2. Disclaimer
Certain information regarding Solid Resources Ltd. (SRW) contained herein may be deemed
forward looking statements within the meaning of applicable securities laws. Forward-looking
statements may include estimates, plans, expectations, opinions, forecasts, projections, guidance
or other statements that are not statements of fact. Although SRW believes that the expectations
expressed in such forward-looking statements are based on reasonable assumptions, such
statements are not guarantees of future performance and actual results or developments may
differ materially from those in forward-looking statements. SRW cautions that actual performance
will be affected by a number of factors, most of which are beyond its control, and that future events
and results may vary substantially from what SRW currently foresees. Factors that could cause
actual results to differ materially from those in forward-looking statements could include
exploitation and exploration results, continued availability of capital and financing and general
economic, market or business conditions.
The forward-looking statements are expressly qualified in their entirety by this cautionary
statement. The information contained herein is stated as of the current date and subject to change
after that date.
THIS IS NOT A RECOMMENDATION TO BUY OR SELL ANY SECURITY
SolidResources.com
2
TSX.V: SRW
FSE: YRS
3. Alberta-1: Tin/Tantalum & Lithium
Northwestern Spain
• Proven Reserves
• Excellent Infrastructure in place
Spain
• Submission for Mining Permit Underway
P
• 100% owned
• No royalties100r
SolidResources.com
3
TSX.V: SRW
FSE: YRS
4. Cehegin Magnetite Iron Ore Concession
Southeastern Spain
Spain
Glencore Agreement In Place
SolidResources.com
4
TSX.V: SRW
FSE: YRS
6. Iron Ore Supply & Demand
The Next 20 Years
Demand from China will continue its steep
climb before peaking in 2030DDemand from
China will continue its steep climb
Iron Ore Forecast (US$/dry metric tonne)
beforeI peaking in 2030
Source: Rio Tinto, Dec., 2013
SolidResources.com
6
TSX.V: SRW
FSE: YRS
7. The Glencore Agreement
The Glencore Agreement Provides:
• Expertise in Mine Development
• Expertise in Marketing
• Expertise in Logistics
• Financing & Equity Participation
• The strength of Glencore combined
with the historical drilling & production
data will significantly facilitate the
advancement of the project.
SolidResources.com
7
TSX.V: SRW
FSE: YRS
8. Glencore Agreement
Solid Resources Enters Co-Operation Agreement With Glencore
N ORE PROJECT
Glencore Xstrata inks cooperation
accord with Solid Resources
GLENCORE SIGNS ON TO SPANISH
IRON ORE PROJECT
SolidResources.com
8
TSX.V: SRW
FSE: YRS
9. Solid Resources & Glencore Agreement
•
Equity Stake: Glencore – 20%/Solid Resources 80%
•
Glencore to exclusively Purchase all production
NEXT STEPS:
•
Jointly finalize a Due Diligence report on the historical drilling and production data
•
Jointly commence a Scoping Study to include making the historical reserves NI 43-101
compliant, conduct parallel deep drilling to establish increased reserves
•
Joint Pre-feasibility Study
•
Joint Feasibility Study
•
Construction of a 1 Million tonne per year operation
•
Time Frame: 12 - 24 months
SolidResources.com
9
TSX.V: SRW
FSE: YRS
10. Cehegin Magnetite Iron Ore Concession
Geology
Massive magnetite with beaded
morphology is embedded in Ophites in
the wall and Limestone in the ceiling.
LIMESTONE
Excellent response to magnetometry
OFITAS
MAGNETITE
Natural outcrop at the surface of a
massive magnetite occurrence
SolidResources.com
The mineralization is associated with
intrusive sub-volcanic rocks of ofitodoleritic composition
Massive Magnetite Dykes
10
TSX.V: SRW
FSE: YRS
11. Cehegin Magnetite Iron Ore Concession
• 62 existing valid mining concessions 1,030 Ha (Red)
• Extension to 3,000 Ha (Blue)
• Applied to increase for additional 3,630 Ha (Green)
• Total – 6,630 Ha (66 sq Km’s)
• 90 year operating licences
Option Agreement:
• No time limit or financial commitments
• Solid earns 100% upon exercise with no royalties
• € 900,000 once 1st mining permit in place
• € 2.1 million for 2nd mining permit on remaining
61 concessions
SolidResources.com
11
TSX.V: SRW
FSE: YRS
12. Cehegin Magnetite Iron Ore Concession
Historical Data
•
•
•
•
38,043 metres drilled
23,528 magnetometry stations
23,697 magnetic concentration tests
Historical production data
Magnetometry Profile – Colossus Concession
Geological & Magnetometric Profile - Soledad Mine
SolidResources.com
Underground Mining in Edison Deposit Pending Exploration
12
TSX.V: SRW
FSE: YRS
13. 3D Model of Historical Drilling on Cehegin
Orebody Open at Width & Depth
Intersecting Magnetite at Depth
of over 200 Metres
SolidResources.com
13
TSX.V: SRW
FSE: YRS
15. Cehegin Magnetite Iron Ore Concession
Cehegín Iron Ore Reserves
Measured
Indicated
Measured & Indicated
Inferred
December, 7, 2012
Million Tonnes
Fe %
7.63
39
5.93
31
13.56
35.5
62.50
40
DTWR %
41.5
42.1
41.8
41.7
DT %
64.6
63.4
64.1
65.3
•
Current analysis of the historical drill data supports an upgrade of the measured and indicated
reserves to a minimum of 27 Million Tons. This is only on 3 of the 62 concessions.
•
Strike zones in excess of 1,000m in length and with a thickness of 15-50m.
•
Aerial magnetometric information supports potential Inferred Resource increase
All of the "reserves" and "resources" described and documented by previous operators are considered to be "Historic
Resources" under NI 43-101, as they were estimated prior to February 1, 2001. Solid is not treating any of the estimates
as a current NI 43-101-compliant resource, and the historical estimates should not be relied upon, however,
management does consider these to be accurate and is taking measures to upgrade to a NI 43-101 compliant resource.
SolidResources.com
15
TSX.V: SRW
FSE: YRS
16. Cehegin Magnetite Iron Ore Concession
Quality
OTCQX: SLDRF
Category
Iron
Concentrate %
65.19
“The ore processed in Cehegin was almost exclusively high
quality magnetite concentrate, easily obtainable by physical
processing (grinding and wet magnetic separation) of up to
68% iron. These values normally correspond to concentrates
of “Premium” class.”
Manganese
0.05
Silica
3.99
Alumina
1.73
Calcium Oxide
0.28
Magnesium Oxide
1.80
Potassium Oxide
0.06
Sodium Oxide
0.016
Sulfur
0.01
Phosphorus
0.04
Fe (Iron Ore Content)
Zinc
0.004
Silica
Dr. Alfonso Gracia, Senior Geologist
Global benchmark for magnetite iron ore:
GLOBAL BENCHMARK
CEHEGIN
Alumina
35.1% Avg
3.99%
1.73%
Phosphorus
SolidResources.com
> 25%
< 3-7%
< 3%
< 0.1%
0.04%
16
TSX.V: SRW
FSE: YRS
17. Cehegin Magnetite Iron Ore Concession
Infrastructure
•
•
•
•
•
•
The Port of Cartagena – 104 Km’s from Cehegin Concessions
Rail to the Port of Cartagena and throughout all of Europe
Excellent toll-free highway
Port of Cartagena handles up to 400,000 ton vessels
Cehegin features on-site Hydro & Water
Calasparra Rail Station 12 Km’s from Cehegin Concessiont
SolidResources.com
17
TSX.V: SRW
FSE: YRS
19. Port of Cartagena – Region of Murcia
SolidResources.com
19
TSX.V: SRW
FSE: YRS
20. José Ballesta - Minister for Business, Industry & Innovation
Press Conference
• Region to declare the project
a “Strategic Initiative”
• Solid/Glencore Agreement
gives project solidity
• Wants to expedite the
permitting process CW
“The Giant Glencore Mining Project Launches in Spain”
Expansión 25 October, 2013
SolidResources.com
20
TSX.V: SRW
FSE: YRS
21. Cehegin Magnetite Iron Ore Concession
Political & Economic
Pro-Mining Spain – Motivated to “Dig itself out of Recession”
• Considered one of the most mineralized countries in Europe
• Spain is considered “Ground Zero” for the European mining revival
• Politically stable mining environment, with world class infrastructure
• 30% corporate tax rate with no government royalties
• Exploration subsidies of 20% granted to Solid for 2011 & 2012
• First year CAPEX can be written off/further subsidies available
•
SolidResources.com
21
TSX.V: SRW
FSE: YRS
23. Tantalum
$125 / lb Concentrate
$200 / lb Oxide
Uses: 70% Electronics – High Performance Capacitors
Supply: Current shortfall of 21%. “Conflict Metal”
Outlook: Considered a critical metal in Europe
SolidResources.com
23
TSX.V: SRW
FSE: YRS
24. Tantalum
Dodd-Frank Wall Street Reform Bill
and Consumer Protection Act - 2010
One of the world’s largest tantalum
processors
The act outlines Conflict Minerals
legislation.
''We do not purchase any raw
materials from the Democratic
Republic of Congo or adjoining
countries, even if we are offered
material with allegedly official
certifications from other state
authorities.''
SEC prohibits the purchase of “conflict
minerals.”
Legislation now requires audited paper
trail of purchase
SolidResources.com
24
TSX.V: SRW
FSE: YRS
25. Tin
#1 performing Base Metal 2013 & 2014
Tin: ~ $10.00/lb. “Conflict Metal”
Demand: 52% soldering for electronics
SolidResources.com
25
TSX.V: SRW
FSE: YRS
26. Lithium
$2.75 /lb
Uses – Rechargeable batteries, Glass & Ceramics, Lubricants & Chemicals,
Medications & Fusion Energy.
Outlook – Hybrid gasoline / electric vehicles with lightweight Lithium batteries are
expected to significantly impact future demand.
SolidResources.com
26
TSX.V: SRW
FSE: YRS
27. Alberta-1 Tin/Tantalum/Lithium
• Unique Objective: Become the major European tin/tantalum/lithium
production mine
• Assays speak volumes: Multi-year drill programs (2003, ‘05, ‘11 & ’12)
Each year showing dramatic zone extension
• 2012 Final Drill Program Completed
In-fill Drill - 4-5 Mt measured & indicated reserve in only the north zone
100t Pilot Plant - completed
Scoping Study – completed
Water & Environmental surveys - underway
On Time, on Budget
•
Application for Mining Permit about to be submitted
Preliminary approval of 1,500 ton per day (“tpd”) operation
•
CAPEX - $25 million
•
Near Term Production & positive cash-flow
SolidResources.com
27
TSX.V: SRW
FSE: YRS
28. Alberta-1 Tin/Tantalum/ Lithium
2012 Drill Program Overview
Area of 2012 Drill Program which upgraded the inferred
and indicated to become NI 43-101 compliant “measured”
resource to meet the requirements of the Spanish Mining
Authorities for a Mining Permit.
Average economical grades for just the northernmost
“open-pit” zone – Presqueiras:
• 633 ppm Tin (~1.5 lbs./t @ $10.00 lb.)
• 91 ppm Tantalum ( 1/5 lb./t @ $125 lb.)
• 0.45% Lithium (~10 lbs./t @ $2.75 lb.)
• Commercial value ~ $67/t
Yellow line indicates the 11 km mineralized pegmatite strike
zone for the entire 3,690 Ha (36 sq. Km’s) Alberta-1
concession
infill classified
SolidResources.com
28
TSX.V: SRW
FSE: YRS
29. Alberta-1 Tin/Tantalum/Lithium
Presqueiras (Northern Zone)
The 2012 Drill Program met the directives of the Spanish Mining
Authority to upgrade the previous 1.6 Mt measured & indicated
resource estimate to 4-5 Mt’s to advance to a Mining Permit Application.
Resource Class
Tonnes
(Millions)
Ta205
(Tantalum)
ppm
Sn
(Tin)
%
Li20
(Lithium)
%
Nb205
(Niobium)
Ppm
Presqueiras
April 30, 2013 Resource Estimate
Measured
3.15
96.7
0.065
0.45
91.3
Indicated
1.67
80.1
0.06
0.46
86.0
Measured
&
Indicated
4.83
91.0
0.063
0.45
89.4
Represents less than 5% of the entire mineralized zones
SolidResources.com
29
TSX.V: SRW
FSE: YRS
30. Alberta-1 Tin/Tantalum/Lithium
Southern Zones
2013 Scoping Study NI 43-101 Resource Estimate
April 30, 2013Scop
Southern Zones
Southern Zones Grades: Tantalum - 50% higher
Tin - 20% higher
Total Measured, Indicated & Inferred – 16.6 Mt’s
SolidResources.com
30
TSX.V: SRW
FSE: YRS
31. Corporate Listing Details
Symbol SRW – TSX.V ; YRS – FSE
Shares Outstanding: 127 million
Options: 13 million
Warrants: 42.7 million (13 million expire January 2014)
Fully Diluted :182.7 million
Insider & Associates Holdings: 22%
Number of Warrants Strike Price
3.1 Million
10 Million
10.8 Million
4.1 Million
3.8 Million
3.9 Million
7 Million
SolidResources.com
31
Expiry Date
January 6, 2014
January 14, 2014
May 10, 2014
January 21, 2015
March 22, 2015
April 22, 2015
August 14, 2015
$0.15
$0.15
$0.15
$0.15
$0.15
$0.15
$0.15
TSX.V: SRW
FSE: YRS
32. Management & Directors
Greg Pendura, CEO, President & Director - Mr. Pendura has more than 35 years of experience in founding,
financing and advising emerging private and public companies.
Ven Côté, Director - Mr.Côté, as the President, CEO and original founder of ZCL Composites Inc., from 1987 until
retirement in 2010, led the largest manufacturer and distributor of Fiberglass Underground Storage Tanks and
accessories in North America, with revenues in excess of $100 million per year. In 2008, Mr.Côté was named
Entrepreneur of the Year ® (Prairies Region) by the global accounting firm Ernst & Young LLP. Under his leadership,
ZCL was named as one of Canada’s 50 Best Managed Companies.
Rick Gliege, COO, CFO & Director - With over 20 years of leadership and advisory experience as a senior manager
in the public and private sectors, he brings to Solid knowledge in strategic planning, operations, marketing and
development.
Randy Hayward, B. Comm, LLB – Chairman - Mr. Hayward has maintained a successful law practice in Edmonton,
Alberta for 20 years. He has worked with numerous private and public companies for 15 years – roles include
raising investment capital, corporate communications, business development and various other positions.
Harry A. McKinders – Director - Mr. McKinders joined Solid Resources in 1995 and became a Director in 1998. He
has had broad experience in the investment field and has provided consulting services to numerous public and
private companies over the years.
SolidResources.com
32
TSX.V: SRW
FSE: YRS
33. Mining Team
Dr. Alfonso Gracia, PhD, Geologist, Solid Mines Espana - Dr. Gracia has worked in geological exploration and evaluation of mining projects
for 35 years, on over 100 projects in five continents, has also undertaken further studies in Business & Environmental Engineering.
Karl B. Douglas – Economics, Princeton University, Advisory Board - Karl has over 20 years’ experience in energy and commodities investing
gained at Salomon Brothers, Bear Stearns, JP Morgan and Merrill Lynch. Mr. Douglas is the founder and CEO of Terra Nova Resources
Ltd., an iron ore mining company that has rapidly developed over 6,000 hectares of iron ore in Northern Peru. At the present time, Terra
Nova is producing iron ore for export internationally. The company operates a number of supporting businesses in the areas of export
logistics and contract mining
David Henstridge, P. Geol., Advisory Board - David brings over 37 years in the mining industry including 20 years in the management of
public-listed mineral exploration companies. He has managed numerous advanced exploration projects throughout Australia, Europe,
North and South America.
Tomás Vecillas Fernández. – Mining Engineer - Tomás Vecillas is a graduate of the Technical University of Madrid with over 20 years of
experience in all stages of the industrial mining sector: exploration, development, starting-up of mines, operation and financing. He is a
Member of the Official Association of Mining Engineers of Spain (Colegio Oficial de Ingenieros de Minas de España) and the Australasian
Institute of Mining and Metallurgy (AussIMM).
Manuel Prieto de Dios, M.Sc, Geology - Manuel Prieto is a senior geologist with over 24 years of experience in exploration, evaluation,
mining geology and petroleum. He is a Member of European Geologist Association “Ilustre Colegio Oficial de Geologos” and is a
Qualified Person for NI 43-101 reporting.
.
SolidResources.com
33
TSX.V: SRW
FSE: YRS
34. Primary Corporate Focus
To Enhance Shareholder Value
Options Moving Forward:
1.JV OR OFF-TAKE AGREEMENT WITH A SUITABLE END USER
2. JV WITH SUITABLE MINING COMPANY
Insitu Value:
3. SELL OUTRIGHT
Present
SolidResources.com
34
TSX.V: SRW