Cargo sous Terrain is a project to develop an underground pallet transportation system using proven tunneling technology. The system would use dedicated tunnels to efficiently transport cargo and reduce surface congestion. It aims to be privately financed using revenue from operations, CO2 certificates, and increased land values. An initial proof of concept tunnel is proposed between cities in Switzerland to demonstrate the system's ability to improve quality of life by reducing pollution while providing reliable, low-cost logistics.
2. Cargo sous Terrain
highlights at oneglance
1. Project drivenbyfuturecustomersneeds
and desires (consequentlymarketdriven)
1. Realisation through private financing
1. Trafficsegregation
1. In general, proven and tested technology
only
2
3. System Design
Cargosous Terrain
• Focus on logistics – needs,
full integrations !
• “Committed traffic” ensures
Requirements profitability
System
CargoTube • Design of cargo moving systems
Design
based on the know how of the
technology partners
Technology
• Setting up project organization
with local partners
3
4. Multidisziplinary
Project setup
Cargo sous Terrain
• Short PoC phase (12 month)
Construction
Mechatronic
Logistics
Business-
Operatins
Oecology
model
Users (logistics)
• Short planing phase (12 month)
Proof of
Concept
CargoTube Inc • Short building phase
&
(40 km / year)
Operators
Planing
associations
universities
authorities
Investors
politics
4
5. Private financing
• Low costs
– Construction
– Financing
– Operations
• Revenues
– Operations
– CO2-certificates
– Increase of land price
– Compensation from state
– Multiple use of tunnel
5
6. Life Quality
• Improve
• Life quality
• Supply reliability
• Reduced
• CO2
• Pollution
• Noise
• Energy
• Land usage
• …..
6
7. Technical
considerations
• Diameter : 4.5 – 6 mfor
– 3 palette tracks
– One tunnel – both ways
– Multiple use of tunnel
(generating additional revenue)
• Speed: 20 – 30 km/h
7
8. • Proof of conceptCargo sous Terrain Switzerland
(80 km)
Vision
• Surface for humans
Extension north Zurich Winterthur
Extension east • Supplies underground
• Water, gas, electricity is
underground, its time for
Cityeast cargo underground
• Quality of live increases
Suhr Cityouest
Härkingen Cargo sous Terrain
• Low cost – high
performance
CargoTube phase 1 • Sustainable
Warehouses,, Crossdocking, Shoppingcenters, • profitable
Further phases
Interfaces to train und trucks
Extension ouest
Container link from harbor to
• Harbor link Hamburg (37 km) logistic center
Project proposal: City quality
• World Bank (transport carbon division): check up
8
9. Cargosous Terrain
• Technology partners are
ligned up
– Logistics
– Mechatronics
– Geoengineering
– Financial engineering
• First results indicate
profitable investment !
BAV
9