6. What can we do to avoid injuries?
◦ Identify & communicate pinch points
◦ Proper tools & equipment
◦ Share lessons learned from mistakes
◦ Tag lines!
◦ Require specific JSA’s… and follow them!
◦ Engineering / Safety by design
◦ Safety Meetings & Training Programs
WHAT CAN WE DO?
Helmerich & Payne Inc.
16. Employee was
removing the pipe
spinners from
behind the top drive
track, as the spinner
swung out his hand
got caught between
the top tong handle
and the pipe spinner
handle.
FIRST AID @ RIG / 1 June 2009
Helmerich & Payne Inc.
18. What can we do to avoid injuries?
◦ Identify & communicate pinch points
◦ Proper tools & equipment
◦ Share lessons learned from mistakes
◦ Tag lines!
◦ Require specific JSA’s… and follow them!
◦ Engineering / Safety by design
◦ Safety Meetings & Training Programs
WHAT CAN WE DO? Helmerich & Payne Inc.
38. What can we do to avoid injuries?
◦ Identify & communicate pinch points
◦ Proper tools & equipment
◦ Share lessons learned from mistakes
◦ Tag lines!
◦ Require specific JSA’s… and follow them!
◦ Engineering / Safety by design
◦ Safety Meetings & Training Programs
WHAT CAN WE DO?
Helmerich & Payne Inc.
41. Installing ground rods during
rig up activities / Instead of
using a hammer to strike the
ground rod driver he it like a
vertical battering ram / After
several cycles he picked up
too far, ground rod came outta
the tube and on the next blow
he came down on the top of
the ground rod causing a
laceration at the base of his
thumb / 2 stitches
OSHA Recordable / 23 Mar 05
Helmerich & Payne Inc.
47. Changing out the
chain in a set of
Spin Master pipe
spinners
IP grasped the chain
& operator engaged
the hyd motor to
reverse chain
IP’s hand caught
between chain &
rollers
Amputate 2 fingers
OSHA Recordable / 7 April 09
Helmerich & Payne Inc.
51. What can we do to avoid injuries?
◦ Identify & communicate pinch points
◦ Proper tools & equipment
◦ Share lessons learned from mistakes
◦ Tag lines!
◦ Require specific JSA’s… and follow them!
◦ Engineering / Safety by design
◦ Safety Meetings & Training Programs
WHAT CAN WE DO?
Helmerich & Payne Inc.
58. Tag Lines / Pipe spinners
Helmerich & Payne Inc.
59. Tag Lines / Drill pipe tongs
Helmerich & Payne Inc.
60. What can we do to avoid injuries?
◦ Identify & communicate pinch points
◦ Proper tools & equipment
◦ Share lessons learned from mistakes
◦ Tag lines!
◦ Require specific JSA’s and follow them!
◦ Engineering / Safety by design
◦ Safety Meetings & Training Programs
WHAT CAN WE DO?
Helmerich & Payne Inc.
62. Highlight & discuss the hazards
Be specific on pinch points
Focus attention to the third column /
Rec’d procedure to eliminate hazards
List responsible person on worksheet
H&P’s Mission Critical JSA’s
◦ 15 for Drilling Operations
◦ 12 for Rig Moves
Follow up with a JSA review
Job Safety Analysis
Helmerich & Payne Inc.
63. Holding onto CRT while
co-worker removed the
lay down line.
3rd party hand operated
control lever to release
the tool.
Tool energized instead.
Six stitches / Two fingers
OSHA Recordable / 2 Jan 09
Helmerich & Payne Inc.
65. What can we do to avoid injuries?
◦ Identify & communicate pinch points
◦ Proper tools & equipment
◦ Share lessons learned from mistakes
◦ Tag lines!
◦ Require specific JSA’s… and follow them!
◦ Engineering / Safety by design
◦ Safety Meetings & Training Programs
WHAT CAN WE DO?
Helmerich & Payne Inc.
76. What can we do to avoid injuries?
◦ Identify & communicate pinch points
◦ Proper tools & equipment
◦ Share lessons learned from mistakes
◦ Tag lines!
◦ Require specific JSA’s… and follow them!
◦ Engineering / Safety by design
◦ Safety Meetings & Training Programs
WHAT CAN WE DO?
Helmerich & Payne Inc.
77. Behavior Based Safety Programs
◦ DuPont STOP Program
Pre-Tour ‘toolbox’ meetings
Rig Safety Management Teams
Daily Safety Notes
Accident Investigations
Safety Stand Downs
STEPS Network
◦ Share lessons learned
Helmerich & Payne Inc.
78. Demonstrate Safety
as a Personal Value
Thanks for listening
….Phil Brazil
Helmerich & Payne Inc.