SlideShare uma empresa Scribd logo
1 de 14
Presentation
                     on
Salient features of the Electricity Act, 2003
                                                 BY
                                                 Hemant E.Sarukte.
                                                 Yadav Ganesh.
    Rural Electrification
                                                Yadav Dinesh.
    Generation

    Transmission

    Role of Government

    Distribution

    Consumer Protection

    Trading / Market Development

    Regulatory Commission / Appellate Tribunal

    Tariff Principles

    CEA

    Measures against Theft of electricity

    Restructuring of SEBs
                                                                    1
Role of Government
 Central Government to prepare National Electricity Policy
  and Tariff Policy.(Section 3)
 Central Govt. to notify a National Policy for rural areas
  permitting stand alone systems based on renewal and
  Non-Conventional energy sources in consultation with
  States. (Section 4)
 Central Government to formulate a National Policy in
  consultation with the concerned State. for bulk purchase
  of power and management of local distribution through
  Users’ Association, Cooperatives, Franchisees and
  Panchayat Institutions etc. (Section 5)
                                                              2
Rural Electrification

 

Appropriate Government to endeavor to extend supply of
electricity to all villages/hamlets. (Section 6)

No requirement of licence if a person intends to generate and
distribute power in rural area. (Section 14)




                                                                 3
Generation
 Generation free from licensing. (Section 7)

Requirement of TEC for non-hydro generation done away with. (Section
7)

Captive Generation       is free from controls.       Open access to Captive
generating plants subject to availability of transmission facility. (Section 9)

Clearance of CEA for hydro projects required. Necessary due to concern of
dam safety and inter-State issues. (Section 8)

Generation from Non-Conventional Sources / Co-generation to be
promoted. Minimum percentage of purchase of power from renewable may
be prescribed by Regulatory Commissions.         (Sections 61 (h), 86 (1) (e))    4
Transmission
 There would be Transmission Utility at the Centre and in the States to undertake
  planning & development of transmission system. (Sections 38 & 39)
 Load dispatch to be in the hands of a government company/organisation.
  Flexibility regarding keeping Transmission Utility and load dispatch together or
  separating them. Load Dispatch function critical for grid stability and neutrality as
  compare to generators and distributors. Instructions to be binding on both.
                                                           (Sections 26, 27,31, 38, 39)
 Transmission companies to be licensed by the Appropriate Commission after
  giving due consideration to the views of the Transmission Utility.
                                                                   (Sections 15(5)(b))
 The Load Dispatch Centre/Transmission Utility / Transmission Licensee not to
  trade in power. Facilitating genuine competition between generators
                                                          (Sections 27, 31, 38, 39,41)
 Open access to the transmission lines to be provided to distribution licensees,
  generating companies.                              (Sections 38-40)
 This would generate competitive pressures and lead to gradual cost reduction.
                                                                                          5
Distribution
Distribution to be licensed by SERCs.
Distribution licensee free to take up generation & Generating co. free
 to take up distribution licence. This would facilitate private sector
 participation without Government guarantee/ Escrow. (Sections 7, 12)
Retail tariff to be determined by the Regulatory Commission.
 (Section 62)
Metering made mandatory. (Section 55)
Provision for suspension/revocation of licence by Regulatory
 Commission as it is an essential service which can not be allowed to
 collapse. (Sections 19, 24)
Open access in distribution to be allowed by SERC in phases. (Section 42)
In addition to the wheeling charges provision for surcharge if open access
 is allowed before elimination of cross subsidies, to take care of
Current level of cross subsidy
Licensee’s obligation to supply. (Section 42)
This would give choice to customer.
                                                                              6
Consumer Protection
 Consumer to be given connection within stipulated time. (Section 43(1))
 Penalty in the event of failure to give connection (Section 43(3))
 Payment of interest on security deposit. (Section 47(4))
 Regulatory commission to specify Electricity supply code to be followed by
    licensees. (Section 50)
 No sum due from consumers recoverable after a period of two years unless the
    same
    was shown recoverable continuously. (Section 56(2))
    Redresses forum for redresses of grievances of consumers, to be appointed by

    every distribution licensee within six months. Ombudsman scheme (Section 42 )
    Standards of performance

    Licensees required to meet standards of performance specified by Regulatory

    Commission. Failure to meet standards makes them liable to pay compensation
    to affected person within ninety days.
    Licensee to furnish to the Commission periodical information on standards of

    performance (Section 57)
                                                                                    7
Trading/ Market Development
                                  
 
     Trading distinct activity permitted with licensing.
     (Section 12)

     Regulatory Commission may fix ceiling on trading
     margin to avoid artificial price volatility. (Sections 79 (2)
     (b) & 86 (2) (b))

     The Regulatory Commission to promote development
     of market including trading. (Section 66)



                                                                     8
Regulatory Commissions/Appellate
               Tribunal
 State Electricity Regulatory Commission to be constituted within six
  months. (Section 82)
 Provision for Joint Commission by more than one State/UT. (Section 83)
 Provision for constitution of Appellate Tribunal consisting of Chairman and
  three Members. (Section 110, 112)
 Appellate Tribunal to hear appeals against the orders of CERC/SERC, and
  also to exercise general supervision and control over the Central/State
  Commissions. (Section 111)
 Appeal against the orders of Appellate Tribunal to lie before the Supreme
  Court. (Section 125)
 Appellate Tribunal considered necessary to-
     Reduce litigation and delay in decisions through High Court.
     Provide technical expertise in decision on appeals.

                                                                                9
Central Electricity Authority

CEA to continue as the main technical Advisor of the Govt. of
India/ State Government with the responsibility of overall planning.
(Section 70)

CEA to specify the technical standards for electrical plants and
electrical lines. (Section 73)

CEA to be technical adviser to CERC as well as SERCs.(Section
73)

CEA to specify the safety standards. (Section 53)
                                                                       10
Tariff Principles
 Regulatory Commission to determine tariff for supply of electricity by
generating co. on long/medium term contracts. (Section 62)
No tariff fixation by regulatory commission if tariff is determined
through competitive bidding or where consumers, on being allowed
open access enter into agreement with generators/traders.
 Consumer tariff should progressively reduce cross subsidies and
move towards actual cost of supply. (Section 61 (g), (h))
 State Government may provide subsidy in advance through the
budget for specified target groups if it requires the tariff to be lower than
that determined by the Regulatory Commission. (Section 65)
Regulatory Commissions may undertake regulation including
determination of multi-year tariff principles, which rewards efficiency and
is based on commercial principles. (Section 61 (e), (f))
Regulatory Commission to look at the costs of                   generation,
transmission and distribution separately. (Section 62 (2))


                                                                                11
Measures Against Theft of Electricity
 Focus on revenue realization rather than criminal
  proceedings. (Sections 126, 135)
 Penalties linked to the connected load and quantum of
  energy and financial gain involved in theft. (Section 135)
 Provisions for compounding of offences. (Section 152)
 Assessment of electricity charges for unauthorized use of
  electricity by the assessing officer designated by the State
  Government. (Section 126)
 Theft punishable with imprisonment. (Section 135)
 Punishment provision for abetment of theft. (Section 150)
 Special Courts (Sections 153-158)
                                                                 12
Restructuring of SEBs

 Provision for transfer scheme to create one or more

 companies from SEB. (Section 131)



 Provision for continuance of SEBs (Section 172)



 States given flexibility to adopt reform model/path.


                                                         13
New Central Law as compared with State
       Reform / Amendment Laws
All licenses, authorizations, permissions, approvals,
clearances issued under the repealed laws are saved for a
maximum period of one year. (Section 172(b)).
Action taken under corresponding provisions of the repealed
laws or rules made there under are saved to the extent of
consistency/correspondence with the provisions of the new
Act(Section 185 (2)).
Provisions of State Reform laws not inconsistent with
provisions of the new Central law will continue to apply in that
State (Section 185(3)).
State Governments can defer implementation of the new Act
                                                           14
by a maximum period of six months. (Section 172(d)).

Mais conteúdo relacionado

Mais procurados

ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case studyWaseem Hashmat
 
National energy policy nep presentation r1
National energy policy  nep presentation r1National energy policy  nep presentation r1
National energy policy nep presentation r1Prashantkarhade72
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdfSourav Bhunia
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)Ravi Pohani
 
Power System Planning
Power System PlanningPower System Planning
Power System Planninglinsstalex
 
Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationSushant Kumar Sinha
 
Presentation on captive power plants
Presentation on captive power plantsPresentation on captive power plants
Presentation on captive power plantsJay Ranvir
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart gridAshfaq khan
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of ElectricityRupesh Bobbili
 
What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?Power System Operation
 
Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Gensol Engineering Limited
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Dhruv Agarwal
 

Mais procurados (20)

ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case study
 
National energy policy nep presentation r1
National energy policy  nep presentation r1National energy policy  nep presentation r1
National energy policy nep presentation r1
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdf
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)
 
Power trading
Power tradingPower trading
Power trading
 
Indian Electricity Grid Code
Indian Electricity Grid CodeIndian Electricity Grid Code
Indian Electricity Grid Code
 
Power System Planning
Power System PlanningPower System Planning
Power System Planning
 
Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulation
 
Presentation on captive power plants
Presentation on captive power plantsPresentation on captive power plants
Presentation on captive power plants
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart grid
 
Regulations, Supply Rules and Standards of Electricity
Regulations,  Supply Rules and Standards of ElectricityRegulations,  Supply Rules and Standards of Electricity
Regulations, Supply Rules and Standards of Electricity
 
What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?
 
Grid code
Grid codeGrid code
Grid code
 
Plug in hybrid electric vehicle
Plug in hybrid electric vehiclePlug in hybrid electric vehicle
Plug in hybrid electric vehicle
 
Restructuring
RestructuringRestructuring
Restructuring
 
Storage In Smart Grids
Storage In Smart GridsStorage In Smart Grids
Storage In Smart Grids
 
Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy Electric Vehicle & Integration with Renewable Energy
Electric Vehicle & Integration with Renewable Energy
 
Power Markets & Trading in India
Power Markets & Trading in IndiaPower Markets & Trading in India
Power Markets & Trading in India
 
Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)Power system operation corporation ltd (posoco)
Power system operation corporation ltd (posoco)
 

Semelhante a Presentation On Salient Features Of The Electricity Act , 2003

K a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionK a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionsrinivasdeepak
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxmsounak95
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012rupeshsingh_1
 
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...electricitygovernance
 
Presentation_on_DSM_and_ABTmechanisam.pptx
Presentation_on_DSM_and_ABTmechanisam.pptxPresentation_on_DSM_and_ABTmechanisam.pptx
Presentation_on_DSM_and_ABTmechanisam.pptxRuchikavanjari6thstd
 
RSN 4 Generation of ELectricity.pdf
RSN 4 Generation of ELectricity.pdfRSN 4 Generation of ELectricity.pdf
RSN 4 Generation of ELectricity.pdfSourav Bhunia
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionIPPAI
 
Solar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaSolar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaY P Chawla
 
Experience of GCCIA in developing GCC Regional Electricity Market
Experience of GCCIA in developing GCC Regional Electricity MarketExperience of GCCIA in developing GCC Regional Electricity Market
Experience of GCCIA in developing GCC Regional Electricity MarketPower System Operation
 
Utility Distribution Franchisee Business in India
Utility Distribution Franchisee Business in IndiaUtility Distribution Franchisee Business in India
Utility Distribution Franchisee Business in IndiaAbhisek Bhattacharya
 
Draft Article - V1
Draft Article - V1Draft Article - V1
Draft Article - V1Ajay Nanda
 
Trans African Energy - Overview of Australian Wholesale Market Rules
Trans African Energy - Overview of Australian Wholesale Market RulesTrans African Energy - Overview of Australian Wholesale Market Rules
Trans African Energy - Overview of Australian Wholesale Market RulesStephen Labson
 

Semelhante a Presentation On Salient Features Of The Electricity Act , 2003 (20)

Ee09 801 eed ppt
Ee09 801 eed pptEe09 801 eed ppt
Ee09 801 eed ppt
 
K a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distributionK a-sivaram-chitale-policy-framework-for-transmission-distribution
K a-sivaram-chitale-policy-framework-for-transmission-distribution
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
A Presentation on the Regulatory Regime for Renewable Energy Projects in Andh...
 
Presentation_on_DSM_and_ABTmechanisam.pptx
Presentation_on_DSM_and_ABTmechanisam.pptxPresentation_on_DSM_and_ABTmechanisam.pptx
Presentation_on_DSM_and_ABTmechanisam.pptx
 
5973334.ppt
5973334.ppt5973334.ppt
5973334.ppt
 
RSN 4 Generation of ELectricity.pdf
RSN 4 Generation of ELectricity.pdfRSN 4 Generation of ELectricity.pdf
RSN 4 Generation of ELectricity.pdf
 
Ppt nep n ntp
Ppt nep n ntpPpt nep n ntp
Ppt nep n ntp
 
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distributionDay-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
Day-3, Mr. Ramesh Narayan BYPL Ippai issues in distribution
 
Solar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaSolar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP Chawla
 
Experience of GCCIA in developing GCC Regional Electricity Market
Experience of GCCIA in developing GCC Regional Electricity MarketExperience of GCCIA in developing GCC Regional Electricity Market
Experience of GCCIA in developing GCC Regional Electricity Market
 
Republic act no 9136 (2001)
Republic act no 9136 (2001)Republic act no 9136 (2001)
Republic act no 9136 (2001)
 
Utility Distribution Franchisee Business in India
Utility Distribution Franchisee Business in IndiaUtility Distribution Franchisee Business in India
Utility Distribution Franchisee Business in India
 
Captive gen
Captive genCaptive gen
Captive gen
 
Draft Article - V1
Draft Article - V1Draft Article - V1
Draft Article - V1
 
Trans African Energy - Overview of Australian Wholesale Market Rules
Trans African Energy - Overview of Australian Wholesale Market RulesTrans African Energy - Overview of Australian Wholesale Market Rules
Trans African Energy - Overview of Australian Wholesale Market Rules
 
Tariff policy
Tariff policyTariff policy
Tariff policy
 
IEGC.pptx
IEGC.pptxIEGC.pptx
IEGC.pptx
 

Último

USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinojohnmickonozaleda
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxPoojaSen20
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 

Último (20)

USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipino
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptxCulture Uniformity or Diversity IN SOCIOLOGY.pptx
Culture Uniformity or Diversity IN SOCIOLOGY.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 

Presentation On Salient Features Of The Electricity Act , 2003

  • 1. Presentation on Salient features of the Electricity Act, 2003 BY Hemant E.Sarukte. Yadav Ganesh. Rural Electrification  Yadav Dinesh. Generation  Transmission  Role of Government  Distribution  Consumer Protection  Trading / Market Development  Regulatory Commission / Appellate Tribunal  Tariff Principles  CEA  Measures against Theft of electricity  Restructuring of SEBs  1
  • 2. Role of Government  Central Government to prepare National Electricity Policy and Tariff Policy.(Section 3)  Central Govt. to notify a National Policy for rural areas permitting stand alone systems based on renewal and Non-Conventional energy sources in consultation with States. (Section 4)  Central Government to formulate a National Policy in consultation with the concerned State. for bulk purchase of power and management of local distribution through Users’ Association, Cooperatives, Franchisees and Panchayat Institutions etc. (Section 5) 2
  • 3. Rural Electrification   Appropriate Government to endeavor to extend supply of electricity to all villages/hamlets. (Section 6) No requirement of licence if a person intends to generate and distribute power in rural area. (Section 14) 3
  • 4. Generation  Generation free from licensing. (Section 7) Requirement of TEC for non-hydro generation done away with. (Section 7) Captive Generation is free from controls. Open access to Captive generating plants subject to availability of transmission facility. (Section 9) Clearance of CEA for hydro projects required. Necessary due to concern of dam safety and inter-State issues. (Section 8) Generation from Non-Conventional Sources / Co-generation to be promoted. Minimum percentage of purchase of power from renewable may be prescribed by Regulatory Commissions. (Sections 61 (h), 86 (1) (e)) 4
  • 5. Transmission  There would be Transmission Utility at the Centre and in the States to undertake planning & development of transmission system. (Sections 38 & 39)  Load dispatch to be in the hands of a government company/organisation. Flexibility regarding keeping Transmission Utility and load dispatch together or separating them. Load Dispatch function critical for grid stability and neutrality as compare to generators and distributors. Instructions to be binding on both. (Sections 26, 27,31, 38, 39)  Transmission companies to be licensed by the Appropriate Commission after giving due consideration to the views of the Transmission Utility. (Sections 15(5)(b))  The Load Dispatch Centre/Transmission Utility / Transmission Licensee not to trade in power. Facilitating genuine competition between generators (Sections 27, 31, 38, 39,41)  Open access to the transmission lines to be provided to distribution licensees, generating companies. (Sections 38-40)  This would generate competitive pressures and lead to gradual cost reduction. 5
  • 6. Distribution Distribution to be licensed by SERCs. Distribution licensee free to take up generation & Generating co. free to take up distribution licence. This would facilitate private sector participation without Government guarantee/ Escrow. (Sections 7, 12) Retail tariff to be determined by the Regulatory Commission. (Section 62) Metering made mandatory. (Section 55) Provision for suspension/revocation of licence by Regulatory Commission as it is an essential service which can not be allowed to collapse. (Sections 19, 24) Open access in distribution to be allowed by SERC in phases. (Section 42) In addition to the wheeling charges provision for surcharge if open access is allowed before elimination of cross subsidies, to take care of Current level of cross subsidy Licensee’s obligation to supply. (Section 42) This would give choice to customer. 6
  • 7. Consumer Protection  Consumer to be given connection within stipulated time. (Section 43(1))  Penalty in the event of failure to give connection (Section 43(3))  Payment of interest on security deposit. (Section 47(4))  Regulatory commission to specify Electricity supply code to be followed by licensees. (Section 50)  No sum due from consumers recoverable after a period of two years unless the same was shown recoverable continuously. (Section 56(2)) Redresses forum for redresses of grievances of consumers, to be appointed by  every distribution licensee within six months. Ombudsman scheme (Section 42 ) Standards of performance  Licensees required to meet standards of performance specified by Regulatory  Commission. Failure to meet standards makes them liable to pay compensation to affected person within ninety days. Licensee to furnish to the Commission periodical information on standards of  performance (Section 57) 7
  • 8. Trading/ Market Development      Trading distinct activity permitted with licensing. (Section 12)  Regulatory Commission may fix ceiling on trading margin to avoid artificial price volatility. (Sections 79 (2) (b) & 86 (2) (b))  The Regulatory Commission to promote development of market including trading. (Section 66) 8
  • 9. Regulatory Commissions/Appellate Tribunal  State Electricity Regulatory Commission to be constituted within six months. (Section 82)  Provision for Joint Commission by more than one State/UT. (Section 83)  Provision for constitution of Appellate Tribunal consisting of Chairman and three Members. (Section 110, 112)  Appellate Tribunal to hear appeals against the orders of CERC/SERC, and also to exercise general supervision and control over the Central/State Commissions. (Section 111)  Appeal against the orders of Appellate Tribunal to lie before the Supreme Court. (Section 125)  Appellate Tribunal considered necessary to-  Reduce litigation and delay in decisions through High Court.  Provide technical expertise in decision on appeals. 9
  • 10. Central Electricity Authority CEA to continue as the main technical Advisor of the Govt. of India/ State Government with the responsibility of overall planning. (Section 70) CEA to specify the technical standards for electrical plants and electrical lines. (Section 73) CEA to be technical adviser to CERC as well as SERCs.(Section 73) CEA to specify the safety standards. (Section 53) 10
  • 11. Tariff Principles  Regulatory Commission to determine tariff for supply of electricity by generating co. on long/medium term contracts. (Section 62) No tariff fixation by regulatory commission if tariff is determined through competitive bidding or where consumers, on being allowed open access enter into agreement with generators/traders.  Consumer tariff should progressively reduce cross subsidies and move towards actual cost of supply. (Section 61 (g), (h))  State Government may provide subsidy in advance through the budget for specified target groups if it requires the tariff to be lower than that determined by the Regulatory Commission. (Section 65) Regulatory Commissions may undertake regulation including determination of multi-year tariff principles, which rewards efficiency and is based on commercial principles. (Section 61 (e), (f)) Regulatory Commission to look at the costs of generation, transmission and distribution separately. (Section 62 (2)) 11
  • 12. Measures Against Theft of Electricity  Focus on revenue realization rather than criminal proceedings. (Sections 126, 135)  Penalties linked to the connected load and quantum of energy and financial gain involved in theft. (Section 135)  Provisions for compounding of offences. (Section 152)  Assessment of electricity charges for unauthorized use of electricity by the assessing officer designated by the State Government. (Section 126)  Theft punishable with imprisonment. (Section 135)  Punishment provision for abetment of theft. (Section 150)  Special Courts (Sections 153-158) 12
  • 13. Restructuring of SEBs  Provision for transfer scheme to create one or more companies from SEB. (Section 131)  Provision for continuance of SEBs (Section 172)  States given flexibility to adopt reform model/path. 13
  • 14. New Central Law as compared with State Reform / Amendment Laws All licenses, authorizations, permissions, approvals, clearances issued under the repealed laws are saved for a maximum period of one year. (Section 172(b)). Action taken under corresponding provisions of the repealed laws or rules made there under are saved to the extent of consistency/correspondence with the provisions of the new Act(Section 185 (2)). Provisions of State Reform laws not inconsistent with provisions of the new Central law will continue to apply in that State (Section 185(3)). State Governments can defer implementation of the new Act 14 by a maximum period of six months. (Section 172(d)).