Introduction
• In India 65% of total power is generated by the Thermal Power Stations .
• In thermal generating stations coal, oil, natural gas etc. are employed as
primary sources of energy .
• A thermal power station basically work on the rankine cycle.
• Thermal power plant convert the heat energy of coal into electrical
energy.
• Coal is burnt in a boiler which converts water into steam.
• The expansion of steam in turbine produces mechanical power which
drives the alternator coupled to the turbine.
Definition
A generating station which converts heat
energy of coal combustion into electrical
energy is known as thermal power
station.
Schematic arrangement of steam power station
Main and auxiliary equipment's
• Coal handling plant
• Pulverizing plant
• Draft fans
• Boiler
• Ash handling plant
• Turbine
• Alternator
• Condenser
• Cooling towers and ponds
• Feed water heater
• Economizer
• Super heater and Reheater
• Air preheater
Coal Handling Plant
• The function of coal handling plant is automatic
feeding of coal to the boiler furnace.
• A thermal power plant burns enormous amounts of
coal.
• A 200MW plant may require around 2000 tons of coal
daily
• following are the process of plant-:
1. Unloading process
2. Feeding process
3. Screening process
4. Crushing process
5. Stacking process
6. Reclaiming process
7. Bunkering process
Pulverizing Plant
• In modern thermal power plant , coal is
pulverized
• ground to dust like size and carried to the
furnace in a stream of hot air.
• Pulverizing is a means of exposing a large surface
area to the action of oxygen and consequently
helping combustion.
• Pulverizing mills are further classified as:
1. Contact mill
2. Ball mill
3. Impact mill
Draft System
• The circulation of air is caused by a
difference in pressure, known as
Draft.
• Draft is a differential pressure b/w
atmosphere and inside the boiler.
• It is necessary to cause the flow of
gases through boiler setting It may
be –
1. Natural draft
2. Mechanical draft
Boiler
• A boiler is a closed vessel in which water
under pressure, is converted into steam.
• It is one of the major components of a
thermal power plant Always designed to
absorb maximum amount of heat
released in the process of combustion
• Boilers are of two types-
1. Fire tube boiler
2. Water tube boiler
Ash Handling Plant
• The percentage of ash in coal varies from 5% in
good quality coal to about 40% in poor quality
coal Power plants generally use poor quality of
coal .
• thus amount of ash produced by it is pretty large
.
• A modern 2000MW plant produces about 5000
tons of ash daily.
• The stations use some conveyor arrangement to
carry ash to dump sites directly or for carrying
and loading it to trucks and wagons which
transport it to the site of disposal
Steam Turbine
• A steam turbine converts heat energy of steam
into mechanical energy and drives the generator.
• It uses the principle that steam when issuing
from a small opening attains a high velocity.
• This velocity attained during expansion depends
on the initial and final heat content of the steam.
• This difference b/w initial and final heat content
represents the heat energy converted into kinetic
energy.
• These are of two types :-
1. Impulse turbine
2. Reaction turbine
Alternator
•Turbine and alternator are mechanical
coupled with each other.
•Alternator convert mechanical energy
of turbine into electrical energy.
•The electrical output from the
alternator is delivered to the bus bar
through transformer.
Condenser
• Steam after rotating steam turbine comes to Condenser refers
here to the shell and tube heat exchanger installed at the outlet of
every steam turbine in Thermal power stations of utility
companies generally.
• These condensers are heat exchangers which convert steam from
its gaseous to its liquid state, also known as phase transition.
• In so doing, the latent heat of steam is given out inside the
condenser. Where water is in short supply an air cooled condenser
is often used.
• An air cooled condenser is however significantly more expensive
and cannot achieve as low a steam turbine backpressure (and
therefore less efficient) as a surface condenser.
• The purpose is to condense the outlet (or exhaust) steam from
steam turbine to obtain maximum efficiency and also to get the
condensed steam in the form of pure water, otherwise known as
condensate, back to steam generator or (boiler) as boiler feed
water
Cooling Towers And Ponds
• A condenser needs huge quantity of water to
condense the steam .
• Most plants use a closed cooling system where warm
water coming from condenser is cooled and reused
• Small plants use spray ponds and medium and large
plants use cooling towers.
• Cooling tower is a steel or concrete hyperbolic
structure having a reservoir at the base
• For storage of cooled water Height of the cooling
tower may be 150 m or so and diameter at the base is
150 m
Feed Water Heater
• Advantages of heating water before feeding
back to the boiler:-
• Feed water heating improves overall plant
efficiency.
• The dissolved oxygen and carbon dioxide
which would otherwise cause boiler corrosion
are removed in feed water heater
• Thermal quantity of steam produced by the
boiler is increased.
• Some other impurities carried by the steam
and condensate, due to corrosion of boiler
and condenser are precipitated outside the
boiler.
Economizer
• Flue gases coming out of the boiler
carry lot of heat.
• An economizer extracts a part of
this heat from flue gases and uses
it for heating feed water.
• This use of economizer results in
saving coal consumption and
higher boiler efficiency
Super heater
• Super heater is a component of a steam-
generating unit in which steam, after it has left
the boiler drum, is heated above its saturation
temperature.
• The super heater may consist of one or more
stages of tube banks arranged to effectively
transfer heat from the products of combustion.
• Super heaters are classified as convection ,
radiant or combination of these.
Reheater
• Some of the heat of superheated steam is used to rotate the turbine
where it loses some of its energy.
• Reheater is also steam boiler component in which heat is added to
this intermediate-pressure steam, which has given up some of its
energy in expansion through the high-pressure turbine.
• The steam after reheating is used to rotate the second steam turbine
where the heat is converted to mechanical energy.
• This mechanical energy is used to run the alternator, which is coupled
to turbine , there by generating electrical energy.
Air Preheater
• An air pre heater increases the
temperature of air supplied for coal
burning
• And it driven from the flue gases.
• Air is drown from the atmosphere by the
force of draft fan.
• Air preheaters may be of three types
1. Plate type
2. Tubular type
3. Regenerative type
• The fuel used is quite cheap.
• Less initial cost as compared to other generating plants.
• It can be installed at any place irrespective of the existence of
coal.
• The coal can be easily transported to the site
• It require less space as compared to Hydro power plants.
• Cost of generation is less than that of diesel power plants.
Advantages
Disadvantages
• It pollutes the atmosphere due to production of large amount of
smoke and fumes.
• It is costlier in running cost as compared to Hydro electric plants.
• Maintenance cost is more
References-:
A. K. Wanjari
Thank
You

Mais conteúdo relacionado

Mais procurados

Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
Dr. Ramesh B
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
Manish Kumar
 

Mais procurados (20)

Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Coal based power plant
Coal based power plantCoal based power plant
Coal based power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Gas turbine power plants
Gas turbine power plantsGas turbine power plants
Gas turbine power plants
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
 
Micro hydro power plant
Micro hydro power plantMicro hydro power plant
Micro hydro power plant
 
Types of Nuclear Reactors
Types of Nuclear ReactorsTypes of Nuclear Reactors
Types of Nuclear Reactors
 
Nuclear power plants
Nuclear power plantsNuclear power plants
Nuclear power plants
 
Thermal Power Generation Report
Thermal Power Generation ReportThermal Power Generation Report
Thermal Power Generation Report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Solar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawatSolar plant ppt by ritesh kumawat
Solar plant ppt by ritesh kumawat
 
Thermal power plant
 Thermal power plant  Thermal power plant
Thermal power plant
 
[PPT] on Steam Turbine
[PPT] on Steam Turbine[PPT] on Steam Turbine
[PPT] on Steam Turbine
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Power plant, Power Station and types of power plant
Power plant, Power Station and types of power plantPower plant, Power Station and types of power plant
Power plant, Power Station and types of power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Hydroelectric power
Hydroelectric power Hydroelectric power
Hydroelectric power
 

Destaque

Diesel engine applications
Diesel engine applicationsDiesel engine applications
Diesel engine applications
Abanoub Hanna
 
Sistem clutch
Sistem clutchSistem clutch
Sistem clutch
ika92
 
Aircraft landing gear system
Aircraft landing gear systemAircraft landing gear system
Aircraft landing gear system
Krishikesh Singh
 

Destaque (17)

Best ppt on thermal power station working
Best ppt on thermal power station workingBest ppt on thermal power station working
Best ppt on thermal power station working
 
Thermal Power Plant - Manual
Thermal Power Plant - ManualThermal Power Plant - Manual
Thermal Power Plant - Manual
 
Thermal power plant
Thermal power plant Thermal power plant
Thermal power plant
 
Heat engine
Heat engineHeat engine
Heat engine
 
Thermal power point
Thermal power pointThermal power point
Thermal power point
 
Corona effect
Corona effectCorona effect
Corona effect
 
IC Engine Piston Design
IC Engine Piston DesignIC Engine Piston Design
IC Engine Piston Design
 
Diesel engine applications
Diesel engine applicationsDiesel engine applications
Diesel engine applications
 
THERMAL POWER PLANTS DESIGN
THERMAL POWER PLANTS DESIGNTHERMAL POWER PLANTS DESIGN
THERMAL POWER PLANTS DESIGN
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Sistem clutch
Sistem clutchSistem clutch
Sistem clutch
 
Mechanical Testing of Materials
Mechanical Testing of Materials Mechanical Testing of Materials
Mechanical Testing of Materials
 
Gear trains
Gear trainsGear trains
Gear trains
 
Abrasive water jet machining
Abrasive water jet machining Abrasive water jet machining
Abrasive water jet machining
 
Aircraft landing gear system
Aircraft landing gear systemAircraft landing gear system
Aircraft landing gear system
 
Diesel engine Powerpoint
Diesel engine PowerpointDiesel engine Powerpoint
Diesel engine Powerpoint
 

Semelhante a Presentation on thermal power plant

Steam-Power-Plant-updated.pdf engineering students
Steam-Power-Plant-updated.pdf engineering studentsSteam-Power-Plant-updated.pdf engineering students
Steam-Power-Plant-updated.pdf engineering students
ashokpradhan23
 
Tpp summer pro rep
Tpp summer pro repTpp summer pro rep
Tpp summer pro rep
Rohit Anand
 

Semelhante a Presentation on thermal power plant (20)

Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
 
Ppt aman
Ppt amanPpt aman
Ppt aman
 
PPT ON THERMAL POWER PLANT (POLLUTION CONTROLLED)
PPT ON THERMAL POWER PLANT (POLLUTION  CONTROLLED)PPT ON THERMAL POWER PLANT (POLLUTION  CONTROLLED)
PPT ON THERMAL POWER PLANT (POLLUTION CONTROLLED)
 
Steam plan
Steam planSteam plan
Steam plan
 
Thermal Power Station
Thermal Power StationThermal Power Station
Thermal Power Station
 
power plant classifications
power plant classificationspower plant classifications
power plant classifications
 
Types of power plant.ppt
Types of power plant.pptTypes of power plant.ppt
Types of power plant.ppt
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
 
Kota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTUKota super thermal power plant,kstps ppt,RTU
Kota super thermal power plant,kstps ppt,RTU
 
Steam-Power-Plant-updated.pdf engineering students
Steam-Power-Plant-updated.pdf engineering studentsSteam-Power-Plant-updated.pdf engineering students
Steam-Power-Plant-updated.pdf engineering students
 
BPS-UNIT -I (TPS).pptx
BPS-UNIT -I (TPS).pptxBPS-UNIT -I (TPS).pptx
BPS-UNIT -I (TPS).pptx
 
Ntpc dadri ppt
Ntpc dadri pptNtpc dadri ppt
Ntpc dadri ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
L6 thermal power plant
L6 thermal power plantL6 thermal power plant
L6 thermal power plant
 
thermal power plant
thermal power plant thermal power plant
thermal power plant
 
Thermal Power Plant or Thermal Energy (Chapter-2)
Thermal Power Plant or Thermal Energy (Chapter-2)Thermal Power Plant or Thermal Energy (Chapter-2)
Thermal Power Plant or Thermal Energy (Chapter-2)
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Steam Power Plant and Components
Steam Power Plant and ComponentsSteam Power Plant and Components
Steam Power Plant and Components
 
Tpp summer pro rep
Tpp summer pro repTpp summer pro rep
Tpp summer pro rep
 

Último

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Último (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Presentation on thermal power plant

  • 1. Presentation On Thermal Power Station Presented by :- Rashmi Nimje
  • 2. Contents -: • Introduction • Definition • Block diagram • Main & auxiliary equipment's • Explanations of equipment's • Advantages • Dis- advantages
  • 3. Introduction • In India 65% of total power is generated by the Thermal Power Stations . • In thermal generating stations coal, oil, natural gas etc. are employed as primary sources of energy . • A thermal power station basically work on the rankine cycle. • Thermal power plant convert the heat energy of coal into electrical energy. • Coal is burnt in a boiler which converts water into steam. • The expansion of steam in turbine produces mechanical power which drives the alternator coupled to the turbine.
  • 4. Definition A generating station which converts heat energy of coal combustion into electrical energy is known as thermal power station.
  • 5. Schematic arrangement of steam power station
  • 6. Main and auxiliary equipment's • Coal handling plant • Pulverizing plant • Draft fans • Boiler • Ash handling plant • Turbine • Alternator • Condenser • Cooling towers and ponds • Feed water heater • Economizer • Super heater and Reheater • Air preheater
  • 7. Coal Handling Plant • The function of coal handling plant is automatic feeding of coal to the boiler furnace. • A thermal power plant burns enormous amounts of coal. • A 200MW plant may require around 2000 tons of coal daily • following are the process of plant-: 1. Unloading process 2. Feeding process 3. Screening process 4. Crushing process 5. Stacking process 6. Reclaiming process 7. Bunkering process
  • 8. Pulverizing Plant • In modern thermal power plant , coal is pulverized • ground to dust like size and carried to the furnace in a stream of hot air. • Pulverizing is a means of exposing a large surface area to the action of oxygen and consequently helping combustion. • Pulverizing mills are further classified as: 1. Contact mill 2. Ball mill 3. Impact mill
  • 9. Draft System • The circulation of air is caused by a difference in pressure, known as Draft. • Draft is a differential pressure b/w atmosphere and inside the boiler. • It is necessary to cause the flow of gases through boiler setting It may be – 1. Natural draft 2. Mechanical draft
  • 10. Boiler • A boiler is a closed vessel in which water under pressure, is converted into steam. • It is one of the major components of a thermal power plant Always designed to absorb maximum amount of heat released in the process of combustion • Boilers are of two types- 1. Fire tube boiler 2. Water tube boiler
  • 11. Ash Handling Plant • The percentage of ash in coal varies from 5% in good quality coal to about 40% in poor quality coal Power plants generally use poor quality of coal . • thus amount of ash produced by it is pretty large . • A modern 2000MW plant produces about 5000 tons of ash daily. • The stations use some conveyor arrangement to carry ash to dump sites directly or for carrying and loading it to trucks and wagons which transport it to the site of disposal
  • 12. Steam Turbine • A steam turbine converts heat energy of steam into mechanical energy and drives the generator. • It uses the principle that steam when issuing from a small opening attains a high velocity. • This velocity attained during expansion depends on the initial and final heat content of the steam. • This difference b/w initial and final heat content represents the heat energy converted into kinetic energy. • These are of two types :- 1. Impulse turbine 2. Reaction turbine
  • 13. Alternator •Turbine and alternator are mechanical coupled with each other. •Alternator convert mechanical energy of turbine into electrical energy. •The electrical output from the alternator is delivered to the bus bar through transformer.
  • 14. Condenser • Steam after rotating steam turbine comes to Condenser refers here to the shell and tube heat exchanger installed at the outlet of every steam turbine in Thermal power stations of utility companies generally. • These condensers are heat exchangers which convert steam from its gaseous to its liquid state, also known as phase transition. • In so doing, the latent heat of steam is given out inside the condenser. Where water is in short supply an air cooled condenser is often used. • An air cooled condenser is however significantly more expensive and cannot achieve as low a steam turbine backpressure (and therefore less efficient) as a surface condenser. • The purpose is to condense the outlet (or exhaust) steam from steam turbine to obtain maximum efficiency and also to get the condensed steam in the form of pure water, otherwise known as condensate, back to steam generator or (boiler) as boiler feed water
  • 15. Cooling Towers And Ponds • A condenser needs huge quantity of water to condense the steam . • Most plants use a closed cooling system where warm water coming from condenser is cooled and reused • Small plants use spray ponds and medium and large plants use cooling towers. • Cooling tower is a steel or concrete hyperbolic structure having a reservoir at the base • For storage of cooled water Height of the cooling tower may be 150 m or so and diameter at the base is 150 m
  • 16. Feed Water Heater • Advantages of heating water before feeding back to the boiler:- • Feed water heating improves overall plant efficiency. • The dissolved oxygen and carbon dioxide which would otherwise cause boiler corrosion are removed in feed water heater • Thermal quantity of steam produced by the boiler is increased. • Some other impurities carried by the steam and condensate, due to corrosion of boiler and condenser are precipitated outside the boiler.
  • 17. Economizer • Flue gases coming out of the boiler carry lot of heat. • An economizer extracts a part of this heat from flue gases and uses it for heating feed water. • This use of economizer results in saving coal consumption and higher boiler efficiency
  • 18. Super heater • Super heater is a component of a steam- generating unit in which steam, after it has left the boiler drum, is heated above its saturation temperature. • The super heater may consist of one or more stages of tube banks arranged to effectively transfer heat from the products of combustion. • Super heaters are classified as convection , radiant or combination of these.
  • 19. Reheater • Some of the heat of superheated steam is used to rotate the turbine where it loses some of its energy. • Reheater is also steam boiler component in which heat is added to this intermediate-pressure steam, which has given up some of its energy in expansion through the high-pressure turbine. • The steam after reheating is used to rotate the second steam turbine where the heat is converted to mechanical energy. • This mechanical energy is used to run the alternator, which is coupled to turbine , there by generating electrical energy.
  • 20. Air Preheater • An air pre heater increases the temperature of air supplied for coal burning • And it driven from the flue gases. • Air is drown from the atmosphere by the force of draft fan. • Air preheaters may be of three types 1. Plate type 2. Tubular type 3. Regenerative type
  • 21. • The fuel used is quite cheap. • Less initial cost as compared to other generating plants. • It can be installed at any place irrespective of the existence of coal. • The coal can be easily transported to the site • It require less space as compared to Hydro power plants. • Cost of generation is less than that of diesel power plants. Advantages
  • 22. Disadvantages • It pollutes the atmosphere due to production of large amount of smoke and fumes. • It is costlier in running cost as compared to Hydro electric plants. • Maintenance cost is more