Results from Electrical Audit of  Sutherland’s Malad Facility, Mumbai Presentation to Mr. K.P. Nair & Mr. Ramunni Nair Version 2 March 17, 2008
About This Report ,[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Audit Scope of Work ATS LDB Panel UPS SBP  3 x 60 kVA HVAC  Panel UPS SBP 20 KVA DB1 DB2 DB3 DB2 DB3 DB4 DB2 DB3 DB4 DB1 DBI DB4 DG Backup DB5 500 kVA  DG-1 Energy Meter  Chiller Plant DB5 DB5 Sever Room Main LT Panel PFC-1 100 KVAR Chiller Distribution AMF-1 AMF-2 AMF Panels  Main LT Panel  APFC  250 kVA  250 kVA  First Floor End to End Power Distribution System End Loads Intermediate Loads 1 1 1 1 1 1 1 1 1 1
Audit Scope of Work LTG Panel UPS SBP  3 x 40 kVA 2 x  60 kVA HVAC  Panel DB1 DB2 DB3 DB2 DB3 DB4 DB2 DB3 DB4 DB1 DBI DB4 DB5 DB5 DB5 ATS DG Backup 500 kVA DG-2 Energy Meter  Main LT Panel PFC-1 100 KVAR AMF-1 AMF Panels  Main LT Panel  APFC  Second  Floor End to End Power Distribution System 2 x 225 kVA Intermediate Loads End Loads 1 1 1 1 1
Reliance Power  Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
DG Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
DG Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Load Balancing on EB and DG Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
AMF Panel Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
APFC Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Power Distribution Panels Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
UPS Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Other Loads Audit Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
FIRST FLOOR
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Loads and their Maximum Consumption Reliance Power 500 kVA MD Total: 346.53 kVA Max Electricity Bill Unit = 1kW 3x60 kVA UPS   (For Facility) 20 KVA UPS   (For Server Room) AHU (AHU 33.69 kVA) LDB  (For Lighting) Current: 54.89 kVA Current: 75.3 kVA Current: 6.34 kVA Current: 50.4 kVA Current: 159.6 kVA Chiller Plant (1X80, 1X60 TR)
Capacity vs. Utilization MD (Off-Peak Load) ,[object Object],[object Object],[object Object],500 kVA MD Utilization = 333/(500+125) = 53.28% Diversity Factor = 370/500 = 0.74 333 TOTAL 0.95 0.95 0.95 PF 36.62 472.8 475.5 485.4 Current (A) 2.072 N 110 233.4 B 110 231.4 Y 113 233.5 R kVA Voltage (V) 500 kVA
Capacity vs. Utilization MD (Peak Load) ,[object Object],[object Object],[object Object],500 kVA MD Utilization = 370/500 = 74% 370 TOTAL 0.94 0.95 0.93 PF 41.53 498.7 511.9 503.3 Current (A) 0.858 N 121 243.8 B 126 244.4 Y 123 243.9 R kVA Voltage (V) 225 kVA
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Capacity vs. Utilization Generator (DG-1) DG utilization = 382/500 = 76.4% ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],341 114 114 113 kW 382 TOTAL 0.90 0.89 0.89 PF 531.5 535.7 518.6 Current (A) 127 238.7 B 128 239.2 Y 127 237.8 R kVA Voltage (V) 500 kVA
Capacity vs. Utilization UPS (3 x 60 kVA Facility) ,[object Object],[object Object],[object Object],UPS Utilization = 75.3 /180 = 41.7% 75.3 TOTAL 0.85 0.86 0.87 PF 103.6 113.5 116.6 Current (A) 23.5 225.9 B 25.6 225.8 Y 26.2 223.6 R KVA Voltage (V) 3x60 kVA
Capacity vs. Utilization UPS (20 kVA Server) ,[object Object],[object Object],[object Object],UPS Utilization = 6.34 /20 = 31.7% 6.34 TOTAL 0.99 0.99 1.00 PF 8.66 7.49 10.19 Current (A) 2.08 239.2 B 1.80 240.4 Y 2.46 241.0 R KVA Voltage (V) 20 kVA
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Consumption LDB Lighting Consumption = 54.89 54.8 TOTAL 0.95 0.98 0.96 PF 75.6 80.2 76.1 Current (A) 17.7 235.2 B 19.0 236.1 Y 18.1 237.2 R kVA Voltage (V) LDB
Consumption AHU Total AHU Consumption =50.4 kVA ,[object Object],50.4 TOTAL 0.73 0.75 0.74 PF 69.1 71.8 71.3 Current (A) 16.3 236.2 B 17.0 238.1 Y 17.1 240.0 R KVA Voltage (V) 80 & 60 TR
Consumption Chiller Plant (80 and 60 TR) Chiller Plant Consumption = 159.6  kVA ,[object Object],[object Object],159.6 TOTAL 0.75 0.74 0.73 PF 232.9 240.8 238.8 Current (A) 54.6 234.0 B 57.9 236.2 Y 47.1 237.2 R KVA Voltage (V) # TR
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Potential Power Savings Electricity Bill Incentive and Penalty ,[object Object],[object Object],23,999 12,89,770 Aug 2007 Consumption at LT Meter( 500 kVA MD) (L964882 and L964883) 1 22,732 12,21,720 Oct 2007 Consumption at LT Meter( 500 kVA MD) (L964882 and L964883) 2 Peak Hour Penalty Bill Amount Bill Date Location #
Potential Power Savings MD * (MD charge/kVA/month of Rs. 300/-) x (demand difference of 100 kVA) x (12 months per year) 3,60,000 TOTAL 3,60,000 Shifting to 400 kVA MD instead of 500 kVA * 1 Capex Opex (Annual) Area of Saving #
Potential Power Savings   DG ** Based on new Caterpillar 500 kVA DG set price *** (Rs. 30 per lt diesel) x (20 lts/hr difference) x (12 hrs power cut per month) x (12 months per year) 2,50,000 86,400 TOTAL 86,400 ,[object Object],[object Object],2,50,000 Use 400 kVA instead of 500 kVA ** 2 Capex Opex (Annual) Area of Saving #
Potential Power Savings   UPS **** Requirement is met by 3x40 kVA (this includes 6% cushion and redundancy with 1x40KVA ) ***** For the3x60kVA and 3 x40kVA  UPS Efficiency difference, 9.6 kW per hour x Rs. 4 per hr x 24 hrs x 30 days per month x 12 months per year  ****** For the 60kVA  and 40 kVA   UPS AMC charges diffierence, Rs. 30,000 per year x 3 no of UPS ******* For the 3x60kVA  and 3x40kVA UPS cooling requirements diffierence, 3.36 kW per hr x Rs. 4 per hr x 24 hrs x 30 days per month x 12 months per year 90,000 ,[object Object],[object Object],1,16,122 24,00,000 5,87,898 TOTAL 3,31,776 ,[object Object],24,00,000 Sell 3x60 kVA UPS and batteries **** 3 Capex Opex (Annual) Area of Saving #
Potential Power Savings   Summary * (MD charge/kVA/month of Rs. 300/-) x (demand difference of 100 kVA) x (12 months per year) ** Based on new Caterpillar 500 kVA DG set price *** (Rs. 30 per lt diesel) x (20 lts/hr difference) x (12 hrs power cut per month) x (12 months per year) **** Requirement is met by 3x40 kVA (this includes 6% cushion and redundancy with 1x40KVA ) ***** For the3x60kVA and 3 x40kVA  UPS Efficiency difference, 9.6 kW per hour x Rs. 4 per hr x 24 hrs x 30 days per month x 12 months per year  ****** For the 60kVA  and 40 kVA   UPS AMC charges difference, Rs. 30,000 per year x 3 no of UPS ******* For the 3x60kVA  and 3x40kVA UPS cooling requirements difference, 3.36 kW per hr x Rs. 4 per hr x 24 hrs x 30 days per month x 12 months per year 90,000 ,[object Object],3,60,000 Shifting to 400KVA MD in place of 500 kVA * 1 ,[object Object],1,16,122 26,50,000 9,84,298 TOTAL 3,31,776 ,[object Object],24,00,000 Sell 3x60 kVA UPS and batteries **** 3 86,400 ,[object Object],[object Object],2,50,000 Use existing 400 kVA instead of 500 kVA ** 2 Capex Opex (Annual) Area of Saving #
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Wastage Control LDB * (Rs. 5.5/unit) x (80-26)/80 x 11.6 x (24 hr/day) x (365 day/yr) = Rs. 3,77,249/yr 3,77,249 TOTAL 3,77,249 ,[object Object],Use 2x13 W lamps instead of 4x20 W 1 Capex  Opex (Annual)  Area of Saving #
Wastage Control  Desktop ** (Rs. 5.5/unit ) x (35% x 145 kVA x 0.78 PF) x (24/day) x (365 day/year) = Rs. 19,07,205/year 19,07,205 TOTAL 19,07,205 ,[object Object],Shutdown desktops which are not in use 2 Capex  Opex (Annual)  Area of Saving #
Wastage Control  AHU and Chiller Plant  *** (Rs. 5.5/unit ) x (5% x 234 kVA x 0.78 PF) x (24 hr/day) x (365 day/yr) = Rs. 4,39,690/yr 4,39,690 TOTAL 4,39,690 ,[object Object],Install VFD to Optimize the cooling 3 Capex  Opex (Annual)  Area of Saving #
Wastage Control  Summary * (Rs. 5.5/unit) x (80-26)/80 x 11.6 x (24 hr/day) x (365 day/yr) = Rs. 3,77,249/yr ** (Rs. 5.5/unit ) x (35% x 145 kVA x 0.78 PF) x (24/day) x (365 day/year) = Rs. 19,07,205/year *** (Rs. 5.5/unit ) x (5% x 234 kVA x 0.78 PF) x (24 hr/day) x (365 day/yr) = Rs. 4,39,690/yr 3,77,249 ,[object Object],Use 2x13 W lamps instead of 4x20 W 1 19,07,205 ,[object Object],Shutdown desktops which are not in use 2 27,24,144 TOTAL 4,39,690 ,[object Object],Install VFD to Optimize the cooling 3 Capex  Opex (Annual)  Area of Saving #
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Power Quality (MD Off-Peak Load) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (MD Off-Peak Load) R-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (MD Off-Peak Load) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (MD Off-Peak Load) Y-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.0% Harmonics Impact Standard Reading Parameter
Power Quality (MD Off-Peak Load) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (MD Off-Peak Load) B-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.2% Harmonics Impact Standard Reading Parameter
Power Quality (MD Off-Peak Load) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],3v< 2.072v E-N voltage Impact Standard Reading Parameter
Power Quality (MD Off-Peak Load) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 72.4% Harmonics Impact Standard Reading Parameter
Power Quality (DG) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (DG) R-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.8% Harmonics Impact Standard Reading Parameter
Power Quality (DG) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.89 PF Impact Standard Reading Parameter
Power Quality (DG) Y-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 2.0% Harmonics Impact Standard Reading Parameter
Power Quality (DG) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.90 PF Impact Standard Reading Parameter
Power Quality (DG) B-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.9% Harmonics Impact Standard Reading Parameter
Power Quality (DG) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],3v< 2.072v E-N voltage Impact Standard Reading Parameter
Power Quality (DG) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 72.4% Harmonics Impact Standard Reading Parameter
Power Quality (PFC) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (PFC) R-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (PFC) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (PFC) Y-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.0% Harmonics Impact Standard Reading Parameter
Power Quality (PFC) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (PFC) B-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.2% Harmonics Impact Standard Reading Parameter
Power Quality (MD Peak Load) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.93 PF ,[object Object],44.6 KVAR Impact Standard Reading Parameter
Power Quality (MD Peak Load) R-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.0% Harmonics Impact Standard Reading Parameter
Power Quality (MD Peak Load) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (MD Peak Load) Y-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 0.7% Harmonics Impact Standard Reading Parameter
Power Quality (MD Peak Load) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.94 PF Impact Standard Reading Parameter
Power Quality (MD Peak Load) B-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 3.1% Harmonics Impact Standard Reading Parameter
Power Quality (MD Peak Load) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],3v< 0.858v E-N voltage Impact Standard Reading Parameter
Power Quality (MD Peak Load) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 65.3% Harmonics Impact Standard Reading Parameter
Power Quality (Main LDB) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.96 PF Impact Standard Reading Parameter
Power Quality (Main LDB) R-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.4% Harmonics Impact Standard Reading Parameter
Power Quality (Main LDB) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.98 PF Impact Standard Reading Parameter
Power Quality (Main LDB) Y-Phase: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (Main LDB) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (Main LDB) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.3% Harmonics Impact Standard Reading Parameter
Power Quality (Main LDB) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],3v< 2.561v E-N voltage Impact Standard Reading Parameter
Power Quality (Main LDB) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 67.9% Harmonics Impact Standard Reading Parameter
Power Quality (PDB1) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.96 PF Impact Standard Reading Parameter
Power Quality (PDB1) R-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.5% Harmonics Impact Standard Reading Parameter
Power Quality (PDB1) Y-Phase: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],>0.95 0.98 PF Impact Standard Reading Parameter
Power Quality (PDB1) Y-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (PDB1) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.84 PF Impact Standard Reading Parameter
Power Quality (PDB1) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.4% Harmonics Impact Standard Reading Parameter
Power Quality (PDB1) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],3v< 2.636v N-E  Impact Standard Reading Parameter
Power Quality (PDB1) N-E: Voltage and Current Harmonics ,[object Object],0 19.56 N-current ,[object Object],3-5% 69.6% Harmonics Impact Standard Reading Parameter
Power Quality (PDB2) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform  ,[object Object],>0.95 0.91 PF Impact Standard Reading Parameter
Power Quality (PDB2) R-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.6% Harmonics Impact Standard Reading Parameter
Power Quality (PDB2) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.89 PF Impact Standard Reading Parameter
Power Quality (PDB2) Y-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (PDB2) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (PDB2) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.5% Harmonics Impact Standard Reading Parameter
Power Quality (PDB2) N-E: Voltage, Current and Power ,[object Object],0A 10.32 N current ,[object Object],3< 2.584v NE  Impact Standard Reading Parameter
Power Quality (PDB2) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 78.8% Harmonics Impact Standard Reading Parameter
Power Quality (PDB3) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (PDB3) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.7% Harmonics Impact Standard Reading Parameter
Power Quality (PDB3) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.96 PF Impact Standard Reading Parameter
Power Quality (PDB3) Y-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.3% Harmonics Impact Standard Reading Parameter
Power Quality (PDB3) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.95 PF Impact Standard Reading Parameter
Power Quality (PDB3) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.6% Harmonics Impact Standard Reading Parameter
Power Quality (PDB3) N-E: Voltage, Current and Power ,[object Object],0 8.84A N current ,[object Object],3< 2.698v NE Impact Standard Reading Parameter
Power Quality (PDB3) N-E: Voltage and Current Harmonics ,[object Object],3-5% 73.7 Harmonics Impact Standard Reading Parameter
Power Quality (PDB4) R-Phase: Voltage, Current and Power ,[object Object],>0.95 0.95 PF ,[object Object],Sine wave Distorted Waveform Impact Standard Reading Parameter
Power Quality (PDB 4) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.6% Harmonics Impact Standard Reading Parameter
Power Quality (PDB 4) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.96 PF Impact Standard Reading Parameter
Power Quality (PDB 4) Y-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.4% Harmonics Impact Standard Reading Parameter
Power Quality (PDB 4) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.89 PF Impact Standard Reading Parameter
Power Quality (PDB 4) Y-Phase: Voltage and Current Harmonics ,[object Object],Stable Stable Waveform ,[object Object],3-5% 1.6% Harmonics Impact Standard Reading Parameter
Power Quality (PDB 4) N-E: Voltage, Current and Power ,[object Object],0 10.03 N current ,[object Object],3v< 2.751v NE volt Impact Standard Reading Parameter
Power Quality (PDB 4) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 70.4% Harmonics Impact Standard Reading Parameter
Power Quality (PDB 5) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.92 PF Impact Standard Reading Parameter
Power Quality (PDB 5) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.6% Harmonics Impact Standard Reading Parameter
Power Quality (PDB 5) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.94 PF Impact Standard Reading Parameter
Power Quality (PDB 5) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.3% Harmonics Impact Standard Reading Parameter
Power Quality (PDB 5) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.94 PF Impact Standard Reading Parameter
Power Quality (PDB 5) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.6% Harmonics Impact Standard Reading Parameter
Power Quality (PDB 5) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],0 11.83A N current ,[object Object],3v< 2.693v NE voltage Impact Standard Reading Parameter
Power Quality (PDB 5) N-E: Voltage and Current Harmonics ,[object Object],3-5% 76.5% Harmonics Impact Standard Reading Parameter
Power Quality (PDB Kitchen) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.97 PF Impact Standard Reading Parameter
Power Quality (PDB Kitchen) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.7% Harmonics Impact Standard Reading Parameter
Power Quality (PDB Kitchen) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.98 PF Impact Standard Reading Parameter
Power Quality (PDB Kitchen) Y-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.4% Harmonics Impact Standard Reading Parameter
Power Quality (PDB Kitchen) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 1 PF Impact Standard Reading Parameter
Power Quality (PDB Kitchen) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.8% Harmonics Impact Standard Reading Parameter
Power Quality (PDB Kitchen) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],3v< 2.721v NE voltage Impact Standard Reading Parameter
Power Quality (PDB Kitchen) N-E: Voltage and Current Harmonics ,[object Object],3-5% 68.4% Harmonics Impact Standard Reading Parameter
Power Quality (UPS 3x60 kVA) R-Phase: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],>0.95 0.87 PF Impact Standard Reading Parameter
Power Quality (UPS 3x60 kVA) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 2.7% Harmonics Impact Standard Reading Parameter
Power Quality (UPS 3x60 kVA) Y-Phase: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],>0.95 0.86 PF Impact Standard Reading Parameter
Power Quality (UPS 3x60 kVA) Y-Phase: Voltage and Current Harmonics ,[object Object],3-5% 3.2% Harmonics Impact Standard Reading Parameter
Power Quality (UPS 3x60 kVA) B-Phase: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],>0.95 0.85 PF Impact Standard Reading Parameter
Power Quality (UPS 3x60 kVA) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 3.8% Harmonics Impact Standard Reading Parameter
Power Quality (UPS 3x60 kVA) N-E: Voltage, Current and Power Waveform PF Impact Standard Reading Parameter
Power Quality (UPS 3x60 kVA) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 51.0% Harmonics Impact Standard Reading Parameter
Power Quality (UPS 20 kVA) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 1  PF Impact Standard Reading Parameter
Power Quality (UPS 20 kVA) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 0.8% Harmonics Impact Standard Reading Parameter
Power Quality (UPS 20 kVA) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.99 PF Impact Standard Reading Parameter
Power Quality (UPS 20 kVA) Y-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.2% Harmonics Impact Standard Reading Parameter
Power Quality (UPS 20 kVA) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.99 PF Impact Standard Reading Parameter
Power Quality (UPS 20 kVA) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.3% Harmonics Impact Standard Reading Parameter
Power Quality (UPS 20 kVA) N-E: Voltage, Current and Power ,[object Object],3v< 1.670v NE voltage Impact Standard Reading Parameter
Power Quality (UPS 20 kVA) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 77.9% Harmonics Impact Standard Reading Parameter
Power Quality (AHU) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.74 PF ,[object Object],11.6 KVAR Impact Standard Reading Parameter
Power Quality (AHU) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (AHU) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.75 PF ,[object Object],11.3 KVAR Impact Standard Reading Parameter
Power Quality (AHU) Y-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (AHU) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.73 PF ,[object Object],11.1 KVAR Impact Standard Reading Parameter
Power Quality (AHU) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (AHU) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],3v< 2.182v NE voltage Impact Standard Reading Parameter
Power Quality (AHU) N-E: Voltage and Current Harmonics ,[object Object],Stable Unstable Waveform ,[object Object],3-5% 71.6% Harmonics Impact Standard Reading Parameter
Power Quality (Chiller Plant) R-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.73 PF ,[object Object],39.3 KVAR Impact Standard Reading Parameter
Power Quality (Chiller Plant) R-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.1% Harmonics Impact Standard Reading Parameter
Power Quality (Chiller Plant) Y-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.74 PF ,[object Object],39.0 KVAR Impact Standard Reading Parameter
Power Quality (Chiller Plant) Y-Phase: Voltage and Current Harmonics ,[object Object],3-5% 0.9% Harmonics Impact Standard Reading Parameter
Power Quality (Chiller Plant) B-Phase: Voltage, Current and Power ,[object Object],Stable Stable Waveform ,[object Object],>0.95 0.75 PF ,[object Object],36 KVAR Impact Standard Reading Parameter
Power Quality (Chiller Plant) B-Phase: Voltage and Current Harmonics ,[object Object],3-5% 1.2% Harmonics Impact Standard Reading Parameter
Power Quality (Chiller Plant) N-E: Voltage, Current and Power ,[object Object],Stable Unstable Waveform ,[object Object],3v< 2.163v NE voltage Impact Standard Reading Parameter
Power Quality (Chiller Plant) N-E: Voltage and Current Harmonics ,[object Object],3-5% 70.2% Harmonics Impact Standard Reading Parameter
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Facility Observations Auto Change Over Panel CT’s hanging Switches not mounted in panel Improper cabling
Facility Observations Meter Unprofessional way of jointing Switches not mounted in panel Improper Cabling
Facility Observations Electrical Room No gap between UPS and battery
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Agenda
Conclusions, Recommendations & Next Steps ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Contd…
Conclusions, Recommendations & Next Steps ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Mais conteúdo relacionado

Mais procurados

Final year Ieee power electronics project titles 2013 2014
Final year Ieee power electronics project titles 2013 2014Final year Ieee power electronics project titles 2013 2014
Final year Ieee power electronics project titles 2013 2014
onepointer
 
Bosch Project
Bosch ProjectBosch Project
Bosch Project
Akash Roy
 
Design of a mode decoupling facts device for voltage control of wind driven i...
Design of a mode decoupling facts device for voltage control of wind driven i...Design of a mode decoupling facts device for voltage control of wind driven i...
Design of a mode decoupling facts device for voltage control of wind driven i...
IAEME Publication
 

Mais procurados (20)

Design And Simulation of Microgrid Control based Wind Power Generation Syst...
Design And Simulation of  Microgrid Control  based Wind Power Generation Syst...Design And Simulation of  Microgrid Control  based Wind Power Generation Syst...
Design And Simulation of Microgrid Control based Wind Power Generation Syst...
 
Load Flow Analysis for Process – Tank Loading Power Generation Networks Inter...
Load Flow Analysis for Process – Tank Loading Power Generation Networks Inter...Load Flow Analysis for Process – Tank Loading Power Generation Networks Inter...
Load Flow Analysis for Process – Tank Loading Power Generation Networks Inter...
 
ETAP - Load flow and panel rev2014-1
ETAP - Load flow and panel   rev2014-1ETAP - Load flow and panel   rev2014-1
ETAP - Load flow and panel rev2014-1
 
46 icaer presentation_corrected
46 icaer presentation_corrected46 icaer presentation_corrected
46 icaer presentation_corrected
 
Unit 4 Automatic Generation Control
Unit 4 Automatic Generation ControlUnit 4 Automatic Generation Control
Unit 4 Automatic Generation Control
 
Automatic Generation Control
Automatic Generation ControlAutomatic Generation Control
Automatic Generation Control
 
Final year Ieee power electronics project titles 2013 2014
Final year Ieee power electronics project titles 2013 2014Final year Ieee power electronics project titles 2013 2014
Final year Ieee power electronics project titles 2013 2014
 
Ece333 2018 lect18_rh power flow
Ece333 2018 lect18_rh power flowEce333 2018 lect18_rh power flow
Ece333 2018 lect18_rh power flow
 
Bosch Project
Bosch ProjectBosch Project
Bosch Project
 
Unit commitment
Unit commitmentUnit commitment
Unit commitment
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
Fractional Order PID Controlled Interleaved Boost converter Fed Shunt Active ...
Fractional Order PID Controlled Interleaved Boost converter Fed Shunt Active ...Fractional Order PID Controlled Interleaved Boost converter Fed Shunt Active ...
Fractional Order PID Controlled Interleaved Boost converter Fed Shunt Active ...
 
Bank kapasitor
Bank kapasitorBank kapasitor
Bank kapasitor
 
179 narayan p
179 narayan p179 narayan p
179 narayan p
 
Lecture 15
Lecture 15Lecture 15
Lecture 15
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmission
 
Design of a mode decoupling facts device for voltage control of wind driven i...
Design of a mode decoupling facts device for voltage control of wind driven i...Design of a mode decoupling facts device for voltage control of wind driven i...
Design of a mode decoupling facts device for voltage control of wind driven i...
 
Economic Dispatch
Economic DispatchEconomic Dispatch
Economic Dispatch
 
Economic load dispatch
Economic load dispatchEconomic load dispatch
Economic load dispatch
 
A Three Phase AC-AC ZCS Resonant Converter for Induction Heating
A Three Phase AC-AC ZCS Resonant Converter for Induction HeatingA Three Phase AC-AC ZCS Resonant Converter for Induction Heating
A Three Phase AC-AC ZCS Resonant Converter for Induction Heating
 

Destaque

Application Note – UPS Power System Design Parameters
Application Note – UPS Power System Design ParametersApplication Note – UPS Power System Design Parameters
Application Note – UPS Power System Design Parameters
Leonardo ENERGY
 
Current And Voltages
Current And VoltagesCurrent And Voltages
Current And Voltages
ritchiek
 
Tom and Hattie's Birthday
Tom and Hattie's BirthdayTom and Hattie's Birthday
Tom and Hattie's Birthday
guest3adda8
 
Capital Projects Assessment [Infographic]
Capital Projects Assessment [Infographic]Capital Projects Assessment [Infographic]
Capital Projects Assessment [Infographic]
Gerard B. Hawkins
 
Polyolefins Catalyst Industry [Infographic]
Polyolefins Catalyst Industry [Infographic]Polyolefins Catalyst Industry [Infographic]
Polyolefins Catalyst Industry [Infographic]
Gerard B. Hawkins
 
Chinese Imperial Crisis
Chinese Imperial CrisisChinese Imperial Crisis
Chinese Imperial Crisis
Greg Knight
 
Opium wars powerpoint (alex thompson's conflicted copy 2014 06-18)
Opium wars powerpoint (alex thompson's conflicted copy 2014 06-18)Opium wars powerpoint (alex thompson's conflicted copy 2014 06-18)
Opium wars powerpoint (alex thompson's conflicted copy 2014 06-18)
Alex Thompson
 

Destaque (20)

Application Note – UPS Power System Design Parameters
Application Note – UPS Power System Design ParametersApplication Note – UPS Power System Design Parameters
Application Note – UPS Power System Design Parameters
 
UPS
UPSUPS
UPS
 
Current And Voltages
Current And VoltagesCurrent And Voltages
Current And Voltages
 
Queda Da Republica
Queda Da RepublicaQueda Da Republica
Queda Da Republica
 
Tom and Hattie's Birthday
Tom and Hattie's BirthdayTom and Hattie's Birthday
Tom and Hattie's Birthday
 
Adroit Power Systems India Private Limited , Coimbatore, Oil Cooled Voltage S...
Adroit Power Systems India Private Limited , Coimbatore, Oil Cooled Voltage S...Adroit Power Systems India Private Limited , Coimbatore, Oil Cooled Voltage S...
Adroit Power Systems India Private Limited , Coimbatore, Oil Cooled Voltage S...
 
Capital Projects Assessment [Infographic]
Capital Projects Assessment [Infographic]Capital Projects Assessment [Infographic]
Capital Projects Assessment [Infographic]
 
Nutdemineralized 1
Nutdemineralized 1Nutdemineralized 1
Nutdemineralized 1
 
Hydrogen recovery from purge gas(energy saving)
Hydrogen recovery from purge gas(energy saving)Hydrogen recovery from purge gas(energy saving)
Hydrogen recovery from purge gas(energy saving)
 
Polyolefins Catalyst Industry [Infographic]
Polyolefins Catalyst Industry [Infographic]Polyolefins Catalyst Industry [Infographic]
Polyolefins Catalyst Industry [Infographic]
 
Cold War Overview
Cold War OverviewCold War Overview
Cold War Overview
 
Sun yat sen memorial hall taipei (台北國父紀念館)
Sun yat sen memorial hall taipei (台北國父紀念館)Sun yat sen memorial hall taipei (台北國父紀念館)
Sun yat sen memorial hall taipei (台北國父紀念館)
 
Sun Yat Sen High School of Iloilo Inc. THE DAWN 2013
Sun Yat Sen High School of Iloilo Inc. THE DAWN 2013Sun Yat Sen High School of Iloilo Inc. THE DAWN 2013
Sun Yat Sen High School of Iloilo Inc. THE DAWN 2013
 
BSI ISO5001 Seminar - Energy Management Standards
BSI ISO5001 Seminar - Energy Management Standards BSI ISO5001 Seminar - Energy Management Standards
BSI ISO5001 Seminar - Energy Management Standards
 
Energy saving in urea plant by modification in heat exchanger and process
Energy saving in urea plant by modification in heat exchanger and processEnergy saving in urea plant by modification in heat exchanger and process
Energy saving in urea plant by modification in heat exchanger and process
 
Chinese Imperial Crisis
Chinese Imperial CrisisChinese Imperial Crisis
Chinese Imperial Crisis
 
Iso50001 (Energy Management System
Iso50001 (Energy Management SystemIso50001 (Energy Management System
Iso50001 (Energy Management System
 
Opium wars powerpoint (alex thompson's conflicted copy 2014 06-18)
Opium wars powerpoint (alex thompson's conflicted copy 2014 06-18)Opium wars powerpoint (alex thompson's conflicted copy 2014 06-18)
Opium wars powerpoint (alex thompson's conflicted copy 2014 06-18)
 
NI 17 China Packet
NI 17 China PacketNI 17 China Packet
NI 17 China Packet
 
HVAC Energy Audit for a Global Pharmaceutical Company in Philadelphia
HVAC Energy Audit for a Global Pharmaceutical Company in PhiladelphiaHVAC Energy Audit for a Global Pharmaceutical Company in Philadelphia
HVAC Energy Audit for a Global Pharmaceutical Company in Philadelphia
 

Semelhante a Sutherland.Malad Audit Results Electrical.Final.17 Mar 08

Sample Power Audit Results
Sample Power Audit ResultsSample Power Audit Results
Sample Power Audit Results
Sandeep Changula
 
INDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATIONINDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATION
Argha Dutta
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
PoojaAnupGarg
 
UPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxUPS operation, Rev 2.pptx
UPS operation, Rev 2.pptx
Jaimohan15
 

Semelhante a Sutherland.Malad Audit Results Electrical.Final.17 Mar 08 (20)

Sample Power Audit Results
Sample Power Audit ResultsSample Power Audit Results
Sample Power Audit Results
 
APFC AMTL 30.01.2015
APFC  AMTL  30.01.2015APFC  AMTL  30.01.2015
APFC AMTL 30.01.2015
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers rating
 
Energy Efficient Data Center
Energy Efficient Data CenterEnergy Efficient Data Center
Energy Efficient Data Center
 
H09 Building Level Design
H09 Building Level DesignH09 Building Level Design
H09 Building Level Design
 
INDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATIONINDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATION
 
How Power Factor corection works.pdf
How Power Factor corection works.pdfHow Power Factor corection works.pdf
How Power Factor corection works.pdf
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
 
UPS operation, Rev 2.pptx
UPS operation, Rev 2.pptxUPS operation, Rev 2.pptx
UPS operation, Rev 2.pptx
 
Latex_Final_Bryan_F
Latex_Final_Bryan_FLatex_Final_Bryan_F
Latex_Final_Bryan_F
 
ICERA2021_Present_Final.pptx
ICERA2021_Present_Final.pptxICERA2021_Present_Final.pptx
ICERA2021_Present_Final.pptx
 
IEEE Blue Book
IEEE Blue BookIEEE Blue Book
IEEE Blue Book
 
D Var Statcom Introduction
D Var Statcom IntroductionD Var Statcom Introduction
D Var Statcom Introduction
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībām
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībāmPC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībām
PC 3-fāžu UPS izvēles iespējas ražošanas uzņēmumu vajadzībām
 
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
 
Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7Cis eo dte_power_factor_138474_7
Cis eo dte_power_factor_138474_7
 
Maritime afternoon Event short
Maritime afternoon Event shortMaritime afternoon Event short
Maritime afternoon Event short
 
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdfSwitching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
Switching Over Voltages (SOV)_Temporary Over Voltage (TOV).pdf
 
Final FYP presentation new
Final FYP presentation newFinal FYP presentation new
Final FYP presentation new
 

Último

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 

Último (20)

Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLWhitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
Whitefield CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 

Sutherland.Malad Audit Results Electrical.Final.17 Mar 08

  • 1. Results from Electrical Audit of Sutherland’s Malad Facility, Mumbai Presentation to Mr. K.P. Nair & Mr. Ramunni Nair Version 2 March 17, 2008
  • 2.
  • 3.
  • 4. Audit Scope of Work ATS LDB Panel UPS SBP 3 x 60 kVA HVAC Panel UPS SBP 20 KVA DB1 DB2 DB3 DB2 DB3 DB4 DB2 DB3 DB4 DB1 DBI DB4 DG Backup DB5 500 kVA DG-1 Energy Meter Chiller Plant DB5 DB5 Sever Room Main LT Panel PFC-1 100 KVAR Chiller Distribution AMF-1 AMF-2 AMF Panels Main LT Panel APFC 250 kVA 250 kVA First Floor End to End Power Distribution System End Loads Intermediate Loads 1 1 1 1 1 1 1 1 1 1
  • 5. Audit Scope of Work LTG Panel UPS SBP 3 x 40 kVA 2 x 60 kVA HVAC Panel DB1 DB2 DB3 DB2 DB3 DB4 DB2 DB3 DB4 DB1 DBI DB4 DB5 DB5 DB5 ATS DG Backup 500 kVA DG-2 Energy Meter Main LT Panel PFC-1 100 KVAR AMF-1 AMF Panels Main LT Panel APFC Second Floor End to End Power Distribution System 2 x 225 kVA Intermediate Loads End Loads 1 1 1 1 1
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 16.
  • 17. Loads and their Maximum Consumption Reliance Power 500 kVA MD Total: 346.53 kVA Max Electricity Bill Unit = 1kW 3x60 kVA UPS (For Facility) 20 KVA UPS (For Server Room) AHU (AHU 33.69 kVA) LDB (For Lighting) Current: 54.89 kVA Current: 75.3 kVA Current: 6.34 kVA Current: 50.4 kVA Current: 159.6 kVA Chiller Plant (1X80, 1X60 TR)
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25. Consumption LDB Lighting Consumption = 54.89 54.8 TOTAL 0.95 0.98 0.96 PF 75.6 80.2 76.1 Current (A) 17.7 235.2 B 19.0 236.1 Y 18.1 237.2 R kVA Voltage (V) LDB
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Potential Power Savings MD * (MD charge/kVA/month of Rs. 300/-) x (demand difference of 100 kVA) x (12 months per year) 3,60,000 TOTAL 3,60,000 Shifting to 400 kVA MD instead of 500 kVA * 1 Capex Opex (Annual) Area of Saving #
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61.
  • 62.
  • 63.
  • 64.
  • 65.
  • 66.
  • 67.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 73.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 88.
  • 89.
  • 90.
  • 91.
  • 92.
  • 93.
  • 94.
  • 95.
  • 96.
  • 97.
  • 98.
  • 99.
  • 100.
  • 101.
  • 102.
  • 103.
  • 104.
  • 105.
  • 106.
  • 107.
  • 108.
  • 109.
  • 110.
  • 111.
  • 112.
  • 113.
  • 114.
  • 115.
  • 116.
  • 117.
  • 118.
  • 119.
  • 120.
  • 121.
  • 122.
  • 123.
  • 124.
  • 125.
  • 126.
  • 127.
  • 128.
  • 129.
  • 130.
  • 131.
  • 132. Power Quality (UPS 3x60 kVA) N-E: Voltage, Current and Power Waveform PF Impact Standard Reading Parameter
  • 133.
  • 134.
  • 135.
  • 136.
  • 137.
  • 138.
  • 139.
  • 140.
  • 141.
  • 142.
  • 143.
  • 144.
  • 145.
  • 146.
  • 147.
  • 148.
  • 149.
  • 150.
  • 151.
  • 152.
  • 153.
  • 154.
  • 155.
  • 156.
  • 157.
  • 158.
  • 159. Facility Observations Auto Change Over Panel CT’s hanging Switches not mounted in panel Improper cabling
  • 160. Facility Observations Meter Unprofessional way of jointing Switches not mounted in panel Improper Cabling
  • 161. Facility Observations Electrical Room No gap between UPS and battery