Delivering healthcare projects
Healthcare project delievery must focus on         We have a holistic approach to project
                                          people: the patients and visitors and those        delivery; an approach that demands
                                          who delivery the healing: doctors, nurses,         a committed partnership between all
                                          technicians, administrators and maintenance        members of the project team, the healthcare
                                          staff. And then there are those whose job it is    provider, and the stakeholders in a patient-
contents                                  to construct the building on time and within       centred delivery process.
                                          budget. Each has important but different
                                          needs.                                             We believe that collaborative working is key
01. 	 introduction                                                                           to the success of all our healthcare projects.
                                          At Capita Symonds we specialise in delivering      We achieve this collaboration by talking to
02. 	 delivering success                  healthcare projects that meet all of these         end users (patients, nurses, consultants, and
                                          needs. Our team has an unparalleled                managers), engaging them in the process,
03. 	 brampton CV project                 knowledge of the issues, people and                find out what they need, stimulating debate
04. 	 guild Lodge 	                       processes involved in healthcare facilities.
                                          We understand the rate at which healthcare
                                                                                             and discussion on best practice, in order to
                                                                                             generate a dynamic vision for their new or
05.	 guild Lodge Ph2.                     delivery evolves, and we recognise                 refurbished healthcare facility.
                                          the need to design adaptable, flexible
06. 	 new pathology & pharmacy building   accommodation, which can change in line
                                          with our clients needs.
07. 	 wembley hospital
08. 	 royal victoria hospital             We have the capacity to meet our clients’
                                          requirements; from delivering large acute
09.	 downe lisburn hospital               facilities through intermediate care facilities,
                                          polyclinics, health centres, GP surgeries and
10.	 the london clinic                    mental health units. Capita Symonds are
                                          able to help our healthcare clients through
11.	 diamond light source                 all stages of the project lifecycle from the

12.	services                              initial investigation and evaluation of the
                                          service strategies, through the detailed
13.	company                               briefing and design of capital schemes,
                                          to the commissioning and evaluation of
                                          completed facilities in terms of construction
                                          management services.
Delivering Success
                     One team, one goal
                                                                   Healthcare requires more
                     There’s no denying it’s a complex process     than a grand facade
                     with significant sums being invested
                     and spent. And that’s before the actual       The project manager and their team
                     building starts. In addition to project       must listen to and try to accommodate
                     managers you have architects, healthcare      everyone’s needs: planners, engineers,
                     planners, engineers, builders, surveyors,     builders, cost advisors, equipment
                     construction managers and landscape           specialists, and, especially nurses,
                     architects involved. Each has important       clinicians and healthcare managers. Often
                     skills to offer that requires effective       needs are conflicting and an optimised
                     management.                                   compromise must be sought. The co-
                                                                   ordination must work on many fronts;
                     Building a healthcare facility requires       aesthetics, construction, safety, cost, and
                     team players. You need a project manager      maintenance.
                     that understands healthcare and can
                     inspire a design team produce an efficient    And of course it must have the flexibility
                     design which is also affordable. But just     to support the delivery of changing
                     as important is the project manager’s         healthcare services which are becoming
                     ability to bring people of differing          ever more complicated. Whether our
                     opinions together. Capita Symonds is          commission is for a hospital, a primary
                     skilled at creating teams that break down     care clinic or a laboratory, it must focus
                     the traditional barriers between Health       on people; staff, patients, and visitors. A
                     Facility Users, Designers and Contractors,    grand design just will not be enough.
                     thereby creating an integrated team
                     dedicated to one goal; successful delivery.
A new challenge                                procurement routes place a premium on       and an improvement in the quality and             It’s about what works, not just
                                               speed of construction. The requirement      robustness of the completed design.
With the advent of innovative                  for the builder to maintain finished
                                                                                                                                             organisational diagrams
procurement routes, such as PFI,               facilities at a high standard for 30+       Do it once, do it right                           When as project manager we put together
Procure21, Express LIFT and Framework          years has also placed a much greater                                                          a team of architects for a healthcare
                                                                                           How do you delivery a better quality
appointments, much of the responsibility       emphasis on quality. These factors taken                                                      project, each team has designers and
                                                                                           product, faster? By re-evaluating the
for delivery of the project has passed         together were the impetus for Capita                                                          specialist healthcare planners. We
                                                                                           whole project delivery process which
to the contractor. However, as project         Symonds’s rethinking of the whole                                                             understand that good management goes
                                                                                           can sometimes mean spending more
manager we ultimately assume single            design development process, to allow for                                                      hand in hand with innovative design and
                                                                                           time on one element of the process to
point responsibility for delivering success.   techniques such as off site construction,                                                     a solid understanding of best practice in
                                                                                           save a greater amount of time latter
In addition many of these innovative           site waste minimisation and recycling,                                                        healthcare design.
                                                                                           on. You also must look closely at the
                                                                                           construction and fit-out processes and
                                                                                           see where time on site can be reduced.            The project manager works closely with
                                                                                           One way to reduce time / minimise risk            the contractor and project consultants
                                                                                           is to reduce the number of different              and alongside the planners and designers.
                                                                                           elements by replacing multiple units              Our role is to make sure the work is
                                                                                           with identical repeatable ones. E.g. whole        adequately programmed and resourced
                                                                                           rooms such as clean utilities, dirty utilities,   and to keep track of progress and costs.
                                                                                           bedrooms and sanitary facilities, can             It is a key management role and we
                                                                                           be easily replicated, manufactured off            deliberately separate the roles of project
                                                                                           site and swiftly installed. The unit cost         management from that of designer and
                                                                                           may increase but this is outweighed by            healthcare specialist to ensure it is given
                                                                                           the benefit of a shorter time on site. It         proper weight.
                                                                                           also results in higher quality building by
                                                                                           using appropriate off site construction
                                                                                           techniques.
future trends, of what constitutes ‘best     we go to great lengths to make sure that
                                                                                           practice’, and of the high expectations of   everyone, understands the vision for their
                                                                                           staff, patients and visitors.                new facility and the processes involved to
                                                                                                                                        deliver it.
                                                                                           Gently does it
                                                                                           From the start of the process to the         Place making
                                                                                           selection of the design team and then on
                                                                                                                                        Project Management is just one of
                                                                                           to the award of the construction contract,
                                                                                                                                        several areas in which we specialise.
                                                                                           we manage for change. During the various
                                                                                                                                        Our healthcare designers and planners
                                                                                           types of bidding process much can
                                                                                                                                        often work alongside colleagues in our
                                                                                           evolve. New rules and regulations can be
                                                                                                                                        firm who are experts in urban design,
                                                                                           introduced, patient numbers can fluctuate
                                                                                                                                        environmental graphics, interiors, retail
                                                                                           and some treatments can take precedence
                                                                                                                                        and education. They are able to contribute
                                                                                           over others. Our flexible and informed
                                                                                                                                        their knowledge to ensure that the
                                                                                           approach means that these changes need
                                                                                                                                        healthcare facility becomes a viable,
                                                                                           not mean drastic re-thinking or re-scoping
                                                                                                                                        dynamic environment and part of the local
                                                                                           of the project. Our team has been through
                                                                                                                                        community.
                                                                                           this process several times. But for a
                                                                                           Trust, it may be their first introduction
                                                                                           to the issues involved in delivering major
                                                                                                                                        Our wider team
                                                                                           capital works and as project managers we     Aside from Project Management Capita
                                                                                           help and support the Trust throughout        Symonds can offer a fully integrated
We know what works                           But perhaps of more importance is the         the delivery process. We are aware of        design service including Architecture, Civil
We’ve been delivering healthcare             fact that to every project we can call upon   the issues that can arise, the disruption    and Structural Engineering, Mechanical
buildings; hospitals, primary care clinics   over 40 years of experience acquired in       which can be caused and the difficulty       and Electrical Engineering, Landscape
and laboratories, in the UK for many         healthcare economies throughout the           clinicians and administrators have with      Architecture, Acoustic Engineering, Fire
years. We are familiar with all forms of     world including the America, and the          interpreting drawings and accepting          Engineering, Traffic Engineering, Clinical
procurement, with their unique funding,      middle and far east. Capita Symonds are       change. Therefore, when we meet the end      Healthcare Planning and Construction
tendering and reporting processes.           therefore very aware of current and likely    users, be they patients staff or visitors,   Management.
If there is an interest in the wider services   Our work - case studies                     affordable and incorporate the most up
we can offer due to the economies of scale                                                   to date practices; and contractors want
there can be significant savings to the          Patients and visitors want environments     buildings that are quick to build with
delivery costs on a healthcare project.          that are welcoming, comfortable, safe and   minimum risk.
                                                 which help healing. Healthcare workers
                                                 and their managers want environments        At Capita Symonds we recognise that this
                                                 that support their efforts to care for      is the background against which modern
                                                 patients and to improve productivity.       healthcare facilities need to be delivered
                                                 HealthcareTrusts want designs that are      in the UK and it is this knowledge that
                                                                                             underpins our ability to deliver successful
                                                                                             healthcare projects.
community
CASE STUDY             Brampton Community Ventures Project
CLIENT                 Cumbria PCT and Cumbria County Council
LOCATION               Brampton, Cumbria
VALUE                  £10m




This integrated healthcare and community project includes facilities
for Brampton GPs, PCT nursing beds and 30 adult social care beds.
In addition, flexible space for the local Community Association is
included together with facilities for children’s services. There is also
provision for a pharmacy and shared space and facilities have played
a prominent part in the initial accommodation and models of care
assessments.


Our engagement has been both to provide project management
services and also fully integrated design and cost management .Our
role has required effective communication with stakeholders beyond
the partners actually taking space in the facility including the local
neighbourhood forum and traders association. We have also been
tasked with co-ordinating delivery of an outline business case and
planning application.


Two sites are under consideration for the facility and thorough in-depth
analysis of both sites has resulted in the delivery of a detailed report.
This shall allow a highly informed choice of site to be made, providing
confidence that users, investors and the local community can be sure
that the facility provides maximum value to the environment and
population it serves.
community
CASE STUDY            Guild Lodge - Medium Secure Unit and High
                      Dependency Unit
CLIENT                Guild Community Healthcare NHS Trust
LOCATION              Guild Park, Preston
VALUE                 £10m



Part of the old Whittingham Hospital at Goosnargh, Preston the
Guild Lodge facility has been developed as a new state-of-the-art
combined 54 bed Medium Secure Unit (MSU) and High Dependency
Unit (HDU).


The 30 bed Medium Secure Unit comprises the following:


•	         Single storey 8 bed acute ward including a seclusion suite 	
	          available to other wards;
•	         Two storey block with a 12 bed ongoing therapy ward on 	
	          the ground floor and a 10 bed pre-discharge ward on the 	
	          first floor.


The 24 bed High Dependency Unit is a single story building comprising
three 8 bed wards, that is linked directly to the main entrance and
sports hall to form a secure courtyard.


Serving both the MSU and HDU are the following:


•	         Single storey occupational therapy unit;


•	         Part single/two storey building administration building
	          providing office, kitchen, dining and changing 		
	          facilities, with meeting areas for family visits and a GP 		
	          surgery space; and
•	         Single storey gymnasium.  


A flexible but disciplined approach was needed to control all stages
of the project, within the required 29 month programme from
commencement of Outline Business Case to the commissioned
facility. Whilst much emphasis was placed on security, the careful
selection of materials and components ensured a domestic and relaxed
environment for more effective patient rehabilitation.
community
CASE STUDY             Guild Lodge Phase II - Long Term Medium Secure
                       Unit
CLIENT                 Lancashire NHS Trust
LOCATION               Guild Park, Preston
VALUE                  £9m



The Guild Lodge Phase II project was an expansion of an existing
Medium Secure Facility, to provide a new 38 bed Long Term Medium
Secure Unit, together with alterations and extensions to existing
facilities.


The single storey development comprised a cluster of six individual
buildings as follows:


•	         House with 16 beds;
•	         House with 14 beds and an Extra Care Suite;
•	         House with 8 beds;
•	         Vocational Therapy Centre;
•	         Rehabilitation Management Centre; and
•	         Social Centre/Café


The buildings were set within a common landscape with interconnecting
walkways. Each house had access to an external ‘garden’, some of
which were secure, that provided a recreational and therapeutic
environment.


The architectural style of each building reflected its intended use.


Capita Symonds worked very closely with the Trust and stakeholders,
to develop a scheme that established a community, where quality of
life was maximised, creating a safe and spacious environment, which
was both attractive and comfortable, and yet provided maximum
observation with minimum obtrusion.
centre of excellence
CASE STUDY             Regional Cancer Centre, City Hospital, Belfast
CLIENT                 Belfast City Hospital Trust
LOCATION               Northern Ireland
VALUE                  £60m




The new Belfast Cancer Centre is planned to serve Northern Ireland
as a Regional Centre of Excellence. It replaces existing facilities at
Belvoir Park Hospital and provides patients and their families with
access to treatment and support services, diagnosis and treatment,
through to follow-up care. The centre is part of a government plan for
cancer care across the UK which involves regional centres supported
by satellite follow-up centres.


Linked to the existing City Hospital by underground and elevated
walkways, the 84-bed centre will provide integrated access to support
surgical and chemotherapy facilities. The hi-tech treatment facilities
include 10 linear accelerator vaults for radiotherapy – making this one
of the largest cancer care facilities in the UK – and a High Dose Rate
(HDR) operating theatre.


The diagnostic and treatment planning for radiotherapy facilities
utilise the very latest technology for all imaging modalities currently
being employed. These include 2 MRI scanners, 3 CT scanners, X-ray,
ultrasound and 2 gamma cameras. There is also an Outpatient Clinics
for Rehabilitation and Palliative Care.


A “patient focused care” approach was adopted for the delivery of
cancer care throughout Northern Ireland.


The new centre has been designed to create a non-institutional,
human-scale environment with maximum use of natural daylight,
which will provide a therapeutic and harmonious atmosphere to
benefit and improve the patient’s progress and well being.
clinical support
                           CASE STUDY            New Pathology and Pharmacy Building
                           CLIENT                Bart’s and the Royal London NHS Trust
                           LOCATION              London
                           VALUE                 £58m




                           The new Pathology and Pharmacy Building is one of the advance
                           projects of the £1billion Bart’s and the Royal London Hospitals PFI
                           redevelopment planned at Whitechapel, East London.

Main image:                The 16,000sqm accommodation is housed in a 7-storey
Second floor laboratory    building, located on a prominent corner site in the London Hospital
Below:
                           Conservation Area. The state-of-the-art building contains teaching
Colourful west staircase
                           laboratories, lecture rooms, seminar rooms, and a fully automated
                           multidisciplinary analytical laboratory. The modular-designed
                           laboratories provide flexible accommodation for a range of Pathology
                           disciplines, including Biochemistry, Immunology, Histopathology,
                           Virology, Molecular Biology, and Haematology. A pedestrian tunnel
                           links the building with the main hospital complex, to provide a
                           convenient route for internal trolley traffic and specimen deliveries.


                           The project was very challenging. The site was constrained; opposite
                           is the construction site for the PFI, Queen Mary’s
                           School of Medicine and Dentistry lies to the west and Whitechapel
                           Underground station is situated directly below. Additionally, these
                           departments are notoriously difficult to design together, as Pharmacy
                           is ultra clean, whilst Pathology is not.


                           There were many end users to consult with as the new building
                           accommodates 14 different pathology and pharmacy divisions that
                           were originally scattered across East London in separate buildings.


                           Capita Symonds worked very closely with the Trust and clinicians
                           both during planning and design in order to understand the different
                           requirements of each of the different disciplines.
Main image:
Main entrance
Above & below:
Reception area
primary care
CASE STUDY             Wembley Hospital, London
CLIENT                 Parkside Health
LOCATION               London
VALUE                  £6.4m




Parkside Health is committed to delivering out-patient
services in a different way. The model of care is unique and
involves a wide provision of Health Services under one roof.
The centre is located at Wembley Hospital and will provide
modern and efficient accommodation for GPs, primary care
health teams, health promotion unit, welfare advice and
specialist services, women’s services, general hospital
outreach services, pharmacy, local authority and a minor
accident and treatment service (MATS).


The building comprises a mixture of single and two storey
wings arranged around a double height, circular reception
area and central core with semi-scenic lift. This ‘heart’ of the
building acts as the pivotal hub from which all health services
are approached.


The massing of the building has been carefully considered,
responding to the surrounding suburban environment and
disguising the overall floor area from its neighbours. The building
received a highly commended award at the NHS Estates -
Building Better Healthcare Awards 2001.
design competition
                                CASE STUDY             Royal Victoria Hospital, Belfast
                                CLIENT                 Health Estates
                                LOCATION               Belfast, Northern Ireland
                                VALUE                  £91.4m




                                Phase 1 comprises a 7-storey glazed hospital street serving 16 wards
                                of 400 beds on levels 4-7. Day procedures, ITU, theatre suite and
                                recovery are on level 3 and a range of investigations, outpatients and
                                pharmacy facilities on Levels 1 and 2.


                                Medical areas are supported by a new hospital main entrance
                                and restaurant above and enhanced by a major programme of
                                landscaping and integrated art work.


                                The external cladding is of composite aluminium insulated panels
                                finished in sterling silver PVF2. The ‘street’ is fully glazed on both
                                sides using a ‘stick’ curtain walling system.


                                Phase 2 will be carried out in stages after demolition of 20 Victorian
                                wards and will comprise a new A&E department, Admissions ward,
                                additional theatres, PFI imaging centre, OPD departments, Education
                                centre and west entrance.




Main image:
Royal Victoria Hospital, main
entrance
Design for Excellence
CASE STUDY             Downe Lisburn Hospital
CLIENT                 South Eastern Health and Social Care Trust
LOCATION               Northern Ireland
VALUE                  £47m




Won under an invited design competition in May 2004 Capita
Symonds adopted an holistic approach to the design. We are
committed to partnership between all members of the design
team, Trust and stakeholders in a patient centred design process.
It is an approach that encourages a truly inclusive plan for the
design development, based on a common vision to provide a better
healthcare experience. The local community is also seen as an
important element in the design process and takes ownership of the
final design.


The New Downe Hospital site is set within a powerful and dynamic
landscape, housing the existing Grade II listed Hospital which is
retained and converted for Civic usage. The new hospital respects
it’s surroundings and corresponds to the major views of the famous
Mourne Mountains to the South West.


Departments provided include: 10 bed observation unit, accident
and emergency, outpatients, 20 bed in patient ward, coronary care
unit, health records, dementia, 25 bed acute psychiatric unit, day
procedures unit, clinical support, rehabilitation, radiology, children’s
day care, pharmacy, miscellaneous, support services and mortuary.
Specialist & Medical Provision
CASE STUDY            The London Eye Clinic
CLIENT                The London Clinic
LOCATION              119 Harley Street, W1
VALUE                 £4.6m



The Eye Clinic is a specialist medical provision providing ‘state-
of-the-arts’ eye care within The London Clinic’s private health
care campus. It prides itself on housing highly respected leading
ophthalmic consultant surgeons, physicians, orthoptists,
optometrists and nursing staff. It provides unrivalled excellence
and individual care to patients including members of the Royal
family. It is self-contained using the latest diagnostics and
treatment for eye disorders.


The London Clinic is the UK’s largest, independently owned and
operating, non-profit hospital.


This high profile project consisted of the extensive refurbishment,
extension and conversion of the Grade II listed building resulting in
a ‘one stop shop’ for outpatients seeking the very best in eye health
treatment and care.


The provision includes nine consulting suites, eight procedure and
treatment rooms including laser surgeries and full nursing support
situated over six storeys.


The clinic was successfully completed and fully operational in
line with its royal opening by HRH Princess Alexandra on 23rd
November 2012.
Centre of Excellence
CASE STUDY            Diamond
CLIENT                Diamond Light Source
LOCATION              Didcot, Oxfordshire
VALUE                 £276m



Diamond Light Source (DLS) is a scientific facility on the Harwell
Science & Innovation Campus, Rutherford Appleton Laboratory site
in Oxfordshire.


It is a circular-shaped machine, called a synchrotron that uses arrays
of magnets, called insertion devices, to generate bright beams of
synchrotron light.


Around the machine is a collection of experimental research
laboratories called beamlines. At each beamline, scientists
independently use the light generated by the machine for a wide
variety of experiments.


The Diamond project team consisted of 250 dedicated engineers,
scientists, support staff and technicians. By 2012, Diamond will
grow to 300 staff and will welcome about 2,000 scientific users per
annum.


The Synchrotron building is aluminium clad steel framed building
enclosing a high bay experimental hall with a curved roof profile,
the concrete machine housing, inner access and service zone.
Around the external perimeter of the building are arranged two
storey perimeter offices and laboratories with precast concrete
suspended floors.


Diamond now produces pinpoint ultra-violet and X-ray beams of
exceptional brightness. These highly focused light beams enable
scientists and engineers to probe deep into the basic structure of
matter and materials, answering fundamental questions about
everything from the building blocks of life to the origin of our
planet. State-of-the-art instrumentation complements the light
source, ensuring that researchers from the UK and abroad have
access to cutting-edge analytical techniques and services.
services
Capita Symonds are in a position to                  •	   Environmental Noise                            •	   Technology
                                                     •	   Facilities Management                          •	   Telecoms Engineering
provide an integrated multi-disciplinary             •	   Geotechnical Engineering                       •	   Town Planning and Masterplanning
team. Services include:                              •	   GIS and Data Management                        •	   Traffic Surveys
                                                     •	   Health & Safety Training                       •	   Transport Planning
                                                     •	   Healthcare Planning                            •	   Tunnel Design and Refurbishment
                                                     •	   Highway Asset Management                       •	   Urban Design
•	   Arboriculture
                                                     •	   Highway Design                                 •	   Value Management
•	   Architecture
                                                     •	   Highway Maintenance                            •	   Water Environment
•	   Aviation
                                                     •	   Highway Pavement & Construction Materials      •	   Waterways
•	   Bridge Design
                                                     •	   Innovations Software Development
•	   Brief development
                                                     •	   Insurance
•	   Building Services Engineering
                                                     •	   Instrumentation Consultancy
•	   Building Surveying
                                                     •	   Interior Design
•	   Communications and Technology
                                                     •	   Landscape and Urban Design
•	   Construction Management
                                                     •	   Leisure and Event Safety
•	   Construction and Occupational Health & Safety
                                                     •	   Litigation
•	   Consultation and communication
                                                     •	   Masterplanning
•	   Contract Management
                                                     •	   PFI/PPP Consultancy
•	   Conservation
                                                     •	   Project Management
•	   Cost Management
                                                     •	   Property Management
•	   Countryside Management
                                                     •	   Rail Engineering/Operations
•	   Decriminalised Parking Enforcement
                                                     •	   Rail Project, Commercial and Risk Management
•	   Design Management
                                                     •	   Rail Property (Estates)
•	   Development infrastructure
                                                     •	   Regen and Contaminated Land
•	   Development Monitoring
                                                     •	   Resource and Waste Management
•	   Development Planning
                                                     •	   Risk Management
•	   Disability Access Consultancy
                                                     •	   Road Safety / Road Safety Audits
•	   Earth Sciences
                                                     •	   Security
•	   Ecology
                                                     •	   Space Planning
•	   Electronic Data Management
                                                     •	   Sport, Leisure and Culture Consulting
•	   Energy
                                                     •	   Structures
•	   Environmental Impact Assessment
                                                     •	   Sustainable Design
company
Capita Symonds employs over
4000 staff located around
the UK and cover fourteen
key sectors with a significant
track record and expertise
in each. Each of our offices
are run by directors who
oversee operations, business
development, design quality,
commercia and construction
management. We undertake a
wide range of work across the
UK and overseas and have won
numerous awards for the quality
of our completed projects.




                                  Capita Symonds
                                  T +44 (0) 207 492 0200
                                  www.capitasymonds.co.uk
Healthcare with Construction, Capita Symonds

Mais conteúdo relacionado

Destaque

2012 uk industrial and distribution market overview
2012 uk industrial and distribution market overview2012 uk industrial and distribution market overview
2012 uk industrial and distribution market overviewCapita Symonds
 
Capita Symonds Commercial Real Estate Services
Capita Symonds Commercial Real Estate ServicesCapita Symonds Commercial Real Estate Services
Capita Symonds Commercial Real Estate ServicesCapita Symonds
 
Capita Symonds Real Estate
Capita Symonds Real Estate Capita Symonds Real Estate
Capita Symonds Real Estate Capita Symonds
 
CMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyCMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyAusrine Rakauskaite
 
Capita Symonds Investment activity
Capita Symonds Investment activityCapita Symonds Investment activity
Capita Symonds Investment activityCapita Symonds
 
Capita symonds renewal magazine
Capita symonds renewal magazineCapita symonds renewal magazine
Capita symonds renewal magazineCapita Symonds
 
Q&A Campbell River Hospital
Q&A Campbell River HospitalQ&A Campbell River Hospital
Q&A Campbell River HospitalIsland Health
 
Dorce hospital & health centers
Dorce hospital & health centersDorce hospital & health centers
Dorce hospital & health centersEUROPAGES
 
Gökhan AK - 130907047 N.Ö. - ALİBABA
Gökhan AK - 130907047 N.Ö. - ALİBABAGökhan AK - 130907047 N.Ö. - ALİBABA
Gökhan AK - 130907047 N.Ö. - ALİBABAGökhan Ak
 
Alibaba Group - Strategic Analysis - Overview
Alibaba Group - Strategic Analysis - OverviewAlibaba Group - Strategic Analysis - Overview
Alibaba Group - Strategic Analysis - OverviewSelf Employed
 

Destaque (10)

2012 uk industrial and distribution market overview
2012 uk industrial and distribution market overview2012 uk industrial and distribution market overview
2012 uk industrial and distribution market overview
 
Capita Symonds Commercial Real Estate Services
Capita Symonds Commercial Real Estate ServicesCapita Symonds Commercial Real Estate Services
Capita Symonds Commercial Real Estate Services
 
Capita Symonds Real Estate
Capita Symonds Real Estate Capita Symonds Real Estate
Capita Symonds Real Estate
 
CMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyCMAA Presentation Final Cook County
CMAA Presentation Final Cook County
 
Capita Symonds Investment activity
Capita Symonds Investment activityCapita Symonds Investment activity
Capita Symonds Investment activity
 
Capita symonds renewal magazine
Capita symonds renewal magazineCapita symonds renewal magazine
Capita symonds renewal magazine
 
Q&A Campbell River Hospital
Q&A Campbell River HospitalQ&A Campbell River Hospital
Q&A Campbell River Hospital
 
Dorce hospital & health centers
Dorce hospital & health centersDorce hospital & health centers
Dorce hospital & health centers
 
Gökhan AK - 130907047 N.Ö. - ALİBABA
Gökhan AK - 130907047 N.Ö. - ALİBABAGökhan AK - 130907047 N.Ö. - ALİBABA
Gökhan AK - 130907047 N.Ö. - ALİBABA
 
Alibaba Group - Strategic Analysis - Overview
Alibaba Group - Strategic Analysis - OverviewAlibaba Group - Strategic Analysis - Overview
Alibaba Group - Strategic Analysis - Overview
 

Semelhante a Healthcare with Construction, Capita Symonds

PACEARCHITECTS - HEALTH Capability statement
PACEARCHITECTS -  HEALTH Capability statementPACEARCHITECTS -  HEALTH Capability statement
PACEARCHITECTS - HEALTH Capability statementPatrick Pace
 
Areen NTD Architecture and Mimar Healthcare Design Projects
Areen NTD Architecture and Mimar Healthcare Design ProjectsAreen NTD Architecture and Mimar Healthcare Design Projects
Areen NTD Architecture and Mimar Healthcare Design ProjectsAreen Design
 
Healthcare Capability statement v3
Healthcare Capability statement v3Healthcare Capability statement v3
Healthcare Capability statement v3Howard Johnson
 
ACS healthcare presentation for ipad
ACS healthcare presentation for ipad ACS healthcare presentation for ipad
ACS healthcare presentation for ipad In Out Creatives
 
Jacobs Health - Capability Statement
Jacobs Health - Capability StatementJacobs Health - Capability Statement
Jacobs Health - Capability Statementsean2000
 
Asma resume strategy business solutions final
Asma resume strategy business solutions finalAsma resume strategy business solutions final
Asma resume strategy business solutions finalasmajaleel
 
IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)rujbennett
 
Real Estate Solutions Brochure
Real Estate Solutions BrochureReal Estate Solutions Brochure
Real Estate Solutions BrochureManeer
 
case study.pdf
case study.pdfcase study.pdf
case study.pdfHongLc19
 
JLL - Project Management 2012
JLL - Project Management 2012JLL - Project Management 2012
JLL - Project Management 2012Colin Harrop
 
PM-Partners Group 10 Point Project Checklist
PM-Partners Group 10 Point Project ChecklistPM-Partners Group 10 Point Project Checklist
PM-Partners Group 10 Point Project Checklistihoudane
 
Top10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful ProjectTop10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful Projectarjencornelisse
 
MMS Managed Projects - Presentation
MMS Managed Projects - PresentationMMS Managed Projects - Presentation
MMS Managed Projects - PresentationBrian Kuramoto
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAllison Thompson
 

Semelhante a Healthcare with Construction, Capita Symonds (20)

PACEARCHITECTS - HEALTH Capability statement
PACEARCHITECTS -  HEALTH Capability statementPACEARCHITECTS -  HEALTH Capability statement
PACEARCHITECTS - HEALTH Capability statement
 
Hospital Projects
Hospital ProjectsHospital Projects
Hospital Projects
 
Areen NTD Architecture and Mimar Healthcare Design Projects
Areen NTD Architecture and Mimar Healthcare Design ProjectsAreen NTD Architecture and Mimar Healthcare Design Projects
Areen NTD Architecture and Mimar Healthcare Design Projects
 
Value of Care
Value of CareValue of Care
Value of Care
 
Healthcare Capability statement v3
Healthcare Capability statement v3Healthcare Capability statement v3
Healthcare Capability statement v3
 
ACS healthcare presentation for ipad
ACS healthcare presentation for ipad ACS healthcare presentation for ipad
ACS healthcare presentation for ipad
 
Brochure
BrochureBrochure
Brochure
 
KGDMT-UK
KGDMT-UKKGDMT-UK
KGDMT-UK
 
Jacobs Health - Capability Statement
Jacobs Health - Capability StatementJacobs Health - Capability Statement
Jacobs Health - Capability Statement
 
Asma resume strategy business solutions final
Asma resume strategy business solutions finalAsma resume strategy business solutions final
Asma resume strategy business solutions final
 
IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)IIBA Change Management Presentation (4-21-10)
IIBA Change Management Presentation (4-21-10)
 
Real Estate Solutions Brochure
Real Estate Solutions BrochureReal Estate Solutions Brochure
Real Estate Solutions Brochure
 
Change and project_management
Change and project_managementChange and project_management
Change and project_management
 
case study.pdf
case study.pdfcase study.pdf
case study.pdf
 
JLL - Project Management 2012
JLL - Project Management 2012JLL - Project Management 2012
JLL - Project Management 2012
 
PM-Partners Group 10 Point Project Checklist
PM-Partners Group 10 Point Project ChecklistPM-Partners Group 10 Point Project Checklist
PM-Partners Group 10 Point Project Checklist
 
Top10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful ProjectTop10 Key Attributes For A Successful Project
Top10 Key Attributes For A Successful Project
 
MMS Managed Projects - Presentation
MMS Managed Projects - PresentationMMS Managed Projects - Presentation
MMS Managed Projects - Presentation
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Mentor imc group brochure
Mentor imc group brochureMentor imc group brochure
Mentor imc group brochure
 

Último

Radiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfRadiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfashiyadav24
 
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfAnandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfabbu831446
 
What Is Biophilic Design .pdf
What Is Biophilic Design            .pdfWhat Is Biophilic Design            .pdf
What Is Biophilic Design .pdfyamunaNMH
 
How to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
How to Navigate the Eviction Process in Pennsylvania: A Landlord's GuideHow to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
How to Navigate the Eviction Process in Pennsylvania: A Landlord's GuideezLandlordForms
 
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdfNamrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdfPrachiRudram
 
Prestige Somerville Whitefield Bangalore E- Brochure.pdf
Prestige Somerville Whitefield Bangalore E- Brochure.pdfPrestige Somerville Whitefield Bangalore E- Brochure.pdf
Prestige Somerville Whitefield Bangalore E- Brochure.pdffaheemali990101
 
Sobha Aranya Sector 80 Gurgaon E- Brochure.pdf
Sobha Aranya Sector 80 Gurgaon E- Brochure.pdfSobha Aranya Sector 80 Gurgaon E- Brochure.pdf
Sobha Aranya Sector 80 Gurgaon E- Brochure.pdffaheemali990101
 
Kumar Fireworks Hadapsar Link Road Pune Brochure.pdf
Kumar Fireworks Hadapsar Link Road Pune Brochure.pdfKumar Fireworks Hadapsar Link Road Pune Brochure.pdf
Kumar Fireworks Hadapsar Link Road Pune Brochure.pdfBabyrudram
 
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdfProvident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdffaheemali990101
 
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxLCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxTom Blefko
 
Ryan Mahoney - How Property Technology Is Altering the Real Estate Market
Ryan Mahoney - How Property Technology Is Altering the Real Estate MarketRyan Mahoney - How Property Technology Is Altering the Real Estate Market
Ryan Mahoney - How Property Technology Is Altering the Real Estate MarketRyan Mahoney
 
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your SpaceShapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Spaceaidasheikh47
 
DLF Plots Sriperumbudur in Chennai E Brochure Pdf
DLF Plots Sriperumbudur in Chennai E Brochure PdfDLF Plots Sriperumbudur in Chennai E Brochure Pdf
DLF Plots Sriperumbudur in Chennai E Brochure Pdfashiyadav24
 
Ajmera Prive at Juhu, Mumbai E-Brochure.pdf
Ajmera Prive at Juhu, Mumbai  E-Brochure.pdfAjmera Prive at Juhu, Mumbai  E-Brochure.pdf
Ajmera Prive at Juhu, Mumbai E-Brochure.pdfManishSaxena95
 
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCRCall Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCRasmaqueen5
 
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...lizamodels9
 
Brigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- BrochureBrigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- Brochurefaheemali990101
 
Rustomjee The Panorama At Pali Hill, Bandra West, Mumbai - Brochure.pdf
Rustomjee The Panorama At Pali Hill, Bandra West, Mumbai - Brochure.pdfRustomjee The Panorama At Pali Hill, Bandra West, Mumbai - Brochure.pdf
Rustomjee The Panorama At Pali Hill, Bandra West, Mumbai - Brochure.pdfmonikasharma630
 
MADHUGIRI FARM LAND BROCHURES (11)_compressed (1).pdf
MADHUGIRI FARM LAND BROCHURES (11)_compressed (1).pdfMADHUGIRI FARM LAND BROCHURES (11)_compressed (1).pdf
MADHUGIRI FARM LAND BROCHURES (11)_compressed (1).pdfknoxdigital1
 

Último (20)

Radiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfRadiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdf
 
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfAnandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
 
What Is Biophilic Design .pdf
What Is Biophilic Design            .pdfWhat Is Biophilic Design            .pdf
What Is Biophilic Design .pdf
 
How to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
How to Navigate the Eviction Process in Pennsylvania: A Landlord's GuideHow to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
How to Navigate the Eviction Process in Pennsylvania: A Landlord's Guide
 
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdfNamrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
Namrata 7 Plumeria Drive Pimpri Chinchwad Pune Brochure.pdf
 
Prestige Somerville Whitefield Bangalore E- Brochure.pdf
Prestige Somerville Whitefield Bangalore E- Brochure.pdfPrestige Somerville Whitefield Bangalore E- Brochure.pdf
Prestige Somerville Whitefield Bangalore E- Brochure.pdf
 
Sobha Aranya Sector 80 Gurgaon E- Brochure.pdf
Sobha Aranya Sector 80 Gurgaon E- Brochure.pdfSobha Aranya Sector 80 Gurgaon E- Brochure.pdf
Sobha Aranya Sector 80 Gurgaon E- Brochure.pdf
 
Kumar Fireworks Hadapsar Link Road Pune Brochure.pdf
Kumar Fireworks Hadapsar Link Road Pune Brochure.pdfKumar Fireworks Hadapsar Link Road Pune Brochure.pdf
Kumar Fireworks Hadapsar Link Road Pune Brochure.pdf
 
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdfProvident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
Provident Solitaire Park Square Kanakapura Road, Bangalore E- Brochure.pdf
 
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxLCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
 
Ryan Mahoney - How Property Technology Is Altering the Real Estate Market
Ryan Mahoney - How Property Technology Is Altering the Real Estate MarketRyan Mahoney - How Property Technology Is Altering the Real Estate Market
Ryan Mahoney - How Property Technology Is Altering the Real Estate Market
 
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your SpaceShapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
Shapoorji Pallonji Vanaha GolfLand 2 | A Space For You To Find Your Space
 
DLF Plots Sriperumbudur in Chennai E Brochure Pdf
DLF Plots Sriperumbudur in Chennai E Brochure PdfDLF Plots Sriperumbudur in Chennai E Brochure Pdf
DLF Plots Sriperumbudur in Chennai E Brochure Pdf
 
Ajmera Prive at Juhu, Mumbai E-Brochure.pdf
Ajmera Prive at Juhu, Mumbai  E-Brochure.pdfAjmera Prive at Juhu, Mumbai  E-Brochure.pdf
Ajmera Prive at Juhu, Mumbai E-Brochure.pdf
 
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCRCall Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
Call Girls In Peeragarhi, Delhi↫8447779280↬Call Girls in Peeragarhi Delhi NCR
 
9953056974 Low Rate Call Girls In Saket, Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR9953056974 Low Rate Call Girls In Saket, Delhi NCR
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
Call Girls In Sahibabad Ghaziabad ❤️8860477959 Low Rate Escorts Service In 24...
 
Brigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- BrochureBrigade Neopolis Kokapet, Hyderabad E- Brochure
Brigade Neopolis Kokapet, Hyderabad E- Brochure
 
Rustomjee The Panorama At Pali Hill, Bandra West, Mumbai - Brochure.pdf
Rustomjee The Panorama At Pali Hill, Bandra West, Mumbai - Brochure.pdfRustomjee The Panorama At Pali Hill, Bandra West, Mumbai - Brochure.pdf
Rustomjee The Panorama At Pali Hill, Bandra West, Mumbai - Brochure.pdf
 
MADHUGIRI FARM LAND BROCHURES (11)_compressed (1).pdf
MADHUGIRI FARM LAND BROCHURES (11)_compressed (1).pdfMADHUGIRI FARM LAND BROCHURES (11)_compressed (1).pdf
MADHUGIRI FARM LAND BROCHURES (11)_compressed (1).pdf
 

Healthcare with Construction, Capita Symonds

  • 2.
  • 3. Healthcare project delievery must focus on We have a holistic approach to project people: the patients and visitors and those delivery; an approach that demands who delivery the healing: doctors, nurses, a committed partnership between all technicians, administrators and maintenance members of the project team, the healthcare staff. And then there are those whose job it is provider, and the stakeholders in a patient- contents to construct the building on time and within centred delivery process. budget. Each has important but different needs. We believe that collaborative working is key 01. introduction to the success of all our healthcare projects. At Capita Symonds we specialise in delivering We achieve this collaboration by talking to 02. delivering success healthcare projects that meet all of these end users (patients, nurses, consultants, and needs. Our team has an unparalleled managers), engaging them in the process, 03. brampton CV project knowledge of the issues, people and find out what they need, stimulating debate 04. guild Lodge processes involved in healthcare facilities. We understand the rate at which healthcare and discussion on best practice, in order to generate a dynamic vision for their new or 05. guild Lodge Ph2. delivery evolves, and we recognise refurbished healthcare facility. the need to design adaptable, flexible 06. new pathology & pharmacy building accommodation, which can change in line with our clients needs. 07. wembley hospital 08. royal victoria hospital We have the capacity to meet our clients’ requirements; from delivering large acute 09. downe lisburn hospital facilities through intermediate care facilities, polyclinics, health centres, GP surgeries and 10. the london clinic mental health units. Capita Symonds are able to help our healthcare clients through 11. diamond light source all stages of the project lifecycle from the 12. services initial investigation and evaluation of the service strategies, through the detailed 13. company briefing and design of capital schemes, to the commissioning and evaluation of completed facilities in terms of construction management services.
  • 4. Delivering Success One team, one goal Healthcare requires more There’s no denying it’s a complex process than a grand facade with significant sums being invested and spent. And that’s before the actual The project manager and their team building starts. In addition to project must listen to and try to accommodate managers you have architects, healthcare everyone’s needs: planners, engineers, planners, engineers, builders, surveyors, builders, cost advisors, equipment construction managers and landscape specialists, and, especially nurses, architects involved. Each has important clinicians and healthcare managers. Often skills to offer that requires effective needs are conflicting and an optimised management. compromise must be sought. The co- ordination must work on many fronts; Building a healthcare facility requires aesthetics, construction, safety, cost, and team players. You need a project manager maintenance. that understands healthcare and can inspire a design team produce an efficient And of course it must have the flexibility design which is also affordable. But just to support the delivery of changing as important is the project manager’s healthcare services which are becoming ability to bring people of differing ever more complicated. Whether our opinions together. Capita Symonds is commission is for a hospital, a primary skilled at creating teams that break down care clinic or a laboratory, it must focus the traditional barriers between Health on people; staff, patients, and visitors. A Facility Users, Designers and Contractors, grand design just will not be enough. thereby creating an integrated team dedicated to one goal; successful delivery.
  • 5. A new challenge procurement routes place a premium on and an improvement in the quality and It’s about what works, not just speed of construction. The requirement robustness of the completed design. With the advent of innovative for the builder to maintain finished organisational diagrams procurement routes, such as PFI, facilities at a high standard for 30+ Do it once, do it right When as project manager we put together Procure21, Express LIFT and Framework years has also placed a much greater a team of architects for a healthcare How do you delivery a better quality appointments, much of the responsibility emphasis on quality. These factors taken project, each team has designers and product, faster? By re-evaluating the for delivery of the project has passed together were the impetus for Capita specialist healthcare planners. We whole project delivery process which to the contractor. However, as project Symonds’s rethinking of the whole understand that good management goes can sometimes mean spending more manager we ultimately assume single design development process, to allow for hand in hand with innovative design and time on one element of the process to point responsibility for delivering success. techniques such as off site construction, a solid understanding of best practice in save a greater amount of time latter In addition many of these innovative site waste minimisation and recycling, healthcare design. on. You also must look closely at the construction and fit-out processes and see where time on site can be reduced. The project manager works closely with One way to reduce time / minimise risk the contractor and project consultants is to reduce the number of different and alongside the planners and designers. elements by replacing multiple units Our role is to make sure the work is with identical repeatable ones. E.g. whole adequately programmed and resourced rooms such as clean utilities, dirty utilities, and to keep track of progress and costs. bedrooms and sanitary facilities, can It is a key management role and we be easily replicated, manufactured off deliberately separate the roles of project site and swiftly installed. The unit cost management from that of designer and may increase but this is outweighed by healthcare specialist to ensure it is given the benefit of a shorter time on site. It proper weight. also results in higher quality building by using appropriate off site construction techniques.
  • 6. future trends, of what constitutes ‘best we go to great lengths to make sure that practice’, and of the high expectations of everyone, understands the vision for their staff, patients and visitors. new facility and the processes involved to deliver it. Gently does it From the start of the process to the Place making selection of the design team and then on Project Management is just one of to the award of the construction contract, several areas in which we specialise. we manage for change. During the various Our healthcare designers and planners types of bidding process much can often work alongside colleagues in our evolve. New rules and regulations can be firm who are experts in urban design, introduced, patient numbers can fluctuate environmental graphics, interiors, retail and some treatments can take precedence and education. They are able to contribute over others. Our flexible and informed their knowledge to ensure that the approach means that these changes need healthcare facility becomes a viable, not mean drastic re-thinking or re-scoping dynamic environment and part of the local of the project. Our team has been through community. this process several times. But for a Trust, it may be their first introduction to the issues involved in delivering major Our wider team capital works and as project managers we Aside from Project Management Capita help and support the Trust throughout Symonds can offer a fully integrated We know what works But perhaps of more importance is the the delivery process. We are aware of design service including Architecture, Civil We’ve been delivering healthcare fact that to every project we can call upon the issues that can arise, the disruption and Structural Engineering, Mechanical buildings; hospitals, primary care clinics over 40 years of experience acquired in which can be caused and the difficulty and Electrical Engineering, Landscape and laboratories, in the UK for many healthcare economies throughout the clinicians and administrators have with Architecture, Acoustic Engineering, Fire years. We are familiar with all forms of world including the America, and the interpreting drawings and accepting Engineering, Traffic Engineering, Clinical procurement, with their unique funding, middle and far east. Capita Symonds are change. Therefore, when we meet the end Healthcare Planning and Construction tendering and reporting processes. therefore very aware of current and likely users, be they patients staff or visitors, Management.
  • 7. If there is an interest in the wider services Our work - case studies affordable and incorporate the most up we can offer due to the economies of scale to date practices; and contractors want there can be significant savings to the Patients and visitors want environments buildings that are quick to build with delivery costs on a healthcare project. that are welcoming, comfortable, safe and minimum risk. which help healing. Healthcare workers and their managers want environments At Capita Symonds we recognise that this that support their efforts to care for is the background against which modern patients and to improve productivity. healthcare facilities need to be delivered HealthcareTrusts want designs that are in the UK and it is this knowledge that underpins our ability to deliver successful healthcare projects.
  • 8.
  • 9. community CASE STUDY Brampton Community Ventures Project CLIENT Cumbria PCT and Cumbria County Council LOCATION Brampton, Cumbria VALUE £10m This integrated healthcare and community project includes facilities for Brampton GPs, PCT nursing beds and 30 adult social care beds. In addition, flexible space for the local Community Association is included together with facilities for children’s services. There is also provision for a pharmacy and shared space and facilities have played a prominent part in the initial accommodation and models of care assessments. Our engagement has been both to provide project management services and also fully integrated design and cost management .Our role has required effective communication with stakeholders beyond the partners actually taking space in the facility including the local neighbourhood forum and traders association. We have also been tasked with co-ordinating delivery of an outline business case and planning application. Two sites are under consideration for the facility and thorough in-depth analysis of both sites has resulted in the delivery of a detailed report. This shall allow a highly informed choice of site to be made, providing confidence that users, investors and the local community can be sure that the facility provides maximum value to the environment and population it serves.
  • 10. community CASE STUDY Guild Lodge - Medium Secure Unit and High Dependency Unit CLIENT Guild Community Healthcare NHS Trust LOCATION Guild Park, Preston VALUE £10m Part of the old Whittingham Hospital at Goosnargh, Preston the Guild Lodge facility has been developed as a new state-of-the-art combined 54 bed Medium Secure Unit (MSU) and High Dependency Unit (HDU). The 30 bed Medium Secure Unit comprises the following: • Single storey 8 bed acute ward including a seclusion suite available to other wards; • Two storey block with a 12 bed ongoing therapy ward on the ground floor and a 10 bed pre-discharge ward on the first floor. The 24 bed High Dependency Unit is a single story building comprising three 8 bed wards, that is linked directly to the main entrance and sports hall to form a secure courtyard. Serving both the MSU and HDU are the following: • Single storey occupational therapy unit; • Part single/two storey building administration building providing office, kitchen, dining and changing facilities, with meeting areas for family visits and a GP surgery space; and • Single storey gymnasium. A flexible but disciplined approach was needed to control all stages of the project, within the required 29 month programme from commencement of Outline Business Case to the commissioned facility. Whilst much emphasis was placed on security, the careful selection of materials and components ensured a domestic and relaxed environment for more effective patient rehabilitation.
  • 11. community CASE STUDY Guild Lodge Phase II - Long Term Medium Secure Unit CLIENT Lancashire NHS Trust LOCATION Guild Park, Preston VALUE £9m The Guild Lodge Phase II project was an expansion of an existing Medium Secure Facility, to provide a new 38 bed Long Term Medium Secure Unit, together with alterations and extensions to existing facilities. The single storey development comprised a cluster of six individual buildings as follows: • House with 16 beds; • House with 14 beds and an Extra Care Suite; • House with 8 beds; • Vocational Therapy Centre; • Rehabilitation Management Centre; and • Social Centre/Café The buildings were set within a common landscape with interconnecting walkways. Each house had access to an external ‘garden’, some of which were secure, that provided a recreational and therapeutic environment. The architectural style of each building reflected its intended use. Capita Symonds worked very closely with the Trust and stakeholders, to develop a scheme that established a community, where quality of life was maximised, creating a safe and spacious environment, which was both attractive and comfortable, and yet provided maximum observation with minimum obtrusion.
  • 12.
  • 13. centre of excellence CASE STUDY Regional Cancer Centre, City Hospital, Belfast CLIENT Belfast City Hospital Trust LOCATION Northern Ireland VALUE £60m The new Belfast Cancer Centre is planned to serve Northern Ireland as a Regional Centre of Excellence. It replaces existing facilities at Belvoir Park Hospital and provides patients and their families with access to treatment and support services, diagnosis and treatment, through to follow-up care. The centre is part of a government plan for cancer care across the UK which involves regional centres supported by satellite follow-up centres. Linked to the existing City Hospital by underground and elevated walkways, the 84-bed centre will provide integrated access to support surgical and chemotherapy facilities. The hi-tech treatment facilities include 10 linear accelerator vaults for radiotherapy – making this one of the largest cancer care facilities in the UK – and a High Dose Rate (HDR) operating theatre. The diagnostic and treatment planning for radiotherapy facilities utilise the very latest technology for all imaging modalities currently being employed. These include 2 MRI scanners, 3 CT scanners, X-ray, ultrasound and 2 gamma cameras. There is also an Outpatient Clinics for Rehabilitation and Palliative Care. A “patient focused care” approach was adopted for the delivery of cancer care throughout Northern Ireland. The new centre has been designed to create a non-institutional, human-scale environment with maximum use of natural daylight, which will provide a therapeutic and harmonious atmosphere to benefit and improve the patient’s progress and well being.
  • 14.
  • 15. clinical support CASE STUDY New Pathology and Pharmacy Building CLIENT Bart’s and the Royal London NHS Trust LOCATION London VALUE £58m The new Pathology and Pharmacy Building is one of the advance projects of the £1billion Bart’s and the Royal London Hospitals PFI redevelopment planned at Whitechapel, East London. Main image: The 16,000sqm accommodation is housed in a 7-storey Second floor laboratory building, located on a prominent corner site in the London Hospital Below: Conservation Area. The state-of-the-art building contains teaching Colourful west staircase laboratories, lecture rooms, seminar rooms, and a fully automated multidisciplinary analytical laboratory. The modular-designed laboratories provide flexible accommodation for a range of Pathology disciplines, including Biochemistry, Immunology, Histopathology, Virology, Molecular Biology, and Haematology. A pedestrian tunnel links the building with the main hospital complex, to provide a convenient route for internal trolley traffic and specimen deliveries. The project was very challenging. The site was constrained; opposite is the construction site for the PFI, Queen Mary’s School of Medicine and Dentistry lies to the west and Whitechapel Underground station is situated directly below. Additionally, these departments are notoriously difficult to design together, as Pharmacy is ultra clean, whilst Pathology is not. There were many end users to consult with as the new building accommodates 14 different pathology and pharmacy divisions that were originally scattered across East London in separate buildings. Capita Symonds worked very closely with the Trust and clinicians both during planning and design in order to understand the different requirements of each of the different disciplines.
  • 16. Main image: Main entrance Above & below: Reception area
  • 17. primary care CASE STUDY Wembley Hospital, London CLIENT Parkside Health LOCATION London VALUE £6.4m Parkside Health is committed to delivering out-patient services in a different way. The model of care is unique and involves a wide provision of Health Services under one roof. The centre is located at Wembley Hospital and will provide modern and efficient accommodation for GPs, primary care health teams, health promotion unit, welfare advice and specialist services, women’s services, general hospital outreach services, pharmacy, local authority and a minor accident and treatment service (MATS). The building comprises a mixture of single and two storey wings arranged around a double height, circular reception area and central core with semi-scenic lift. This ‘heart’ of the building acts as the pivotal hub from which all health services are approached. The massing of the building has been carefully considered, responding to the surrounding suburban environment and disguising the overall floor area from its neighbours. The building received a highly commended award at the NHS Estates - Building Better Healthcare Awards 2001.
  • 18.
  • 19. design competition CASE STUDY Royal Victoria Hospital, Belfast CLIENT Health Estates LOCATION Belfast, Northern Ireland VALUE £91.4m Phase 1 comprises a 7-storey glazed hospital street serving 16 wards of 400 beds on levels 4-7. Day procedures, ITU, theatre suite and recovery are on level 3 and a range of investigations, outpatients and pharmacy facilities on Levels 1 and 2. Medical areas are supported by a new hospital main entrance and restaurant above and enhanced by a major programme of landscaping and integrated art work. The external cladding is of composite aluminium insulated panels finished in sterling silver PVF2. The ‘street’ is fully glazed on both sides using a ‘stick’ curtain walling system. Phase 2 will be carried out in stages after demolition of 20 Victorian wards and will comprise a new A&E department, Admissions ward, additional theatres, PFI imaging centre, OPD departments, Education centre and west entrance. Main image: Royal Victoria Hospital, main entrance
  • 20.
  • 21. Design for Excellence CASE STUDY Downe Lisburn Hospital CLIENT South Eastern Health and Social Care Trust LOCATION Northern Ireland VALUE £47m Won under an invited design competition in May 2004 Capita Symonds adopted an holistic approach to the design. We are committed to partnership between all members of the design team, Trust and stakeholders in a patient centred design process. It is an approach that encourages a truly inclusive plan for the design development, based on a common vision to provide a better healthcare experience. The local community is also seen as an important element in the design process and takes ownership of the final design. The New Downe Hospital site is set within a powerful and dynamic landscape, housing the existing Grade II listed Hospital which is retained and converted for Civic usage. The new hospital respects it’s surroundings and corresponds to the major views of the famous Mourne Mountains to the South West. Departments provided include: 10 bed observation unit, accident and emergency, outpatients, 20 bed in patient ward, coronary care unit, health records, dementia, 25 bed acute psychiatric unit, day procedures unit, clinical support, rehabilitation, radiology, children’s day care, pharmacy, miscellaneous, support services and mortuary.
  • 22. Specialist & Medical Provision CASE STUDY The London Eye Clinic CLIENT The London Clinic LOCATION 119 Harley Street, W1 VALUE £4.6m The Eye Clinic is a specialist medical provision providing ‘state- of-the-arts’ eye care within The London Clinic’s private health care campus. It prides itself on housing highly respected leading ophthalmic consultant surgeons, physicians, orthoptists, optometrists and nursing staff. It provides unrivalled excellence and individual care to patients including members of the Royal family. It is self-contained using the latest diagnostics and treatment for eye disorders. The London Clinic is the UK’s largest, independently owned and operating, non-profit hospital. This high profile project consisted of the extensive refurbishment, extension and conversion of the Grade II listed building resulting in a ‘one stop shop’ for outpatients seeking the very best in eye health treatment and care. The provision includes nine consulting suites, eight procedure and treatment rooms including laser surgeries and full nursing support situated over six storeys. The clinic was successfully completed and fully operational in line with its royal opening by HRH Princess Alexandra on 23rd November 2012.
  • 23. Centre of Excellence CASE STUDY Diamond CLIENT Diamond Light Source LOCATION Didcot, Oxfordshire VALUE £276m Diamond Light Source (DLS) is a scientific facility on the Harwell Science & Innovation Campus, Rutherford Appleton Laboratory site in Oxfordshire. It is a circular-shaped machine, called a synchrotron that uses arrays of magnets, called insertion devices, to generate bright beams of synchrotron light. Around the machine is a collection of experimental research laboratories called beamlines. At each beamline, scientists independently use the light generated by the machine for a wide variety of experiments. The Diamond project team consisted of 250 dedicated engineers, scientists, support staff and technicians. By 2012, Diamond will grow to 300 staff and will welcome about 2,000 scientific users per annum. The Synchrotron building is aluminium clad steel framed building enclosing a high bay experimental hall with a curved roof profile, the concrete machine housing, inner access and service zone. Around the external perimeter of the building are arranged two storey perimeter offices and laboratories with precast concrete suspended floors. Diamond now produces pinpoint ultra-violet and X-ray beams of exceptional brightness. These highly focused light beams enable scientists and engineers to probe deep into the basic structure of matter and materials, answering fundamental questions about everything from the building blocks of life to the origin of our planet. State-of-the-art instrumentation complements the light source, ensuring that researchers from the UK and abroad have access to cutting-edge analytical techniques and services.
  • 24. services Capita Symonds are in a position to • Environmental Noise • Technology • Facilities Management • Telecoms Engineering provide an integrated multi-disciplinary • Geotechnical Engineering • Town Planning and Masterplanning team. Services include: • GIS and Data Management • Traffic Surveys • Health & Safety Training • Transport Planning • Healthcare Planning • Tunnel Design and Refurbishment • Highway Asset Management • Urban Design • Arboriculture • Highway Design • Value Management • Architecture • Highway Maintenance • Water Environment • Aviation • Highway Pavement & Construction Materials • Waterways • Bridge Design • Innovations Software Development • Brief development • Insurance • Building Services Engineering • Instrumentation Consultancy • Building Surveying • Interior Design • Communications and Technology • Landscape and Urban Design • Construction Management • Leisure and Event Safety • Construction and Occupational Health & Safety • Litigation • Consultation and communication • Masterplanning • Contract Management • PFI/PPP Consultancy • Conservation • Project Management • Cost Management • Property Management • Countryside Management • Rail Engineering/Operations • Decriminalised Parking Enforcement • Rail Project, Commercial and Risk Management • Design Management • Rail Property (Estates) • Development infrastructure • Regen and Contaminated Land • Development Monitoring • Resource and Waste Management • Development Planning • Risk Management • Disability Access Consultancy • Road Safety / Road Safety Audits • Earth Sciences • Security • Ecology • Space Planning • Electronic Data Management • Sport, Leisure and Culture Consulting • Energy • Structures • Environmental Impact Assessment • Sustainable Design
  • 25. company Capita Symonds employs over 4000 staff located around the UK and cover fourteen key sectors with a significant track record and expertise in each. Each of our offices are run by directors who oversee operations, business development, design quality, commercia and construction management. We undertake a wide range of work across the UK and overseas and have won numerous awards for the quality of our completed projects. Capita Symonds T +44 (0) 207 492 0200 www.capitasymonds.co.uk