Municipality of Tirana
                      Albania




Profile of the Tirana ’s River Basin and Hydro
                   Power Plant
            Prof.Dr. Edmond Panariti
                  Deputy/Mayor



               Tirana-Albania
Capital of Albania
Tirana city
Tirana is the capital of Albania. Included surrounding villages, Tirana counts in
total about 800.000 inhabitants among which about 500 000 are located in Tirana
Municipality. The surface extension of the city is 1238 km2
Tirana River   Tirana City
Watershed Area of Tirana
     Tirana river tributaries




           Ishem
           Ishem



                      T ii r
                      Tr
                        ana
                        ana
             La
             La
               na
               na
The Basin
River Tirana
 Tirana river constitutes the principal branch of Ishmi river . It has an ovearll
length of 35 km , and collects the water of Lana river and Limuthi branch. The
main river Ishem is formed downstream Tirana city.
          The hydrographic catchment of Ishmi river has a total area of 673 km2. It
has a total length of about 75 km and an average elevation of 357 m. The Ishmi
river is formed by three main rivers Tirana river, Tercuza river and Zeza river



Tirana river
 January 2012
Restoration and Rehabilitation of the Tiranas
River’Banks one of the largest project of Tirana |
                         Municipality
       Tirana River is the most polluted river in Albania
Rivers crossing the Capital Tirana
Two relevant rivers cross the city; the Lana River and the Tirana river. Those two
      water bodies meet the main Ishem River downstream of Tirana city.




 Point where Tirana river join’s Lana river
Lana River

Lana River is a tributary of River Tirana, which crosses from East to West the
urban area of the Capital.
POPULATION AND AGRICULTURE IN WATERSHEDS AREA
The historic and actual archive of HI is used
Data to be collected

 Land use and urban density (Population) of connected watersheds

               Density of    Rural land   Arable   Arboriculture   Forest   Pasture
               population    (%)          land     (%)             (%)      (%)
               Sq/km                      (%)
  Tirana       385.5         36.3         29.1     7.2             33.9     4.3
  River
  Tirana       460.4         25.4         19.1     6.3             39.7     6.1


 Detailed maps of the river area 1:25.000
                                     Tirana’s Watershed Chart
                                                 Untitled
    4610000


    4608000


    4606000


    4604000


    4602000


    4600000


    4598000


    4596000


    4594000


    4592000


    4590000




                                                                                                            1.1
    4588000




                                                                                                        75 3
                                                        22112




                                                                                                    0 -5
    4586000




                                                                                                    EM
    4584000




                                                                                                ISH
    4582000


    4580000


                                                                                         62.6
    4578000                                                                      0-228
                                                                            Lana

    4576000

        4370000   4375000   4380000    4385000    4390000       4395000   4400000           4405000
Tirana River Cascade Hydropower Potential
• Tirana’s river watershed energy project, will include the
  constructions of two hydropower plants situated in two sites
  along the Tirana river flow Zall-Dajt and Brar.
• Average perennial flow rate is 2,7 cubic m/s. The output
  energy shall enter the 20 kV substation situated 1000 m far
  from the HP plant. The plant will be placed at approximately 8
  km from the capital.
• A concession contract is expected to be concluded with the
  Ministry of Economy and Energy, once an investor shall be
  identified and will take it over.
• Construction permit will be granted by the Government
  following the presentation of a detailed design of the work.
Card
• Name of the work: HP watershed on Tirana’s river
• Installed Power 18,20 MW (Average Annual Energy 68,20
  MWh) supplied by two hydropower plants
HPP-s technical Data
•   Zall-Dajt-HPP
•   Q average=0,70m3/sec
•   Derivation pipeline Nr1 (Pipe/C/R) 1Ø1m and L=1250 m length
•   Derivation pipeline Nr 2 (Pipe/C/R) 1Ø 0,8 m and L=1550 m length
•   Pipeline of turbines (Steel) 2Ø0.90 m and L=130 m length.
•   Installed Power N=2,60 MW
•   Average Annual Energy E=11,35 million kWh.
•   Brar-HPP
•   Dam from gravel H Dam=55m
•   Total Volume of Reservoir, V reservoir=41.50 million m3
•   Regulator volume of Reservoir, V regulator=31.50 million m3
•   Dead Volume of Reservoir, V dead=10 million m3
•   Average perennial inflow rate Q average=2,70m3/sec
•   Derivation: Pipeline C/R Di= 1Ø2.2 m, L=3100 length an tunnel Di=Ø2.2m, L=3100m length
•   Balance Tower with DT=8m and Height H T=20m
•   Pipeline of Turbines (Steel) 2Ø1,60 m and L=1100 m length
•   Installed Power N=15.60 MW
•   Average annual energy output=68.20 million kWh
HP Turbines
• ZALL-DAJT – HPP
PELTON type turbine, two sets capacity 1500 kW.
• BRAR – HPP
PELTON type turbine, two sets capacity 8000 kW.
• Energy produced by two HPP-s to be dispatched through a
  10.300 m long line of 350 kv in Brari/Tirana substation.
• Current Status of Work – Pending a concessionary biding
  process.
• List o Conducted studies include: Hydrology, geology-
  engineering report, hydrotechnical and hydroenergetic
  report. Information by the Regional Water Basin Council on
  details of the concessionary operations, advantages and
  amounts of water to be used,
Project’s time Lines and
            Financial terms
• The anticipated expected investment amounts at
  42.60 millions of euro.
• Operational Costs (running and maintenance)at
  0.015 euro/kW
• Electricity selling price: 0.09-0.12 euro/kWh
• Deadline for self-settlement: 9.0-7.3 years
• Construction period 3.5 years
• Land to be used for the works: To be purchased by
  the investor in accordance with the price set by the
  state.
Tirana of the near future
A profile of the Tirana's river planned Hydro Power Plant

Mais conteúdo relacionado

Semelhante a A profile of the Tirana's river planned Hydro Power Plant

Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresPrasad Thanthratey
 
Capital Summit 2015: Tirana - Strategic Projects
Capital Summit 2015: Tirana - Strategic Projects Capital Summit 2015: Tirana - Strategic Projects
Capital Summit 2015: Tirana - Strategic Projects NALED Serbia
 
EMSSA Infraestructures Network GIS
EMSSA Infraestructures Network GISEMSSA Infraestructures Network GIS
EMSSA Infraestructures Network GISEsri
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhandijsrd.com
 
3kw Propeller Turbine Blade Design Based on Tidal Range
3kw Propeller Turbine Blade Design Based on Tidal Range3kw Propeller Turbine Blade Design Based on Tidal Range
3kw Propeller Turbine Blade Design Based on Tidal Rangeijtsrd
 

Semelhante a A profile of the Tirana's river planned Hydro Power Plant (10)

Hydro power
Hydro powerHydro power
Hydro power
 
Case Studies of Water Supply Infrastructures
Case Studies of Water Supply InfrastructuresCase Studies of Water Supply Infrastructures
Case Studies of Water Supply Infrastructures
 
Water supply system
Water supply systemWater supply system
Water supply system
 
AMIT 17357.pptx
AMIT 17357.pptxAMIT 17357.pptx
AMIT 17357.pptx
 
Small Hydro Power for Rural Development
Small Hydro Power for Rural DevelopmentSmall Hydro Power for Rural Development
Small Hydro Power for Rural Development
 
Capital Summit 2015: Tirana - Strategic Projects
Capital Summit 2015: Tirana - Strategic Projects Capital Summit 2015: Tirana - Strategic Projects
Capital Summit 2015: Tirana - Strategic Projects
 
EMSSA Infraestructures Network GIS
EMSSA Infraestructures Network GISEMSSA Infraestructures Network GIS
EMSSA Infraestructures Network GIS
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhand
 
Final
FinalFinal
Final
 
3kw Propeller Turbine Blade Design Based on Tidal Range
3kw Propeller Turbine Blade Design Based on Tidal Range3kw Propeller Turbine Blade Design Based on Tidal Range
3kw Propeller Turbine Blade Design Based on Tidal Range
 

Mais de Global Infrastructure Basel Foundation

GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_ChangshengGIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_ChangshengGlobal Infrastructure Basel Foundation
 

Mais de Global Infrastructure Basel Foundation (20)

GIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
GIB2015_Structuring Sustainable Infrastructure Projects_IISD PanelGIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
GIB2015_Structuring Sustainable Infrastructure Projects_IISD Panel
 
GIB2015_Solid Standards and Ratings_Schneider_Roos
GIB2015_Solid Standards and Ratings_Schneider_RoosGIB2015_Solid Standards and Ratings_Schneider_Roos
GIB2015_Solid Standards and Ratings_Schneider_Roos
 
GIB2015_Solid Standards and Ratings_Ruijie
GIB2015_Solid Standards and Ratings_RuijieGIB2015_Solid Standards and Ratings_Ruijie
GIB2015_Solid Standards and Ratings_Ruijie
 
GIB20115_Solid Standards and Ratings-Kornmann
GIB20115_Solid Standards and Ratings-KornmannGIB20115_Solid Standards and Ratings-Kornmann
GIB20115_Solid Standards and Ratings-Kornmann
 
GIB2015_Solid Standards and Ratings_Georgoulias
GIB2015_Solid Standards and Ratings_GeorgouliasGIB2015_Solid Standards and Ratings_Georgoulias
GIB2015_Solid Standards and Ratings_Georgoulias
 
GIB2015_Solid Standards and Ratings_Baillon
GIB2015_Solid Standards and Ratings_BaillonGIB2015_Solid Standards and Ratings_Baillon
GIB2015_Solid Standards and Ratings_Baillon
 
GIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_HughesGIB2015_Public and Private Sector Transit Development_Hughes
GIB2015_Public and Private Sector Transit Development_Hughes
 
GIB2015_Public and Private Sector Transit Development_Grant
GIB2015_Public and Private Sector Transit Development_GrantGIB2015_Public and Private Sector Transit Development_Grant
GIB2015_Public and Private Sector Transit Development_Grant
 
GIB2015_Public and Private sector Transit Development_Gonzalez
GIB2015_Public and Private sector Transit Development_GonzalezGIB2015_Public and Private sector Transit Development_Gonzalez
GIB2015_Public and Private sector Transit Development_Gonzalez
 
GIB2015_Public and Private Sector Transit Development_Bustinduy
GIB2015_Public and Private Sector Transit Development_BustinduyGIB2015_Public and Private Sector Transit Development_Bustinduy
GIB2015_Public and Private Sector Transit Development_Bustinduy
 
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_ValahuGIB2015_Investors Approach to Sustainable Infrastructure_Valahu
GIB2015_Investors Approach to Sustainable Infrastructure_Valahu
 
GIB2015_Investors Approach to Sustainable Infrastructure_Barben
GIB2015_Investors Approach to Sustainable Infrastructure_BarbenGIB2015_Investors Approach to Sustainable Infrastructure_Barben
GIB2015_Investors Approach to Sustainable Infrastructure_Barben
 
GIB2015_Instruments for Increasing Capital Flows_Zhang
GIB2015_Instruments for Increasing Capital Flows_ZhangGIB2015_Instruments for Increasing Capital Flows_Zhang
GIB2015_Instruments for Increasing Capital Flows_Zhang
 
GIB2015_Instruments for Increasing Capital Flows_von Gunten
GIB2015_Instruments for Increasing Capital Flows_von GuntenGIB2015_Instruments for Increasing Capital Flows_von Gunten
GIB2015_Instruments for Increasing Capital Flows_von Gunten
 
GIB2015_Instruments for Increasing Capital Flows_Fischer
GIB2015_Instruments for Increasing Capital Flows_FischerGIB2015_Instruments for Increasing Capital Flows_Fischer
GIB2015_Instruments for Increasing Capital Flows_Fischer
 
GIB2015_Instruments for Increasing Capital Flows_Alexander
GIB2015_Instruments for Increasing Capital Flows_AlexanderGIB2015_Instruments for Increasing Capital Flows_Alexander
GIB2015_Instruments for Increasing Capital Flows_Alexander
 
GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_ChangshengGIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
GIB2015_Increasing Efficiency of Sustainable Infrastructure_Changsheng
 
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_JianzhongGIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
GIB2015_Increase Investment in Sustainable Infrasructure_Jianzhong
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
GIB2015_Closing Financing Gap in Resilient Infrastructure_PretelGIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
GIB2015_Closing Financing Gap in Resilient Infrastructure_Pretel
 
GIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
GIB2015_Closing Financing Gap in Resilient Infrastructure_BreschGIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
GIB2015_Closing Financing Gap in Resilient Infrastructure_Bresch
 

Último

TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 

Último (20)

TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 

A profile of the Tirana's river planned Hydro Power Plant

  • 1. Municipality of Tirana Albania Profile of the Tirana ’s River Basin and Hydro Power Plant Prof.Dr. Edmond Panariti Deputy/Mayor Tirana-Albania
  • 2. Capital of Albania Tirana city Tirana is the capital of Albania. Included surrounding villages, Tirana counts in total about 800.000 inhabitants among which about 500 000 are located in Tirana Municipality. The surface extension of the city is 1238 km2
  • 3. Tirana River Tirana City
  • 4. Watershed Area of Tirana Tirana river tributaries Ishem Ishem T ii r Tr ana ana La La na na
  • 5. The Basin River Tirana Tirana river constitutes the principal branch of Ishmi river . It has an ovearll length of 35 km , and collects the water of Lana river and Limuthi branch. The main river Ishem is formed downstream Tirana city. The hydrographic catchment of Ishmi river has a total area of 673 km2. It has a total length of about 75 km and an average elevation of 357 m. The Ishmi river is formed by three main rivers Tirana river, Tercuza river and Zeza river Tirana river January 2012
  • 6. Restoration and Rehabilitation of the Tiranas River’Banks one of the largest project of Tirana | Municipality Tirana River is the most polluted river in Albania
  • 7. Rivers crossing the Capital Tirana Two relevant rivers cross the city; the Lana River and the Tirana river. Those two water bodies meet the main Ishem River downstream of Tirana city.  Point where Tirana river join’s Lana river
  • 8. Lana River Lana River is a tributary of River Tirana, which crosses from East to West the urban area of the Capital.
  • 9. POPULATION AND AGRICULTURE IN WATERSHEDS AREA The historic and actual archive of HI is used Data to be collected  Land use and urban density (Population) of connected watersheds Density of Rural land Arable Arboriculture Forest Pasture population (%) land (%) (%) (%) Sq/km (%) Tirana 385.5 36.3 29.1 7.2 33.9 4.3 River Tirana 460.4 25.4 19.1 6.3 39.7 6.1  Detailed maps of the river area 1:25.000
  • 10. Tirana’s Watershed Chart Untitled 4610000 4608000 4606000 4604000 4602000 4600000 4598000 4596000 4594000 4592000 4590000 1.1 4588000 75 3 22112 0 -5 4586000 EM 4584000 ISH 4582000 4580000 62.6 4578000 0-228 Lana 4576000 4370000 4375000 4380000 4385000 4390000 4395000 4400000 4405000
  • 11. Tirana River Cascade Hydropower Potential • Tirana’s river watershed energy project, will include the constructions of two hydropower plants situated in two sites along the Tirana river flow Zall-Dajt and Brar. • Average perennial flow rate is 2,7 cubic m/s. The output energy shall enter the 20 kV substation situated 1000 m far from the HP plant. The plant will be placed at approximately 8 km from the capital. • A concession contract is expected to be concluded with the Ministry of Economy and Energy, once an investor shall be identified and will take it over. • Construction permit will be granted by the Government following the presentation of a detailed design of the work.
  • 12. Card • Name of the work: HP watershed on Tirana’s river • Installed Power 18,20 MW (Average Annual Energy 68,20 MWh) supplied by two hydropower plants
  • 13. HPP-s technical Data • Zall-Dajt-HPP • Q average=0,70m3/sec • Derivation pipeline Nr1 (Pipe/C/R) 1Ø1m and L=1250 m length • Derivation pipeline Nr 2 (Pipe/C/R) 1Ø 0,8 m and L=1550 m length • Pipeline of turbines (Steel) 2Ø0.90 m and L=130 m length. • Installed Power N=2,60 MW • Average Annual Energy E=11,35 million kWh. • Brar-HPP • Dam from gravel H Dam=55m • Total Volume of Reservoir, V reservoir=41.50 million m3 • Regulator volume of Reservoir, V regulator=31.50 million m3 • Dead Volume of Reservoir, V dead=10 million m3 • Average perennial inflow rate Q average=2,70m3/sec • Derivation: Pipeline C/R Di= 1Ø2.2 m, L=3100 length an tunnel Di=Ø2.2m, L=3100m length • Balance Tower with DT=8m and Height H T=20m • Pipeline of Turbines (Steel) 2Ø1,60 m and L=1100 m length • Installed Power N=15.60 MW • Average annual energy output=68.20 million kWh
  • 14. HP Turbines • ZALL-DAJT – HPP PELTON type turbine, two sets capacity 1500 kW. • BRAR – HPP PELTON type turbine, two sets capacity 8000 kW. • Energy produced by two HPP-s to be dispatched through a 10.300 m long line of 350 kv in Brari/Tirana substation. • Current Status of Work – Pending a concessionary biding process. • List o Conducted studies include: Hydrology, geology- engineering report, hydrotechnical and hydroenergetic report. Information by the Regional Water Basin Council on details of the concessionary operations, advantages and amounts of water to be used,
  • 15. Project’s time Lines and Financial terms • The anticipated expected investment amounts at 42.60 millions of euro. • Operational Costs (running and maintenance)at 0.015 euro/kW • Electricity selling price: 0.09-0.12 euro/kWh • Deadline for self-settlement: 9.0-7.3 years • Construction period 3.5 years • Land to be used for the works: To be purchased by the investor in accordance with the price set by the state.
  • 16. Tirana of the near future