Hussainsagar Lake- Background
• Constructed in 1562 AD to meet the irrigation needs
• Drinking water source from 1884 to 1930.
• Total catchment area = 240 Sq. km
• Maximum water spread area of the lake = 5.7 Sq. km
• Present Water spread area @ FTL = 4.81 Sq. km
• Shore line length = 14 km
• Volume of the Lake at spill level = 27.18 Mcum
• Average depth at full capacity = 5.02 m
• Full Tank Level (FTL) = 513.43 M
                                                        2
                                                        2
Inflows and Outflows
                                           Picket Nala


Kukatpally
  Nala




 Banjara Nala                                        Surplus Outlet
                                                     - Opp: Marriot




    Balkapur Nala


                                                    Surplus Outlet
                                                     - at Liberty
SOURCES OF POLLUTION
External – Point Source
•   Raw sewage through nalas viz. Balkapur, Banjara, Kukatpally &
    Picket Nalas
•   Industrial effluents through Kukatpally Nala
•   Solid Waste Dumping in Nalas – Leading into Lake

External – Non - Point Source
• Slums
• Dried Flower and Garlands – Puja material
• Commercial Establishments
• Visitors, Tourists etc.
• Immersion of Ganesh and Durga Idols
Internal
•   Nutrient rich sediments in the lake bed.


                                                               4
REVAMPED SYSTEM OF HUSSAINSAGAR CLEANING


1. Floating material and Shoreline Cleaning

2. Treatment of Inflows
     • Stoppage of inflows (Interception and Diversions)
     • Sewage Treatment Plants – Maintain Water Balance

3. Improvement in quality of lake water
     • Dredging of Sediments
     • Aeration and Oxidation

4. Protection of Lakes and Nalas in Catchment Areas

5. Public Awareness / Peoples Participation /Peoples
   Movement
                                                       5
1. FLOATING MATERIAL        AND SHORELINE CLEANING
                SOURCES of solid waste

POINT SOURCE:
• NALAS IS THE MAIN SOURCE


NON-POINT SOURCES:
• SLUMS
• COMMERCIAL ESTABLISHMENTS
• PUJA FLOWERS
• VISITORS, TOURISTS ETC.
• GANESH IMMERSIONS, DURGA PUJA IMMERSIONS
• .
                                                 6
1. FLOATING MATERIAL AND SHORELINE CLEANING
                   NALAS




                                              7
1. FLOATING MATERIAL   AND SHORELINE CLEANING

             PUJA FLOWERS




                                                8
1. FLOATING MATERIAL   AND SHORELINE CLEANING

             PUJA FLOWERS




                                                9
1. FLOATING MATERIAL   AND SHORELINE CLEANING

  FLOATING MATERIAL INSIDE LAKE

                                       Floating matter
                                   accumulation in the lake




         Floating matter removal
              by using DUC


                                                        10
1. FLOATING MATERIAL      AND SHORELINE CLEANING
                     Action points


1. Cleaning of Shoreline
2. Removal of floating material
3. Removal of Water Hyacinth
4. Disturbance of Algal Bloom
5. Collection & Stacking Solid Waste material
6. Transportation to disposal site


                                                11
1. FLOATING MATERIAL                AND SHORELINE CLEANING

            SHORELINE IS DIVIDED INTO SIX SECTORS


SN              REACH /SECTOR                     Km
                                                                  4
1 Tank Bund – Sagar Park – BPP - Lumbini         2.59
                                                                                 5
  NTR Marg – Rotary – Bridge 1 – Charvee                                                  6
2 pond – upto PP                                 1.78
  Peoples Plaza, Bridge 2, Bridge 3, upto
3 Jalvihar                                        2.1
                                                              3
4 Jalvihar, Bridge 4, PV Ghat, Part of SV Park   2.62

5 Part SV Park - Bridge 5- Ecopark                3

  Buddha Bhavan - Workshops - Sailing
6 Clubs - Surplus Wier - Rotary Park             2.63
                                                                                 1
                       TTL                       14.72                2



                                                                                     12
REACH /SECTOR - 1
SN                                Km    Lab
  Tank Bund – Sagar Park –
                               2.59      4
1 BPP - Lumbini
2 Divided into (3) Sub-Sectors
3 One boat with two semi-skilled labors by
4 Grill for small stretch at Sagar Park

                                       One Boat + (2)
                                       Semi skilled -
                                          APTDC




                    2


                              2

                                                                    4            5
                                                                                     6

                                                        Grill   3

                                                                                 1
                                                                        2
                                                                            13
REACH /SECTOR - 2
                                                SN                               Km        Lab
                                                  NTR Marg – Rotary – Bridge
                                                                               1.78        16
                                                1 1 – Charvee pond – upto PP
                            2                   2 Divided into six sub-sectors
                                                3 Grill to be provided at Rotary
                                Grill & Mesh
                                                4 Facility for immersing puja flowers in lake
                                for Puja Flrs
                                                  at Hanuman Temple – Iron grill and net
                    4                             facility
                                2           2          3



                        Grill



                                                                        3
    4       5
                6
3

            1
        2
                                                                                      14
REACH /SECTOR - 3
SN                              Km    Lab
     Peoples Plaza, Bridge 2,                       2
                                2.1   14
     Bridge 3, upto Jalvihar                    2
     Divided into seven (7) sub-Sectors     2
                                            2

                                                2




                                                        2



                                                            2
                                                                    4        5
                                                                                 6
                                                                3

                                                                             1
                                                                        2
                                                                        15
4              4



                                             4
        4




                                             4


2

    REACH /SECTOR = 4
                          Km   Lab
Jalvihar, Bridge 4, PV                   3           4        5
                        2.62 25                                   6
Ghat, Part of SV Park
                                                 3
Divided into (7) Sub Sectors
DUC services are Utilized at this                             1
                                                         2
sector for most of time                                  16
3



      REACH /SECTOR - 5
                           Km    Lab
Part SV Park - Bridge 5-
                             3   18
Ecopark                                        4
Divided into (6) Sub Sectors                       2




                                           3                   4            5
                                                                                6
                                                           3

                                                                            1
                                       3                           2
                                                                       17
                     3
REACH /SECTOR – 6
        SN                                   Km      Lab
        1 Buddha Bhavan - Workshops -        2.63     17
          Sailing Clubs - Surplus Wier -                          4
          Rotary Park
        2 Divided into (4) Sub-Sectors
                                                                                   5
                                                             FACILITY
        3 Wall at shoreline of workshops                    FOR PUJA
                                                            FLOWERS
        4 Facility for immersing puja flowers in lake
          with Iron grill and net - for people of Sec bad                   WALL




                                                                        5



    4        5
                 6                                                            3
3

             1
        2
                                                                                       18
SN         REACH /SECTOR             Km     Lab Sup
       Tank Bund – Sagar Park – BPP
  1    - Lumbini                      2.59    4
                                                             4
                                                   I
       NTR Marg – Rotary – Bridge 1                                  5
  2    – Charvee pond – upto PP       1.78    16                              6
       Peoples Plaza, Bridge 2,
                                                   II
  3    Bridge 3, upto Jalvihar         2.1    14
       Jalvihar, Bridge 4, PV Ghat,
                                                   III   3
  4    Part of SV Park                2.62    25
       Part SV Park - Bridge 5-
                                                   IV
  5    Ecopark                         3      18
    Buddha Bhavan - Workshops -
    Sailing Clubs - Surplus Wier -                 V
  6 Rotary Park                       2.63    17                     1
                    TTL               14.72   94   5             2
• Floating material removal by Pedal Boats & DUCs
• Disturbance of Algae in Summers by Motor boats
• Two Vehicles with Dumpers collect and transport
  to GHMC site
• Estimated Financials Rs 147 lacs per annum
• Monitored by two Sanitary Officers

                                                                         19
2. Treatment of Inflows

• Stoppage of inflows - Interception and Diversion of Nalas

• Sewage Treatment Plants – Maintain Water Balance




                                                       20
2. Treatment of Inflows
         Interception and Diversion of Nalas – Total (7) I&Ds
                                                            Enhanced for projected
                                                 Existing
S.No            Nala & Location of I&Ds                        population of 2021
                                                  Peak              Peak
 1     Picketnala – Opp: Kims Hospital           15 MLD           171 MLD

 2     Balkapur Channel                          22 MLD            52 MLD

 3     Yousufguda Nala near Divyashakthi Apt     23 MLD
                                                                      --
 4     Bajara Nala near Yashoda Hospital         12 MLD
                                                                      --
 5     Kukatpally Nala at Fathenagar             75 MLD           185 MLD

 6     Kukatpally Nala at Prakashnagar           30 MLD            44 MLD

 7     Kukatpally Nala at Necklace Road (New)       -             100 MLD

                                           Total 177 MLD          552 MLD

                                                                             21
I&D
Prakash
 Nagar                    I&D Picket

           I&D Necklace
               Road

Interception &
   Diversion
  Structures




  I&D
Balkapur



                                       22
Construction Of Sewerage Facilities

                 Sewage Diversion
– 1600 mm dia Ring Sewer main of length of 2.5 Km from Necklace road to
  Manhole No. 88 of Duplicate K&S Main opposite to Sailors Club for diverting
  the Kukatpally Nala flows

– Diversion Trunk Main at Rangadhamini of length 1.15 km
– 1400 mm dia Balanagar Sewage Trunk Main of a length of 4.85 km from the
  confluence point of Jeedimetla and Kukatpally Nala to Ring Sewer at Necklace
  road

– Sewer Network over a length of 15.05 Km in Cantonment area is
  taken up under 4 Packages by HMWS&SB



                                                                         23
2.5 Kms – 1600 mm
            Ring Sewer on
             Necklace Rd



 Ring
Sewers




                     24
Sewage Diversion – During works in progress

1600mm Pipe Jacking              1400 mm dia Balanagar Main – Reach-I
                                 Pipe jacking technique inside the Begumpet Airport




1600mm Ring Main Pipe laying   1400 mm dia Balanagar Main – Reach-II
                               Railway Crossing by box pushing technique




                                                                                  25
2. Treatment of Inflows

             SEWAGE TREATMENT PLANTS


• 30 MLD at Picket Nala – Opp: Kims – Tertiary Treatment

• 20 MLD on Balkapur Nala - adj. Khairatabad Flyover –
  Upgradation – Tertiary level – Membrane treatment

• 5 Mld on Rangadhamini Cheruvu


• Treated good quality water is let in the lake
• For maintaining water balance in the lake


                                                      26
30 MLD STP
                     at PICKET
5 MLD STP at
Rangadhamini


STPs




    20 MLD STP at
     Khairatabad
                                 27
I&Ds and STPs
  I&D at Necklace Road              20 MLD STP at Balkapur Nala




                                       30 MLD STP at Picket Nala
5 MLD STP at Rangadhamani Cheruvu




                                                             28
3. IMPROVEMENT IN QUALITY OF LAKE WATER
        I . Dredging of Sediments at mouth of Nalas



• 4 Dredging zones
• At the confluence points of Nalas
• Total quantity of 10 Lakh Cum.
• Dredging commences shortly at (3) Sites
• Dredged material is first dumped at Temporary site for
  abot (7) days
• Permanent dumping site at Jawaharnagar


                                                      29
                                                      29
3. IMPROVEMENT IN QUALITY OF LAKE WATER
   i. Dredging of Sediments at mouth of Nalas
       HUSSAIN SAGAR LAKE DREDGING ZONES

                KUKATPALLY NALA = 3,50,000 CUM




                               PICKET NALA = 3,09,989 CUM




                BANJARA NALA = 1,52,712 CUM




            BALKAPUR NALA = 1,86,913 CUM




                                                            30
3. IMPROVEMENT IN QUALITY OF LAKE WATER
                  ii. Aeration and Oxidation
Fountains 7 No.s are installed with objective to improve the
dissolved oxygen content in the lake.




Proposals for Oxidation of Sediment in the Lake Bed.
4. Protection of Lakes and Nalas in Catchment Areas
                                                         TO MUMBAI            NH 7
                            To Medal                                                       Catchment area 240 Sqkms

                                                                                                                 N
                                    Panthulu Cheruvu
        Ramamma Cheruvu

                                            Pedda
                                                             Fox Sagar
                                                                     Poora Cheruvu
                            Chintal Cheruvu         Cheruv
                                                    u

                          Ambe Cheruvu
                                                             Qutubullapur Kunta          Kotha (Alwal) Cheruvu
                           Yellamma Cheruvu

       To
                                                                                     Chinna naray(Rayan)
                             NallaCheruvu
           Mum                                                                            Cheruvu
To Mumbai  bai
                              Rangadhamuni
        NH 9                                                                Boin Tan (Hasmathpet)
                              Cheruvu

                          Kamuni
                          cheruvu
                                      Maisamma
                                      Cheruvu

                            Sudulavani Kunta
                                            KBR Cheruvu                                To Sec-Bad

                                                                         Hussain Sagar
                                                               
                                                                 
4. Protection of Lakes and Nalas in Catchment Areas


● There are about 80 lakes in the
 catchment area of Hussainsagar Lake.

● Total catchment area 240 sq km
● spreadover Kukatpally , Yousoufguda ,
 Qutbullapur, Bowenpally , Balanagar,
 Jeedemetla, &Alwal.

● Proposed  to take     by up Protection
 categorizing into the following.
    Lakes > 10 hectares

    Lakes <10 Ha but Prominent & Prone
     for Encroachment                      Rangadhamini Lake.
    Lakes of 10 hectares below
Slum Improvement

 1. 22 slums around Hussansagar taken up
    Through (4) NGOs CARE , Sukuki Exnora,
    CHATRI, APSA NGO
2. Solid Waste Management
    ● Provision of infrastructure (tri cycles,
        dumper bins)
    ● Proper Disposal of Solid Waste with
        Subraks
3. Community toilets
    ● New Constructions
    ● Repairs to the existing
4. Health and Sanitation
    ● Health camps




                                                 34
                                                 34
PUBLIC AWARENESS AND PARTICIPATION

●   Pamphlets, Poster , Door / wall stickers, Banners, Brouchers
●   Kalajatha programs , Awareness meetings, Exhibition
●   Lake walk & Rallies (WED) on the necklace road
●   Propaganda through Mike announcements
●   Promotion of Clay Ganesh Idols
●   Vendors Meeting around the HS lake on “ say no to Plastics”.




                                                                   35
Creation of People’s Movement for
 Restoration and Preservation of
       Hussain Sagar Lake




                               36
Creation of People’s Movement for Restoration and
            Preservation of Hussain Sagar Lake
• Water Literacy amongst Stake Holders
• Stakeholder’s Involvement: Residents, Corporate,       Students,
  Celebrities, NGOs
• Awareness Creation: Signage, Hoardings, Radio, Films
• Ads in Press, Media etc
• Workshops, Meetings, , Debates, Talks
• Painting, quiz, Walks, Runs etc
• Social Media set up – Face book, Twitter

• Invite public participation
• Ultimate goal - Neat & Clean Hussainsagar through people’s
  initiative

                                                             37
Help in restoring the Glory of Hussainsagar Lake

                          INVITED
       Comments, Remarks and Suggestions

         Your Suggestions are Valuable to us
               hsclean@hmda.gov.in




                   Also available on Face book
         https://www.facebook.com/ hussiansagar.cleaning

More Related Content

What's hot

urban studies NASHIK by GB
urban studies NASHIK by GBurban studies NASHIK by GB
urban studies NASHIK by GBGajananBhamare
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish KumarNitish Kumar
 
River front development
River front developmentRiver front development
River front developmentBismi S
 
LAVASA CITY
LAVASA CITYLAVASA CITY
LAVASA CITYdhumsa
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront DevelopmentBeda Choudhury
 
Sabarmati riverfront development
Sabarmati riverfront developmentSabarmati riverfront development
Sabarmati riverfront developmentShailja km
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lakeharshilshah546931
 
Atta Market, Sector 18, Noida - Case study
Atta Market, Sector 18, Noida - Case studyAtta Market, Sector 18, Noida - Case study
Atta Market, Sector 18, Noida - Case studyAyushi Agrawal
 
CITY PLANNING OF AHMEDABAD
CITY PLANNING OF AHMEDABADCITY PLANNING OF AHMEDABAD
CITY PLANNING OF AHMEDABADKSHIPRASHAH
 
Evolution of Chennai & Bangalore over time
Evolution of Chennai & Bangalore over timeEvolution of Chennai & Bangalore over time
Evolution of Chennai & Bangalore over timeAbby Varghese
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyAnoushka Tyagi
 
Architecture and Planning of jaipur
Architecture and Planning of jaipurArchitecture and Planning of jaipur
Architecture and Planning of jaipursaumyakohli
 
Varanasi -town planning pdf
Varanasi -town planning  pdfVaranasi -town planning  pdf
Varanasi -town planning pdfAayushiMalviya4
 

What's hot (20)

urban studies NASHIK by GB
urban studies NASHIK by GBurban studies NASHIK by GB
urban studies NASHIK by GB
 
Thesis report Nitish Kumar
Thesis report Nitish KumarThesis report Nitish Kumar
Thesis report Nitish Kumar
 
River front development
River front developmentRiver front development
River front development
 
LAVASA CITY
LAVASA CITYLAVASA CITY
LAVASA CITY
 
Varanasi Riverfront Development
Varanasi Riverfront DevelopmentVaranasi Riverfront Development
Varanasi Riverfront Development
 
Sabarmati riverfront development
Sabarmati riverfront developmentSabarmati riverfront development
Sabarmati riverfront development
 
Lakefront development at kanelav lake
Lakefront development at kanelav lakeLakefront development at kanelav lake
Lakefront development at kanelav lake
 
Atta Market, Sector 18, Noida - Case study
Atta Market, Sector 18, Noida - Case studyAtta Market, Sector 18, Noida - Case study
Atta Market, Sector 18, Noida - Case study
 
Detailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master PlanDetailed understanding of the Chennai Master Plan
Detailed understanding of the Chennai Master Plan
 
Ahmedabad
Ahmedabad Ahmedabad
Ahmedabad
 
Navi mumbai
Navi mumbaiNavi mumbai
Navi mumbai
 
CITY PLANNING OF AHMEDABAD
CITY PLANNING OF AHMEDABADCITY PLANNING OF AHMEDABAD
CITY PLANNING OF AHMEDABAD
 
Evolution of Chennai & Bangalore over time
Evolution of Chennai & Bangalore over timeEvolution of Chennai & Bangalore over time
Evolution of Chennai & Bangalore over time
 
Gandhinagar town planning and master plan study
Gandhinagar town planning and master plan studyGandhinagar town planning and master plan study
Gandhinagar town planning and master plan study
 
Ahmedabad srfdcl
Ahmedabad srfdclAhmedabad srfdcl
Ahmedabad srfdcl
 
Gurugram casestudy
Gurugram casestudyGurugram casestudy
Gurugram casestudy
 
Architecture and Planning of jaipur
Architecture and Planning of jaipurArchitecture and Planning of jaipur
Architecture and Planning of jaipur
 
Varanasi -town planning pdf
Varanasi -town planning  pdfVaranasi -town planning  pdf
Varanasi -town planning pdf
 
Gandhinagar- Town Planning
Gandhinagar- Town PlanningGandhinagar- Town Planning
Gandhinagar- Town Planning
 
Cidco- NAVI MUMBAI
Cidco- NAVI MUMBAICidco- NAVI MUMBAI
Cidco- NAVI MUMBAI
 

Viewers also liked

Status of lakes in Hyderabad-Dec 2013
Status of lakes in Hyderabad-Dec 2013Status of lakes in Hyderabad-Dec 2013
Status of lakes in Hyderabad-Dec 2013Nisha Kumari
 
Critical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityCritical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityMaitreyi Yellapragada
 
Lake preservation and protection in Hyderabad: a watershed systems approach
Lake preservation and protection in Hyderabad: a watershed systems approachLake preservation and protection in Hyderabad: a watershed systems approach
Lake preservation and protection in Hyderabad: a watershed systems approachSiddharth Hande
 
Using ICT to support water sector monitoring
Using ICT to support water sector monitoringUsing ICT to support water sector monitoring
Using ICT to support water sector monitoringDavid Schaub-Jones
 
Hussain sagar
Hussain sagar Hussain sagar
Hussain sagar akshara110
 
What is the soul?
What is the soul?What is the soul?
What is the soul?Nick Curry
 
Do we need clean lakes or polluted lakes
Do we need clean lakes or polluted lakesDo we need clean lakes or polluted lakes
Do we need clean lakes or polluted lakesrrnagaricare
 
Bangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBhargavi Rao
 
Hyderabad City
Hyderabad CityHyderabad City
Hyderabad CityArjun CM
 
Urban Design of an area with multiple heritage
Urban Design of an area with multiple heritageUrban Design of an area with multiple heritage
Urban Design of an area with multiple heritageAjitha Reddy
 
Urban Flooding causes and Management Dr.Reddy
Urban Flooding causes and Management Dr.ReddyUrban Flooding causes and Management Dr.Reddy
Urban Flooding causes and Management Dr.ReddySai Bhaskar Reddy Nakka
 
Master plan and land use
Master plan and land useMaster plan and land use
Master plan and land useShourya Puri
 
Hyderabad Tourist Attraction
Hyderabad Tourist AttractionHyderabad Tourist Attraction
Hyderabad Tourist AttractionKundan Sharma
 

Viewers also liked (19)

Status of lakes in Hyderabad-Dec 2013
Status of lakes in Hyderabad-Dec 2013Status of lakes in Hyderabad-Dec 2013
Status of lakes in Hyderabad-Dec 2013
 
Critical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad CityCritical Analysis of the Planning scenario in Hyderabad City
Critical Analysis of the Planning scenario in Hyderabad City
 
Lake preservation and protection in Hyderabad: a watershed systems approach
Lake preservation and protection in Hyderabad: a watershed systems approachLake preservation and protection in Hyderabad: a watershed systems approach
Lake preservation and protection in Hyderabad: a watershed systems approach
 
Soul
Soul Soul
Soul
 
Great Cities Case Study Hyderabad
Great Cities  Case Study  HyderabadGreat Cities  Case Study  Hyderabad
Great Cities Case Study Hyderabad
 
Using ICT to support water sector monitoring
Using ICT to support water sector monitoringUsing ICT to support water sector monitoring
Using ICT to support water sector monitoring
 
Hussain sagar
Hussain sagar Hussain sagar
Hussain sagar
 
HMWSSB Bill Payment
HMWSSB Bill PaymentHMWSSB Bill Payment
HMWSSB Bill Payment
 
What is the soul?
What is the soul?What is the soul?
What is the soul?
 
Nala (sewerage) plantation designs
Nala (sewerage) plantation designsNala (sewerage) plantation designs
Nala (sewerage) plantation designs
 
Do we need clean lakes or polluted lakes
Do we need clean lakes or polluted lakesDo we need clean lakes or polluted lakes
Do we need clean lakes or polluted lakes
 
Bangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground water
 
Hyderabad City
Hyderabad CityHyderabad City
Hyderabad City
 
Urban Design of an area with multiple heritage
Urban Design of an area with multiple heritageUrban Design of an area with multiple heritage
Urban Design of an area with multiple heritage
 
Urban Flooding causes and Management Dr.Reddy
Urban Flooding causes and Management Dr.ReddyUrban Flooding causes and Management Dr.Reddy
Urban Flooding causes and Management Dr.Reddy
 
Master plan and land use
Master plan and land useMaster plan and land use
Master plan and land use
 
Hyderabad Tourist Attraction
Hyderabad Tourist AttractionHyderabad Tourist Attraction
Hyderabad Tourist Attraction
 
Hyderabad ppt
Hyderabad pptHyderabad ppt
Hyderabad ppt
 
Flood Management
Flood ManagementFlood Management
Flood Management
 

Recently uploaded

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIShubhangi Sonawane
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 

Recently uploaded (20)

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 

Hussainsagar Presentation by HMDA

  • 1. REVAMPED SYSTEM OF HUSSAINSAGAR CLEANING 1
  • 2. Hussainsagar Lake- Background • Constructed in 1562 AD to meet the irrigation needs • Drinking water source from 1884 to 1930. • Total catchment area = 240 Sq. km • Maximum water spread area of the lake = 5.7 Sq. km • Present Water spread area @ FTL = 4.81 Sq. km • Shore line length = 14 km • Volume of the Lake at spill level = 27.18 Mcum • Average depth at full capacity = 5.02 m • Full Tank Level (FTL) = 513.43 M 2 2
  • 3. Inflows and Outflows Picket Nala Kukatpally Nala Banjara Nala Surplus Outlet - Opp: Marriot Balkapur Nala Surplus Outlet - at Liberty
  • 4. SOURCES OF POLLUTION External – Point Source • Raw sewage through nalas viz. Balkapur, Banjara, Kukatpally & Picket Nalas • Industrial effluents through Kukatpally Nala • Solid Waste Dumping in Nalas – Leading into Lake External – Non - Point Source • Slums • Dried Flower and Garlands – Puja material • Commercial Establishments • Visitors, Tourists etc. • Immersion of Ganesh and Durga Idols Internal • Nutrient rich sediments in the lake bed. 4
  • 5. REVAMPED SYSTEM OF HUSSAINSAGAR CLEANING 1. Floating material and Shoreline Cleaning 2. Treatment of Inflows • Stoppage of inflows (Interception and Diversions) • Sewage Treatment Plants – Maintain Water Balance 3. Improvement in quality of lake water • Dredging of Sediments • Aeration and Oxidation 4. Protection of Lakes and Nalas in Catchment Areas 5. Public Awareness / Peoples Participation /Peoples Movement 5
  • 6. 1. FLOATING MATERIAL AND SHORELINE CLEANING SOURCES of solid waste POINT SOURCE: • NALAS IS THE MAIN SOURCE NON-POINT SOURCES: • SLUMS • COMMERCIAL ESTABLISHMENTS • PUJA FLOWERS • VISITORS, TOURISTS ETC. • GANESH IMMERSIONS, DURGA PUJA IMMERSIONS • . 6
  • 7. 1. FLOATING MATERIAL AND SHORELINE CLEANING NALAS 7
  • 8. 1. FLOATING MATERIAL AND SHORELINE CLEANING PUJA FLOWERS 8
  • 9. 1. FLOATING MATERIAL AND SHORELINE CLEANING PUJA FLOWERS 9
  • 10. 1. FLOATING MATERIAL AND SHORELINE CLEANING FLOATING MATERIAL INSIDE LAKE Floating matter accumulation in the lake Floating matter removal by using DUC 10
  • 11. 1. FLOATING MATERIAL AND SHORELINE CLEANING Action points 1. Cleaning of Shoreline 2. Removal of floating material 3. Removal of Water Hyacinth 4. Disturbance of Algal Bloom 5. Collection & Stacking Solid Waste material 6. Transportation to disposal site 11
  • 12. 1. FLOATING MATERIAL AND SHORELINE CLEANING SHORELINE IS DIVIDED INTO SIX SECTORS SN REACH /SECTOR Km 4 1 Tank Bund – Sagar Park – BPP - Lumbini 2.59 5 NTR Marg – Rotary – Bridge 1 – Charvee 6 2 pond – upto PP 1.78 Peoples Plaza, Bridge 2, Bridge 3, upto 3 Jalvihar 2.1 3 4 Jalvihar, Bridge 4, PV Ghat, Part of SV Park 2.62 5 Part SV Park - Bridge 5- Ecopark 3 Buddha Bhavan - Workshops - Sailing 6 Clubs - Surplus Wier - Rotary Park 2.63 1 TTL 14.72 2 12
  • 13. REACH /SECTOR - 1 SN Km Lab Tank Bund – Sagar Park – 2.59 4 1 BPP - Lumbini 2 Divided into (3) Sub-Sectors 3 One boat with two semi-skilled labors by 4 Grill for small stretch at Sagar Park One Boat + (2) Semi skilled - APTDC 2 2 4 5 6 Grill 3 1 2 13
  • 14. REACH /SECTOR - 2 SN Km Lab NTR Marg – Rotary – Bridge 1.78 16 1 1 – Charvee pond – upto PP 2 2 Divided into six sub-sectors 3 Grill to be provided at Rotary Grill & Mesh 4 Facility for immersing puja flowers in lake for Puja Flrs at Hanuman Temple – Iron grill and net 4 facility 2 2 3 Grill 3 4 5 6 3 1 2 14
  • 15. REACH /SECTOR - 3 SN Km Lab Peoples Plaza, Bridge 2, 2 2.1 14 Bridge 3, upto Jalvihar 2 Divided into seven (7) sub-Sectors 2 2 2 2 2 4 5 6 3 1 2 15
  • 16. 4 4 4 4 4 2 REACH /SECTOR = 4 Km Lab Jalvihar, Bridge 4, PV 3 4 5 2.62 25 6 Ghat, Part of SV Park 3 Divided into (7) Sub Sectors DUC services are Utilized at this 1 2 sector for most of time 16
  • 17. 3 REACH /SECTOR - 5 Km Lab Part SV Park - Bridge 5- 3 18 Ecopark 4 Divided into (6) Sub Sectors 2 3 4 5 6 3 1 3 2 17 3
  • 18. REACH /SECTOR – 6 SN Km Lab 1 Buddha Bhavan - Workshops - 2.63 17 Sailing Clubs - Surplus Wier - 4 Rotary Park 2 Divided into (4) Sub-Sectors 5 FACILITY 3 Wall at shoreline of workshops FOR PUJA FLOWERS 4 Facility for immersing puja flowers in lake with Iron grill and net - for people of Sec bad WALL 5 4 5 6 3 3 1 2 18
  • 19. SN REACH /SECTOR Km Lab Sup Tank Bund – Sagar Park – BPP 1 - Lumbini 2.59 4 4 I NTR Marg – Rotary – Bridge 1 5 2 – Charvee pond – upto PP 1.78 16 6 Peoples Plaza, Bridge 2, II 3 Bridge 3, upto Jalvihar 2.1 14 Jalvihar, Bridge 4, PV Ghat, III 3 4 Part of SV Park 2.62 25 Part SV Park - Bridge 5- IV 5 Ecopark 3 18 Buddha Bhavan - Workshops - Sailing Clubs - Surplus Wier - V 6 Rotary Park 2.63 17 1 TTL 14.72 94 5 2 • Floating material removal by Pedal Boats & DUCs • Disturbance of Algae in Summers by Motor boats • Two Vehicles with Dumpers collect and transport to GHMC site • Estimated Financials Rs 147 lacs per annum • Monitored by two Sanitary Officers 19
  • 20. 2. Treatment of Inflows • Stoppage of inflows - Interception and Diversion of Nalas • Sewage Treatment Plants – Maintain Water Balance 20
  • 21. 2. Treatment of Inflows Interception and Diversion of Nalas – Total (7) I&Ds Enhanced for projected Existing S.No Nala & Location of I&Ds population of 2021 Peak Peak 1 Picketnala – Opp: Kims Hospital 15 MLD 171 MLD 2 Balkapur Channel 22 MLD 52 MLD 3 Yousufguda Nala near Divyashakthi Apt 23 MLD -- 4 Bajara Nala near Yashoda Hospital 12 MLD -- 5 Kukatpally Nala at Fathenagar 75 MLD 185 MLD 6 Kukatpally Nala at Prakashnagar 30 MLD 44 MLD 7 Kukatpally Nala at Necklace Road (New) - 100 MLD Total 177 MLD 552 MLD 21
  • 22. I&D Prakash Nagar I&D Picket I&D Necklace Road Interception & Diversion Structures I&D Balkapur 22
  • 23. Construction Of Sewerage Facilities Sewage Diversion – 1600 mm dia Ring Sewer main of length of 2.5 Km from Necklace road to Manhole No. 88 of Duplicate K&S Main opposite to Sailors Club for diverting the Kukatpally Nala flows – Diversion Trunk Main at Rangadhamini of length 1.15 km – 1400 mm dia Balanagar Sewage Trunk Main of a length of 4.85 km from the confluence point of Jeedimetla and Kukatpally Nala to Ring Sewer at Necklace road – Sewer Network over a length of 15.05 Km in Cantonment area is taken up under 4 Packages by HMWS&SB 23
  • 24. 2.5 Kms – 1600 mm Ring Sewer on Necklace Rd Ring Sewers 24
  • 25. Sewage Diversion – During works in progress 1600mm Pipe Jacking 1400 mm dia Balanagar Main – Reach-I Pipe jacking technique inside the Begumpet Airport 1600mm Ring Main Pipe laying 1400 mm dia Balanagar Main – Reach-II Railway Crossing by box pushing technique 25
  • 26. 2. Treatment of Inflows SEWAGE TREATMENT PLANTS • 30 MLD at Picket Nala – Opp: Kims – Tertiary Treatment • 20 MLD on Balkapur Nala - adj. Khairatabad Flyover – Upgradation – Tertiary level – Membrane treatment • 5 Mld on Rangadhamini Cheruvu • Treated good quality water is let in the lake • For maintaining water balance in the lake 26
  • 27. 30 MLD STP at PICKET 5 MLD STP at Rangadhamini STPs 20 MLD STP at Khairatabad 27
  • 28. I&Ds and STPs I&D at Necklace Road 20 MLD STP at Balkapur Nala 30 MLD STP at Picket Nala 5 MLD STP at Rangadhamani Cheruvu 28
  • 29. 3. IMPROVEMENT IN QUALITY OF LAKE WATER I . Dredging of Sediments at mouth of Nalas • 4 Dredging zones • At the confluence points of Nalas • Total quantity of 10 Lakh Cum. • Dredging commences shortly at (3) Sites • Dredged material is first dumped at Temporary site for abot (7) days • Permanent dumping site at Jawaharnagar 29 29
  • 30. 3. IMPROVEMENT IN QUALITY OF LAKE WATER i. Dredging of Sediments at mouth of Nalas HUSSAIN SAGAR LAKE DREDGING ZONES KUKATPALLY NALA = 3,50,000 CUM PICKET NALA = 3,09,989 CUM BANJARA NALA = 1,52,712 CUM BALKAPUR NALA = 1,86,913 CUM 30
  • 31. 3. IMPROVEMENT IN QUALITY OF LAKE WATER ii. Aeration and Oxidation Fountains 7 No.s are installed with objective to improve the dissolved oxygen content in the lake. Proposals for Oxidation of Sediment in the Lake Bed.
  • 32. 4. Protection of Lakes and Nalas in Catchment Areas TO MUMBAI NH 7 To Medal Catchment area 240 Sqkms N Panthulu Cheruvu Ramamma Cheruvu Pedda Fox Sagar Poora Cheruvu Chintal Cheruvu Cheruv u Ambe Cheruvu Qutubullapur Kunta Kotha (Alwal) Cheruvu Yellamma Cheruvu To Chinna naray(Rayan) NallaCheruvu Mum Cheruvu To Mumbai bai Rangadhamuni NH 9 Boin Tan (Hasmathpet) Cheruvu Kamuni cheruvu Maisamma Cheruvu Sudulavani Kunta KBR Cheruvu To Sec-Bad Hussain Sagar      
  • 33. 4. Protection of Lakes and Nalas in Catchment Areas ● There are about 80 lakes in the catchment area of Hussainsagar Lake. ● Total catchment area 240 sq km ● spreadover Kukatpally , Yousoufguda , Qutbullapur, Bowenpally , Balanagar, Jeedemetla, &Alwal. ● Proposed to take by up Protection categorizing into the following.  Lakes > 10 hectares  Lakes <10 Ha but Prominent & Prone for Encroachment Rangadhamini Lake.  Lakes of 10 hectares below
  • 34. Slum Improvement 1. 22 slums around Hussansagar taken up Through (4) NGOs CARE , Sukuki Exnora, CHATRI, APSA NGO 2. Solid Waste Management ● Provision of infrastructure (tri cycles, dumper bins) ● Proper Disposal of Solid Waste with Subraks 3. Community toilets ● New Constructions ● Repairs to the existing 4. Health and Sanitation ● Health camps 34 34
  • 35. PUBLIC AWARENESS AND PARTICIPATION ● Pamphlets, Poster , Door / wall stickers, Banners, Brouchers ● Kalajatha programs , Awareness meetings, Exhibition ● Lake walk & Rallies (WED) on the necklace road ● Propaganda through Mike announcements ● Promotion of Clay Ganesh Idols ● Vendors Meeting around the HS lake on “ say no to Plastics”. 35
  • 36. Creation of People’s Movement for Restoration and Preservation of Hussain Sagar Lake 36
  • 37. Creation of People’s Movement for Restoration and Preservation of Hussain Sagar Lake • Water Literacy amongst Stake Holders • Stakeholder’s Involvement: Residents, Corporate, Students, Celebrities, NGOs • Awareness Creation: Signage, Hoardings, Radio, Films • Ads in Press, Media etc • Workshops, Meetings, , Debates, Talks • Painting, quiz, Walks, Runs etc • Social Media set up – Face book, Twitter • Invite public participation • Ultimate goal - Neat & Clean Hussainsagar through people’s initiative 37
  • 38. Help in restoring the Glory of Hussainsagar Lake INVITED Comments, Remarks and Suggestions Your Suggestions are Valuable to us hsclean@hmda.gov.in Also available on Face book https://www.facebook.com/ hussiansagar.cleaning