WHY ENERGY MANAGEMENT ? Generation of power needs resources Resources available on earth are of Diminishing Nature capital investment requirement is very high for renewable energy sources Hence, to restrict the use or increase the life of diminishing type of resources.
Thus the need to conserve energy, particularly in industry and commerce is strongly felt as the energy cost takes up substantial share in the overall cost structure of the operation. Hence it calls MANAGEMENT OF ENERGY
HOW TO MANAGE ? ,[object Object],It is a Mission with a Target Self knowledge & Awareness among the masses  Re-engineering & evaluation  Technology Upgradations
Plantation Sector… Global energy Crisis Carbon conservation Sequestration in plantation Increasing cost of production Facing Energy shortage Cost optimization
Strategies for Conservation Management for conservation (prevent emission) Management for storage (short term measure) Management for substitution (long term)
Energy Requirement in Tea Industry  ,[object Object]
Thermal energy is required to remove the moisture from the green leaf as well as fermented tea, whereas electrical energy is required at almost all stages of unit operations.
Every kg of made tea requires 3.5-6 kWh of thermal energy, 0.21 - 0.5 kWh of electrical energy and 0.11 kWh of manpower,[object Object]
CONTD…….. 2) Waste Heat Recovery :- The waste heat available in tea factories are mainly from (i) flue gas and (ii) exhaust of tea dryer.  Sensible heat losses in the flue gases leaving the chimney is 35-55% of the heat input to the furnace, which can be recovered by either preheating combustion air or charge preheating.  Preheating combustion air effects fuel savings. Heating devices used for this purpose are recuperator and regenerator.
CONTD…….. 3)Electrical Energy Conservation :- Motors of adequate capacity should replace oversized motors. This will reduce the under-utilisation of motor capacity.  Power factor improvement is to be investigated. Power factor may be corrected to at least 90% under rated loaded condition. Energy efficient motors and Soft start motors enable to reduce electrical energy losses. For lightly loaded motors, delta-to-star conversion connection schemes can be used.
Proposed Energy Saving Equipments:  Fluidised Bed Dryer with Biomass Gasifier:-  The Fluidised Bed Dryer can be supplied with hot air produced by the heater based on woody biomass down draught gasifier. The system, specially adapted for tea drying, uses conventional fired wood or any other.  The system, specially adapted for tea drying, uses conventional fired wood or any other woody biomass with density above 250 kg/m3 available at the factory location.  The gasifiers have achieved upto 80% thermal efficiency in the conversion of solid biomass to gas and upto 33% of efficiency in electrical conversion.
CONTD…….. 2) Combination Tea Dryer:- For producing tea with brisk, strong liquors, Endless Chain Pressure / Fluidised Bed Dryer combination dryers can be used in which low temperature firing and gradual removal of moisture take place. Its energy requirement is 3.6 kWh/kg of made tea. It has got water evaporation capacity of 700 kWh whereas the conventional dryers have a capacity of only 380-kg/hr.  Fluidised Bed Dryer reduces the moisture of CTC dhool from 70% to 3% within 15 minutes whereas a conventional dryer takes 23 minutes.
CONTD…… 3) Heat Pump:- The exhaust gases from a tea dryer may have high moisture content. Since they are vented at a moderately high temperature to atmosphere, heat loss takes place. This heat can be recovered effectively by using a heat pump with a recycle system. The heat pump extracts heat from the vent gases by cooling them and uses it for heating the air going to the dryer. For a dryer of capacity 200 kg tea/hour in 2 shifts, approximate net investment required for heat pump system is Rs. 4.62 lakhs and payback period is less than 2 years.5
Alternate Energy Sources for Tea Industry:  Combined Heat and Power System :- Combined heat and power (cogeneration) system is the coincident generation of necessary heat and power - electrical and/or mechanical - or the recovery of low level heat for power production.  Two basic types of Combined Heat and Power systems are (i) bottoming cycle in which thermal energy is produced first and (ii) topping cycle in which electrical energy is produced first.  For a tea factory, a steam turbine topping cycle is recommended5. Thermal match cogeneration system offers higher overall efficiency in tea manufacture.  For the Combined Heat and Power system of the above capacity, approximate cost of the equipment is Rs. 1 crore  and the payback period is around 6 years
CONTD…… 2) Solar Hot Air System :- On a clear sunny day, the saving on the fuel by use of solar energy is around 50% of the fuelwood used for drying.  Solar air heating panels can be mounted on the roof of the tea factory. Ambient air drawn through the solar panels will get heated during daytime. One module of 10 m2 area can provide heat to the order of 2.1 MJ/year.  Approximate cost of the modular solar hot air system is Rs. 8.5 lakhs and the payback period is around 4 years. The constraints in making use of solar panels in tea factories are difficulty in storage of heat, high initial cost and large area required for locating the solar collectors.
CONTD…… 3) Mini-Hydro Power Generation:- Waterpower is economical as well as non-polluting the environment. Depending on the head of water available, mini hydro can produce 100 - 500 kW.  South Indian tea plantations have good potential for mini hydel schemes as they are located in hilly regions with mountainous terrains. Also streams and ravines are available to provide water sources . For a mini-hydel project, approximate cost per kW generation is Rs. 25,000 per kW. For 500 kW project, payback period is around 11 years.5
CONTD….. 4) Wind Power :- Wind energy has enormous resource potential in our country. In wind power plants, there is no fuel expenses as wind is free.  The wind energy is environment friendly and pollution-free. The capacity can vary in the range 0.25-15 MW. Windmills have a life span of about 20 years. Once the plant starts generating power, the investment is paid back over a period of 7 years . Cost of power generation by wind reduces from Rs. 1.09/kWh in the first year to Rs. 0.23/kWh in the 8th year

More Related Content

What's hot

CHP / Cogeneration As An Alternative Energy Resource
CHP / Cogeneration As An Alternative Energy ResourceCHP / Cogeneration As An Alternative Energy Resource
CHP / Cogeneration As An Alternative Energy ResourceJohn Thornton
 
Biomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plantBiomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plantUlsah T N
 
Co-Generation Plant Reverse Engineering
Co-Generation Plant Reverse EngineeringCo-Generation Plant Reverse Engineering
Co-Generation Plant Reverse EngineeringDerek Dodge
 
Solar-biomass hybrid power plant
Solar-biomass hybrid power plantSolar-biomass hybrid power plant
Solar-biomass hybrid power plantprajeesh pv
 
Biomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plantBiomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plantabhi1802verma
 
Biomass cogeneration
Biomass cogenerationBiomass cogeneration
Biomass cogenerationY Salman Baig
 
4.5 mw hybrid_senegal_presentation
4.5 mw hybrid_senegal_presentation4.5 mw hybrid_senegal_presentation
4.5 mw hybrid_senegal_presentationF_Chanelle_K
 
Cogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and BenefitsCogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and BenefitsBobby Green
 
Biomass supported solar thermal power plant
Biomass supported solar thermal power plantBiomass supported solar thermal power plant
Biomass supported solar thermal power plantA Nagesh Bhat
 
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15 SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15 Ram Kaul
 
Solar Cogeneration
Solar CogenerationSolar Cogeneration
Solar Cogenerationpaulc1884
 
The Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsThe Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsFortum Heat Lietuva
 
Cogeneration (chp)
Cogeneration (chp)Cogeneration (chp)
Cogeneration (chp)Saeed Saleem
 

What's hot (19)

Cogeneration Of Power
Cogeneration Of PowerCogeneration Of Power
Cogeneration Of Power
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Satish
SatishSatish
Satish
 
CHP / Cogeneration As An Alternative Energy Resource
CHP / Cogeneration As An Alternative Energy ResourceCHP / Cogeneration As An Alternative Energy Resource
CHP / Cogeneration As An Alternative Energy Resource
 
Biomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plantBiomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plant
 
Co-Generation Plant Reverse Engineering
Co-Generation Plant Reverse EngineeringCo-Generation Plant Reverse Engineering
Co-Generation Plant Reverse Engineering
 
Solar-biomass hybrid power plant
Solar-biomass hybrid power plantSolar-biomass hybrid power plant
Solar-biomass hybrid power plant
 
Biomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plantBiomass supported solar thermal hybrid power plant
Biomass supported solar thermal hybrid power plant
 
Co-Generation
Co-GenerationCo-Generation
Co-Generation
 
Biomass cogeneration
Biomass cogenerationBiomass cogeneration
Biomass cogeneration
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
Cogeneration Concept
Cogeneration ConceptCogeneration Concept
Cogeneration Concept
 
4.5 mw hybrid_senegal_presentation
4.5 mw hybrid_senegal_presentation4.5 mw hybrid_senegal_presentation
4.5 mw hybrid_senegal_presentation
 
Cogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and BenefitsCogeneration and On-Site Utility (PPA): Definition and Benefits
Cogeneration and On-Site Utility (PPA): Definition and Benefits
 
Biomass supported solar thermal power plant
Biomass supported solar thermal power plantBiomass supported solar thermal power plant
Biomass supported solar thermal power plant
 
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15 SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
SUGAR COGEN PPT PPP NTPC DIM MNRE 25APR15
 
Solar Cogeneration
Solar CogenerationSolar Cogeneration
Solar Cogeneration
 
The Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - BalticsThe Combined Heat & Power (CHP) story - Baltics
The Combined Heat & Power (CHP) story - Baltics
 
Cogeneration (chp)
Cogeneration (chp)Cogeneration (chp)
Cogeneration (chp)
 

Viewers also liked

Session 6.3 taking tree based ecosystem approaches to scale
Session 6.3 taking tree based ecosystem approaches to scaleSession 6.3 taking tree based ecosystem approaches to scale
Session 6.3 taking tree based ecosystem approaches to scaleWorld Agroforestry (ICRAF)
 
Captive biomass energy plantations
Captive biomass energy plantationsCaptive biomass energy plantations
Captive biomass energy plantationsRitesh Pothan
 
Energy plantation
Energy plantationEnergy plantation
Energy plantationPrem Kumara
 
Plantation ppt
Plantation pptPlantation ppt
Plantation pptRam Marthi
 
ENERGY CRISIS
ENERGY CRISISENERGY CRISIS
ENERGY CRISISSVCE
 
Tree plantation
Tree plantationTree plantation
Tree plantationSYED ATIF
 

Viewers also liked (8)

Session 6.3 taking tree based ecosystem approaches to scale
Session 6.3 taking tree based ecosystem approaches to scaleSession 6.3 taking tree based ecosystem approaches to scale
Session 6.3 taking tree based ecosystem approaches to scale
 
Captive biomass energy plantations
Captive biomass energy plantationsCaptive biomass energy plantations
Captive biomass energy plantations
 
Tree diversityday2012swaminathan
Tree diversityday2012swaminathanTree diversityday2012swaminathan
Tree diversityday2012swaminathan
 
Energy plantation
Energy plantationEnergy plantation
Energy plantation
 
Plantation ppt
Plantation pptPlantation ppt
Plantation ppt
 
ENERGY CRISIS
ENERGY CRISISENERGY CRISIS
ENERGY CRISIS
 
Energy crisis ppt
Energy crisis pptEnergy crisis ppt
Energy crisis ppt
 
Tree plantation
Tree plantationTree plantation
Tree plantation
 

Similar to Em in plantation

Energy_Conservation_PPT.pptx
Energy_Conservation_PPT.pptxEnergy_Conservation_PPT.pptx
Energy_Conservation_PPT.pptxsudyadav
 
Cogeneration
CogenerationCogeneration
Cogenerationskdass23
 
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...IRJET Journal
 
Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle Sindhu Maiyya
 
project report MICROTURBINE BY -Asif quamar
project report MICROTURBINE BY -Asif quamarproject report MICROTURBINE BY -Asif quamar
project report MICROTURBINE BY -Asif quamarAsif Quamar
 
Study On Diesel Power Plant In Textile Industry. Diesel Power Plant In Texti...
Study On Diesel Power Plant In Textile Industry. Diesel Power Plant In Texti...Study On Diesel Power Plant In Textile Industry. Diesel Power Plant In Texti...
Study On Diesel Power Plant In Textile Industry. Diesel Power Plant In Texti...Md Rakibul Hassan
 
IRJET- IC Engine Waste Heat Recovery Systems
IRJET- IC Engine Waste Heat Recovery SystemsIRJET- IC Engine Waste Heat Recovery Systems
IRJET- IC Engine Waste Heat Recovery SystemsIRJET Journal
 
iaetsd Thermal energy audit of kiln system in a cement plant
iaetsd Thermal energy audit of kiln system in a cement plantiaetsd Thermal energy audit of kiln system in a cement plant
iaetsd Thermal energy audit of kiln system in a cement plantIaetsd Iaetsd
 
Economies Of Industrial Cogeneration
Economies Of Industrial CogenerationEconomies Of Industrial Cogeneration
Economies Of Industrial CogenerationSurraya Mehbub Malik
 
To Improve Thermal Efficiency of 27mw Coal Fired Power Plant
To Improve Thermal Efficiency of 27mw Coal Fired Power PlantTo Improve Thermal Efficiency of 27mw Coal Fired Power Plant
To Improve Thermal Efficiency of 27mw Coal Fired Power PlantIJMER
 
Modelling of solar micro gas turbine for parabolic dish based controller appl...
Modelling of solar micro gas turbine for parabolic dish based controller appl...Modelling of solar micro gas turbine for parabolic dish based controller appl...
Modelling of solar micro gas turbine for parabolic dish based controller appl...TELKOMNIKA JOURNAL
 
Sugar cane - an energy crop
Sugar cane - an energy cropSugar cane - an energy crop
Sugar cane - an energy cropRajendran K
 
G03404047050
G03404047050G03404047050
G03404047050theijes
 
IRJET - IC Engine Waste Heat Recovery Systems
IRJET -  	  IC Engine Waste Heat Recovery SystemsIRJET -  	  IC Engine Waste Heat Recovery Systems
IRJET - IC Engine Waste Heat Recovery SystemsIRJET Journal
 
IRJET- Analysis and Suitability of Concentrating Solar Thermal Technology...
IRJET-  	  Analysis and Suitability of Concentrating Solar Thermal Technology...IRJET-  	  Analysis and Suitability of Concentrating Solar Thermal Technology...
IRJET- Analysis and Suitability of Concentrating Solar Thermal Technology...IRJET Journal
 

Similar to Em in plantation (20)

Energy_Conservation_PPT.pptx
Energy_Conservation_PPT.pptxEnergy_Conservation_PPT.pptx
Energy_Conservation_PPT.pptx
 
Cogeneration
CogenerationCogeneration
Cogeneration
 
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
IRJET - An Experimental Evaluation of Automobile Waste Heat Recovery System u...
 
Micro turbine
Micro turbineMicro turbine
Micro turbine
 
Solar thermal technologies
Solar thermal technologiesSolar thermal technologies
Solar thermal technologies
 
Ect
EctEct
Ect
 
Air pre heater
Air pre heaterAir pre heater
Air pre heater
 
Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle Make power out of your waste heat - Organic Rankine Cycle
Make power out of your waste heat - Organic Rankine Cycle
 
Unit2
Unit2Unit2
Unit2
 
project report MICROTURBINE BY -Asif quamar
project report MICROTURBINE BY -Asif quamarproject report MICROTURBINE BY -Asif quamar
project report MICROTURBINE BY -Asif quamar
 
Study On Diesel Power Plant In Textile Industry. Diesel Power Plant In Texti...
Study On Diesel Power Plant In Textile Industry. Diesel Power Plant In Texti...Study On Diesel Power Plant In Textile Industry. Diesel Power Plant In Texti...
Study On Diesel Power Plant In Textile Industry. Diesel Power Plant In Texti...
 
IRJET- IC Engine Waste Heat Recovery Systems
IRJET- IC Engine Waste Heat Recovery SystemsIRJET- IC Engine Waste Heat Recovery Systems
IRJET- IC Engine Waste Heat Recovery Systems
 
iaetsd Thermal energy audit of kiln system in a cement plant
iaetsd Thermal energy audit of kiln system in a cement plantiaetsd Thermal energy audit of kiln system in a cement plant
iaetsd Thermal energy audit of kiln system in a cement plant
 
Economies Of Industrial Cogeneration
Economies Of Industrial CogenerationEconomies Of Industrial Cogeneration
Economies Of Industrial Cogeneration
 
To Improve Thermal Efficiency of 27mw Coal Fired Power Plant
To Improve Thermal Efficiency of 27mw Coal Fired Power PlantTo Improve Thermal Efficiency of 27mw Coal Fired Power Plant
To Improve Thermal Efficiency of 27mw Coal Fired Power Plant
 
Modelling of solar micro gas turbine for parabolic dish based controller appl...
Modelling of solar micro gas turbine for parabolic dish based controller appl...Modelling of solar micro gas turbine for parabolic dish based controller appl...
Modelling of solar micro gas turbine for parabolic dish based controller appl...
 
Sugar cane - an energy crop
Sugar cane - an energy cropSugar cane - an energy crop
Sugar cane - an energy crop
 
G03404047050
G03404047050G03404047050
G03404047050
 
IRJET - IC Engine Waste Heat Recovery Systems
IRJET -  	  IC Engine Waste Heat Recovery SystemsIRJET -  	  IC Engine Waste Heat Recovery Systems
IRJET - IC Engine Waste Heat Recovery Systems
 
IRJET- Analysis and Suitability of Concentrating Solar Thermal Technology...
IRJET-  	  Analysis and Suitability of Concentrating Solar Thermal Technology...IRJET-  	  Analysis and Suitability of Concentrating Solar Thermal Technology...
IRJET- Analysis and Suitability of Concentrating Solar Thermal Technology...
 

Recently uploaded

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 

Recently uploaded (20)

MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 

Em in plantation

  • 1. Energy Management in Plantations Sector
  • 2. WHY ENERGY MANAGEMENT ? Generation of power needs resources Resources available on earth are of Diminishing Nature capital investment requirement is very high for renewable energy sources Hence, to restrict the use or increase the life of diminishing type of resources.
  • 3. Thus the need to conserve energy, particularly in industry and commerce is strongly felt as the energy cost takes up substantial share in the overall cost structure of the operation. Hence it calls MANAGEMENT OF ENERGY
  • 4.
  • 5. Plantation Sector… Global energy Crisis Carbon conservation Sequestration in plantation Increasing cost of production Facing Energy shortage Cost optimization
  • 6. Strategies for Conservation Management for conservation (prevent emission) Management for storage (short term measure) Management for substitution (long term)
  • 7.
  • 8. Thermal energy is required to remove the moisture from the green leaf as well as fermented tea, whereas electrical energy is required at almost all stages of unit operations.
  • 9.
  • 10. CONTD…….. 2) Waste Heat Recovery :- The waste heat available in tea factories are mainly from (i) flue gas and (ii) exhaust of tea dryer. Sensible heat losses in the flue gases leaving the chimney is 35-55% of the heat input to the furnace, which can be recovered by either preheating combustion air or charge preheating. Preheating combustion air effects fuel savings. Heating devices used for this purpose are recuperator and regenerator.
  • 11. CONTD…….. 3)Electrical Energy Conservation :- Motors of adequate capacity should replace oversized motors. This will reduce the under-utilisation of motor capacity. Power factor improvement is to be investigated. Power factor may be corrected to at least 90% under rated loaded condition. Energy efficient motors and Soft start motors enable to reduce electrical energy losses. For lightly loaded motors, delta-to-star conversion connection schemes can be used.
  • 12. Proposed Energy Saving Equipments: Fluidised Bed Dryer with Biomass Gasifier:- The Fluidised Bed Dryer can be supplied with hot air produced by the heater based on woody biomass down draught gasifier. The system, specially adapted for tea drying, uses conventional fired wood or any other. The system, specially adapted for tea drying, uses conventional fired wood or any other woody biomass with density above 250 kg/m3 available at the factory location. The gasifiers have achieved upto 80% thermal efficiency in the conversion of solid biomass to gas and upto 33% of efficiency in electrical conversion.
  • 13. CONTD…….. 2) Combination Tea Dryer:- For producing tea with brisk, strong liquors, Endless Chain Pressure / Fluidised Bed Dryer combination dryers can be used in which low temperature firing and gradual removal of moisture take place. Its energy requirement is 3.6 kWh/kg of made tea. It has got water evaporation capacity of 700 kWh whereas the conventional dryers have a capacity of only 380-kg/hr. Fluidised Bed Dryer reduces the moisture of CTC dhool from 70% to 3% within 15 minutes whereas a conventional dryer takes 23 minutes.
  • 14. CONTD…… 3) Heat Pump:- The exhaust gases from a tea dryer may have high moisture content. Since they are vented at a moderately high temperature to atmosphere, heat loss takes place. This heat can be recovered effectively by using a heat pump with a recycle system. The heat pump extracts heat from the vent gases by cooling them and uses it for heating the air going to the dryer. For a dryer of capacity 200 kg tea/hour in 2 shifts, approximate net investment required for heat pump system is Rs. 4.62 lakhs and payback period is less than 2 years.5
  • 15. Alternate Energy Sources for Tea Industry: Combined Heat and Power System :- Combined heat and power (cogeneration) system is the coincident generation of necessary heat and power - electrical and/or mechanical - or the recovery of low level heat for power production. Two basic types of Combined Heat and Power systems are (i) bottoming cycle in which thermal energy is produced first and (ii) topping cycle in which electrical energy is produced first. For a tea factory, a steam turbine topping cycle is recommended5. Thermal match cogeneration system offers higher overall efficiency in tea manufacture. For the Combined Heat and Power system of the above capacity, approximate cost of the equipment is Rs. 1 crore and the payback period is around 6 years
  • 16. CONTD…… 2) Solar Hot Air System :- On a clear sunny day, the saving on the fuel by use of solar energy is around 50% of the fuelwood used for drying. Solar air heating panels can be mounted on the roof of the tea factory. Ambient air drawn through the solar panels will get heated during daytime. One module of 10 m2 area can provide heat to the order of 2.1 MJ/year. Approximate cost of the modular solar hot air system is Rs. 8.5 lakhs and the payback period is around 4 years. The constraints in making use of solar panels in tea factories are difficulty in storage of heat, high initial cost and large area required for locating the solar collectors.
  • 17. CONTD…… 3) Mini-Hydro Power Generation:- Waterpower is economical as well as non-polluting the environment. Depending on the head of water available, mini hydro can produce 100 - 500 kW. South Indian tea plantations have good potential for mini hydel schemes as they are located in hilly regions with mountainous terrains. Also streams and ravines are available to provide water sources . For a mini-hydel project, approximate cost per kW generation is Rs. 25,000 per kW. For 500 kW project, payback period is around 11 years.5
  • 18. CONTD….. 4) Wind Power :- Wind energy has enormous resource potential in our country. In wind power plants, there is no fuel expenses as wind is free. The wind energy is environment friendly and pollution-free. The capacity can vary in the range 0.25-15 MW. Windmills have a life span of about 20 years. Once the plant starts generating power, the investment is paid back over a period of 7 years . Cost of power generation by wind reduces from Rs. 1.09/kWh in the first year to Rs. 0.23/kWh in the 8th year