Advanced Planning & Scheduling Overview
Introduction Collaboration among sales, production, planning, purchasing, maintenance and management to positively impact the bottom line.
Critical Business Issues Late deliveries due to manufacturing delays Missed sales due to demand exceeding capacity Lost orders due to excessive Work-in-Process High production costs due to machine set-up or machine down time Excessive overhead due to managing scheduling changes and impact on delivery schedule Difficult to plan for future capacity requirements
Critical Business Issues Job delays due to material shortages (raw materials and/or manufactured components) Excessive overtime costs due to inefficient resource utilization Job delays due to tooling, molds or dies unavailable Disconnect among departmental objectives (sales, production, planning, purchasing, maintenance and management) Difficult to coordinate between plants and/or planners
Material Resources
Manufacturing Operations
Management Objectives
Manufacturing Process House Sub Assembly Saw 1 3/8 “ plywood Sand 1 Line 1 Bird House Paint & Dry Feeder Sub Assembly Saw 2  1 /4“ plywood Sand 2 Line 2 Bird Feeder Final Assembly Packaging Ship
Production Schedule House Sub Assembly Saw 1 3/8 “ plywood Sand 1 Line 1 Bird House Paint & Dry Feeder Sub Assembly Saw 2  1 /4“ plywood Sand 2 Line 2 Bird Feeder Final Assembly Packaging Ship
Shop Floor Disruptions Resource Bottleneck Inefficient set-up higher cost J1 J3 J5 House Sub Assembly Saw 1 3/8 “ plywood Sand 1 Line 1 J4 Bird House Paint & Dry Feeder Sub Assembly Saw 2  1 /4“ plywood Sand 2 Line 2 J6 J7 Bird Feeder Machine down J2 Final Assembly Packaging Ship J8 Late order  material shortage
Shop Floor Optimization J1 J2 House Sub Assembly Saw 1 3/8 “ plywood Sand 1 Line 1 J4 Bird House Paint & Dry J2 Feeder Sub Assembly Saw 2  1 /4“ plywood Sand 2 Line 2 J6 J7 Bird Feeder J3 J5 Final Assembly Packaging Ship J8 Late order material shortage
APS – The Solution Plans and schedules production based on available materials, labor and plant capacity Optimizes the schedule to meet customer service objectives, operational efficiencies, cost containment and profit objectives Allows planners to quickly respond to disruptions on the shop floor and immediately see the impact Provides a safe planning environment using “what-if” as well and ability to “undo” a schedule change
APS - Who benefits? Improves communication among departments Accurate order dates to sales department Detailed, actionable schedules to production department Capacity loads to set staffing and machine resources to the planning department Schedule-driven material requirements to drive ordering to the purchasing department Cash flow projections to management Maintenance & setup schedules to maintenancedepartment
APS – The bottom line ,[object Object],Reduced Production Times Improved Machine Utilization Reduced Inventories  ,[object Object],Increased  On-time Deliveries Reduced Customer Stock-outs ,[object Object],Reduce Order-to-Cash and Cash-to-Cash Conversion Cycle
Process Flow BOM Routing Sales Orders Forecast Work Orders MRP ? Purchase Orders Receiving Production RM Inventory Shop Floor FG Inventory
Process Flow BOM Routing Sales Orders Forecast Work Orders MRP Purchase Orders A A Receiving Production RM Inventory Shop Floor FG Inventory
Next Step Call (888) 317-8807 To learn more about how Advanced Planning & Scheduling can work for your business

Mais conteúdo relacionado

Mais procurados

Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemYash Dave
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and controlKarthik Yadav
 
Supply Chain Planning and SAP APO Overview
Supply Chain Planning and SAP APO OverviewSupply Chain Planning and SAP APO Overview
Supply Chain Planning and SAP APO OverviewSap Ides
 
Demand driven mrp rudi - sap forum - sept 2017[2521]
Demand driven mrp   rudi - sap forum - sept 2017[2521]Demand driven mrp   rudi - sap forum - sept 2017[2521]
Demand driven mrp rudi - sap forum - sept 2017[2521]Jarlei N
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Timesejalgfer
 
APO Demand Planning
APO Demand PlanningAPO Demand Planning
APO Demand PlanningAJAY
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and controlNikhil Pandey
 
MRP & Inventory Performance Management
MRP & Inventory Performance ManagementMRP & Inventory Performance Management
MRP & Inventory Performance ManagementMurugeshan KN
 
Supply Chain Management in ERP
Supply Chain Management in ERPSupply Chain Management in ERP
Supply Chain Management in ERPTom Matys
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto businessAjit Kumar
 
Sap – pp online training course
Sap – pp online training courseSap – pp online training course
Sap – pp online training courseVenkat reddy
 
how_rockwell_automation_optimized_its_product_costing_process
how_rockwell_automation_optimized_its_product_costing_processhow_rockwell_automation_optimized_its_product_costing_process
how_rockwell_automation_optimized_its_product_costing_processJohn Jordan
 
Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1Carmine Incretolli
 
Manufacturing planning and control systems
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systemshaitham shehata
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity PlanningPam Cudal
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 

Mais procurados (20)

sap-apo overview
sap-apo overviewsap-apo overview
sap-apo overview
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) system
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
Supply Chain Planning and SAP APO Overview
Supply Chain Planning and SAP APO OverviewSupply Chain Planning and SAP APO Overview
Supply Chain Planning and SAP APO Overview
 
Demand driven mrp rudi - sap forum - sept 2017[2521]
Demand driven mrp   rudi - sap forum - sept 2017[2521]Demand driven mrp   rudi - sap forum - sept 2017[2521]
Demand driven mrp rudi - sap forum - sept 2017[2521]
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
APO Demand Planning
APO Demand PlanningAPO Demand Planning
APO Demand Planning
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
MRP-II
MRP-IIMRP-II
MRP-II
 
MRP & Inventory Performance Management
MRP & Inventory Performance ManagementMRP & Inventory Performance Management
MRP & Inventory Performance Management
 
Supply Chain Management in ERP
Supply Chain Management in ERPSupply Chain Management in ERP
Supply Chain Management in ERP
 
Ch11 introto business
Ch11 introto businessCh11 introto business
Ch11 introto business
 
Sap – pp online training course
Sap – pp online training courseSap – pp online training course
Sap – pp online training course
 
Does APO Really Work? - An APO Case Study
Does APO Really Work? - An APO Case StudyDoes APO Really Work? - An APO Case Study
Does APO Really Work? - An APO Case Study
 
how_rockwell_automation_optimized_its_product_costing_process
how_rockwell_automation_optimized_its_product_costing_processhow_rockwell_automation_optimized_its_product_costing_process
how_rockwell_automation_optimized_its_product_costing_process
 
Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1
 
Manufacturing planning and control systems
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systems
 
Capacity Planning
Capacity PlanningCapacity Planning
Capacity Planning
 
Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 

Destaque

Advanced Planning & Scheduling
Advanced Planning &  SchedulingAdvanced Planning &  Scheduling
Advanced Planning & Schedulinguapippo
 
Advance Planning & Scheduling
Advance Planning & SchedulingAdvance Planning & Scheduling
Advance Planning & SchedulingAnand Subramaniam
 
Advanced Planning and Scheduling
Advanced Planning and SchedulingAdvanced Planning and Scheduling
Advanced Planning and Schedulingmformby
 
Ordina Planning & Scheduling Day - APS - powerful forecasting for a good plan...
Ordina Planning & Scheduling Day - APS - powerful forecasting for a good plan...Ordina Planning & Scheduling Day - APS - powerful forecasting for a good plan...
Ordina Planning & Scheduling Day - APS - powerful forecasting for a good plan...Ordina
 
About asprova
About asprovaAbout asprova
About asprovaAsprova
 
Preactor 12 (Brochure)_What`s New (APS-system/Advanced Planning and Schedulin...
Preactor 12 (Brochure)_What`s New (APS-system/Advanced Planning and Schedulin...Preactor 12 (Brochure)_What`s New (APS-system/Advanced Planning and Schedulin...
Preactor 12 (Brochure)_What`s New (APS-system/Advanced Planning and Schedulin...Vera Leonik-Shilyaeva
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain ManagementKori Bori
 
Rapid Project Inception
Rapid Project InceptionRapid Project Inception
Rapid Project Inceptionudairaj
 
Inception workshop - Kickstarting an Agile project in style
Inception workshop - Kickstarting an Agile project in styleInception workshop - Kickstarting an Agile project in style
Inception workshop - Kickstarting an Agile project in styleJenny Wong
 
Service / Product Innovation
Service / Product InnovationService / Product Innovation
Service / Product InnovationAnand Subramaniam
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overviewWebseology
 

Destaque (20)

Advanced Planning & Scheduling
Advanced Planning &  SchedulingAdvanced Planning &  Scheduling
Advanced Planning & Scheduling
 
Advance Planning & Scheduling
Advance Planning & SchedulingAdvance Planning & Scheduling
Advance Planning & Scheduling
 
Advanced Planning and Scheduling
Advanced Planning and SchedulingAdvanced Planning and Scheduling
Advanced Planning and Scheduling
 
Ordina Planning & Scheduling Day - APS - powerful forecasting for a good plan...
Ordina Planning & Scheduling Day - APS - powerful forecasting for a good plan...Ordina Planning & Scheduling Day - APS - powerful forecasting for a good plan...
Ordina Planning & Scheduling Day - APS - powerful forecasting for a good plan...
 
About asprova
About asprovaAbout asprova
About asprova
 
Preactor 12 (Brochure)_What`s New (APS-system/Advanced Planning and Schedulin...
Preactor 12 (Brochure)_What`s New (APS-system/Advanced Planning and Schedulin...Preactor 12 (Brochure)_What`s New (APS-system/Advanced Planning and Schedulin...
Preactor 12 (Brochure)_What`s New (APS-system/Advanced Planning and Schedulin...
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Rapid Project Inception
Rapid Project InceptionRapid Project Inception
Rapid Project Inception
 
Inception workshop - Kickstarting an Agile project in style
Inception workshop - Kickstarting an Agile project in styleInception workshop - Kickstarting an Agile project in style
Inception workshop - Kickstarting an Agile project in style
 
Material Handling
Material Handling Material Handling
Material Handling
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
 
Service / Product Innovation
Service / Product InnovationService / Product Innovation
Service / Product Innovation
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Creativity & Innovation
Creativity & InnovationCreativity & Innovation
Creativity & Innovation
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
OEE
OEEOEE
OEE
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 

Semelhante a Advanced Planning And Scheduling Aps Overview

Session 8
Session 8Session 8
Session 8thangv
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OMthangv
 
05262016 resume
05262016 resume05262016 resume
05262016 resumeDan Faust
 
Cut & bend rebars
Cut & bend rebarsCut & bend rebars
Cut & bend rebarsParam Saxena
 
P L A Nt Layout1
P L A Nt  Layout1P L A Nt  Layout1
P L A Nt Layout1Bob Bin
 
The Problem with Post-Production Scrap In Manufacturing
The Problem with Post-Production Scrap In ManufacturingThe Problem with Post-Production Scrap In Manufacturing
The Problem with Post-Production Scrap In ManufacturingContentAssets
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layouthakimizaki
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layouthakimizaki
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec domsBabasab Patil
 
Internship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxInternship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxPedroFerreira876615
 
Product service -profiling
Product service -profilingProduct service -profiling
Product service -profilingMeenakshi Singh
 
Office Lean
Office LeanOffice Lean
Office Leanflevko
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionAnand Subramaniam
 

Semelhante a Advanced Planning And Scheduling Aps Overview (20)

Plant Layout.ppt
Plant Layout.pptPlant Layout.ppt
Plant Layout.ppt
 
Plant layout
Plant layoutPlant layout
Plant layout
 
Session 8
Session 8Session 8
Session 8
 
Session 8_OM
Session 8_OMSession 8_OM
Session 8_OM
 
Jit And Lean
Jit And LeanJit And Lean
Jit And Lean
 
05262016 resume
05262016 resume05262016 resume
05262016 resume
 
JIT
JITJIT
JIT
 
Pom
PomPom
Pom
 
Cut & bend rebars
Cut & bend rebarsCut & bend rebars
Cut & bend rebars
 
P L A Nt Layout1
P L A Nt  Layout1P L A Nt  Layout1
P L A Nt Layout1
 
The Problem with Post-Production Scrap In Manufacturing
The Problem with Post-Production Scrap In ManufacturingThe Problem with Post-Production Scrap In Manufacturing
The Problem with Post-Production Scrap In Manufacturing
 
Plant layouts(presentation)
Plant layouts(presentation)Plant layouts(presentation)
Plant layouts(presentation)
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
 
C5 process & layout
C5 process & layoutC5 process & layout
C5 process & layout
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec doms
 
Internship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxInternship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptx
 
Product service -profiling
Product service -profilingProduct service -profiling
Product service -profiling
 
Office Lean
Office LeanOffice Lean
Office Lean
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 

Advanced Planning And Scheduling Aps Overview

  • 1. Advanced Planning & Scheduling Overview
  • 2. Introduction Collaboration among sales, production, planning, purchasing, maintenance and management to positively impact the bottom line.
  • 3. Critical Business Issues Late deliveries due to manufacturing delays Missed sales due to demand exceeding capacity Lost orders due to excessive Work-in-Process High production costs due to machine set-up or machine down time Excessive overhead due to managing scheduling changes and impact on delivery schedule Difficult to plan for future capacity requirements
  • 4. Critical Business Issues Job delays due to material shortages (raw materials and/or manufactured components) Excessive overtime costs due to inefficient resource utilization Job delays due to tooling, molds or dies unavailable Disconnect among departmental objectives (sales, production, planning, purchasing, maintenance and management) Difficult to coordinate between plants and/or planners
  • 8. Manufacturing Process House Sub Assembly Saw 1 3/8 “ plywood Sand 1 Line 1 Bird House Paint & Dry Feeder Sub Assembly Saw 2 1 /4“ plywood Sand 2 Line 2 Bird Feeder Final Assembly Packaging Ship
  • 9. Production Schedule House Sub Assembly Saw 1 3/8 “ plywood Sand 1 Line 1 Bird House Paint & Dry Feeder Sub Assembly Saw 2 1 /4“ plywood Sand 2 Line 2 Bird Feeder Final Assembly Packaging Ship
  • 10. Shop Floor Disruptions Resource Bottleneck Inefficient set-up higher cost J1 J3 J5 House Sub Assembly Saw 1 3/8 “ plywood Sand 1 Line 1 J4 Bird House Paint & Dry Feeder Sub Assembly Saw 2 1 /4“ plywood Sand 2 Line 2 J6 J7 Bird Feeder Machine down J2 Final Assembly Packaging Ship J8 Late order material shortage
  • 11. Shop Floor Optimization J1 J2 House Sub Assembly Saw 1 3/8 “ plywood Sand 1 Line 1 J4 Bird House Paint & Dry J2 Feeder Sub Assembly Saw 2 1 /4“ plywood Sand 2 Line 2 J6 J7 Bird Feeder J3 J5 Final Assembly Packaging Ship J8 Late order material shortage
  • 12. APS – The Solution Plans and schedules production based on available materials, labor and plant capacity Optimizes the schedule to meet customer service objectives, operational efficiencies, cost containment and profit objectives Allows planners to quickly respond to disruptions on the shop floor and immediately see the impact Provides a safe planning environment using “what-if” as well and ability to “undo” a schedule change
  • 13. APS - Who benefits? Improves communication among departments Accurate order dates to sales department Detailed, actionable schedules to production department Capacity loads to set staffing and machine resources to the planning department Schedule-driven material requirements to drive ordering to the purchasing department Cash flow projections to management Maintenance & setup schedules to maintenancedepartment
  • 14.
  • 15. Process Flow BOM Routing Sales Orders Forecast Work Orders MRP ? Purchase Orders Receiving Production RM Inventory Shop Floor FG Inventory
  • 16. Process Flow BOM Routing Sales Orders Forecast Work Orders MRP Purchase Orders A A Receiving Production RM Inventory Shop Floor FG Inventory
  • 17. Next Step Call (888) 317-8807 To learn more about how Advanced Planning & Scheduling can work for your business

Notas do Editor

  1. Thank you for joining us for the next 15 minutes to see how PlanetTogether Advanced Planning and Scheduling can directly impact your bottom line through collaboration among sales, production, planning, purchasing, maintenance and management.
  2. Planning and scheduling activities can be extremely difficult to manage for companies that produce a variety of products, are operating near or above capacity, have multiple manufacturing facilities, are equipment-intensive or require skilled labor. Perhaps you can relate to some or many of the issues presented here, each of which can have a significant impact on the bottom line.Allow enough time for viewer to read through the issues and then advance to the next page
  3. Collaboration among multiple planners and/or manufacturing facilities can add to the complexities involved with planning and scheduling. If you are faced with some of these challenges, it may be time to consider advanced planning and scheduling.Again give the viewer time to read through the issues
  4. The more resources you have to manage, the more complex and overwhelming the planning and scheduling process becomes.Machines may require significant set-up or change-over and unlike labor resources can not easily be added to the production line. Certain jobs may only be allowed to run on certain equipment or need routine maintenance or go down.Tooling, Molds and Dies can add to the complexity of scheduling equipment.Labor may be a constraint based on certain skill levels, or you may want to plan future requirements for long term staffing considerations.In a traditional MRP and scheduling environment Material requirements are resolved by MRP and capacity requirements are handled by the scheduling system. With this two phased approach the production schedule can get “out of phase” with the material requirements. For example a job can get released to the shop floor only to find out there is a raw material shortage, or a job gets moved on the schedule, but the “predecessor” jobs did not get re-scheduled accordingly, creating a material shortage of excess Work-in-process.
  5. Let’s look at a simple process. In this example our routing calls for a saw, paint and assemble operation. Each operation requires one or more resources.We have 2 saws, however one can only handle wood up to a certain thickness. The other saw is capable of handling any size. For certain jobs a special saw blade is required.The paint booth requires laborers with certain skills and there is significant set-up when the paint color changes from darker to lighter color.The last operation is the assembly process. We only need to know that three people are on the assembly line to make sure we have enough people available to work today.
  6. Our little scenario seems simple enough except for the fact that different departments can have conflicting goals and management typically has multiple objectives that need to be met.Maximizing profit may be a difficult goal to meet when orders are late. The planner is going to expedite the job, work overtime or do whatever it takes and can not necessarily see the impact on profit objectives
  7. How difficult can it be to manage the planning and scheduling activities involved in building a birdhouse? Let’s find out.Our finished product consists of a birdhouse and a bird feeder. There are two lines, one for the house and one for the feeder. The process is identical for each with the exception that the house can only use saw #1. The feeder could actually go on either saw #1 or saw #2.
  8. Four orders come in and the jobs are scheduled according to the order due date.
  9. 1 week later, we are in real trouble! One of the orders is already late. The red bird feeder is sitting in the final assembly area, however there is no red birdhouse.As we work our way back, we start to see all sorts of inefficiencies and bottlenecks. Remember our paint booth requires significant set up time when we switch from dark to light color paint, but the planner failed to take the color into consideration when scheduling jobs 4, 6 and 7.There are 3 jobs lined up on sander number 1 while the 2nd sander stands idol. Finally to make our day, saw #2 goes down.
  10. Now let’s see what happens when we optimize our schedule to reflect all of the objectives we have of minimizing set-up, maximizing profit and meeting on-time deliveries.The bird feeder (job 2) gets moved to saw #1, when saw #2 goes down. Jobs 3 and 5 are offloaded to sander #2 to eliminate the bottleneck on sander #1. And finally job 6 is moved up to eliminate set-up time. The end result is lower costs, and higher profits making sure that none of the other jobs are late.
  11. PlanetTogether Advanced Planning & Scheduling resolves material, labor and capacity constraints simultaneously by looking at all of the required and available resources and the specific capabilities of those resources.The schedule is optimized to meet customer service objectives, operational efficiencies, cost containment and profit objectives.It is a collaborative tool that allows planners to quickly respond to disruptions on the shop floor and immediately assess the impact by looking at specific metrics such as on-time deliveries, profit, etc.Planners can make changes to the schedule with confidence knowing that they can “undo” a schedule change or work in a “what-if” environment before committing the change.
  12. Who in your organization stands to benefit from PlanetTogether advanced planning & scheduling?Sales will have accurate order dates to communicate to their customers.Detailed, actionable schedules will be dispatched to production.Planning is able to efficiently and effectively manage capacity loads.Material requirements are communicated to purchasing based on realistic schedulesScheduled and unscheduled down-time and set-up scheduled are communicated to the maintenance departmentManagement can forecast future cash flows
  13. The bottom line is that every company wants to decrease expenses, increase revenue and increase cash flow. PlanetTogether Advanced Planning & Scheduling can potentially help you improve the bottom line by:Reducing production cycle timesImproving machine utilizationReducing inventoriesIncreasing on-time deliveriesReducing customer stock-outsReducing Order-to-Cash and Cash to Cash conversion cycles
  14. How does the production schedule get communicated to the shop floor? Are planners spending time managing spreadsheets or in daily meetings with production, sales and purchasing?
  15. PlanetTogether Advanced Planning & Scheduling is the missing piece in your current planning process.  Fully integrated with your other systems it will enable you to share accurate dates with your sales and production teams, quickly adjust to changes, and execute according to schedule.
  16. Call to learn more about how Advanced Planning & Scheduling can work for your business.