SlideShare uma empresa Scribd logo
1 de 35
Baixar para ler offline
Seismic Structural
 Considerations
      JCC Training

            by
 Paul W. McMullin, SE, PhD
       October 15, 2009
The Paper Clip Test




© Dunn Associates Inc, 2009
Concept of Selected Deformation




© Dunn Associates Inc, 2009
Early Use of Moment Connections


          Flatiron Building, NYC
           • One of the first steel frame
             buildings
           • Portal frame moment
             connections at all wind girders.
          Early Steel Frames- all
          moment connected




© Dunn Associates Inc, 2009
Construction Changes that led to
                                    Northridge Failures


          Fewer, but larger moment
          frames
           • Heavier connections
          Changed from Riveted to
          Welded construction
          Used lower toughness
          welding rod
           • Welds went down fast
           • Not permitted in pipelines
          Quality control problems




© Dunn Associates Inc, 2009
Acceleration Record from Northridge




                                From the Strong Motion Database (SMDB, 2000a)


© Dunn Associates Inc, 2009
Northridge Earthquake


          Magnitude 6.7                     Building Inventory
           • Estimated Economic             Damage
           • Loss = $49.3 billion            • 100 buildings with minor
                                               fractures
                                             • 100 buildings with major
                                               fractures
                                             • 30 buildings with
                                               major fractures in 90%
                                               of all connections




© Dunn Associates Inc, 2009
Fracture Causes


          Welding
           • Low Toughness Weld Metal
           • Slag Inclusions
           • Lack of fusion
          Mismatched Yield Strengths
          Erroneous Joint Detailing
          Weld Constraint by Heavy
          Sections
          Slab Interaction with Column




© Dunn Associates Inc, 2009
Changes: Code


          Code limited approved filler
          metals
          Inspection requirements
          tightened
          Limited connection types
          Quality control significantly
          increased




© Dunn Associates Inc, 2009
Changes: Weld Access Hole




© Dunn Associates Inc, 2009
Connections: WUF-W




© Dunn Associates Inc, 2009
Connections: Extended Flange




© Dunn Associates Inc, 2009
Connections: Flange Cover Plate




© Dunn Associates Inc, 2009
Connections: Reduced Beam
                                       Section




© Dunn Associates Inc, 2009
Connections: Bolted End Plate




© Dunn Associates Inc, 2009
Connections: SidePlate




© Dunn Associates Inc, 2009
Protected Zone Requirements


          No discontinuities in           Get protected zone from
          protected zone                  drawings or engineer
           •   Arc Strikes                Mark protected zones with
           •   Erection Aids              bright paint after erection and
           •   Air-arc Gouging            after fire coating
           •   Thermal Cutting
          Not permitted
           •   Welded studs
           •   Shot pins
           •   Screws
           •   Welds
           •   Holes



© Dunn Associates Inc, 2009
Protected Zones: Dog Bone




© Dunn Associates Inc, 2009
Protected Zones:
                              Concentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Concentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Eccentric Braced Frame




© Dunn Associates Inc, 2009
Protected Zones:
                              Eccentric Braced Frame




© Dunn Associates Inc, 2009
Connections


          Bolted End Plate


          Reduced Beam
          Section (“Dog
          Bone”)


          SidePlate™




© Dunn Associates Inc, 2009
Reduced Beam Section Connection


                                            Advantages
                                            • Approved
                                            • Reduces column-beam weld
                                              stresses
                                            Disadvantages
                                            • Milling of beam flange
                                            • 80%-90% reliable
                                            • Looks odd




© Dunn Associates Inc, 2009
Reduced Beam Section Connection


                                            Watch for:
                                            • Protected Zone (nicks, arc
                                              strikes, shot pins, welds)
                                            • Smoothness of Cut
                                            • Bracing just outside cut




© Dunn Associates Inc, 2009
SidePlate Connection



                                       Advantages
                                        • Approved- seismic &
                                          progressive collapse
                                        • Eliminates beam-column weld
                                        • High reliability
                                        • Looks strong
                                       Disadvantages
                                        • Licensing fee
                                        • Flip columns in shop




© Dunn Associates Inc, 2009
Step 1: Column Tree Assembly




         Rotate Column to Column1intoColumn Sub-Assembly (Not Shown Here).
            Bring inRotate Applyand andPosition Weld intoTack into Place
                    Side Plates Weld 2Weld 2, toSide Plates Apply
                     Bring in Sidewith to Bring in Temporary Plates
                                     Horiz. Other Alignment,
     Bring in Horizontal Shear Plates, Tack, CheckApply Other Dogs Welds 1 and 3
                     Apply Welds Apply 3, Tack NS/FS. Position
                            Begin Plates, Shear Plates,
                      After that, Column Sub-Assembly Complete.
© Dunn Associates Inc, 2009
Step 2: Full-Length Beam Assembly




               Begin Full-Length Full-LengthTack & and into Position 5 Shown)
                   Bring inFull-Length Beam Beam Weld Inverted As
                          Rotate Beam Assembly Tack Apply Position
                           Bring in Cover Plates, (Beam into Weld
                            Erection Angle, Assembly Complete




© Dunn Associates Inc, 2009
Step 3: Erect Column Trees & Full-Length Beams with six 7/8” A325 Bolts Each End




© Dunn Associates Inc, 2009
SidePlate Connection




© Dunn Associates Inc, 2009
SidePlate Connection


                                                 Watch for:
                                                 1) Joint Gap
                                                 2) Protected Zone (nicks, arc
                                                    strikes, shot pins, welds)
                                                 3) SidePlate attachments

                              1

                                  3       2




© Dunn Associates Inc, 2009
SidePlate Protected Zone




© Dunn Associates Inc, 2009
SidePlate: WELDING OK




© Dunn Associates Inc, 2009
What keeps us from backtracking?


          Special Inspection                Good Communication
           •   Ensure done well              • RFIs that are researched &
           •   Ultrasonic                      propose solutions
           •   Mag Particle ends             • Notify us ahead of certain
                                               activities (pours, fire coating)
          Shop Drawings                      • Tell us about problems as soon
           •   Complete                        as you know (even your screw-
           •   Well detailed                   ups)
           •   Contractor review             Think/Plan Ahead
          Shop vs Field Welds                • Catch problems
           • Define up-front                 • Give us time to determine a
                                               solution
           • Shop welds- faster, higher
             quality
           • Field welds- some pieces too
             big for shop

© Dunn Associates Inc, 2009
Our Liability


          STRUCTURAL ENGINEER                     CONTRACTOR
          Becomes liable when:                    Becomes liable when:
           • Omit information                     • Deviate from approved plans
           • Don’t follow the State of the          and specs
             Art (code is minimum)                • Material/workmanship/Quality
                                                    problems



                Regardless of who is liable, if
                there is a problem, we all get
                   dragged into the mess
© Dunn Associates Inc, 2009

Mais conteúdo relacionado

Mais procurados

PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONDAVIDSON ECHIDIKE
 
5 principles of construction project management
5 principles of construction project management5 principles of construction project management
5 principles of construction project managementreachfirst01
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Jamal Nelson, CCM
 
Building Construction and Technology
Building Construction and TechnologyBuilding Construction and Technology
Building Construction and TechnologySultan M Muzahir
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structureMinh Bui Si
 
Precipitation and its forms (hydrology)
Precipitation and its forms (hydrology)Precipitation and its forms (hydrology)
Precipitation and its forms (hydrology)Maha Sabri
 
Geology lecture 20
Geology lecture 20Geology lecture 20
Geology lecture 20Lauren Adams
 
Study on foundation in Construction
Study on foundation in ConstructionStudy on foundation in Construction
Study on foundation in ConstructionAyushHajare
 
Rock slope stability analysis lec 1
Rock slope stability analysis lec 1Rock slope stability analysis lec 1
Rock slope stability analysis lec 1aquarius123
 
Geological investigation.pptx
Geological investigation.pptxGeological investigation.pptx
Geological investigation.pptxUmesh Yadav
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsSafdar Ali
 
Erection of structural components in precast constructions
Erection of structural components in precast constructionsErection of structural components in precast constructions
Erection of structural components in precast constructionsParamaAthmeka
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18SANJEEV Wazir
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity SSudhaVelan
 
Bim for construction safety design
Bim for construction safety designBim for construction safety design
Bim for construction safety designStephen Au
 
An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities Arshad Mohanut
 

Mais procurados (20)

PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISIONPROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
PROJECT CONSTRUCTION SUPERVISOR AND SUPERVISION
 
5 principles of construction project management
5 principles of construction project management5 principles of construction project management
5 principles of construction project management
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
Building Construction and Technology
Building Construction and TechnologyBuilding Construction and Technology
Building Construction and Technology
 
Concreting of super structure
Concreting of super structureConcreting of super structure
Concreting of super structure
 
Precipitation and its forms (hydrology)
Precipitation and its forms (hydrology)Precipitation and its forms (hydrology)
Precipitation and its forms (hydrology)
 
Destructive test
Destructive testDestructive test
Destructive test
 
Geology lecture 20
Geology lecture 20Geology lecture 20
Geology lecture 20
 
Study on foundation in Construction
Study on foundation in ConstructionStudy on foundation in Construction
Study on foundation in Construction
 
Rock slope stability analysis lec 1
Rock slope stability analysis lec 1Rock slope stability analysis lec 1
Rock slope stability analysis lec 1
 
Geological investigation.pptx
Geological investigation.pptxGeological investigation.pptx
Geological investigation.pptx
 
Statutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sectionsStatutory provisions for the preaparation of mine plans and sections
Statutory provisions for the preaparation of mine plans and sections
 
Thesis on Labor Management Practices
Thesis on Labor Management PracticesThesis on Labor Management Practices
Thesis on Labor Management Practices
 
Erection of structural components in precast constructions
Erection of structural components in precast constructionsErection of structural components in precast constructions
Erection of structural components in precast constructions
 
107 quality control
107 quality control107 quality control
107 quality control
 
Hydrogeological studies and groundwater
Hydrogeological studies and groundwaterHydrogeological studies and groundwater
Hydrogeological studies and groundwater
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity
 
Bim for construction safety design
Bim for construction safety designBim for construction safety design
Bim for construction safety design
 
An introduction to taking off building quantities
An introduction to taking off building quantities An introduction to taking off building quantities
An introduction to taking off building quantities
 

Destaque

Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracingsuddal
 
03 2frame Str Steel Jan07sbq&C2213&42
03 2frame Str Steel  Jan07sbq&C2213&4203 2frame Str Steel  Jan07sbq&C2213&42
03 2frame Str Steel Jan07sbq&C2213&42nik kin
 
Seismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsSeismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsPaul McMullin
 
Seismic retrofit methods
Seismic retrofit methodsSeismic retrofit methods
Seismic retrofit methodsPaul McMullin
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structuresRizwan Khurram
 
Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
Aisc 341 05+supliment
Aisc 341 05+suplimentAisc 341 05+supliment
Aisc 341 05+suplimentUTCB
 
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016Jo Gijbels
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesMike Whaling
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistantKris Kiran
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...Hiroyuki Nakaji
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Hajar Ch
 
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...Full Scale Dynamics
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonNishkianDean
 
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Maurizio Pollino
 
Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016IRS srl
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringPieter Jan Jordaens
 

Destaque (20)

Connection and Bracing
Connection and BracingConnection and Bracing
Connection and Bracing
 
03 2frame Str Steel Jan07sbq&C2213&42
03 2frame Str Steel  Jan07sbq&C2213&4203 2frame Str Steel  Jan07sbq&C2213&42
03 2frame Str Steel Jan07sbq&C2213&42
 
Seismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural ElementsSeismic Bracing- Non-Structural Elements
Seismic Bracing- Non-Structural Elements
 
Seismic retrofit methods
Seismic retrofit methodsSeismic retrofit methods
Seismic retrofit methods
 
Connections in steel structures
Connections in steel structuresConnections in steel structures
Connections in steel structures
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Aisc 341 05+supliment
Aisc 341 05+suplimentAisc 341 05+supliment
Aisc 341 05+supliment
 
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
IDEA StatiCa Seel Connections - seminar Genk/Kortrijk nov 2016
 
Voice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing PropertiesVoice, Video and Data: Retrofitting Existing Properties
Voice, Video and Data: Retrofitting Existing Properties
 
Disaster resistant
Disaster resistantDisaster resistant
Disaster resistant
 
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
EVALUATION OF RESTORING FORCE CHARACTERISTICS OF MUD-WALLS CONSIDERING EFFECT...
 
Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111Structural health monitoring 2011-wei fan-83-111
Structural health monitoring 2011-wei fan-83-111
 
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
SEISMIC STRUCTURAL HEALTH MONITORING AND REAL‐TIME DATA BROADCASTING SPECIAL ...
 
Seismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, OregonSeismic Considerations Seminar | Portland, Oregon
Seismic Considerations Seminar | Portland, Oregon
 
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
Seismic Vulnerability Assessment Using Field Survey and Remote Sensing Techni...
 
Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016Structural Health Monitoring platform presentation at NI week 2016
Structural Health Monitoring platform presentation at NI week 2016
 
Green Retrofitting 101
Green Retrofitting 101Green Retrofitting 101
Green Retrofitting 101
 
Offshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoringOffshore research measurements & focus on structural health monitoring
Offshore research measurements & focus on structural health monitoring
 
Retrofitting and rehabilitation
Retrofitting and rehabilitationRetrofitting and rehabilitation
Retrofitting and rehabilitation
 
Considerations for Seismic Retrofitting
Considerations for Seismic RetrofittingConsiderations for Seismic Retrofitting
Considerations for Seismic Retrofitting
 

Semelhante a Seismic Structural Considerations in Steel

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fastenersklubbering
 
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009mikeasavage
 
Flexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsFlexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsDesign World
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)dgonano
 

Semelhante a Seismic Structural Considerations in Steel (7)

Ejot Solar Fasteners
Ejot Solar FastenersEjot Solar Fasteners
Ejot Solar Fasteners
 
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
Infiniband 4X/12X & CX4 Nx Cable Presentation Jan2009
 
Bogner Industrial
Bogner IndustrialBogner Industrial
Bogner Industrial
 
Flexibile vs. Rigid Couplings
Flexibile vs. Rigid CouplingsFlexibile vs. Rigid Couplings
Flexibile vs. Rigid Couplings
 
Overmold Design Guide
Overmold Design GuideOvermold Design Guide
Overmold Design Guide
 
Fasteners Presentation
Fasteners PresentationFasteners Presentation
Fasteners Presentation
 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)
 

Último

CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 
2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptxsuhanimunjal27
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...Delhi Call girls
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...sonalitrivedi431
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...amitlee9823
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdshivubhavv
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 

Último (20)

CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 
2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
💫✅jodhpur 24×7 BEST GENUINE PERSON LOW PRICE CALL GIRL SERVICE FULL SATISFACT...
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
Call Girls Basavanagudi Just Call 👗 7737669865 👗 Top Class Call Girl Service ...
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
 
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Brookefield Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 

Seismic Structural Considerations in Steel

  • 1. Seismic Structural Considerations JCC Training by Paul W. McMullin, SE, PhD October 15, 2009
  • 2. The Paper Clip Test © Dunn Associates Inc, 2009
  • 3. Concept of Selected Deformation © Dunn Associates Inc, 2009
  • 4. Early Use of Moment Connections Flatiron Building, NYC • One of the first steel frame buildings • Portal frame moment connections at all wind girders. Early Steel Frames- all moment connected © Dunn Associates Inc, 2009
  • 5. Construction Changes that led to Northridge Failures Fewer, but larger moment frames • Heavier connections Changed from Riveted to Welded construction Used lower toughness welding rod • Welds went down fast • Not permitted in pipelines Quality control problems © Dunn Associates Inc, 2009
  • 6. Acceleration Record from Northridge From the Strong Motion Database (SMDB, 2000a) © Dunn Associates Inc, 2009
  • 7. Northridge Earthquake Magnitude 6.7 Building Inventory • Estimated Economic Damage • Loss = $49.3 billion • 100 buildings with minor fractures • 100 buildings with major fractures • 30 buildings with major fractures in 90% of all connections © Dunn Associates Inc, 2009
  • 8. Fracture Causes Welding • Low Toughness Weld Metal • Slag Inclusions • Lack of fusion Mismatched Yield Strengths Erroneous Joint Detailing Weld Constraint by Heavy Sections Slab Interaction with Column © Dunn Associates Inc, 2009
  • 9. Changes: Code Code limited approved filler metals Inspection requirements tightened Limited connection types Quality control significantly increased © Dunn Associates Inc, 2009
  • 10. Changes: Weld Access Hole © Dunn Associates Inc, 2009
  • 11. Connections: WUF-W © Dunn Associates Inc, 2009
  • 12. Connections: Extended Flange © Dunn Associates Inc, 2009
  • 13. Connections: Flange Cover Plate © Dunn Associates Inc, 2009
  • 14. Connections: Reduced Beam Section © Dunn Associates Inc, 2009
  • 15. Connections: Bolted End Plate © Dunn Associates Inc, 2009
  • 16. Connections: SidePlate © Dunn Associates Inc, 2009
  • 17. Protected Zone Requirements No discontinuities in Get protected zone from protected zone drawings or engineer • Arc Strikes Mark protected zones with • Erection Aids bright paint after erection and • Air-arc Gouging after fire coating • Thermal Cutting Not permitted • Welded studs • Shot pins • Screws • Welds • Holes © Dunn Associates Inc, 2009
  • 18. Protected Zones: Dog Bone © Dunn Associates Inc, 2009
  • 19. Protected Zones: Concentric Braced Frame © Dunn Associates Inc, 2009
  • 20. Protected Zones: Concentric Braced Frame © Dunn Associates Inc, 2009
  • 21. Protected Zones: Eccentric Braced Frame © Dunn Associates Inc, 2009
  • 22. Protected Zones: Eccentric Braced Frame © Dunn Associates Inc, 2009
  • 23. Connections Bolted End Plate Reduced Beam Section (“Dog Bone”) SidePlate™ © Dunn Associates Inc, 2009
  • 24. Reduced Beam Section Connection Advantages • Approved • Reduces column-beam weld stresses Disadvantages • Milling of beam flange • 80%-90% reliable • Looks odd © Dunn Associates Inc, 2009
  • 25. Reduced Beam Section Connection Watch for: • Protected Zone (nicks, arc strikes, shot pins, welds) • Smoothness of Cut • Bracing just outside cut © Dunn Associates Inc, 2009
  • 26. SidePlate Connection Advantages • Approved- seismic & progressive collapse • Eliminates beam-column weld • High reliability • Looks strong Disadvantages • Licensing fee • Flip columns in shop © Dunn Associates Inc, 2009
  • 27. Step 1: Column Tree Assembly Rotate Column to Column1intoColumn Sub-Assembly (Not Shown Here). Bring inRotate Applyand andPosition Weld intoTack into Place Side Plates Weld 2Weld 2, toSide Plates Apply Bring in Sidewith to Bring in Temporary Plates Horiz. Other Alignment, Bring in Horizontal Shear Plates, Tack, CheckApply Other Dogs Welds 1 and 3 Apply Welds Apply 3, Tack NS/FS. Position Begin Plates, Shear Plates, After that, Column Sub-Assembly Complete. © Dunn Associates Inc, 2009
  • 28. Step 2: Full-Length Beam Assembly Begin Full-Length Full-LengthTack & and into Position 5 Shown) Bring inFull-Length Beam Beam Weld Inverted As Rotate Beam Assembly Tack Apply Position Bring in Cover Plates, (Beam into Weld Erection Angle, Assembly Complete © Dunn Associates Inc, 2009
  • 29. Step 3: Erect Column Trees & Full-Length Beams with six 7/8” A325 Bolts Each End © Dunn Associates Inc, 2009
  • 30. SidePlate Connection © Dunn Associates Inc, 2009
  • 31. SidePlate Connection Watch for: 1) Joint Gap 2) Protected Zone (nicks, arc strikes, shot pins, welds) 3) SidePlate attachments 1 3 2 © Dunn Associates Inc, 2009
  • 32. SidePlate Protected Zone © Dunn Associates Inc, 2009
  • 33. SidePlate: WELDING OK © Dunn Associates Inc, 2009
  • 34. What keeps us from backtracking? Special Inspection Good Communication • Ensure done well • RFIs that are researched & • Ultrasonic propose solutions • Mag Particle ends • Notify us ahead of certain activities (pours, fire coating) Shop Drawings • Tell us about problems as soon • Complete as you know (even your screw- • Well detailed ups) • Contractor review Think/Plan Ahead Shop vs Field Welds • Catch problems • Define up-front • Give us time to determine a solution • Shop welds- faster, higher quality • Field welds- some pieces too big for shop © Dunn Associates Inc, 2009
  • 35. Our Liability STRUCTURAL ENGINEER CONTRACTOR Becomes liable when: Becomes liable when: • Omit information • Deviate from approved plans • Don’t follow the State of the and specs Art (code is minimum) • Material/workmanship/Quality problems Regardless of who is liable, if there is a problem, we all get dragged into the mess © Dunn Associates Inc, 2009