50MWp Solar Thermal Power Project,
                     Rajasthan – INDIA
                               – Detailed Project Report




                      Gammon Infrastructure Projects Ltd, Mumbai




Project Consultants
Pan Exergy Pvt Ltd
D-32, Sector-7, Noida – 201301,
INDIA.
Ph: +91-9999676750; +91-9654436886
Web: www.exergy.in Email: info@exergy.in
50M W     So lar    The r mal Po we r       Projec t Repor t                                                    P a g e |2




                                                         50MW Solar CST Power Plant

                                                                           - Detailed Project Report

Document Version:              1.4/Draft #3
Document Ref:                  PEPL/SOLAR/10-11/NESSPL/001
Date of Issue:                 February 21, 2011
Author:                        Arun K Pandey, Project Coordinator
                               Rajat Sethi, Supervisor
Authorized by:                 Ravindra P Dubey, Managing Director, PEPL
                               Dr OP Nangia, Director, NESSPL



                                                                                                 © Copyright. All rights reserved.




Abstract
This project report study examines solar thermal electricity generation technologies, undertakes a brief
analysis of those that could reasonably be considered suitable for commercial power generation for the
client, and identifies a preferred technology for further evaluation. The review and selection of a
preferred technology includes: (i) an assessment of the technology; (ii) consideration of the status of the
technology and commercial experience; (iii) consideration of the solar resource at the proposed
location; (iv) costs; and (v) risks.




           Project Consultants                                        Project Promoters
           Pan Exergy Private Ltd.                                    Gammon Infrastructure Projects Ltd
                                                     .
50M W      So lar     The r mal Po we r          Projec t Repor t                                                             P a g e |3




                                                     NON DISCLOSURE



This Detailed Project Report (referred to as “the DPR”) has been prepared by Pan Exergy Pvt Ltd (PEPL) for Gammon Infrastructure
Private Limited (GIPL) and remains the property of GIPL & PEPL.
This report is produced for the purpose of securing various government approvals and clearances for GIPL and its potential investors and is
distributed only to a limited number of persons identified with the prior consent of PEPL, and is distributed on the understanding that it
must not be further distributed to any person.
The DPR is henceforth made available and is received specifically on the implied understanding that the recipient will hold the information
contained therein confidential and will not copy, reproduce, distribute or disclose the information or any part of it to any other person. The
recipient agrees, on request to return promptly, or destroy, all information received from PEPL and its consultants without r etaining any
copies and undertakes that any persons to whom a copy or copies have been passed will do likewise.
There has been no independent third party verification of the information in the report. While the information in the plan has been prepared
in good faith and is believed to be accurate in all material respects, PEPL, GIPL, its Directors, officers and employees, nor any of them give
any representation or warranty, expressed or implied as to the completeness or accuracy of any information in the report or otherwise made
available (whether orally or in writing), or that any such information remains unchanged after the date of its receipt. PEPL, its Directors,
officers and employees will not be liable or responsible in any way whatsoever in respect of any statement, opinion, or other information
contained in this report or howsoever made available, in relation to it, nor for any omission from it.
Each party in receipt of this report must make its own independent assessment of the project after making such investigations and taking its
own independent advice, as it may deem necessary. In particular, any estimates, forecasts, projections or opinions contained in the plan
necessarily involve significant elements of subjective judgement and analysis and each recipient must satisfy itself in relat ion to such
matters.
The report is not a prospectus and does not form part of a contract or an offer of sale. It does not constitute an offer capable of acceptance,
nor an invitation for the sale or purchase of any securities.




ISSUED BY:


Director, Pan Exergy Pvt Ltd
D-32, Sector #7, Noida – 201301, INDIA.
W: www.exergy.in E: info@exergy.in
Tel: 0120-4243211 Fax: 011-22719964




DATE:               18th October 2010




            Project Consultants                                                   Project Promoters
            Pan Exergy Private Ltd.                                               Gammon Infrastructure Projects Ltd
                                                            .
50M W      So lar       The r mal Po we r       Projec t Repor t                                                          P a g e |4




                                                       BACKGROUND


The Client
Gammon Infrastructure Projects Limited ("GIPL") is an infrastructure project development company promoted by Gammon India
Limited, to participate in the development of infrastructure projects on a public private partnership ("PPP") basis. GIPL leads Gammon's
forays into development of infrastructure projects on PPP basis across sectors such as Roads & Expressways, Ports, Hydro Power, Urban
infrastructure, Airports, Special Economic Zones, Water and Wastewater management, Railways, Power Transmission lines, and
Agricultural Infrastructure. GIPL has also started undertaking projects in renewable energy sector. It has taken up biomass power projects
in Punjab and Haryana and Hydro Power Projects in the states of Himachal Pradesh and Sikkim. It now wants to enter into the area of solar
power and has assigned the job of preparing a project report on a 50 MW Solar Thermal Power Plant for suitable site in the country to the
consultants.



The Consultants
Pan Exergy Pvt. Ltd. (PEPL) is a leading Solar Technology Consultant and Turnkey Executor of upto 100kW Solar Projects. It has had a
significant expertise in Indian Solar Markets based on an experience of offering services to more than 600MW of Solar Projects in India.
Out of these 250MW are already under advanced stages of execution. For more details visit our website (www.exergy.in) of email us at
(info@exergy.in).


GIPL awarded PEPL the job for preparing a Project Report on a 50 MW Solar Thermal Power Project at a suitable site in the country.
PEPL hereby submits this report on 50 MW Solar Thermal Power Plant at Village Malar, Tehsil Phalodi, District Jodhpur in Rajasthan.




               Project Consultants                                             Project Promoters
               Pan Exergy Private Ltd.                                         Gammon Infrastructure Projects Ltd
                                                          .
50M W    So lar    The r mal Po we r   Projec t Repor t                                         P a g e |5



                                    TABLE OF CONTENTS
NON DISCLOSURE                                                                                               3

BACKGROUND                                                                                                   4

1     ABOUT THIS DOCUMENT                                                                                    8

1.1     Change control                                                                                       8
  1.1.1  Current status and anticipated changes                                                              8
  1.1.2  Change history                                                                                      8

2     TERMS AND ABBREVIATIONS                                                                                9

2.1      Definitions                                                                                         10

3     SOLAR IN INDIA: AN INTRODUCTION                                                                        11

3.1      Energy Scenario in Rajasthan                                                                        12

3.2      Jawaharlal Nehru National Solar Mission                                                             12

3.3      Benefits of Grid Connect Solar Energy                                                               13

3.4      Socio Economic Benefits of Grid Connect Solar Power Plants                                          13

3.5      Approach to this Study                                                                              14

3.6     Key Study Assumptions                                                                                15
  3.6.1  General
  3.6.2  Project Size
  3.6.3  Project Location

3.7      Assumptions in Financial Modelling                                                                  16

4     PHOTOVOLTAICS OR SOLAR CST POWER PLANTS ?                                                              17

4.1      Principle                                                                                           17

4.2      Photovoltaics                                                                                       17

4.3      Solar Thermal Power Plants                                                                          17

4.4      Reference Systems                                                                                   19

4.5      Areas of Operations                                                                                 20

4.6      Future Perspectives                                                                                 23

4.7      Conclusions                                                                                         23

5     POTENTIAL, FEASIBILITY & PATH TO CST REALITY IN INDIA                                                  24

5.1      Solar Thermal Electric Systems – Concentrating Solar Thermal (CST)                                  24

5.2      Types of CST Systems                                                                                26

5.3      Comparison of CST Systems                                                                           29
          Project Consultants                              Project Promoters
          Pan Exergy Private Ltd.                          Gammon Infrastructure Projects Ltd
                                              .
50M W    So lar    The r mal Po we r   Projec t Repor t                                           P a g e |6


5.4     Potential for CST in India                                                                             32
  5.4.1   Solar Resource Assessment
  5.4.2   Land Assessment
  5.4.3   Power Grid Assessment
  5.4.4   Fossil Fuel & Water Requirement
  5.4.5   Previous Assessment of CST in India
  5.4.6   Improvements to Previous Assessments of CST in India
  5.4.7   Framework for Comprehensive Assessment

5.5      CST Projects & Activities in India                                                                    42

5.6     Levelized Electricity Cost (LEC)                                                                       43
  5.6.1   Drivers of CST Economics
  5.6.2   Predicting CST’s Future with Experience Curve

5.7      The Path to CST Commercialization in India                                                            48

6     SITE SELECTION FOR 50MW CST PLANT                                                                        49

6.1      Nature & Use of Solar Radiation                                                                       49

6.2      Land Assessment Criteria for CST Plant at Phalodi                                                     52

6.3      Solar Resource in Phalodi (Jodhpur), Rajasthan                                                        54

6.4      Reliability & Measurement of Solar Radiation in Rajasthan                                             59

7     TECHNOLOGY SELECTION & SYSTEM DESCRIPTION                                                                60

7.1      Technology Selection                                                                                  60

7.2      Size of the Plant                                                                                     62

7.3     Energy Storage & Auxiliary Fuel                                                                        63
  7.3.1   Heat Storage for Solar Thermal
  7.3.2   Plant Performance

7.4      Staged Development Planning                                                                           64

7.5      Development Schedule                                                                                  65

7.6      Environmental Concerns                                                                                66

8     POWER EVACUATION STRATEGY                                                                                67

8.1      Network connection                                                                                    67

8.2      Grid Synchronization Scheme                                                                           68

8.3      Interface Scheme Proposed                                                                             68

8.4      Single Line Diagram for Power Evacuation                                                              70

8.5      Metering Requirements                                                                                 71

9     OPERATION AND MAINTENANCE REQUIREMENTS                                                                   72

9.1      O&M Lessons for Running CST Plants                                                                    72

9.2      Basic Structure of the O&M Team                                                                       75
          Project Consultants                                Project Promoters
          Pan Exergy Private Ltd.                            Gammon Infrastructure Projects Ltd
                                              .
50M W     So lar    The r mal Po we r   Projec t Repor t                                        P a g e |7


  9.2.1     Operation
  9.2.2     Maintenance
  9.2.3     Administration
  9.2.4     Facilities to Be Extended to the Employees

9.3       Station Operations Philosophy                                                                      76

9.4     Station Maintenance Philosophy                                                                       76
  9.4.1   Ordinary Maintenance
  9.4.2   Emergency Maintenance
  9.4.3   Maintenance Plan and Scheduled Maintenance

9.5       Maintenance Management System                                                                      77

9.6       Spare Parts Management System                                                                      77

9.7       Availability of O&M Manual                                                                         77

9.8       Special Tools & Tackles                                                                            77

9.9       Checklist & Protocol                                                                               78

9.10      Safety & Protection                                                                                78

9.11      Organization Structure                                                                             79

9.12      Training                                                                                           80

10        PROJECT FINANCIALS                                                                                 81

10.1      Project Cost                                                                                       81

10.2      Assumptions                                                                                        82

10.3      Cash Flow                                                                                          83

11        CONCLUSIONS & RECOMMENDATIONS                                                                      84

11.1      Conclusions                                                                                        84

11.2      Recommendations                                                                                    86

11.3      Risk Assessment                                                                                    87

APPENDIX – I SOLAR IRRADIATION IN PHALODI, JODHPUR                                                           88

APPENDIX – II LEC-CALCULATION BASED ON BILL OF MATERIALS FOR LS-3

LATEST SEGS CALIFORNIA PLANT                                                                                 90

APPENDIX – III TECHNO-COMMERCIAL SURVEY OF CST PLANT INSTALLATIONS                                           92

APPENDIX – IV CST PLANTS WORLDWIDE                                                                           98




           Project Consultants                             Project Promoters
           Pan Exergy Private Ltd.                         Gammon Infrastructure Projects Ltd
                                                .
50M W   So lar   The r mal Po we r   Projec t Repor t                                        P a g e |8




Requests for any specific section of the report can be made directly
emailed to info@exergy.in or Rajat@Exergy.in. The entire report is
available at a cost of Rs. 35,000. For any queries please feel free to
call our consultants at 00-91-9999676750 or 00-91-9654436886. For
any updates please visit our website: www.exergy.in.




        Project Consultants                             Project Promoters
        Pan Exergy Private Ltd.                         Gammon Infrastructure Projects Ltd
                                           .

Mais conteúdo relacionado

Destaque

Solar Impulse - A Flying Laboratory (DE)
Solar Impulse - A Flying Laboratory (DE)Solar Impulse - A Flying Laboratory (DE)
Solar Impulse - A Flying Laboratory (DE)Solar Impulse
 
Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectMitchellDong
 
CSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - InfographicCSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - InfographicDavid Williams
 
Finalpresentation4 14-140907135606-phpapp02
Finalpresentation4 14-140907135606-phpapp02Finalpresentation4 14-140907135606-phpapp02
Finalpresentation4 14-140907135606-phpapp02pritam patel
 
World's largest solar thermal power plants
World's largest solar thermal power plantsWorld's largest solar thermal power plants
World's largest solar thermal power plantsPamela Simamora
 
Solar energy world_examples
Solar energy world_examplesSolar energy world_examples
Solar energy world_examplesSekem Energy
 
COMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEYCOMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEYSanjay Jha
 
Civil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsCivil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsRajesh B
 
Hanisons Construction Profile
Hanisons Construction ProfileHanisons Construction Profile
Hanisons Construction ProfileSuhail Nadeem
 
Pusad solar power plant presentation (rev 7)
Pusad solar power plant presentation  (rev 7)Pusad solar power plant presentation  (rev 7)
Pusad solar power plant presentation (rev 7)California Free Solar
 
Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016David Karim
 
Scope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaScope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaRAJ BAIRWA
 
csp (concentrated solar power) technology
csp (concentrated solar power) technologycsp (concentrated solar power) technology
csp (concentrated solar power) technologyArvind Dautaniya
 
GIS profile of Data Point
GIS profile of Data PointGIS profile of Data Point
GIS profile of Data PointMandar Mehta
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysisAnkur Agarwal
 
Concentrated Solar Power Technologies (CSP)
Concentrated Solar Power Technologies (CSP)Concentrated Solar Power Technologies (CSP)
Concentrated Solar Power Technologies (CSP)swapnil_energy
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 

Destaque (20)

Solar Impulse - A Flying Laboratory (DE)
Solar Impulse - A Flying Laboratory (DE)Solar Impulse - A Flying Laboratory (DE)
Solar Impulse - A Flying Laboratory (DE)
 
Introducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar ProjectIntroducing the Hualapai Valley Solar Project
Introducing the Hualapai Valley Solar Project
 
CSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - InfographicCSP Today Solar Tower report 2014 - Infographic
CSP Today Solar Tower report 2014 - Infographic
 
Finalpresentation4 14-140907135606-phpapp02
Finalpresentation4 14-140907135606-phpapp02Finalpresentation4 14-140907135606-phpapp02
Finalpresentation4 14-140907135606-phpapp02
 
World's largest solar thermal power plants
World's largest solar thermal power plantsWorld's largest solar thermal power plants
World's largest solar thermal power plants
 
Solar energy world_examples
Solar energy world_examplesSolar energy world_examples
Solar energy world_examples
 
Securing the Supply Chain for Solar in India
Securing the Supply Chain for Solar in IndiaSecuring the Supply Chain for Solar in India
Securing the Supply Chain for Solar in India
 
COMPANY PROFILE AYRTON CONSTRUCTION
COMPANY PROFILE AYRTON CONSTRUCTIONCOMPANY PROFILE AYRTON CONSTRUCTION
COMPANY PROFILE AYRTON CONSTRUCTION
 
COMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEYCOMPANY PROFILE- CIVIL & SURVEY
COMPANY PROFILE- CIVIL & SURVEY
 
Civil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsCivil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey Contractors
 
Hanisons Construction Profile
Hanisons Construction ProfileHanisons Construction Profile
Hanisons Construction Profile
 
Pusad solar power plant presentation (rev 7)
Pusad solar power plant presentation  (rev 7)Pusad solar power plant presentation  (rev 7)
Pusad solar power plant presentation (rev 7)
 
Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016
 
Scope of solar thermal power plants in India
Scope of solar thermal power plants in IndiaScope of solar thermal power plants in India
Scope of solar thermal power plants in India
 
csp (concentrated solar power) technology
csp (concentrated solar power) technologycsp (concentrated solar power) technology
csp (concentrated solar power) technology
 
GIS profile of Data Point
GIS profile of Data PointGIS profile of Data Point
GIS profile of Data Point
 
Solar power in India - A financial analysis
Solar power in India - A financial analysisSolar power in India - A financial analysis
Solar power in India - A financial analysis
 
Concentrated Solar Power Technologies (CSP)
Concentrated Solar Power Technologies (CSP)Concentrated Solar Power Technologies (CSP)
Concentrated Solar Power Technologies (CSP)
 
Solar Thermal Power
Solar Thermal PowerSolar Thermal Power
Solar Thermal Power
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 

Semelhante a 50 MW solar-thermal-dpr

Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesExergy
 
04_WEnergy Power Pilipinas, Inc..pdf
04_WEnergy Power Pilipinas, Inc..pdf04_WEnergy Power Pilipinas, Inc..pdf
04_WEnergy Power Pilipinas, Inc..pdfMarkAlburo3
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Akhilesh Upadhyay
 
Four s monthly cleantech track march,2012
Four s monthly cleantech track march,2012Four s monthly cleantech track march,2012
Four s monthly cleantech track march,2012Four-S
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
Solar power generation
Solar power generationSolar power generation
Solar power generationAngel Dass
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Engineering Limited
 
SSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting servicesSSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting servicesSatya Kumar DV
 
Exergy
ExergyExergy
ExergyExergy
 
pManifold Indis_Solar PV_IIES_Workshop_report
pManifold Indis_Solar PV_IIES_Workshop_reportpManifold Indis_Solar PV_IIES_Workshop_report
pManifold Indis_Solar PV_IIES_Workshop_reportpManifold
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plantRusiru Sanjaya
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateSaurabh Parihar
 
эрчим хүчний яам
эрчим хүчний яамэрчим хүчний яам
эрчим хүчний яамBayar Tsend
 
Model Solar City: Dr. Omkar Jani, Principal Research Scientist, Gujarat Energ...
Model Solar City: Dr. Omkar Jani, Principal Research Scientist, Gujarat Energ...Model Solar City: Dr. Omkar Jani, Principal Research Scientist, Gujarat Energ...
Model Solar City: Dr. Omkar Jani, Principal Research Scientist, Gujarat Energ...www.theurbanvision.com
 
Case studies ppp
Case studies pppCase studies ppp
Case studies pppamityasum23
 

Semelhante a 50 MW solar-thermal-dpr (20)

Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
 
04_WEnergy Power Pilipinas, Inc..pdf
04_WEnergy Power Pilipinas, Inc..pdf04_WEnergy Power Pilipinas, Inc..pdf
04_WEnergy Power Pilipinas, Inc..pdf
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park
 
Four s monthly cleantech track march,2012
Four s monthly cleantech track march,2012Four s monthly cleantech track march,2012
Four s monthly cleantech track march,2012
 
Solar tracking-systems-india
Solar tracking-systems-indiaSolar tracking-systems-india
Solar tracking-systems-india
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Solar power generation
Solar power generationSolar power generation
Solar power generation
 
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)Gensol Group Profile  - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
Gensol Group Profile - Solar Advisory, Solar Rooftop EPC, Solar O&M (13.12.17)
 
SSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting servicesSSAEL Utility Solar pre bid and post bid consulting services
SSAEL Utility Solar pre bid and post bid consulting services
 
Exergy
ExergyExergy
Exergy
 
Imagineering
ImagineeringImagineering
Imagineering
 
A S EnterprisE
A S EnterprisEA S EnterprisE
A S EnterprisE
 
pManifold Indis_Solar PV_IIES_Workshop_report
pManifold Indis_Solar PV_IIES_Workshop_reportpManifold Indis_Solar PV_IIES_Workshop_report
pManifold Indis_Solar PV_IIES_Workshop_report
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plant
 
Epc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard templateEpc service proposal for setting up solar power project standard template
Epc service proposal for setting up solar power project standard template
 
эрчим хүчний яам
эрчим хүчний яамэрчим хүчний яам
эрчим хүчний яам
 
Mahindra War room Finals 2012
Mahindra War room Finals 2012 Mahindra War room Finals 2012
Mahindra War room Finals 2012
 
Model Solar City: Dr. Omkar Jani, Principal Research Scientist, Gujarat Energ...
Model Solar City: Dr. Omkar Jani, Principal Research Scientist, Gujarat Energ...Model Solar City: Dr. Omkar Jani, Principal Research Scientist, Gujarat Energ...
Model Solar City: Dr. Omkar Jani, Principal Research Scientist, Gujarat Energ...
 
Case studies ppp
Case studies pppCase studies ppp
Case studies ppp
 

Último

The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 

Último (20)

The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 

50 MW solar-thermal-dpr

  • 1. 50MWp Solar Thermal Power Project, Rajasthan – INDIA – Detailed Project Report Gammon Infrastructure Projects Ltd, Mumbai Project Consultants Pan Exergy Pvt Ltd D-32, Sector-7, Noida – 201301, INDIA. Ph: +91-9999676750; +91-9654436886 Web: www.exergy.in Email: info@exergy.in
  • 2. 50M W So lar The r mal Po we r Projec t Repor t P a g e |2 50MW Solar CST Power Plant - Detailed Project Report Document Version: 1.4/Draft #3 Document Ref: PEPL/SOLAR/10-11/NESSPL/001 Date of Issue: February 21, 2011 Author: Arun K Pandey, Project Coordinator Rajat Sethi, Supervisor Authorized by: Ravindra P Dubey, Managing Director, PEPL Dr OP Nangia, Director, NESSPL © Copyright. All rights reserved. Abstract This project report study examines solar thermal electricity generation technologies, undertakes a brief analysis of those that could reasonably be considered suitable for commercial power generation for the client, and identifies a preferred technology for further evaluation. The review and selection of a preferred technology includes: (i) an assessment of the technology; (ii) consideration of the status of the technology and commercial experience; (iii) consideration of the solar resource at the proposed location; (iv) costs; and (v) risks. Project Consultants Project Promoters Pan Exergy Private Ltd. Gammon Infrastructure Projects Ltd .
  • 3. 50M W So lar The r mal Po we r Projec t Repor t P a g e |3 NON DISCLOSURE This Detailed Project Report (referred to as “the DPR”) has been prepared by Pan Exergy Pvt Ltd (PEPL) for Gammon Infrastructure Private Limited (GIPL) and remains the property of GIPL & PEPL. This report is produced for the purpose of securing various government approvals and clearances for GIPL and its potential investors and is distributed only to a limited number of persons identified with the prior consent of PEPL, and is distributed on the understanding that it must not be further distributed to any person. The DPR is henceforth made available and is received specifically on the implied understanding that the recipient will hold the information contained therein confidential and will not copy, reproduce, distribute or disclose the information or any part of it to any other person. The recipient agrees, on request to return promptly, or destroy, all information received from PEPL and its consultants without r etaining any copies and undertakes that any persons to whom a copy or copies have been passed will do likewise. There has been no independent third party verification of the information in the report. While the information in the plan has been prepared in good faith and is believed to be accurate in all material respects, PEPL, GIPL, its Directors, officers and employees, nor any of them give any representation or warranty, expressed or implied as to the completeness or accuracy of any information in the report or otherwise made available (whether orally or in writing), or that any such information remains unchanged after the date of its receipt. PEPL, its Directors, officers and employees will not be liable or responsible in any way whatsoever in respect of any statement, opinion, or other information contained in this report or howsoever made available, in relation to it, nor for any omission from it. Each party in receipt of this report must make its own independent assessment of the project after making such investigations and taking its own independent advice, as it may deem necessary. In particular, any estimates, forecasts, projections or opinions contained in the plan necessarily involve significant elements of subjective judgement and analysis and each recipient must satisfy itself in relat ion to such matters. The report is not a prospectus and does not form part of a contract or an offer of sale. It does not constitute an offer capable of acceptance, nor an invitation for the sale or purchase of any securities. ISSUED BY: Director, Pan Exergy Pvt Ltd D-32, Sector #7, Noida – 201301, INDIA. W: www.exergy.in E: info@exergy.in Tel: 0120-4243211 Fax: 011-22719964 DATE: 18th October 2010 Project Consultants Project Promoters Pan Exergy Private Ltd. Gammon Infrastructure Projects Ltd .
  • 4. 50M W So lar The r mal Po we r Projec t Repor t P a g e |4 BACKGROUND The Client Gammon Infrastructure Projects Limited ("GIPL") is an infrastructure project development company promoted by Gammon India Limited, to participate in the development of infrastructure projects on a public private partnership ("PPP") basis. GIPL leads Gammon's forays into development of infrastructure projects on PPP basis across sectors such as Roads & Expressways, Ports, Hydro Power, Urban infrastructure, Airports, Special Economic Zones, Water and Wastewater management, Railways, Power Transmission lines, and Agricultural Infrastructure. GIPL has also started undertaking projects in renewable energy sector. It has taken up biomass power projects in Punjab and Haryana and Hydro Power Projects in the states of Himachal Pradesh and Sikkim. It now wants to enter into the area of solar power and has assigned the job of preparing a project report on a 50 MW Solar Thermal Power Plant for suitable site in the country to the consultants. The Consultants Pan Exergy Pvt. Ltd. (PEPL) is a leading Solar Technology Consultant and Turnkey Executor of upto 100kW Solar Projects. It has had a significant expertise in Indian Solar Markets based on an experience of offering services to more than 600MW of Solar Projects in India. Out of these 250MW are already under advanced stages of execution. For more details visit our website (www.exergy.in) of email us at (info@exergy.in). GIPL awarded PEPL the job for preparing a Project Report on a 50 MW Solar Thermal Power Project at a suitable site in the country. PEPL hereby submits this report on 50 MW Solar Thermal Power Plant at Village Malar, Tehsil Phalodi, District Jodhpur in Rajasthan. Project Consultants Project Promoters Pan Exergy Private Ltd. Gammon Infrastructure Projects Ltd .
  • 5. 50M W So lar The r mal Po we r Projec t Repor t P a g e |5 TABLE OF CONTENTS NON DISCLOSURE 3 BACKGROUND 4 1 ABOUT THIS DOCUMENT 8 1.1 Change control 8 1.1.1 Current status and anticipated changes 8 1.1.2 Change history 8 2 TERMS AND ABBREVIATIONS 9 2.1 Definitions 10 3 SOLAR IN INDIA: AN INTRODUCTION 11 3.1 Energy Scenario in Rajasthan 12 3.2 Jawaharlal Nehru National Solar Mission 12 3.3 Benefits of Grid Connect Solar Energy 13 3.4 Socio Economic Benefits of Grid Connect Solar Power Plants 13 3.5 Approach to this Study 14 3.6 Key Study Assumptions 15 3.6.1 General 3.6.2 Project Size 3.6.3 Project Location 3.7 Assumptions in Financial Modelling 16 4 PHOTOVOLTAICS OR SOLAR CST POWER PLANTS ? 17 4.1 Principle 17 4.2 Photovoltaics 17 4.3 Solar Thermal Power Plants 17 4.4 Reference Systems 19 4.5 Areas of Operations 20 4.6 Future Perspectives 23 4.7 Conclusions 23 5 POTENTIAL, FEASIBILITY & PATH TO CST REALITY IN INDIA 24 5.1 Solar Thermal Electric Systems – Concentrating Solar Thermal (CST) 24 5.2 Types of CST Systems 26 5.3 Comparison of CST Systems 29 Project Consultants Project Promoters Pan Exergy Private Ltd. Gammon Infrastructure Projects Ltd .
  • 6. 50M W So lar The r mal Po we r Projec t Repor t P a g e |6 5.4 Potential for CST in India 32 5.4.1 Solar Resource Assessment 5.4.2 Land Assessment 5.4.3 Power Grid Assessment 5.4.4 Fossil Fuel & Water Requirement 5.4.5 Previous Assessment of CST in India 5.4.6 Improvements to Previous Assessments of CST in India 5.4.7 Framework for Comprehensive Assessment 5.5 CST Projects & Activities in India 42 5.6 Levelized Electricity Cost (LEC) 43 5.6.1 Drivers of CST Economics 5.6.2 Predicting CST’s Future with Experience Curve 5.7 The Path to CST Commercialization in India 48 6 SITE SELECTION FOR 50MW CST PLANT 49 6.1 Nature & Use of Solar Radiation 49 6.2 Land Assessment Criteria for CST Plant at Phalodi 52 6.3 Solar Resource in Phalodi (Jodhpur), Rajasthan 54 6.4 Reliability & Measurement of Solar Radiation in Rajasthan 59 7 TECHNOLOGY SELECTION & SYSTEM DESCRIPTION 60 7.1 Technology Selection 60 7.2 Size of the Plant 62 7.3 Energy Storage & Auxiliary Fuel 63 7.3.1 Heat Storage for Solar Thermal 7.3.2 Plant Performance 7.4 Staged Development Planning 64 7.5 Development Schedule 65 7.6 Environmental Concerns 66 8 POWER EVACUATION STRATEGY 67 8.1 Network connection 67 8.2 Grid Synchronization Scheme 68 8.3 Interface Scheme Proposed 68 8.4 Single Line Diagram for Power Evacuation 70 8.5 Metering Requirements 71 9 OPERATION AND MAINTENANCE REQUIREMENTS 72 9.1 O&M Lessons for Running CST Plants 72 9.2 Basic Structure of the O&M Team 75 Project Consultants Project Promoters Pan Exergy Private Ltd. Gammon Infrastructure Projects Ltd .
  • 7. 50M W So lar The r mal Po we r Projec t Repor t P a g e |7 9.2.1 Operation 9.2.2 Maintenance 9.2.3 Administration 9.2.4 Facilities to Be Extended to the Employees 9.3 Station Operations Philosophy 76 9.4 Station Maintenance Philosophy 76 9.4.1 Ordinary Maintenance 9.4.2 Emergency Maintenance 9.4.3 Maintenance Plan and Scheduled Maintenance 9.5 Maintenance Management System 77 9.6 Spare Parts Management System 77 9.7 Availability of O&M Manual 77 9.8 Special Tools & Tackles 77 9.9 Checklist & Protocol 78 9.10 Safety & Protection 78 9.11 Organization Structure 79 9.12 Training 80 10 PROJECT FINANCIALS 81 10.1 Project Cost 81 10.2 Assumptions 82 10.3 Cash Flow 83 11 CONCLUSIONS & RECOMMENDATIONS 84 11.1 Conclusions 84 11.2 Recommendations 86 11.3 Risk Assessment 87 APPENDIX – I SOLAR IRRADIATION IN PHALODI, JODHPUR 88 APPENDIX – II LEC-CALCULATION BASED ON BILL OF MATERIALS FOR LS-3 LATEST SEGS CALIFORNIA PLANT 90 APPENDIX – III TECHNO-COMMERCIAL SURVEY OF CST PLANT INSTALLATIONS 92 APPENDIX – IV CST PLANTS WORLDWIDE 98 Project Consultants Project Promoters Pan Exergy Private Ltd. Gammon Infrastructure Projects Ltd .
  • 8. 50M W So lar The r mal Po we r Projec t Repor t P a g e |8 Requests for any specific section of the report can be made directly emailed to info@exergy.in or Rajat@Exergy.in. The entire report is available at a cost of Rs. 35,000. For any queries please feel free to call our consultants at 00-91-9999676750 or 00-91-9654436886. For any updates please visit our website: www.exergy.in. Project Consultants Project Promoters Pan Exergy Private Ltd. Gammon Infrastructure Projects Ltd .