1 Electrify fence, Phase 4 modify first Continually improve response Sources: ITPI Visible Ops & IT Infrastructure Library (ITIL) / BS 15000 @RealGeneKim, genek@realgenekim.me
  • 34. Source: John Allspaw @RealGeneKim, genek@realgenekim.me
  • 35. Source: John Allspaw @RealGeneKim, genek@realgenekim.me
  • 36. The First Way: Systems Thinking @RealGeneKim, genek@realgenekim.me
  • 37. The First Way: Systems Thinking (Business) (Customer) @RealGeneKim, genek@realgenekim.me
  • 38. The Second Way: Amplify Feedback Loops @RealGeneKim, genek@realgenekim.me
  • 39. The Third Way: Culture Of Continual Experimentation And Learning @RealGeneKim, genek@realgenekim.me
  • 40. Good News: It Can Be Done Bad News: You Can’t Do It Alone @RealGeneKim, genek@realgenekim.me
  • 41. Ops @RealGeneKim, genek@realgenekim.me
  • 42. QA And Test Source: Flickr: vandyll @RealGeneKim, genek@realgenekim.me
  • 43. Development @RealGeneKim, genek@realgenekim.me
  • 44. Process And Controls @RealGeneKim, genek@realgenekim.me
  • 45. Product Management And Design Source: Flickr: birdsandanchors @RealGeneKim, genek@realgenekim.me
  • 46. What Does Transformation Feel Like? 47 @RealGeneKim, genek@realgenekim.me
  • 47. Find What’s Most Important First @RealGeneKim, genek@realgenekim.me
  • 48. Quickly Find What Is Different… @RealGeneKim, genek@realgenekim.me
  • 49. Before Something Bad Happens… @RealGeneKim, genek@realgenekim.me
  • 50. Find Risk Early… @RealGeneKim, genek@realgenekim.me
  • 51. Communicate It Effectively To Peers… @RealGeneKim, genek@realgenekim.me
  • 52. Hold People Accountable… @RealGeneKim, genek@realgenekim.me
  • 53. Based On Objective Evidence… @RealGeneKim, genek@realgenekim.me
  • 54. Answer Important Questions… @RealGeneKim, genek@realgenekim.me
  • 55. Recognize Compounding Technical Debt… @RealGeneKim, genek@realgenekim.me
  • 56. That Gets Worse… @RealGeneKim, genek@realgenekim.me
  • 57. And Fixing It… Source: Pingdom @RealGeneKim, genek@realgenekim.me
  • 58. Have What We Need, When We Need It… @RealGeneKim, genek@realgenekim.me
  • 59. Big Things Get Done Quickly… @RealGeneKim, genek@realgenekim.me
  • 60. Ever Increasing Situational Mastery… @RealGeneKim, genek@realgenekim.me
  • 61. Help The Business Win… @RealGeneKim, genek@realgenekim.me
  • 62. With Support From Your Peers… @RealGeneKim, genek@realgenekim.me
  • 63. And Do More With Less Effort… @RealGeneKim, genek@realgenekim.me
  • 64. This Is An Important Problem Operations Sees… Dev Sees…  Fragile applications are prone to  More urgent, date-driven projects failure put into the queue  Long time required to figure out “which  Even more fragile code (less bit got flipped” secure) put into production  Detective control is a salesperson  More releases have increasingly “turbulent installs”  Too much time required to restore service  Release cycles lengthen to amortize “cost of deployments”  Too much firefighting and unplanned work  Failing bigger deployments more difficult to diagnose  Urgent security rework and remediation  Most senior and constrained IT ops resources have less time to  Planned project work cannot complete fix underlying process problems  Frustrated customers leave  Ever increasing backlog of work  Market share goes down that cold help the business win  Business misses Wall Street  Ever increasing amount of commitments tension between IT Ops, Development, Design…  Business makes even larger promises to Wall Street @RealGeneKim, genek@realgenekim.me
  • 65. 66 @RealGeneKim, genek@realgenekim.me
  • 67. When IT Fails: A Business Novel and The DevOps Cookbook  Coming in Winter 2012/2013  “In the tradition of the best MBA case studies, this book should be mandatory reading for business and IT graduates alike.” Paul Muller, VP Software Marketing, Hewlett- Packard Gene Kim, Tripwire founder,  “The greatest IT management book of our Visible Ops co-author generation.” Branden Williams, CTO Marketing, RSA @RealGeneKim, genek@realgenekim.me
  • 68. When IT Fails: The Novel and The DevOps Cookbook  Our mission is to positively affect the lives of 1 million IT workers by 2017  If you would like the novel excerpts, “Top 10 Things You Needs To Know About DevOps,” and updates on the book:  Sign up at http://itrevolution.com Gene Kim, Tripwire founder, Visible Ops co-author  Email genek@realgenekim.me  Hand me a business card @RealGeneKim, genek@realgenekim.me
  • 69. If you’d like the slides from today’s presentation…  Text your first name, email address and “68383” to: +1 (858) 598-3980  Or visit: http://www.instantcustomer.c om/go/68383  Or scan this QR Code: 70 @RealGeneKim, genek@realgenekim.me

Editor's Notes

  1. How each side Actively impedes the achievement of each other’s goals.
  2. “Project Phoenix is essential to closing the gap with the competition,so we can finally do what the competition has been doing for years. Customers need to beable to buy from us from wherever they want, whether it’s on the Internet or in our retailstores. Otherwise, we’ll soon have no customers, at all.”The outage
  3. Who are they auditing? IT operations.I love IT operatoins. Why? Because when the developers screw up, the only people who can save the day are the IT operations people. Memory leak? No problem, we’ll do hourly reboots until you figure that out.Who here is from IT operations?Bad day:Not as prepared for the audit as they thoughtSpending 30% of their time scrambling, generating presentation for auditorsOr an outage, and the developer is adamant that they didn’t make the change – they’re saying, “it must be the security guys – they’re always causing outages”Or, there’s 50 systems behind the load balancer, and six systems are acting funny – what different, and who made them differentOr every server is like a snowflake, each having their own personalityWe as Tripwire practitioners can help them make sure changes are made visible, authorized, deployed completely and accurately, find differencesCreate and enforce a culture of change management and causality
  4. Who’s introducing variance? Well, it’s often these guys. Show me a developer who isn’t causing an outage, I’ll show you one who is on vacation.Primary measurement is deploy features quickly – get to market.I’ve worked with two of the five largest Internet companies (Google, Microsoft, Yahoo, AOL, Amazon), and I now believe that the biggest differentiator to great time to market is great operations:Bad day: We do 6 weeks of testing, but deployment still fails. Why? QA environment doesn’t match productionOr there’s a failure in testing, and no one can agree whether it’s a code failure or an environment failureOr changes are made in QA, but no one wrote them down, so they didn’t get replicated downstream in productionBelieve it or not, we as Tripwire practitioners can even help them – make sure environments are available when we need them, that they’re properly configured correctly the first time, document all the changes, replicate them downstream
  5. So who are all these constituencies that we can help, and increase our relevance as Tripwire practitioners and champions?How many people here are in infosec?Goal: protect critical systems and dataSafeguard organizational commitmentsPrevent security breaches, help quickly detect and recover from themBad day: no security standardsNo one is complyingYes, we’re 3 years behind. “Whaddyagonna do about it?”Vs. we (Tripwire owner) can become more relevant and add value by help infosec by leveraging all the configuration guidance out thereMeasure variance between produciton and those known good statesTrust and verify that when management says, we’ve trued up the configurations, they’ve actually done itWhy? Now, more than ever, there are an ever increasing amount of regulatory and contractual requirements to protect systems and data
  6. [ picture of messy data center ] Ten minutes into Bill’s first day on the job, he has to deal with a payroll run failure. Tomorrow is payday, and finance just found out that while all the salaried employees are going to get paid, none of the hourly factory employees will. All their records from the factory timekeeping systems were zeroed out.Was it a SAN failure? A database failure? An application failure? Interface failure? Cabling error?
  7. http://www.flickr.com/photos/heritagefutures/3110685470/
  8. How each side Actively impedes the achievement of each other’s goals.