SlideShare uma empresa Scribd logo
1 de 20
Presented By:
Mr. Ponnuraj, IAS,
Deputy Commissioner,
Shimoga Dist.
District Administration, Shimoga
Presentation Before
The Hon. Lok Adalath
STRUCTURE OF PRESENTATION
Municipal Solid Waste Management
Bio Medical Waste Management
Tank & Water Table – Management & Restoration
Watershed Management
Industrial Pollution
Forest – Plantation
Eviction Clearance
Village Forest Committee
INF0RMATION ABOUT DISTRICT
INF0RMATION ABOUT DISTRICT
1. Population: 16.42 Lakhs
2. Area: 8,477 Sq. Km
3. Taluks: 07
4. ULB’s: 09
5. GP’s: 260
6. Urban Population: 10.71 Lakhs
7. Rural Population: 5.71 Lakhs
8. Annual Rain Fall: 1800 to 2000 mm
9. No. of Rainy Days: 87
1. MUNICIPAL SOILD WASTE MANAGEMENT
MSW - AT A GLANCE
Name of ULB No. of
Wards
Population
(2011)
Solid Waste
Gen. (TPD)
Primary
Collection
Segregation Sec. Collection &
Transportation
MSW
Treatment
Disposal
Facility
CMC - Shimoga 35 3,22,505 166.06 28 Wards 1 Ward Yes Yes IMSWTLFF
CMC - Bhadravathi 35 150540 51.68 6 Wards - Yes - ELFF
CMC - Sagara 31 53,660 22.00 26 Wards 3 Ward Yes Yes ELFF
TMC - Shikaripura 23 36,024 16.50 6 Wards - Yes - ELFF
TP – Thirthahalli 15 14,537 5.00 15 Wards - Yes Yes IMSWTLFF
TP - Soraba, 11 11,027 5.00 8 Wards - Yes - ELFF
TP – Shiralkoppa 15 16,872 5.00 3 Wards - Yes - ELFF
TP – Hosanagara 11 5,533 1.80 2 Wards - Yes - LF
TP - Jog-Kargal 13 10,840 3.65 3 Wards - Yes - LF
189 6,21,538 276.69 97 4 9 ULBs 3 ULB 9 ULB
NOTE:
IMSWTLFF : Integrated MSW Treatment & Sanitary Landfill Facility - 2 ULB
ELFF: Engineering Land Fill Facility- 5 ULB
LF: Land Filling - 2 ULB
SWM ACHIVEMENTS - SHIMOGA
SWM ACHIVEMENTS - SAGARA
SEWERAGE SYSTEM
Name of ULB Population
(2011)
UGD Network Facility STP Facility Remarks
CMC - Shimoga 3,22,505
Old network revamping and
additional coverage being tackled
Renovation and fresh STP
being constructed
Slow progress, contract
terminated, matter before HC
CMC - Bhadravathi 150540
UGD Network Work being
established
Renovation being done
and additional coverage
Slow progress, Fresh tender
called
CMC - Sagara 53,660 Tender Called Tender Called work will begin in 2- 3 months
TMC - Shikaripura 36,024 UGD Network Work is Completed
STP Work is Under
Progress
Site dispute resolved, work
under progress
TP – Thirthahalli 14,537 No UGD System
No STP System -
TP - Soraba, 11,027 No UGD System
No STP System -
TP – Shiralkoppa 16,872 No UGD System
No STP System -
TP – Hosanagara 5,533 No UGD System
No STP System -
TP - Jog-Kargal 10,840 No UGD System
No STP System -
SLAUGHTER HOUSE
Slaughter
House
Exists
Thirthahalli
DPR
Preparation
Shimoga,
Bhadravathi,
Shikaripura
Land
Identification
Shimoga,
Sagara
In all other ULBs
DPR & Land
Identification to be
done
2. BIO MEDICAL WASTE MANAGEMENT
MEDICAL INSTITUTIONS (MI) - SHIMOGA DIST.
Particulars of HCF’s No. of HCFs
Health and Family Welfare 112
Medical Education 01
Govt. AYUSH 35
Veterinary and Animal Husbandry 162
Private 669
Total 979
BIO MEDICAL WASTE MANAGEMENT – Govt. MI
Sl.
No.
Levels of Hospitals No. of
Health Care
Facilities
Progress on Bio Medical Waste Handling Rules
No. of HCF
Tied up with
CTF
Deep Burial & Sharp Pit
Completed
Liquid Waste
Disinfection
Unit Completed
1 District Level Hospital
(Shikaripura)
1 1 - 1
Medical Education (SIMS) 1 1 - 1
Taluk Level Hospital 5 5 - 5
Community Health Center 7 5 2 7
Primary Health Center &
Urban Health Centre
99 7 72 78
2 District Level Ayush
Hospital
01 01 Tied up with MeG..H. 01
Taluk Level Hospital 34 34 All Ayush dispensaries
are tied up with near
by PHCS
34
Time required for implementation: Remaining 20 Deep burial, Sharp Pits & 21 Liquid Waste
Disinfection Units will be completed by 31-12-2011
BIO MEDICAL WASTE MANAGEMENT – Animal Hus. & Pvt. Inst.
Type of HCE No. of
HCE’s
Solid BMW
Handing over to
CBMWTF
Installed Captive
facility
Captive facility under
Construction
Veterinary Hospital 17 - 13 -
Veterinary dispensary 72 - 17 -
Primary veterinary centre and
Artificial Insemination Centre
73 - 14 -
Total 162 44
Time required for implementation: Remaining units will be completed by 31-03-2012
No.s of HCE Solid BMW
Tie up with CBMWTF Installed Captive
facility
Yet to
Comply
669 444 06 219
Animal Husbandry:
Private HCE’s:
ACTION TAKEN
Description No.s
Closed Establishments 28
Closer Order Issued 49
Notice Issued for Non-Compliance 301
Soraba & Hosanagara Taluk HCE’s are covered under Common Bio Medical Waste
Treatment Facility
BIO MEDICAL WASTE – COLLECTION & SEGREGATION SYSTEM
Human anatomical waste into yellow Bins
Infected waste into Red Bins
Sharps into White Bins
BIO MEDICAL WASTE – TRANSPORTATION
Door step Collection
Transportation by BMW Authorized
Vehicle
COMMON BMW TREATEMNT FACILITY - SHIMOGA
Plant Capacity: 1000 Kg/ Day
Effluents Handling Capacity: 3000 Lt/d
Plant Area: 1 Acr.
Established: 2004
Shushurutha Bio Medical Waste Treatment Facility,
Machenahalli
COMMON BMW TREATEMNT FACILITY - SHIMOGA
Facilities Available at CBWTF
Incinerator Scrubber
Autoclave
Sharp & Ash Pit
ETP
IN-SITU BIO MEDICAL WASTE TREATMENT UNITS
ETP LWTP
LWTP
LWTP
Sharp Pit

Mais conteúdo relacionado

Semelhante a Lok adalath ppt 1 to 20

Dakshina kannada Lok adalath
Dakshina kannada Lok adalath  Dakshina kannada Lok adalath
Dakshina kannada Lok adalath
prakash_dcpa
 
An Internship Report on Chittagong WASA
An Internship Report on Chittagong WASAAn Internship Report on Chittagong WASA
An Internship Report on Chittagong WASA
Kowshick Sen
 
Packaged water plant sandeep gupta
Packaged water plant sandeep guptaPackaged water plant sandeep gupta
Packaged water plant sandeep gupta
ANIKET KULKARNI
 
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptxGREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
circle28ghmc
 

Semelhante a Lok adalath ppt 1 to 20 (20)

Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
Dakshina kannada Lok adalath
Dakshina kannada Lok adalath  Dakshina kannada Lok adalath
Dakshina kannada Lok adalath
 
AMIT 17357.pptx
AMIT 17357.pptxAMIT 17357.pptx
AMIT 17357.pptx
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSB
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
 
An Internship Report on Chittagong WASA
An Internship Report on Chittagong WASAAn Internship Report on Chittagong WASA
An Internship Report on Chittagong WASA
 
Rajiv awas yojna in situ Development india
Rajiv awas yojna in situ Development indiaRajiv awas yojna in situ Development india
Rajiv awas yojna in situ Development india
 
Packaged water plant sandeep gupta
Packaged water plant sandeep guptaPackaged water plant sandeep gupta
Packaged water plant sandeep gupta
 
Integrated Solid Waste Management of PMC
Integrated Solid Waste Management of PMCIntegrated Solid Waste Management of PMC
Integrated Solid Waste Management of PMC
 
28.12.16, hse on project nh 60 a delhi world bank meeting
28.12.16, hse on project nh 60 a delhi world bank meeting28.12.16, hse on project nh 60 a delhi world bank meeting
28.12.16, hse on project nh 60 a delhi world bank meeting
 
Cavinitan barangay assembly 1st sem2015(april)
Cavinitan barangay assembly 1st sem2015(april)Cavinitan barangay assembly 1st sem2015(april)
Cavinitan barangay assembly 1st sem2015(april)
 
National Rurban Mission and Uttarakhand
National Rurban Mission and UttarakhandNational Rurban Mission and Uttarakhand
National Rurban Mission and Uttarakhand
 
Narendra Kumar_NIT warangal
Narendra Kumar_NIT warangalNarendra Kumar_NIT warangal
Narendra Kumar_NIT warangal
 
Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
 
Comprehensive plan for Simhastha
Comprehensive plan for SimhasthaComprehensive plan for Simhastha
Comprehensive plan for Simhastha
 
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptxGREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
GREATER HYDERABAD MUNICIPAL CORPORATION (1).pptx
 
Environmental design consideration for an educational institution
Environmental design consideration for an educational institution Environmental design consideration for an educational institution
Environmental design consideration for an educational institution
 
Non-Financial Census of Municipalities, 2017
Non-Financial Census of Municipalities, 2017Non-Financial Census of Municipalities, 2017
Non-Financial Census of Municipalities, 2017
 
Non-financial census of municipalities
Non-financial census of municipalitiesNon-financial census of municipalities
Non-financial census of municipalities
 
Department of Agriculture, Rajasthan
Department of Agriculture, Rajasthan Department of Agriculture, Rajasthan
Department of Agriculture, Rajasthan
 

Último

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Último (20)

Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Buy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From SeosmmearthBuy Verified TransferWise Accounts From Seosmmearth
Buy Verified TransferWise Accounts From Seosmmearth
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 

Lok adalath ppt 1 to 20

  • 1. Presented By: Mr. Ponnuraj, IAS, Deputy Commissioner, Shimoga Dist. District Administration, Shimoga Presentation Before The Hon. Lok Adalath
  • 2. STRUCTURE OF PRESENTATION Municipal Solid Waste Management Bio Medical Waste Management Tank & Water Table – Management & Restoration Watershed Management Industrial Pollution Forest – Plantation Eviction Clearance Village Forest Committee
  • 4. INF0RMATION ABOUT DISTRICT 1. Population: 16.42 Lakhs 2. Area: 8,477 Sq. Km 3. Taluks: 07 4. ULB’s: 09 5. GP’s: 260 6. Urban Population: 10.71 Lakhs 7. Rural Population: 5.71 Lakhs 8. Annual Rain Fall: 1800 to 2000 mm 9. No. of Rainy Days: 87
  • 5. 1. MUNICIPAL SOILD WASTE MANAGEMENT
  • 6. MSW - AT A GLANCE Name of ULB No. of Wards Population (2011) Solid Waste Gen. (TPD) Primary Collection Segregation Sec. Collection & Transportation MSW Treatment Disposal Facility CMC - Shimoga 35 3,22,505 166.06 28 Wards 1 Ward Yes Yes IMSWTLFF CMC - Bhadravathi 35 150540 51.68 6 Wards - Yes - ELFF CMC - Sagara 31 53,660 22.00 26 Wards 3 Ward Yes Yes ELFF TMC - Shikaripura 23 36,024 16.50 6 Wards - Yes - ELFF TP – Thirthahalli 15 14,537 5.00 15 Wards - Yes Yes IMSWTLFF TP - Soraba, 11 11,027 5.00 8 Wards - Yes - ELFF TP – Shiralkoppa 15 16,872 5.00 3 Wards - Yes - ELFF TP – Hosanagara 11 5,533 1.80 2 Wards - Yes - LF TP - Jog-Kargal 13 10,840 3.65 3 Wards - Yes - LF 189 6,21,538 276.69 97 4 9 ULBs 3 ULB 9 ULB NOTE: IMSWTLFF : Integrated MSW Treatment & Sanitary Landfill Facility - 2 ULB ELFF: Engineering Land Fill Facility- 5 ULB LF: Land Filling - 2 ULB
  • 9. SEWERAGE SYSTEM Name of ULB Population (2011) UGD Network Facility STP Facility Remarks CMC - Shimoga 3,22,505 Old network revamping and additional coverage being tackled Renovation and fresh STP being constructed Slow progress, contract terminated, matter before HC CMC - Bhadravathi 150540 UGD Network Work being established Renovation being done and additional coverage Slow progress, Fresh tender called CMC - Sagara 53,660 Tender Called Tender Called work will begin in 2- 3 months TMC - Shikaripura 36,024 UGD Network Work is Completed STP Work is Under Progress Site dispute resolved, work under progress TP – Thirthahalli 14,537 No UGD System No STP System - TP - Soraba, 11,027 No UGD System No STP System - TP – Shiralkoppa 16,872 No UGD System No STP System - TP – Hosanagara 5,533 No UGD System No STP System - TP - Jog-Kargal 10,840 No UGD System No STP System -
  • 11. 2. BIO MEDICAL WASTE MANAGEMENT
  • 12. MEDICAL INSTITUTIONS (MI) - SHIMOGA DIST. Particulars of HCF’s No. of HCFs Health and Family Welfare 112 Medical Education 01 Govt. AYUSH 35 Veterinary and Animal Husbandry 162 Private 669 Total 979
  • 13. BIO MEDICAL WASTE MANAGEMENT – Govt. MI Sl. No. Levels of Hospitals No. of Health Care Facilities Progress on Bio Medical Waste Handling Rules No. of HCF Tied up with CTF Deep Burial & Sharp Pit Completed Liquid Waste Disinfection Unit Completed 1 District Level Hospital (Shikaripura) 1 1 - 1 Medical Education (SIMS) 1 1 - 1 Taluk Level Hospital 5 5 - 5 Community Health Center 7 5 2 7 Primary Health Center & Urban Health Centre 99 7 72 78 2 District Level Ayush Hospital 01 01 Tied up with MeG..H. 01 Taluk Level Hospital 34 34 All Ayush dispensaries are tied up with near by PHCS 34 Time required for implementation: Remaining 20 Deep burial, Sharp Pits & 21 Liquid Waste Disinfection Units will be completed by 31-12-2011
  • 14. BIO MEDICAL WASTE MANAGEMENT – Animal Hus. & Pvt. Inst. Type of HCE No. of HCE’s Solid BMW Handing over to CBMWTF Installed Captive facility Captive facility under Construction Veterinary Hospital 17 - 13 - Veterinary dispensary 72 - 17 - Primary veterinary centre and Artificial Insemination Centre 73 - 14 - Total 162 44 Time required for implementation: Remaining units will be completed by 31-03-2012 No.s of HCE Solid BMW Tie up with CBMWTF Installed Captive facility Yet to Comply 669 444 06 219 Animal Husbandry: Private HCE’s:
  • 15. ACTION TAKEN Description No.s Closed Establishments 28 Closer Order Issued 49 Notice Issued for Non-Compliance 301 Soraba & Hosanagara Taluk HCE’s are covered under Common Bio Medical Waste Treatment Facility
  • 16. BIO MEDICAL WASTE – COLLECTION & SEGREGATION SYSTEM Human anatomical waste into yellow Bins Infected waste into Red Bins Sharps into White Bins
  • 17. BIO MEDICAL WASTE – TRANSPORTATION Door step Collection Transportation by BMW Authorized Vehicle
  • 18. COMMON BMW TREATEMNT FACILITY - SHIMOGA Plant Capacity: 1000 Kg/ Day Effluents Handling Capacity: 3000 Lt/d Plant Area: 1 Acr. Established: 2004 Shushurutha Bio Medical Waste Treatment Facility, Machenahalli
  • 19. COMMON BMW TREATEMNT FACILITY - SHIMOGA Facilities Available at CBWTF Incinerator Scrubber Autoclave Sharp & Ash Pit ETP
  • 20. IN-SITU BIO MEDICAL WASTE TREATMENT UNITS ETP LWTP LWTP LWTP Sharp Pit