SlideShare a Scribd company logo
1 of 5
Download to read offline
1
Ram Chandra Tripathi
Email: tripathirc2006@yahoo.com, tripathirc2014@gmail.com
Cell no: +977 9841694815, +977 9751006699
Rainas Municipality, Ward No. 7, Alkatar, Lamjung, Nepal
Proposed Position: Project Manager / Construction Manager
Key Qualifications:
I have more than seventeen years of work experiences in civil engineering field. In this
period, I have worked for over six years in hydropower projects in construction and
engineering consulting firms as a Project Manager, In-charge, Site Engineer and Junior
Engineer. I have been involved in micro hydro, small hydro, medium hydro and test tunnel
construction work of large size projects. I have also worked more than ten years in survey,
design, estimate and construction supervision in road, drinking water supply & sanitation
project, community based small irrigation project and building construction in private sector,
government and non-government organization. I have also worked in programme supported
by DFID–Community Support Programme, CARE International in Nepal and Gulmi-
Arghakhanchi Rural Development Project (GARDP Phase II) as short term consultant. I have
knowledge and skills in project planning, management, administration, construction
supervision & implementation of hydro power project. I have also knowledge and skills in
design, estimate &construction supervision of road, water supply &sanitation project. My
other skills include billing, reporting, documentation and work scheduling of construction
project.
Education:
Bachelor in Civil Engineering, Advanced College of Engineering & Management,
Tribhuwan University, Nepal, 2010.
Diploma in Civil Engineering, Western Region Campus,Tribhuwan University, Nepal, 1991.
School Leaving Certificate, Soubhagyodaya Higher Secondary School, Lamjung, Nepal,
1988.
Professional Membership:
Nepal Engineering Council, Registration no. 6404 ‘Civil’, ‘A’ category.
Nepal Engineers’ Association, Registration no. 11818 ‘Civil’.
Country of Work Experience: Nepal
Employment Record:
(Project Manager / In-charge = 2 yrs.10 month, Civil Engineer = 4 yrs. 2 month, Junior
Engineer = 10 yrs., Consultancy Services = 9 month)
April 2016 to present In-charge, Headworks & Inlet Tunnel, Sanjen Hydroelectric
Project (42.5 MW), SEW - Tundi JV, Rasuwa, Nepal.
Oct 2015 to March 2016 In-charge, Penstock & Surge Tank, Solu Hydroelectric Project
(23.5 MW), CE Construction, Solukhumbu, Nepal.
April 2012 to March 2015 High Himalaya Hydro Construction.
April 2012 - March 2013: Site Engineer, Upper Mai
Hydroelectric Project (9.98 MW), Ilam, Nepal.
April 2013 - March 2014: Project Manager, Budhi Gandaki
Test Tunnel Project (600 MW), Gorkha, Nepal.
April 2014 - March 2015: Project Manager, Tanahun
Hydropower Additional Test Adit Tunnel Project (140
MW), Tanahun, Nepal.
Jan 2010 to March 2012 Civil Engineer, DK Consult (P.) Kathmandu, Nepal.
2
Jan 2009 to Nov 2009 Civil Engineer. Kailas Kunda Construction & Consultants,
Achham, Nepal.
April 2007 to Oct 2008 Junior Engineer, EPSOM Engineering Consultancy,
Kathmandu, Nepal.
May 1995 to July 2002 Junior Engineer, CARE International in Nepal.
May 1995 - Nov 1997: Natural Resource Management Project,
Mahottari.
Dec 1997 - Feb 1998: Livelihood Security Project Jajarkot.
March 1998 - Sept 1999: Remote Area Basic Needs Project,
Gorkha.
Sept 1999 - June 2000: Upper Andhi Khola Watershed
Management Project, Syangja.
July 2000 - Feb 2002): Livelihoods security project, Achham.
Feb - July 2002: Upper Andhi Khola Watershed Management
Project, Syangja.
Sept 1993 to April 1995 Junior Engineer, Kohalpur Town Development Committee,
Banke, Nepal.
Feb to Aug, 1993 Junior engineer, Building, Housing & Urban Development
Section, Lamjung, Nepal.
Consultancy Services:
Dec 2009 Consultant, CARE / ASHA Programme, Nepalgunj, Nepal.
Nov 2008 Consultant Engineer, CARE – WATSAN / SEBAC Nepal,
Achham, Nepal.
March 2007 Consultant Engineer, DFID–Community Support Programme,
CARE Nepal, RRN, Nepalgunj, Nepal.
Jan 2006 Consultant, ECHO / CARE - WATSAN, Baitadi, Nepal.
Jan 2005 Consultant, CARE Nepal / JIBIKA, Achham, Nepal.
Jan 2004 Consultant, CARE Nepal / JIBIKA, Achham, Nepal.
June 2004 Consultant, ECHO / CARE - WATSAN, Surkhet, Nepal.
June 2003 Consultant, Gulmi-Arghakhanchi Rural Development Project
(GARDP Phase II), Nepal.
April 2002 Consultant, CARE Nepal, Nepalgunj, Nepal.
Professional Experience:
April 2016 to Present In-charge, Headworks & Inlet Tunnel. Sanjen HEP (42.50 MW).
SEW - Tundi JV, Rasuwa, Nepal.
Overall planning, management, site administration and
construction supervision of Headworks and Inlet Tunnel
works. Maintain the technical records, progress record and
safety in the site. Prepare weekly progress report, monthly
progress report. Monitor the line & level of the inlet portal,
tunnel alignment & headwork.
Consultant: SMEC International Pty. Ltd.
Oct 2015 to March 2016 In-charge, Penstock & Surge Tank. Solu HEP (23.5 MW). CE
Construction, Solukhumbu, Nepal.
Overall planning, management and construction supervision of
low pressure penstock pipe line work, anchor blocks work.
Maintain the technical records, progress record. Monitor the
line & level of the LPPP alignment & anchor Blocks. Prepare
weekly & monthly progress report.
Consultant- ITECO Nepal TMS JV.
3
April 2013 to March 2015 Project Manager, Tanahun Hydropower Additional Test Adit
Tunnel Project, (140 MW), Tanahun. Nepal.
Budhi Gandaki Test Tunnel Project, (600 MW), Gorkha, Nepal.
High Himalaya Hydro Construction.
Tanahun HP: tunnel size = (2.50m x 2m) and length = 293 m.
Budhi Gandaki : tunnel size = (2m x 2m) and length = 817 m.
Planning, management & construction of the tunnel work 1110
m. Responsible in project level administration, financial control
in site level, store & material management, quality control.
Maintain the technical records, progress records, explosive
records, safety in the tunnel. Monitor the line & level of the
tunnel, tunnel support works. Prepare and verified Interim
Payment Certificates (IPCs) from client / consultant. Prepare &
submit the weekly and monthly progress reports.
Budhi Gandaki Test Tunnel Project-
Consultant: Tractebel Engineering / Jade Consult.
April 2012 to March 2013 Site Engineer, Upper Mai Hydroelectric Project (9.98 MW).
High Himalaya Hydro Construction. Ilam, Nepal.
Upper Mai: tunnel size = (2m x 2.5m) and length = 1200m.
Planning of day to day site work of inlet headrace tunnel
including construction work, quality control, materials planning,
site administration, supervise & monitor the store and plant
operation. Prepare the weekly & monthly work progress
reports. Prepare and verified Interim Payment Certificates of
the project. Monitor the line & level of the tunnel both inlet &
outlet site, tunnel support works. Responsible to set up the lab
as described in contract document and performed the test,
provide test reports, sieve analysis, material testing and mix
design for concrete. Monitor rock bolt pulling out test.
Jan 2010 to March 2012 Civil Engineer, DK Consult, Kathmandu, Nepal.
Site visit for preliminary studies of 6 nos. small hydropower
project as a team member. Manage & handle the team as a
team leader to conduct detail topographic survey for feasibility
studies of hydropower project -2 nos. small hydro & 2 nos.
medium hydro. Hydrological analysis, assist to prepare the
feasibility study report of Tinau Khola I, Palpa (2.24 MW).
Jan 2009 to Nov 2009 Civil Engineer, Kailas Kunda Const. & Consultants, Achham,
Conduct feasibility / detail survey, designed, drawing, estimate
of district and village road: Chaukhutte - Khaptad Green Road,
Achham (7 km). Sanfebagar - Baijanath Agricultural Road,
Achham (8.5 km). Dhakari – Balata Rural Road, Achham
(10.311 km). Co-ordinate with DDC, VDC and other stake
holders.
April 2007 to Oct 2008 Junior Engineer, EPSOM Engineering Consultancy,
Kathmandu, Nepal.
Conduct feasibility / detail survey of hydro power project.
4
Baglung District: Naitul MHP, Jaljala. Ranasingh Kiteni MHP,
Ranasingh Kiteni, Righa MHP, Righa. Argal MHP, Argal.
Hatiya # 1, 2– extension line from national grid.
Parbat District: Karkineta VDC – extension line from national
grid. Drawing of micro hydro power project.
May 1995 to July 2002 Junior Engineer, CARE International in Nepal.
Assist and involve in the whole process of project level
planning, assist to engineer for sectorial planning and
budgeting. Conduct feasibility / detailed survey, design,
estimate & construction supervision of the project, mainly on
gravity flow drinking water supply and sanitation project, small
irrigation project rehab, watershed management, stream bank
protection, health post building, village road. Involve in
monitoring, evaluation and documentation of the activities.
Prepare measurement book, monthly progress report and
completion report.
Sept 1993 to April 1995 Junior Engineer, Kohalpur Town Development Committee,
Banke, Nepal.
Surveying, drawings, estimating, construction supervision of
road (8 Km), side drain (2 Km) and buildings (10 nos.).
Prepare measurement book, supported in bid process.
Feb to Aug, 1993 Junior Engineer, Building, Housing & Urban Development
Section, Lamjung, Nepal.
Estimating, construction supervision of building project (2 no.),
estimating, construction supervision of Irrigation canal
rehabilitation work (1 no.), survey, construction supervision of
gravity flow water supply system (1 no.).
Consultancy Services:
Dec 2009 Consultant, CARE Nepal / ASHA Programme, Nepalgunj, Nepal.
Design training curriculum, facilitation & report preparation of five
days ‘Technical Training’ based on drinking water supply system
(Participants: Overseer / Sub-Overseer).
Dec 2008 Consultant Engineer, CARE - WATSAN / SEBAC Nepal, Achham.
Design, drawing, estimate of water supply & sanitation projects
- three nos. Design training curriculum, facilitation & reporting
of ten days ‘Basic Care and Maintenance Training’- two event.
March 2007 Consultant Engineer, DFID – Community Support
Programme, CARE Nepal, RRN. Nepalgunj, Nepal.
Detail survey, design, drawing & estimate of community
Irrigation Project (named: Kothiya I.P - 6 Km) in Bardia.
Jan 2006 Consultant, ECHO / CARE - WATSAN, Baitadi, Nepal.
Design training curriculum, facilitation and report preparation of ten
days ‘Basic Care and Maintenance Training’.
Jan 2005 & Jan 2004 Consultant, CARE Nepal / JIBIKA, Achham, Nepal.
Design, drawing and cost estimate of DWSS (thirty five nos.)
and Irrigation Projects (ten nos.). Design training curriculum,
5
facilitation and report preparation of ‘Basic Care and
Maintenance Training’.
June 2004 Consultant, ECHO / CARE - WATSAN, Surkhet, Nepal.
Design training curriculum, facilitation and report preparation of ten
days ‘Basic Care and Maintenance Training’ for DWSS users.
June 2003 Consultant, Gulmi-Arghakhanchi Rural Development Project
(GARDP Phase II), Nepal.
Design training curriculum, facilitation and report preparation of four
days ‘System Management Training’ for Holbang - Bangra DWSS
user committee member. Design training curriculum, facilitation and
report preparation of twelve days " Village Maintenance Worker’s
(VMW) training” for Resunga I & II DWSS user committee member.
Dec 2002 Consultant, CARE International in Nepal, Nepalgunj, Nepal.
Design training curriculum, facilitation and report preparation of
seven days ‘Technical Training’ - based on DWSS and
irrigation projects (participants: Overseer / Sub-Overseer).
Trainings:
Curriculum developed, training managed, facilitated, reporting & documentation-
Basic care and maintenance training (BCMT) to DWSS users (six event - ten days each
event). Technical training to Overseer / Sub-Overseer (two event - five days each event).
Training / Workshop – Participated-
ITA Training Course: Site Investigation, Design and Construction of Hydro and Transport
Tunnels organized by Nepal Tunneling Association, 19 – 20 December 2013.
Workshop on Soil Conservation activities organized by CARE- Syangja, 14 -18 Sept, 1998.
Computer Skill: AutoCAD, SW DTM, MS office (Excel, MS Word, Power point), work
scheduling of construction project.
Languages : Nepali (native), English
Personal Information:
Sex : Male Date of Birth : Sept 06, 1971
Nationality : Nepali Marital Status : Married
I confirm the descriptions above are correct and true.
Date: Sept 07, 2016.

More Related Content

Viewers also liked (18)

CV_Dilip_General
CV_Dilip_GeneralCV_Dilip_General
CV_Dilip_General
 
151111_shahriar_esri_australia
151111_shahriar_esri_australia151111_shahriar_esri_australia
151111_shahriar_esri_australia
 
Resume
ResumeResume
Resume
 
Publications_NishadW
Publications_NishadWPublications_NishadW
Publications_NishadW
 
vishnu resume (1)
vishnu resume (1)vishnu resume (1)
vishnu resume (1)
 
CV_Uddin
CV_UddinCV_Uddin
CV_Uddin
 
CV 2016 Oct 31
CV 2016 Oct 31CV 2016 Oct 31
CV 2016 Oct 31
 
CV Dr. Pant June 2016
CV Dr. Pant June 2016CV Dr. Pant June 2016
CV Dr. Pant June 2016
 
Cv of md zahidul islam 120316
Cv of md zahidul islam 120316Cv of md zahidul islam 120316
Cv of md zahidul islam 120316
 
Name of the Assignment
Name of the AssignmentName of the Assignment
Name of the Assignment
 
Dr. Ramanand Jadhav_CV
Dr. Ramanand Jadhav_CVDr. Ramanand Jadhav_CV
Dr. Ramanand Jadhav_CV
 
Work Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team LeaderWork Experiment Certificate From SRTPPF-2 Team Leader
Work Experiment Certificate From SRTPPF-2 Team Leader
 
CV- Mowdudur RAHMAN
CV- Mowdudur RAHMANCV- Mowdudur RAHMAN
CV- Mowdudur RAHMAN
 
Wood CV_short_Sept 2015
Wood CV_short_Sept 2015Wood CV_short_Sept 2015
Wood CV_short_Sept 2015
 
Abu_Nahid_-Env. Engineer.doc(December 14 )
Abu_Nahid_-Env. Engineer.doc(December 14  )Abu_Nahid_-Env. Engineer.doc(December 14  )
Abu_Nahid_-Env. Engineer.doc(December 14 )
 
Updated CV-MPJ 010416.DOC
Updated CV-MPJ 010416.DOCUpdated CV-MPJ 010416.DOC
Updated CV-MPJ 010416.DOC
 
CV_Birara
CV_BiraraCV_Birara
CV_Birara
 
CV-_Dr_S_K_Singh -Nov. 2016
CV-_Dr_S_K_Singh -Nov. 2016CV-_Dr_S_K_Singh -Nov. 2016
CV-_Dr_S_K_Singh -Nov. 2016
 

Similar to CV-post in Linkedin

Narender_Geologist cum Shift Engg. Resume
Narender_Geologist cum Shift Engg. ResumeNarender_Geologist cum Shift Engg. Resume
Narender_Geologist cum Shift Engg. Resumegauravdarshu
 
resume_om_Nov2014
resume_om_Nov2014resume_om_Nov2014
resume_om_Nov2014Om Jangid
 
ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016Asit Kumar Adhikary
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khansikandar Khan
 
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidatedCv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidatedMallikarjunaRaoBhadr
 
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidatedCv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidatedMallikarjunaRaoBhadr
 
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_Ajay singh
 
Cv govind acharya for senior engineer
Cv  govind acharya for senior engineerCv  govind acharya for senior engineer
Cv govind acharya for senior engineerGovind Acharya
 
Pramod Tewari-M.Tech._Civil_ - 11yr Exp.
Pramod Tewari-M.Tech._Civil_ - 11yr Exp.Pramod Tewari-M.Tech._Civil_ - 11yr Exp.
Pramod Tewari-M.Tech._Civil_ - 11yr Exp.Pramod Tewari
 
Brief about self through ppt
Brief about self through pptBrief about self through ppt
Brief about self through pptRajesh Prasad
 

Similar to CV-post in Linkedin (20)

Narender_Geologist cum Shift Engg. Resume
Narender_Geologist cum Shift Engg. ResumeNarender_Geologist cum Shift Engg. Resume
Narender_Geologist cum Shift Engg. Resume
 
CV-Riaz Arshad
CV-Riaz ArshadCV-Riaz Arshad
CV-Riaz Arshad
 
resume_om_Nov2014
resume_om_Nov2014resume_om_Nov2014
resume_om_Nov2014
 
ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016ASIT_CV-RCO_INDIA_Asit_June_2016
ASIT_CV-RCO_INDIA_Asit_June_2016
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khan
 
Sivadas Chandrasekharan 5
Sivadas Chandrasekharan 5Sivadas Chandrasekharan 5
Sivadas Chandrasekharan 5
 
CV-1
CV-1CV-1
CV-1
 
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidatedCv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
 
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidatedCv mallikarjuna rao venkata  bhadriraju 1 july 2019 consolidated
Cv mallikarjuna rao venkata bhadriraju 1 july 2019 consolidated
 
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
resume_ajaysingh2926_rediffmail.com_-1__2_new__1_
 
Cv govind acharya
Cv  govind acharyaCv  govind acharya
Cv govind acharya
 
CV Govind Acharya
CV  Govind AcharyaCV  Govind Acharya
CV Govind Acharya
 
Cv govind acharya for senior engineer
Cv  govind acharya for senior engineerCv  govind acharya for senior engineer
Cv govind acharya for senior engineer
 
SMP_BIO_S.M. Patil
SMP_BIO_S.M. PatilSMP_BIO_S.M. Patil
SMP_BIO_S.M. Patil
 
Pramod Tewari-M.Tech._Civil_ - 11yr Exp.
Pramod Tewari-M.Tech._Civil_ - 11yr Exp.Pramod Tewari-M.Tech._Civil_ - 11yr Exp.
Pramod Tewari-M.Tech._Civil_ - 11yr Exp.
 
Cv of sandeep
Cv of sandeepCv of sandeep
Cv of sandeep
 
S_S_Kushwah_CV_-_Copy
S_S_Kushwah_CV_-_CopyS_S_Kushwah_CV_-_Copy
S_S_Kushwah_CV_-_Copy
 
Brief about self through ppt
Brief about self through pptBrief about self through ppt
Brief about self through ppt
 
LVS Varma
LVS VarmaLVS Varma
LVS Varma
 
CV (1).doc
CV (1).docCV (1).doc
CV (1).doc
 

CV-post in Linkedin

  • 1. 1 Ram Chandra Tripathi Email: tripathirc2006@yahoo.com, tripathirc2014@gmail.com Cell no: +977 9841694815, +977 9751006699 Rainas Municipality, Ward No. 7, Alkatar, Lamjung, Nepal Proposed Position: Project Manager / Construction Manager Key Qualifications: I have more than seventeen years of work experiences in civil engineering field. In this period, I have worked for over six years in hydropower projects in construction and engineering consulting firms as a Project Manager, In-charge, Site Engineer and Junior Engineer. I have been involved in micro hydro, small hydro, medium hydro and test tunnel construction work of large size projects. I have also worked more than ten years in survey, design, estimate and construction supervision in road, drinking water supply & sanitation project, community based small irrigation project and building construction in private sector, government and non-government organization. I have also worked in programme supported by DFID–Community Support Programme, CARE International in Nepal and Gulmi- Arghakhanchi Rural Development Project (GARDP Phase II) as short term consultant. I have knowledge and skills in project planning, management, administration, construction supervision & implementation of hydro power project. I have also knowledge and skills in design, estimate &construction supervision of road, water supply &sanitation project. My other skills include billing, reporting, documentation and work scheduling of construction project. Education: Bachelor in Civil Engineering, Advanced College of Engineering & Management, Tribhuwan University, Nepal, 2010. Diploma in Civil Engineering, Western Region Campus,Tribhuwan University, Nepal, 1991. School Leaving Certificate, Soubhagyodaya Higher Secondary School, Lamjung, Nepal, 1988. Professional Membership: Nepal Engineering Council, Registration no. 6404 ‘Civil’, ‘A’ category. Nepal Engineers’ Association, Registration no. 11818 ‘Civil’. Country of Work Experience: Nepal Employment Record: (Project Manager / In-charge = 2 yrs.10 month, Civil Engineer = 4 yrs. 2 month, Junior Engineer = 10 yrs., Consultancy Services = 9 month) April 2016 to present In-charge, Headworks & Inlet Tunnel, Sanjen Hydroelectric Project (42.5 MW), SEW - Tundi JV, Rasuwa, Nepal. Oct 2015 to March 2016 In-charge, Penstock & Surge Tank, Solu Hydroelectric Project (23.5 MW), CE Construction, Solukhumbu, Nepal. April 2012 to March 2015 High Himalaya Hydro Construction. April 2012 - March 2013: Site Engineer, Upper Mai Hydroelectric Project (9.98 MW), Ilam, Nepal. April 2013 - March 2014: Project Manager, Budhi Gandaki Test Tunnel Project (600 MW), Gorkha, Nepal. April 2014 - March 2015: Project Manager, Tanahun Hydropower Additional Test Adit Tunnel Project (140 MW), Tanahun, Nepal. Jan 2010 to March 2012 Civil Engineer, DK Consult (P.) Kathmandu, Nepal.
  • 2. 2 Jan 2009 to Nov 2009 Civil Engineer. Kailas Kunda Construction & Consultants, Achham, Nepal. April 2007 to Oct 2008 Junior Engineer, EPSOM Engineering Consultancy, Kathmandu, Nepal. May 1995 to July 2002 Junior Engineer, CARE International in Nepal. May 1995 - Nov 1997: Natural Resource Management Project, Mahottari. Dec 1997 - Feb 1998: Livelihood Security Project Jajarkot. March 1998 - Sept 1999: Remote Area Basic Needs Project, Gorkha. Sept 1999 - June 2000: Upper Andhi Khola Watershed Management Project, Syangja. July 2000 - Feb 2002): Livelihoods security project, Achham. Feb - July 2002: Upper Andhi Khola Watershed Management Project, Syangja. Sept 1993 to April 1995 Junior Engineer, Kohalpur Town Development Committee, Banke, Nepal. Feb to Aug, 1993 Junior engineer, Building, Housing & Urban Development Section, Lamjung, Nepal. Consultancy Services: Dec 2009 Consultant, CARE / ASHA Programme, Nepalgunj, Nepal. Nov 2008 Consultant Engineer, CARE – WATSAN / SEBAC Nepal, Achham, Nepal. March 2007 Consultant Engineer, DFID–Community Support Programme, CARE Nepal, RRN, Nepalgunj, Nepal. Jan 2006 Consultant, ECHO / CARE - WATSAN, Baitadi, Nepal. Jan 2005 Consultant, CARE Nepal / JIBIKA, Achham, Nepal. Jan 2004 Consultant, CARE Nepal / JIBIKA, Achham, Nepal. June 2004 Consultant, ECHO / CARE - WATSAN, Surkhet, Nepal. June 2003 Consultant, Gulmi-Arghakhanchi Rural Development Project (GARDP Phase II), Nepal. April 2002 Consultant, CARE Nepal, Nepalgunj, Nepal. Professional Experience: April 2016 to Present In-charge, Headworks & Inlet Tunnel. Sanjen HEP (42.50 MW). SEW - Tundi JV, Rasuwa, Nepal. Overall planning, management, site administration and construction supervision of Headworks and Inlet Tunnel works. Maintain the technical records, progress record and safety in the site. Prepare weekly progress report, monthly progress report. Monitor the line & level of the inlet portal, tunnel alignment & headwork. Consultant: SMEC International Pty. Ltd. Oct 2015 to March 2016 In-charge, Penstock & Surge Tank. Solu HEP (23.5 MW). CE Construction, Solukhumbu, Nepal. Overall planning, management and construction supervision of low pressure penstock pipe line work, anchor blocks work. Maintain the technical records, progress record. Monitor the line & level of the LPPP alignment & anchor Blocks. Prepare weekly & monthly progress report. Consultant- ITECO Nepal TMS JV.
  • 3. 3 April 2013 to March 2015 Project Manager, Tanahun Hydropower Additional Test Adit Tunnel Project, (140 MW), Tanahun. Nepal. Budhi Gandaki Test Tunnel Project, (600 MW), Gorkha, Nepal. High Himalaya Hydro Construction. Tanahun HP: tunnel size = (2.50m x 2m) and length = 293 m. Budhi Gandaki : tunnel size = (2m x 2m) and length = 817 m. Planning, management & construction of the tunnel work 1110 m. Responsible in project level administration, financial control in site level, store & material management, quality control. Maintain the technical records, progress records, explosive records, safety in the tunnel. Monitor the line & level of the tunnel, tunnel support works. Prepare and verified Interim Payment Certificates (IPCs) from client / consultant. Prepare & submit the weekly and monthly progress reports. Budhi Gandaki Test Tunnel Project- Consultant: Tractebel Engineering / Jade Consult. April 2012 to March 2013 Site Engineer, Upper Mai Hydroelectric Project (9.98 MW). High Himalaya Hydro Construction. Ilam, Nepal. Upper Mai: tunnel size = (2m x 2.5m) and length = 1200m. Planning of day to day site work of inlet headrace tunnel including construction work, quality control, materials planning, site administration, supervise & monitor the store and plant operation. Prepare the weekly & monthly work progress reports. Prepare and verified Interim Payment Certificates of the project. Monitor the line & level of the tunnel both inlet & outlet site, tunnel support works. Responsible to set up the lab as described in contract document and performed the test, provide test reports, sieve analysis, material testing and mix design for concrete. Monitor rock bolt pulling out test. Jan 2010 to March 2012 Civil Engineer, DK Consult, Kathmandu, Nepal. Site visit for preliminary studies of 6 nos. small hydropower project as a team member. Manage & handle the team as a team leader to conduct detail topographic survey for feasibility studies of hydropower project -2 nos. small hydro & 2 nos. medium hydro. Hydrological analysis, assist to prepare the feasibility study report of Tinau Khola I, Palpa (2.24 MW). Jan 2009 to Nov 2009 Civil Engineer, Kailas Kunda Const. & Consultants, Achham, Conduct feasibility / detail survey, designed, drawing, estimate of district and village road: Chaukhutte - Khaptad Green Road, Achham (7 km). Sanfebagar - Baijanath Agricultural Road, Achham (8.5 km). Dhakari – Balata Rural Road, Achham (10.311 km). Co-ordinate with DDC, VDC and other stake holders. April 2007 to Oct 2008 Junior Engineer, EPSOM Engineering Consultancy, Kathmandu, Nepal. Conduct feasibility / detail survey of hydro power project.
  • 4. 4 Baglung District: Naitul MHP, Jaljala. Ranasingh Kiteni MHP, Ranasingh Kiteni, Righa MHP, Righa. Argal MHP, Argal. Hatiya # 1, 2– extension line from national grid. Parbat District: Karkineta VDC – extension line from national grid. Drawing of micro hydro power project. May 1995 to July 2002 Junior Engineer, CARE International in Nepal. Assist and involve in the whole process of project level planning, assist to engineer for sectorial planning and budgeting. Conduct feasibility / detailed survey, design, estimate & construction supervision of the project, mainly on gravity flow drinking water supply and sanitation project, small irrigation project rehab, watershed management, stream bank protection, health post building, village road. Involve in monitoring, evaluation and documentation of the activities. Prepare measurement book, monthly progress report and completion report. Sept 1993 to April 1995 Junior Engineer, Kohalpur Town Development Committee, Banke, Nepal. Surveying, drawings, estimating, construction supervision of road (8 Km), side drain (2 Km) and buildings (10 nos.). Prepare measurement book, supported in bid process. Feb to Aug, 1993 Junior Engineer, Building, Housing & Urban Development Section, Lamjung, Nepal. Estimating, construction supervision of building project (2 no.), estimating, construction supervision of Irrigation canal rehabilitation work (1 no.), survey, construction supervision of gravity flow water supply system (1 no.). Consultancy Services: Dec 2009 Consultant, CARE Nepal / ASHA Programme, Nepalgunj, Nepal. Design training curriculum, facilitation & report preparation of five days ‘Technical Training’ based on drinking water supply system (Participants: Overseer / Sub-Overseer). Dec 2008 Consultant Engineer, CARE - WATSAN / SEBAC Nepal, Achham. Design, drawing, estimate of water supply & sanitation projects - three nos. Design training curriculum, facilitation & reporting of ten days ‘Basic Care and Maintenance Training’- two event. March 2007 Consultant Engineer, DFID – Community Support Programme, CARE Nepal, RRN. Nepalgunj, Nepal. Detail survey, design, drawing & estimate of community Irrigation Project (named: Kothiya I.P - 6 Km) in Bardia. Jan 2006 Consultant, ECHO / CARE - WATSAN, Baitadi, Nepal. Design training curriculum, facilitation and report preparation of ten days ‘Basic Care and Maintenance Training’. Jan 2005 & Jan 2004 Consultant, CARE Nepal / JIBIKA, Achham, Nepal. Design, drawing and cost estimate of DWSS (thirty five nos.) and Irrigation Projects (ten nos.). Design training curriculum,
  • 5. 5 facilitation and report preparation of ‘Basic Care and Maintenance Training’. June 2004 Consultant, ECHO / CARE - WATSAN, Surkhet, Nepal. Design training curriculum, facilitation and report preparation of ten days ‘Basic Care and Maintenance Training’ for DWSS users. June 2003 Consultant, Gulmi-Arghakhanchi Rural Development Project (GARDP Phase II), Nepal. Design training curriculum, facilitation and report preparation of four days ‘System Management Training’ for Holbang - Bangra DWSS user committee member. Design training curriculum, facilitation and report preparation of twelve days " Village Maintenance Worker’s (VMW) training” for Resunga I & II DWSS user committee member. Dec 2002 Consultant, CARE International in Nepal, Nepalgunj, Nepal. Design training curriculum, facilitation and report preparation of seven days ‘Technical Training’ - based on DWSS and irrigation projects (participants: Overseer / Sub-Overseer). Trainings: Curriculum developed, training managed, facilitated, reporting & documentation- Basic care and maintenance training (BCMT) to DWSS users (six event - ten days each event). Technical training to Overseer / Sub-Overseer (two event - five days each event). Training / Workshop – Participated- ITA Training Course: Site Investigation, Design and Construction of Hydro and Transport Tunnels organized by Nepal Tunneling Association, 19 – 20 December 2013. Workshop on Soil Conservation activities organized by CARE- Syangja, 14 -18 Sept, 1998. Computer Skill: AutoCAD, SW DTM, MS office (Excel, MS Word, Power point), work scheduling of construction project. Languages : Nepali (native), English Personal Information: Sex : Male Date of Birth : Sept 06, 1971 Nationality : Nepali Marital Status : Married I confirm the descriptions above are correct and true. Date: Sept 07, 2016.