WIND ENERGY
Sites assensement in STEG
13. DÉVELOPPEMENT PV
1- Rooftops
Planned capacity : 13 MW.
Energy produced : 23 GWh/an.
Owner : STEG.
Target: STEG building,
administrative building …
Period : 2014 – 2016.
Investment : 40 M€.
Pilot installation at STEG HQ-building
22 kWp + 13 kWp
14. DÉVELOPPEMENT PV
PV plant for Electricity production
Planned capacity : 10 MW
Owner : STEG.
Planned Sites : South of Tunisia.
Investment : 25 M€.
Planned to be in operation in 2014
16. CSP DEVELOPPEMENT
CSP for Electricity production
Planned capacity : 50 MW
Owner : STEG.
Planned Sites : South of Tunisia.
Investment : 250 M€.
Planned to be in operation in 2016.
17. STEG RE DEVELOPPEMENT PROGRAM
project
Capaciy
MW
Production
GWh
And
installation
wind
power plant T1 80 210 2017
power plant T2 110 289 2019
PV
PV power plant 1 10 17 2014
Roofs 13 21 2016
PV power plant 2 50 85 2019
CSP CSP power plant 50 132 2017
OTHERS
Station de Transfert d'Energie par
Pompage (STEP)
400 800 2020
STEG Projects 2013-2020
19. Energy Conservation Law in 2009
Any company or groups of companies can produce electricity for their own
consumption.
Self producers are allowed to use national electricity grid when the
electricity is not generated locally.
STEG is obliged to buy electricity surplus in the limit of 30%.
ENERGY CONSERVATION LAW
Regulatory framework for electricity export and renewable energy
production by private sector is under preparation.
20. June 2013:Tunisian national debate on Energy : what is the best
energy mix for the country in the horizon of 2030 ?
https://www.facebook.com/DebatEnergie2013?ref=ts&fref=ts