OPERATIONAL RISK MANAGEMENT
06/09/2013 1
What is Operational Risk?
The risk of loss resulting from inadequate or failed
internal processes, people and systems or from
external events (The Basel II Capital Accord)
FORMERLY any risk but market and credit risks
It is NOT a brand new stuff and it is the risk that affects
06/09/2013 2
It is NOT a brand new stuff and it is the risk that affects
all businesses
Operational risk is inherent in carrying out a process/
operational activity.
Classification of Operational Risks
Operational risk events are
classified by two factors:
frequency – how often the
event occurs
impact – the amount of the
High
Frequency
Low
Impact
High
Frequency
High
Impact
Frequency
06/09/2013 3
impact – the amount of the
losses resulting from the
event
Low
Frequency
Low
Impact
Low
Frequency
High
Impact
Frequency
Impact
Classification of Operational Risks
Generally, operational risk management focuses on only
two of these event types:
Low frequency / high impact (LFHI)
High frequency / low impact (HFLI)
06/09/2013 4
Why?
Classification of Operational Risks
High frequency/low impact events are managed to
improve business efficiency. These events tend to be
readily understood and are viewed as ‘the cost of doing
business’.
Examples?
06/09/2013 5
Examples?
Expected loss verses unexpected loss
Expected loss is the loss incurred as a bank conducts its
normal business.
Can be simply defined as the cost of doing business
The only way to totally prevent them is to cease doing
business.
06/09/2013 6
business.
Expected loss versus unexpected loss
A bank uses statistical methods to predict its expected
losses.
In short, the firm uses past data and experience to
predict the future.
A simple method of calculating expected loss is to
06/09/2013 7
A simple method of calculating expected loss is to
compute the mean (average) of the actual losses over a
given time and accept this as the likely future level.
Expected loss verses unexpected loss
A firm may also attempt to ‘predict’ its unexpected losses
using statistics, much like the way that is used to predict
expected losses.
The problems are the past data may not available and
therefore to calculate unexpected loss a firm uses:
06/09/2013 8
therefore to calculate unexpected loss a firm uses:
available internal data
external data from other firms
data from operational risk scenarios
Operational risk event categories
The simplest way of understanding operational risk in banks is to
categorize it as anything but credit risk or market risk.
However, this is a very broad definition and does not help manage
operational risk.
06/09/2013 9
Generally, operational risk events can be subdivided into:
internal process risk
people risk
systems risk
external risk
legal risk
Internal Process Risk
Internal process risk is defined as the risk associated
with the failure of a bank’s processes or procedures.
During a bank’s day-to-day operations, staff follow preset
working practices.
These procedures and policies will include all the
06/09/2013 10
These procedures and policies will include all the
checks, and controls required to ensure that customers
are correctly served and the bank remains within the
laws and regulations by which it is governed
Internal Process Risks
Internal process risk events include:
documentation – inadequate, insufficient or wrong
lack of controls
marketing errors
misselling
money laundering
06/09/2013 11
money laundering
incorrect or insufficient reporting (e.g. regulatory)
transaction error
Reviewing and improving a bank’s internal processes as part of
operational risk management can improve its efficiency. Errors often
occur when a process is complicated, disorganized or easily
circumvented, all of which are also inefficient business practices.
Risk Management Process Feedback Loop
1. Identify, assess and
prioritize risks
2. Develop
strategies to
measure risk
6. Revise
policies and
procedures
06/09/2013 12
3. Design policies and
procedures to mitigate risks
4. Implement
and assign
responsibility
5. Test
effectiveness
and evaluate
results
MEASUREMENT
• Estimation of annual
losses – cost of
operational failurePROCESSES
REPORTING
• Integrated MIS
reporting
• Awareness of
exposures
• Knowledge of
controls quality
There are four fundamental steps to managing operational risk, with
each step leading to improvements in management & control quality and
greater economic profit
FRAMEWORK
• Risk strategy,
tolerance
• Roles and
responsibilities
• Policies and
procedures
• Risk definition and
categorization
operational failure
• Estimation of VaR –
risk capital
• Estimation of scores
representing quality
of internal controls
PROCESSES
• Loss data collection
• Risk indicator data
collection
• Control self-
assessment
• Risk assessment and
analysis
• Workflow
• Automatic notification
• Follow up action
controls quality
• Cost benefit analysis
• Improved risk
mitigation and
transfer strategy
Management & Control Quality
EconomicProfit
The universe of operational risks spans causes, events and
consequences
Insufficient training
CAUSES EVENTS CONSEQUENCES
Lack of management
supervision
Inadequate
segregation of duties
External
Fraud
Internal
Fraud
Regulatory, Compliance
& Taxation Penalties
EFFECTS
Monetary
Loss or Damage
to Assets
Legal Liability
Inadequate
auditing procedures
Inadequate security
measures
Poor HR
policies
Poor systems
design
Employment Practices
& Workplace Safety
Clients, Products
& Business Practices
Damage to
Physical Assets
Business Disruption
& System Failures
Execution, Delivery &
Process Management
Restitution
Loss of Recourse
Reputation
Business Interruption
Monetary
Losses
OTHER
IMPACTS
Forgone
Income
•
•
•
Write-down
Using internal and external loss data can calculate Value at Risk
INDIVIDUAL
LOSS EVENTS
RISK MATRIX FOR
LOSS DATA
VAR
CALCULATION
TOTAL LOSS
DISTRIBUTION
74,712,345
74,603,709
LOSS
DISTRIBUTIONS
Frequency
of events74,603,709
74,457,745
74,345,957
74,344,576
167,245
142,456
123,345
113,342
94,458
•
•
•
of events
Severity
of loss
43210
40-
50
30-
40
20-
30
10-
20
0-10
INTERNAL
FRAUD
EXTERN AL
FRAUD
EMPLO YMEN T
PRACT ICES &
W ORKPLACE
SAFET Y
CLIENTS,
PRODUCTS &
BUSINESS
PRACT ICES
DAMAGE TO
PHYS IC AL
ASSETS
EXECUTION,
DELIVERY &
PROCESS
MAN AGEMENT
BUSINESS
DISRUPT ION AND
SYSTEM
FAILURES TOTAL
Corporate Finance Number 36 3 25 36 33 150 2 315
Mean 35,459 52,056 3,456 56,890 56,734 1,246 89,678 44,215
Standard Deviation 5,694 8,975 3,845 7,890 3,456 245 23,543 6,976
Trading & Sales Number 50 4 35 50 46 210 3 441
Mean 53,189 78,084 5,184 85,335 85,101 1,869 134,517 66,322
Standard Deviation 8,541 13,463 5,768 11,835 5,184 368 35,315 10,464
Retail Banking Number 45 4 32 45 42 189 3 397
Mean 47,870 70,276 4,666 76,802 76,591 1,682 121,065 59,690
Standard Deviation 7,687 12,116 5,191 10,652 4,666 331 31,783 9,417
Commercial Banking Number 41 3 28 41 37 170 2 357
Mean 43,083 63,248 4,199 69,121 68,932 1,514 108,959 53,721
Standard Deviation 6,918 10,905 4,672 9,586 4,199 298 28,605 8,476
Payment & Settlements Number 37 3 26 37 34 153 2 321
Mean 38,774 56,923 3,779 62,209 62,039 1,363 98,063 48,349
Standard Deviation 6,226 9,814 4,205 8,628 3,779 268 25,744 7,628
Agency Services Number 44 4 31 44 40 184 2 386
Mean 46,529 68,308 4,535 74,651 74,446 1,635 117,675 58,018
Standard Deviation 7,472 11,777 5,045 10,353 4,535 321 30,893 9,154
Asset Management Number 40 3 28 40 36 165 2 347
Mean 41,876 61,477 4,081 67,186 67,002 1,472 105,908 52,217
Standard Deviation 6,725 10,599 4,541 9,318 4,081 289 27,804 8,238
Retail Brokerage Number 48 4 33 48 44 198 3 417
Mean 50,252 73,773 4,898 80,623 80,402 1,766 127,090 62,660
Standard Deviation 8069 12719 5449 11182 4898 347 33365 9886
Insurance Number 43 4 30 43 39 179 2 375
Mean 45,226 66,395 4,408 72,561 72,362 1,589 114,381 56,394
Standard Deviation 7,262 11,447 4,904 10,063 4,408 312 30,028 8,897
Total Number 435 36 302 435 399 1,812 24 3,806
Mean 45,653 67,021 4,450 73,245 73,044 1,604 115,459 56,926
Standard Deviation 7,331 11,555 4,950 10,158 4,450 315 30,311 8,981
Annual Aggregate Loss ($)
Mean 99th Percentile
Simulation
VaR
Calculator
e.g.,
Monte
Carlo
Simulation
Engine
Composite control assessment/indicator scores can be used to modify
capital figures
VAR
CONTROL
ASSESSMENT/INDICATOR
SCORE
Adjustment for
Quality of
CAPITAL
0
Current score
Quality of
Current Control
Environment
190100210
Previous score 50
Linking capital to changes in the quality of internal controls provides an incentive for
desired behavioral change
What does it tell us?
06/09/2013 17
Basel II Approaches on Operational Risk
•Basic Indicator
•Standardized
•Advanced Measurement
•Standardized
•Foundation IRB
•Advanced IRB
06/09/2013 18
•OPERATIONAL •CREDIT
The Basic Indicator Approach
Banks using the Basic Indicator Approach must hold
capital for operational risk equal to the average over the
previous three years of a fixed percentage (denoted
alpha) of positive annual gross income.
Figures for any year in which annual gross income is
06/09/2013 19
Figures for any year in which annual gross income is
negative or zero should be excluded from both the
numerator and denominator when calculating the
average.
The charge may be expressed as follows:
06/09/2013 20
The Standardized Approach
In the Standardized Approach, banks’ activities are divided into eight business lines:
corporate finance, trading & sales, retail banking, commercial banking, payment &
settlement, agency services, asset management, and retail brokerage.
Within each business line, gross income is a broad indicator that serves as a proxy
for the scale of business operations and thus the likely scale of operational risk
exposure within each of these business lines.
The capital charge for each business line is calculated by multiplying gross income by
a factor (denoted beta) assigned to that business line.
06/09/2013 21
a factor (denoted beta) assigned to that business line.
Beta serves as a proxy for the industry-wide relationship between the operational risk
loss experience for a given business line and the aggregate level of gross income for
that business line.
It should be noted that in the Standardized Approach gross income is measured for
each business line, not the whole institution, i.e. in corporate finance, the indicator is
the gross income generated in the corporate finance business line
Standardized Approach
06/09/2013 22
Standardized Approach
06/09/2013 23
Mapping Business Lines
06/09/2013 24
Advanced Measurement Approaches (AMA)
Under the AMA, the regulatory capital requirement will
equal the risk measure generated by the bank’s internal
operational risk measurement system using the
quantitative and qualitative criteria.
Use of the AMA is subject to supervisory approval.
06/09/2013 25
Use of the AMA is subject to supervisory approval.
A bank adopting the AMA may, with the approval of its
host supervisors and the support of its home supervisor,
use an allocation mechanism for the purpose of
determining the regulatory capital requirement
Lakukanlah agregasi dengan @Risk dengan prosedur berikut
1. Data severity dan frequency dicari distribusinya untuk mendapatkan
parameter dalam simulasi Monte Carlo
2. Pertama kali yang disimulasi adalah parameter distribusi frequency,
buatlah 1.000 iterasi
3. Identifikasikan numbers of #event dengan fungsi Excel
COUNTIF(range,criteria). Ex. COUNTIF(a1:a1000;1)=220. Artinya
dalam 1000 simulasi, ada 220 kejadian dimana fraud terjadi sekali
Agregasi Operational VaR Dengan Simulasi MC
26
dalam 1000 simulasi, ada 220 kejadian dimana fraud terjadi sekali
4. Akumulasikan #event (tentunya terkecuali untuk 0 event), untuk
menentukan berapa iterasi yang diperlukan untuk simulasi kedua
yakni simulasi atas distribusi severity. Misalnya kita harus
memperoleh 2.370 data severity data untuk membangun (aggregate)
operational loss distribution
5. Lakukanlah agregasi (lihat slide berikut) dan sortirlah untuk
memperoleh the worst 1% (data ke 11 dari hasil sortiran), itulah nilai
VaR
6. VaR = unexpected loss, sedangkan Capital at Risk adalah VaR –
expected loss. Bagaimana cara menghitung Expected loss ?
How to prepare frequency distribution for aggregation…
Aggregation: Estimate the Operational VaR
Result of Monte Carlo Simulation for Frequency Distribution
0 926 0
1 2204 9074
2 2621 6870
3 2079 4249
4 1237 2170
5 589 933
6 233 344
27
6 233 344
7 79 111
8 24 32
9 6 8
10 1 2
11 1 1
12 0 0
13 0 0
14 0 0
15 0 0
10000 23794
#iteration for Monte Carlo
Simulation of Severity Distribution
How to operate the aggregation in @Risk and Excel from 10.000 iteration
Aggregation: Estimate the Operational VaR
#iteration 1 2 3 4 5 6 7 8 9 10 11 TOTAL SORTED TOTAL
1 139.403 25.355 3.028 37.287 2.413 62.683 3.077 106.145 17.996 29.145 28.931 455.462 2.794.407
2 5.906 15.094 60.111 6.412 5.717 2.888 6.190 4.368 13.120 12.693 132.498 2.302.650
3 41.016 34.273 17.829 10.913 121.993 31.014 3.013 4.311 2.867 267.227 1.838.147
4 3.010 16.466 71.539 3.668 24.766 64.436 4.789 2.848 1.036.967 1.228.489 1.589.285
5 5.372 16.507 12.280 229.791 396.221 3.133 3.356 2.820 14.135 683.615 1.442.909
6 19.552 5.364 2.544 5.840 15.704 11.879 10.091 3.044 9.696 83.713 1.372.917
7 2.817 22.719 9.117 12.405 26.192 3.262 6.648 2.848 17.606 103.614 1.371.524
8 4.491 29.917 4.240 4.270 11.240 41.110 2.943 8.490 5.850 112.552 1.262.464
28
8 4.491 29.917 4.240 4.270 11.240 41.110 2.943 8.490 5.850 112.552 1.262.464
9 17.105 10.360 6.097 7.844 21.148 69.398 42.012 6.649 4.104 184.717 1.228.489
10 2.311 11.268 33.293 58.336 7.880 4.487 71.697 9.249 198.521 1.208.609
11 10.619 28.960 39.238 7.351 2.273 397.857 17.500 22.171 525.969 1.194.787
98 4.044 20.590 12.202 8.690 5.730 236.285 36.835 324.377 455.850
99 40.555 32.769 52.625 107.587 2.755 4.314 3.747 244.353 455.462
100 15.605 25.863 89.315 3.224 62.638 19.859 12.503 229.006 448.611
101 5.584 4.667 19.408 6.858 4.147 2.814 3.533 47.010 447.740
102 21.416 8.238 5.680 8.168 13.596 3.667 15.001 75.766 442.711
103 7.437 13.141 66.185 13.844 5.912 10.419 32.618 149.557 442.142
104 7.152 5.699 11.974 5.746 2.813 2.551 15.965 51.900 441.322
105 6.927 5.045 10.536 4.530 26.766 2.612 5.228 61.644 439.977
Unexpected Loss Rp 447.740.000
Expected Loss Rp 25.265.000
Capital at Risk Rp 422.475.000
Frequencyoflosses
Capital at Risk (Rp 422.475.000)
=
Unexpected losses – Expected Losses
Sustaining losses in Operational Risk
1%
29
Size of losses
Frequencyoflosses
Income Capital Insurance
1%
447.74025.265

Mais conteúdo relacionado

Mais procurados

Operation Risk Management in Banking Sector
Operation Risk Management in Banking SectorOperation Risk Management in Banking Sector
Operation Risk Management in Banking SectorSanjay Kumbhar
 
Operational Risk Management under BASEL era
Operational Risk Management under BASEL eraOperational Risk Management under BASEL era
Operational Risk Management under BASEL eraTreat Risk
 
Operational Risk Management
Operational Risk ManagementOperational Risk Management
Operational Risk Managementarsqureshi
 
Operational risk management (orm)
Operational risk management (orm)Operational risk management (orm)
Operational risk management (orm)Bushra Angbeen
 
Risk Management ERM Presentation
Risk Management ERM PresentationRisk Management ERM Presentation
Risk Management ERM Presentationalygale
 
operations risk management power point presentation.
operations risk management power point presentation.operations risk management power point presentation.
operations risk management power point presentation.Miyelani Shibambo
 
Implementation of Enterprise Risk Management with ISO 31000 Risk Management S...
Implementation of Enterprise Risk Management with ISO 31000 Risk Management S...Implementation of Enterprise Risk Management with ISO 31000 Risk Management S...
Implementation of Enterprise Risk Management with ISO 31000 Risk Management S...PECB
 
Report - Risk Management in Banks
Report - Risk Management in BanksReport - Risk Management in Banks
Report - Risk Management in BanksSharad Srivastava
 
Risk Management Essentials for Bankers
Risk Management Essentials for BankersRisk Management Essentials for Bankers
Risk Management Essentials for BankersDavid Vu
 
Riskpro - Operational Risk Management
Riskpro - Operational Risk ManagementRiskpro - Operational Risk Management
Riskpro - Operational Risk ManagementManoj Jain
 
Risk & Risk Management
Risk & Risk ManagementRisk & Risk Management
Risk & Risk Managementansula
 
Strategic Risk Management as a CFO: Getting Risk Management Right
Strategic Risk Management as a CFO: Getting Risk Management RightStrategic Risk Management as a CFO: Getting Risk Management Right
Strategic Risk Management as a CFO: Getting Risk Management RightProformative, Inc.
 
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksStrategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksInternational Federation of Accountants
 
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...Eric Campbell
 
Chapter 5 - Risk Management - 2nd Semester - M.Com - Bangalore University
Chapter 5 - Risk Management - 2nd Semester - M.Com - Bangalore UniversityChapter 5 - Risk Management - 2nd Semester - M.Com - Bangalore University
Chapter 5 - Risk Management - 2nd Semester - M.Com - Bangalore UniversitySwaminath Sam
 
Risk Management Fundamentals
Risk Management FundamentalsRisk Management Fundamentals
Risk Management Fundamentalsmikaelastafrace
 

Mais procurados (20)

Operation Risk Management in Banking Sector
Operation Risk Management in Banking SectorOperation Risk Management in Banking Sector
Operation Risk Management in Banking Sector
 
Operational Risk Management under BASEL era
Operational Risk Management under BASEL eraOperational Risk Management under BASEL era
Operational Risk Management under BASEL era
 
Operational Risk Management
Operational Risk ManagementOperational Risk Management
Operational Risk Management
 
Operational risk management (orm)
Operational risk management (orm)Operational risk management (orm)
Operational risk management (orm)
 
Risk Management ERM Presentation
Risk Management ERM PresentationRisk Management ERM Presentation
Risk Management ERM Presentation
 
operations risk management power point presentation.
operations risk management power point presentation.operations risk management power point presentation.
operations risk management power point presentation.
 
Implementation of Enterprise Risk Management with ISO 31000 Risk Management S...
Implementation of Enterprise Risk Management with ISO 31000 Risk Management S...Implementation of Enterprise Risk Management with ISO 31000 Risk Management S...
Implementation of Enterprise Risk Management with ISO 31000 Risk Management S...
 
Report - Risk Management in Banks
Report - Risk Management in BanksReport - Risk Management in Banks
Report - Risk Management in Banks
 
Risk Management Essentials for Bankers
Risk Management Essentials for BankersRisk Management Essentials for Bankers
Risk Management Essentials for Bankers
 
Riskpro - Operational Risk Management
Riskpro - Operational Risk ManagementRiskpro - Operational Risk Management
Riskpro - Operational Risk Management
 
Risk & Risk Management
Risk & Risk ManagementRisk & Risk Management
Risk & Risk Management
 
ERM-Enterprise Risk Management
ERM-Enterprise Risk ManagementERM-Enterprise Risk Management
ERM-Enterprise Risk Management
 
Strategic Risk Management as a CFO: Getting Risk Management Right
Strategic Risk Management as a CFO: Getting Risk Management RightStrategic Risk Management as a CFO: Getting Risk Management Right
Strategic Risk Management as a CFO: Getting Risk Management Right
 
Risk Appetite
Risk AppetiteRisk Appetite
Risk Appetite
 
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected RisksStrategic Risk Management in the Face of Uncertainty and Unexpected Risks
Strategic Risk Management in the Face of Uncertainty and Unexpected Risks
 
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
Risk Appetite & Risk Tolerance: Improving their application from Abstract to ...
 
Chapter 5 - Risk Management - 2nd Semester - M.Com - Bangalore University
Chapter 5 - Risk Management - 2nd Semester - M.Com - Bangalore UniversityChapter 5 - Risk Management - 2nd Semester - M.Com - Bangalore University
Chapter 5 - Risk Management - 2nd Semester - M.Com - Bangalore University
 
Risk Management Fundamentals
Risk Management FundamentalsRisk Management Fundamentals
Risk Management Fundamentals
 
Risk Appetite
Risk AppetiteRisk Appetite
Risk Appetite
 
Fundamentals of Market Risk Management by Dr. Emmanuel Moore ABOLO
Fundamentals of Market Risk Management by Dr. Emmanuel Moore ABOLOFundamentals of Market Risk Management by Dr. Emmanuel Moore ABOLO
Fundamentals of Market Risk Management by Dr. Emmanuel Moore ABOLO
 

Semelhante a Operational risk management and measurement

Operational Risk Management
Operational Risk ManagementOperational Risk Management
Operational Risk ManagementAsad Hameed
 
Current Write-off Rates and Q-factors in Roll-rate Method
Current Write-off Rates and Q-factors in Roll-rate MethodCurrent Write-off Rates and Q-factors in Roll-rate Method
Current Write-off Rates and Q-factors in Roll-rate MethodGraceCooper18
 
Operational risk management
Operational risk managementOperational risk management
Operational risk managementUjjwal 'Shanu'
 
Operation var (ama) con0529e
Operation var (ama) con0529eOperation var (ama) con0529e
Operation var (ama) con0529eChipo Nyachiwowa
 
Creditscore
CreditscoreCreditscore
Creditscorekevinlan
 
Spire Brief - Risk Consulting
Spire Brief - Risk ConsultingSpire Brief - Risk Consulting
Spire Brief - Risk ConsultingPrashant Jain
 
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011IBM Sverige
 
Ultimate guide to performance measurement
Ultimate guide to performance measurementUltimate guide to performance measurement
Ultimate guide to performance measurementRebecca Manjra
 
Operational Risk : Take a look at the raw canvas
Operational Risk : Take a look at the raw canvasOperational Risk : Take a look at the raw canvas
Operational Risk : Take a look at the raw canvasTreat Risk
 
Key considerations for your internal audit plan
Key considerations for your internal audit planKey considerations for your internal audit plan
Key considerations for your internal audit planessbaih
 
Analytics to the Rescue: Better Loss Prevention through Modeling
Analytics to the Rescue: Better Loss Prevention through ModelingAnalytics to the Rescue: Better Loss Prevention through Modeling
Analytics to the Rescue: Better Loss Prevention through ModelingCognizant
 
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'miranga88
 
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'miranga88
 
Case 2.2INTRODUCTION 1Apple Inc. (Apple) is a worldwide provid.docx
Case 2.2INTRODUCTION 1Apple Inc. (Apple) is a worldwide provid.docxCase 2.2INTRODUCTION 1Apple Inc. (Apple) is a worldwide provid.docx
Case 2.2INTRODUCTION 1Apple Inc. (Apple) is a worldwide provid.docxtidwellveronique
 
Arens12e 08
Arens12e 08Arens12e 08
Arens12e 08John Sy
 
Weaver - Financial Institutions Consulting
Weaver - Financial Institutions ConsultingWeaver - Financial Institutions Consulting
Weaver - Financial Institutions ConsultingAndrew Topa
 
Study ROI of Supply Chain Risk Management (riskmethods Nov 2014)
Study ROI of Supply Chain Risk Management (riskmethods Nov 2014)Study ROI of Supply Chain Risk Management (riskmethods Nov 2014)
Study ROI of Supply Chain Risk Management (riskmethods Nov 2014)Heiko Schwarz
 

Semelhante a Operational risk management and measurement (20)

Operational Risk Management
Operational Risk ManagementOperational Risk Management
Operational Risk Management
 
Current Write-off Rates and Q-factors in Roll-rate Method
Current Write-off Rates and Q-factors in Roll-rate MethodCurrent Write-off Rates and Q-factors in Roll-rate Method
Current Write-off Rates and Q-factors in Roll-rate Method
 
Operational risk management
Operational risk managementOperational risk management
Operational risk management
 
Operation var (ama) con0529e
Operation var (ama) con0529eOperation var (ama) con0529e
Operation var (ama) con0529e
 
Creditscore
CreditscoreCreditscore
Creditscore
 
Spire Brief - Risk Consulting
Spire Brief - Risk ConsultingSpire Brief - Risk Consulting
Spire Brief - Risk Consulting
 
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
Effektiv riskhantering - teori vs praktik - IBM Smarter Business 2011
 
Ultimate guide to performance measurement
Ultimate guide to performance measurementUltimate guide to performance measurement
Ultimate guide to performance measurement
 
Operational Risk : Take a look at the raw canvas
Operational Risk : Take a look at the raw canvasOperational Risk : Take a look at the raw canvas
Operational Risk : Take a look at the raw canvas
 
Key considerations for your internal audit plan
Key considerations for your internal audit planKey considerations for your internal audit plan
Key considerations for your internal audit plan
 
Analytics to the Rescue: Better Loss Prevention through Modeling
Analytics to the Rescue: Better Loss Prevention through ModelingAnalytics to the Rescue: Better Loss Prevention through Modeling
Analytics to the Rescue: Better Loss Prevention through Modeling
 
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
 
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
Ratio Analysis in 'ROYAL CERAMIC LANKA PLC'
 
Risk management
Risk managementRisk management
Risk management
 
Case 2.2INTRODUCTION 1Apple Inc. (Apple) is a worldwide provid.docx
Case 2.2INTRODUCTION 1Apple Inc. (Apple) is a worldwide provid.docxCase 2.2INTRODUCTION 1Apple Inc. (Apple) is a worldwide provid.docx
Case 2.2INTRODUCTION 1Apple Inc. (Apple) is a worldwide provid.docx
 
ARMOL
ARMOLARMOL
ARMOL
 
Arens12e 08
Arens12e 08Arens12e 08
Arens12e 08
 
Mcclain Plastics
Mcclain PlasticsMcclain Plastics
Mcclain Plastics
 
Weaver - Financial Institutions Consulting
Weaver - Financial Institutions ConsultingWeaver - Financial Institutions Consulting
Weaver - Financial Institutions Consulting
 
Study ROI of Supply Chain Risk Management (riskmethods Nov 2014)
Study ROI of Supply Chain Risk Management (riskmethods Nov 2014)Study ROI of Supply Chain Risk Management (riskmethods Nov 2014)
Study ROI of Supply Chain Risk Management (riskmethods Nov 2014)
 

Último

Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 

Último (20)

Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 

Operational risk management and measurement

  • 2. What is Operational Risk? The risk of loss resulting from inadequate or failed internal processes, people and systems or from external events (The Basel II Capital Accord) FORMERLY any risk but market and credit risks It is NOT a brand new stuff and it is the risk that affects 06/09/2013 2 It is NOT a brand new stuff and it is the risk that affects all businesses Operational risk is inherent in carrying out a process/ operational activity.
  • 3. Classification of Operational Risks Operational risk events are classified by two factors: frequency – how often the event occurs impact – the amount of the High Frequency Low Impact High Frequency High Impact Frequency 06/09/2013 3 impact – the amount of the losses resulting from the event Low Frequency Low Impact Low Frequency High Impact Frequency Impact
  • 4. Classification of Operational Risks Generally, operational risk management focuses on only two of these event types: Low frequency / high impact (LFHI) High frequency / low impact (HFLI) 06/09/2013 4 Why?
  • 5. Classification of Operational Risks High frequency/low impact events are managed to improve business efficiency. These events tend to be readily understood and are viewed as ‘the cost of doing business’. Examples? 06/09/2013 5 Examples?
  • 6. Expected loss verses unexpected loss Expected loss is the loss incurred as a bank conducts its normal business. Can be simply defined as the cost of doing business The only way to totally prevent them is to cease doing business. 06/09/2013 6 business.
  • 7. Expected loss versus unexpected loss A bank uses statistical methods to predict its expected losses. In short, the firm uses past data and experience to predict the future. A simple method of calculating expected loss is to 06/09/2013 7 A simple method of calculating expected loss is to compute the mean (average) of the actual losses over a given time and accept this as the likely future level.
  • 8. Expected loss verses unexpected loss A firm may also attempt to ‘predict’ its unexpected losses using statistics, much like the way that is used to predict expected losses. The problems are the past data may not available and therefore to calculate unexpected loss a firm uses: 06/09/2013 8 therefore to calculate unexpected loss a firm uses: available internal data external data from other firms data from operational risk scenarios
  • 9. Operational risk event categories The simplest way of understanding operational risk in banks is to categorize it as anything but credit risk or market risk. However, this is a very broad definition and does not help manage operational risk. 06/09/2013 9 Generally, operational risk events can be subdivided into: internal process risk people risk systems risk external risk legal risk
  • 10. Internal Process Risk Internal process risk is defined as the risk associated with the failure of a bank’s processes or procedures. During a bank’s day-to-day operations, staff follow preset working practices. These procedures and policies will include all the 06/09/2013 10 These procedures and policies will include all the checks, and controls required to ensure that customers are correctly served and the bank remains within the laws and regulations by which it is governed
  • 11. Internal Process Risks Internal process risk events include: documentation – inadequate, insufficient or wrong lack of controls marketing errors misselling money laundering 06/09/2013 11 money laundering incorrect or insufficient reporting (e.g. regulatory) transaction error Reviewing and improving a bank’s internal processes as part of operational risk management can improve its efficiency. Errors often occur when a process is complicated, disorganized or easily circumvented, all of which are also inefficient business practices.
  • 12. Risk Management Process Feedback Loop 1. Identify, assess and prioritize risks 2. Develop strategies to measure risk 6. Revise policies and procedures 06/09/2013 12 3. Design policies and procedures to mitigate risks 4. Implement and assign responsibility 5. Test effectiveness and evaluate results
  • 13. MEASUREMENT • Estimation of annual losses – cost of operational failurePROCESSES REPORTING • Integrated MIS reporting • Awareness of exposures • Knowledge of controls quality There are four fundamental steps to managing operational risk, with each step leading to improvements in management & control quality and greater economic profit FRAMEWORK • Risk strategy, tolerance • Roles and responsibilities • Policies and procedures • Risk definition and categorization operational failure • Estimation of VaR – risk capital • Estimation of scores representing quality of internal controls PROCESSES • Loss data collection • Risk indicator data collection • Control self- assessment • Risk assessment and analysis • Workflow • Automatic notification • Follow up action controls quality • Cost benefit analysis • Improved risk mitigation and transfer strategy Management & Control Quality EconomicProfit
  • 14. The universe of operational risks spans causes, events and consequences Insufficient training CAUSES EVENTS CONSEQUENCES Lack of management supervision Inadequate segregation of duties External Fraud Internal Fraud Regulatory, Compliance & Taxation Penalties EFFECTS Monetary Loss or Damage to Assets Legal Liability Inadequate auditing procedures Inadequate security measures Poor HR policies Poor systems design Employment Practices & Workplace Safety Clients, Products & Business Practices Damage to Physical Assets Business Disruption & System Failures Execution, Delivery & Process Management Restitution Loss of Recourse Reputation Business Interruption Monetary Losses OTHER IMPACTS Forgone Income • • • Write-down
  • 15. Using internal and external loss data can calculate Value at Risk INDIVIDUAL LOSS EVENTS RISK MATRIX FOR LOSS DATA VAR CALCULATION TOTAL LOSS DISTRIBUTION 74,712,345 74,603,709 LOSS DISTRIBUTIONS Frequency of events74,603,709 74,457,745 74,345,957 74,344,576 167,245 142,456 123,345 113,342 94,458 • • • of events Severity of loss 43210 40- 50 30- 40 20- 30 10- 20 0-10 INTERNAL FRAUD EXTERN AL FRAUD EMPLO YMEN T PRACT ICES & W ORKPLACE SAFET Y CLIENTS, PRODUCTS & BUSINESS PRACT ICES DAMAGE TO PHYS IC AL ASSETS EXECUTION, DELIVERY & PROCESS MAN AGEMENT BUSINESS DISRUPT ION AND SYSTEM FAILURES TOTAL Corporate Finance Number 36 3 25 36 33 150 2 315 Mean 35,459 52,056 3,456 56,890 56,734 1,246 89,678 44,215 Standard Deviation 5,694 8,975 3,845 7,890 3,456 245 23,543 6,976 Trading & Sales Number 50 4 35 50 46 210 3 441 Mean 53,189 78,084 5,184 85,335 85,101 1,869 134,517 66,322 Standard Deviation 8,541 13,463 5,768 11,835 5,184 368 35,315 10,464 Retail Banking Number 45 4 32 45 42 189 3 397 Mean 47,870 70,276 4,666 76,802 76,591 1,682 121,065 59,690 Standard Deviation 7,687 12,116 5,191 10,652 4,666 331 31,783 9,417 Commercial Banking Number 41 3 28 41 37 170 2 357 Mean 43,083 63,248 4,199 69,121 68,932 1,514 108,959 53,721 Standard Deviation 6,918 10,905 4,672 9,586 4,199 298 28,605 8,476 Payment & Settlements Number 37 3 26 37 34 153 2 321 Mean 38,774 56,923 3,779 62,209 62,039 1,363 98,063 48,349 Standard Deviation 6,226 9,814 4,205 8,628 3,779 268 25,744 7,628 Agency Services Number 44 4 31 44 40 184 2 386 Mean 46,529 68,308 4,535 74,651 74,446 1,635 117,675 58,018 Standard Deviation 7,472 11,777 5,045 10,353 4,535 321 30,893 9,154 Asset Management Number 40 3 28 40 36 165 2 347 Mean 41,876 61,477 4,081 67,186 67,002 1,472 105,908 52,217 Standard Deviation 6,725 10,599 4,541 9,318 4,081 289 27,804 8,238 Retail Brokerage Number 48 4 33 48 44 198 3 417 Mean 50,252 73,773 4,898 80,623 80,402 1,766 127,090 62,660 Standard Deviation 8069 12719 5449 11182 4898 347 33365 9886 Insurance Number 43 4 30 43 39 179 2 375 Mean 45,226 66,395 4,408 72,561 72,362 1,589 114,381 56,394 Standard Deviation 7,262 11,447 4,904 10,063 4,408 312 30,028 8,897 Total Number 435 36 302 435 399 1,812 24 3,806 Mean 45,653 67,021 4,450 73,245 73,044 1,604 115,459 56,926 Standard Deviation 7,331 11,555 4,950 10,158 4,450 315 30,311 8,981 Annual Aggregate Loss ($) Mean 99th Percentile Simulation VaR Calculator e.g., Monte Carlo Simulation Engine
  • 16. Composite control assessment/indicator scores can be used to modify capital figures VAR CONTROL ASSESSMENT/INDICATOR SCORE Adjustment for Quality of CAPITAL 0 Current score Quality of Current Control Environment 190100210 Previous score 50 Linking capital to changes in the quality of internal controls provides an incentive for desired behavioral change
  • 17. What does it tell us? 06/09/2013 17
  • 18. Basel II Approaches on Operational Risk •Basic Indicator •Standardized •Advanced Measurement •Standardized •Foundation IRB •Advanced IRB 06/09/2013 18 •OPERATIONAL •CREDIT
  • 19. The Basic Indicator Approach Banks using the Basic Indicator Approach must hold capital for operational risk equal to the average over the previous three years of a fixed percentage (denoted alpha) of positive annual gross income. Figures for any year in which annual gross income is 06/09/2013 19 Figures for any year in which annual gross income is negative or zero should be excluded from both the numerator and denominator when calculating the average.
  • 20. The charge may be expressed as follows: 06/09/2013 20
  • 21. The Standardized Approach In the Standardized Approach, banks’ activities are divided into eight business lines: corporate finance, trading & sales, retail banking, commercial banking, payment & settlement, agency services, asset management, and retail brokerage. Within each business line, gross income is a broad indicator that serves as a proxy for the scale of business operations and thus the likely scale of operational risk exposure within each of these business lines. The capital charge for each business line is calculated by multiplying gross income by a factor (denoted beta) assigned to that business line. 06/09/2013 21 a factor (denoted beta) assigned to that business line. Beta serves as a proxy for the industry-wide relationship between the operational risk loss experience for a given business line and the aggregate level of gross income for that business line. It should be noted that in the Standardized Approach gross income is measured for each business line, not the whole institution, i.e. in corporate finance, the indicator is the gross income generated in the corporate finance business line
  • 25. Advanced Measurement Approaches (AMA) Under the AMA, the regulatory capital requirement will equal the risk measure generated by the bank’s internal operational risk measurement system using the quantitative and qualitative criteria. Use of the AMA is subject to supervisory approval. 06/09/2013 25 Use of the AMA is subject to supervisory approval. A bank adopting the AMA may, with the approval of its host supervisors and the support of its home supervisor, use an allocation mechanism for the purpose of determining the regulatory capital requirement
  • 26. Lakukanlah agregasi dengan @Risk dengan prosedur berikut 1. Data severity dan frequency dicari distribusinya untuk mendapatkan parameter dalam simulasi Monte Carlo 2. Pertama kali yang disimulasi adalah parameter distribusi frequency, buatlah 1.000 iterasi 3. Identifikasikan numbers of #event dengan fungsi Excel COUNTIF(range,criteria). Ex. COUNTIF(a1:a1000;1)=220. Artinya dalam 1000 simulasi, ada 220 kejadian dimana fraud terjadi sekali Agregasi Operational VaR Dengan Simulasi MC 26 dalam 1000 simulasi, ada 220 kejadian dimana fraud terjadi sekali 4. Akumulasikan #event (tentunya terkecuali untuk 0 event), untuk menentukan berapa iterasi yang diperlukan untuk simulasi kedua yakni simulasi atas distribusi severity. Misalnya kita harus memperoleh 2.370 data severity data untuk membangun (aggregate) operational loss distribution 5. Lakukanlah agregasi (lihat slide berikut) dan sortirlah untuk memperoleh the worst 1% (data ke 11 dari hasil sortiran), itulah nilai VaR 6. VaR = unexpected loss, sedangkan Capital at Risk adalah VaR – expected loss. Bagaimana cara menghitung Expected loss ?
  • 27. How to prepare frequency distribution for aggregation… Aggregation: Estimate the Operational VaR Result of Monte Carlo Simulation for Frequency Distribution 0 926 0 1 2204 9074 2 2621 6870 3 2079 4249 4 1237 2170 5 589 933 6 233 344 27 6 233 344 7 79 111 8 24 32 9 6 8 10 1 2 11 1 1 12 0 0 13 0 0 14 0 0 15 0 0 10000 23794 #iteration for Monte Carlo Simulation of Severity Distribution
  • 28. How to operate the aggregation in @Risk and Excel from 10.000 iteration Aggregation: Estimate the Operational VaR #iteration 1 2 3 4 5 6 7 8 9 10 11 TOTAL SORTED TOTAL 1 139.403 25.355 3.028 37.287 2.413 62.683 3.077 106.145 17.996 29.145 28.931 455.462 2.794.407 2 5.906 15.094 60.111 6.412 5.717 2.888 6.190 4.368 13.120 12.693 132.498 2.302.650 3 41.016 34.273 17.829 10.913 121.993 31.014 3.013 4.311 2.867 267.227 1.838.147 4 3.010 16.466 71.539 3.668 24.766 64.436 4.789 2.848 1.036.967 1.228.489 1.589.285 5 5.372 16.507 12.280 229.791 396.221 3.133 3.356 2.820 14.135 683.615 1.442.909 6 19.552 5.364 2.544 5.840 15.704 11.879 10.091 3.044 9.696 83.713 1.372.917 7 2.817 22.719 9.117 12.405 26.192 3.262 6.648 2.848 17.606 103.614 1.371.524 8 4.491 29.917 4.240 4.270 11.240 41.110 2.943 8.490 5.850 112.552 1.262.464 28 8 4.491 29.917 4.240 4.270 11.240 41.110 2.943 8.490 5.850 112.552 1.262.464 9 17.105 10.360 6.097 7.844 21.148 69.398 42.012 6.649 4.104 184.717 1.228.489 10 2.311 11.268 33.293 58.336 7.880 4.487 71.697 9.249 198.521 1.208.609 11 10.619 28.960 39.238 7.351 2.273 397.857 17.500 22.171 525.969 1.194.787 98 4.044 20.590 12.202 8.690 5.730 236.285 36.835 324.377 455.850 99 40.555 32.769 52.625 107.587 2.755 4.314 3.747 244.353 455.462 100 15.605 25.863 89.315 3.224 62.638 19.859 12.503 229.006 448.611 101 5.584 4.667 19.408 6.858 4.147 2.814 3.533 47.010 447.740 102 21.416 8.238 5.680 8.168 13.596 3.667 15.001 75.766 442.711 103 7.437 13.141 66.185 13.844 5.912 10.419 32.618 149.557 442.142 104 7.152 5.699 11.974 5.746 2.813 2.551 15.965 51.900 441.322 105 6.927 5.045 10.536 4.530 26.766 2.612 5.228 61.644 439.977 Unexpected Loss Rp 447.740.000 Expected Loss Rp 25.265.000 Capital at Risk Rp 422.475.000
  • 29. Frequencyoflosses Capital at Risk (Rp 422.475.000) = Unexpected losses – Expected Losses Sustaining losses in Operational Risk 1% 29 Size of losses Frequencyoflosses Income Capital Insurance 1% 447.74025.265