GLASS FIBRE REINFORCED
GYPSUM PANELS
PRESENTED BY: RAVI SHANKAR
REDG. NO. 11130060
WHAT IS GFRG PANEL?
• It is a gypsum based walling panel
reinforced with glass fibre.
• It was developed by Australia in 1990.
• Dimension: 12m x 3m x 124mm
• Also known as Rapidwall, Gypcrete, etc,.
WHY GFRG?
• Our India is still a developing country fighting with a huge shortage of housing every year.
• We need a very fast construction technology which can increase our development rate
• Conventional methods of construction lead to formation of huge amount of CO2 (about 40% is
developed due to construction industry) increasing chances of global warming.
• Fertilizer industries are facing problems regarding disposal of industrial waste gypsum (2000 tonnes per
day)
• We are not having enough water for ourselves, then why allow buildings to drink it?
WHAT ARE THE ADVANTAGES?
• Waste is used as resource making it very economical
• Construction rate is very fast- changes brick by brick construction to wall by wall construction
• Green Alternative Technology- Thus Environment Friendly
• Uses very less Sand, Steel and Water
• Building is fire resistant
• Earthquake resistant
• Much less labour force needed
• Weight of structure is very less
• More carpet area for same built up area
• No need of beams and columns
• No need of plastering thus cost can be saved in finishing
HOW MUCH IT IS FIRE RESISTANT?
HOW MUCH WEIGHT CAN BE REDUCED?
HOW MUCH CAN WE SAVE?
50.8
35.2
76 75
8
67.59
82
65
27.47
Cement Steel Sand Water Built Area Labour Time Weight Of
Superstructure
Cost of
Construction
Savings in %
Savings in %
ECONOMICS (for 2 storey, 1500 sqft)
S.No. Materials/ items GFRG Building Conventional Building Saving in %
1. Cement 16 tons 32.55 tons 50.8
2. Steel 1800 kg 2779 kg 35.2
3. River sand 20 cum 83.37 cum 76
4. Granite Metal 38 cum 52.46 cum 27.56
5. Bricks - 57200
6. GFRG Panel 500sqm -
7. Water 50000 ltr 200000 ltr 75
8. Built Area 143 sqm 154.45 sqm 8
9. Labour 389 mandays 1200 mandays 67.59
10. Construction Time 21 days 120 days 82
11. Total weight of superstructure 179 tons 490 tons 65
12. Construction cost Rs 13.25 lakhs Rs 18.27 lakhs 27.47
13. Embodied energy in kWh 82921 215400 61.5
HOW IT IS MADE?
• It is made from Gypsum, an industrial waste from fertilizer industries (2000tonnes/day).
• It takes only 30 minutes to make a panel.
It is made in three stages:
STAGE-1
• A paste of calcined gypsum and other chemical additives is poured on the specially designed table.
• Glass fibres are then spread evenly by means of screeding and rolling process.
STAGE-2
• Special aluminium plugs are inserted on top of finished first layer with 20mm gaps in between to form hollow
cavities.
• 2nd pouring of mix is done along with glass fibre with tamping to form ribs of the hollow panel.
STAGE-3
• Process of 1st Stage is repeated to complete the top layer of the panel.
After 25 minutes plugs are taken out, casting table is rotated and panel is then taken out for drying using special
fork lift.
Then drying is done for 90 minutes in a drier chamber in which hot air is circulated
After that panel is cut into its dimensions are per the customers design.
WHERE IT IS MADE?
• FACT Cochin (Fertilizers And Chemicals Travancore LTD)
• RCF Mumbai (Rashtriya Chemicals and Fertilizers)
HOW TO MAKE BUILDINGS?
FOUNDATION
• A conventional foundation like spread footing, RCC column footing, raft or pile foundation is used as per
the soil condition and load factors.
• All around the building RCC plinth beam is provided at basement plinth level.
• For erection of panel as wall, 12 mm dia vertical reinforcement called “starter bars” of 0.75m length of
which 0.45m protrudes up and remaining portion with 0.15m angle is placed into the RCC plinth beams
before casting.
• These bars are kept at a distance of 1m centre to centre to match the cavities of the panel.
SUPERSTRUCTURE
• Pre-cut panels are brought to the construction site.
• Panels are kept over the starter bars on the plinth beam using cranes.
• Grooves are cut into the panels at every joints to facilitate integral bonding.
• Appropriate reinforcement bars are inserted as per design into the cavities.
• These reinforcements are then tide to the starter bars.
• Verticality of panels are checked and then cavities having reinforcements are filled with concrete.
• It is mandatory to reinforce and fill all the joints with concrete.
• Other cavities can be filled with any inert materials (e.g. quarry dust mixed with 5% cement and water)
SUPERSTRUCTURE CONT.
• After completing the walls, doors and windows are fixed in position at there respective locations where
panels are cut and the it is fixed by filling the cavities with concrete.
• Then shuttering for sunshades are kept in position and concreting is done.
• Staircase is constructed by using panel as waist and landing slabs with reinforcement in all the cavities.
ROOF SLAB
• Formworks are erected.
• Tie beams are constructed all along the walls to provide bond between roof slab and walls.
• Panels are then placed in position.
• Every third cavity is then cut open from the top and reinforcement cages are inserted for concrete micro
beams.
• Electrical conduits are then placed in position.
• Welded wire mesh is then kept all over the panel.
• Then concreting is done with thickness 50mm.
• Subsequently waterproofing of roof is done.
WHERE WE CAN USE IT?
We can use for:
• Institutional Buildings
• Residential Buildings
• Hospital Buildings
• Hotel
• Apartments
SOME PROJECTS
CONCLUSION
• GFRG Panel provides a new method of building construction in fast track.
• By this process, man power, cost and time of construction can be reduced.
• The use of scarce natural resources like river sand, water and agricultural land can be significantly
reduced.
• We can save our environment by reducing CO2 production in conventional construction method.
• And the most important, this new technology is having potential to provide shelter to the “Homeless
Indians”.
Thank you

Mais conteúdo relacionado

Mais procurados

Glass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building ConstructionGlass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building ConstructionGRD Journals
 
New materials used in building industry
New materials used in building industryNew materials used in building industry
New materials used in building industryTanzil Faraz
 
Brick partition walls
Brick partition wallsBrick partition walls
Brick partition wallsRashi Jain
 
Fabric - Building construction material
Fabric - Building construction materialFabric - Building construction material
Fabric - Building construction materialDenis Patel
 
Strawbale construction
Strawbale constructionStrawbale construction
Strawbale constructionSravyashyamala
 
WOOD SUBSTITUTES.pdf
WOOD SUBSTITUTES.pdfWOOD SUBSTITUTES.pdf
WOOD SUBSTITUTES.pdfAnoHossey
 
Partition wall
Partition wallPartition wall
Partition wallKris Kiran
 
Partition wall
Partition wallPartition wall
Partition wallasif anwar
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish typesAnqaParvez
 

Mais procurados (20)

Glass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building ConstructionGlass Fiber Reinforced Gypsum Panel use in Building Construction
Glass Fiber Reinforced Gypsum Panel use in Building Construction
 
New materials used in building industry
New materials used in building industryNew materials used in building industry
New materials used in building industry
 
Gfrg
GfrgGfrg
Gfrg
 
Brick partition walls
Brick partition wallsBrick partition walls
Brick partition walls
 
Flyash Bricks
Flyash BricksFlyash Bricks
Flyash Bricks
 
Fabric - Building construction material
Fabric - Building construction materialFabric - Building construction material
Fabric - Building construction material
 
Facade engineering
Facade engineeringFacade engineering
Facade engineering
 
Damp proofing ppt
Damp proofing pptDamp proofing ppt
Damp proofing ppt
 
Strawbale construction
Strawbale constructionStrawbale construction
Strawbale construction
 
Gypsum board
Gypsum boardGypsum board
Gypsum board
 
Gypsum Board
Gypsum BoardGypsum Board
Gypsum Board
 
Pavegen seminar ppt.
Pavegen seminar ppt.Pavegen seminar ppt.
Pavegen seminar ppt.
 
WOOD SUBSTITUTES.pdf
WOOD SUBSTITUTES.pdfWOOD SUBSTITUTES.pdf
WOOD SUBSTITUTES.pdf
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
Partition wall
Partition wallPartition wall
Partition wall
 
Partition wall
Partition wallPartition wall
Partition wall
 
Ceramic Tiles
Ceramic TilesCeramic Tiles
Ceramic Tiles
 
Cladding
CladdingCladding
Cladding
 
235562808 coffered-slab
235562808 coffered-slab235562808 coffered-slab
235562808 coffered-slab
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish types
 

Destaque

Glass fiber reinforced concrete
Glass fiber reinforced concreteGlass fiber reinforced concrete
Glass fiber reinforced concretebhavin shah
 
Glass fibers reinforced concrete
Glass fibers reinforced concreteGlass fibers reinforced concrete
Glass fibers reinforced concreteAbhishek Gupta
 
Epoxy resin presented by biswajit maity
Epoxy resin  presented by biswajit maityEpoxy resin  presented by biswajit maity
Epoxy resin presented by biswajit maityBiswajit Maity
 
Composite materials
Composite materialsComposite materials
Composite materialsKrishna Gali
 
Composite materials
Composite materialsComposite materials
Composite materialsJokiYagit
 
Composite materials
Composite materialsComposite materials
Composite materialsStudent
 
Soil stabilisation clg
Soil stabilisation clg Soil stabilisation clg
Soil stabilisation clg Prabhat Sharma
 
GFRC Presentation - PDF Website Version
GFRC Presentation - PDF Website VersionGFRC Presentation - PDF Website Version
GFRC Presentation - PDF Website VersionHarry Grace
 
Apollo Offshore Engineering
Apollo Offshore EngineeringApollo Offshore Engineering
Apollo Offshore Engineeringsafetyatsea
 
Lunch on the sky-scraper
Lunch on the sky-scraperLunch on the sky-scraper
Lunch on the sky-scraperpazpormexico
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technologyAnjith Augustine
 

Destaque (19)

FIBRE REINFORCED GYPSUM PANELS!
FIBRE REINFORCED GYPSUM PANELS!FIBRE REINFORCED GYPSUM PANELS!
FIBRE REINFORCED GYPSUM PANELS!
 
gfrg panels
gfrg panelsgfrg panels
gfrg panels
 
Glass fiber reinforced concrete
Glass fiber reinforced concreteGlass fiber reinforced concrete
Glass fiber reinforced concrete
 
Glass fibre reinforced plastic (GFRP)
Glass fibre reinforced plastic (GFRP)Glass fibre reinforced plastic (GFRP)
Glass fibre reinforced plastic (GFRP)
 
Glass fibers reinforced concrete
Glass fibers reinforced concreteGlass fibers reinforced concrete
Glass fibers reinforced concrete
 
Rapidwall
RapidwallRapidwall
Rapidwall
 
Gfrc presentation
Gfrc presentationGfrc presentation
Gfrc presentation
 
15 epoxy resins
15 epoxy resins15 epoxy resins
15 epoxy resins
 
Epoxy resin
Epoxy resinEpoxy resin
Epoxy resin
 
Epoxy resin presented by biswajit maity
Epoxy resin  presented by biswajit maityEpoxy resin  presented by biswajit maity
Epoxy resin presented by biswajit maity
 
Composite materials
Composite materialsComposite materials
Composite materials
 
Composite materials
Composite materialsComposite materials
Composite materials
 
Composite materials
Composite materialsComposite materials
Composite materials
 
Soil stabilisation clg
Soil stabilisation clg Soil stabilisation clg
Soil stabilisation clg
 
GFRC Presentation - PDF Website Version
GFRC Presentation - PDF Website VersionGFRC Presentation - PDF Website Version
GFRC Presentation - PDF Website Version
 
Apollo Offshore Engineering
Apollo Offshore EngineeringApollo Offshore Engineering
Apollo Offshore Engineering
 
Out of reach
Out of reachOut of reach
Out of reach
 
Lunch on the sky-scraper
Lunch on the sky-scraperLunch on the sky-scraper
Lunch on the sky-scraper
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 

Semelhante a Fast, Eco-Friendly GFRG Panel Construction

alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdfNithyashree594058
 
Hudco Construction Techniques
Hudco Construction TechniquesHudco Construction Techniques
Hudco Construction TechniquesUday Yadav
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover projectKriShna Sharma
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesAr Jitendra
 
Construction & Management
Construction & ManagementConstruction & Management
Construction & ManagementMohan Seshaa
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters DubaiNeha Rampuria
 
New Building Materials
New Building MaterialsNew Building Materials
New Building MaterialsDr K M SONI
 
Kitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic PouringKitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic PouringAshleyLiKITSEN
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction systemchirag aggarwal
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017ktx500
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEDr K M SONI
 
Technical textiles in Central Public Works Department
Technical textiles in Central Public Works DepartmentTechnical textiles in Central Public Works Department
Technical textiles in Central Public Works DepartmentDr K M SONI
 
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTIONRajesh Kolli
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSjagrutib22
 
Alternate Building Materials,Alternative Construction Technology and Rain Wat...
Alternate Building Materials,Alternative Construction Technology and Rain Wat...Alternate Building Materials,Alternative Construction Technology and Rain Wat...
Alternate Building Materials,Alternative Construction Technology and Rain Wat...Rajesh Kolli
 
Building maintenance
Building maintenance Building maintenance
Building maintenance Janki Patel
 

Semelhante a Fast, Eco-Friendly GFRG Panel Construction (20)

alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdf
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Hudco Construction Techniques
Hudco Construction TechniquesHudco Construction Techniques
Hudco Construction Techniques
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover project
 
Aerocon bricks
Aerocon bricksAerocon bricks
Aerocon bricks
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure services
 
Construction & Management
Construction & ManagementConstruction & Management
Construction & Management
 
Mivan
MivanMivan
Mivan
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
New Building Materials
New Building MaterialsNew Building Materials
New Building Materials
 
Kitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic PouringKitsen Aluminum Formwork -Monolithic Pouring
Kitsen Aluminum Formwork -Monolithic Pouring
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction system
 
Ntpc summer training 2017
Ntpc summer training 2017Ntpc summer training 2017
Ntpc summer training 2017
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
Technical textiles in Central Public Works Department
Technical textiles in Central Public Works DepartmentTechnical textiles in Central Public Works Department
Technical textiles in Central Public Works Department
 
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
ALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTIONALTERNATE BUILDING MATERIALS  & TECHNOLOGICAL ALTERNATIVES IN  CONSTRUCTION
ALTERNATE BUILDING MATERIALS & TECHNOLOGICAL ALTERNATIVES IN CONSTRUCTION
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
Alternate Building Materials,Alternative Construction Technology and Rain Wat...
Alternate Building Materials,Alternative Construction Technology and Rain Wat...Alternate Building Materials,Alternative Construction Technology and Rain Wat...
Alternate Building Materials,Alternative Construction Technology and Rain Wat...
 
material ppt
material pptmaterial ppt
material ppt
 
Building maintenance
Building maintenance Building maintenance
Building maintenance
 

Último

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Último (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

Fast, Eco-Friendly GFRG Panel Construction

  • 1. GLASS FIBRE REINFORCED GYPSUM PANELS PRESENTED BY: RAVI SHANKAR REDG. NO. 11130060
  • 2. WHAT IS GFRG PANEL? • It is a gypsum based walling panel reinforced with glass fibre. • It was developed by Australia in 1990. • Dimension: 12m x 3m x 124mm • Also known as Rapidwall, Gypcrete, etc,.
  • 3. WHY GFRG? • Our India is still a developing country fighting with a huge shortage of housing every year. • We need a very fast construction technology which can increase our development rate • Conventional methods of construction lead to formation of huge amount of CO2 (about 40% is developed due to construction industry) increasing chances of global warming. • Fertilizer industries are facing problems regarding disposal of industrial waste gypsum (2000 tonnes per day) • We are not having enough water for ourselves, then why allow buildings to drink it?
  • 4. WHAT ARE THE ADVANTAGES? • Waste is used as resource making it very economical • Construction rate is very fast- changes brick by brick construction to wall by wall construction • Green Alternative Technology- Thus Environment Friendly • Uses very less Sand, Steel and Water • Building is fire resistant • Earthquake resistant • Much less labour force needed • Weight of structure is very less • More carpet area for same built up area • No need of beams and columns • No need of plastering thus cost can be saved in finishing
  • 5. HOW MUCH IT IS FIRE RESISTANT?
  • 6. HOW MUCH WEIGHT CAN BE REDUCED?
  • 7. HOW MUCH CAN WE SAVE? 50.8 35.2 76 75 8 67.59 82 65 27.47 Cement Steel Sand Water Built Area Labour Time Weight Of Superstructure Cost of Construction Savings in % Savings in %
  • 8. ECONOMICS (for 2 storey, 1500 sqft) S.No. Materials/ items GFRG Building Conventional Building Saving in % 1. Cement 16 tons 32.55 tons 50.8 2. Steel 1800 kg 2779 kg 35.2 3. River sand 20 cum 83.37 cum 76 4. Granite Metal 38 cum 52.46 cum 27.56 5. Bricks - 57200 6. GFRG Panel 500sqm - 7. Water 50000 ltr 200000 ltr 75 8. Built Area 143 sqm 154.45 sqm 8 9. Labour 389 mandays 1200 mandays 67.59 10. Construction Time 21 days 120 days 82 11. Total weight of superstructure 179 tons 490 tons 65 12. Construction cost Rs 13.25 lakhs Rs 18.27 lakhs 27.47 13. Embodied energy in kWh 82921 215400 61.5
  • 9. HOW IT IS MADE? • It is made from Gypsum, an industrial waste from fertilizer industries (2000tonnes/day). • It takes only 30 minutes to make a panel.
  • 10. It is made in three stages:
  • 11. STAGE-1 • A paste of calcined gypsum and other chemical additives is poured on the specially designed table. • Glass fibres are then spread evenly by means of screeding and rolling process.
  • 12. STAGE-2 • Special aluminium plugs are inserted on top of finished first layer with 20mm gaps in between to form hollow cavities. • 2nd pouring of mix is done along with glass fibre with tamping to form ribs of the hollow panel.
  • 13. STAGE-3 • Process of 1st Stage is repeated to complete the top layer of the panel. After 25 minutes plugs are taken out, casting table is rotated and panel is then taken out for drying using special fork lift. Then drying is done for 90 minutes in a drier chamber in which hot air is circulated After that panel is cut into its dimensions are per the customers design.
  • 14. WHERE IT IS MADE? • FACT Cochin (Fertilizers And Chemicals Travancore LTD) • RCF Mumbai (Rashtriya Chemicals and Fertilizers)
  • 15. HOW TO MAKE BUILDINGS?
  • 16. FOUNDATION • A conventional foundation like spread footing, RCC column footing, raft or pile foundation is used as per the soil condition and load factors. • All around the building RCC plinth beam is provided at basement plinth level. • For erection of panel as wall, 12 mm dia vertical reinforcement called “starter bars” of 0.75m length of which 0.45m protrudes up and remaining portion with 0.15m angle is placed into the RCC plinth beams before casting. • These bars are kept at a distance of 1m centre to centre to match the cavities of the panel.
  • 17.
  • 18. SUPERSTRUCTURE • Pre-cut panels are brought to the construction site. • Panels are kept over the starter bars on the plinth beam using cranes. • Grooves are cut into the panels at every joints to facilitate integral bonding. • Appropriate reinforcement bars are inserted as per design into the cavities. • These reinforcements are then tide to the starter bars. • Verticality of panels are checked and then cavities having reinforcements are filled with concrete. • It is mandatory to reinforce and fill all the joints with concrete. • Other cavities can be filled with any inert materials (e.g. quarry dust mixed with 5% cement and water)
  • 19.
  • 20. SUPERSTRUCTURE CONT. • After completing the walls, doors and windows are fixed in position at there respective locations where panels are cut and the it is fixed by filling the cavities with concrete. • Then shuttering for sunshades are kept in position and concreting is done. • Staircase is constructed by using panel as waist and landing slabs with reinforcement in all the cavities.
  • 21.
  • 22. ROOF SLAB • Formworks are erected. • Tie beams are constructed all along the walls to provide bond between roof slab and walls. • Panels are then placed in position. • Every third cavity is then cut open from the top and reinforcement cages are inserted for concrete micro beams. • Electrical conduits are then placed in position. • Welded wire mesh is then kept all over the panel. • Then concreting is done with thickness 50mm. • Subsequently waterproofing of roof is done.
  • 23.
  • 24. WHERE WE CAN USE IT? We can use for: • Institutional Buildings • Residential Buildings • Hospital Buildings • Hotel • Apartments
  • 26.
  • 27.
  • 28.
  • 29. CONCLUSION • GFRG Panel provides a new method of building construction in fast track. • By this process, man power, cost and time of construction can be reduced. • The use of scarce natural resources like river sand, water and agricultural land can be significantly reduced. • We can save our environment by reducing CO2 production in conventional construction method. • And the most important, this new technology is having potential to provide shelter to the “Homeless Indians”.