 Salient Features of Jayakwadi Project
 Introduction to ROS, GOS & EAP
 Gate Operation Schedule (GOS)
 Catchment Map of Paithan Dam & River Gauging
Stations
 Reservoir Operation Schedule (ROS)
 Concluding Remarks
2
PPT Downloaded from http://www.pravinkolhe.com/
3
1. Name of project: Jayakwadi Project
2. Location: Paithan; Dist: Aurangabad.
3 Catchment Area 21750 Sq. Km
4 Gross Storage 2909 Mm3
5 Maximum height of dam from river bed 37.73 m
6 Length of dam 10280 m
7 Length of Spillway 417 m
8 Type of Dam Earthen
PPT Downloaded from http://www.pravinkolhe.com/
4
9 Submergence Area 35,000 Ha
10 Earth Work 13 Mm3
11 Masonry 0.33 Mm3
12 Concrete 0.80 Mm3
13 Gates of Dam
a. Number 27
a. Size 12 x 7.9 m
a. Type Radial
a. Designed Spillway Capacity 6,41,000 cusecs
14 Power Generation 12 MW
PPT Downloaded from http://www.pravinkolhe.com/
5
15 Lowest River Bed Level 432.206 m
16 Maximum Draw Down Level 455.524 m
17 Spillway Crest Level 455.981 m
18 Full Reservoir Level 463.900 m
19 Maximum Water Level 465.583 m
20 Foundation Level of Masonry Dam 427.640 m
21 Top of Dam 468.980 m
22 Cut-Off Trench Level 419.917 m
23 Sill Level of Canal 452.171 m
PPT Downloaded from http://www.pravinkolhe.com/
6
• Single Purpose Reservoirs
• Multi- Purpose Reservoirs
• System of Reservoirs
PPT Downloaded from http://www.pravinkolhe.com/
 Reservoir Operation
Schedule (ROS) is a
scientific tool which
helps to maintain the
storage in reservoir
and at the same time,
avoids the risk of
flood at down stream.
7
 Gate Operation
Schedule (GOS) is
the sequence in
which gates are
operated so that
required discharge
is released safely.
PPT Downloaded from http://www.pravinkolhe.com/
 Emergency Action
Plan (EAP) is a pre-
decided procedure
in which preventive
measures are
undertaken in case
of emergency.
8
 In short, ROS, GOS
and EAP helps in
safely release of
flood without
damage to structure,
life and property on
down stream of
dam.PPT Downloaded from http://www.pravinkolhe.com/
9
Reservoir Operation Schedule
Previously Field Officers
Hydraulic Operation Schedule of Spillway
(GOS)
CDO (MD) Nashik
Gate Maintenance Schedule
SE (Mechanical-Gates)
PPT Downloaded from http://www.pravinkolhe.com/
10
• ROS & EAP : CE (WRD)
• GOS : SE (MD) CDO, NashikMajor Project
• ROS : CE (WRD)
• GOS : SE (MD) CDO, Nashik
• EAP : SE of Project
Medium
Project
• ROS & GOS : Not Applicable for
Ungated Waste Weir
• EAP : EE of Project
Minor Project
PPT Downloaded from http://www.pravinkolhe.com/
11
PPT Downloaded from http://www.pravinkolhe.com/
12
PPT Downloaded from http://www.pravinkolhe.com/
WL
Gate
Operation Q/gate GATE NUMBERS
(Feet) Left Right cusecs LEFT SIDE RIGHT SIDE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
1522 0.5 529
1 1043
1.5 1547
2 2035
2.5 2513
3 2984
3.5 3453
4 3909
0.5 529
1 1043
1.5 1547
2 2035
2.5 2513
3 2984
1524 4.5 4492
5 4952
1 12 23 34 45 56 67 78 89 9
 Opened 18 Gates by 5 feet (RIGHT SIDE)
 Discharge = 18 x 4952 cusecs
= 89,136 cusecs
 Opened 9 Gates by 3 feet (LEFT SIDE)
 Discharge = 9 x 2984 cusecs
= 26,856 cusecs
 Total Discharge = (LEFT+RIGHT) = 1,15,992
cusecs
13
PPT Downloaded from http://www.pravinkolhe.com/
14
PPT Downloaded from http://www.pravinkolhe.com/
15
PPT Downloaded from http://www.pravinkolhe.com/
16
PPT Downloaded from http://www.pravinkolhe.com/
17
PPT Downloaded from http://www.pravinkolhe.com/
18
PPT Downloaded from http://www.pravinkolhe.com/
19
Sr.
No
Name of
River
River
Gauge
station
Catchme
nt Area
(sq. km)
Distance
from dam
site
Travelling
time form
dam
1 Godavari NMC 4247 154 km 30 hours
2 Pravara Devgarh 7273 54 km 6 hours
3 Shivana Solegaon 2505 36 4 hours
PPT Downloaded from http://www.pravinkolhe.com/
20
Sr.
No
Name of
River
River
Gauge
station
Catchmen
t Area
(sq. km)
Distance
from dam
site
Travelling
time form
dam
1 Godavari NAUR 4310 76 km 12 hours
2 Shivana Lasur 2267 48 km 6 hours
3 Kham Tembhapuri 613 36 km 5 hours
4 Nani Wadule 527 33 km 3 hours
5 Dhor Jalgaon 456 48 km 4 hours
PPT Downloaded from http://www.pravinkolhe.com/
21
PPT Downloaded from http://www.pravinkolhe.com/
22
PPT Downloaded from http://www.pravinkolhe.com/
23
PPT Downloaded from http://www.pravinkolhe.com/
24
PPT Downloaded from http://www.pravinkolhe.com/
25
PPT Downloaded from http://www.pravinkolhe.com/
26
PPT Downloaded from http://www.pravinkolhe.com/
27
PPT Downloaded from http://www.pravinkolhe.com/
28
PPT Downloaded from http://www.pravinkolhe.com/
29
 The GOS for designed capacity is not yet tested.
 Although ROS is generally prepared in case of Flood situations, it
might be useful in case of water deficiency.
 It is observed that the ROS is prepared by referring the past data
which is based on the old methods of analysis.
 Now a days rainfall prediction is possible with help of satellite
observations and by performing rigorous analysis of meteorological
data, using high speed computer, accurate prediction is of yield
possible. Such techniques should be preferred for ROS and GOS.
PPT Downloaded from http://www.pravinkolhe.com/
Thank
You…!
30

Mais conteúdo relacionado

Mais procurados

5th line project presentation
5th line project presentation5th line project presentation
5th line project presentationMicha Duman
 
Remote Region LNG Supply Study - Makassar Project
Remote Region LNG Supply Study - Makassar ProjectRemote Region LNG Supply Study - Makassar Project
Remote Region LNG Supply Study - Makassar ProjectAchmad Agung P
 
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - How to set u...
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - How to set u...DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - How to set u...
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - How to set u...Deltares
 
Asia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionInnovation Norway
 
Pt Sankyu Indonesia International
Pt Sankyu Indonesia InternationalPt Sankyu Indonesia International
Pt Sankyu Indonesia Internationalarmenaldrin
 
Eia kpt deep water container port - report
Eia kpt deep water container port - reportEia kpt deep water container port - report
Eia kpt deep water container port - reportzubeditufail
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)petroEDGE
 
Compatibility Study of FSRU Exemplar for STS Transfer with LNGC
Compatibility Study of FSRU Exemplar for STS Transfer with LNGCCompatibility Study of FSRU Exemplar for STS Transfer with LNGC
Compatibility Study of FSRU Exemplar for STS Transfer with LNGCAchmad Agung P
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Huan Duong Quoc
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project DevelopmentWalter Lee
 
LNG Effect on Ship Design
LNG Effect on Ship DesignLNG Effect on Ship Design
LNG Effect on Ship DesignStephanie Camay
 
Centrigugal pump by GAURAV DHADSE
Centrigugal pump by GAURAV DHADSECentrigugal pump by GAURAV DHADSE
Centrigugal pump by GAURAV DHADSEGaurav Dhadse
 

Mais procurados (17)

5th line project presentation
5th line project presentation5th line project presentation
5th line project presentation
 
Remote Region LNG Supply Study - Makassar Project
Remote Region LNG Supply Study - Makassar ProjectRemote Region LNG Supply Study - Makassar Project
Remote Region LNG Supply Study - Makassar Project
 
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - How to set u...
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - How to set u...DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - How to set u...
DSD-INT 2014 - Symposium Next Generation Hydro Software (NGHS) - How to set u...
 
Tangguh LNG Project
Tangguh LNG ProjectTangguh LNG Project
Tangguh LNG Project
 
Asia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distributionAsia Days 2013 - Market opportunities for small LNG distribution
Asia Days 2013 - Market opportunities for small LNG distribution
 
Pt Sankyu Indonesia International
Pt Sankyu Indonesia InternationalPt Sankyu Indonesia International
Pt Sankyu Indonesia International
 
Eia kpt deep water container port - report
Eia kpt deep water container port - reportEia kpt deep water container port - report
Eia kpt deep water container port - report
 
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)
 
Compatibility Study of FSRU Exemplar for STS Transfer with LNGC
Compatibility Study of FSRU Exemplar for STS Transfer with LNGCCompatibility Study of FSRU Exemplar for STS Transfer with LNGC
Compatibility Study of FSRU Exemplar for STS Transfer with LNGC
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project Development
 
LNG Effect on Ship Design
LNG Effect on Ship DesignLNG Effect on Ship Design
LNG Effect on Ship Design
 
LNG Ready
LNG ReadyLNG Ready
LNG Ready
 
FSRU_projects
FSRU_projectsFSRU_projects
FSRU_projects
 
Centrigugal pump by GAURAV DHADSE
Centrigugal pump by GAURAV DHADSECentrigugal pump by GAURAV DHADSE
Centrigugal pump by GAURAV DHADSE
 
Lloyd ppt
Lloyd pptLloyd ppt
Lloyd ppt
 

Semelhante a Jayakwadi Project ROS GOS EAP Guide

ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017Alvin Chen
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL MUDASSAR AFZAL
 
Dam Break Analysis of Peringalkuthu Dam, Thrissur Using HEC-RAS
Dam Break Analysis of Peringalkuthu Dam, Thrissur Using HEC-RASDam Break Analysis of Peringalkuthu Dam, Thrissur Using HEC-RAS
Dam Break Analysis of Peringalkuthu Dam, Thrissur Using HEC-RASIRJET Journal
 
Fast track projects experiences and overview by Rajesh Prasad
Fast track projects   experiences and overview by Rajesh PrasadFast track projects   experiences and overview by Rajesh Prasad
Fast track projects experiences and overview by Rajesh PrasadRajesh Prasad
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesaUtsav Tripathy
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...Egyptian Engineers Association
 
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Global CCS Institute
 
2006 iitk-urban transportation-infrastructure
2006 iitk-urban transportation-infrastructure2006 iitk-urban transportation-infrastructure
2006 iitk-urban transportation-infrastructurePravin Kolhe
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfAbhinava Tripathi
 
L&t PARKCIRCUS
L&t PARKCIRCUSL&t PARKCIRCUS
L&t PARKCIRCUSRajdip Das
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCCRakshita Raghunath
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction PRABHASH GOKARN
 
Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxmuk7971
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)MaxAlagoa
 

Semelhante a Jayakwadi Project ROS GOS EAP Guide (20)

jahangir
jahangirjahangir
jahangir
 
CV Latest Rosdi PL381
CV Latest Rosdi PL381CV Latest Rosdi PL381
CV Latest Rosdi PL381
 
ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017ALVIN'S CURRICULUM VITAE 2017
ALVIN'S CURRICULUM VITAE 2017
 
SomkiatC
SomkiatCSomkiatC
SomkiatC
 
SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV SAFIUDDIN SOHOT CV
SAFIUDDIN SOHOT CV
 
Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL Grid Station Construction (GSC) NTDCL
Grid Station Construction (GSC) NTDCL
 
Ghufran Resume 2015 a
Ghufran Resume 2015 aGhufran Resume 2015 a
Ghufran Resume 2015 a
 
Dam Break Analysis of Peringalkuthu Dam, Thrissur Using HEC-RAS
Dam Break Analysis of Peringalkuthu Dam, Thrissur Using HEC-RASDam Break Analysis of Peringalkuthu Dam, Thrissur Using HEC-RAS
Dam Break Analysis of Peringalkuthu Dam, Thrissur Using HEC-RAS
 
Fast track projects experiences and overview by Rajesh Prasad
Fast track projects   experiences and overview by Rajesh PrasadFast track projects   experiences and overview by Rajesh Prasad
Fast track projects experiences and overview by Rajesh Prasad
 
Training report on railway structure at tata aldesa
Training report on railway structure at tata aldesaTraining report on railway structure at tata aldesa
Training report on railway structure at tata aldesa
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
 
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...Webinar: From compressor to reservoir – Flow assurance and control philosophy...
Webinar: From compressor to reservoir – Flow assurance and control philosophy...
 
2006 iitk-urban transportation-infrastructure
2006 iitk-urban transportation-infrastructure2006 iitk-urban transportation-infrastructure
2006 iitk-urban transportation-infrastructure
 
Kalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdfKalpasar Project PPT _NCCR-1.3.22.pdf
Kalpasar Project PPT _NCCR-1.3.22.pdf
 
L&t PARKCIRCUS
L&t PARKCIRCUSL&t PARKCIRCUS
L&t PARKCIRCUS
 
Civil-Report on industrial training at URCC
Civil-Report on industrial training at URCCCivil-Report on industrial training at URCC
Civil-Report on industrial training at URCC
 
Project Management Challenges in an Effluent Treatment Plant Construction
Project Management  Challenges in an Effluent Treatment Plant Construction Project Management  Challenges in an Effluent Treatment Plant Construction
Project Management Challenges in an Effluent Treatment Plant Construction
 
Presentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptxPresentation for NFRCC 16.11.2022 revised.pptx
Presentation for NFRCC 16.11.2022 revised.pptx
 
Carrer Profile
Carrer ProfileCarrer Profile
Carrer Profile
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
 

Jayakwadi Project ROS GOS EAP Guide

  • 1. Guided by- 1 Presented by- PPT Downloaded from http://www.pravinkolhe.com/
  • 2.  Salient Features of Jayakwadi Project  Introduction to ROS, GOS & EAP  Gate Operation Schedule (GOS)  Catchment Map of Paithan Dam & River Gauging Stations  Reservoir Operation Schedule (ROS)  Concluding Remarks 2 PPT Downloaded from http://www.pravinkolhe.com/
  • 3. 3 1. Name of project: Jayakwadi Project 2. Location: Paithan; Dist: Aurangabad. 3 Catchment Area 21750 Sq. Km 4 Gross Storage 2909 Mm3 5 Maximum height of dam from river bed 37.73 m 6 Length of dam 10280 m 7 Length of Spillway 417 m 8 Type of Dam Earthen PPT Downloaded from http://www.pravinkolhe.com/
  • 4. 4 9 Submergence Area 35,000 Ha 10 Earth Work 13 Mm3 11 Masonry 0.33 Mm3 12 Concrete 0.80 Mm3 13 Gates of Dam a. Number 27 a. Size 12 x 7.9 m a. Type Radial a. Designed Spillway Capacity 6,41,000 cusecs 14 Power Generation 12 MW PPT Downloaded from http://www.pravinkolhe.com/
  • 5. 5 15 Lowest River Bed Level 432.206 m 16 Maximum Draw Down Level 455.524 m 17 Spillway Crest Level 455.981 m 18 Full Reservoir Level 463.900 m 19 Maximum Water Level 465.583 m 20 Foundation Level of Masonry Dam 427.640 m 21 Top of Dam 468.980 m 22 Cut-Off Trench Level 419.917 m 23 Sill Level of Canal 452.171 m PPT Downloaded from http://www.pravinkolhe.com/
  • 6. 6 • Single Purpose Reservoirs • Multi- Purpose Reservoirs • System of Reservoirs PPT Downloaded from http://www.pravinkolhe.com/
  • 7.  Reservoir Operation Schedule (ROS) is a scientific tool which helps to maintain the storage in reservoir and at the same time, avoids the risk of flood at down stream. 7  Gate Operation Schedule (GOS) is the sequence in which gates are operated so that required discharge is released safely. PPT Downloaded from http://www.pravinkolhe.com/
  • 8.  Emergency Action Plan (EAP) is a pre- decided procedure in which preventive measures are undertaken in case of emergency. 8  In short, ROS, GOS and EAP helps in safely release of flood without damage to structure, life and property on down stream of dam.PPT Downloaded from http://www.pravinkolhe.com/
  • 9. 9 Reservoir Operation Schedule Previously Field Officers Hydraulic Operation Schedule of Spillway (GOS) CDO (MD) Nashik Gate Maintenance Schedule SE (Mechanical-Gates) PPT Downloaded from http://www.pravinkolhe.com/
  • 10. 10 • ROS & EAP : CE (WRD) • GOS : SE (MD) CDO, NashikMajor Project • ROS : CE (WRD) • GOS : SE (MD) CDO, Nashik • EAP : SE of Project Medium Project • ROS & GOS : Not Applicable for Ungated Waste Weir • EAP : EE of Project Minor Project PPT Downloaded from http://www.pravinkolhe.com/
  • 11. 11 PPT Downloaded from http://www.pravinkolhe.com/
  • 12. 12 PPT Downloaded from http://www.pravinkolhe.com/ WL Gate Operation Q/gate GATE NUMBERS (Feet) Left Right cusecs LEFT SIDE RIGHT SIDE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 1522 0.5 529 1 1043 1.5 1547 2 2035 2.5 2513 3 2984 3.5 3453 4 3909 0.5 529 1 1043 1.5 1547 2 2035 2.5 2513 3 2984 1524 4.5 4492 5 4952 1 12 23 34 45 56 67 78 89 9
  • 13.  Opened 18 Gates by 5 feet (RIGHT SIDE)  Discharge = 18 x 4952 cusecs = 89,136 cusecs  Opened 9 Gates by 3 feet (LEFT SIDE)  Discharge = 9 x 2984 cusecs = 26,856 cusecs  Total Discharge = (LEFT+RIGHT) = 1,15,992 cusecs 13 PPT Downloaded from http://www.pravinkolhe.com/
  • 14. 14 PPT Downloaded from http://www.pravinkolhe.com/
  • 15. 15 PPT Downloaded from http://www.pravinkolhe.com/
  • 16. 16 PPT Downloaded from http://www.pravinkolhe.com/
  • 17. 17 PPT Downloaded from http://www.pravinkolhe.com/
  • 18. 18 PPT Downloaded from http://www.pravinkolhe.com/
  • 19. 19 Sr. No Name of River River Gauge station Catchme nt Area (sq. km) Distance from dam site Travelling time form dam 1 Godavari NMC 4247 154 km 30 hours 2 Pravara Devgarh 7273 54 km 6 hours 3 Shivana Solegaon 2505 36 4 hours PPT Downloaded from http://www.pravinkolhe.com/
  • 20. 20 Sr. No Name of River River Gauge station Catchmen t Area (sq. km) Distance from dam site Travelling time form dam 1 Godavari NAUR 4310 76 km 12 hours 2 Shivana Lasur 2267 48 km 6 hours 3 Kham Tembhapuri 613 36 km 5 hours 4 Nani Wadule 527 33 km 3 hours 5 Dhor Jalgaon 456 48 km 4 hours PPT Downloaded from http://www.pravinkolhe.com/
  • 21. 21 PPT Downloaded from http://www.pravinkolhe.com/
  • 22. 22 PPT Downloaded from http://www.pravinkolhe.com/
  • 23. 23 PPT Downloaded from http://www.pravinkolhe.com/
  • 24. 24 PPT Downloaded from http://www.pravinkolhe.com/
  • 25. 25 PPT Downloaded from http://www.pravinkolhe.com/
  • 26. 26 PPT Downloaded from http://www.pravinkolhe.com/
  • 27. 27 PPT Downloaded from http://www.pravinkolhe.com/
  • 28. 28 PPT Downloaded from http://www.pravinkolhe.com/
  • 29. 29  The GOS for designed capacity is not yet tested.  Although ROS is generally prepared in case of Flood situations, it might be useful in case of water deficiency.  It is observed that the ROS is prepared by referring the past data which is based on the old methods of analysis.  Now a days rainfall prediction is possible with help of satellite observations and by performing rigorous analysis of meteorological data, using high speed computer, accurate prediction is of yield possible. Such techniques should be preferred for ROS and GOS. PPT Downloaded from http://www.pravinkolhe.com/