Best Practices White Paper




Addressing the Change and Configuration
Management Imperative
 how to overCoMe your fIve toughest ChAllenges




Mention “Change and Configuration Management” (CCM) to even the boldest
manufacturing executives, and they’ll tell you it’s a serious and complex issue that is
frequently a stumbling block. More often than not, companies wistfully hope CCM
can be magically solved by a set of patchwork solutions.
With the current pace and intensity of global competition, today’s business leaders can no longer put
CCM on the backburner. Progressive companies that have successfully tackled CCM are now able to
develop a greater number of high-quality, highly innovative products faster than the competition. What’s
more, they’re significantly increasing productivity and profitability along the way.

So, why has the CCM process become so difficult and complex in just the past decade? What are the
ramifications for companies that don’t deal intelligently with the issue? What best practices are top
companies applying to solve the CCM riddle?

Thankfully, with today’s advanced Product Lifecycle Management (PLM) technology, there is a clear and
comprehensive solution that can finally resolve the CCM issue.

 In this white paper you’ll learn about:

 • the five toughest CCM challenges manufacturers face

 • why and how leading organizations are tackling the CCM process

 • proven best practices supported by real-world examples

With this information, your team will be well equipped to start the process
of confronting the CCM issue – once and for all.


“An efficient change process can cut up to 33% off the typical
 product development cycle time.”
–McKinsey and Company




Page 1 of 9 | Adressing the CCM imperative                                                                                  PTC.com
Best Practices White Paper




Agility and speed-to-market are critical competitive weapons         • Improve product quality and safety
in manufacturing today. Manufacturers must be able to rapidly
introduce new products, update existing features, reducecosts        • Eliminate costly errors
and improve quality if they expect to maximize market
                                                                     • Reduce scrap and rework
opportunities. Product innovation is the key to satisfying market
demands, but can also be disruptive to product developers,           • Eliminate confusion in manufacturing
suppliers, and manufacturing. Manufacturers in today’s
challenging global market must embrace agility, but can’t afford     • Synchronize support information with the
to lose control.                                                       latest product changes

Companies that can manage change effectively via sound               • Provide an audit trail and traceability of design decisions
change and configuration management processes can quickly
meet changing market needs with confidence. These two critical,      So, how do you identify ‘effective’ change management
integrated processes now serve as the foundation for defining        processes? Effective change and configuration management
manufactured products:                                               demands tight team cooperation and coordination, and
                                                                     a clear understanding of what is needed at any given point
 • Configuration Management is a process to manage                   in the development lifecycle. Today’s increasingly complex
   product definitions and content to ensure that all                products simply can’t be managed effectively through manual,
   interested parties have a common understanding of what            paper-based processes. Likewise, information cannot be
   is being designed, verified, released, purchased, built,          silo’ed, and enterprise systems cannot be disparate and
   sold, and serviced.                                               disconnected. Today, the status quo is a surefire recipe for
                                                                     launch delays, compromised product quality, and high
 • Change Management is a complementary, integrated                  development costs, all of which negatively impact revenue
   process that controls and tracks design changes, and how          and profitability.
   product configurations evolve over their lifecycles.
                                                                     The pace and complexity of global business today requires
“54% of companies lack a single repository to re-                    the intelligent use of advanced technology to streamline these
 view, analyze, approve and track changes across                     processes, giving companies the control they need to deliver
 products.”                                                          high quality, innovative products ahead of the competition.
                                                                     Product Lifecycle Management (PLM) software is designed to
– gartner group                                                      manage complex product configurations, and provide the
                                                                     platform to control, collaborate, and communicate product
These processes are essential to ensure efficient production         information, so you can develop, produce, and support
and lifecycle support of high quality products. Today’s fast-        world-class products.
paced, global markets no longer allow for these processes
to be merely “good enough.” Manufacturers need to adopt              Business Drivers of Change and Configuration Management
best practices for change and configuration management to
remain competitive. Otherwise, they will suffer from inefficiency,   Today’s manufacturers rely more heavily on change and
cost overruns, quality issues, and delayed time-to-market.           configuration management (CCM) due to increased demands
Today, manufacturers not only require strong configuration           on product developers, suppliers, and manufacturers to get to
management, but also robust, flexible control, coordination,         market faster to drive profitability. This trend is caused by a
and communication to support their change processes.                 number of factors:

Efficient, well-structured change and configuration management           Customized Products. Demand for more customizable
processes have a positive impact on the competitiveness of               products, with multiple options, increases the number of
manufacturers, suppliers, and their customers. The benefits              product configurations, which complicates design changes.
extend from early product innovation through design, to service          Offering multiple product variants, based on modular
and support, allowing companies to:                                      product designs, can deliver a competitive advantage, but
                                                                         adds to the complexity that must be managed.




Page 2 of 9 | Adressing the CCM imperative                                                                                    PTC.com
Best Practices White Paper




     globalization and global Competition. Increased                                                     Aerospace exemplifies the
     global competition is now driving the need for shorter                                              challenge of mastering a
                                                                                                         complex range of product
     development cycles, cost efficiency, and rapid innovation.
                                                                                                         configuration requirements and
     Globalization and outsourcing of product development                                                related change processes.
     and manufacturing demand greater control and better
     communication, so you can avoid producing the wrong
     revision, or misinterpreting designs.

     Product Complexity. Today’s products are more complex
     due to miniaturization and the introduction of smarter        To address these challenges, PTC helps customers improve the
     products. Many products today include mechanical,             efficiency of critical product development processes, enabled by
     electrical, firmware, and software components that must all   robust PLM technology. For instance, PTC’s Windchill® platform
     be integrated and synchronized.                               helps manufacturers efficiently and effectively manage their
                                                                   CCM needs by offering:
     regulatory oversight. Growth in regulations, including
     environmental compliance mandates, require that key           • Robust, flexible support for simple or complex levels of
     employees now have an accurate understanding – and              configuration management.
     instant access to – relevant product content. Certain
     industries and customers specifically dictate product         • A flexible, automated, closed-loop change process that
     configuration management and traceability, such as              instantly connects key stakeholders to secure, accurate,
     mandates for “device master records” for medical devices.       actionable information. Change activities are always
                                                                     synchronized with product design data in a single, integral
These market trends are driving the need for better control          system, and enabled by powerful and traceable electronic
of change and product configurations. Even if CCM is not             workflows.
mandated, trusted configurations represent core knowledge
for manufacturers, and are crucial to support processes            • Fast, accurate change across disciplines, with a single,
such as change impact analysis, manufacturing planning,              integrated process to update the complete product
environmental product compliance, outsourcing and costing.           definition.

A Best Practice Approach to Change and Configuration               • A tailored change process integration that fosters effective
Management                                                           partner and supplier collaboration while protecting
                                                                     intellectual property (IP).
CCM seems like a simple concept, but in practice is
complicated due to product complexity and the importance of        • Concurrent development of the engineering BOM
getting configurations right. Managing product information,          (eBOM) and manufacturing BOM (mBOM) with Windchill
from early requirements through design, sourcing,                    MPMLink™ that integrates manufacturing stakeholders
manufacturing, and service, is difficult. Different people           early in the design process.
need different pieces of information, and all of it needs
to be synchronized. Effective control requires a thoughtful,       In its 25 years of designing advanced product development
disciplined process that’s efficient, without placing an undue     solutions, PTC has developed best practices and software to
burden on product developers.                                      help manufacturers develop world-class CCM processes.
                                                                   Implementing effective CCM requires consistent, efficient
“Companies now recognize that better change                        processes enabled by integrated, flexible software. The ideal
                                                                   solution provides rapid communication and broad, but
 processes can deliver top-line benefits...and are
                                                                   controlled access to product data across the enterprise and
 therefore developing change management with                       the supply chain.
 an eye towards improving speed to market.”
- Aberdeen group




Page 3 of 9 | Adressing the CCM imperative                                                                                    PTC.com
Best Practices White Paper




PTC Windchill provides a proven foundation and capabilities          Best Practices:
to enable companies to benefit from the best practices
needed to address today’s significant CCM challenges.                A. Product Configuration lifecycle Management. Create,
Here’s how PTC is solving the five toughest challenges to            understand and track product configurations and related
optimizing CCM.                                                      changes in a single system. Ideally, anyone looking for
                                                                     information about a product should have a common source of
overcoming the five Challenges of Change and                         trusted information – one version of the truth – for products. This
Configuration Management                                             single definition should provide views into future and pending
                                                                     changes, as well as a detailed, accurate history of past changes
Over thousands of customer engagements worldwide, PTC has            and their related configurations.
identified five significant challenges when implementing CCM,
and the best practices required to address them. Addressing          Managing product configurations across the product
these challenges directly impacts a company’s ability to             lifecycle includes:
enhance productivity, lower overall cost, improve quality, and
accelerate time-to-market.                                           • Creating BOMs in Windchill from CAD data or from
                                                                       Microsoft Excel®
1 MAnAgIng A ProDuCt’s ConfIgurAtIon
                                                                     • Easily defining and navigating products by baselines,
the ChAllenge: Inability to accurately create, understand              release level, and effectivity
and track product configurations and their change history
over time.                                                           • Creating rules-driven variants–quickly–while maximizing
                                                                       data reuse for Configure-to-Order and Engineer-to-Order
People across the company need to have “a single source of             products
truth” when working with product information. They must have
an accurate, up-to-date definition of product configurations         • Easily creating, managing and sharing option sets for
and related information throughout the numerous engineering            Assemble-to-Order products
changes during the product lifecycle. Keeping this information
                                                                     • Integrating navigation, design and visualization of option
in sync is incredibly difficult given the complexity of today’s
                                                                       combinations
products and the varied information needs of Engineering,
Suppliers, Purchasing, Manufacturing, service technicians, and       B. Modular Product Architecture Definition. Take a systematic
countless other stakeholders.                                        approach to organizing products into interchangeable modules.
                                                                     Formalize product module interfaces to better manage the
Different versions, variants, and change history must be readily
                                                                     transfer and reintegration of design data, while preserving its
accessible to provide traceability and ensure that product
                                                                     integrity. This allows design activities to occur independently and
designs are not subject to misinterpretation.
                                                                     concurrently in a highly synchronized approach.
the solutIon: enable the enterprise to create, understand
                                                                     Implementing a modular product architecture involves:
and track product configurations.
                                                                     • Organizing and analyzing platform and variant
Provide a common understanding of the complete product
                                                                       requirements
definition across the enterprise to ensure quality, and to prevent
costly errors. This one-source approach ensures that people can      • Translating requirements into required functions
quickly and confidently retrieve and share accurate information
at any time in the product’s history. Your configuration             • Organizing the means into a logical set of modules
management process must support engineering best practices,
including product platforms and modular product design to            • Identifying appropriate interfaces
allow companies to better reuse designs, manage change, and
rapidly develop variant designs from a common base.




Page 4 of 9 | Adressing the CCM imperative                                                                                      PTC.com
Best Practices White Paper




C. generic Product Platform Design. Capture and manage
a modular product architecture definition and the associated,         CAse In PoInt
detailed product platform design as it is developed. Windchill
manages the high-level platform structure, including related          streamlining the Design Process at Maserati racing
product options, together with the required interfaces. The           Maserati Racing is a branch of luxury sports car manufacturer
Windchill solution also manages the detailed CAD structure            Maserati S.p.A. Maserati consolidated their engineering data
during development, by associating it with the product                into a centralized repository using PTC’s Windchill. Leveraging
structure. By managing and synchronizing modular product              this centralized information, Maserati Racing streamlined their
structure, supporting interfaces and modular design content,          internal change management process, which now supportstheir
the distributed team is kept on the same page throughout              varied vehicle configurations. The net result for Maserati includes
                                                                      increased commercial part reuse, early discovery of design
development, which minimizes integration surprises.
                                                                      defects, and easier sharing of technical information with the
                                                                      shop floor.
enabling a generic product platform design requires:
                                                                      schneider electric Makes its world smaller in one system
• Capturing and managing a high-level platform
  architecture                                                        One of the world’s largest manufacturers of equipment for
                                                                      electrical power distribution, industrial control and automation,
• Defining module interfaces, and controlling changes                 Schneider Electric consolidated seven disparate engineering
                                                                      systems into a common PLM solution. Implementing a single,
• Managing the coordinated development of a detailed                  integrated system enabled a seamless, integrated change and
  product structure with CAD designs                                  configuration management process. The company used PTC’s
                                                                      Windchill to ensure secure control and management of product
2 struCturIng A fleXIBle, relIABle                                    data, and to enable more cohesive, integrated collaboration and
  ChAnge ProCess                                                      communication of information. As a result, Schneider reduced
                                                                      engineer-to-order cycle times by several weeks, improved
the ChAllenge: Difficulty in structuring a reliable, flexible         support for their growing customer base, and recognized multi-
change process that supports rapid and accurate design                million dollar annual savings.
changes.
                                                                                                               Schneider Electric
                                                                                                               converted seven
Product developers and downstream functions, such as
                                                                                                               incompatible engineering
manufacturing and service, need to play a role in evaluating,                                                  systems into a single
approving and implementing changes. This requirement is                                                        Windchill PLM system
particularly challenging with product changes that impact                                                      to improve global
multiple designs or design variants.                                                                           collaboration and
                                                                                                               integrate its change
the solutIon: Implement a flexible, automated process                                                          and configuration
that always delivers accurate, actionable information.                                                         management process.


Provide a clear, predictable, repeatable process that is flexible
enough to cover the spectrum of changes, from new product
release to service updates. An effective process provides
decision-makers with the right context to understand the
proposed change and its implications, and it must be efficient,     Best Practices:
so participants can focus on innovation, and not on change
                                                                    A. standardized, Automated Change Processes. Adopt an
administration. This automated process reduces change cycle
                                                                    integrated decision management process that supports accurate,
times and results in fewer downstream issues that typically lead
                                                                    controlled changes, within a single system that’s connected to
to rework and scrap.
                                                                    product data. Here, everyone involved with the change process
                                                                    must be able to quickly understand the proposed changes,
                                                                    and review the associated product information to make better
                                                                    business decisions.




Page 5 of 9 | Adressing the CCM imperative                                                                                         PTC.com
Best Practices White Paper




A well-defined, standardized, automated change process
allows:                                                            CAse In PoInt

• Synchronizing change with product configuration data in a        Automated Change Process transforms Kirloskar oil engines
  single, integral system                                          ltd. (Koel)

• Providing problem reporting, deviation/waiver requests, as       KOEL, India’s leading manufacturer of diesel engines, engine
                                                                   bearings, and generators for a broad range of industrial
  well as change requests, notices and activities
                                                                   applications, replaced their manual change process,
                                                                   implementing an automated process for tracking and
• Applying predefined and configurable change process
                                                                   managing engineering changes. The company introduced
  workflows, activities and process roles
                                                                   separate processes for managing change in different phases
                                                                   of the product lifecycle, with differing approaches for prototype
• Automating change routing and task notifications
                                                                   and production. As a result, they have a centralized change
                                                                   management process using PTC’s Windchill across their
• Offering flexible support for both simple and complex
                                                                   different locations, and now can easily track and monitor
  changes                                                          engineering changes across their enterprise.

• Providing enterprise visibility to pending and approved          The net result for Kirloskar Oil is a set of comprehensive reports
  changes throughout the lifecycle                                 that help users create a “knowledge bank” of their designs. By
                                                                   improving their process, KOEL was also able to reduce change
                                                                   cycle time by 40%.
3 MAnAgIng ChAnge AnD ConfIgurAtIons
  ACross DIsCIPlInes                                               Improving global Change Management at stryker navigation

the ChAllenge: Ineffective and inefficient change control          As a leading innovator of medical products in orthopedics,
                                                                   implants, physiotherapy, traumatology and biotechnology,
processes, and difficulty synchronizing design changes, so
                                                                   Stryker needed to establish a global product lifecycle platform
they can be leveraged across the entire enterprise.
                                                                   to manage its change processes to conform to FDA regulations.

Today’s products have increasingly complex design relationships.   Windchill PDMLink gave Stryker employees access to all
The integration of mechanical design, electrical design,           product-related data from one source, resulting in a 20%
                                                                   reduction in time taken for change and release of documents
software, firmware, and requirements is driving the need for
                                                                   and document search.
users to better understand product configurations and related
information. Changes to products can have far-reaching
                                                                                                           Windchill PDMLink
impacts throughout the product lifecycle. Understanding the
                                                                                                           transformed Stryker’s
impact on the whole product is challenging, yet critical to
                                                                                                           global change
ensuring that changes are fully understood and implemented                                                 management process.
accurately across all disciplines.

the solutIon: enable the whole enterprise to work
with and view integral product data and configurations,
so changes can be synchronized quickly and accurately
across disciplines.

Link data from across the enterprise to product configurations,
applying changes to the complete product definition. Provide
an integrated change management process to keep designs,
specifications, quality plans, manufacturing processes,
compliance data, documentation, and other product information
synchronized. Managing change in an integrated way reduces
errors and rework that can result from implementing change
incompletely, incorrectly, or at different times.




Page 6 of 9 | Adressing the CCM imperative                                                                                     PTC.com
Best Practices White Paper




Best Practices:
                                                                       CAse In PoInt
Integrated Cross-Discipline Change Management. Implement
fast, accurate change across disciplines with a single, integrated     Data traceability and visibility fosters Collaboration and
process to update the complete product definition. Windchill           Quality at Cochlear
provides the ability to create, manage, and deploy a complete
                                                                       Cochlear is the global leader in innovative, implantable
product definition in a single integral tool.
                                                                       hearing solutions. Cochlear implemented Windchill PDMLink to
                                                                       control and audit their complete “Bill of Information,”
An integrated change management process that supports
                                                                       accelerating time-to-market by allowing their global
multiple disciplines includes:
                                                                       development teams to better manage product data. Users now
                                                                       manage all product data in a single data vault, and provide
• A single source for product data
                                                                       online traceability and visibility to the information.

• A single, global BOM, which integrates all product                   The result for Cochlear included increased speed and efficiency
  data, including heterogeneous MCAD, ECAD, software,                  of document reviews and change control using electronic
                                                                       signatures. The company also achieved accurate tracking of
  documents, requirements, and visualization
                                                                       product configurations across departments. Cochlear now
                                                                       executes design changes centrally and visibly across teams,
• Robust configuration traceability
                                                                       thereby reducing errors, enforcing version control, and driving
                                                                       product change quality through clear workflows.
• Product data that’s integrally connected to change info via
  a powerful, flexible PLM toolset
                                                                                                             The change process at
• Global, enterprise visibility                                                                              Cochlear was transformed
                                                                                                             through better visibility to data,
• Formal change impact and root cause analysis                                                               resulting in higher quality and
                                                                                                             faster time-to-market for new
4 IntegrAtIng PArtners Into the                                                                              products.
  ChAnge ProCess

the ChAllenge: how to integrate partners into the change
progress while protecting valuable intellectual property (IP).

Manufacturers must balance the need to provide transparent
access to change information across their supply and design          content in a single, secure environment, so you can control and
chains, with the need to protect proprietary product knowledge.      share it, so as to manage change and product configurations
                                                                     over the product’s lifecycle.
the solutIon: enable external parties to seamlessly and
securely interact with product configurations and changes            A well-managed process allows third parties to have the
throughout product development.                                      appropriate level of access, ranging from “arms length”
                                                                     relationships, such as a component supplier, to a trusted strategic
Third parties are increasingly critical to the timely development    partner who may be involved in complete system development.
and delivery of high quality products. Keeping these resources
informed and including them in critical decisions helps improve      successfully integrating partners into the change process
product designs and ensure smooth downstream operations.             involves:
Doing so in a well-controlled manner helps manufacturers
                                                                     • Sharing change and product data information in a
improve quality and reduce waste by ensuring that partners
                                                                       controlled manner appropriate to the specific relationship
have access to up-to-date, accurate information, without putting
                                                                       with a partner
their IP at risk.
                                                                     • Integrating partners into change review, approval and
Best Practices:
                                                                       implementation activities
Partner Change Integration. Automate processes, so
                                                                     • Exchanging design and change information offline
information moves quickly and efficiently. Capture digital data




Page 7 of 9 | Adressing the CCM imperative                                                                                              PTC.com
Best Practices White Paper




• Using rich visualization to enhance collaboration, for
  instance, in design reviews                                        CAse In PoInt

• Tracing history of what was sent and when                          hP ®, Itt, and Plug Power® realize Productivity Benefits of
                                                                     Change Management solutions
5 CoorDInAtIng ChAnges ACross
  engIneerIng AnD MAnufACturIng                                      HP’s Imaging and Printing division spans 23,000 products
                                                                     and tens of thousands of suppliers across 160 countries. By
the ChAllenge: Difficulty in connecting engineering and              implementing a PTC-based change management process,
Manufacturing in a single, concurrent change process.                HP’s Imaging and Printing division realized an 80% improvement
                                                                     in design and process reuse; increased productivity between 20 –
One of the most critical connections in CCM is between               30%; reduced time-to-market, product costs and warranty costs;
                                                                     and experienced a 2% decline in part counts.
Engineering and Manufacturing. Accurate and timely
communication between the people that design the product             ITT Industries–the world’s premier supplier of pumps, systems
and the people that produce it is critical to quality, cost,         and services to move and control water and other fluids –
and time-to-market. The Manufacturing group requires                 implemented a global engineering change process with a one-
product data in different formats than Engineering, so               year payback. In addition, the company reduced the time to
accurate translation of information is needed for effective          implement engineering changes by 50%, eliminating significant
                                                                     scrap and rework costs.
communication. The challenge is keeping these different views
of the same information in sync, while still providing the right     Plug Power designs, develops and manufactures on-site electric
information to each organization in a way that makes sense.          power generation systems utilizing Proton Exchange Membrane
                                                                     fuel cells for stationary applications. The company was able to
the solutIon: tightly align manufacturing processes                  cut its ECN cycle time by 62% and reduce variability in the time to
to engineering design by integrating engineering and                 complete an ECN by 76%.
Manufacturing in the same change management process.

Provide manufacturing with associative views of engineering
data to plan and execute closed-loop changes quickly. Eliminate
miscommunication that can lead to increased inventory and
slow cycle times.
                                                                   • Managing variance decisions and incorporating
Best Practices:
                                                                     deviations and waivers using the same change process for
Associative eBoM/mBoM. Translate engineering BOMs                    Engineering and Manufacturing
(eBOMs) into manufacturing BOMs (mBOMs) while
                                                                   • Providing fully traceable change history
maintaining bi-directional associativity and linkages between
these two views of the product. Link the two in order to           Conclusion
better analyze and implement change in manufacturing as
engineering designs change.                                        taking the next step toward change and configuration
                                                                   management excellence
Associating eBoMs to mBoMs in an integrated change
process includes:                                                  Change and configuration management in product
                                                                   development is critical for today’s fiercely competitive global
• Enabling concurrent development of eBOM and mBOM                 markets. “Good enough” practices simply won’t help any
                                                                   organization grow their business and capitalize on new and
• Implementing a common change process for Engineering
                                                                   emerging markets.
  and Manufacturing teams
                                                                   Applying best practices is now a must-have that impacts
• Associating manufacturing process data with change records
                                                                   quality, time-to-market and product cost, which in turn fuel
• Easily synchronizing eBOM and mBOM product structure             revenue, market share, and profitability. As products become
  changes




Page 8 of 9 | Adressing the CCM imperative                                                                                         PTC.com
Best Practices White Paper




more complex, and as product development becomes more
distributed, a fast, reliable, automated change process –                                        CAse In PoInt
supported by robust PLM technology – is the only way to
master market demands for tailored product configurations                                        grand river group (grg) unifies engineering and
that meet customer needs.                                                                        Manufacturing Change Processes

Change and configuration management challenges are                                               GRG is China’s largest motorcycle manufacturer, with a
magnified when complex products are developed globally with                                      production capacity of three million engines and three million
                                                                                                 motorcycles per year, and is the largest partner of Suzuki Motor
a network of dispersed internal and external design partners,
                                                                                                 Corp. in China. GRG implemented Windchill PDMLink and
suppliers and manufacturers. Getting participants synchronized                                   Windchill MPMLink (Manufacturing Process Management) to
with common data and integrated processes is critical. At stake                                  shorten time-to-market by accelerating the engineering-to-
is a company’s ability to enhance productivity, lower overall                                    manufacturing change process. GRG used PTC solutions
cost, improve quality and accelerate time-to-market. CCM                                         to streamline and standardize manufacturing engineering
has to be rigorous across the enterprise, in collaboration both                                  deliverables and implement a closed-loop change process.
with partners and with dependent downstream stakeholders in
                                                                                                 As a result, GRG increased production and manufacturing
manufacturing and service support.                                                               engineering efficiency while improving product quality and
                                                                                                 consistency of manufacturing data. They also dramatically
Creating the “single source of truth”                                                            reduced the time to propagate a new product derivative to
                                                                                                 manufacturing, and improved reliability of manufacturing data,
PTC excels at all levels of CCM because, with PTC solutions,                                     process plans and work instructions.
change activities are always synchronized to product design
data, in a single, integral system–creating the single source of                                                                        Grand River Group
truth that’s essential to coordinated CCM. Add to this a powerful,                                                                      leveraged Windchill
                                                                                                                                                  ®

automated workflow, and teams can collaborate more efficiently                                                                          MPMLink to accelerate
                                                                                                                                        its engineering-to-
and securely. No doubt, CCM is a complex problem, but best
                                                                                                                                        manufacturing change
practices and supporting technology from PTC can simplify and
                                                                                                                                        process.
streamline operations, enabling you to speed innovation to
market while maintaining control and confidence.

So how do you get started? Review PTC’s Value Roadmap, an
invaluable tool that many successful PTC customers have used
as a first step to evaluating their current processes, and then
developing a strategy to improve CCM in their business.

See the PTC Value Roadmap at http://ptc.com/go/ccmpvr

© 2010, Parametric Technology Corporation (PTC). All rights reserved. Information described
herein is furnished for informational use only and is subject to change without notice. The
only warranties for PTC products and services are set forth in the express warranty statements
accompanying such products and services and nothing herein should be construed as
constituting an additional warranty. References to customer successes are based upon a
single user experience and such customer’s testimonial. Analyst or other forward-looking
statements about PTC products and services or the markets in which PTC participates are
those of the analysts themselves and PTC makes no representations as to the basis or
accuracy thereof. PTC, the PTC Logo, Creo, Elements/Direct, Elements/Pro, Elements/
View, Unlock Potential, Think. Create. Believe. and all PTC product names and logos are
trademarks or registered trademarks of PTC and/or its subsidiaries in the United States and in
other countries. All other product or company names are property of their respective owners.
the timing of any product release, including any features or functionality, is subject to
change at PtC’s discretion.

                                                     5945-ChangeConfigPLM_WP-EN-0708




Page 9 of 9 | Adressing the CCM imperative                                                                                                                 PTC.com

Mais conteúdo relacionado

Mais procurados

241985748 plm-case-study
241985748 plm-case-study241985748 plm-case-study
241985748 plm-case-studyhomeworkping4
 
PECB Webinar: Implementing and maintaining an OHS system within the framework...
PECB Webinar: Implementing and maintaining an OHS system within the framework...PECB Webinar: Implementing and maintaining an OHS system within the framework...
PECB Webinar: Implementing and maintaining an OHS system within the framework...PECB
 
World Class Manufacturing
World Class Manufacturing World Class Manufacturing
World Class Manufacturing Sushanta Meher
 
Software Project Management (SPM)
Software Project Management (SPM)Software Project Management (SPM)
Software Project Management (SPM)RubySaud
 
Plm specialist-Professor-PLM-0909
Plm specialist-Professor-PLM-0909Plm specialist-Professor-PLM-0909
Plm specialist-Professor-PLM-0909francisdt
 
Four key strategies for enabling innovation in the age of smart
Four key strategies for enabling innovation in the age of smartFour key strategies for enabling innovation in the age of smart
Four key strategies for enabling innovation in the age of smartIBM Rational software
 
A better way to manage change and transitions in project manufacturing
A better way to manage change and transitions in project manufacturingA better way to manage change and transitions in project manufacturing
A better way to manage change and transitions in project manufacturingJulie Fraser
 
Implementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_tImplementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_t17TUME122MITHUNM
 
Product life cycle management (www.ironsystems.com)
Product life cycle management (www.ironsystems.com)Product life cycle management (www.ironsystems.com)
Product life cycle management (www.ironsystems.com)Mrigendra Sharma
 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesNên Trần Ngọc
 
Product Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software ToolsProduct Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software ToolsProductCamp Atlanta
 
Flow Manufacturing: How to Achieve Superior Customer Response
Flow Manufacturing: How to Achieve Superior Customer ResponseFlow Manufacturing: How to Achieve Superior Customer Response
Flow Manufacturing: How to Achieve Superior Customer ResponseCognizant
 
Product innovation strategy v1
Product innovation strategy v1Product innovation strategy v1
Product innovation strategy v1Stephen Au
 
Infosys - Product Development White Paper | Global Sourcing
Infosys - Product Development White Paper | Global SourcingInfosys - Product Development White Paper | Global Sourcing
Infosys - Product Development White Paper | Global SourcingInfosys
 

Mais procurados (20)

241985748 plm-case-study
241985748 plm-case-study241985748 plm-case-study
241985748 plm-case-study
 
World class manufacturing
World class manufacturingWorld class manufacturing
World class manufacturing
 
World Class Manufacturing
World Class ManufacturingWorld Class Manufacturing
World Class Manufacturing
 
PECB Webinar: Implementing and maintaining an OHS system within the framework...
PECB Webinar: Implementing and maintaining an OHS system within the framework...PECB Webinar: Implementing and maintaining an OHS system within the framework...
PECB Webinar: Implementing and maintaining an OHS system within the framework...
 
World Class Manufacturing
World Class Manufacturing World Class Manufacturing
World Class Manufacturing
 
Software Project Management (SPM)
Software Project Management (SPM)Software Project Management (SPM)
Software Project Management (SPM)
 
Plm specialist-Professor-PLM-0909
Plm specialist-Professor-PLM-0909Plm specialist-Professor-PLM-0909
Plm specialist-Professor-PLM-0909
 
Iarjset n core tech 8
Iarjset n core tech 8Iarjset n core tech 8
Iarjset n core tech 8
 
Four key strategies for enabling innovation in the age of smart
Four key strategies for enabling innovation in the age of smartFour key strategies for enabling innovation in the age of smart
Four key strategies for enabling innovation in the age of smart
 
A better way to manage change and transitions in project manufacturing
A better way to manage change and transitions in project manufacturingA better way to manage change and transitions in project manufacturing
A better way to manage change and transitions in project manufacturing
 
Implementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_tImplementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_t
 
Product life cycle management (www.ironsystems.com)
Product life cycle management (www.ironsystems.com)Product life cycle management (www.ironsystems.com)
Product life cycle management (www.ironsystems.com)
 
Chapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_servicesChapter 5 design_of_goods_and_services
Chapter 5 design_of_goods_and_services
 
Product Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software ToolsProduct Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software Tools
 
Flow Manufacturing: How to Achieve Superior Customer Response
Flow Manufacturing: How to Achieve Superior Customer ResponseFlow Manufacturing: How to Achieve Superior Customer Response
Flow Manufacturing: How to Achieve Superior Customer Response
 
Product innovation strategy v1
Product innovation strategy v1Product innovation strategy v1
Product innovation strategy v1
 
Infosys - Product Development White Paper | Global Sourcing
Infosys - Product Development White Paper | Global SourcingInfosys - Product Development White Paper | Global Sourcing
Infosys - Product Development White Paper | Global Sourcing
 
whitepaper9-11
whitepaper9-11whitepaper9-11
whitepaper9-11
 
CMMI V2.0
CMMI V2.0CMMI V2.0
CMMI V2.0
 
CMMI
CMMICMMI
CMMI
 

Semelhante a Addressing the Change and Configuration Management Imperative

Achieving Compliant Manufacturing Excellence through Real-time Performance Ma...
Achieving Compliant Manufacturing Excellence through Real-time Performance Ma...Achieving Compliant Manufacturing Excellence through Real-time Performance Ma...
Achieving Compliant Manufacturing Excellence through Real-time Performance Ma...FindWhitePapers
 
Untangling Product Complexity in M&A
Untangling Product Complexity in M&AUntangling Product Complexity in M&A
Untangling Product Complexity in M&AMichael Hu
 
Infosys – Quality Management Software Manufacturing | White Paper
Infosys – Quality Management Software Manufacturing | White PaperInfosys – Quality Management Software Manufacturing | White Paper
Infosys – Quality Management Software Manufacturing | White PaperInfosys
 
Bakery plant Operational Excellence Catalog
Bakery plant Operational Excellence CatalogBakery plant Operational Excellence Catalog
Bakery plant Operational Excellence CatalogMattcons
 
7 Reasons Why Companies Need PLM Software .pdf
7 Reasons Why Companies Need PLM Software .pdf7 Reasons Why Companies Need PLM Software .pdf
7 Reasons Why Companies Need PLM Software .pdfVeryshop1Line
 
GCL Group Corporate Brochure
GCL Group Corporate BrochureGCL Group Corporate Brochure
GCL Group Corporate BrochureKevin_Annocque
 
Gcl Group Corporate Brochure
Gcl Group Corporate BrochureGcl Group Corporate Brochure
Gcl Group Corporate BrochureKevin_Annocque
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarAbhinandan Kumar
 
“World class manufacturing and its implementation in india”
“World class manufacturing and its implementation in india”“World class manufacturing and its implementation in india”
“World class manufacturing and its implementation in india”Dipesh Vora
 
Infosys - Telecom OEM Solutions | Quote to Cash White Paper
Infosys - Telecom OEM Solutions | Quote to Cash White PaperInfosys - Telecom OEM Solutions | Quote to Cash White Paper
Infosys - Telecom OEM Solutions | Quote to Cash White PaperInfosys
 
Mobile solutions for the manufacturing industry
Mobile solutions for the manufacturing industryMobile solutions for the manufacturing industry
Mobile solutions for the manufacturing industryCygnet Infotech
 
Glass manufacturing plant operational excellence catalog
Glass manufacturing plant operational excellence catalogGlass manufacturing plant operational excellence catalog
Glass manufacturing plant operational excellence catalogMattcons
 
Cement plant catalog for operational excellence
Cement plant catalog for operational excellenceCement plant catalog for operational excellence
Cement plant catalog for operational excellenceMattcons
 
Agile manufacturing.pptx
Agile manufacturing.pptxAgile manufacturing.pptx
Agile manufacturing.pptxvirshit
 
7.component part
7.component part7.component part
7.component partlibfsb
 
HCLT Whitepaper: Responsive Efficient Customer- focused Creating Value Across...
HCLT Whitepaper: Responsive Efficient Customer- focused Creating Value Across...HCLT Whitepaper: Responsive Efficient Customer- focused Creating Value Across...
HCLT Whitepaper: Responsive Efficient Customer- focused Creating Value Across...HCL Technologies
 

Semelhante a Addressing the Change and Configuration Management Imperative (20)

Manufacturing
ManufacturingManufacturing
Manufacturing
 
Achieving Compliant Manufacturing Excellence through Real-time Performance Ma...
Achieving Compliant Manufacturing Excellence through Real-time Performance Ma...Achieving Compliant Manufacturing Excellence through Real-time Performance Ma...
Achieving Compliant Manufacturing Excellence through Real-time Performance Ma...
 
Untangling Product Complexity in M&A
Untangling Product Complexity in M&AUntangling Product Complexity in M&A
Untangling Product Complexity in M&A
 
Infosys – Quality Management Software Manufacturing | White Paper
Infosys – Quality Management Software Manufacturing | White PaperInfosys – Quality Management Software Manufacturing | White Paper
Infosys – Quality Management Software Manufacturing | White Paper
 
Msfairchildcasestudy
MsfairchildcasestudyMsfairchildcasestudy
Msfairchildcasestudy
 
Bakery plant Operational Excellence Catalog
Bakery plant Operational Excellence CatalogBakery plant Operational Excellence Catalog
Bakery plant Operational Excellence Catalog
 
7 Reasons Why Companies Need PLM Software .pdf
7 Reasons Why Companies Need PLM Software .pdf7 Reasons Why Companies Need PLM Software .pdf
7 Reasons Why Companies Need PLM Software .pdf
 
GCL Group Corporate Brochure
GCL Group Corporate BrochureGCL Group Corporate Brochure
GCL Group Corporate Brochure
 
Gcl Group Corporate Brochure
Gcl Group Corporate BrochureGcl Group Corporate Brochure
Gcl Group Corporate Brochure
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan Kumar
 
“World class manufacturing and its implementation in india”
“World class manufacturing and its implementation in india”“World class manufacturing and its implementation in india”
“World class manufacturing and its implementation in india”
 
Infosys - Telecom OEM Solutions | Quote to Cash White Paper
Infosys - Telecom OEM Solutions | Quote to Cash White PaperInfosys - Telecom OEM Solutions | Quote to Cash White Paper
Infosys - Telecom OEM Solutions | Quote to Cash White Paper
 
agile.docx
agile.docxagile.docx
agile.docx
 
Mobile solutions for the manufacturing industry
Mobile solutions for the manufacturing industryMobile solutions for the manufacturing industry
Mobile solutions for the manufacturing industry
 
Glass manufacturing plant operational excellence catalog
Glass manufacturing plant operational excellence catalogGlass manufacturing plant operational excellence catalog
Glass manufacturing plant operational excellence catalog
 
Ijsea04031015
Ijsea04031015Ijsea04031015
Ijsea04031015
 
Cement plant catalog for operational excellence
Cement plant catalog for operational excellenceCement plant catalog for operational excellence
Cement plant catalog for operational excellence
 
Agile manufacturing.pptx
Agile manufacturing.pptxAgile manufacturing.pptx
Agile manufacturing.pptx
 
7.component part
7.component part7.component part
7.component part
 
HCLT Whitepaper: Responsive Efficient Customer- focused Creating Value Across...
HCLT Whitepaper: Responsive Efficient Customer- focused Creating Value Across...HCLT Whitepaper: Responsive Efficient Customer- focused Creating Value Across...
HCLT Whitepaper: Responsive Efficient Customer- focused Creating Value Across...
 

Mais de PTC

4 ways fashion and apparel brands can benefit from digital storyboarding
4 ways fashion and apparel brands can benefit from digital storyboarding4 ways fashion and apparel brands can benefit from digital storyboarding
4 ways fashion and apparel brands can benefit from digital storyboardingPTC
 
Get Your Aircraft Spare Parts Inventory Management Off the Ground
Get Your Aircraft Spare Parts Inventory Management Off the GroundGet Your Aircraft Spare Parts Inventory Management Off the Ground
Get Your Aircraft Spare Parts Inventory Management Off the GroundPTC
 
PTC Corporate Overview 2018
PTC Corporate Overview 2018PTC Corporate Overview 2018
PTC Corporate Overview 2018PTC
 
Terumo BCT Selects Windchill Quality Management to Enhance Global Quality Pro...
Terumo BCT Selects Windchill Quality Management to Enhance Global Quality Pro...Terumo BCT Selects Windchill Quality Management to Enhance Global Quality Pro...
Terumo BCT Selects Windchill Quality Management to Enhance Global Quality Pro...PTC
 
PTC Announces a Major New Release to Vuforia Augmented Reality Platform
PTC Announces a Major New Release to Vuforia  Augmented Reality PlatformPTC Announces a Major New Release to Vuforia  Augmented Reality Platform
PTC Announces a Major New Release to Vuforia Augmented Reality PlatformPTC
 
PTC Announces Vuforia Chalk App for Augmented Reality Communications
PTC Announces Vuforia Chalk App for Augmented Reality CommunicationsPTC Announces Vuforia Chalk App for Augmented Reality Communications
PTC Announces Vuforia Chalk App for Augmented Reality CommunicationsPTC
 
ThingWorx® Studio Brings Highly Immersive Augmented Reality Interactions to t...
ThingWorx® Studio Brings Highly Immersive Augmented Reality Interactions to t...ThingWorx® Studio Brings Highly Immersive Augmented Reality Interactions to t...
ThingWorx® Studio Brings Highly Immersive Augmented Reality Interactions to t...PTC
 
PTC to Accelerate Mixed Reality for Enterprises with Microsoft HoloLens
PTC to Accelerate Mixed Reality for Enterprises with Microsoft HoloLensPTC to Accelerate Mixed Reality for Enterprises with Microsoft HoloLens
PTC to Accelerate Mixed Reality for Enterprises with Microsoft HoloLensPTC
 
PTC Product Lifecycle Management SaaS Bookings Double Over Last Four Quarters
PTC Product Lifecycle Management SaaS Bookings Double Over Last Four QuartersPTC Product Lifecycle Management SaaS Bookings Double Over Last Four Quarters
PTC Product Lifecycle Management SaaS Bookings Double Over Last Four QuartersPTC
 
PTC Marks 15 Years of Partnering with DoD STARBASE Program for Hands-On STEM...
PTC Marks 15 Years of Partnering with DoD STARBASE Program  for Hands-On STEM...PTC Marks 15 Years of Partnering with DoD STARBASE Program  for Hands-On STEM...
PTC Marks 15 Years of Partnering with DoD STARBASE Program for Hands-On STEM...PTC
 
Are You Delivering Customer-Centric Technical Illustrations?
Are You Delivering Customer-Centric Technical Illustrations?Are You Delivering Customer-Centric Technical Illustrations?
Are You Delivering Customer-Centric Technical Illustrations?PTC
 
Top 7 Considerations for High Velocity Maintenance
Top 7 Considerations for High Velocity MaintenanceTop 7 Considerations for High Velocity Maintenance
Top 7 Considerations for High Velocity MaintenancePTC
 
Three Keys to True Inventory Optimization
Three Keys to True Inventory OptimizationThree Keys to True Inventory Optimization
Three Keys to True Inventory OptimizationPTC
 
PTC and L&T Technology Services Unveil Industry 4.0 Center of Excellence
PTC and L&T Technology Services Unveil  Industry 4.0 Center of ExcellencePTC and L&T Technology Services Unveil  Industry 4.0 Center of Excellence
PTC and L&T Technology Services Unveil Industry 4.0 Center of ExcellencePTC
 
Hitachi Construction Machinery Adopts PTC Service Parts Management SaaS
Hitachi Construction Machinery Adopts PTC Service Parts Management SaaSHitachi Construction Machinery Adopts PTC Service Parts Management SaaS
Hitachi Construction Machinery Adopts PTC Service Parts Management SaaSPTC
 
HIROTEC Selects ThingWorx Platform from PTC for Remote Monitoring and Real-Ti...
HIROTEC Selects ThingWorx Platform from PTC for Remote Monitoring and Real-Ti...HIROTEC Selects ThingWorx Platform from PTC for Remote Monitoring and Real-Ti...
HIROTEC Selects ThingWorx Platform from PTC for Remote Monitoring and Real-Ti...PTC
 
PTC Announces New ThingWorx Manufacturing Apps
PTC Announces New ThingWorx Manufacturing AppsPTC Announces New ThingWorx Manufacturing Apps
PTC Announces New ThingWorx Manufacturing AppsPTC
 
3D Systems Chooses ThingWorx Platform from PTC to Enable Smart, Connected 3D ...
3D Systems Chooses ThingWorx Platform from PTC to Enable Smart, Connected 3D ...3D Systems Chooses ThingWorx Platform from PTC to Enable Smart, Connected 3D ...
3D Systems Chooses ThingWorx Platform from PTC to Enable Smart, Connected 3D ...PTC
 
PTC and ANSYS to Develop Platform Solution Enabling Digital Simulation for th...
PTC and ANSYS to Develop Platform Solution Enabling Digital Simulation for th...PTC and ANSYS to Develop Platform Solution Enabling Digital Simulation for th...
PTC and ANSYS to Develop Platform Solution Enabling Digital Simulation for th...PTC
 
Healthcare & Med Device - LiveWorx Recommended Agenda
Healthcare & Med Device - LiveWorx Recommended AgendaHealthcare & Med Device - LiveWorx Recommended Agenda
Healthcare & Med Device - LiveWorx Recommended AgendaPTC
 

Mais de PTC (20)

4 ways fashion and apparel brands can benefit from digital storyboarding
4 ways fashion and apparel brands can benefit from digital storyboarding4 ways fashion and apparel brands can benefit from digital storyboarding
4 ways fashion and apparel brands can benefit from digital storyboarding
 
Get Your Aircraft Spare Parts Inventory Management Off the Ground
Get Your Aircraft Spare Parts Inventory Management Off the GroundGet Your Aircraft Spare Parts Inventory Management Off the Ground
Get Your Aircraft Spare Parts Inventory Management Off the Ground
 
PTC Corporate Overview 2018
PTC Corporate Overview 2018PTC Corporate Overview 2018
PTC Corporate Overview 2018
 
Terumo BCT Selects Windchill Quality Management to Enhance Global Quality Pro...
Terumo BCT Selects Windchill Quality Management to Enhance Global Quality Pro...Terumo BCT Selects Windchill Quality Management to Enhance Global Quality Pro...
Terumo BCT Selects Windchill Quality Management to Enhance Global Quality Pro...
 
PTC Announces a Major New Release to Vuforia Augmented Reality Platform
PTC Announces a Major New Release to Vuforia  Augmented Reality PlatformPTC Announces a Major New Release to Vuforia  Augmented Reality Platform
PTC Announces a Major New Release to Vuforia Augmented Reality Platform
 
PTC Announces Vuforia Chalk App for Augmented Reality Communications
PTC Announces Vuforia Chalk App for Augmented Reality CommunicationsPTC Announces Vuforia Chalk App for Augmented Reality Communications
PTC Announces Vuforia Chalk App for Augmented Reality Communications
 
ThingWorx® Studio Brings Highly Immersive Augmented Reality Interactions to t...
ThingWorx® Studio Brings Highly Immersive Augmented Reality Interactions to t...ThingWorx® Studio Brings Highly Immersive Augmented Reality Interactions to t...
ThingWorx® Studio Brings Highly Immersive Augmented Reality Interactions to t...
 
PTC to Accelerate Mixed Reality for Enterprises with Microsoft HoloLens
PTC to Accelerate Mixed Reality for Enterprises with Microsoft HoloLensPTC to Accelerate Mixed Reality for Enterprises with Microsoft HoloLens
PTC to Accelerate Mixed Reality for Enterprises with Microsoft HoloLens
 
PTC Product Lifecycle Management SaaS Bookings Double Over Last Four Quarters
PTC Product Lifecycle Management SaaS Bookings Double Over Last Four QuartersPTC Product Lifecycle Management SaaS Bookings Double Over Last Four Quarters
PTC Product Lifecycle Management SaaS Bookings Double Over Last Four Quarters
 
PTC Marks 15 Years of Partnering with DoD STARBASE Program for Hands-On STEM...
PTC Marks 15 Years of Partnering with DoD STARBASE Program  for Hands-On STEM...PTC Marks 15 Years of Partnering with DoD STARBASE Program  for Hands-On STEM...
PTC Marks 15 Years of Partnering with DoD STARBASE Program for Hands-On STEM...
 
Are You Delivering Customer-Centric Technical Illustrations?
Are You Delivering Customer-Centric Technical Illustrations?Are You Delivering Customer-Centric Technical Illustrations?
Are You Delivering Customer-Centric Technical Illustrations?
 
Top 7 Considerations for High Velocity Maintenance
Top 7 Considerations for High Velocity MaintenanceTop 7 Considerations for High Velocity Maintenance
Top 7 Considerations for High Velocity Maintenance
 
Three Keys to True Inventory Optimization
Three Keys to True Inventory OptimizationThree Keys to True Inventory Optimization
Three Keys to True Inventory Optimization
 
PTC and L&T Technology Services Unveil Industry 4.0 Center of Excellence
PTC and L&T Technology Services Unveil  Industry 4.0 Center of ExcellencePTC and L&T Technology Services Unveil  Industry 4.0 Center of Excellence
PTC and L&T Technology Services Unveil Industry 4.0 Center of Excellence
 
Hitachi Construction Machinery Adopts PTC Service Parts Management SaaS
Hitachi Construction Machinery Adopts PTC Service Parts Management SaaSHitachi Construction Machinery Adopts PTC Service Parts Management SaaS
Hitachi Construction Machinery Adopts PTC Service Parts Management SaaS
 
HIROTEC Selects ThingWorx Platform from PTC for Remote Monitoring and Real-Ti...
HIROTEC Selects ThingWorx Platform from PTC for Remote Monitoring and Real-Ti...HIROTEC Selects ThingWorx Platform from PTC for Remote Monitoring and Real-Ti...
HIROTEC Selects ThingWorx Platform from PTC for Remote Monitoring and Real-Ti...
 
PTC Announces New ThingWorx Manufacturing Apps
PTC Announces New ThingWorx Manufacturing AppsPTC Announces New ThingWorx Manufacturing Apps
PTC Announces New ThingWorx Manufacturing Apps
 
3D Systems Chooses ThingWorx Platform from PTC to Enable Smart, Connected 3D ...
3D Systems Chooses ThingWorx Platform from PTC to Enable Smart, Connected 3D ...3D Systems Chooses ThingWorx Platform from PTC to Enable Smart, Connected 3D ...
3D Systems Chooses ThingWorx Platform from PTC to Enable Smart, Connected 3D ...
 
PTC and ANSYS to Develop Platform Solution Enabling Digital Simulation for th...
PTC and ANSYS to Develop Platform Solution Enabling Digital Simulation for th...PTC and ANSYS to Develop Platform Solution Enabling Digital Simulation for th...
PTC and ANSYS to Develop Platform Solution Enabling Digital Simulation for th...
 
Healthcare & Med Device - LiveWorx Recommended Agenda
Healthcare & Med Device - LiveWorx Recommended AgendaHealthcare & Med Device - LiveWorx Recommended Agenda
Healthcare & Med Device - LiveWorx Recommended Agenda
 

Último

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 

Último (20)

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 

Addressing the Change and Configuration Management Imperative

  • 1. Best Practices White Paper Addressing the Change and Configuration Management Imperative how to overCoMe your fIve toughest ChAllenges Mention “Change and Configuration Management” (CCM) to even the boldest manufacturing executives, and they’ll tell you it’s a serious and complex issue that is frequently a stumbling block. More often than not, companies wistfully hope CCM can be magically solved by a set of patchwork solutions. With the current pace and intensity of global competition, today’s business leaders can no longer put CCM on the backburner. Progressive companies that have successfully tackled CCM are now able to develop a greater number of high-quality, highly innovative products faster than the competition. What’s more, they’re significantly increasing productivity and profitability along the way. So, why has the CCM process become so difficult and complex in just the past decade? What are the ramifications for companies that don’t deal intelligently with the issue? What best practices are top companies applying to solve the CCM riddle? Thankfully, with today’s advanced Product Lifecycle Management (PLM) technology, there is a clear and comprehensive solution that can finally resolve the CCM issue. In this white paper you’ll learn about: • the five toughest CCM challenges manufacturers face • why and how leading organizations are tackling the CCM process • proven best practices supported by real-world examples With this information, your team will be well equipped to start the process of confronting the CCM issue – once and for all. “An efficient change process can cut up to 33% off the typical product development cycle time.” –McKinsey and Company Page 1 of 9 | Adressing the CCM imperative PTC.com
  • 2. Best Practices White Paper Agility and speed-to-market are critical competitive weapons • Improve product quality and safety in manufacturing today. Manufacturers must be able to rapidly introduce new products, update existing features, reducecosts • Eliminate costly errors and improve quality if they expect to maximize market • Reduce scrap and rework opportunities. Product innovation is the key to satisfying market demands, but can also be disruptive to product developers, • Eliminate confusion in manufacturing suppliers, and manufacturing. Manufacturers in today’s challenging global market must embrace agility, but can’t afford • Synchronize support information with the to lose control. latest product changes Companies that can manage change effectively via sound • Provide an audit trail and traceability of design decisions change and configuration management processes can quickly meet changing market needs with confidence. These two critical, So, how do you identify ‘effective’ change management integrated processes now serve as the foundation for defining processes? Effective change and configuration management manufactured products: demands tight team cooperation and coordination, and a clear understanding of what is needed at any given point • Configuration Management is a process to manage in the development lifecycle. Today’s increasingly complex product definitions and content to ensure that all products simply can’t be managed effectively through manual, interested parties have a common understanding of what paper-based processes. Likewise, information cannot be is being designed, verified, released, purchased, built, silo’ed, and enterprise systems cannot be disparate and sold, and serviced. disconnected. Today, the status quo is a surefire recipe for launch delays, compromised product quality, and high • Change Management is a complementary, integrated development costs, all of which negatively impact revenue process that controls and tracks design changes, and how and profitability. product configurations evolve over their lifecycles. The pace and complexity of global business today requires “54% of companies lack a single repository to re- the intelligent use of advanced technology to streamline these view, analyze, approve and track changes across processes, giving companies the control they need to deliver products.” high quality, innovative products ahead of the competition. Product Lifecycle Management (PLM) software is designed to – gartner group manage complex product configurations, and provide the platform to control, collaborate, and communicate product These processes are essential to ensure efficient production information, so you can develop, produce, and support and lifecycle support of high quality products. Today’s fast- world-class products. paced, global markets no longer allow for these processes to be merely “good enough.” Manufacturers need to adopt Business Drivers of Change and Configuration Management best practices for change and configuration management to remain competitive. Otherwise, they will suffer from inefficiency, Today’s manufacturers rely more heavily on change and cost overruns, quality issues, and delayed time-to-market. configuration management (CCM) due to increased demands Today, manufacturers not only require strong configuration on product developers, suppliers, and manufacturers to get to management, but also robust, flexible control, coordination, market faster to drive profitability. This trend is caused by a and communication to support their change processes. number of factors: Efficient, well-structured change and configuration management Customized Products. Demand for more customizable processes have a positive impact on the competitiveness of products, with multiple options, increases the number of manufacturers, suppliers, and their customers. The benefits product configurations, which complicates design changes. extend from early product innovation through design, to service Offering multiple product variants, based on modular and support, allowing companies to: product designs, can deliver a competitive advantage, but adds to the complexity that must be managed. Page 2 of 9 | Adressing the CCM imperative PTC.com
  • 3. Best Practices White Paper globalization and global Competition. Increased Aerospace exemplifies the global competition is now driving the need for shorter challenge of mastering a complex range of product development cycles, cost efficiency, and rapid innovation. configuration requirements and Globalization and outsourcing of product development related change processes. and manufacturing demand greater control and better communication, so you can avoid producing the wrong revision, or misinterpreting designs. Product Complexity. Today’s products are more complex due to miniaturization and the introduction of smarter To address these challenges, PTC helps customers improve the products. Many products today include mechanical, efficiency of critical product development processes, enabled by electrical, firmware, and software components that must all robust PLM technology. For instance, PTC’s Windchill® platform be integrated and synchronized. helps manufacturers efficiently and effectively manage their CCM needs by offering: regulatory oversight. Growth in regulations, including environmental compliance mandates, require that key • Robust, flexible support for simple or complex levels of employees now have an accurate understanding – and configuration management. instant access to – relevant product content. Certain industries and customers specifically dictate product • A flexible, automated, closed-loop change process that configuration management and traceability, such as instantly connects key stakeholders to secure, accurate, mandates for “device master records” for medical devices. actionable information. Change activities are always synchronized with product design data in a single, integral These market trends are driving the need for better control system, and enabled by powerful and traceable electronic of change and product configurations. Even if CCM is not workflows. mandated, trusted configurations represent core knowledge for manufacturers, and are crucial to support processes • Fast, accurate change across disciplines, with a single, such as change impact analysis, manufacturing planning, integrated process to update the complete product environmental product compliance, outsourcing and costing. definition. A Best Practice Approach to Change and Configuration • A tailored change process integration that fosters effective Management partner and supplier collaboration while protecting intellectual property (IP). CCM seems like a simple concept, but in practice is complicated due to product complexity and the importance of • Concurrent development of the engineering BOM getting configurations right. Managing product information, (eBOM) and manufacturing BOM (mBOM) with Windchill from early requirements through design, sourcing, MPMLink™ that integrates manufacturing stakeholders manufacturing, and service, is difficult. Different people early in the design process. need different pieces of information, and all of it needs to be synchronized. Effective control requires a thoughtful, In its 25 years of designing advanced product development disciplined process that’s efficient, without placing an undue solutions, PTC has developed best practices and software to burden on product developers. help manufacturers develop world-class CCM processes. Implementing effective CCM requires consistent, efficient “Companies now recognize that better change processes enabled by integrated, flexible software. The ideal solution provides rapid communication and broad, but processes can deliver top-line benefits...and are controlled access to product data across the enterprise and therefore developing change management with the supply chain. an eye towards improving speed to market.” - Aberdeen group Page 3 of 9 | Adressing the CCM imperative PTC.com
  • 4. Best Practices White Paper PTC Windchill provides a proven foundation and capabilities Best Practices: to enable companies to benefit from the best practices needed to address today’s significant CCM challenges. A. Product Configuration lifecycle Management. Create, Here’s how PTC is solving the five toughest challenges to understand and track product configurations and related optimizing CCM. changes in a single system. Ideally, anyone looking for information about a product should have a common source of overcoming the five Challenges of Change and trusted information – one version of the truth – for products. This Configuration Management single definition should provide views into future and pending changes, as well as a detailed, accurate history of past changes Over thousands of customer engagements worldwide, PTC has and their related configurations. identified five significant challenges when implementing CCM, and the best practices required to address them. Addressing Managing product configurations across the product these challenges directly impacts a company’s ability to lifecycle includes: enhance productivity, lower overall cost, improve quality, and accelerate time-to-market. • Creating BOMs in Windchill from CAD data or from Microsoft Excel® 1 MAnAgIng A ProDuCt’s ConfIgurAtIon • Easily defining and navigating products by baselines, the ChAllenge: Inability to accurately create, understand release level, and effectivity and track product configurations and their change history over time. • Creating rules-driven variants–quickly–while maximizing data reuse for Configure-to-Order and Engineer-to-Order People across the company need to have “a single source of products truth” when working with product information. They must have an accurate, up-to-date definition of product configurations • Easily creating, managing and sharing option sets for and related information throughout the numerous engineering Assemble-to-Order products changes during the product lifecycle. Keeping this information • Integrating navigation, design and visualization of option in sync is incredibly difficult given the complexity of today’s combinations products and the varied information needs of Engineering, Suppliers, Purchasing, Manufacturing, service technicians, and B. Modular Product Architecture Definition. Take a systematic countless other stakeholders. approach to organizing products into interchangeable modules. Formalize product module interfaces to better manage the Different versions, variants, and change history must be readily transfer and reintegration of design data, while preserving its accessible to provide traceability and ensure that product integrity. This allows design activities to occur independently and designs are not subject to misinterpretation. concurrently in a highly synchronized approach. the solutIon: enable the enterprise to create, understand Implementing a modular product architecture involves: and track product configurations. • Organizing and analyzing platform and variant Provide a common understanding of the complete product requirements definition across the enterprise to ensure quality, and to prevent costly errors. This one-source approach ensures that people can • Translating requirements into required functions quickly and confidently retrieve and share accurate information at any time in the product’s history. Your configuration • Organizing the means into a logical set of modules management process must support engineering best practices, including product platforms and modular product design to • Identifying appropriate interfaces allow companies to better reuse designs, manage change, and rapidly develop variant designs from a common base. Page 4 of 9 | Adressing the CCM imperative PTC.com
  • 5. Best Practices White Paper C. generic Product Platform Design. Capture and manage a modular product architecture definition and the associated, CAse In PoInt detailed product platform design as it is developed. Windchill manages the high-level platform structure, including related streamlining the Design Process at Maserati racing product options, together with the required interfaces. The Maserati Racing is a branch of luxury sports car manufacturer Windchill solution also manages the detailed CAD structure Maserati S.p.A. Maserati consolidated their engineering data during development, by associating it with the product into a centralized repository using PTC’s Windchill. Leveraging structure. By managing and synchronizing modular product this centralized information, Maserati Racing streamlined their structure, supporting interfaces and modular design content, internal change management process, which now supportstheir the distributed team is kept on the same page throughout varied vehicle configurations. The net result for Maserati includes increased commercial part reuse, early discovery of design development, which minimizes integration surprises. defects, and easier sharing of technical information with the shop floor. enabling a generic product platform design requires: schneider electric Makes its world smaller in one system • Capturing and managing a high-level platform architecture One of the world’s largest manufacturers of equipment for electrical power distribution, industrial control and automation, • Defining module interfaces, and controlling changes Schneider Electric consolidated seven disparate engineering systems into a common PLM solution. Implementing a single, • Managing the coordinated development of a detailed integrated system enabled a seamless, integrated change and product structure with CAD designs configuration management process. The company used PTC’s Windchill to ensure secure control and management of product 2 struCturIng A fleXIBle, relIABle data, and to enable more cohesive, integrated collaboration and ChAnge ProCess communication of information. As a result, Schneider reduced engineer-to-order cycle times by several weeks, improved the ChAllenge: Difficulty in structuring a reliable, flexible support for their growing customer base, and recognized multi- change process that supports rapid and accurate design million dollar annual savings. changes. Schneider Electric converted seven Product developers and downstream functions, such as incompatible engineering manufacturing and service, need to play a role in evaluating, systems into a single approving and implementing changes. This requirement is Windchill PLM system particularly challenging with product changes that impact to improve global multiple designs or design variants. collaboration and integrate its change the solutIon: Implement a flexible, automated process and configuration that always delivers accurate, actionable information. management process. Provide a clear, predictable, repeatable process that is flexible enough to cover the spectrum of changes, from new product release to service updates. An effective process provides decision-makers with the right context to understand the proposed change and its implications, and it must be efficient, Best Practices: so participants can focus on innovation, and not on change A. standardized, Automated Change Processes. Adopt an administration. This automated process reduces change cycle integrated decision management process that supports accurate, times and results in fewer downstream issues that typically lead controlled changes, within a single system that’s connected to to rework and scrap. product data. Here, everyone involved with the change process must be able to quickly understand the proposed changes, and review the associated product information to make better business decisions. Page 5 of 9 | Adressing the CCM imperative PTC.com
  • 6. Best Practices White Paper A well-defined, standardized, automated change process allows: CAse In PoInt • Synchronizing change with product configuration data in a Automated Change Process transforms Kirloskar oil engines single, integral system ltd. (Koel) • Providing problem reporting, deviation/waiver requests, as KOEL, India’s leading manufacturer of diesel engines, engine bearings, and generators for a broad range of industrial well as change requests, notices and activities applications, replaced their manual change process, implementing an automated process for tracking and • Applying predefined and configurable change process managing engineering changes. The company introduced workflows, activities and process roles separate processes for managing change in different phases of the product lifecycle, with differing approaches for prototype • Automating change routing and task notifications and production. As a result, they have a centralized change management process using PTC’s Windchill across their • Offering flexible support for both simple and complex different locations, and now can easily track and monitor changes engineering changes across their enterprise. • Providing enterprise visibility to pending and approved The net result for Kirloskar Oil is a set of comprehensive reports changes throughout the lifecycle that help users create a “knowledge bank” of their designs. By improving their process, KOEL was also able to reduce change cycle time by 40%. 3 MAnAgIng ChAnge AnD ConfIgurAtIons ACross DIsCIPlInes Improving global Change Management at stryker navigation the ChAllenge: Ineffective and inefficient change control As a leading innovator of medical products in orthopedics, implants, physiotherapy, traumatology and biotechnology, processes, and difficulty synchronizing design changes, so Stryker needed to establish a global product lifecycle platform they can be leveraged across the entire enterprise. to manage its change processes to conform to FDA regulations. Today’s products have increasingly complex design relationships. Windchill PDMLink gave Stryker employees access to all The integration of mechanical design, electrical design, product-related data from one source, resulting in a 20% reduction in time taken for change and release of documents software, firmware, and requirements is driving the need for and document search. users to better understand product configurations and related information. Changes to products can have far-reaching Windchill PDMLink impacts throughout the product lifecycle. Understanding the transformed Stryker’s impact on the whole product is challenging, yet critical to global change ensuring that changes are fully understood and implemented management process. accurately across all disciplines. the solutIon: enable the whole enterprise to work with and view integral product data and configurations, so changes can be synchronized quickly and accurately across disciplines. Link data from across the enterprise to product configurations, applying changes to the complete product definition. Provide an integrated change management process to keep designs, specifications, quality plans, manufacturing processes, compliance data, documentation, and other product information synchronized. Managing change in an integrated way reduces errors and rework that can result from implementing change incompletely, incorrectly, or at different times. Page 6 of 9 | Adressing the CCM imperative PTC.com
  • 7. Best Practices White Paper Best Practices: CAse In PoInt Integrated Cross-Discipline Change Management. Implement fast, accurate change across disciplines with a single, integrated Data traceability and visibility fosters Collaboration and process to update the complete product definition. Windchill Quality at Cochlear provides the ability to create, manage, and deploy a complete Cochlear is the global leader in innovative, implantable product definition in a single integral tool. hearing solutions. Cochlear implemented Windchill PDMLink to control and audit their complete “Bill of Information,” An integrated change management process that supports accelerating time-to-market by allowing their global multiple disciplines includes: development teams to better manage product data. Users now manage all product data in a single data vault, and provide • A single source for product data online traceability and visibility to the information. • A single, global BOM, which integrates all product The result for Cochlear included increased speed and efficiency data, including heterogeneous MCAD, ECAD, software, of document reviews and change control using electronic signatures. The company also achieved accurate tracking of documents, requirements, and visualization product configurations across departments. Cochlear now executes design changes centrally and visibly across teams, • Robust configuration traceability thereby reducing errors, enforcing version control, and driving product change quality through clear workflows. • Product data that’s integrally connected to change info via a powerful, flexible PLM toolset The change process at • Global, enterprise visibility Cochlear was transformed through better visibility to data, • Formal change impact and root cause analysis resulting in higher quality and faster time-to-market for new 4 IntegrAtIng PArtners Into the products. ChAnge ProCess the ChAllenge: how to integrate partners into the change progress while protecting valuable intellectual property (IP). Manufacturers must balance the need to provide transparent access to change information across their supply and design content in a single, secure environment, so you can control and chains, with the need to protect proprietary product knowledge. share it, so as to manage change and product configurations over the product’s lifecycle. the solutIon: enable external parties to seamlessly and securely interact with product configurations and changes A well-managed process allows third parties to have the throughout product development. appropriate level of access, ranging from “arms length” relationships, such as a component supplier, to a trusted strategic Third parties are increasingly critical to the timely development partner who may be involved in complete system development. and delivery of high quality products. Keeping these resources informed and including them in critical decisions helps improve successfully integrating partners into the change process product designs and ensure smooth downstream operations. involves: Doing so in a well-controlled manner helps manufacturers • Sharing change and product data information in a improve quality and reduce waste by ensuring that partners controlled manner appropriate to the specific relationship have access to up-to-date, accurate information, without putting with a partner their IP at risk. • Integrating partners into change review, approval and Best Practices: implementation activities Partner Change Integration. Automate processes, so • Exchanging design and change information offline information moves quickly and efficiently. Capture digital data Page 7 of 9 | Adressing the CCM imperative PTC.com
  • 8. Best Practices White Paper • Using rich visualization to enhance collaboration, for instance, in design reviews CAse In PoInt • Tracing history of what was sent and when hP ®, Itt, and Plug Power® realize Productivity Benefits of Change Management solutions 5 CoorDInAtIng ChAnges ACross engIneerIng AnD MAnufACturIng HP’s Imaging and Printing division spans 23,000 products and tens of thousands of suppliers across 160 countries. By the ChAllenge: Difficulty in connecting engineering and implementing a PTC-based change management process, Manufacturing in a single, concurrent change process. HP’s Imaging and Printing division realized an 80% improvement in design and process reuse; increased productivity between 20 – One of the most critical connections in CCM is between 30%; reduced time-to-market, product costs and warranty costs; and experienced a 2% decline in part counts. Engineering and Manufacturing. Accurate and timely communication between the people that design the product ITT Industries–the world’s premier supplier of pumps, systems and the people that produce it is critical to quality, cost, and services to move and control water and other fluids – and time-to-market. The Manufacturing group requires implemented a global engineering change process with a one- product data in different formats than Engineering, so year payback. In addition, the company reduced the time to accurate translation of information is needed for effective implement engineering changes by 50%, eliminating significant scrap and rework costs. communication. The challenge is keeping these different views of the same information in sync, while still providing the right Plug Power designs, develops and manufactures on-site electric information to each organization in a way that makes sense. power generation systems utilizing Proton Exchange Membrane fuel cells for stationary applications. The company was able to the solutIon: tightly align manufacturing processes cut its ECN cycle time by 62% and reduce variability in the time to to engineering design by integrating engineering and complete an ECN by 76%. Manufacturing in the same change management process. Provide manufacturing with associative views of engineering data to plan and execute closed-loop changes quickly. Eliminate miscommunication that can lead to increased inventory and slow cycle times. • Managing variance decisions and incorporating Best Practices: deviations and waivers using the same change process for Associative eBoM/mBoM. Translate engineering BOMs Engineering and Manufacturing (eBOMs) into manufacturing BOMs (mBOMs) while • Providing fully traceable change history maintaining bi-directional associativity and linkages between these two views of the product. Link the two in order to Conclusion better analyze and implement change in manufacturing as engineering designs change. taking the next step toward change and configuration management excellence Associating eBoMs to mBoMs in an integrated change process includes: Change and configuration management in product development is critical for today’s fiercely competitive global • Enabling concurrent development of eBOM and mBOM markets. “Good enough” practices simply won’t help any organization grow their business and capitalize on new and • Implementing a common change process for Engineering emerging markets. and Manufacturing teams Applying best practices is now a must-have that impacts • Associating manufacturing process data with change records quality, time-to-market and product cost, which in turn fuel • Easily synchronizing eBOM and mBOM product structure revenue, market share, and profitability. As products become changes Page 8 of 9 | Adressing the CCM imperative PTC.com
  • 9. Best Practices White Paper more complex, and as product development becomes more distributed, a fast, reliable, automated change process – CAse In PoInt supported by robust PLM technology – is the only way to master market demands for tailored product configurations grand river group (grg) unifies engineering and that meet customer needs. Manufacturing Change Processes Change and configuration management challenges are GRG is China’s largest motorcycle manufacturer, with a magnified when complex products are developed globally with production capacity of three million engines and three million motorcycles per year, and is the largest partner of Suzuki Motor a network of dispersed internal and external design partners, Corp. in China. GRG implemented Windchill PDMLink and suppliers and manufacturers. Getting participants synchronized Windchill MPMLink (Manufacturing Process Management) to with common data and integrated processes is critical. At stake shorten time-to-market by accelerating the engineering-to- is a company’s ability to enhance productivity, lower overall manufacturing change process. GRG used PTC solutions cost, improve quality and accelerate time-to-market. CCM to streamline and standardize manufacturing engineering has to be rigorous across the enterprise, in collaboration both deliverables and implement a closed-loop change process. with partners and with dependent downstream stakeholders in As a result, GRG increased production and manufacturing manufacturing and service support. engineering efficiency while improving product quality and consistency of manufacturing data. They also dramatically Creating the “single source of truth” reduced the time to propagate a new product derivative to manufacturing, and improved reliability of manufacturing data, PTC excels at all levels of CCM because, with PTC solutions, process plans and work instructions. change activities are always synchronized to product design data, in a single, integral system–creating the single source of Grand River Group truth that’s essential to coordinated CCM. Add to this a powerful, leveraged Windchill ® automated workflow, and teams can collaborate more efficiently MPMLink to accelerate its engineering-to- and securely. No doubt, CCM is a complex problem, but best manufacturing change practices and supporting technology from PTC can simplify and process. streamline operations, enabling you to speed innovation to market while maintaining control and confidence. So how do you get started? Review PTC’s Value Roadmap, an invaluable tool that many successful PTC customers have used as a first step to evaluating their current processes, and then developing a strategy to improve CCM in their business. See the PTC Value Roadmap at http://ptc.com/go/ccmpvr © 2010, Parametric Technology Corporation (PTC). All rights reserved. Information described herein is furnished for informational use only and is subject to change without notice. The only warranties for PTC products and services are set forth in the express warranty statements accompanying such products and services and nothing herein should be construed as constituting an additional warranty. References to customer successes are based upon a single user experience and such customer’s testimonial. Analyst or other forward-looking statements about PTC products and services or the markets in which PTC participates are those of the analysts themselves and PTC makes no representations as to the basis or accuracy thereof. PTC, the PTC Logo, Creo, Elements/Direct, Elements/Pro, Elements/ View, Unlock Potential, Think. Create. Believe. and all PTC product names and logos are trademarks or registered trademarks of PTC and/or its subsidiaries in the United States and in other countries. All other product or company names are property of their respective owners. the timing of any product release, including any features or functionality, is subject to change at PtC’s discretion. 5945-ChangeConfigPLM_WP-EN-0708 Page 9 of 9 | Adressing the CCM imperative PTC.com