Torque and Drag:
Concepts that Every Drilling and Completion Engineer Should Know
Pegasus Vertex, Inc.
Drilling Software | Sophisticated Yet Simple
White Paper
CONTENTS
I. The Problem....................................................................................
II. Proof the Problem Exists ............................................................
IV. Pre-Job Planning ........................................................................
VIII. Conclusion ................................................................................
3
6
8
12
III. The Basic Solution ..................................................................... 7
V. Real-Time Monitoring ..................................................................
VII. Our Solution ...............................................................................
9
10
VI. Post-Mortem Analysis ................................................................ 9
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
3
I. The Problem
With the increase in the difficulty of drilling and completing oil and natural gas wells around the world
(Figure 1), the technology required for discovering, accessing and then producing oil and natural gas
has developed rapidly. Larger rigs and top drives, double-shouldered connections for drill pipe, new
tools and new grades of steel are just a few of the many advancements in technology over the past
few decades. Other advancements in technology needed to successfully locate and extract oil and
natural gas are advanced software packages that assist with pre-job planning, assimilating and inter-
preting data and other crucial operational concerns.
A common statement made of the energy industry is that the technology used to locate, access and
produce hydrocarbons is on par with the technology used by NASA to put satellites in orbit and send
astronauts to the moon. Drilling and operating tools several miles below the surface of the earth in
temperatures exceeding 300 degrees Fahrenheit and pressures in excess of 5,000 psi on a regular
basis requires very advanced technology. Wells that have pushed the limits of our current techno-
logical capabilities include a well drilled over 40,000 ft deep on the Kola Peninsula in Russia and a
shallow ultra-extended reach well in Qatar less than 4,000 ft deep that extended almost 38,000 ft
away from the rig (Table 1).
Figure 1: Baker Hughes International Rig Count November 2010
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
4
One of the largest challenges while drilling and completing wells is that surface data only provides
a partial picture of what is happening downhole (Figure 2).
Year Maximum Departure Maximum TVD
1975 10,900 31,441
1980 15,082 31,441
1990 24,203 31,441
1995 26,361 31,441
2000 35,197 31,441
2005 35,197 40,230
2009 37,956 40,230
Table 1: Wells by Departure 1975 - 2009 [SPE 139410]
Figure 2: Iceberg Photo Representing Surface Indicators vs. Downhole Forces
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
5
Hookloads, surface torque readings and standpipe pressure measurements can indicate problems
downhole, but even with these technological advancements, experienced individuals and engineers
often have to make educated guesses as to what is happening in the well or with the particular bit or
tool being run. Multi-million dollar decisions are commonly made by intelligent men and women using
sound engineering principles. The problem is that these decisions are, by necessity, almost exclusive-
ly based off of partial data. The partial data used can be termed as surface indicators.
When centralizer salesmen claim their centralizers will reduce the drag running casing or a liner into
the hole, how can this be verified? Lubricant companies claim reduction in the coefficient of friction as
high as 80-90% within cased hole and specific formations, but is this true? When planning a challeng-
ing well or entering a new field, the questions of what size pipe, which type of connection and what
size rig are needed to drill to TD. Run casing and complete the well cannot be answered without pre-
job planning and the advanced software packages needed to analyze the various scenarios.
Although using offset well data can give excellent indicators, no two wells are the same. Moreover, it is
not fiscally feasible to run a string of casing to TD without centralizers, pull it out of the hole and then
run the same string into the same wellbore with centralizers. Disputes between operators and service
companies often arise when a tool failure occurs. Often times theories are developed based upon the
surface indicators available and the condition of tools that are removed from the well. Conclusive ev-
idence to resolve these disputes is often unavailable without modeling software that can give a more
accurate picture of what conditions the string was under before, during and after the failure.
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
6
II. Proof the Problem Exits
The most publicized problem over the past decade is likely the Gulf of Mexico oil spill that cost the
operator many billions of dollars. Less publicized failures happen on a daily basis in the US. Though
these problems with wellbores, downhole equipment and rigs often do not cause massive envi-
ronmental damage, they are a regular part of the risk and business of accessing and producing oil
and natural gas. The financial cost is difficult to assess, but settlements in the range of $50,000 to
$1,000,000 occur fairly often.
Challenges in drilling and completing wells abound in today’s oilfield where hydrocarbons are tapped
in more and more challenging environments. One well in the Gulf during the previous decade began
with an estimated cost of 17 million USD, but spent closer to 90 million USD by the time the final
drilling assembly reached TD. This well was exploratory and turned out to be dry, with no hydrocar-
bons in the trap zone. Another operator in the US successfully drilled a well with a long reach. Two
different types of specialty equipment, one on the production liner and one on the drill pipe used to
convey the liner, were used to assist with getting the final section of the well cased. Unfortunately the
liner landed several hundred feet off bottom.
In IADC/SPE 98969, ExxonMobil discusses an intensive R&D and field validation of various torque
reduction methods that were used when drilling the shorter wells amongst an ambitious extended
reach well project in the Russian Far East. Notable amongst the results is that lubricant testing in the
laboratory under ideal conditions showed up to a 50% reduction in the coefficient of friction verses
the use of the base fluid alone, but in the field the actual torque reduction was 5-15%. The engineers
involved were also able to determine a significant torque reduction between hardbanded pipe and
pipe with worn hardbanding, as the coefficient of friction of the steel was 0.21 and the hardbanding
was 0.15.
In SPE 125991 three wells are discussed, of which two had unexpected problems drilling to total
depth (TD) and one had unexpected problems completing the well. Well 1 was power limited and the
string was torque limited. A new mud system was used which was expected to reduce the torque by
5-10%, but the torque increased by 7% as a result. Well 2 had a severe wellpath and the rig being
used could not supply enough torque to finish drilling. The wellpath for well 3 had a small section
that was severely off-path. Although the well was drilled to TD, the completion of this well was not
possible without specialty tools to assist with drag reduction.
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
7
III. The Basic Solution
With the capital risk of moving into a new area to drill, ambitious ERW projects that push the tech-
nological envelope and challenges associated with conclusively determining what caused a partic-
ular failure during a downhole operation, many types of software are used during pre-job planning,
real-time monitoring and post-mortem analysis. Torque and drag (T&D) software is one of the most
widely-used types of oilfield engineering analysis packages. With T&D software the risks associated
with drilling and completing a well can be assessed and much of the risk can be remediated during
pre-job planning. Real-time monitoring of an operation can alert the rig crew to changing well con-
ditions, and post-mortem analysis becomes much more accurate with the ability to understand the
forces that various string components were subjected to downhole.
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
8
IV. Pre-Job Planning
In terms of pre-job planning, T&D software removes and reduces much of the risk of a drilling pro-
gram, completions design or specific tool operation. Limits in the length of a horizontal based on
specific friction factors can be determined. The ability to get needed weight to a liner-top packer can
be evaluated. With the ability to analyze forces downhole, rig equipment specifications for torque and
hookload can be predicted.
A short discussion on friction factors is pertinent at this point. A friction factor takes into account the
coefficient of friction between the string and the already cemented casing, called the cased hole
friction factor (CHFF), the coefficient of friction between the string and the open hole, called the open
hole friction factor (OHFF), and a host of other factors. These other factors accounted for by the fric-
tion factor include good/poor hole cleaning and micro-tortuosity between survey points.
Because friction factors might vary, a sensitivity graph can be generated to show the degree of risk
in OHFFs. Below is a friction factor sensitivity graph displaying a casing run with a set CHFF and
OHFFs ranging from 0.1 to 0.35. At a 0.22 CHFF, which is typical for a water-based mud, and an
OHFF of 0.1, there is still plenty of available hookload at TD. At an OHFF of 0.23, the available weight
by TD drops almost to the block weight of 50,000 lbs. The friction factor of 0.35 is severe enough in
this well that it is not possible to drill to TD, even when pushing with the block, which is necessary
when the graph shows a hookload below the block weight.
Figure 3: Friction Factor Sensitivity Graph
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
9
V. Real-Time Monitoring
Real-time monitoring is also a benefit of using T&D software. Some engineers and technicians take
their software programs or hookload graphs onto the rig during drilling operations. As the rig drills
deeper, the hookloads can be tracked against the predicted values. If the actual hookloads follow the
predicted line for a 0.3 OHFF for a few thousand feet, but then transition to a 0.4 OHFF, something in
the well has changed, such as decreased hole cleaning efficiency. This is an opportunity for the rig to
change the drilling parameters such as slowing the ROP, or to stop and circulate prior to continuing,
before a problem actually occurs.
VI. Post-Mortem Analysis
When a failure occurs there is an inevitable argument between service providers, oil companies and
the rig contractor. Was a mistake made while performing the operation? Did a mechanical tool failure
occur downhole or was it simply an unforeseen challenge presented by the formation? T&D modeling
software can be calibrated to actual hookloads and surface torque values to get an accurate friction
factor. Then the software can be used to look at the actual forces that were experienced by different
sections of the string downhole when the problem occurred.
For any number of reasons from mitigating risks before a well is spudded, to managing operations as
they are performed or looking into the drilling performance or a problem scenario after it has occurred,
torque and drag modeling software is an excellent and vital tool for oil and service companies alike.
Any company looking to purchase new T&D software should vet the software before making a capital
commitment. Since the equations used to model torque and drag have not changed much since their
inception into oil and natural gas drilling and completions, this task of evaluating a software provider’s
evidence of proper calculations should be fairly straight forward.
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
10
VII. Our Solution
Once a software’s basic calculations for torque and drag have been evaluated, the question is which
software will provide the best results, ease of use and quality regarding the outputs provided. Al-
though the main calculations are the same for any T&D program on the market, there are philosoph-
ical differences on how to account for pipe sag, calculate the density of string components and when
to initiate buckling that can affect the results. The ease of a user acclimating to the input screens and
entering information will affect how readily those users accept the software and how efficient they
are with the modeling. Pegasus Vertex, Inc., a drilling software company, has produced, marketed
and supported the TADPRO (torque and drag model) software program since 2002, and it has been
in use by multiple major oilfield service companies.
The calculations used for the TADPRO software can be found in industry documentation and were
compiled with the assistance of PhD research professors. A comparison of these calculations with
the industry’s largest competitor in the market can be found in SPE 143623. The torque equation
takes into account pipe sag when calculating torque, which is pertinent considering the increase in
horizontal drilling in shale plays and the increase in deviated wellbores and ERWs. The density cal-
culation fixes the density and weight, unlike competitive programs that allow the density to fluctuate
if the user edits an existing component to create a new component (Table 2), which happens often
when a specialty tool is needed for a model. The force required to initiate buckling in TADPRO is
more conservative than other T&D programs, which has always been the industries preference when
approaching potential buckling issues.
Table 2: Equivalent Density of String Components - TADPRO (software A) and Software B [SPE 143623]
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
11
The user-friendliness of this program is unparalleled in the industry, allowing users to import PDF®
files of wellpaths instead of requiring the user to generate a Microsoft Excel®
file prior to import. The
user-interface is easy to acclimate to and enables users to begin modeling sooner. The auto-gen-
erated reports are put together in a Microsoft Word®
document that allows editing and the technical
support provided is not only fast but also practical and useful.
The graphical outputs of the TADPRO software lead the industries T&D software. 3D graphical video
representations of where buckling will occur while drilling and tripping in allow the engineers involved
to view where the buckling will initiate (Figure 4), how it will propagate and how severe it will get over
the entire run.
Figure 4: 3D Video Screenshot of Buckling in a String
Another important point to note is that, unlike other software programs, there are two operation lines
in TADPRO that allow users to define every parameter. Other software programs are unable to handle
computations involving drilling with casing because the drilling line rotates at an RPM value that is too
high, overpull applied when jarring up because the upward moving lines either do not allow a force at
the bottom of the string or involve rotation, and many other scenarios that are likely to occur in a well.
TADPRO provides both versatility and accuracy in its calculations, while also integrating many fea-
tures that make it easy to use and interpret results.
Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know
12
V. Conclusion
With the uncertainty and cost involved in drilling, running tools and providing services, a good evaluation
software is a necessary part of any oilfield company’s toolbox. No one would walk across a busy street
with their eyes closed, nor should anyone send a tool or bit downhole without a clear view of what forces
it might encounter.
For more information, visit the TADPRO website to look at more of the features the software provides,
download a brochure or obtain a quote: www.pvisoftware.com/TADPRO.html
Pegasus Vertex, Inc.
6100 Corporate Dr., Suite 448, Houston, TX 77036
Tel: (713) 981-5558 / Fax: (713) 981-5556
sales@pvisoftware.com

Mais conteúdo relacionado

Mais procurados

Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
AFATous
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
kaleem ullah
 
Q922+de1+l04 v1
Q922+de1+l04 v1Q922+de1+l04 v1
Q922+de1+l04 v1
AFATous
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
tmhsweb
 
Q922+de2+l10 v1
Q922+de2+l10 v1Q922+de2+l10 v1
Q922+de2+l10 v1
AFATous
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
Mohamed Elnagar
 

Mais procurados (20)

Hydraulics
HydraulicsHydraulics
Hydraulics
 
Directional drilling
Directional drillingDirectional drilling
Directional drilling
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
 
Artificial Lift Selection Criterion
Artificial Lift Selection CriterionArtificial Lift Selection Criterion
Artificial Lift Selection Criterion
 
Well completion and stimulation
Well completion and stimulation Well completion and stimulation
Well completion and stimulation
 
Well test analysis
Well test analysisWell test analysis
Well test analysis
 
Q922+de1+l04 v1
Q922+de1+l04 v1Q922+de1+l04 v1
Q922+de1+l04 v1
 
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
A Brief Introduction to Coiled Tubing: What is it? What to do with it?, pumps...
 
Introduction to Drilling Engineering
Introduction to Drilling EngineeringIntroduction to Drilling Engineering
Introduction to Drilling Engineering
 
BHA components and performances
BHA components and performances BHA components and performances
BHA components and performances
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
 
Q922+de2+l10 v1
Q922+de2+l10 v1Q922+de2+l10 v1
Q922+de2+l10 v1
 
BHA.pdf
BHA.pdfBHA.pdf
BHA.pdf
 
Formation pressure in oil and gas drilling wells
Formation pressure in oil and gas drilling wellsFormation pressure in oil and gas drilling wells
Formation pressure in oil and gas drilling wells
 
Petroleum Production Engineering - Perforation
Petroleum Production Engineering - PerforationPetroleum Production Engineering - Perforation
Petroleum Production Engineering - Perforation
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Horizontal drilling
Horizontal drillingHorizontal drilling
Horizontal drilling
 
2.2 rig components
2.2 rig components2.2 rig components
2.2 rig components
 

Destaque

Spontaneous potential Log
Spontaneous potential LogSpontaneous potential Log
Spontaneous potential Log
Jam Mahmood
 
Q921 de2 lec5 v1
Q921 de2 lec5 v1Q921 de2 lec5 v1
Q921 de2 lec5 v1
AFATous
 
Masters Thesis - Ankit_Kukreja
Masters Thesis - Ankit_KukrejaMasters Thesis - Ankit_Kukreja
Masters Thesis - Ankit_Kukreja
ANKIT KUKREJA
 
[Alghumgham]2011SPEpowerpoint
[Alghumgham]2011SPEpowerpoint[Alghumgham]2011SPEpowerpoint
[Alghumgham]2011SPEpowerpoint
Essam Alghumgham
 
Drill bit optimization and Surge swab pressure calculations
Drill bit optimization and Surge swab pressure calculationsDrill bit optimization and Surge swab pressure calculations
Drill bit optimization and Surge swab pressure calculations
ANKIT KUKREJA
 

Destaque (20)

Wll logging
Wll loggingWll logging
Wll logging
 
Jindal Presentation
Jindal Presentation  Jindal Presentation
Jindal Presentation
 
Wll logging
Wll loggingWll logging
Wll logging
 
Resistivity log
Resistivity logResistivity log
Resistivity log
 
Spontaneous potential Log
Spontaneous potential LogSpontaneous potential Log
Spontaneous potential Log
 
Basics of drilling 2
Basics of drilling 2Basics of drilling 2
Basics of drilling 2
 
Drilling efficiency optimization at hassai site
Drilling efficiency optimization at hassai siteDrilling efficiency optimization at hassai site
Drilling efficiency optimization at hassai site
 
optimization of drilling process parameter
optimization of drilling process parameteroptimization of drilling process parameter
optimization of drilling process parameter
 
Q921 de2 lec5 v1
Q921 de2 lec5 v1Q921 de2 lec5 v1
Q921 de2 lec5 v1
 
Drilling Engineering - Drill Bit
Drilling Engineering - Drill BitDrilling Engineering - Drill Bit
Drilling Engineering - Drill Bit
 
Neutron density and sonic logs
Neutron density and sonic logs Neutron density and sonic logs
Neutron density and sonic logs
 
Rop services i
Rop services iRop services i
Rop services i
 
Masters Thesis - Ankit_Kukreja
Masters Thesis - Ankit_KukrejaMasters Thesis - Ankit_Kukreja
Masters Thesis - Ankit_Kukreja
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 
Seal the Formation Surface With Optimized Bridging Blend
Seal the Formation Surface With Optimized Bridging BlendSeal the Formation Surface With Optimized Bridging Blend
Seal the Formation Surface With Optimized Bridging Blend
 
[Alghumgham]2011SPEpowerpoint
[Alghumgham]2011SPEpowerpoint[Alghumgham]2011SPEpowerpoint
[Alghumgham]2011SPEpowerpoint
 
Drill bit optimization and Surge swab pressure calculations
Drill bit optimization and Surge swab pressure calculationsDrill bit optimization and Surge swab pressure calculations
Drill bit optimization and Surge swab pressure calculations
 
Gama ray log
Gama ray logGama ray log
Gama ray log
 
جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم
 
Well loggining. Gamma Ray log
Well loggining. Gamma Ray logWell loggining. Gamma Ray log
Well loggining. Gamma Ray log
 

Semelhante a Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know

[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
IJET - International Journal of Engineering and Techniques
 
WO 10 2014 Oren
WO 10 2014 OrenWO 10 2014 Oren
WO 10 2014 Oren
KC Oren
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
Jean-Francois Saint-Marcoux
 
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
pierdole
 
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Paul Brett
 
2014 04 (a4) naogp editorial - q&a maats bending machines
2014   04 (a4) naogp editorial - q&a maats bending machines2014   04 (a4) naogp editorial - q&a maats bending machines
2014 04 (a4) naogp editorial - q&a maats bending machines
Maats
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
WorldofAllLyrics
 
Roll a-way storm protection
Roll a-way storm protectionRoll a-way storm protection
Roll a-way storm protection
lisaqmiusa
 

Semelhante a Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know (20)

Roy Shilling
Roy ShillingRoy Shilling
Roy Shilling
 
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme [IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
[IJET-V1I2P10] Authors :L. O. Osuman, A. Dosunmu , B .S. Odagme
 
Faster Cycle Times The Future Of D&B
Faster Cycle Times The Future Of D&BFaster Cycle Times The Future Of D&B
Faster Cycle Times The Future Of D&B
 
WO 10 2014 Oren
WO 10 2014 OrenWO 10 2014 Oren
WO 10 2014 Oren
 
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser ProjectsISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
ISOPE-2010-TCP-0462 Lessons Learnt from deepwater Riser Projects
 
Casing Wear: Causes, Prediction and Prevention
Casing Wear: Causes, Prediction and PreventionCasing Wear: Causes, Prediction and Prevention
Casing Wear: Causes, Prediction and Prevention
 
"Real-time Validation of Driven Cast-In-Situ Piles"
"Real-time Validation of Driven Cast-In-Situ Piles""Real-time Validation of Driven Cast-In-Situ Piles"
"Real-time Validation of Driven Cast-In-Situ Piles"
 
Radial jet drilling industry review
Radial jet drilling industry reviewRadial jet drilling industry review
Radial jet drilling industry review
 
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
Risk Assessment and Method Statement for Installation of Boardwalk in Dublin ...
 
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTING
 
Field Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer BitField Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer Bit
 
WP Offshore Coating Techniques Aug 2015
WP Offshore Coating Techniques Aug 2015WP Offshore Coating Techniques Aug 2015
WP Offshore Coating Techniques Aug 2015
 
"Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles""Factors Affecting the Design and Construction of High Capacity Minipiles"
"Factors Affecting the Design and Construction of High Capacity Minipiles"
 
2014 04 (a4) naogp editorial - q&a maats bending machines
2014   04 (a4) naogp editorial - q&a maats bending machines2014   04 (a4) naogp editorial - q&a maats bending machines
2014 04 (a4) naogp editorial - q&a maats bending machines
 
HPHT Well Engineering
HPHT Well Engineering HPHT Well Engineering
HPHT Well Engineering
 
Leading Naval Architectural Firm Leverages 3D to Solve Large Scale Problems
Leading Naval Architectural Firm Leverages 3D to Solve Large Scale ProblemsLeading Naval Architectural Firm Leverages 3D to Solve Large Scale Problems
Leading Naval Architectural Firm Leverages 3D to Solve Large Scale Problems
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
Roll a-way storm protection
Roll a-way storm protectionRoll a-way storm protection
Roll a-way storm protection
 

Mais de pvisoftware

Mais de pvisoftware (12)

Infographic: Common Drilling Mud Problems - Causes and Solutions
Infographic: Common Drilling Mud Problems - Causes and SolutionsInfographic: Common Drilling Mud Problems - Causes and Solutions
Infographic: Common Drilling Mud Problems - Causes and Solutions
 
StuckPipePro | Stuck Pipe Analysis Software
StuckPipePro | Stuck Pipe Analysis SoftwareStuckPipePro | Stuck Pipe Analysis Software
StuckPipePro | Stuck Pipe Analysis Software
 
PathView | Well Path Visualization Software
PathView | Well Path Visualization SoftwarePathView | Well Path Visualization Software
PathView | Well Path Visualization Software
 
CTEMP | Circulation Temperature Software
CTEMP | Circulation Temperature SoftwareCTEMP | Circulation Temperature Software
CTEMP | Circulation Temperature Software
 
CEMVIEW | Cementing Engineering Toolbox
CEMVIEW | Cementing Engineering ToolboxCEMVIEW | Cementing Engineering Toolbox
CEMVIEW | Cementing Engineering Toolbox
 
Best Practices for Cementing Job Software
Best Practices for Cementing Job SoftwareBest Practices for Cementing Job Software
Best Practices for Cementing Job Software
 
A Better Way to Capture and Manage Cement Lab Data
A Better Way to Capture and Manage Cement Lab DataA Better Way to Capture and Manage Cement Lab Data
A Better Way to Capture and Manage Cement Lab Data
 
Design and Simulation of Foamed Cement Jobs
Design and Simulation of Foamed Cement JobsDesign and Simulation of Foamed Cement Jobs
Design and Simulation of Foamed Cement Jobs
 
Surge Pressure Prediction for Running Liners
Surge Pressure Prediction for Running LinersSurge Pressure Prediction for Running Liners
Surge Pressure Prediction for Running Liners
 
Dr. DE - A Simple Way to Solve Complex Drilling Problems
Dr. DE - A Simple Way to Solve Complex Drilling ProblemsDr. DE - A Simple Way to Solve Complex Drilling Problems
Dr. DE - A Simple Way to Solve Complex Drilling Problems
 
Casing Centralizers: Are We Using Too Many or Too Few?
Casing Centralizers: Are We Using Too Many or Too Few?Casing Centralizers: Are We Using Too Many or Too Few?
Casing Centralizers: Are We Using Too Many or Too Few?
 
Mud Reporting: Streamlined Process and Data Management
Mud Reporting: Streamlined Process and Data ManagementMud Reporting: Streamlined Process and Data Management
Mud Reporting: Streamlined Process and Data Management
 

Último

CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM TechniquesAI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
VictorSzoltysek
 
TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service provider
mohitmore19
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
Health
 

Último (20)

VTU technical seminar 8Th Sem on Scikit-learn
VTU technical seminar 8Th Sem on Scikit-learnVTU technical seminar 8Th Sem on Scikit-learn
VTU technical seminar 8Th Sem on Scikit-learn
 
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students8257 interfacing 2 in microprocessor for btech students
8257 interfacing 2 in microprocessor for btech students
 
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
 
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdfAzure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
 
10 Trends Likely to Shape Enterprise Technology in 2024
10 Trends Likely to Shape Enterprise Technology in 202410 Trends Likely to Shape Enterprise Technology in 2024
10 Trends Likely to Shape Enterprise Technology in 2024
 
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
 
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
 
Introducing Microsoft’s new Enterprise Work Management (EWM) Solution
Introducing Microsoft’s new Enterprise Work Management (EWM) SolutionIntroducing Microsoft’s new Enterprise Work Management (EWM) Solution
Introducing Microsoft’s new Enterprise Work Management (EWM) Solution
 
BUS PASS MANGEMENT SYSTEM USING PHP.pptx
BUS PASS MANGEMENT SYSTEM USING PHP.pptxBUS PASS MANGEMENT SYSTEM USING PHP.pptx
BUS PASS MANGEMENT SYSTEM USING PHP.pptx
 
Chinsurah Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts ...
Chinsurah Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts ...Chinsurah Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts ...
Chinsurah Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts ...
 
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM TechniquesAI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
AI Mastery 201: Elevating Your Workflow with Advanced LLM Techniques
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
 
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
 
Pharm-D Biostatistics and Research methodology
Pharm-D Biostatistics and Research methodologyPharm-D Biostatistics and Research methodology
Pharm-D Biostatistics and Research methodology
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
 
TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service provider
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 

Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know

  • 1. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know Pegasus Vertex, Inc. Drilling Software | Sophisticated Yet Simple White Paper
  • 2. CONTENTS I. The Problem.................................................................................... II. Proof the Problem Exists ............................................................ IV. Pre-Job Planning ........................................................................ VIII. Conclusion ................................................................................ 3 6 8 12 III. The Basic Solution ..................................................................... 7 V. Real-Time Monitoring .................................................................. VII. Our Solution ............................................................................... 9 10 VI. Post-Mortem Analysis ................................................................ 9
  • 3. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 3 I. The Problem With the increase in the difficulty of drilling and completing oil and natural gas wells around the world (Figure 1), the technology required for discovering, accessing and then producing oil and natural gas has developed rapidly. Larger rigs and top drives, double-shouldered connections for drill pipe, new tools and new grades of steel are just a few of the many advancements in technology over the past few decades. Other advancements in technology needed to successfully locate and extract oil and natural gas are advanced software packages that assist with pre-job planning, assimilating and inter- preting data and other crucial operational concerns. A common statement made of the energy industry is that the technology used to locate, access and produce hydrocarbons is on par with the technology used by NASA to put satellites in orbit and send astronauts to the moon. Drilling and operating tools several miles below the surface of the earth in temperatures exceeding 300 degrees Fahrenheit and pressures in excess of 5,000 psi on a regular basis requires very advanced technology. Wells that have pushed the limits of our current techno- logical capabilities include a well drilled over 40,000 ft deep on the Kola Peninsula in Russia and a shallow ultra-extended reach well in Qatar less than 4,000 ft deep that extended almost 38,000 ft away from the rig (Table 1). Figure 1: Baker Hughes International Rig Count November 2010
  • 4. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 4 One of the largest challenges while drilling and completing wells is that surface data only provides a partial picture of what is happening downhole (Figure 2). Year Maximum Departure Maximum TVD 1975 10,900 31,441 1980 15,082 31,441 1990 24,203 31,441 1995 26,361 31,441 2000 35,197 31,441 2005 35,197 40,230 2009 37,956 40,230 Table 1: Wells by Departure 1975 - 2009 [SPE 139410] Figure 2: Iceberg Photo Representing Surface Indicators vs. Downhole Forces
  • 5. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 5 Hookloads, surface torque readings and standpipe pressure measurements can indicate problems downhole, but even with these technological advancements, experienced individuals and engineers often have to make educated guesses as to what is happening in the well or with the particular bit or tool being run. Multi-million dollar decisions are commonly made by intelligent men and women using sound engineering principles. The problem is that these decisions are, by necessity, almost exclusive- ly based off of partial data. The partial data used can be termed as surface indicators. When centralizer salesmen claim their centralizers will reduce the drag running casing or a liner into the hole, how can this be verified? Lubricant companies claim reduction in the coefficient of friction as high as 80-90% within cased hole and specific formations, but is this true? When planning a challeng- ing well or entering a new field, the questions of what size pipe, which type of connection and what size rig are needed to drill to TD. Run casing and complete the well cannot be answered without pre- job planning and the advanced software packages needed to analyze the various scenarios. Although using offset well data can give excellent indicators, no two wells are the same. Moreover, it is not fiscally feasible to run a string of casing to TD without centralizers, pull it out of the hole and then run the same string into the same wellbore with centralizers. Disputes between operators and service companies often arise when a tool failure occurs. Often times theories are developed based upon the surface indicators available and the condition of tools that are removed from the well. Conclusive ev- idence to resolve these disputes is often unavailable without modeling software that can give a more accurate picture of what conditions the string was under before, during and after the failure.
  • 6. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 6 II. Proof the Problem Exits The most publicized problem over the past decade is likely the Gulf of Mexico oil spill that cost the operator many billions of dollars. Less publicized failures happen on a daily basis in the US. Though these problems with wellbores, downhole equipment and rigs often do not cause massive envi- ronmental damage, they are a regular part of the risk and business of accessing and producing oil and natural gas. The financial cost is difficult to assess, but settlements in the range of $50,000 to $1,000,000 occur fairly often. Challenges in drilling and completing wells abound in today’s oilfield where hydrocarbons are tapped in more and more challenging environments. One well in the Gulf during the previous decade began with an estimated cost of 17 million USD, but spent closer to 90 million USD by the time the final drilling assembly reached TD. This well was exploratory and turned out to be dry, with no hydrocar- bons in the trap zone. Another operator in the US successfully drilled a well with a long reach. Two different types of specialty equipment, one on the production liner and one on the drill pipe used to convey the liner, were used to assist with getting the final section of the well cased. Unfortunately the liner landed several hundred feet off bottom. In IADC/SPE 98969, ExxonMobil discusses an intensive R&D and field validation of various torque reduction methods that were used when drilling the shorter wells amongst an ambitious extended reach well project in the Russian Far East. Notable amongst the results is that lubricant testing in the laboratory under ideal conditions showed up to a 50% reduction in the coefficient of friction verses the use of the base fluid alone, but in the field the actual torque reduction was 5-15%. The engineers involved were also able to determine a significant torque reduction between hardbanded pipe and pipe with worn hardbanding, as the coefficient of friction of the steel was 0.21 and the hardbanding was 0.15. In SPE 125991 three wells are discussed, of which two had unexpected problems drilling to total depth (TD) and one had unexpected problems completing the well. Well 1 was power limited and the string was torque limited. A new mud system was used which was expected to reduce the torque by 5-10%, but the torque increased by 7% as a result. Well 2 had a severe wellpath and the rig being used could not supply enough torque to finish drilling. The wellpath for well 3 had a small section that was severely off-path. Although the well was drilled to TD, the completion of this well was not possible without specialty tools to assist with drag reduction.
  • 7. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 7 III. The Basic Solution With the capital risk of moving into a new area to drill, ambitious ERW projects that push the tech- nological envelope and challenges associated with conclusively determining what caused a partic- ular failure during a downhole operation, many types of software are used during pre-job planning, real-time monitoring and post-mortem analysis. Torque and drag (T&D) software is one of the most widely-used types of oilfield engineering analysis packages. With T&D software the risks associated with drilling and completing a well can be assessed and much of the risk can be remediated during pre-job planning. Real-time monitoring of an operation can alert the rig crew to changing well con- ditions, and post-mortem analysis becomes much more accurate with the ability to understand the forces that various string components were subjected to downhole.
  • 8. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 8 IV. Pre-Job Planning In terms of pre-job planning, T&D software removes and reduces much of the risk of a drilling pro- gram, completions design or specific tool operation. Limits in the length of a horizontal based on specific friction factors can be determined. The ability to get needed weight to a liner-top packer can be evaluated. With the ability to analyze forces downhole, rig equipment specifications for torque and hookload can be predicted. A short discussion on friction factors is pertinent at this point. A friction factor takes into account the coefficient of friction between the string and the already cemented casing, called the cased hole friction factor (CHFF), the coefficient of friction between the string and the open hole, called the open hole friction factor (OHFF), and a host of other factors. These other factors accounted for by the fric- tion factor include good/poor hole cleaning and micro-tortuosity between survey points. Because friction factors might vary, a sensitivity graph can be generated to show the degree of risk in OHFFs. Below is a friction factor sensitivity graph displaying a casing run with a set CHFF and OHFFs ranging from 0.1 to 0.35. At a 0.22 CHFF, which is typical for a water-based mud, and an OHFF of 0.1, there is still plenty of available hookload at TD. At an OHFF of 0.23, the available weight by TD drops almost to the block weight of 50,000 lbs. The friction factor of 0.35 is severe enough in this well that it is not possible to drill to TD, even when pushing with the block, which is necessary when the graph shows a hookload below the block weight. Figure 3: Friction Factor Sensitivity Graph
  • 9. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 9 V. Real-Time Monitoring Real-time monitoring is also a benefit of using T&D software. Some engineers and technicians take their software programs or hookload graphs onto the rig during drilling operations. As the rig drills deeper, the hookloads can be tracked against the predicted values. If the actual hookloads follow the predicted line for a 0.3 OHFF for a few thousand feet, but then transition to a 0.4 OHFF, something in the well has changed, such as decreased hole cleaning efficiency. This is an opportunity for the rig to change the drilling parameters such as slowing the ROP, or to stop and circulate prior to continuing, before a problem actually occurs. VI. Post-Mortem Analysis When a failure occurs there is an inevitable argument between service providers, oil companies and the rig contractor. Was a mistake made while performing the operation? Did a mechanical tool failure occur downhole or was it simply an unforeseen challenge presented by the formation? T&D modeling software can be calibrated to actual hookloads and surface torque values to get an accurate friction factor. Then the software can be used to look at the actual forces that were experienced by different sections of the string downhole when the problem occurred. For any number of reasons from mitigating risks before a well is spudded, to managing operations as they are performed or looking into the drilling performance or a problem scenario after it has occurred, torque and drag modeling software is an excellent and vital tool for oil and service companies alike. Any company looking to purchase new T&D software should vet the software before making a capital commitment. Since the equations used to model torque and drag have not changed much since their inception into oil and natural gas drilling and completions, this task of evaluating a software provider’s evidence of proper calculations should be fairly straight forward.
  • 10. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 10 VII. Our Solution Once a software’s basic calculations for torque and drag have been evaluated, the question is which software will provide the best results, ease of use and quality regarding the outputs provided. Al- though the main calculations are the same for any T&D program on the market, there are philosoph- ical differences on how to account for pipe sag, calculate the density of string components and when to initiate buckling that can affect the results. The ease of a user acclimating to the input screens and entering information will affect how readily those users accept the software and how efficient they are with the modeling. Pegasus Vertex, Inc., a drilling software company, has produced, marketed and supported the TADPRO (torque and drag model) software program since 2002, and it has been in use by multiple major oilfield service companies. The calculations used for the TADPRO software can be found in industry documentation and were compiled with the assistance of PhD research professors. A comparison of these calculations with the industry’s largest competitor in the market can be found in SPE 143623. The torque equation takes into account pipe sag when calculating torque, which is pertinent considering the increase in horizontal drilling in shale plays and the increase in deviated wellbores and ERWs. The density cal- culation fixes the density and weight, unlike competitive programs that allow the density to fluctuate if the user edits an existing component to create a new component (Table 2), which happens often when a specialty tool is needed for a model. The force required to initiate buckling in TADPRO is more conservative than other T&D programs, which has always been the industries preference when approaching potential buckling issues. Table 2: Equivalent Density of String Components - TADPRO (software A) and Software B [SPE 143623]
  • 11. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 11 The user-friendliness of this program is unparalleled in the industry, allowing users to import PDF® files of wellpaths instead of requiring the user to generate a Microsoft Excel® file prior to import. The user-interface is easy to acclimate to and enables users to begin modeling sooner. The auto-gen- erated reports are put together in a Microsoft Word® document that allows editing and the technical support provided is not only fast but also practical and useful. The graphical outputs of the TADPRO software lead the industries T&D software. 3D graphical video representations of where buckling will occur while drilling and tripping in allow the engineers involved to view where the buckling will initiate (Figure 4), how it will propagate and how severe it will get over the entire run. Figure 4: 3D Video Screenshot of Buckling in a String Another important point to note is that, unlike other software programs, there are two operation lines in TADPRO that allow users to define every parameter. Other software programs are unable to handle computations involving drilling with casing because the drilling line rotates at an RPM value that is too high, overpull applied when jarring up because the upward moving lines either do not allow a force at the bottom of the string or involve rotation, and many other scenarios that are likely to occur in a well. TADPRO provides both versatility and accuracy in its calculations, while also integrating many fea- tures that make it easy to use and interpret results.
  • 12. Pegasus Vertex, Inc. Torque and Drag: Concepts that Every Drilling and Completion Engineer Should Know 12 V. Conclusion With the uncertainty and cost involved in drilling, running tools and providing services, a good evaluation software is a necessary part of any oilfield company’s toolbox. No one would walk across a busy street with their eyes closed, nor should anyone send a tool or bit downhole without a clear view of what forces it might encounter. For more information, visit the TADPRO website to look at more of the features the software provides, download a brochure or obtain a quote: www.pvisoftware.com/TADPRO.html Pegasus Vertex, Inc. 6100 Corporate Dr., Suite 448, Houston, TX 77036 Tel: (713) 981-5558 / Fax: (713) 981-5556 sales@pvisoftware.com