Petroleum Development Geology
Development Geology
• Hybrid discipline: geology on the field and
  reservoir scale.
• Requires good knowledge of many disciplines.
  –   Structural Geology.
  –   Stratigraphy and sedimentology.
  –   Reservoir engineering.
  –   Drilling methods and engineering.
  –   Petrophysics.
  –   Seismology.
  –   Petroleum Economics and land management.
  –   Organic geochemistry……..
Why have a development
            geologist
• Not all companies do! …this is becoming
  less common.
• Engineers, Geologists and Geophysicists
  don’t just specialize in different fields, they
  think in different ways.
• There is a communication problem: the
  development geologist must be able to
  bridge the gap.
The Energy Crisis
• Size of discoveries decreasing.
• Reserves declining.
• New opportunities must be derived from old
  plays and systems.
• Existing reserves must be economically
  extracted.
• Modelling and understanding petroleum
  systems as a whole is an essential skill.
• Importance of the Development Geologist
  will progressively increase:
• Additional reserves required from known
  occurrences
• Older discounted reserves need to be
  reassessed
• Remember, about 60% reserves are left in
  the ground.
Principal responsibilities of the
     Development Geologist

• Estimation of Volumetric Reserves
• Justifying drilling options
• Providing a framework for maximum
  financial return for his company
• Exploration Group discovers a field
• Responsibility for the field passed to the DG.
• DG must develop the field as economically and
  efficiently as possible.
• Input needed from geologists, engineers, drillers,
  financial whizzkids….need to be able to talk to all
  these experts.
• 4 broad areas of responsibility lie within the title
  DG:
1. Predevelopment Evaluation
• After discovery of field.
• Exploratory wells & delineation wells are
  drilled
  – Evaluate field for reserves and design criteria.
• Very important stage in offshore areas
  – Large capital investment: got to get the design
    right
  – Essential that this phase is done correctly
2. Development Drilling
• DG is responsible for:
  – Initiating development well recommendations
  – Monitoring these wells during drilling
  – Adjusting development plans as wells are
    drilled
Well Surveillance
• Generally handled by the reservoir engineer
  – However, when performance is not as expected
    or when remedial work is required (workover)
    the DG inputs geological constraint.
• RE & DG work together to evaluate unusual
  reservoir performance
• RE & DG then make remedial
  recommendations
Field Studies
• One of the most important roles of the DG.
• Re-evaluation of old fields and
  recognition of new opportunities in these
  fields.
  – This role will become increasingly important in
    the future as reserves decrease.
  – The days of wild-catting are long gone.
Development Geology in a major Oil
            Company
• 5 general subdivisions within a large oil company
  (NOC, IOC..). Do not confuse these with the oil
  process previously described in this course.
   – Exploration
   – Production
      • E&P generally combined
   – Refining
   – Transportation
   – Marketing
Common employment
  positions in E&P and the
   disciplines hired to fill
them in a large oil company
Development Geologist in small or
    independent oil companies
• These companies don’t have the resources
  to hire specialists in all the areas.
• E&P: generally a geologist/ geophysicist
  combination.
• Production: a petroleum engineer
• Otherwise, a single geologist fills E&P and
  consultants are used for everything else.
The Independent Petroleum
              Geologist
• A real fun occupation: exciting career for a
  petroleum geologist
• Must develop and produce an attractive
  prospect alone and get wells drilled
• Must understand the methods by which a
  prospect gets financed: the “third for a
  quarter” deal
Important definitions
• Overriding Royalty Interest
   – An ORI owner gets a percentage off the top (before operating
     expenses.
   – An ORI owner has no financial obligation
   – Can be obtained by writing a book, mineral leases or generating
     prospects in the oil business: lucrative.
• Working Interest
   – Receives income but has financial obligations
   – All costs incurred are the working interest owners responsibility
• Operator
   – Individual or company responsible for getting the well drilled,
     usually the principal working interest owner in the field
The Petroleum “Deal”.
       How a petroleum geologist gets a overriding royalty
      interest in a well and his/her company gets a working
                          interest in a well

                                    AS you can see, with no investment on
                                    his part, the prospect generator gets an
                                     Royalty Interest: must, by law, for paid
                                      overriding royalty interest just be
                                     defining and justifying where to drill.
                                    Overriding Royalty Interest: commonly
1/4                                 2-10% availablethe maths:
                                                  Do for the people who make
                                                    ORI =deal
                                                      the 3%

                                         500 barrels a day production
                                       Investment companies thirdtop a
                                       You get 3% of the oil off the for
3/4
                                                quarter interest
                                           Oil sells at $40 a barrel
                                    You make $600 per day or $18,000 per
                                          month from ONE well
In conclusion
• Development geology is not only a rewarding, but a
  lucrative field for the small and independent operator.
• In the future, this field (which requires skills in many
  fields) will become more important as reserves decline.
• The bottom line in all petroleum exploration is financial,
  and economic evaluations require input from many
  disciplines: the DG must have these skills.
• The most important ability is RESERVE ESTIMATION
Reserves Estimation

Processes, terminology and prediction
               curves
• A well will not be drilled just because the geology
  is good.
• Wells get drilled because the geology is good and
  there is potential for economic gain.
• The most important role os a DG is to:
   – estimate the oil and gas reserves that may be discovered
     in a particular venture.
   – keep track of the reserves in all past ventures.
The 4 Basic Reserves Estimation
             Methods
1. Educated Guess
2. Comparison with nearby production.
3. Reservoir Simulation – material balance
   calculations
4. Volumetric Calculations
1. The Educated Guess
• Historically wells were drilled by wildcat
  techniques: some of the largest US discioveries
  were made in this way.
• Even today some wells are drilled without an
  economic analysis, largely due to contract
  obligations.
• Very unlikely these days that you will get to drill a
  well because you have a gut feeling about a
  particular area.
2. Comparison of nearby production
• Consider a region where production is from a
  highly fractured tight formation or where
  poroperm heterogeneity is unpredictable.
• Volumetric calculations are largely meaningless.
• A way to estimate potential production from a
  well is to consider those nearby.
• Generally, such a wildcat well will not perform
  better than the nearest wells: best to estimate
  cautiously
3. Reservoir Simulation
• Reservoir Modelling: primarily the reservoir engineer’s
  job.
• Commonest simulation model – finite difference model
• Reservoir is modelled in terms of shape and:
   –   Porosity
   –   Permeability
   –   Fluid saturations
   –   Pressure
   –   Barriers and baffles….
• Internal reservoir conditions are then modelled: problem-
  the best models are built after drilling development wells.
3. Reservoir Simulation: Decline
                 Curves
•   After wells have been producing for a while:
•   Decline rate of production is graphed
•   Generally 6 months-1year after start of production
•   Good reserves estimates can be derived.
•   Often compared with volumetric technique results.
•   We will look at decline curves in detail later in the
    course.
4. Volumetrics
• Most accurate and widely used methods of
  reserves estimation.
• Carried out by geologists as they are based on
  geological structure and isopach maps.
• Rock volumes are established that are assumed to
  contain hydrocarbons (e.g. seismic bright spot).
• Can be a simple volume calculation or a complex
  net gas or net oil isopach approach, determined by
  structure contours modified by fluid contacts and
  net reservoir thickness isopachs.
• Most rock volumes established through use
  of net gas and net oil isopachs.
• Constructed from structure contour maps
  with well defined OWC and/or GOC.
Once rock volume is estimated, the in place
       oil and/or gas is calculated by:
1. Determination of pore volume
   –   = rock volume x average porosity
   –   Average porosity generally from well logs or
       engineers
2. By subtraction of water saturation, connate or
   free water in the reservoir rocks.
   –   Water saturation numbers generally calculated by
       petrophysicists or engineers
3. Correcting to sales line temperature and pressure
   by using Formation Volume Factors
   –   FVF generally determined by reservoir engineers
Points of note
• Not the difference:
   – In place volume = total oil/ gas
   – Recoverable volume= that percentage that can actually
     be produced as estimated by a recovery efficiency
     (average 35%)
• All reserves are expressed in surface or pipeline
  units
   – Gas at reservoir conditions occupies less volume than at
     surface.
   – All are converted to a common sale pressure base.
   – Conversely, oil shrinks on its way to the surface
Formulae for Volumetric
 Reserve Calculations
Quantifying uncertainty in reserves
             estimates
• ALWAYS uncertainty in estimates, hence we always
  construct minimum, most likely and best-case estimates
   – If you were putting your money into a venture, which would you
     base your financial analyses on?
• In addition, we must always speak the same language:
  terminology is essential in understanding what reserves
  have been offered to you for investment
   – Reserves are anything that can be recovered economically under
     current economic and technological conditions.
   – Reserves are classified as Proved or Unproved – what do we
     mean by this?
   – NB. A Reserve is not a Resource: A resource is anything that could
     become economic given certain developments in the future. Do not
     confuse the two (as many do)
Reserves: Proved

• Estimated to reasonable certainty
• Often based on well logs but normally requires
  actual production or formation tests.
• Can be:
   – Proved developed reserves
      • Reserves that are expected to be recovered from existing wells
   – Proved undeveloped reserves
      • To be recovered by new drilling, deepening wells to a new
        reservoir or where additional finance is required to produce
Reserves: Unproved
• Based on similar data but contractual, technical or
  financial constraints prevent them from being
  classified as proved.
• Can be:
   – Probable Reserves
      • Less certain than proved but can be assessed to some degree of
        certainty
      • May include logging estimates, improved recovery technique
        estimates
   – Possible Reserves
      • Not as certain as probable reserves and can only be estimated
        to a low degree of confidence.
Decision Making: protocol
• Despite these defined terms, there is still some
  latitude in their application. In general, we use
  this:

• Proved Reserves
   – = minimum case economics. Financial investment is
     based on proved reserves.
• Proved + Probable Reserves
   – = most likely case economics. Internal company
     decisions usually based on this.
• Proved +Probable + Possible Reserves
   – = maximum case economics. This is the best that could
     reasonably happe for a venture. Companies try to sell
     ventures based on this.
Decision Making: projected
        income analysis

• Standard diagram for major oil companies
  to base their decisions on drilling and
  development is a Reserves/ Potential
  Income Diagram.
• Best shown with an example:
• Consider a company deciding whether to
  spend $50m on the development of a field
  by building an offshore platform….
Economists then provide estimates of likely oil price on production at:
                                       Max: $40 per barrel
                                       Most Likely: $25 per barrel
                                       Min: $15 per barrel
                                         This allows us to project best and worst case scenarios
                                                        for the well development.


                             200
    Projected Income (MM$)




                                                                                                      Maximum
                             160                                                                       Profit

                             120


                              80

                                                                              Expected Capital
                              40        At
                                                                              Expenditure Costs
                                       Risk

                                   0
                                              1     2                3          4                 5             6

                                          MINIMUM             MOST LIKELY                    MAXIMUM

                                                    Reserves (Million bbls)

     If minimum is true: company will lose $10 – 25 million.
From other wells, geologists estimate recoverable reserves at:
    Max: 5,000,000 barrels (provedprofit will be made.
             If most likely is true: + probable + possible)
    Most Likely: 3,000,000 barrels (proved + probable)
    Min: 1,000,000 barrels (proved)
• As you can see, accurate estimation of
  reserves is essential.
• Moreover, a knowledge of the financial
  implications of terminology and your
  assessments is critical.
• This is a fun and challenging aspect of the
  business IF YOU ARE GOOD AT IT.
Reserves Estimation II

Subsurface Maps and Volume
         Estimation
Isopach Maps
• Graphical representation of the vertical thickness
  of a particular unit or feature.
   – Vertical thickness of reservoir
   – Vertical thickness saturated with oil
   – Vertical thickness saturated with gas…
• Not to be confused with Isolith Maps
   – True stratigraphic thickness of a lithological horizon.
• In reserves estimation, the Isopach maps are
  projected onto the flat map surface. Isolith maps
  must be rotated to account for dip.
• Overlying a structure contour map with an isopach map
  allows determination of the true vertical thickness of a unit
  of interest within a particular structure (e.g. trap)
• Designing an isopach map:
   – Lot of data and reservoir irregular: make contour intervals small.
   – Little data and/or reservoir regular: larger contour intervals
     (shortcut)
• Different types of isopach map
   – Gross sand thickness isopachs
   – Net pay thickness isopachs
   – Variable reservoir thickness isopachs
Gross Sand Thickness Isopachs
• GST = total thickness of rock saturated with oil or gas
  irrespective of
• Tight zones
• Low porosity areas
• Low permeability areas etc..
• Easy to make, especially for gas
• Zero contour = downdip limits of gas (GOC or GWC)
• Gross isopachs should increase updip correspondingly with
  the structure contour elevations
• E.g. if GWC is at -7,000’ subsea, then the following
  isopach lines should overlay the structure contour lines as
  shown:

Structure Contour Line               Gross Isopach Line
-7000                                0
-6980                                20
-6960                                40

• Until sand becomes full or top of structure is reached.

• For oil, the OWC will plot similarly, although the presence
  of gas on top will cause updip wedging (decreasing
  thickness) of the gross oil isopach
Net Pay thickness isopachs
• Refers to the gross reservoir thickness with
  tight zones thrown out.
• If the reservoir is homogeneous we can
  simply take the net to gross of the reservoir
  and multiply the thickness of the unit by
  this reduction.
• Otherwise, heterogeneity can considerably
  complicate matters.
Variable reservoir thickness isopachs
• Reservoir thickness changes rapidly
   – e.g. edge of reef, channel
   – Requires a net reservoir thickness isopach map
• GWC or GOC = structure contour (zero gas line)
  but this will veer away from the structure contour
  where the sand thickness disappears (can’t have
  gas where there is no reservoir)
• Basically, the thicknesses are modified so that the
  net gas or net oil thickness isopachs do not exceed
  the thickness of the reservoir.
Calculations from isopachs
•   Trapezoidal Rule
     – Used to calculate rock volume from an isopach:

    BV = (h/2) [A0 + 2A1 + 2A2 + …+ 2An-1 + An] +hnAn/2

Where
     BV = bulk volume (acre feet)
     h = contour interval
     A0 = area enclosed by zero contour line
     A1 = area enclosed by first contour line
     An-1 = area enclosed by first contour line above top contour
     An = top contour line
     hn = vertical distance from top contour to top of reservoir

     i.e. take the average area between two intervals and multiply that area by
         contour interval thickness to get the volume it encloses.
GOC or GWC
                                                      0’

                                                  20’                    h = contour interval = 20’

                                                40’
               A
                                          54’
                                                                     B
                                                                                  Illustration of the
                                                                                  Trapezoidal Rule:


                                                                                    Net gas isopach
                                                                                    over the top of a
                                max h = 54’


                                                                                         dome.


hn = 60 – 54                                                             60’
   = 14’
                                 An                                      40’

                                 A1                                      20’
               A                                           h = 20’   B
                                  A0                                     0’
                                               GOC or GWC

                                              BV = (h/2) [A0 + 2A1 + 2A2 + …+ 2An-1 + An] +hnAn/2
GOC or GWC
                                       0’

                                   20’

                                 40’
A                                           B
                           54’
                                                        Useful Shortcut

                                                       Area of the top of a
                                                      sphere is remarkably
                                                      close to the result of
                 max h = 54’




                                                      multiplying the base
                                                        area A0 by ½ the
                                                      maximum thickness

                                                60’
                                                      i.e. 0.5 x 54 = 27 ft
                  An                            40’

                   A1                           20’
A                                           B
                   A0                           0’
Wedge of gas filled sand here




                        0’                                                                            Reservoir is full of gas to the base of the sandstone in this area
                                                                       Fa
                                     ’                                    ult
                                20                                            A
                                                                   ’
                                              ’                 54
                                         40                 =
                                                        h
                                                   ax
                                                  m
  C                                                                                                    D




                                                                                   SAND FULL LINE
                                                                            lt B
                                                                         Fau




                                                                                      Fault A




                                                                                                60’
                                                                 Max h = 54’
                                                                                                40’

      C                                                                                         20’
                                                                                                        D
                                                                                                0’

                Fluid Contact
                                                                Sand Full above this point




Well drilled here will find gas
       and oil or water                            Well drilled here will find only gas
Knowing the volume is only part of
   the story….the well must be
            economic
 petroleum-development-geology

Mais conteúdo relacionado

Mais procurados (20)

SP Log
SP Log SP Log
SP Log
 
Density log
Density logDensity log
Density log
 
Reservoir characterization
Reservoir characterizationReservoir characterization
Reservoir characterization
 
Reservoir Modeling with Petrel
Reservoir Modeling with PetrelReservoir Modeling with Petrel
Reservoir Modeling with Petrel
 
traps_Masoom
 traps_Masoom traps_Masoom
traps_Masoom
 
formation evaluation chapter 1
formation evaluation chapter 1formation evaluation chapter 1
formation evaluation chapter 1
 
Reservoir mapping
Reservoir mappingReservoir mapping
Reservoir mapping
 
Structur Alanalysis
Structur AlanalysisStructur Alanalysis
Structur Alanalysis
 
Well Log Interpretation
Well Log InterpretationWell Log Interpretation
Well Log Interpretation
 
Geophysical Exploration
Geophysical ExplorationGeophysical Exploration
Geophysical Exploration
 
Introduction to seismic interpretation
Introduction to seismic interpretationIntroduction to seismic interpretation
Introduction to seismic interpretation
 
Neutron log
Neutron logNeutron log
Neutron log
 
Reservoir porosity
Reservoir porosityReservoir porosity
Reservoir porosity
 
Principles of well logging and formation evaluation m.m.badawy
Principles of well logging and formation evaluation m.m.badawyPrinciples of well logging and formation evaluation m.m.badawy
Principles of well logging and formation evaluation m.m.badawy
 
Reservoir modeling and characterization
Reservoir modeling and characterizationReservoir modeling and characterization
Reservoir modeling and characterization
 
Well log data processing
Well log data processingWell log data processing
Well log data processing
 
Image logs
Image logsImage logs
Image logs
 
Petroleum Geology
Petroleum GeologyPetroleum Geology
Petroleum Geology
 
Well loggining. Gamma Ray log
Well loggining. Gamma Ray logWell loggining. Gamma Ray log
Well loggining. Gamma Ray log
 
Volume calculation
Volume calculationVolume calculation
Volume calculation
 

Destaque

Reservoir Characterization 062816
Reservoir Characterization 062816Reservoir Characterization 062816
Reservoir Characterization 062816Calvin Reppe
 
What is the different between the net pay and resrvoir thickness
What is the different between the net pay and resrvoir thicknessWhat is the different between the net pay and resrvoir thickness
What is the different between the net pay and resrvoir thicknessStudent
 
Philippine Petroleum Exploration - Charting Stormy Waters
Philippine Petroleum Exploration  - Charting Stormy WatersPhilippine Petroleum Exploration  - Charting Stormy Waters
Philippine Petroleum Exploration - Charting Stormy WatersFernando Penarroyo
 
Evaluation of low resistivity zones
Evaluation of low resistivity zonesEvaluation of low resistivity zones
Evaluation of low resistivity zonesShahnawaz Mustafa
 
45038163 geological-map-interpretation
45038163 geological-map-interpretation45038163 geological-map-interpretation
45038163 geological-map-interpretationShahnawaz Mustafa
 
Reserves and reservoir
Reserves and reservoirReserves and reservoir
Reserves and reservoirOmar Khorshed
 
Fluid Saturation
Fluid SaturationFluid Saturation
Fluid SaturationM.T.H Group
 
Cairn case study
Cairn case studyCairn case study
Cairn case studySwapnil Pal
 
Introduction to Reservoir Rock & Fluid Properties
Introduction to Reservoir Rock & Fluid PropertiesIntroduction to Reservoir Rock & Fluid Properties
Introduction to Reservoir Rock & Fluid PropertiesM.T.H Group
 
Properties of reservoir rocks
Properties of reservoir rocksProperties of reservoir rocks
Properties of reservoir rocksuos
 
Basicwellloginterpretation 120715012749-phpapp01
Basicwellloginterpretation 120715012749-phpapp01Basicwellloginterpretation 120715012749-phpapp01
Basicwellloginterpretation 120715012749-phpapp01petro11
 
importance of shelf edge delta for hydrocarbon exploration
importance of shelf edge delta for hydrocarbon explorationimportance of shelf edge delta for hydrocarbon exploration
importance of shelf edge delta for hydrocarbon explorationAbzal Alpysbayev
 
Using potential field data and stochastic optimisation to refine 3D geologica...
Using potential field data and stochastic optimisation to refine 3D geologica...Using potential field data and stochastic optimisation to refine 3D geologica...
Using potential field data and stochastic optimisation to refine 3D geologica...Richard Lane
 
Robust 3D Geological Models: Hard Data is Key
Robust 3D Geological Models: Hard Data is KeyRobust 3D Geological Models: Hard Data is Key
Robust 3D Geological Models: Hard Data is KeyFF Explore 3D
 
Drilling Fluid Technology - Halliburton
Drilling Fluid Technology - HalliburtonDrilling Fluid Technology - Halliburton
Drilling Fluid Technology - HalliburtonMichael Andira
 

Destaque (20)

Reservoir Rock Properties
Reservoir Rock PropertiesReservoir Rock Properties
Reservoir Rock Properties
 
Reservoir Characterization 062816
Reservoir Characterization 062816Reservoir Characterization 062816
Reservoir Characterization 062816
 
What is the different between the net pay and resrvoir thickness
What is the different between the net pay and resrvoir thicknessWhat is the different between the net pay and resrvoir thickness
What is the different between the net pay and resrvoir thickness
 
Basics of petroleum geology
Basics of petroleum geologyBasics of petroleum geology
Basics of petroleum geology
 
Philippine Petroleum Exploration - Charting Stormy Waters
Philippine Petroleum Exploration  - Charting Stormy WatersPhilippine Petroleum Exploration  - Charting Stormy Waters
Philippine Petroleum Exploration - Charting Stormy Waters
 
Evaluation of low resistivity zones
Evaluation of low resistivity zonesEvaluation of low resistivity zones
Evaluation of low resistivity zones
 
45038163 geological-map-interpretation
45038163 geological-map-interpretation45038163 geological-map-interpretation
45038163 geological-map-interpretation
 
Reserves and reservoir
Reserves and reservoirReserves and reservoir
Reserves and reservoir
 
Fluid Saturation
Fluid SaturationFluid Saturation
Fluid Saturation
 
Cairn case study
Cairn case studyCairn case study
Cairn case study
 
Introduction to Reservoir Rock & Fluid Properties
Introduction to Reservoir Rock & Fluid PropertiesIntroduction to Reservoir Rock & Fluid Properties
Introduction to Reservoir Rock & Fluid Properties
 
TYPES OF RESERVOIR
TYPES OF RESERVOIRTYPES OF RESERVOIR
TYPES OF RESERVOIR
 
Properties of reservoir rocks
Properties of reservoir rocksProperties of reservoir rocks
Properties of reservoir rocks
 
Basicwellloginterpretation 120715012749-phpapp01
Basicwellloginterpretation 120715012749-phpapp01Basicwellloginterpretation 120715012749-phpapp01
Basicwellloginterpretation 120715012749-phpapp01
 
Sexual Tipping Point Model
Sexual Tipping Point ModelSexual Tipping Point Model
Sexual Tipping Point Model
 
importance of shelf edge delta for hydrocarbon exploration
importance of shelf edge delta for hydrocarbon explorationimportance of shelf edge delta for hydrocarbon exploration
importance of shelf edge delta for hydrocarbon exploration
 
Gocad Tutorial
Gocad TutorialGocad Tutorial
Gocad Tutorial
 
Using potential field data and stochastic optimisation to refine 3D geologica...
Using potential field data and stochastic optimisation to refine 3D geologica...Using potential field data and stochastic optimisation to refine 3D geologica...
Using potential field data and stochastic optimisation to refine 3D geologica...
 
Robust 3D Geological Models: Hard Data is Key
Robust 3D Geological Models: Hard Data is KeyRobust 3D Geological Models: Hard Data is Key
Robust 3D Geological Models: Hard Data is Key
 
Drilling Fluid Technology - Halliburton
Drilling Fluid Technology - HalliburtonDrilling Fluid Technology - Halliburton
Drilling Fluid Technology - Halliburton
 

Semelhante a petroleum-development-geology

Erhc south africa conference october 2013 final
Erhc south africa conference october 2013 finalErhc south africa conference october 2013 final
Erhc south africa conference october 2013 finalDan Keeney
 
Economic &financial determinants of oil and gas
Economic &financial determinants of oil and gasEconomic &financial determinants of oil and gas
Economic &financial determinants of oil and gasNikhil Singh
 
Corporate Governance class 3
Corporate Governance class 3Corporate Governance class 3
Corporate Governance class 3VJ KC
 
Conference dschand school_of_sci_&_tech_15-01-18
Conference dschand school_of_sci_&_tech_15-01-18Conference dschand school_of_sci_&_tech_15-01-18
Conference dschand school_of_sci_&_tech_15-01-18Université de Dschang
 
Conference dschang school_of_sci_&_tech_15-01-18
Conference dschang school_of_sci_&_tech_15-01-18Conference dschang school_of_sci_&_tech_15-01-18
Conference dschang school_of_sci_&_tech_15-01-18Université de Dschang
 
Kosmos_Introduction to O&G education deck_EN
Kosmos_Introduction to O&G education deck_ENKosmos_Introduction to O&G education deck_EN
Kosmos_Introduction to O&G education deck_ENDelphine Marques
 
Ogintro 110517110816-phpapp01
Ogintro 110517110816-phpapp01Ogintro 110517110816-phpapp01
Ogintro 110517110816-phpapp01Ranbir Nandan
 
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaBrief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaFidan Aliyeva
 
Reservoir engineering.ppt
Reservoir engineering.pptReservoir engineering.ppt
Reservoir engineering.pptYusufAdamu10
 
ERHC Presentation at the 8th Annual Sub-Saharan Africa Oil & Gas Conference
ERHC Presentation at the 8th Annual Sub-Saharan Africa Oil & Gas ConferenceERHC Presentation at the 8th Annual Sub-Saharan Africa Oil & Gas Conference
ERHC Presentation at the 8th Annual Sub-Saharan Africa Oil & Gas ConferenceDan Keeney
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALSiFluids Engineering
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALSiFluids Engineering
 
Exile Resources June 2010 Investor Presentation
Exile Resources June 2010 Investor PresentationExile Resources June 2010 Investor Presentation
Exile Resources June 2010 Investor PresentationPENTA
 
Millrock Resource - Corporate Pres - March 2015
Millrock Resource - Corporate Pres - March 2015Millrock Resource - Corporate Pres - March 2015
Millrock Resource - Corporate Pres - March 2015Millrock Resources
 
Oil and gas terms and definitions
Oil and gas terms and definitionsOil and gas terms and definitions
Oil and gas terms and definitionsHasan Shubhra
 
Developments in Heavy-Oil EOR for the Era of Low Oil Pricing
Developments in Heavy-Oil EOR for the Era of Low Oil PricingDevelopments in Heavy-Oil EOR for the Era of Low Oil Pricing
Developments in Heavy-Oil EOR for the Era of Low Oil PricingSociety of Petroleum Engineers
 
Graduation Project Book 2020
Graduation Project Book 2020Graduation Project Book 2020
Graduation Project Book 2020Mahmoud Morsy
 

Semelhante a petroleum-development-geology (20)

Erhc south africa conference october 2013 final
Erhc south africa conference october 2013 finalErhc south africa conference october 2013 final
Erhc south africa conference october 2013 final
 
Economic &financial determinants of oil and gas
Economic &financial determinants of oil and gasEconomic &financial determinants of oil and gas
Economic &financial determinants of oil and gas
 
Corporate Governance class 3
Corporate Governance class 3Corporate Governance class 3
Corporate Governance class 3
 
Conference dschand school_of_sci_&_tech_15-01-18
Conference dschand school_of_sci_&_tech_15-01-18Conference dschand school_of_sci_&_tech_15-01-18
Conference dschand school_of_sci_&_tech_15-01-18
 
Conference dschang school_of_sci_&_tech_15-01-18
Conference dschang school_of_sci_&_tech_15-01-18Conference dschang school_of_sci_&_tech_15-01-18
Conference dschang school_of_sci_&_tech_15-01-18
 
Kosmos_Introduction to O&G education deck_EN
Kosmos_Introduction to O&G education deck_ENKosmos_Introduction to O&G education deck_EN
Kosmos_Introduction to O&G education deck_EN
 
Ogintro 110517110816-phpapp01
Ogintro 110517110816-phpapp01Ogintro 110517110816-phpapp01
Ogintro 110517110816-phpapp01
 
MICROBIAL ENHANCED OIL RECOVERY.pptx
MICROBIAL ENHANCED OIL RECOVERY.pptxMICROBIAL ENHANCED OIL RECOVERY.pptx
MICROBIAL ENHANCED OIL RECOVERY.pptx
 
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan AliyevaBrief Introduction into Oil & Gas Industry by Fidan Aliyeva
Brief Introduction into Oil & Gas Industry by Fidan Aliyeva
 
Reservoir engineering.ppt
Reservoir engineering.pptReservoir engineering.ppt
Reservoir engineering.ppt
 
ERHC Presentation at the 8th Annual Sub-Saharan Africa Oil & Gas Conference
ERHC Presentation at the 8th Annual Sub-Saharan Africa Oil & Gas ConferenceERHC Presentation at the 8th Annual Sub-Saharan Africa Oil & Gas Conference
ERHC Presentation at the 8th Annual Sub-Saharan Africa Oil & Gas Conference
 
Key criteria for shale oil
Key criteria for shale oilKey criteria for shale oil
Key criteria for shale oil
 
Oil and Gas Industry.pdf
Oil and Gas Industry.pdfOil and Gas Industry.pdf
Oil and Gas Industry.pdf
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Exile Resources June 2010 Investor Presentation
Exile Resources June 2010 Investor PresentationExile Resources June 2010 Investor Presentation
Exile Resources June 2010 Investor Presentation
 
Millrock Resource - Corporate Pres - March 2015
Millrock Resource - Corporate Pres - March 2015Millrock Resource - Corporate Pres - March 2015
Millrock Resource - Corporate Pres - March 2015
 
Oil and gas terms and definitions
Oil and gas terms and definitionsOil and gas terms and definitions
Oil and gas terms and definitions
 
Developments in Heavy-Oil EOR for the Era of Low Oil Pricing
Developments in Heavy-Oil EOR for the Era of Low Oil PricingDevelopments in Heavy-Oil EOR for the Era of Low Oil Pricing
Developments in Heavy-Oil EOR for the Era of Low Oil Pricing
 
Graduation Project Book 2020
Graduation Project Book 2020Graduation Project Book 2020
Graduation Project Book 2020
 

Último

8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandSharisaBethune
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524najka9823
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 

Último (20)

8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
PB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal BrandPB Project 1: Exploring Your Personal Brand
PB Project 1: Exploring Your Personal Brand
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524Call Girls Contact Number Andheri 9920874524
Call Girls Contact Number Andheri 9920874524
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 

petroleum-development-geology

  • 2. Development Geology • Hybrid discipline: geology on the field and reservoir scale. • Requires good knowledge of many disciplines. – Structural Geology. – Stratigraphy and sedimentology. – Reservoir engineering. – Drilling methods and engineering. – Petrophysics. – Seismology. – Petroleum Economics and land management. – Organic geochemistry……..
  • 3. Why have a development geologist • Not all companies do! …this is becoming less common. • Engineers, Geologists and Geophysicists don’t just specialize in different fields, they think in different ways. • There is a communication problem: the development geologist must be able to bridge the gap.
  • 4. The Energy Crisis • Size of discoveries decreasing. • Reserves declining. • New opportunities must be derived from old plays and systems. • Existing reserves must be economically extracted. • Modelling and understanding petroleum systems as a whole is an essential skill.
  • 5. • Importance of the Development Geologist will progressively increase: • Additional reserves required from known occurrences • Older discounted reserves need to be reassessed • Remember, about 60% reserves are left in the ground.
  • 6. Principal responsibilities of the Development Geologist • Estimation of Volumetric Reserves • Justifying drilling options • Providing a framework for maximum financial return for his company
  • 7. • Exploration Group discovers a field • Responsibility for the field passed to the DG. • DG must develop the field as economically and efficiently as possible. • Input needed from geologists, engineers, drillers, financial whizzkids….need to be able to talk to all these experts. • 4 broad areas of responsibility lie within the title DG:
  • 8. 1. Predevelopment Evaluation • After discovery of field. • Exploratory wells & delineation wells are drilled – Evaluate field for reserves and design criteria. • Very important stage in offshore areas – Large capital investment: got to get the design right – Essential that this phase is done correctly
  • 9. 2. Development Drilling • DG is responsible for: – Initiating development well recommendations – Monitoring these wells during drilling – Adjusting development plans as wells are drilled
  • 10. Well Surveillance • Generally handled by the reservoir engineer – However, when performance is not as expected or when remedial work is required (workover) the DG inputs geological constraint. • RE & DG work together to evaluate unusual reservoir performance • RE & DG then make remedial recommendations
  • 11. Field Studies • One of the most important roles of the DG. • Re-evaluation of old fields and recognition of new opportunities in these fields. – This role will become increasingly important in the future as reserves decrease. – The days of wild-catting are long gone.
  • 12. Development Geology in a major Oil Company • 5 general subdivisions within a large oil company (NOC, IOC..). Do not confuse these with the oil process previously described in this course. – Exploration – Production • E&P generally combined – Refining – Transportation – Marketing
  • 13. Common employment positions in E&P and the disciplines hired to fill them in a large oil company
  • 14. Development Geologist in small or independent oil companies • These companies don’t have the resources to hire specialists in all the areas. • E&P: generally a geologist/ geophysicist combination. • Production: a petroleum engineer • Otherwise, a single geologist fills E&P and consultants are used for everything else.
  • 15. The Independent Petroleum Geologist • A real fun occupation: exciting career for a petroleum geologist • Must develop and produce an attractive prospect alone and get wells drilled • Must understand the methods by which a prospect gets financed: the “third for a quarter” deal
  • 16. Important definitions • Overriding Royalty Interest – An ORI owner gets a percentage off the top (before operating expenses. – An ORI owner has no financial obligation – Can be obtained by writing a book, mineral leases or generating prospects in the oil business: lucrative. • Working Interest – Receives income but has financial obligations – All costs incurred are the working interest owners responsibility • Operator – Individual or company responsible for getting the well drilled, usually the principal working interest owner in the field
  • 17. The Petroleum “Deal”. How a petroleum geologist gets a overriding royalty interest in a well and his/her company gets a working interest in a well AS you can see, with no investment on his part, the prospect generator gets an Royalty Interest: must, by law, for paid overriding royalty interest just be defining and justifying where to drill. Overriding Royalty Interest: commonly 1/4 2-10% availablethe maths: Do for the people who make ORI =deal the 3% 500 barrels a day production Investment companies thirdtop a You get 3% of the oil off the for 3/4 quarter interest Oil sells at $40 a barrel You make $600 per day or $18,000 per month from ONE well
  • 18. In conclusion • Development geology is not only a rewarding, but a lucrative field for the small and independent operator. • In the future, this field (which requires skills in many fields) will become more important as reserves decline. • The bottom line in all petroleum exploration is financial, and economic evaluations require input from many disciplines: the DG must have these skills. • The most important ability is RESERVE ESTIMATION
  • 20. • A well will not be drilled just because the geology is good. • Wells get drilled because the geology is good and there is potential for economic gain. • The most important role os a DG is to: – estimate the oil and gas reserves that may be discovered in a particular venture. – keep track of the reserves in all past ventures.
  • 21. The 4 Basic Reserves Estimation Methods 1. Educated Guess 2. Comparison with nearby production. 3. Reservoir Simulation – material balance calculations 4. Volumetric Calculations
  • 22. 1. The Educated Guess • Historically wells were drilled by wildcat techniques: some of the largest US discioveries were made in this way. • Even today some wells are drilled without an economic analysis, largely due to contract obligations. • Very unlikely these days that you will get to drill a well because you have a gut feeling about a particular area.
  • 23. 2. Comparison of nearby production • Consider a region where production is from a highly fractured tight formation or where poroperm heterogeneity is unpredictable. • Volumetric calculations are largely meaningless. • A way to estimate potential production from a well is to consider those nearby. • Generally, such a wildcat well will not perform better than the nearest wells: best to estimate cautiously
  • 24. 3. Reservoir Simulation • Reservoir Modelling: primarily the reservoir engineer’s job. • Commonest simulation model – finite difference model • Reservoir is modelled in terms of shape and: – Porosity – Permeability – Fluid saturations – Pressure – Barriers and baffles…. • Internal reservoir conditions are then modelled: problem- the best models are built after drilling development wells.
  • 25. 3. Reservoir Simulation: Decline Curves • After wells have been producing for a while: • Decline rate of production is graphed • Generally 6 months-1year after start of production • Good reserves estimates can be derived. • Often compared with volumetric technique results. • We will look at decline curves in detail later in the course.
  • 26. 4. Volumetrics • Most accurate and widely used methods of reserves estimation. • Carried out by geologists as they are based on geological structure and isopach maps. • Rock volumes are established that are assumed to contain hydrocarbons (e.g. seismic bright spot). • Can be a simple volume calculation or a complex net gas or net oil isopach approach, determined by structure contours modified by fluid contacts and net reservoir thickness isopachs.
  • 27. • Most rock volumes established through use of net gas and net oil isopachs. • Constructed from structure contour maps with well defined OWC and/or GOC.
  • 28. Once rock volume is estimated, the in place oil and/or gas is calculated by: 1. Determination of pore volume – = rock volume x average porosity – Average porosity generally from well logs or engineers 2. By subtraction of water saturation, connate or free water in the reservoir rocks. – Water saturation numbers generally calculated by petrophysicists or engineers 3. Correcting to sales line temperature and pressure by using Formation Volume Factors – FVF generally determined by reservoir engineers
  • 29. Points of note • Not the difference: – In place volume = total oil/ gas – Recoverable volume= that percentage that can actually be produced as estimated by a recovery efficiency (average 35%) • All reserves are expressed in surface or pipeline units – Gas at reservoir conditions occupies less volume than at surface. – All are converted to a common sale pressure base. – Conversely, oil shrinks on its way to the surface
  • 30. Formulae for Volumetric Reserve Calculations
  • 31. Quantifying uncertainty in reserves estimates • ALWAYS uncertainty in estimates, hence we always construct minimum, most likely and best-case estimates – If you were putting your money into a venture, which would you base your financial analyses on? • In addition, we must always speak the same language: terminology is essential in understanding what reserves have been offered to you for investment – Reserves are anything that can be recovered economically under current economic and technological conditions. – Reserves are classified as Proved or Unproved – what do we mean by this? – NB. A Reserve is not a Resource: A resource is anything that could become economic given certain developments in the future. Do not confuse the two (as many do)
  • 32. Reserves: Proved • Estimated to reasonable certainty • Often based on well logs but normally requires actual production or formation tests. • Can be: – Proved developed reserves • Reserves that are expected to be recovered from existing wells – Proved undeveloped reserves • To be recovered by new drilling, deepening wells to a new reservoir or where additional finance is required to produce
  • 33. Reserves: Unproved • Based on similar data but contractual, technical or financial constraints prevent them from being classified as proved. • Can be: – Probable Reserves • Less certain than proved but can be assessed to some degree of certainty • May include logging estimates, improved recovery technique estimates – Possible Reserves • Not as certain as probable reserves and can only be estimated to a low degree of confidence.
  • 34. Decision Making: protocol • Despite these defined terms, there is still some latitude in their application. In general, we use this: • Proved Reserves – = minimum case economics. Financial investment is based on proved reserves. • Proved + Probable Reserves – = most likely case economics. Internal company decisions usually based on this. • Proved +Probable + Possible Reserves – = maximum case economics. This is the best that could reasonably happe for a venture. Companies try to sell ventures based on this.
  • 35. Decision Making: projected income analysis • Standard diagram for major oil companies to base their decisions on drilling and development is a Reserves/ Potential Income Diagram. • Best shown with an example: • Consider a company deciding whether to spend $50m on the development of a field by building an offshore platform….
  • 36. Economists then provide estimates of likely oil price on production at: Max: $40 per barrel Most Likely: $25 per barrel Min: $15 per barrel This allows us to project best and worst case scenarios for the well development. 200 Projected Income (MM$) Maximum 160 Profit 120 80 Expected Capital 40 At Expenditure Costs Risk 0 1 2 3 4 5 6 MINIMUM MOST LIKELY MAXIMUM Reserves (Million bbls) If minimum is true: company will lose $10 – 25 million. From other wells, geologists estimate recoverable reserves at: Max: 5,000,000 barrels (provedprofit will be made. If most likely is true: + probable + possible) Most Likely: 3,000,000 barrels (proved + probable) Min: 1,000,000 barrels (proved)
  • 37. • As you can see, accurate estimation of reserves is essential. • Moreover, a knowledge of the financial implications of terminology and your assessments is critical. • This is a fun and challenging aspect of the business IF YOU ARE GOOD AT IT.
  • 38. Reserves Estimation II Subsurface Maps and Volume Estimation
  • 39. Isopach Maps • Graphical representation of the vertical thickness of a particular unit or feature. – Vertical thickness of reservoir – Vertical thickness saturated with oil – Vertical thickness saturated with gas… • Not to be confused with Isolith Maps – True stratigraphic thickness of a lithological horizon. • In reserves estimation, the Isopach maps are projected onto the flat map surface. Isolith maps must be rotated to account for dip.
  • 40. • Overlying a structure contour map with an isopach map allows determination of the true vertical thickness of a unit of interest within a particular structure (e.g. trap) • Designing an isopach map: – Lot of data and reservoir irregular: make contour intervals small. – Little data and/or reservoir regular: larger contour intervals (shortcut) • Different types of isopach map – Gross sand thickness isopachs – Net pay thickness isopachs – Variable reservoir thickness isopachs
  • 41. Gross Sand Thickness Isopachs • GST = total thickness of rock saturated with oil or gas irrespective of • Tight zones • Low porosity areas • Low permeability areas etc.. • Easy to make, especially for gas • Zero contour = downdip limits of gas (GOC or GWC) • Gross isopachs should increase updip correspondingly with the structure contour elevations
  • 42. • E.g. if GWC is at -7,000’ subsea, then the following isopach lines should overlay the structure contour lines as shown: Structure Contour Line Gross Isopach Line -7000 0 -6980 20 -6960 40 • Until sand becomes full or top of structure is reached. • For oil, the OWC will plot similarly, although the presence of gas on top will cause updip wedging (decreasing thickness) of the gross oil isopach
  • 43. Net Pay thickness isopachs • Refers to the gross reservoir thickness with tight zones thrown out. • If the reservoir is homogeneous we can simply take the net to gross of the reservoir and multiply the thickness of the unit by this reduction. • Otherwise, heterogeneity can considerably complicate matters.
  • 44. Variable reservoir thickness isopachs • Reservoir thickness changes rapidly – e.g. edge of reef, channel – Requires a net reservoir thickness isopach map • GWC or GOC = structure contour (zero gas line) but this will veer away from the structure contour where the sand thickness disappears (can’t have gas where there is no reservoir) • Basically, the thicknesses are modified so that the net gas or net oil thickness isopachs do not exceed the thickness of the reservoir.
  • 45. Calculations from isopachs • Trapezoidal Rule – Used to calculate rock volume from an isopach: BV = (h/2) [A0 + 2A1 + 2A2 + …+ 2An-1 + An] +hnAn/2 Where BV = bulk volume (acre feet) h = contour interval A0 = area enclosed by zero contour line A1 = area enclosed by first contour line An-1 = area enclosed by first contour line above top contour An = top contour line hn = vertical distance from top contour to top of reservoir i.e. take the average area between two intervals and multiply that area by contour interval thickness to get the volume it encloses.
  • 46. GOC or GWC 0’ 20’ h = contour interval = 20’ 40’ A 54’ B Illustration of the Trapezoidal Rule: Net gas isopach over the top of a max h = 54’ dome. hn = 60 – 54 60’ = 14’ An 40’ A1 20’ A h = 20’ B A0 0’ GOC or GWC BV = (h/2) [A0 + 2A1 + 2A2 + …+ 2An-1 + An] +hnAn/2
  • 47. GOC or GWC 0’ 20’ 40’ A B 54’ Useful Shortcut Area of the top of a sphere is remarkably close to the result of max h = 54’ multiplying the base area A0 by ½ the maximum thickness 60’ i.e. 0.5 x 54 = 27 ft An 40’ A1 20’ A B A0 0’
  • 48. Wedge of gas filled sand here 0’ Reservoir is full of gas to the base of the sandstone in this area Fa ’ ult 20 A ’ ’ 54 40 = h ax m C D SAND FULL LINE lt B Fau Fault A 60’ Max h = 54’ 40’ C 20’ D 0’ Fluid Contact Sand Full above this point Well drilled here will find gas and oil or water Well drilled here will find only gas
  • 49. Knowing the volume is only part of the story….the well must be economic