SlideShare a Scribd company logo
1 of 64
Download to read offline
LILAMA CORPORATION

VIETNAM MACHINERY INSTALLATION CORPORATION
Address: 124 Minh Khai Street – Hanoi - Vietnam
Tel: (+84) 438633067/ (+84) 438632059 – Fax: (+84) 438638104
Website: www.lilama.com.vn
LILAMA PRESENTATION
TABLE OF CONTENTS
• Company History and Basic Information

• LILAMA's Resources
• LILAMA as Vietnam’s Dominating Installation Contractor

• LILAMA as EPC Contractor
• References
COMPANY HISTORY
• LILAMA - Vietnam Machinery Installation Corporation
 Established in 1960 as a state-owned company.
 Currently a limited company.

• Vietnam’s Leading Fabrication & Installation Contractor
 Dominant in Vietnam’s market for installation and
fabrication works in industrial projects.
 Expanding activities to international markets such as Libya,
Cambodia, Middle East, India and Japan.

• Entered successfully into EPC Projects in Vietnam
 EPC Contracting since 2000.
 Power Generation: Coal-fired and Gas-fired Power Plants.
 Building Material Manufacturing: Cement Plants.
LILAMA - BASIC INFORMATION
• Services provided with over 25,000 permanent employees
 Engineering, Procurement, Fabrication, Installation and
Maintenance Services.
 Power generation, oil & gas, chemical, fertilizer, cement plants
and municipal facilities construction projects.

• 2011 audited consolidated turnover: US$ 796 million.
• Strongest Vietnam’s EPC , Mechanical & Electrical
Contractor.
LILAMA’S CAPABILITIES
o Long-term experience with installation and fabrication
works for all kinds of industrial projects including
power generation, oil & gas and other industries.
o Extensive resources with high qualification proven
through numerous executed projects.
o Flexibility, creativity and determination to meet
international market requirements in terms of
competitiveness, quality and safety standards.
ORGANIZATION CHART
MANAGEMENT BOARD
CHAIRMAN: MR. NGUYEN DINH HAI

PRESIDENT & CEO
MR. LE VAN TUAN

VICE PRESIDENT
MR. TRAN DINH DAI

CORPORATION
DEPARTMENTS

SUBSIDIARIES

VICE PRESIDENT
MR. VU VAN DINH

WELDING TECHNOLOGY
INSTITUTE

VICE PRESIDENT
MR. PHAM QUANG NHAN

PROJECT MANAGEMENT
BOARDS

ASSOCIATED COMPANIES

VICE PRESIDENT
MR. NGO QUANG QUY

REPRESENTATIVE OFFICES
AND BRANCHES

TRAINING COLLEDGES
LILAMA’S ORGANIZATION CHART
LILAMA’S SUBSIDIARIES
12345678910 11 12 -

LILAMA 3 JSC
LILAMA 5 JSC
LILAMA 7 JSC
LILAMA 10 JSC
LILAMA 18 JSC
LILAMA 45.1 JSC
LILAMA 45.3 JSC
LILAMA 45.4 JSC
LILAMA 69.1 JSC
LILAMA 69.2 JSC
LILAMA 69.3 JSC
LILAMA HA NOI JSC

13 - LILAMA HAI PHONG CO.
14 - LILAMA NINH BINH JSC
15 - LILAMA M & E
INSTALLATION & TESTING
16 - VIFA COATING JSC
17 - LILAMA URBAN
DEVELOPMENT JSC
18 - LHT CONSULTANT JSC
19 - SONG ONG HYDRO
POWER JSC
20 - SONG VANG HYDRO
POWER JSC
LILAMA’s Subsidiaries Located All Over Vietnam
HANOI

PHU THO

LILAMA 10
LILAMA HANOI
LILAMA TESTING
LHT CONSULTANT
LILAMA URBAN DEVELOPMENT

LILAMA 3

HAI DUONG

NINH BINH

LILAMA 69-3

LILAMA EMC

HAI PHONG

BAC NINH

LILAMA 69-1

THANH HOA

LILAMA 5

LILAMA 69-2
LISEMCO
VIFA COATING
DA NANG

LILAMA 7
SONG VANG HYDRO POWER
HO CHI MINH CITY

LILAMA 18
LILAMA 45-1

QUANG NGAI

LILAMA 45-3
NINH THUAN

SONG ONG HYDRO POWER
DONG NAI

LILAMA 45-4

8 of 98
LILAMA REPRESENTATIVES AND TRAINNING COLLEDGES

TRAINING COLLEGES
• LILAMA TECHNICAL AND TECHNOLOGY COLLEGE 1
• LILAMA TECHNICAL AND TECHNOLOGY COLLEGE 2

BRANCH & REPRESENTATIVE OFFICES
• REPRESENTATIVE OFFICE IN HO CHI MINH CITY
• REPRESENTATIVE OFFICE IN DA NANG CITY
• CONSTRUCTION BRANCH OFFICE IN HAIDUONG PROVINCE

• CONSULTING BRANCH OFFICE IN HANOI CITY
HSE POLICY
As LILAMA Corporation, we commit ourselves to continuously improve our health,
safety and environment (HSE) performance with ultimate goal of:

NO ACCIDENT
NO INJURY
NO HARM TO ENVIRONMENT
We aim to improve our HSE management system by:

 REGULAR TRAINING AND IMPROVING STAFF’S AWARENESS ON HSE
 CONTINUOUS MONITORING, CHECKING AND ASSESSING HSE
PERFORMANCE AND TAKING IMMEDIATE ACTIONS FOR
RECTIFICATIONS WHENEVER NECESSARY
 PROMOTING ALL HSE ACHIEVEMENTS AS WELL AS INNOVATIONS AND
INITIATIVES ON HSE ENHANCEMENTS.
QUALITY POLICY
In order to meet the ever increasing demands for quality from
our customers, we have the following commitments:
 WE WILL ENSURE THAT ALL CUSTOMERS’ REQUIREMENTS AS WELL
AS THE APPROPRIATE STATUTORY AND REGULATORY REQUIREMENTS
ARE MET.

 WE WILL APPLY THE MOST UP-TO-DATE ADVANCES OF TECHNOLOGY
AND SCIENCES IN THE PRODUCTION FIELD AND CONSTRUCTION SITE
IN ORDER TO ENSURE THE REQUIRED QUALITY OF MECHANICAL
PRODUCTS AND CONSTRUCTION SERVICES.
 WE WILL PROVIDE ALL RESOURCES NECESSARY FOR IMPLEMENTING,
MAINTAINING THE QUALITY MANAGEMENT SYSTEM AND
CONTINUOUSLY IMPROVING ITS EFFECTIVENESS BY ANNUALLY
REVIEWING, ASSESSING AND ESTABLISHING QUALITY OBJECTIVES.
LILAMA’S QUALITY MANAGEMENT STANDARD
LILAMA’S HEAD OFFICE
QA/QC MANAGEMENT ACTIVITIES
1 - Developing and Control of General Work Procedures
& Quality Assurance (QA) Documents.

2 - Supporting for Site & Shop Quality Control (QC)
activities.
3 - Internal QC Audit activities.
4 - Activities to improve production quality of entire
Corporation.
LILAMA’S QUALIFIED PROCEDURES
184 Welding Procedure Specifications (WPS) and Procedure
Qualification Records (PQR), including:
• 47 WPSs qualified in compliance with ASME IX / ASME B31.3 & B31.1
for Piping.

• 12 WPSs qualified in compliance with API 1104 for Pipeline.
• 24 WPSs qualified in compliance with ASME IX / ASME VIII for
Pressure Vessels (with Third Party approved).

• 22 WPSs qualified in compliance with AWS D1.1 for Steel Structures.
• 21 WPSs qualified in compliance with EN 288-3 (BS EN ISO 15614-1)
for Steel Structures.
• 58 WPSs qualified in compliance with RUSSIA standard.
ACHIEVED QUALIFICATIONS
ACHIEVED QUALIFICATIONS
ACHIEVED QUALIFICATIONS
ACHIEVED QUALIFICATIONS
ACHIEVED QUALIFICATIONS
ACHIEVED QUALIFICATIONS
MAIN CLIENTS & SUPPLIERS
MAIN VIETNAMESE CLIENTS

COUNTRY

Petro Vietnam (PVN), Electricity of Vietnam (EVN), Vietnam Coal and
Mineral Industries Group (VINACOMIN), Vietnam Cement Corporation,
Vietnam Steel Corporation

VIETNAM

MAIN FOREIGN CLIENTS AND SUPPLIERS
Foster Wheeler

USA

Siemens, Polysius, Fichtner

GERMANY

Mitsubishi, Toshiba, Hitachi, Marubeni, Sumitomo

JAPAN

Technip, Alstom

FRANCE

Hyundai, Doosan

KOREA

ABB

SWEDEN

Shanghai Electric, Donfang

CHINA

FLSmidth

DENMARK

Poyry Energy

SWITZERLAND

CTCI

TAIWAN
LILAMA PRESENTATION
TABLE OF CONTENTS
• Company History and Basic Information

• LILAMA's Resources
• LILAMA as Vietnam’s Dominating Installation Contractor

• LILAMA as EPC Contractor
• References
HUMAN RESOURCES
LILAMA’s engineers and workers working at 6.5 MTPY Dung Quat Refinery Project
HUMAN RESOURCES
Senior Managers

76

Middle management staff
 Procurement staff
 Mechanical engineers
 Electrical and C&I engineers
 Civil engineers
 Other engineers and staff

2,031
106
901
445
404
175

Skilled workers

21,487

 Welding

 Piping
Testing
 Painting
 Equipment Erection
 Heavy Lifting
 Insulation and Lagging
 Mechanical Fabrication
 Electrical and C&I
 Civil Works
 Other Disciplines

TOTAL PERMANENT EMPLOYEES

2,875
2,447
445
712
4,976
570
1,379
2,953
2,442
685
2,003

24,294
CONSTRUCTION EQUIPMENTS
Cranes operating at US$ 270 million National Convention Centre Project
CONSTRUCTION EQUIPMENT LIST
NO

CONSTRUCTION EQUIPMENT

MANUFACTURER

QUAN'TY

SPECIFICATION

A. HOISTING AND LIFTING MEANS
1

CRAWLER CRANE CC-2800

GERMANY

01

MAX. LIFTING LOAD 600 TONNES

2

CRAWLER CRANE LIEBHERR LB1280-280

GERMANY

01

MAX. LIFTING LOAD 280 TONNES

3

CRAWLER CRANE KOBELCO CKE-2500

JAPAN

05

MAX. LIFTING LOAD 250 TONNES

4

CRAWLER CRANE KOBELCO LB-7150S

JAPAN

03

MAX. LIFTING LOAD 150 TONNES

USA, FRANCE,
JAPAN,
GERMANY…

99

MAX. LIFTING LOAD FROM 10
TONNES TO 136 TONNES

5

CRAWLER CRANE, MOBILE CRANE

6

TOWER CRANE

RUSSIA

04

MAX. LIFTING LOAD 30 TONNES

7

GANTRY CRANE KMK-200

RUSSIA

07

MAX. LIFTING LOAD FROM 8 TO 50
TONNES, SPAN FROM 10M TO 50M

8

DOUBLE BEAM BRIDGE CRANE CT10-23,4 RUSSIA-VIETNAM

02

MAX. LIFTING LOAD FROM 8
TONNES, SPAN 42M

9

DOUBLE BEAM BRIDGE CRANE AW051091 B1

TAIWAN

01

MAX. LIFTING LOAD FROM 8
TONNES, SPAN 42M

10

SINGLE BEAM BRIDGE CRANE TЭ-320

RUSSIA

03

MAX. LIFTING LOAD FROM 8
TONNES, SPAN 42M
CONSTRUCTION EQUIPMENT LIST

NO

CONSTRUCTION EQUIPMENT

MANUFACTURER

QUAN'TY

SPECIFICATION

RUSSIA, KOREA,
BELARUS,
FRANCE,
ITALY, JAPAN,
SWEDEN…

112

LOAD FROM 8 TO 66 TONS,
POWER 150 HP TO 525 HP

B. MOTORIZED VEHICLES

1

SEMI-TRAILER TRUCK, TYRE WHEELED
TRACTOR, CRAWLER TRACTOR, LORRY,
DUMP TRUCK, TRUCK WITH HYDRAULIC
CRANE…

2

SPECIALIZED TRAILEARS

RUSSIA, KOREA,
FRANCE, JAPAN..

10

CARRYING LOAD FROM 20
TONNES TO 120 TONNES

3

SPECIALIZED VEHICLES (PETROL
TANKER, FIRE ENGINE, LADDER
MOUNTING, FORK LIFT…)

RUSSIA, JAPAN,
KOREA, FRANCE…

27

CAPACITY 4200L, LOAD FROM 3
TONNES TO 10 TONNES..

VIETNAM

03

CARRYING LOAD FROM 70
TONNES TO 220 TONNES

C. SHIPS
1

SHIP, AUTOMOBILE BARGE
CONSTRUCTION EQUIPMENT LIST
NO

CONSTRUCTION EQUIPMENT

MANUFACTURER

QUAN'TY

SPECIFICATION

864

WELDING ELECTRIC CURRENT
FROM 140 A TO 2400A

320

WELDING ELECTRIC CURRENT
140A TO 2600A

SWEDEN, USA,
RUSSIA,
FRANCE…

74

WELDING ELECTRIC CURRENT
FROM 300A TO 1000A,
WELDING DIAMETER FROM F25
TO F5000

RUSSIA, SWEDEN,
JAPAN, USA…

53

WELDING ELECTRIC CURRENT
FROM 170A TO 500A

CZECH, RUSSIA,
USA…

52

POWER FROM 30 TO 400 KW

D. FACILITIES FOR WELDING AND CUTTING MEALS

1

2

3

RECTIFYING WELDING MACHINE,
WELDING MACHINE, TIG WELDING
MACHINE, MIG WELDING MACHINE,
DIRECT CURRENT…
ALTENATIVE CURENT WELDING
MACHINE, PORTABLE WELDING
MACHINE…
AUTOMATIC VESSEL WELDING SYSTEM
ESAB LAE1000 + WELDING TRACTOR A2
+ BEAM WELDING SET MKR 300,
AUTOMATIC VESSEL WELDING SYSTEM
AGW-II, BEAM AUTOMATIC WELDING
MACHINE MEGSAFPR3/SUBAR C3,
AUTOMATIC WELDING TRACTOR,
ALLUMINIUM WELDING MACHINE…

SWEDEN,
FRANCE, RUSSIA,
USA, JAPAN,
FILAND, ITALY…
FILAND, FRANCE,
RUSSIA, USA,
JAPAN…

E. GENERATOR
1

WELDING GENERATOR

2

POWER GENERATOR
CONSTRUCTION EQUIPMENT LIST
NO

CONSTRUCTION EQUIPMENT LIST

MANUFACTURER

QUAN'TY

SPECIFICATION

1

PLASMA CUTTING MACHINE, MULTINOZZLE AUTOMATIC CUTTING MACHINE, JAPAN, SWEDEN,
ACETYLEN AUTOMATIC CUTTING
INDIA…
MACHINE, …

108

CUTTING THICKNESS FROM 60
MM TO150 MM

2

LATHE, DRILLING MACHINE, MILLING
MACHINE, PLANING MACHINE, MACHINE
HAMMER, BORING MACHINE, FLANGING
MACHINE, HYDRAULIC PRESS MACHINE,
SHAPED STEEL BENDING ROLLER, PIPE
ROLLER…

CHINA, RUSSIA,
JAPAN, ITALY,
GERMANY…

371

RUSSIA,
JAPAN,USA…

108

PULLING FORCE FROM 0.5
TONNES TO 18 TONNES.
LIFTING LOAD UP TO 800TONS

RUSSIA,
BUNGARIA...

61

CAPACITY 4,5 TO 13KW, WATER
FLOW 0,22M3/H TO 120M3/H

F. MACHINE TOOLS

G. LIFTING MEANS

1

ELECTRICAL WINCH, HYDRAULIC JACK…

H. SPECIAL PUMPS

1

CENTRIFUGAL PUMP, DIESEL PUMP,
HIGH PRESSURE…
CONSTRUCTION EQUIPMENT LIST
NO

CONSTRUCTION EQUIPMENT LIST

MANUFACTURER

QUAN'TY

SPECIFICATION

SWEDEN, RUSSIA,
USA JAPAN…

75

AIR FLOW 30 M3/H TO 1200M3/H,
PRESSURE 6KG/CM2 TO 9KG/CM2

RUSSIA

47

USA, JAPAN,
GERMANY,
RUSSIA…

132

J. AIR COMPRESSORS

1

AIR COMPRESSOR

K. SPECIALIZED MACHINES

1

MOBILE OXYGEN PRODUCING UNIT,
STATIONARY OXYGEN PRODUCING UNIT,
BOTTLE REPAIRING AND TESTING UNIT,
CENTRIFUGAL OIL REFINER, PRESSURE
OIL REFINER , SYNCHRONOUS
TRANSFORMER...

L. TESTING EQUIPMENT & INSTRUMENTATIONS

1

MAGNETIC WELD DEFECT DETECTOR,
ULTRASONIC WELD DEFECT DETECTOR,
LOW FREQUENCY GENERATOR, HIGH
VOLTAGE TESTER, X-RAY RADIOGRAPH,
ELECTRONIC THEODOLITE, LEVELING
DEVICE, COAT LAYER THICKNESS
TESTING DEVICE POSITECTOR…
LILAMA’S FABRICATION FACILITIES

30,000 TPY Haiphong Fabrication and Ship Building Facility
LILAMA’S FABRICATION FACILITIES
LILAMA’s workers fabricating steel structures at factory yard
LILAMA’S TYPICAL
FABRICATION FACILITIES
LILAMA HAIPHONG
COMPANY

Total area:
Total Capacity:

421,075 sqm
70,000 TPY

- Enclosed Shop Area: 97,000 sqm
- Fabrication and
Assembly Area:
304,372 sqm
- Office Area:
19,748 sqm
- Location:
Hai Phong city, 140 km from Noi
Bai International Airport

LILAMA 18
COMPANY

Total area:
Total Capacity:

68,000 sqm
16,000 TPY

- Enclosed Shop Area: 8,000 sqm
- Fabrication and
Assembly Area:
59,584 sqm
- Office Area:
416 sqm
- Location:
Ben Cat district, Binh Duong
province, 75 km from Tan Son
Nhat International Airport

LILAMA 45-4
COMPANY

Total area:
Total capacity:

5,000 sqm
10,000 TPY

- Enclosed Shop Area: 1,000 sqm
- Fabrication and
Assembly Area:
3,500 sqm
- Office Area:
500 sqm
- Location:
Bien Hoa Industrial Zone, Dong
Nai province, 70 km from Tan
Son Nhat International Airport

All other LILAMA’s subsidiaries have their own fabrication facilities from
large to small scales with the total area of around 950,000 sqm.
Total capacity of all LILAMA’s facilities for steel structure and equipment
fabrication is around 200,000 tons per year (TPY).
FABRICATION & INSTALLATION WORKS

National Convention Centre Project
FABRICATION & INSTALLATION WORKS

Da Nang Airport Project
FABRICATION & INSTALLATION WORKS
Fabrication and Installation of Stackers
and Re-claimers for 1,200 MW Vung
Ang 1 Coal Fired Power Plant
FABRICATION & INSTALLATION WORKS
Dinh Vu Fibre Manufacturing Plant

ơ
FABRICATION & INSTALLATION WORKS
Dinh Vu Fibre Manufacturing Plant
FABRICATION & INSTALLATION WORKS
Fabrication of Oil Rigs
LILAMA PRESENTATION
TABLE OF CONTENTS
• Company History and Basic Information

• LILAMA's Resources
• LILAMA as Vietnam’s Dominating Installation Contractor

• LILAMA as EPC Contractor
• References
INSTALLATION WORKS BY LILAMA

Installing
Isolated
Phase
Bus
for
450 MW
Nhon Trach 1
Combined
Cycle
Power
Project
INSTALLATION WORKS BY LILAMA
Installing
320 ton
steam drum
to the
elevation
of 73m in
2x600MW
Vung Ang 1
Coal Fired
Thermal
Power
Project
INSTALLATION WORKS BY LILAMA

Installing 1,000 ton generator rotor in 6x400MW
Son La Hydropower Project
6.5 MTPY DUNG QUAT REFINERY PROJECT
INSTALLED BY LILAMA
INSTALLATION WORKS BY LILAMA

Installing spherical tank in 6,5 MTPY Dung Quat Refinery Project
6.5 MTPY DUNG QUAT REFINERY PROJECT
INSTALLED BY LILAMA
Plant Completed
LILAMA PRESENTATION
TABLE OF CONTENTS
• Company History and Basic Information

• LILAMA's Resources
• LILAMA as Vietnam’s Dominating Installation Contractor

• LILAMA as EPC Contractor
• References
LILAMA AS EPC CONTRACTOR
2x600MW Vung Ang 1 Thermal Power Plant
LILAMA AS EPC CONTRACTOR
2x600MW Vung Ang 1 Thermal Power Plant
LILAMA AS EPC CONTRACTOR
1 MTPY Song Thao Cement Plant
EPC PROJECT BY LILAMA
2X750MW CA MAU 1&2 COMBINED CYCLE POWER PLANT
LILAMA PRESENTATION
TABLE OF CONTENTS
• Company History and Basic Information

• LILAMA's Resources
• LILAMA as Vietnam’s Dominating Installation Contractor

• LILAMA as EPC Contractor
• References
LILAMA’S KEY REFERENCE PROJECTS
No

Project Name

Scope of Work

Contract
Amount
(USD)

Contract
Duration

VINACOAL

106,000,000

2002-2004

Quang Ninh
Vietnam

Electricity of
VietNam
(EVN)

267,000,000

2003-2006

Vung Tau
Vietnam

Electricity of
VietNam
(EVN)

98,778,000
&134,364,000
EURO

2002-2004

Location

Name of
Client

Lang Son
Vietnam

A.

EPC CONTRACTOR OR CONSORTIUM MEMBER

1

Na Duong Thermal
Power Plant
2x50MW

EPC Contractor in Consortium
Marubeni-LILAMA

2

Uong Bi Extension I
Thermal Power
Plant 1x300MW

EPC Contractor

3

Phu My 4 Combine
Cycle Power Plant
450MW

EPC Contractor in Consortium AlstomMarubeni-LILAMA

4

Ca Mau 1&2
Combined Cycle
Power Plant 2x750
MW

EPC Contractor

Ca Mau
Vietnam

Petro Vietnam
(PV)

660,000,000

2003-2008

5

Nhon Trach I
Combined Cycle
Power Plant 450 MW

EPC Contractor

Dong Nai
Vietnam

Petro Vietnam
(PV)

300,000,000

2006-2008

6

Nhon Trach II
Combined Cycle
Power Plant 750 MW

EPC Contractor

Dong Nai
Vietnam

Petro Vietnam
(PV)

524,000,000

2009-2012

7

Vung Ang I Coal
Fired Power Plant
2x600 MW

EPC Contractor

Ha Tinh
Vietnam

Petro Vietnam
(PV)

1,200,000,000

2009-2013
LILAMA’S KEY REFERENCE PROJECTS
Contract
Amount
(USD)

Location

Name of
Client

EPC Contractor

Phu Tho
Vietnam

Song Thao
Cement
Company

66,966,000

2005-2006

EPC Contractor

Ho Chi
Minh City
Vietnam

Vietnam
Airline

21,120,000

2009-2010

Tri An Hydro Power
Plant
(4x100MW)

Fabricating steel structures and equipment
Installation of mechanical equipment
Electrical and instrumentation erection works

Dong Nai
Vietnam

Electricity of
Vietnam
(EVN)

6,500,000

1985-1992

11

Hoa Binh Hydro
Power Plant
(8x240MW)

Fabricating steel structures and equipment
Installation of mechanical equipment
Electrical and instrumentation erection works

Hoa Binh
Vietnam

Electricity of
Vietnam
(EVN)

40,000,000

1982-1994

12

Son La Hydro Power
Plant (6x400MW)

Fabricating steel structures and equipment
Installation of mechanical equipment
Electrical and instrumentation erection works

Son La
Vietnam

Electricity of
Vietnam
(EVN)

70,000,000

2005-2012

13

Pha Lai I Thermal
Power Plant
(4x110MW)

Fabrication of pipes, stack, steel structures,
heaters, dryers and equipment
Installation of mechanical equipment,
pipelines
Electrical and instrumentation erection works

Hai Duong
Vietnam

Electricity of
Vietnam
(EVN)

13,000,000

1978-1984

14

Yaly Hydro Power
Plant (4x180MW)

Fabricating steel structures and equipment
Installation of mechanical equipment
Electrical and instrumentation erection works

Gia Lai
Vietnam

Electricity of
Vietnam
(EVN)

7,000,000

1995-1997

No

Project Name

8

Song Thao
Cement Plant
(2500 ton clinker/ day)

9

Hangar A75

B.

Contract
Duration

POWER PLANTS

10

Scope of Work
LILAMA’S KEY REFERENCE PROJECTS
Contract
Amount
(USD)

Location

Name of
Client

Hai Duong
Vietnam

HYUNDAI
Corp.

10,500,000

1999-2002

India

Indian
Company
NTPC

50.705.000

2007-2011

Fabrication of heat recovery boiler
components
Erection of mechanical equipment
Electrical and instrumentation erection works

Baria-Vung
Tau
Vietnam

Consortium
MitsuiNEMSiemens

4,000,000

1996-1997

PhuMy I Combine
Cycle Thermal Power
Plant 1090 MW

Fabrication & erection of equipment
(Turbine, Boiler, steel structure...),
Electrical and instrumentation erection works

Baria-Vung
Tau
Vietnam

Electricity of
VietNam
(EVN)

10,000,000

1999-2001

19

O Mon I Combined
Cycle Power Plant
330 MW

Fabrication & erection of equipment
(Turbine, Boiler, steel structure...),
Electrical and instrumentation erection works

Can Tho
Vietnam

Electricity of
VietNam
(EVN)

18,500,000

2006-2007

C.

CEMENT PLANT

20

Hoang Thach No. 2
Cement Plant (1.4
million ton per year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole
plant

Hai Duong
Vietnam

Vietnam
Cement
Corporation
(VNCC)

10,000,000

1994-1995

21

Chinfon Cement Plant
(1.4 million ton / year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole
plant

Hai Phong
Vietnam

Chinfon
Cement
Company

5,500,000

1995-1996

No

Project Name

Scope of Work

15

Pha Lai II Thermal
Power Plant
(2x300MW)

Erection of mechanical equipment
Electrical and instrumentation erection works

16

Barh STPP India
(3x660MW)

Fabrication of boiler structures

17

Ba Ria Add - On
Power Plant

18

Contract
Duration
LILAMA’S KEY REFERENCE PROJECTS
No

Project Name

Scope of Work

Location

Name of
Client

Contract
Amount
(USD)

Contract
Duration

22

Hon Chong
Cement Plant
(1.4 million ton / year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole plant

Kien Giang
Vietnam

Vietnam
Cement
Corporation
(VNCC)

5,000,000

1996

23

But Son Cement Plant
(1.4 million ton / year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole plant

Thanh Hoa
Vietnam

Vietnam
Cement
Corporation
(VNCC)

11,000,000

1996-1997

24

Nghi Son Cement
Plant
(2.0 million ton / year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole plant

Thanh Hoa
Vietnam

Vietnam
Cement
Corporation
(VNCC)

20,300,000

1998-2000

25

Hoang Mai Cement
Plant
(1.4 million ton / year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole plant

Nghe An
Vietnam

Vietnam
Cement
Corporation
(VNCC)

5,100,000

1999-2001

26

Bim Son Extension
Cement Plant (1.4
million ton / year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole plant

Thanh Hoa
Vietnam

Vietnam
Cement
Corporation
(VNCC)

5,500,000

2001-2002

27

Tam Diep
Cement Plant
(1.4 million ton / year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole plant

Ninh Binh
Vietnam

Vietnam
Cement
Corporation
(VNCC)

5,700,000

2002-2004

28

Song Gianh
Cement Plant
(1.4 million ton / year)

Fabrication of equipment, steel structures
Erection / installation equipment of whole plant

Quang
Binh
Vietnam

Midland
Construction
Corporation

5,500,000

2004-2006
LILAMA’S KEY REFERENCE PROJECTS
No

Project Name

29

Hai Phong Extension
Cement Plant
(1.4 million ton / year)

D.

Phu My Steel
Company

E.

Location

Fabrication of equipment, steel structures
Erection / installation equipment of whole
plant

Hai Phong
Vietnam

Hai Phong
Cement
Company

4,900,000

2004-2006

Erection works

Baria-Vung
Tau
Vietnam

Mien Nam
Steel
Company

1,420,000

2002-2003

Manufacture of steel structure and equipment
Tanks works
Mechanical and piping works
Electrical and Instrument Works

Quang
Ngai
Vietnam

Petro
Vietnam
(PV)

130,000,000

2006-2009

Manufacture of steel structure and equipment
Mechanical and piping works

Quang
Ngai
Vietnam

Petro
Vietnam
(PV)

Fabrication of equipment, steel structures
Erection / installation equipment of whole
plant

Thanh Hoa
Vietnam

Vietnam
Sugar
Corporation

4,500,000

1983-1986

Manufacture & erection of tanks and pipes

Tay Ninh
Vietnam

Sucreries
de Bourbon
- Tay Ninh
(SBT)

3,500,000

1996-1997

REFINERY PLANT

31

Dung Quat Refinery
Packages 2 & 3

32

Dung Quat Refinery
Packages 1 & 4

F.

OTHER PROJECT

33

Lam Son Sugar Plant
1500 TCD

34

Bourbon - Tay Ninh
Sugar Mill 8000 TCD

Scope of Work

Contract
Duration

STEEL PLANT

30

Contract
Amount
(USD)

Name of
Client
LILAMA’S KEY REFERENCE PROJECTS
No

Project Name

Scope of Work

Contract
Amount
(USD)

Location

Name of
Client

Contract
Duration

Nghe An
Vietnam

NAT&L Sugar
Company

3,200,000

1997-1998

35

Nghe An Tate & Lyle
Sugar Plant 6000 TCD

Design, supply, fabrication & erection of steel
structures
Design of electrical system
Design, supply, fabrication and erection of piping
system
Erection all equipment
Design, supply, fabrication & erection of tanks &
vessels

36

Vietnam-Deawoo Motor
Factory (VIDAMCO)

Civil Works
Equipment installation of whole plant

Hanoi
Vietnam

VietnamDeawoo
Motor Corp.

1,185,000

1996-1997

37

Vedan gourmet's
powder factory

Fabrication & erection works

Dong NaI
Vietnam

Vedan
Company

21,000,000

1993-1995

38

Daso gourmet's powder
factory

Fabrication & erection works

Song Be
Vietnam

Daso
Company

4,000,000

1994-1995

39

Ngoc Hoi Coca-cola
Factory

Fabrication & erection works

Ha Tay
Vietnam

Coca-cola
Factory

1,500,000

1995-1996

40

Innovation and
Modernization of Thai
Nguyen Steel Company

Fabrication & erection works

Thai Nguyen
Viet Nam

Thai Nguyen
Steel
Company

3,100,000

2000-2003

Ministry of
construction

81,320,000

2004-2006

Hanoi
Construction
Department

26,223,744

2008-2009

41

National Convention
Center

42

Hanoi Museum

Fabrication and installation of whole steel structure
and roof structure. Purchasing and installation of:
Diesel Generator package; Low voltage package;
Medium voltage package; Transformer package;
Lighting package; Elevated package; Roofing
Supply and installation of steel beam system, steel
roofing, drip-moulding and steel structure covering
roofing system.

Metri Tu Lem
Vietnam

Hanoi
Vietnam
LILAMA’S KEY REFERENCE PROJECTS
No

Project Name

Scope of Work

Location

Name of
Client

Contract
Amount
(USD)

Contract
Duration

43

Rang Dong, Bach Ho,
Su Tu Den, Dragon Oil
Fields

Fabrication, installation, periodical maintenance of
steel structures, piping for the oil rig projects

Off-shore
Vietnam

PVN

5,500,00

2002 - 2004

44

Bach Ho Oil Field and
Phu My 3 gas
conducting piping
system

Fabrication, installation, periodical maintenance,
upgrade of steel structures, installation of electrical
system for the oil rig projects

Off-shore
Vietnam

PVN

4,600,000

2005 - 2006

Oil Rigs at Various Oil
Fields

Fabrication, installation, repair of steel structures of
Bach Ho Oil Field, Truong Son oil rig.
Fabrication of Topside - Ca Ngu Vang Project
Repairing, anti-corrosion painting for block
modules - Dragon Oil Rig

Off-shore
Vietnam

PVN

4,000,000

2007

Repairing anti-corrosion painting, steel structures.
Piping fabrication & connection, equipment
installation, assisting to commissioning works

Off-shore
Vietnam

PVN

1,800,000

2008

Bach Ho and Dragon Oil
Fields

Reparation for piping system, roofing of turbine,
generator - Bach Ho Oil Rig
Fabrication, installation of celler deck - Dragon Oil
Rig
Installation of piping system and equipments Bach Ho Oil Rig

Off-shore
Vietnam

PVN

Bach Ho Oil Field

Fabrication of BK-14 oil rig - Bach Ho Oil Rig
Fabrication of infrastructure for rig BK-14/BT-7 Bach Ho Oil Rig
Installation, connection of skids (Electrical and E&I)
- Bach Ho Oil Rig

Off-shore
Vietnam

PVN

45

46

47

48

Phuong Dong oil rig at
Bach Ho Oil Field

2,200,000

2,700,000

2009

2010
LILAMA’S OVERSEAS PROJECT HIGHLIGHTS
Barh Thermal Power Plant, INDIA
Fabrication of more than 34.000 tons of steel structure and boiler equipment
Contract value: 50 million USD
Contract duration: 2007-2011

Power and Industrial Production Plants, IRAQ
Mechanical & electrical equipment installation
Contract duration: 1985-1988

LISCO Power Plant in Misurata, LIBYA
Mechanical works for Plant Refurbishment
Contract value: 2.8 million USD
Contract duration: 2009 to now

Kampot Cement Plant, CAMBODIA:
Mechanical equipment installation (6700 tons) and fabrication (1400 tons)
Contract value: 6.0 million USD
Contract duration: 2006 to 2007

Export to JAPAN
Air Heater, HRSG Non Pressured Parts, Boiler Non Pressured Parts in Japan
Fabrication 4,489.38 tons

Export to NEW ZEALAND
Steel pipe structures of Wind Turbines
Fabrication 3,755.20 tons

Export to EU and Various Asian Countries
Electrostatic Precipitators, Vessels, Shipbuilding,
Steel Structure and Equipment for Power & Cement Plants
Time: 2000 to now
LILAMA’S OVERSEAS PROJECT HIGHLIGHTS
Refurbishment mechanical works
at LISCO power plant in MISURATA, LIBYA
HSE AWARDS
CUSTOMERS’ RECOGNITION
THANK YOU!

More Related Content

Viewers also liked

Isgec company profile dsc
Isgec company profile dscIsgec company profile dsc
Isgec company profile dscAjay Jain
 
Company profile -Electrical 12
Company profile -Electrical  12Company profile -Electrical  12
Company profile -Electrical 12shaikh afroj
 
CHÍNH SÁCH PHÁT TRIỂN NĂNG LƯỢNG TÁI TẠO TẠI VIỆT NAM
CHÍNH SÁCH PHÁT TRIỂN NĂNG LƯỢNG TÁI TẠO TẠI VIỆT NAMCHÍNH SÁCH PHÁT TRIỂN NĂNG LƯỢNG TÁI TẠO TẠI VIỆT NAM
CHÍNH SÁCH PHÁT TRIỂN NĂNG LƯỢNG TÁI TẠO TẠI VIỆT NAMTuong Do
 
Schneider electric strategy presentation
Schneider electric strategy presentationSchneider electric strategy presentation
Schneider electric strategy presentationbkaur11
 
HYDROPOWER DEVELOPMENT IN NEPAL
HYDROPOWER DEVELOPMENT IN NEPALHYDROPOWER DEVELOPMENT IN NEPAL
HYDROPOWER DEVELOPMENT IN NEPALSaroj Upadhyay
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Er. Abhushan Neupane
 
Nepal - energy sector synopsis report 2010- wecs
Nepal - energy sector synopsis report 2010- wecsNepal - energy sector synopsis report 2010- wecs
Nepal - energy sector synopsis report 2010- wecsBhim Upadhyaya
 
Cambodia, Laos, Myanmar and Vietnam - where is the final frontier?
Cambodia, Laos, Myanmar and Vietnam - where is the final frontier?Cambodia, Laos, Myanmar and Vietnam - where is the final frontier?
Cambodia, Laos, Myanmar and Vietnam - where is the final frontier?Aleph Vietnam
 
Successful business in Vietnam - What you must know and do :
Successful business in Vietnam - What you must know and do :Successful business in Vietnam - What you must know and do :
Successful business in Vietnam - What you must know and do :Dr. Oliver Massmann
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationSagar Radadiya
 
Plan symbols
Plan symbolsPlan symbols
Plan symbolsgopaltry
 

Viewers also liked (13)

Isgec company profile dsc
Isgec company profile dscIsgec company profile dsc
Isgec company profile dsc
 
Company profile -Electrical 12
Company profile -Electrical  12Company profile -Electrical  12
Company profile -Electrical 12
 
CHÍNH SÁCH PHÁT TRIỂN NĂNG LƯỢNG TÁI TẠO TẠI VIỆT NAM
CHÍNH SÁCH PHÁT TRIỂN NĂNG LƯỢNG TÁI TẠO TẠI VIỆT NAMCHÍNH SÁCH PHÁT TRIỂN NĂNG LƯỢNG TÁI TẠO TẠI VIỆT NAM
CHÍNH SÁCH PHÁT TRIỂN NĂNG LƯỢNG TÁI TẠO TẠI VIỆT NAM
 
Schneider electric strategy presentation
Schneider electric strategy presentationSchneider electric strategy presentation
Schneider electric strategy presentation
 
CV-post in Linkedin
CV-post in LinkedinCV-post in Linkedin
CV-post in Linkedin
 
HYDROPOWER DEVELOPMENT IN NEPAL
HYDROPOWER DEVELOPMENT IN NEPALHYDROPOWER DEVELOPMENT IN NEPAL
HYDROPOWER DEVELOPMENT IN NEPAL
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
 
Nepal - energy sector synopsis report 2010- wecs
Nepal - energy sector synopsis report 2010- wecsNepal - energy sector synopsis report 2010- wecs
Nepal - energy sector synopsis report 2010- wecs
 
Cambodia, Laos, Myanmar and Vietnam - where is the final frontier?
Cambodia, Laos, Myanmar and Vietnam - where is the final frontier?Cambodia, Laos, Myanmar and Vietnam - where is the final frontier?
Cambodia, Laos, Myanmar and Vietnam - where is the final frontier?
 
Successful business in Vietnam - What you must know and do :
Successful business in Vietnam - What you must know and do :Successful business in Vietnam - What you must know and do :
Successful business in Vietnam - What you must know and do :
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 
Plan symbols
Plan symbolsPlan symbols
Plan symbols
 

Similar to LILAMA CORPORATION PRESENTATION

PTSC M&C Brochure (Apr 2018)
PTSC M&C Brochure (Apr 2018)PTSC M&C Brochure (Apr 2018)
PTSC M&C Brochure (Apr 2018)Tung Nguyen
 
Jps profile
Jps profileJps profile
Jps profileJps Gas
 
Eastern Steel Manufacturing Co.,Ltd
Eastern Steel Manufacturing Co.,LtdEastern Steel Manufacturing Co.,Ltd
Eastern Steel Manufacturing Co.,Ltdsulilee2
 
Eastern Steel Manufacturing Co.,Ltd
Eastern Steel Manufacturing Co.,LtdEastern Steel Manufacturing Co.,Ltd
Eastern Steel Manufacturing Co.,Ltdssuserf567d43
 
Longtaidi clad pipe-lined pipe-clad pipe fittings
Longtaidi clad pipe-lined pipe-clad pipe fittingsLongtaidi clad pipe-lined pipe-clad pipe fittings
Longtaidi clad pipe-lined pipe-clad pipe fittingsJason Liu
 
HMD COMPANY PROFILE Updated 24 oct 2014
HMD COMPANY PROFILE  Updated 24 oct 2014HMD COMPANY PROFILE  Updated 24 oct 2014
HMD COMPANY PROFILE Updated 24 oct 2014Muhammad Riaz Khan
 
Authorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment MenufacturerAuthorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment MenufacturerVijayEngineeringandM1
 
Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.VijayEngineeringandM1
 
Megra Rigging & Marine Co.,Ltd
Megra Rigging & Marine Co.,Ltd Megra Rigging & Marine Co.,Ltd
Megra Rigging & Marine Co.,Ltd SOE THIHA AUNG
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerVijayEngineeringandM1
 
Al tehene profile2021
Al tehene profile2021Al tehene profile2021
Al tehene profile2021LIWORTHXTATON
 
AOTC Company Catalogue
AOTC Company CatalogueAOTC Company Catalogue
AOTC Company CatalogueChris Dgama
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010kmccarthy1981
 
Keruigroup - Catalogo de Productos Eléctricos
Keruigroup - Catalogo de Productos EléctricosKeruigroup - Catalogo de Productos Eléctricos
Keruigroup - Catalogo de Productos EléctricosHerbert L Romero
 
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsChemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsIndiaMART InterMESH Limited
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profileJanakbhatt
 
COMPANY PROFILE PRESENTATION (3)
COMPANY PROFILE PRESENTATION (3)COMPANY PROFILE PRESENTATION (3)
COMPANY PROFILE PRESENTATION (3)Amkinah Group
 
Máy hàn cơ khí
Máy hàn cơ khíMáy hàn cơ khí
Máy hàn cơ khíLee Chương
 
AustChrome 2016 Capability Study 8pp Final
AustChrome 2016 Capability Study 8pp FinalAustChrome 2016 Capability Study 8pp Final
AustChrome 2016 Capability Study 8pp FinalVeronica Simeoni
 

Similar to LILAMA CORPORATION PRESENTATION (20)

PTSC M&C Brochure (Apr 2018)
PTSC M&C Brochure (Apr 2018)PTSC M&C Brochure (Apr 2018)
PTSC M&C Brochure (Apr 2018)
 
Jps profile
Jps profileJps profile
Jps profile
 
Eastern Steel Manufacturing Co.,Ltd
Eastern Steel Manufacturing Co.,LtdEastern Steel Manufacturing Co.,Ltd
Eastern Steel Manufacturing Co.,Ltd
 
Eastern Steel Manufacturing Co.,Ltd
Eastern Steel Manufacturing Co.,LtdEastern Steel Manufacturing Co.,Ltd
Eastern Steel Manufacturing Co.,Ltd
 
Longtaidi clad pipe-lined pipe-clad pipe fittings
Longtaidi clad pipe-lined pipe-clad pipe fittingsLongtaidi clad pipe-lined pipe-clad pipe fittings
Longtaidi clad pipe-lined pipe-clad pipe fittings
 
HMD COMPANY PROFILE Updated 24 oct 2014
HMD COMPANY PROFILE  Updated 24 oct 2014HMD COMPANY PROFILE  Updated 24 oct 2014
HMD COMPANY PROFILE Updated 24 oct 2014
 
Authorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment MenufacturerAuthorised Pumpset Original Equipment Menufacturer
Authorised Pumpset Original Equipment Menufacturer
 
Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.Masters Distributors of KBL Process Pumps.
Masters Distributors of KBL Process Pumps.
 
INTRODUCTION TO VEMC.pptx
INTRODUCTION TO VEMC.pptxINTRODUCTION TO VEMC.pptx
INTRODUCTION TO VEMC.pptx
 
Megra Rigging & Marine Co.,Ltd
Megra Rigging & Marine Co.,Ltd Megra Rigging & Marine Co.,Ltd
Megra Rigging & Marine Co.,Ltd
 
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized PartnerTrust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
Trust in Genuine Quality: VEMC, Your Kirloskar Authorized Partner
 
Al tehene profile2021
Al tehene profile2021Al tehene profile2021
Al tehene profile2021
 
AOTC Company Catalogue
AOTC Company CatalogueAOTC Company Catalogue
AOTC Company Catalogue
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
 
Keruigroup - Catalogo de Productos Eléctricos
Keruigroup - Catalogo de Productos EléctricosKeruigroup - Catalogo de Productos Eléctricos
Keruigroup - Catalogo de Productos Eléctricos
 
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & FabricatorsChemical Process Equipment and Services By Seven Star Engineers & Fabricators
Chemical Process Equipment and Services By Seven Star Engineers & Fabricators
 
Final power point teckno profile
Final power point teckno profileFinal power point teckno profile
Final power point teckno profile
 
COMPANY PROFILE PRESENTATION (3)
COMPANY PROFILE PRESENTATION (3)COMPANY PROFILE PRESENTATION (3)
COMPANY PROFILE PRESENTATION (3)
 
Máy hàn cơ khí
Máy hàn cơ khíMáy hàn cơ khí
Máy hàn cơ khí
 
AustChrome 2016 Capability Study 8pp Final
AustChrome 2016 Capability Study 8pp FinalAustChrome 2016 Capability Study 8pp Final
AustChrome 2016 Capability Study 8pp Final
 

Recently uploaded

Fiverr's Product Marketing Interview Assignment
Fiverr's Product Marketing Interview AssignmentFiverr's Product Marketing Interview Assignment
Fiverr's Product Marketing Interview AssignmentFarrel Brest
 
Influencer Marketing Power point presentation
Influencer Marketing  Power point presentationInfluencer Marketing  Power point presentation
Influencer Marketing Power point presentationdgtivemarketingagenc
 
The Evolution of Internet : How consumers use technology and its impact on th...
The Evolution of Internet : How consumers use technology and its impact on th...The Evolution of Internet : How consumers use technology and its impact on th...
The Evolution of Internet : How consumers use technology and its impact on th...sowmyrao14
 
(Generative) AI & Marketing: - Out of the Hype - Empowering the Marketing M...
(Generative) AI & Marketing: - Out of the Hype - Empowering the Marketing M...(Generative) AI & Marketing: - Out of the Hype - Empowering the Marketing M...
(Generative) AI & Marketing: - Out of the Hype - Empowering the Marketing M...Hugues Rey
 
What I learned from auditing over 1,000,000 websites - SERP Conf 2024 Patrick...
What I learned from auditing over 1,000,000 websites - SERP Conf 2024 Patrick...What I learned from auditing over 1,000,000 websites - SERP Conf 2024 Patrick...
What I learned from auditing over 1,000,000 websites - SERP Conf 2024 Patrick...Ahrefs
 
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon GarsideInbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garsiderobwhite630290
 
The power of SEO-driven market intelligence
The power of SEO-driven market intelligenceThe power of SEO-driven market intelligence
The power of SEO-driven market intelligenceHinde Lamrani
 
Michael Kors marketing assignment swot analysis
Michael Kors marketing assignment swot analysisMichael Kors marketing assignment swot analysis
Michael Kors marketing assignment swot analysisjunaid794917
 
Storyboards for my Final Major Project Video
Storyboards for my Final Major Project VideoStoryboards for my Final Major Project Video
Storyboards for my Final Major Project VideoSineadBidwell
 
2024's Top PPC Tactics: Triple Your Google Ads Local Leads
2024's Top PPC Tactics: Triple Your Google Ads Local Leads2024's Top PPC Tactics: Triple Your Google Ads Local Leads
2024's Top PPC Tactics: Triple Your Google Ads Local LeadsSearch Engine Journal
 
The 10 Most Influential CMO's Leading the Way of Success, 2024 (Final file) (...
The 10 Most Influential CMO's Leading the Way of Success, 2024 (Final file) (...The 10 Most Influential CMO's Leading the Way of Success, 2024 (Final file) (...
The 10 Most Influential CMO's Leading the Way of Success, 2024 (Final file) (...CIO Business World
 
Best digital marketing e-book form bignners
Best digital marketing e-book form bignnersBest digital marketing e-book form bignners
Best digital marketing e-book form bignnersmuntasibkhan58
 
Miss Immigrant USA Activity Pageant Program.pdf
Miss Immigrant USA Activity Pageant Program.pdfMiss Immigrant USA Activity Pageant Program.pdf
Miss Immigrant USA Activity Pageant Program.pdfMagdalena Kulisz
 
Codes and Conventions of Film Magazine Covers.pptx
Codes and Conventions of Film Magazine Covers.pptxCodes and Conventions of Film Magazine Covers.pptx
Codes and Conventions of Film Magazine Covers.pptxGeorgeCulica
 
Master the Art of Digital Recruitment in Asia.pdf
Master the Art of Digital Recruitment in Asia.pdfMaster the Art of Digital Recruitment in Asia.pdf
Master the Art of Digital Recruitment in Asia.pdfHigher Education Marketing
 
Talent Management for mba 3rd sem useful
Talent Management for mba 3rd sem usefulTalent Management for mba 3rd sem useful
Talent Management for mba 3rd sem usefulAtifaArbar
 
Digital Marketing Courses In Pune- school Of Internet Marketing
Digital Marketing Courses In Pune- school Of Internet MarketingDigital Marketing Courses In Pune- school Of Internet Marketing
Digital Marketing Courses In Pune- school Of Internet MarketingShauryaBadaya
 
The 10 Most Inspirational Leaders LEADING THE WAY TO SUCCESS, 2024
The 10 Most Inspirational Leaders LEADING THE WAY TO SUCCESS, 2024The 10 Most Inspirational Leaders LEADING THE WAY TO SUCCESS, 2024
The 10 Most Inspirational Leaders LEADING THE WAY TO SUCCESS, 2024CIO Business World
 
Introduction to marketing Management Notes
Introduction to marketing Management NotesIntroduction to marketing Management Notes
Introduction to marketing Management NotesKiranTiwari42
 
McDonald's: A Journey Through Time (PPT)
McDonald's: A Journey Through Time (PPT)McDonald's: A Journey Through Time (PPT)
McDonald's: A Journey Through Time (PPT)DEVARAJV16
 

Recently uploaded (20)

Fiverr's Product Marketing Interview Assignment
Fiverr's Product Marketing Interview AssignmentFiverr's Product Marketing Interview Assignment
Fiverr's Product Marketing Interview Assignment
 
Influencer Marketing Power point presentation
Influencer Marketing  Power point presentationInfluencer Marketing  Power point presentation
Influencer Marketing Power point presentation
 
The Evolution of Internet : How consumers use technology and its impact on th...
The Evolution of Internet : How consumers use technology and its impact on th...The Evolution of Internet : How consumers use technology and its impact on th...
The Evolution of Internet : How consumers use technology and its impact on th...
 
(Generative) AI & Marketing: - Out of the Hype - Empowering the Marketing M...
(Generative) AI & Marketing: - Out of the Hype - Empowering the Marketing M...(Generative) AI & Marketing: - Out of the Hype - Empowering the Marketing M...
(Generative) AI & Marketing: - Out of the Hype - Empowering the Marketing M...
 
What I learned from auditing over 1,000,000 websites - SERP Conf 2024 Patrick...
What I learned from auditing over 1,000,000 websites - SERP Conf 2024 Patrick...What I learned from auditing over 1,000,000 websites - SERP Conf 2024 Patrick...
What I learned from auditing over 1,000,000 websites - SERP Conf 2024 Patrick...
 
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon GarsideInbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
Inbound Marekting 2.0 - The Paradigm Shift in Marketing | Axon Garside
 
The power of SEO-driven market intelligence
The power of SEO-driven market intelligenceThe power of SEO-driven market intelligence
The power of SEO-driven market intelligence
 
Michael Kors marketing assignment swot analysis
Michael Kors marketing assignment swot analysisMichael Kors marketing assignment swot analysis
Michael Kors marketing assignment swot analysis
 
Storyboards for my Final Major Project Video
Storyboards for my Final Major Project VideoStoryboards for my Final Major Project Video
Storyboards for my Final Major Project Video
 
2024's Top PPC Tactics: Triple Your Google Ads Local Leads
2024's Top PPC Tactics: Triple Your Google Ads Local Leads2024's Top PPC Tactics: Triple Your Google Ads Local Leads
2024's Top PPC Tactics: Triple Your Google Ads Local Leads
 
The 10 Most Influential CMO's Leading the Way of Success, 2024 (Final file) (...
The 10 Most Influential CMO's Leading the Way of Success, 2024 (Final file) (...The 10 Most Influential CMO's Leading the Way of Success, 2024 (Final file) (...
The 10 Most Influential CMO's Leading the Way of Success, 2024 (Final file) (...
 
Best digital marketing e-book form bignners
Best digital marketing e-book form bignnersBest digital marketing e-book form bignners
Best digital marketing e-book form bignners
 
Miss Immigrant USA Activity Pageant Program.pdf
Miss Immigrant USA Activity Pageant Program.pdfMiss Immigrant USA Activity Pageant Program.pdf
Miss Immigrant USA Activity Pageant Program.pdf
 
Codes and Conventions of Film Magazine Covers.pptx
Codes and Conventions of Film Magazine Covers.pptxCodes and Conventions of Film Magazine Covers.pptx
Codes and Conventions of Film Magazine Covers.pptx
 
Master the Art of Digital Recruitment in Asia.pdf
Master the Art of Digital Recruitment in Asia.pdfMaster the Art of Digital Recruitment in Asia.pdf
Master the Art of Digital Recruitment in Asia.pdf
 
Talent Management for mba 3rd sem useful
Talent Management for mba 3rd sem usefulTalent Management for mba 3rd sem useful
Talent Management for mba 3rd sem useful
 
Digital Marketing Courses In Pune- school Of Internet Marketing
Digital Marketing Courses In Pune- school Of Internet MarketingDigital Marketing Courses In Pune- school Of Internet Marketing
Digital Marketing Courses In Pune- school Of Internet Marketing
 
The 10 Most Inspirational Leaders LEADING THE WAY TO SUCCESS, 2024
The 10 Most Inspirational Leaders LEADING THE WAY TO SUCCESS, 2024The 10 Most Inspirational Leaders LEADING THE WAY TO SUCCESS, 2024
The 10 Most Inspirational Leaders LEADING THE WAY TO SUCCESS, 2024
 
Introduction to marketing Management Notes
Introduction to marketing Management NotesIntroduction to marketing Management Notes
Introduction to marketing Management Notes
 
McDonald's: A Journey Through Time (PPT)
McDonald's: A Journey Through Time (PPT)McDonald's: A Journey Through Time (PPT)
McDonald's: A Journey Through Time (PPT)
 

LILAMA CORPORATION PRESENTATION

  • 1. LILAMA CORPORATION VIETNAM MACHINERY INSTALLATION CORPORATION Address: 124 Minh Khai Street – Hanoi - Vietnam Tel: (+84) 438633067/ (+84) 438632059 – Fax: (+84) 438638104 Website: www.lilama.com.vn
  • 2. LILAMA PRESENTATION TABLE OF CONTENTS • Company History and Basic Information • LILAMA's Resources • LILAMA as Vietnam’s Dominating Installation Contractor • LILAMA as EPC Contractor • References
  • 3. COMPANY HISTORY • LILAMA - Vietnam Machinery Installation Corporation  Established in 1960 as a state-owned company.  Currently a limited company. • Vietnam’s Leading Fabrication & Installation Contractor  Dominant in Vietnam’s market for installation and fabrication works in industrial projects.  Expanding activities to international markets such as Libya, Cambodia, Middle East, India and Japan. • Entered successfully into EPC Projects in Vietnam  EPC Contracting since 2000.  Power Generation: Coal-fired and Gas-fired Power Plants.  Building Material Manufacturing: Cement Plants.
  • 4. LILAMA - BASIC INFORMATION • Services provided with over 25,000 permanent employees  Engineering, Procurement, Fabrication, Installation and Maintenance Services.  Power generation, oil & gas, chemical, fertilizer, cement plants and municipal facilities construction projects. • 2011 audited consolidated turnover: US$ 796 million. • Strongest Vietnam’s EPC , Mechanical & Electrical Contractor.
  • 5. LILAMA’S CAPABILITIES o Long-term experience with installation and fabrication works for all kinds of industrial projects including power generation, oil & gas and other industries. o Extensive resources with high qualification proven through numerous executed projects. o Flexibility, creativity and determination to meet international market requirements in terms of competitiveness, quality and safety standards.
  • 6. ORGANIZATION CHART MANAGEMENT BOARD CHAIRMAN: MR. NGUYEN DINH HAI PRESIDENT & CEO MR. LE VAN TUAN VICE PRESIDENT MR. TRAN DINH DAI CORPORATION DEPARTMENTS SUBSIDIARIES VICE PRESIDENT MR. VU VAN DINH WELDING TECHNOLOGY INSTITUTE VICE PRESIDENT MR. PHAM QUANG NHAN PROJECT MANAGEMENT BOARDS ASSOCIATED COMPANIES VICE PRESIDENT MR. NGO QUANG QUY REPRESENTATIVE OFFICES AND BRANCHES TRAINING COLLEDGES
  • 7. LILAMA’S ORGANIZATION CHART LILAMA’S SUBSIDIARIES 12345678910 11 12 - LILAMA 3 JSC LILAMA 5 JSC LILAMA 7 JSC LILAMA 10 JSC LILAMA 18 JSC LILAMA 45.1 JSC LILAMA 45.3 JSC LILAMA 45.4 JSC LILAMA 69.1 JSC LILAMA 69.2 JSC LILAMA 69.3 JSC LILAMA HA NOI JSC 13 - LILAMA HAI PHONG CO. 14 - LILAMA NINH BINH JSC 15 - LILAMA M & E INSTALLATION & TESTING 16 - VIFA COATING JSC 17 - LILAMA URBAN DEVELOPMENT JSC 18 - LHT CONSULTANT JSC 19 - SONG ONG HYDRO POWER JSC 20 - SONG VANG HYDRO POWER JSC
  • 8. LILAMA’s Subsidiaries Located All Over Vietnam HANOI PHU THO LILAMA 10 LILAMA HANOI LILAMA TESTING LHT CONSULTANT LILAMA URBAN DEVELOPMENT LILAMA 3 HAI DUONG NINH BINH LILAMA 69-3 LILAMA EMC HAI PHONG BAC NINH LILAMA 69-1 THANH HOA LILAMA 5 LILAMA 69-2 LISEMCO VIFA COATING DA NANG LILAMA 7 SONG VANG HYDRO POWER HO CHI MINH CITY LILAMA 18 LILAMA 45-1 QUANG NGAI LILAMA 45-3 NINH THUAN SONG ONG HYDRO POWER DONG NAI LILAMA 45-4 8 of 98
  • 9. LILAMA REPRESENTATIVES AND TRAINNING COLLEDGES TRAINING COLLEGES • LILAMA TECHNICAL AND TECHNOLOGY COLLEGE 1 • LILAMA TECHNICAL AND TECHNOLOGY COLLEGE 2 BRANCH & REPRESENTATIVE OFFICES • REPRESENTATIVE OFFICE IN HO CHI MINH CITY • REPRESENTATIVE OFFICE IN DA NANG CITY • CONSTRUCTION BRANCH OFFICE IN HAIDUONG PROVINCE • CONSULTING BRANCH OFFICE IN HANOI CITY
  • 10. HSE POLICY As LILAMA Corporation, we commit ourselves to continuously improve our health, safety and environment (HSE) performance with ultimate goal of: NO ACCIDENT NO INJURY NO HARM TO ENVIRONMENT We aim to improve our HSE management system by:  REGULAR TRAINING AND IMPROVING STAFF’S AWARENESS ON HSE  CONTINUOUS MONITORING, CHECKING AND ASSESSING HSE PERFORMANCE AND TAKING IMMEDIATE ACTIONS FOR RECTIFICATIONS WHENEVER NECESSARY  PROMOTING ALL HSE ACHIEVEMENTS AS WELL AS INNOVATIONS AND INITIATIVES ON HSE ENHANCEMENTS.
  • 11. QUALITY POLICY In order to meet the ever increasing demands for quality from our customers, we have the following commitments:  WE WILL ENSURE THAT ALL CUSTOMERS’ REQUIREMENTS AS WELL AS THE APPROPRIATE STATUTORY AND REGULATORY REQUIREMENTS ARE MET.  WE WILL APPLY THE MOST UP-TO-DATE ADVANCES OF TECHNOLOGY AND SCIENCES IN THE PRODUCTION FIELD AND CONSTRUCTION SITE IN ORDER TO ENSURE THE REQUIRED QUALITY OF MECHANICAL PRODUCTS AND CONSTRUCTION SERVICES.  WE WILL PROVIDE ALL RESOURCES NECESSARY FOR IMPLEMENTING, MAINTAINING THE QUALITY MANAGEMENT SYSTEM AND CONTINUOUSLY IMPROVING ITS EFFECTIVENESS BY ANNUALLY REVIEWING, ASSESSING AND ESTABLISHING QUALITY OBJECTIVES.
  • 13. LILAMA’S HEAD OFFICE QA/QC MANAGEMENT ACTIVITIES 1 - Developing and Control of General Work Procedures & Quality Assurance (QA) Documents. 2 - Supporting for Site & Shop Quality Control (QC) activities. 3 - Internal QC Audit activities. 4 - Activities to improve production quality of entire Corporation.
  • 14. LILAMA’S QUALIFIED PROCEDURES 184 Welding Procedure Specifications (WPS) and Procedure Qualification Records (PQR), including: • 47 WPSs qualified in compliance with ASME IX / ASME B31.3 & B31.1 for Piping. • 12 WPSs qualified in compliance with API 1104 for Pipeline. • 24 WPSs qualified in compliance with ASME IX / ASME VIII for Pressure Vessels (with Third Party approved). • 22 WPSs qualified in compliance with AWS D1.1 for Steel Structures. • 21 WPSs qualified in compliance with EN 288-3 (BS EN ISO 15614-1) for Steel Structures. • 58 WPSs qualified in compliance with RUSSIA standard.
  • 21. MAIN CLIENTS & SUPPLIERS MAIN VIETNAMESE CLIENTS COUNTRY Petro Vietnam (PVN), Electricity of Vietnam (EVN), Vietnam Coal and Mineral Industries Group (VINACOMIN), Vietnam Cement Corporation, Vietnam Steel Corporation VIETNAM MAIN FOREIGN CLIENTS AND SUPPLIERS Foster Wheeler USA Siemens, Polysius, Fichtner GERMANY Mitsubishi, Toshiba, Hitachi, Marubeni, Sumitomo JAPAN Technip, Alstom FRANCE Hyundai, Doosan KOREA ABB SWEDEN Shanghai Electric, Donfang CHINA FLSmidth DENMARK Poyry Energy SWITZERLAND CTCI TAIWAN
  • 22. LILAMA PRESENTATION TABLE OF CONTENTS • Company History and Basic Information • LILAMA's Resources • LILAMA as Vietnam’s Dominating Installation Contractor • LILAMA as EPC Contractor • References
  • 23. HUMAN RESOURCES LILAMA’s engineers and workers working at 6.5 MTPY Dung Quat Refinery Project
  • 24. HUMAN RESOURCES Senior Managers 76 Middle management staff  Procurement staff  Mechanical engineers  Electrical and C&I engineers  Civil engineers  Other engineers and staff 2,031 106 901 445 404 175 Skilled workers 21,487  Welding  Piping Testing  Painting  Equipment Erection  Heavy Lifting  Insulation and Lagging  Mechanical Fabrication  Electrical and C&I  Civil Works  Other Disciplines TOTAL PERMANENT EMPLOYEES 2,875 2,447 445 712 4,976 570 1,379 2,953 2,442 685 2,003 24,294
  • 25. CONSTRUCTION EQUIPMENTS Cranes operating at US$ 270 million National Convention Centre Project
  • 26. CONSTRUCTION EQUIPMENT LIST NO CONSTRUCTION EQUIPMENT MANUFACTURER QUAN'TY SPECIFICATION A. HOISTING AND LIFTING MEANS 1 CRAWLER CRANE CC-2800 GERMANY 01 MAX. LIFTING LOAD 600 TONNES 2 CRAWLER CRANE LIEBHERR LB1280-280 GERMANY 01 MAX. LIFTING LOAD 280 TONNES 3 CRAWLER CRANE KOBELCO CKE-2500 JAPAN 05 MAX. LIFTING LOAD 250 TONNES 4 CRAWLER CRANE KOBELCO LB-7150S JAPAN 03 MAX. LIFTING LOAD 150 TONNES USA, FRANCE, JAPAN, GERMANY… 99 MAX. LIFTING LOAD FROM 10 TONNES TO 136 TONNES 5 CRAWLER CRANE, MOBILE CRANE 6 TOWER CRANE RUSSIA 04 MAX. LIFTING LOAD 30 TONNES 7 GANTRY CRANE KMK-200 RUSSIA 07 MAX. LIFTING LOAD FROM 8 TO 50 TONNES, SPAN FROM 10M TO 50M 8 DOUBLE BEAM BRIDGE CRANE CT10-23,4 RUSSIA-VIETNAM 02 MAX. LIFTING LOAD FROM 8 TONNES, SPAN 42M 9 DOUBLE BEAM BRIDGE CRANE AW051091 B1 TAIWAN 01 MAX. LIFTING LOAD FROM 8 TONNES, SPAN 42M 10 SINGLE BEAM BRIDGE CRANE TЭ-320 RUSSIA 03 MAX. LIFTING LOAD FROM 8 TONNES, SPAN 42M
  • 27. CONSTRUCTION EQUIPMENT LIST NO CONSTRUCTION EQUIPMENT MANUFACTURER QUAN'TY SPECIFICATION RUSSIA, KOREA, BELARUS, FRANCE, ITALY, JAPAN, SWEDEN… 112 LOAD FROM 8 TO 66 TONS, POWER 150 HP TO 525 HP B. MOTORIZED VEHICLES 1 SEMI-TRAILER TRUCK, TYRE WHEELED TRACTOR, CRAWLER TRACTOR, LORRY, DUMP TRUCK, TRUCK WITH HYDRAULIC CRANE… 2 SPECIALIZED TRAILEARS RUSSIA, KOREA, FRANCE, JAPAN.. 10 CARRYING LOAD FROM 20 TONNES TO 120 TONNES 3 SPECIALIZED VEHICLES (PETROL TANKER, FIRE ENGINE, LADDER MOUNTING, FORK LIFT…) RUSSIA, JAPAN, KOREA, FRANCE… 27 CAPACITY 4200L, LOAD FROM 3 TONNES TO 10 TONNES.. VIETNAM 03 CARRYING LOAD FROM 70 TONNES TO 220 TONNES C. SHIPS 1 SHIP, AUTOMOBILE BARGE
  • 28. CONSTRUCTION EQUIPMENT LIST NO CONSTRUCTION EQUIPMENT MANUFACTURER QUAN'TY SPECIFICATION 864 WELDING ELECTRIC CURRENT FROM 140 A TO 2400A 320 WELDING ELECTRIC CURRENT 140A TO 2600A SWEDEN, USA, RUSSIA, FRANCE… 74 WELDING ELECTRIC CURRENT FROM 300A TO 1000A, WELDING DIAMETER FROM F25 TO F5000 RUSSIA, SWEDEN, JAPAN, USA… 53 WELDING ELECTRIC CURRENT FROM 170A TO 500A CZECH, RUSSIA, USA… 52 POWER FROM 30 TO 400 KW D. FACILITIES FOR WELDING AND CUTTING MEALS 1 2 3 RECTIFYING WELDING MACHINE, WELDING MACHINE, TIG WELDING MACHINE, MIG WELDING MACHINE, DIRECT CURRENT… ALTENATIVE CURENT WELDING MACHINE, PORTABLE WELDING MACHINE… AUTOMATIC VESSEL WELDING SYSTEM ESAB LAE1000 + WELDING TRACTOR A2 + BEAM WELDING SET MKR 300, AUTOMATIC VESSEL WELDING SYSTEM AGW-II, BEAM AUTOMATIC WELDING MACHINE MEGSAFPR3/SUBAR C3, AUTOMATIC WELDING TRACTOR, ALLUMINIUM WELDING MACHINE… SWEDEN, FRANCE, RUSSIA, USA, JAPAN, FILAND, ITALY… FILAND, FRANCE, RUSSIA, USA, JAPAN… E. GENERATOR 1 WELDING GENERATOR 2 POWER GENERATOR
  • 29. CONSTRUCTION EQUIPMENT LIST NO CONSTRUCTION EQUIPMENT LIST MANUFACTURER QUAN'TY SPECIFICATION 1 PLASMA CUTTING MACHINE, MULTINOZZLE AUTOMATIC CUTTING MACHINE, JAPAN, SWEDEN, ACETYLEN AUTOMATIC CUTTING INDIA… MACHINE, … 108 CUTTING THICKNESS FROM 60 MM TO150 MM 2 LATHE, DRILLING MACHINE, MILLING MACHINE, PLANING MACHINE, MACHINE HAMMER, BORING MACHINE, FLANGING MACHINE, HYDRAULIC PRESS MACHINE, SHAPED STEEL BENDING ROLLER, PIPE ROLLER… CHINA, RUSSIA, JAPAN, ITALY, GERMANY… 371 RUSSIA, JAPAN,USA… 108 PULLING FORCE FROM 0.5 TONNES TO 18 TONNES. LIFTING LOAD UP TO 800TONS RUSSIA, BUNGARIA... 61 CAPACITY 4,5 TO 13KW, WATER FLOW 0,22M3/H TO 120M3/H F. MACHINE TOOLS G. LIFTING MEANS 1 ELECTRICAL WINCH, HYDRAULIC JACK… H. SPECIAL PUMPS 1 CENTRIFUGAL PUMP, DIESEL PUMP, HIGH PRESSURE…
  • 30. CONSTRUCTION EQUIPMENT LIST NO CONSTRUCTION EQUIPMENT LIST MANUFACTURER QUAN'TY SPECIFICATION SWEDEN, RUSSIA, USA JAPAN… 75 AIR FLOW 30 M3/H TO 1200M3/H, PRESSURE 6KG/CM2 TO 9KG/CM2 RUSSIA 47 USA, JAPAN, GERMANY, RUSSIA… 132 J. AIR COMPRESSORS 1 AIR COMPRESSOR K. SPECIALIZED MACHINES 1 MOBILE OXYGEN PRODUCING UNIT, STATIONARY OXYGEN PRODUCING UNIT, BOTTLE REPAIRING AND TESTING UNIT, CENTRIFUGAL OIL REFINER, PRESSURE OIL REFINER , SYNCHRONOUS TRANSFORMER... L. TESTING EQUIPMENT & INSTRUMENTATIONS 1 MAGNETIC WELD DEFECT DETECTOR, ULTRASONIC WELD DEFECT DETECTOR, LOW FREQUENCY GENERATOR, HIGH VOLTAGE TESTER, X-RAY RADIOGRAPH, ELECTRONIC THEODOLITE, LEVELING DEVICE, COAT LAYER THICKNESS TESTING DEVICE POSITECTOR…
  • 31. LILAMA’S FABRICATION FACILITIES 30,000 TPY Haiphong Fabrication and Ship Building Facility
  • 32. LILAMA’S FABRICATION FACILITIES LILAMA’s workers fabricating steel structures at factory yard
  • 33. LILAMA’S TYPICAL FABRICATION FACILITIES LILAMA HAIPHONG COMPANY Total area: Total Capacity: 421,075 sqm 70,000 TPY - Enclosed Shop Area: 97,000 sqm - Fabrication and Assembly Area: 304,372 sqm - Office Area: 19,748 sqm - Location: Hai Phong city, 140 km from Noi Bai International Airport LILAMA 18 COMPANY Total area: Total Capacity: 68,000 sqm 16,000 TPY - Enclosed Shop Area: 8,000 sqm - Fabrication and Assembly Area: 59,584 sqm - Office Area: 416 sqm - Location: Ben Cat district, Binh Duong province, 75 km from Tan Son Nhat International Airport LILAMA 45-4 COMPANY Total area: Total capacity: 5,000 sqm 10,000 TPY - Enclosed Shop Area: 1,000 sqm - Fabrication and Assembly Area: 3,500 sqm - Office Area: 500 sqm - Location: Bien Hoa Industrial Zone, Dong Nai province, 70 km from Tan Son Nhat International Airport All other LILAMA’s subsidiaries have their own fabrication facilities from large to small scales with the total area of around 950,000 sqm. Total capacity of all LILAMA’s facilities for steel structure and equipment fabrication is around 200,000 tons per year (TPY).
  • 34. FABRICATION & INSTALLATION WORKS National Convention Centre Project
  • 35. FABRICATION & INSTALLATION WORKS Da Nang Airport Project
  • 36. FABRICATION & INSTALLATION WORKS Fabrication and Installation of Stackers and Re-claimers for 1,200 MW Vung Ang 1 Coal Fired Power Plant
  • 37. FABRICATION & INSTALLATION WORKS Dinh Vu Fibre Manufacturing Plant ơ
  • 38. FABRICATION & INSTALLATION WORKS Dinh Vu Fibre Manufacturing Plant
  • 39. FABRICATION & INSTALLATION WORKS Fabrication of Oil Rigs
  • 40. LILAMA PRESENTATION TABLE OF CONTENTS • Company History and Basic Information • LILAMA's Resources • LILAMA as Vietnam’s Dominating Installation Contractor • LILAMA as EPC Contractor • References
  • 41. INSTALLATION WORKS BY LILAMA Installing Isolated Phase Bus for 450 MW Nhon Trach 1 Combined Cycle Power Project
  • 42. INSTALLATION WORKS BY LILAMA Installing 320 ton steam drum to the elevation of 73m in 2x600MW Vung Ang 1 Coal Fired Thermal Power Project
  • 43. INSTALLATION WORKS BY LILAMA Installing 1,000 ton generator rotor in 6x400MW Son La Hydropower Project
  • 44. 6.5 MTPY DUNG QUAT REFINERY PROJECT INSTALLED BY LILAMA
  • 45. INSTALLATION WORKS BY LILAMA Installing spherical tank in 6,5 MTPY Dung Quat Refinery Project
  • 46. 6.5 MTPY DUNG QUAT REFINERY PROJECT INSTALLED BY LILAMA Plant Completed
  • 47. LILAMA PRESENTATION TABLE OF CONTENTS • Company History and Basic Information • LILAMA's Resources • LILAMA as Vietnam’s Dominating Installation Contractor • LILAMA as EPC Contractor • References
  • 48. LILAMA AS EPC CONTRACTOR 2x600MW Vung Ang 1 Thermal Power Plant
  • 49. LILAMA AS EPC CONTRACTOR 2x600MW Vung Ang 1 Thermal Power Plant
  • 50. LILAMA AS EPC CONTRACTOR 1 MTPY Song Thao Cement Plant
  • 51. EPC PROJECT BY LILAMA 2X750MW CA MAU 1&2 COMBINED CYCLE POWER PLANT
  • 52. LILAMA PRESENTATION TABLE OF CONTENTS • Company History and Basic Information • LILAMA's Resources • LILAMA as Vietnam’s Dominating Installation Contractor • LILAMA as EPC Contractor • References
  • 53. LILAMA’S KEY REFERENCE PROJECTS No Project Name Scope of Work Contract Amount (USD) Contract Duration VINACOAL 106,000,000 2002-2004 Quang Ninh Vietnam Electricity of VietNam (EVN) 267,000,000 2003-2006 Vung Tau Vietnam Electricity of VietNam (EVN) 98,778,000 &134,364,000 EURO 2002-2004 Location Name of Client Lang Son Vietnam A. EPC CONTRACTOR OR CONSORTIUM MEMBER 1 Na Duong Thermal Power Plant 2x50MW EPC Contractor in Consortium Marubeni-LILAMA 2 Uong Bi Extension I Thermal Power Plant 1x300MW EPC Contractor 3 Phu My 4 Combine Cycle Power Plant 450MW EPC Contractor in Consortium AlstomMarubeni-LILAMA 4 Ca Mau 1&2 Combined Cycle Power Plant 2x750 MW EPC Contractor Ca Mau Vietnam Petro Vietnam (PV) 660,000,000 2003-2008 5 Nhon Trach I Combined Cycle Power Plant 450 MW EPC Contractor Dong Nai Vietnam Petro Vietnam (PV) 300,000,000 2006-2008 6 Nhon Trach II Combined Cycle Power Plant 750 MW EPC Contractor Dong Nai Vietnam Petro Vietnam (PV) 524,000,000 2009-2012 7 Vung Ang I Coal Fired Power Plant 2x600 MW EPC Contractor Ha Tinh Vietnam Petro Vietnam (PV) 1,200,000,000 2009-2013
  • 54. LILAMA’S KEY REFERENCE PROJECTS Contract Amount (USD) Location Name of Client EPC Contractor Phu Tho Vietnam Song Thao Cement Company 66,966,000 2005-2006 EPC Contractor Ho Chi Minh City Vietnam Vietnam Airline 21,120,000 2009-2010 Tri An Hydro Power Plant (4x100MW) Fabricating steel structures and equipment Installation of mechanical equipment Electrical and instrumentation erection works Dong Nai Vietnam Electricity of Vietnam (EVN) 6,500,000 1985-1992 11 Hoa Binh Hydro Power Plant (8x240MW) Fabricating steel structures and equipment Installation of mechanical equipment Electrical and instrumentation erection works Hoa Binh Vietnam Electricity of Vietnam (EVN) 40,000,000 1982-1994 12 Son La Hydro Power Plant (6x400MW) Fabricating steel structures and equipment Installation of mechanical equipment Electrical and instrumentation erection works Son La Vietnam Electricity of Vietnam (EVN) 70,000,000 2005-2012 13 Pha Lai I Thermal Power Plant (4x110MW) Fabrication of pipes, stack, steel structures, heaters, dryers and equipment Installation of mechanical equipment, pipelines Electrical and instrumentation erection works Hai Duong Vietnam Electricity of Vietnam (EVN) 13,000,000 1978-1984 14 Yaly Hydro Power Plant (4x180MW) Fabricating steel structures and equipment Installation of mechanical equipment Electrical and instrumentation erection works Gia Lai Vietnam Electricity of Vietnam (EVN) 7,000,000 1995-1997 No Project Name 8 Song Thao Cement Plant (2500 ton clinker/ day) 9 Hangar A75 B. Contract Duration POWER PLANTS 10 Scope of Work
  • 55. LILAMA’S KEY REFERENCE PROJECTS Contract Amount (USD) Location Name of Client Hai Duong Vietnam HYUNDAI Corp. 10,500,000 1999-2002 India Indian Company NTPC 50.705.000 2007-2011 Fabrication of heat recovery boiler components Erection of mechanical equipment Electrical and instrumentation erection works Baria-Vung Tau Vietnam Consortium MitsuiNEMSiemens 4,000,000 1996-1997 PhuMy I Combine Cycle Thermal Power Plant 1090 MW Fabrication & erection of equipment (Turbine, Boiler, steel structure...), Electrical and instrumentation erection works Baria-Vung Tau Vietnam Electricity of VietNam (EVN) 10,000,000 1999-2001 19 O Mon I Combined Cycle Power Plant 330 MW Fabrication & erection of equipment (Turbine, Boiler, steel structure...), Electrical and instrumentation erection works Can Tho Vietnam Electricity of VietNam (EVN) 18,500,000 2006-2007 C. CEMENT PLANT 20 Hoang Thach No. 2 Cement Plant (1.4 million ton per year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Hai Duong Vietnam Vietnam Cement Corporation (VNCC) 10,000,000 1994-1995 21 Chinfon Cement Plant (1.4 million ton / year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Hai Phong Vietnam Chinfon Cement Company 5,500,000 1995-1996 No Project Name Scope of Work 15 Pha Lai II Thermal Power Plant (2x300MW) Erection of mechanical equipment Electrical and instrumentation erection works 16 Barh STPP India (3x660MW) Fabrication of boiler structures 17 Ba Ria Add - On Power Plant 18 Contract Duration
  • 56. LILAMA’S KEY REFERENCE PROJECTS No Project Name Scope of Work Location Name of Client Contract Amount (USD) Contract Duration 22 Hon Chong Cement Plant (1.4 million ton / year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Kien Giang Vietnam Vietnam Cement Corporation (VNCC) 5,000,000 1996 23 But Son Cement Plant (1.4 million ton / year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Thanh Hoa Vietnam Vietnam Cement Corporation (VNCC) 11,000,000 1996-1997 24 Nghi Son Cement Plant (2.0 million ton / year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Thanh Hoa Vietnam Vietnam Cement Corporation (VNCC) 20,300,000 1998-2000 25 Hoang Mai Cement Plant (1.4 million ton / year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Nghe An Vietnam Vietnam Cement Corporation (VNCC) 5,100,000 1999-2001 26 Bim Son Extension Cement Plant (1.4 million ton / year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Thanh Hoa Vietnam Vietnam Cement Corporation (VNCC) 5,500,000 2001-2002 27 Tam Diep Cement Plant (1.4 million ton / year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Ninh Binh Vietnam Vietnam Cement Corporation (VNCC) 5,700,000 2002-2004 28 Song Gianh Cement Plant (1.4 million ton / year) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Quang Binh Vietnam Midland Construction Corporation 5,500,000 2004-2006
  • 57. LILAMA’S KEY REFERENCE PROJECTS No Project Name 29 Hai Phong Extension Cement Plant (1.4 million ton / year) D. Phu My Steel Company E. Location Fabrication of equipment, steel structures Erection / installation equipment of whole plant Hai Phong Vietnam Hai Phong Cement Company 4,900,000 2004-2006 Erection works Baria-Vung Tau Vietnam Mien Nam Steel Company 1,420,000 2002-2003 Manufacture of steel structure and equipment Tanks works Mechanical and piping works Electrical and Instrument Works Quang Ngai Vietnam Petro Vietnam (PV) 130,000,000 2006-2009 Manufacture of steel structure and equipment Mechanical and piping works Quang Ngai Vietnam Petro Vietnam (PV) Fabrication of equipment, steel structures Erection / installation equipment of whole plant Thanh Hoa Vietnam Vietnam Sugar Corporation 4,500,000 1983-1986 Manufacture & erection of tanks and pipes Tay Ninh Vietnam Sucreries de Bourbon - Tay Ninh (SBT) 3,500,000 1996-1997 REFINERY PLANT 31 Dung Quat Refinery Packages 2 & 3 32 Dung Quat Refinery Packages 1 & 4 F. OTHER PROJECT 33 Lam Son Sugar Plant 1500 TCD 34 Bourbon - Tay Ninh Sugar Mill 8000 TCD Scope of Work Contract Duration STEEL PLANT 30 Contract Amount (USD) Name of Client
  • 58. LILAMA’S KEY REFERENCE PROJECTS No Project Name Scope of Work Contract Amount (USD) Location Name of Client Contract Duration Nghe An Vietnam NAT&L Sugar Company 3,200,000 1997-1998 35 Nghe An Tate & Lyle Sugar Plant 6000 TCD Design, supply, fabrication & erection of steel structures Design of electrical system Design, supply, fabrication and erection of piping system Erection all equipment Design, supply, fabrication & erection of tanks & vessels 36 Vietnam-Deawoo Motor Factory (VIDAMCO) Civil Works Equipment installation of whole plant Hanoi Vietnam VietnamDeawoo Motor Corp. 1,185,000 1996-1997 37 Vedan gourmet's powder factory Fabrication & erection works Dong NaI Vietnam Vedan Company 21,000,000 1993-1995 38 Daso gourmet's powder factory Fabrication & erection works Song Be Vietnam Daso Company 4,000,000 1994-1995 39 Ngoc Hoi Coca-cola Factory Fabrication & erection works Ha Tay Vietnam Coca-cola Factory 1,500,000 1995-1996 40 Innovation and Modernization of Thai Nguyen Steel Company Fabrication & erection works Thai Nguyen Viet Nam Thai Nguyen Steel Company 3,100,000 2000-2003 Ministry of construction 81,320,000 2004-2006 Hanoi Construction Department 26,223,744 2008-2009 41 National Convention Center 42 Hanoi Museum Fabrication and installation of whole steel structure and roof structure. Purchasing and installation of: Diesel Generator package; Low voltage package; Medium voltage package; Transformer package; Lighting package; Elevated package; Roofing Supply and installation of steel beam system, steel roofing, drip-moulding and steel structure covering roofing system. Metri Tu Lem Vietnam Hanoi Vietnam
  • 59. LILAMA’S KEY REFERENCE PROJECTS No Project Name Scope of Work Location Name of Client Contract Amount (USD) Contract Duration 43 Rang Dong, Bach Ho, Su Tu Den, Dragon Oil Fields Fabrication, installation, periodical maintenance of steel structures, piping for the oil rig projects Off-shore Vietnam PVN 5,500,00 2002 - 2004 44 Bach Ho Oil Field and Phu My 3 gas conducting piping system Fabrication, installation, periodical maintenance, upgrade of steel structures, installation of electrical system for the oil rig projects Off-shore Vietnam PVN 4,600,000 2005 - 2006 Oil Rigs at Various Oil Fields Fabrication, installation, repair of steel structures of Bach Ho Oil Field, Truong Son oil rig. Fabrication of Topside - Ca Ngu Vang Project Repairing, anti-corrosion painting for block modules - Dragon Oil Rig Off-shore Vietnam PVN 4,000,000 2007 Repairing anti-corrosion painting, steel structures. Piping fabrication & connection, equipment installation, assisting to commissioning works Off-shore Vietnam PVN 1,800,000 2008 Bach Ho and Dragon Oil Fields Reparation for piping system, roofing of turbine, generator - Bach Ho Oil Rig Fabrication, installation of celler deck - Dragon Oil Rig Installation of piping system and equipments Bach Ho Oil Rig Off-shore Vietnam PVN Bach Ho Oil Field Fabrication of BK-14 oil rig - Bach Ho Oil Rig Fabrication of infrastructure for rig BK-14/BT-7 Bach Ho Oil Rig Installation, connection of skids (Electrical and E&I) - Bach Ho Oil Rig Off-shore Vietnam PVN 45 46 47 48 Phuong Dong oil rig at Bach Ho Oil Field 2,200,000 2,700,000 2009 2010
  • 60. LILAMA’S OVERSEAS PROJECT HIGHLIGHTS Barh Thermal Power Plant, INDIA Fabrication of more than 34.000 tons of steel structure and boiler equipment Contract value: 50 million USD Contract duration: 2007-2011 Power and Industrial Production Plants, IRAQ Mechanical & electrical equipment installation Contract duration: 1985-1988 LISCO Power Plant in Misurata, LIBYA Mechanical works for Plant Refurbishment Contract value: 2.8 million USD Contract duration: 2009 to now Kampot Cement Plant, CAMBODIA: Mechanical equipment installation (6700 tons) and fabrication (1400 tons) Contract value: 6.0 million USD Contract duration: 2006 to 2007 Export to JAPAN Air Heater, HRSG Non Pressured Parts, Boiler Non Pressured Parts in Japan Fabrication 4,489.38 tons Export to NEW ZEALAND Steel pipe structures of Wind Turbines Fabrication 3,755.20 tons Export to EU and Various Asian Countries Electrostatic Precipitators, Vessels, Shipbuilding, Steel Structure and Equipment for Power & Cement Plants Time: 2000 to now
  • 61. LILAMA’S OVERSEAS PROJECT HIGHLIGHTS Refurbishment mechanical works at LISCO power plant in MISURATA, LIBYA