2. NYC COLLEGE
OF TECHNOLOGY
MY TEAM
ANGELA LOPEZ
Email: Adraft@yahoo.com
MY TEAM TOPIC
Number:
MY TEAM MAP
PHOTOS & VIDEO ANNETTE VELIZ
INVENTORY
Email: Annette.veliz@mail.citytech.cuny.edu
Number: 9145654573
ASSETS
LIABILITIES CAMILE BROWN
DESIGN STRATEGIES Email: Bcamile33@yahoo.com
Number:9082059827
CIRCULATION
STRATEGY
CLIMATE STRATEGY PAULA DAMASCENO
Email: Pauladamasceno09@yahoo.com
OUR NEXT STEP …
Number:2034173100
Site Planning
ARCH 1250
FALL 2012
Prof.Paul.King
3. NYC COLLEGE
OF TECHNOLOGY
PAST EFFECT THE CURRENT AND FUTURE
During the 1900’s the water was off limits to everyone, due to the
MY TEAM
high level of pollution created by the warehouses. Today the
MY TEAM TOPIC water at certain areas is open to the public. The Overall
conditions of the water have improved.
MY TEAM MAP
Today is a sustainable park with a great process of collecting rain
PHOTOS & VIDEO water and plants that are self-dependent.
ARTIFACTS AND REUSES
INVENTORY Reuse in many materials. These materials are called salvaged
materials which aids in the sustainability of the park.
ASSETS
RECYCLED WOOD- Park benches, cladding for new park
structures, site furnishings, and wooden decking are
LIABILITIES constructed from old growth Longleaf Yellow Pine that has
been salvaged from Cold Storage Buildings on the uplands of
DESIGN STRATEGIES Pier 1.
SALVAGED GRANITE- The “Granite Prospect” on Pier 1 has
made of over 300 pieces of granite salvaged from the
CIRCULATION reconstructed Roose900 linear Rosevelt Island Bridge.
STRATEGY JANE's CAROUSEL- is a completely restored historic Carousel
made by the Philadelphia Toboggan Company (1922).
CLIMATE STRATEGY RAIL TRACKS- Right in the interception of Old Fulton St. and
Water St. are the remaining of tracks from the late 1800’s.
The rail roads were used to transport weight into to the
OUR NEXT STEP …
boats, to make the boat stable against high water currents.
LONG TERM IMPACTS AND FUTURE DEVEL. PLANS
The future plans of the Brooklyn Bridge Park are making it a 1.3 miles
Site Planning
long park that is sustainable, and self-dependent.
ARCH 1250
FALL 2012
Prof.Paul.King
5. NYC COLLEGE
OF TECHNOLOGY
MY TEAM
MY TEAM TOPIC
MY TEAM MAP
PHOTOS & VIDEO
INVENTORY
ASSETS
LIABILITIES
DESIGN STRATEGIES
The Fulton Ferry Landing
CIRCULATION Water St.
STRATEGY
Old Fulton St. Jane’s Carousel
CLIMATE STRATEGY Furman St.
BQE
OUR NEXT STEP …
Brooklyn Bridge
Manhattan Bridge
Site Planning Piers.
ARCH 1250
FALL 2012
Prof.Paul.King
6. NYC COLLEGE
OF TECHNOLOGY
Rail Track
MY TEAM
MY TEAM TOPIC
MY TEAM MAP
PHOTOS & VIDEO
Robert Fulton
Warehouses
INVENTORY
ASSETS
Inventor
of the
LIABILITIES First
DESIGN STRATEGIES
Steam powered
Ferry
CIRCULATION
STRATEGY
CLIMATE STRATEGY
OUR NEXT STEP …
Site Planning
ARCH 1250
FALL 2012
Prof.Paul.King Fulton Ferry Landing The Horse Trot
7. NYC COLLEGE
OF TECHNOLOGY
MY TEAM
MY TEAM TOPIC
MY TEAM MAP
PHOTOS & VIDEO
INVENTORY
ASSETS Structures Material Reuse Playground
LIABILITIES
Grass
DESIGN STRATEGIES
CIRCULATION
STRATEGY
CLIMATE STRATEGY
OUR NEXT STEP …
Site Planning
ARCH 1250 Carousel
FALL 2012
Prof.Paul.King
8. NYC COLLEGE
OF TECHNOLOGY
Plant Species
MY TEAM
We observed during the field trip,
That there were many beautiful self-dependent
MY TEAM TOPIC Plants. This plants do not require any trims or
MY TEAM MAP
Special care, and thanks to the water collecting
System the park has incorporated, they do not even
PHOTOS & VIDEO
Require watering.
INVENTORY
ASSETS
LIABILITIES
DESIGN STRATEGIES
CIRCULATION
STRATEGY
CLIMATE STRATEGY
OUR NEXT STEP …
What an amazing view?
I think tourist are mostly amazed by the wonderful view
Site Planning that only the Brooklyn Bridge Park offers, NYC, and
ARCH 1250
FALL 2012
of two of the most love bridges in New York City; The Brooklyn Bridge and The Manhattan Bridge.
Prof.Paul.King
9. NYC COLLEGE
OF TECHNOLOGY
MY TEAM
MY TEAM TOPIC
MY TEAM MAP
PHOTOS & VIDEO
INVENTORY
ASSETS Unappealing
LIABILITIES
Old Buildings
DESIGN STRATEGIES Old structure that need
To be renovate or demolish.
CIRCULATION
STRATEGY During our visits we saw
Many forgotten structures.
CLIMATE STRATEGY
Manhattan Bridge
OUR NEXT STEP …
Old Cracked Street
Site Planning This Streets are hard to walk/ uncomfortable
ARCH 1250
FALL 2012
To walk on, and I imagine hard to drive a car,
Prof.Paul.King Through specially is you car is an expensive one.
10. NYC COLLEGE
OF TECHNOLOGY
• The Brooklyn Bridge park was the main port and ferry landing of
MY TEAM
Brooklyn during the 1800’s to late 1900’s. We as a group believe
MY TEAM TOPIC
MY TEAM MAP the park should Incorporate antique Ferries open to the public.
PHOTOS & VIDEO
INVENTORY
ASSETS
• The ferry should be created in an identical way as those in the
LIABILITIES past.
DESIGN STRATEGIES
CIRCULATION
STRATEGY
CLIMATE STRATEGY
• Add more historical artifacts such as the railroads used to
OUR NEXT STEP …
transport materials, and include stands with specific description of
Site Planning
ARCH 1250 their use.
FALL 2012
Prof.Paul.King
11. NYC COLLEGE
OF TECHNOLOGY
MY TEAM • Adding more bike lanes and maybe create a lane for strollers.
MY TEAM TOPIC
MY TEAM MAP
PHOTOS & VIDEO
INVENTORY
ASSETS • Bringing history back.
LIABILITIES By adding small tracks along the water front. As they existed in the past.
DESIGN STRATEGIES
• Creating more sitting areas in high elevations to keep people enjoying the view
CIRCULATION
STRATEGY away from circulations routes.
CLIMATE STRATEGY • Creating suitable a waiting area for people taking the ferry.
OUR NEXT STEP …
• On weekends closing a few street and installing seats to attract tourist to come and
Site Planning seat, as well as keeping them away from routes walking.
ARCH 1250
FALL 2012
Prof.Paul.King
12. NYC COLLEGE
OF TECHNOLOGY
• One way to fix this microclimates is by planting trees with a light canopy. To let the adequate
MY TEAM amount of sunlight through
MY TEAM TOPIC • This trees are also great during the winter because they loose all their leafs and let all
MY TEAM MAP available sun light through.
PHOTOS & VIDEO • Sun Shelters can help during
INVENTORY Summer, as well as during
ASSETS
the winter due to the green
LIABILITIES
house effect.
DESIGN STRATEGIES
CIRCULATION
STRATEGY
CLIMATE STRATEGY
OUR NEXT STEP …
Site Planning
ARCH 1250
FALL 2012
Prof.Paul.King
Ideal Canopy