SlideShare uma empresa Scribd logo
1 de 12
Baixar para ler offline
CURRICULUM VITAE
Name : HO Wing Wah Vera
Contact : Cell Phone: +852-98483944
Email: veraho@nutshaus.com
Education : • The Southern California Institute of Architecture, Master of Architecture
• SCI-Arc, Vico Morcote, Switzerland, Master of Architecture
• Chu Hai College, B. of Sc. in Architecture
Professional
Qualifications:
: • Graduate Membership of Hong Kong Institute of Architects - 1996
• Associate Membership of American Institute of Architects - 1994
Computer
Knowledge
: • Drafting software including AutoCad / SketchUp
 Graphic Software including Photoshop / Illustrator / Acrobat and etc.
 Microsoft Office / iWorks
 Both Window and Mac Platform
Key
Experience
:
2015 - Present PKNG Architects & Engineers Ltd.
Associate / Design Architect
 City University (2013 - 2016) – acted as team leader of a 3-year term
consultancy services for the University. Responsible from preliminary
design, documentation, site supervision and contract and administration
for various renovation.
 King’s Road 1063 Lobby Renovation for Housing Society (2014 – 2015) -
acted as team leader of the design and production team responsible
from preliminary design to documentation. Construction was completed
in October 2015.
 The Link-Signage & Facade Works Batch 1 Group A & B (2014 - 2016) –
acted as team leader of the design and production team responsible
from preliminary design, statutory submission to documentation. The
package includes signage and façade design for 8 shopping malls
including Lok Fu Plaza with a total 50 million dollars estimated contract
sum. Construction will be completed by end of 2016.
 HKSKH Holy Carpenter Church (2015 - 2017) - acted as team leader of
the design and production team responsible from preliminary design,
statutory submission to documentation. The Church received 25 million
dollars HKJC funding for the improvement works including BFA upgrade /
face lifting and interior renovation.
 Pok Hong Shopping Centre Improvement Works for Housing Authority
(2015 – 2017) - acted as team leader of the design and production team
responsible from preliminary design, statutory submission to
documentation. The works included façade design and LG/F interior
renovation.
 Tin Yiu Market Improvement Works for Links (2015 – 2017) - acted as team
leader of the design and production team responsible from preliminary
design, statutory submission to documentation to convert the existing
wet market to a shopping mall with 2 open courtyards. The estimated
contract sum is 150 million dollars.
 Lok Sing Centre Façade and 1/F Improvement Works at Causeway Bay
for China Resources Property Limited (2016 – 2017) - acted as team
leader of the design and production team responsible from preliminary
design, statutory submission to documentation.
 Albania Residential Development (2015 – 2018) - acted as team leader
of the design and production team responsible from preliminary design,
statutory submission to documentation.
2008 - 2015 Samson Wong & Associates Property Consultancy Ltd.
Design Architect / Project Manager
 The Humphrey at Tsim Sha Tsui for SINO Group (2015 – 2017) – acted as
project manager and design architect from concept design, statutory
submission to documentation.
 Installation of a Transferred Lift and Covered Walkway at Jat Ming
Chuen, Shatin for Housing Society (2014 - 2015) — acted as design
architect from preliminary design, statutory submission to documentation
of a total contract sum of 10 million Hong Kong.
 ASD Minor Works Contract (2012 - 2015) - acted as design architect and
team leader of architectural design team for over 20 projects of a total
contract sum of 32 million Hong Kong.
 ASD Barrier Free Contract (2012 - 2015) - acted as design architect and
team leader of architectural design team for over 20 projects of a total
contract sum of 13 million Hong Kong.
 Post Occupancy Evaluation Study for Siu Sai Wan Complex for ASD (2013
-2014) - responsible for architectural section of the Post Occupancy
Evaluation Study Report and overall coordination with the consultancy
team.
 ASD Minor Works Contract (2009 - 2012) - acted as design architect and
team leader of architectural design team for over 50 projects of a total
contract sum of 110 million Hong Kong.
 Hong Kong’s Urban Best Practices Area Exhibition, Expo 2010, Shanghai -
acted as design architect from preliminary design to documentation.
 Renovation Works for Choi Yuen Shopping Arcade, Sheung Shui for Links
(2008-2009) - acted as design architect and project manager;
responsible from preliminary design, statutory submission, documentation
to site supervision of a total contract sum of 35 million Hong Kong.
2005 - 2008 SL HO & Associates Limited
Design Architect / Project Manager
 Fashionwalk at Causeway Bay for Hang Lung Properties Ltd. (2006-2008) -
acted as design architect and project manager; responsible from
preliminary design, statutory submission, documentation, site supervision
and contract and administration of a total contract sum of 35 million
Hong Kong.
 Upgrade Drainage System for Yuen Yuen Institute in Tsuen Wan (2005-
2007) - acted as project manager, responsible of statutory submission,
coordination with other consultants and Government Departments, site
supervision and contract & administration.
2002 - 2005 Kenneth Mak & Associates
Design Architect / Project Manager
 Shunde Fortuna Hotel, China for Fortuna Hotel (2004 - 2005) - acted as
team leader of the architectural team responsible from preliminary
design to documentation.
 Park Island Development Phase 1 for Sun Hung Kai Properties (2002 -
2004) - acted as team leader of the architectural team and project
manager; responsible from preliminary design, documentation, site
supervision and contract & administration for 2 club houses, bus station
and ferry terminal of a total contract sum of 300 million Hong Kong.
1998 - 2002 Samson Wong & Associates Property Consultancy Ltd.
Design Architect / Project Manager
 IBM-GKI, Beijing (2000 - 2002) - acted as team leader of the architectural
team responsible from preliminary design, documentation, site
supervision and contract & administration of a total contract sum of 100
million RMB.
 Smartone Teleport at Chung Hom Kok for Sun Hung Kai Properties (1999 -
2001) - acted as team leader of the architectural team and project
manager; responsible from preliminary design, documentation, site
supervision and contract & administration for 2 club houses, bus station
and ferry terminal of a total contract sum of 200 million Hong Kong.
 Nokia Factory, Beijing (1998 - 2000) - acted as team leader of the
architectural team responsible from preliminary design, statutory
submission, documentation, site supervision and contract and
administration of a total contract sum of 100 million Hong Kong.
 Hong Kong Buddhist Hospital (1999 – 2002) – acted as team leader of a
3-year term consultancy services for the Hospital. Responsible from
preliminary design, documentation, site supervision and contract and
administration for various renovation including G/F renovation.
 The Duchess of Kent Children’s Hospital (1998 – 2001) - acted as team
leader of a 3-year term consultancy services for the Hospital. Responsible
from preliminary design, documentation, site supervision and contract
and administration for various renovation including wards.
1996 - 1998 Richards Basmajian Ltd
Design Architect
 Li & Fung Distribution and Industrial Centre at Panyu, China (1996 - 1998) -
acted as design architect and project manager; responsible from
preliminary design, documentation, site supervision and contract and
administration of a total contract sum of 100 million RMB.
 Li & Fung Centre Headquarters Building, Hong Kong (1996 - 1997) - acted
as design architect; responsible from preliminary design to
documentation of a total contract sum of 30 million Hong Kong.
 Landmark Basement Shopping Centre, Hong Kong (1996) - acted as
project manager to supervise the whole project of a total contract sum
of 20 million Hong Kong.
 Stanley Court Town House Refurbishment for Hong Kong Land, Hong
Kong (1996 - 1997) - acted as design architect and project manager;
responsible from preliminary design, documentation, supervision and
contract administration of a total contract sum of 20 million Hong Kong.
 Hong Kong Jockey Club Members‘ Grandstand and Betting Hall at
Shatin (1996 - 1997) - acted as design architect; responsible from
preliminary design, statutory submission and documentation of a total
contract sum of 250 million Hong Kong.
1995 - 1996 David Au & Associates
Design Architect
 BMW Depot II at Yuen Long for Sime Darby (1995) - acted as design
architect and assistant project manager; responsible from preliminary
design, documentation, site supervision and contract and administration
of a total contract sum of 30 million Hong Kong.
 South China Morning Post Printing Factory at Tai Po Industrial Park (1995) -
acted as assistant project manager; responsible from site supervision,
contract and administration of a total contract sum of 200 million Hong
Kong.
 115 How Ming Street at Kwun Tong, Hong Kong (1995 - 1996) - acted as
design architect and assistant project manager; responsible from
preliminary design, statutory submission, documentation, site supervision
and contract and administration of a total contract sum of 30 million
Hong Kong.
 BMW Motor Services Center at Shenzhen for Sime Dardy (1995) - acted
as design architect and assistant project manager; responsible from
preliminary design, statutory submission, documentation, site supervision
and contract and administration of a total contract sum of 10 million
RMB.
Competition :  Chocolate Factory : Redeveloped Abandoned Chocolate Factory,
Switzerland (1989)
 Chantermerle : Hotel and Multi-Storey Carpark to the Ski Resort, France
(1999)
 Science School: Science School from Grade 1 to Grade 12, Los Angeles,
U.S.A (1994)
 Jyeonggi-do Jeongok Prehistory Museum Competition (2005)
• The Harbourview Hotel for YMCA (2006)
the book
fromthewib
Walt Disney Roadshow
1995 - Appointed byWalt Disney Greater China to
design 2 road shows in Taipei and Kaohsiung
respectively.
Cablex Computer Store
1995 - Appointed by the owner of a computer
shop to renovate the store. The design concept
was inspired by the new Macbook and iPod to
have the glowing white look.
Exit Bar
1995 - Appointed by the owner of a new cafe at
Star Street. The design concept is to provide a
warm and cozy environment by using sand ston
and beech wood.
South China Morning Post Printing Factory
David Au & Associates 1995 - Acted as assistant
project manager; responsible from site supervi-
sion, statutory submission, contract and adminis-
tration of a total contract sum of 200 million
Hong Kong.
115 How Ming Street Redevelopment
David Au & Associates 1995 to 1996 - Acted as
architectural designer and assistant project man-
ager; responsible from preliminary design, statu-
tory submission, documentation, site supervision
and contract and administration of a total con-
tract sum of 30 million Hong Kong.
BMW Service Centre
David Au & Associates 1996 - Acted as architec-
tural designer and assistant project manager;
responsible from preliminary design, statutory
submission, documentation, site supervision and
contract and administration of a total contract
sum of 30 million Hong Kong.
Li Fung Centre Refurbishment
Richards Basmajian Ltd 1996 to 1997 - Acted as
architectural designer; responsible from prelimi-
nary design to documentation of a total contract
sum of 30 million Hong Kong.
Stanley Court Refurbishment
Richards Basmajian Ltd 1996 to 1997 - Acted as
architectural designer and project manager;
responsible from preliminary design, documen-
tation, supervision and contract administration
of a total contract sum of 20 million Hong Kong.
HKJC Shatin Membership Grandstand Refurbish
ment
Richards Basmajian Ltd 1997 to 1998 - Acted as
architectural designer; responsible from prelimi-
nary design, statutory submission and documen-
tation of a total contract sum of 250 million Hong
Kong.
Nokia Beijing Factory
Samson Wong & Associates Property Consultan-
cy Ltd. 1998 to 2000 - Acted as team leader of the
architectural team responsible from preliminary
design, statutory submission, documentation,
site supervision and contract and administration
of a total contract sum of 150 million Hong Kong.
Smartone Teleport
Samson Wong & Associates Property Consultan-
cy Ltd. 1999 to 2001 - Acted as team leader of the
architectural team responsible from preliminary
design, statutory submission, documentation,
site supervision and contract and administration
of a total contract sum of 100 million Hong Kong.
IBM-GKI Chips Factory
Samson Wong & Associates Property Consultan-
cy Ltd. 2000 to 2002 - Acted as team leader of the
architectural team responsible from preliminary
design, documentation, site supervision and
contract & administration of a total contract sum
of 100 million RMB.
World Wide House Multi-media Display
Samson Wong & Associates Property Consultan-
cy Ltd. 2002 - Acted as architectural designer;
responsible from design, statutory submission
and documentation of a total contract sum of
200 million Hong Kong.
Apec Plaza Renovation
Samson Wong & Associates Property Consultan-
cy Ltd. 2002 - Acted as architectural designer;
responsible from design, documentation and
contract and administration of a total contract
sum of 10 million Hong Kong.
Verbena Heights - New Covered Walkway
Samson Wong & Associates Property Consultan-
cy Ltd. 2002 - Acted as architectural designer;
responsible from design, documentation and
contract and administration of a total contract
sum of 10 million Hong Kong.
Vikings & Ellison Factory Renovation
Samson Wong & Associates Property Consultan-
cy Ltd. 2000 - Acted as architectural designer;
responsible from design, and documentation of a
total contract sum of 10 million Hong Kong.
Shunde Fortuna Hotel,
Kenneth Mak & Associates 2004 to 2005 - acted as
team leader of the architectural team responsible
from preliminary design to documentation.
Park Island Development Phase 1 - Blue Blue Club
Kenneth Mak & Associates 2002 to 2004 - acted as
team leader of the architectural team and project
manager; responsible from preliminary design,
documentation, site supervision and contract &
administration for 2 club houses, bus station and
ferry terminal of a total contract sum of 200 mil-
lion Hong Kong.
Park Island Development Phase 1 - Green Green
Club
Kenneth Mak & Associates 2002 to 2004 - Acted
as team leader of the architectural team and pro-
ject manager; responsible from preliminary
design, documentation, site supervision and
contract & administration for 2 club houses, bus
station and ferry terminal of a total contract sum
of 200 million Hong Kong.
Park Island Development Phase 1 - Angsana Spa
Kenneth Mak & Associates 2002 to 2004 - Acted
as team leader of the architectural team and pro-
ject manager; responsible from preliminary
design, documentation, site supervision and
contract & administration for Angsana Spa at
Park Island of a total contract sum of 10 million
Fashionwalk at Causeway Bay
SL HO & Associates Limited 2006 to 2008 - Acted
as architectural designer and project manager;
responsible from preliminary design, statutory
submission, documentation, site supervision and
contract and administration of a total contract
sum of 35 million Hong Kong.
Renovation Works for Choi Yuen Shopping
Arcade
Samson Wong & Associates Property Consultan-
cy Ltd. 2008 t0 2009 - Acted as architectural
designer and AP representative; responsible from
preliminary design, statutory submission, docu-
mentation to site supervision of a total contract
Hong Kong’s Urban Best Practices Area Exhibi-
tion, Expo 2010, Shanghai
Samson Wong & Associates Property Consultan-
cy Ltd. 2009 to 2010 - Acted as architectural
designer from preliminary design to documenta-
Tai Po Waterfront Park - Covered Walkway
Samson Wong & Associates Property Consultan-
cy Ltd. 2009 to 2011 - Acted as architectural
designer and team leader of architectural design
team for over 50 projects of a total contract sum
of 10 million Hong Kong.
Luen Cheong Street Public Toilet
Samson Wong & Associates Property Consultan-
cy Ltd. 2009 to 2012 - Acted as architectural
designer and team leader of architectural design
team for over 50 projects of a total contract sum
of 10 million Hong Kong.
POE for Siu Sai Wan Complex
Samson Wong & Associates Property Consultan-
cy Ltd. 2013 to 2014 - Responsible for architectur-
al part of the POE study report and overall coordi-
nation with the consultancy team.
Proposed Transferred Lift and Covered Walkway
at Jat Ming Chuen
Samson Wong & Associates Property Consultan-
cy Ltd. 2014 to 2015 - Acted as architectural
designer from preliminary design, statutory sub-
mission to documentation of a total contract sum
of 10 million Hong Kong.
Jeongok Prehistory Museum Competition in
South Korea (2005)
The Harbourview Hotel for YMCA (2006)
The Humphreys: To convert a 50-year-old build-
ing in Tsim Sha Tsui to a service apartment for
Sino Group. Construction will start in July 2016.
Renovation to 1063 King’s Road Lobby for Hous-
ing Authority. The project was completed in
October 2015.
New residential development in Albania for join
developers from Albania and Hong Kong. Con-
struction was started in March 2016.
Proposed Facade, G/F & 1/F Renovation for Lok
Sing Centre at Causeway Bay for China Resources
Enterprise. Construction will start in July 2016.
Proposed Facade & shopping arcade renovation
for Housing Authority. Construction will start in
July 2016.
Proposed renovation for students inactive space
at Acedemic 1, Cuty-U. Construction will be com-
pleted in July 2016.
To transform existing Tin Yiu Market to shopping
arcade for Link. Construction will be completed
in January 2017.

Mais conteúdo relacionado

Mais procurados

Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
Ashraf Yehia
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV full
Amr Moussa
 
Sofya Mitsenmakher Portfolio_2015_S
Sofya Mitsenmakher Portfolio_2015_SSofya Mitsenmakher Portfolio_2015_S
Sofya Mitsenmakher Portfolio_2015_S
Sofya Mitsenmakher
 
CV-Jeff Chan 2016
CV-Jeff Chan 2016CV-Jeff Chan 2016
CV-Jeff Chan 2016
Jeff Chan
 
CV TOMMASO AMATO 28Feb2016
CV TOMMASO AMATO 28Feb2016CV TOMMASO AMATO 28Feb2016
CV TOMMASO AMATO 28Feb2016
Tommaso Amato
 
Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)
Thomas Yong
 
Khalid_Sarhan_resume
Khalid_Sarhan_resumeKhalid_Sarhan_resume
Khalid_Sarhan_resume
khalid sarhan
 
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Nitin Kadam
 

Mais procurados (20)

Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)Ashraf Yehia CV E01 1 (1)
Ashraf Yehia CV E01 1 (1)
 
BIM Portfolio Daniel Almenares
BIM Portfolio Daniel AlmenaresBIM Portfolio Daniel Almenares
BIM Portfolio Daniel Almenares
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV full
 
My BIM Profesional Portafolio English version
My BIM Profesional Portafolio English versionMy BIM Profesional Portafolio English version
My BIM Profesional Portafolio English version
 
C V -
C V -C V -
C V -
 
Moin Resume
Moin ResumeMoin Resume
Moin Resume
 
Sofya Mitsenmakher Portfolio_2015_S
Sofya Mitsenmakher Portfolio_2015_SSofya Mitsenmakher Portfolio_2015_S
Sofya Mitsenmakher Portfolio_2015_S
 
Profesional portafolio 2020
Profesional portafolio 2020Profesional portafolio 2020
Profesional portafolio 2020
 
Cv
CvCv
Cv
 
CV
CVCV
CV
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
 
CV-Jeff Chan 2016
CV-Jeff Chan 2016CV-Jeff Chan 2016
CV-Jeff Chan 2016
 
CV TOMMASO AMATO 28Feb2016
CV TOMMASO AMATO 28Feb2016CV TOMMASO AMATO 28Feb2016
CV TOMMASO AMATO 28Feb2016
 
Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)Thomas Yong Project Show Case (May 2015)
Thomas Yong Project Show Case (May 2015)
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
Ayman akef cv 2019
Ayman akef cv 2019Ayman akef cv 2019
Ayman akef cv 2019
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
 
Khalid_Sarhan_resume
Khalid_Sarhan_resumeKhalid_Sarhan_resume
Khalid_Sarhan_resume
 
Mc cv updated 2017
Mc cv   updated 2017Mc cv   updated 2017
Mc cv updated 2017
 
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
Kadam_Nitin_-_civil_engg_resume_.19_Nov__15
 

Destaque

Resume_Tathagata Sen
Resume_Tathagata SenResume_Tathagata Sen
Resume_Tathagata Sen
Tathagata Sen
 
C.V. Hamid Ali Abed AL-Asadi_basra university_COMPUTER_ 8-Nov_2016
C.V. Hamid Ali Abed AL-Asadi_basra university_COMPUTER_ 8-Nov_2016C.V. Hamid Ali Abed AL-Asadi_basra university_COMPUTER_ 8-Nov_2016
C.V. Hamid Ali Abed AL-Asadi_basra university_COMPUTER_ 8-Nov_2016
Hamid Al-Asadi
 
Pavlou_Administrative CV_January 2016
Pavlou_Administrative CV_January 2016Pavlou_Administrative CV_January 2016
Pavlou_Administrative CV_January 2016
Paul A. Pavlou
 
Saurav_super_recent_updated_CV
Saurav_super_recent_updated_CVSaurav_super_recent_updated_CV
Saurav_super_recent_updated_CV
Saurav Biswas
 
CopyofResume-CarlosToxtli
CopyofResume-CarlosToxtliCopyofResume-CarlosToxtli
CopyofResume-CarlosToxtli
Carlos Toxtli
 
CHINOY CV-May 2016
CHINOY CV-May 2016CHINOY CV-May 2016
CHINOY CV-May 2016
Mala Chinoy
 
Ines Mergel CV December 2012
Ines Mergel CV December 2012Ines Mergel CV December 2012
Ines Mergel CV December 2012
Ines Mergel
 

Destaque (18)

HUSSAIN CV
HUSSAIN CVHUSSAIN CV
HUSSAIN CV
 
Filip Winiewicz CV
Filip Winiewicz CVFilip Winiewicz CV
Filip Winiewicz CV
 
Amcb Selected Cv
Amcb Selected CvAmcb Selected Cv
Amcb Selected Cv
 
Matteo's portfolio
Matteo's portfolioMatteo's portfolio
Matteo's portfolio
 
Resume_Tathagata Sen
Resume_Tathagata SenResume_Tathagata Sen
Resume_Tathagata Sen
 
Big Data in Hong Kong -- Dr. Toa Charm
Big Data in Hong Kong -- Dr. Toa CharmBig Data in Hong Kong -- Dr. Toa Charm
Big Data in Hong Kong -- Dr. Toa Charm
 
C.V. Hamid Ali Abed AL-Asadi_basra university_COMPUTER_ 8-Nov_2016
C.V. Hamid Ali Abed AL-Asadi_basra university_COMPUTER_ 8-Nov_2016C.V. Hamid Ali Abed AL-Asadi_basra university_COMPUTER_ 8-Nov_2016
C.V. Hamid Ali Abed AL-Asadi_basra university_COMPUTER_ 8-Nov_2016
 
Pavlou_Administrative CV_January 2016
Pavlou_Administrative CV_January 2016Pavlou_Administrative CV_January 2016
Pavlou_Administrative CV_January 2016
 
Saurav_super_recent_updated_CV
Saurav_super_recent_updated_CVSaurav_super_recent_updated_CV
Saurav_super_recent_updated_CV
 
CopyofResume-CarlosToxtli
CopyofResume-CarlosToxtliCopyofResume-CarlosToxtli
CopyofResume-CarlosToxtli
 
Ahmad Kamal Mohammed - CV
Ahmad Kamal Mohammed - CVAhmad Kamal Mohammed - CV
Ahmad Kamal Mohammed - CV
 
Heidi Kraay CV
Heidi Kraay CVHeidi Kraay CV
Heidi Kraay CV
 
CV-Anglais
CV-AnglaisCV-Anglais
CV-Anglais
 
2016 UK CV MRagge
2016 UK CV MRagge2016 UK CV MRagge
2016 UK CV MRagge
 
CHINOY CV-May 2016
CHINOY CV-May 2016CHINOY CV-May 2016
CHINOY CV-May 2016
 
Ines Mergel CV December 2012
Ines Mergel CV December 2012Ines Mergel CV December 2012
Ines Mergel CV December 2012
 
CV Stephen G. Barr
CV Stephen G. BarrCV Stephen G. Barr
CV Stephen G. Barr
 
Sorin Adam Matei Curriculum Vitae
Sorin Adam Matei Curriculum VitaeSorin Adam Matei Curriculum Vitae
Sorin Adam Matei Curriculum Vitae
 

Semelhante a Vera Ho CV - 2016

Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume Word
Zvezdan Kostic
 
CV_Jimmy See 3-16
CV_Jimmy See 3-16CV_Jimmy See 3-16
CV_Jimmy See 3-16
Jimmy See
 
Arul Nathan CV 19 Oct15
Arul Nathan CV  19 Oct15Arul Nathan CV  19 Oct15
Arul Nathan CV 19 Oct15
arul nathan
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
Tareq Eladawi
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
Bob Goswell
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CV
Mohamed Barakat
 
Iswar Tripathy_2015.AUG
Iswar Tripathy_2015.AUGIswar Tripathy_2015.AUG
Iswar Tripathy_2015.AUG
Iswar Tripathy
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
Vincent Winkler
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
Essam Harby
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
Bashir Albitar
 
supreme court additonal complex project
supreme court additonal complex projectsupreme court additonal complex project
supreme court additonal complex project
Abhishek singh
 
DESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILEDESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILE
Bhauso Desai
 

Semelhante a Vera Ho CV - 2016 (20)

Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume Word
 
CV_Jimmy See 3-16
CV_Jimmy See 3-16CV_Jimmy See 3-16
CV_Jimmy See 3-16
 
Arul Nathan CV 19 Oct15
Arul Nathan CV  19 Oct15Arul Nathan CV  19 Oct15
Arul Nathan CV 19 Oct15
 
170102_RO_Executive Brief_02
170102_RO_Executive Brief_02170102_RO_Executive Brief_02
170102_RO_Executive Brief_02
 
Schoonraad Resume - 2016
Schoonraad Resume - 2016Schoonraad Resume - 2016
Schoonraad Resume - 2016
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CV
 
Iswar Tripathy_2015.AUG
Iswar Tripathy_2015.AUGIswar Tripathy_2015.AUG
Iswar Tripathy_2015.AUG
 
NM_CV1
NM_CV1NM_CV1
NM_CV1
 
Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)Vince Winkler CV (Mar 16)
Vince Winkler CV (Mar 16)
 
CV- bala qa
CV- bala qaCV- bala qa
CV- bala qa
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
 
haitham cv
haitham cvhaitham cv
haitham cv
 
Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1 Bashir Al Bitar C.V. 2016 1
Bashir Al Bitar C.V. 2016 1
 
supreme court additonal complex project
supreme court additonal complex projectsupreme court additonal complex project
supreme court additonal complex project
 
1 Essam CV
1 Essam CV1 Essam CV
1 Essam CV
 
Manal ibrahim.cv 17.docx
Manal ibrahim.cv 17.docxManal ibrahim.cv 17.docx
Manal ibrahim.cv 17.docx
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
DESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILEDESTECH - COMPANY PROFILE
DESTECH - COMPANY PROFILE
 

Vera Ho CV - 2016

  • 1. CURRICULUM VITAE Name : HO Wing Wah Vera Contact : Cell Phone: +852-98483944 Email: veraho@nutshaus.com Education : • The Southern California Institute of Architecture, Master of Architecture • SCI-Arc, Vico Morcote, Switzerland, Master of Architecture • Chu Hai College, B. of Sc. in Architecture Professional Qualifications: : • Graduate Membership of Hong Kong Institute of Architects - 1996 • Associate Membership of American Institute of Architects - 1994 Computer Knowledge : • Drafting software including AutoCad / SketchUp  Graphic Software including Photoshop / Illustrator / Acrobat and etc.  Microsoft Office / iWorks  Both Window and Mac Platform Key Experience : 2015 - Present PKNG Architects & Engineers Ltd. Associate / Design Architect  City University (2013 - 2016) – acted as team leader of a 3-year term consultancy services for the University. Responsible from preliminary design, documentation, site supervision and contract and administration for various renovation.  King’s Road 1063 Lobby Renovation for Housing Society (2014 – 2015) - acted as team leader of the design and production team responsible from preliminary design to documentation. Construction was completed in October 2015.  The Link-Signage & Facade Works Batch 1 Group A & B (2014 - 2016) – acted as team leader of the design and production team responsible from preliminary design, statutory submission to documentation. The package includes signage and façade design for 8 shopping malls including Lok Fu Plaza with a total 50 million dollars estimated contract sum. Construction will be completed by end of 2016.
  • 2.  HKSKH Holy Carpenter Church (2015 - 2017) - acted as team leader of the design and production team responsible from preliminary design, statutory submission to documentation. The Church received 25 million dollars HKJC funding for the improvement works including BFA upgrade / face lifting and interior renovation.  Pok Hong Shopping Centre Improvement Works for Housing Authority (2015 – 2017) - acted as team leader of the design and production team responsible from preliminary design, statutory submission to documentation. The works included façade design and LG/F interior renovation.  Tin Yiu Market Improvement Works for Links (2015 – 2017) - acted as team leader of the design and production team responsible from preliminary design, statutory submission to documentation to convert the existing wet market to a shopping mall with 2 open courtyards. The estimated contract sum is 150 million dollars.  Lok Sing Centre Façade and 1/F Improvement Works at Causeway Bay for China Resources Property Limited (2016 – 2017) - acted as team leader of the design and production team responsible from preliminary design, statutory submission to documentation.  Albania Residential Development (2015 – 2018) - acted as team leader of the design and production team responsible from preliminary design, statutory submission to documentation. 2008 - 2015 Samson Wong & Associates Property Consultancy Ltd. Design Architect / Project Manager  The Humphrey at Tsim Sha Tsui for SINO Group (2015 – 2017) – acted as project manager and design architect from concept design, statutory submission to documentation.  Installation of a Transferred Lift and Covered Walkway at Jat Ming Chuen, Shatin for Housing Society (2014 - 2015) — acted as design architect from preliminary design, statutory submission to documentation of a total contract sum of 10 million Hong Kong.
  • 3.  ASD Minor Works Contract (2012 - 2015) - acted as design architect and team leader of architectural design team for over 20 projects of a total contract sum of 32 million Hong Kong.  ASD Barrier Free Contract (2012 - 2015) - acted as design architect and team leader of architectural design team for over 20 projects of a total contract sum of 13 million Hong Kong.  Post Occupancy Evaluation Study for Siu Sai Wan Complex for ASD (2013 -2014) - responsible for architectural section of the Post Occupancy Evaluation Study Report and overall coordination with the consultancy team.  ASD Minor Works Contract (2009 - 2012) - acted as design architect and team leader of architectural design team for over 50 projects of a total contract sum of 110 million Hong Kong.  Hong Kong’s Urban Best Practices Area Exhibition, Expo 2010, Shanghai - acted as design architect from preliminary design to documentation.  Renovation Works for Choi Yuen Shopping Arcade, Sheung Shui for Links (2008-2009) - acted as design architect and project manager; responsible from preliminary design, statutory submission, documentation to site supervision of a total contract sum of 35 million Hong Kong. 2005 - 2008 SL HO & Associates Limited Design Architect / Project Manager  Fashionwalk at Causeway Bay for Hang Lung Properties Ltd. (2006-2008) - acted as design architect and project manager; responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 35 million Hong Kong.  Upgrade Drainage System for Yuen Yuen Institute in Tsuen Wan (2005- 2007) - acted as project manager, responsible of statutory submission, coordination with other consultants and Government Departments, site supervision and contract & administration. 2002 - 2005 Kenneth Mak & Associates Design Architect / Project Manager  Shunde Fortuna Hotel, China for Fortuna Hotel (2004 - 2005) - acted as team leader of the architectural team responsible from preliminary design to documentation.  Park Island Development Phase 1 for Sun Hung Kai Properties (2002 - 2004) - acted as team leader of the architectural team and project manager; responsible from preliminary design, documentation, site supervision and contract & administration for 2 club houses, bus station and ferry terminal of a total contract sum of 300 million Hong Kong.
  • 4. 1998 - 2002 Samson Wong & Associates Property Consultancy Ltd. Design Architect / Project Manager  IBM-GKI, Beijing (2000 - 2002) - acted as team leader of the architectural team responsible from preliminary design, documentation, site supervision and contract & administration of a total contract sum of 100 million RMB.  Smartone Teleport at Chung Hom Kok for Sun Hung Kai Properties (1999 - 2001) - acted as team leader of the architectural team and project manager; responsible from preliminary design, documentation, site supervision and contract & administration for 2 club houses, bus station and ferry terminal of a total contract sum of 200 million Hong Kong.  Nokia Factory, Beijing (1998 - 2000) - acted as team leader of the architectural team responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 100 million Hong Kong.  Hong Kong Buddhist Hospital (1999 – 2002) – acted as team leader of a 3-year term consultancy services for the Hospital. Responsible from preliminary design, documentation, site supervision and contract and administration for various renovation including G/F renovation.  The Duchess of Kent Children’s Hospital (1998 – 2001) - acted as team leader of a 3-year term consultancy services for the Hospital. Responsible from preliminary design, documentation, site supervision and contract and administration for various renovation including wards. 1996 - 1998 Richards Basmajian Ltd Design Architect  Li & Fung Distribution and Industrial Centre at Panyu, China (1996 - 1998) - acted as design architect and project manager; responsible from preliminary design, documentation, site supervision and contract and administration of a total contract sum of 100 million RMB.  Li & Fung Centre Headquarters Building, Hong Kong (1996 - 1997) - acted as design architect; responsible from preliminary design to documentation of a total contract sum of 30 million Hong Kong.  Landmark Basement Shopping Centre, Hong Kong (1996) - acted as project manager to supervise the whole project of a total contract sum of 20 million Hong Kong.  Stanley Court Town House Refurbishment for Hong Kong Land, Hong Kong (1996 - 1997) - acted as design architect and project manager; responsible from preliminary design, documentation, supervision and contract administration of a total contract sum of 20 million Hong Kong.  Hong Kong Jockey Club Members‘ Grandstand and Betting Hall at Shatin (1996 - 1997) - acted as design architect; responsible from preliminary design, statutory submission and documentation of a total
  • 5. contract sum of 250 million Hong Kong. 1995 - 1996 David Au & Associates Design Architect  BMW Depot II at Yuen Long for Sime Darby (1995) - acted as design architect and assistant project manager; responsible from preliminary design, documentation, site supervision and contract and administration of a total contract sum of 30 million Hong Kong.  South China Morning Post Printing Factory at Tai Po Industrial Park (1995) - acted as assistant project manager; responsible from site supervision, contract and administration of a total contract sum of 200 million Hong Kong.  115 How Ming Street at Kwun Tong, Hong Kong (1995 - 1996) - acted as design architect and assistant project manager; responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 30 million Hong Kong.  BMW Motor Services Center at Shenzhen for Sime Dardy (1995) - acted as design architect and assistant project manager; responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 10 million RMB. Competition :  Chocolate Factory : Redeveloped Abandoned Chocolate Factory, Switzerland (1989)  Chantermerle : Hotel and Multi-Storey Carpark to the Ski Resort, France (1999)  Science School: Science School from Grade 1 to Grade 12, Los Angeles, U.S.A (1994)  Jyeonggi-do Jeongok Prehistory Museum Competition (2005) • The Harbourview Hotel for YMCA (2006)
  • 7. Walt Disney Roadshow 1995 - Appointed byWalt Disney Greater China to design 2 road shows in Taipei and Kaohsiung respectively. Cablex Computer Store 1995 - Appointed by the owner of a computer shop to renovate the store. The design concept was inspired by the new Macbook and iPod to have the glowing white look. Exit Bar 1995 - Appointed by the owner of a new cafe at Star Street. The design concept is to provide a warm and cozy environment by using sand ston and beech wood. South China Morning Post Printing Factory David Au & Associates 1995 - Acted as assistant project manager; responsible from site supervi- sion, statutory submission, contract and adminis- tration of a total contract sum of 200 million Hong Kong. 115 How Ming Street Redevelopment David Au & Associates 1995 to 1996 - Acted as architectural designer and assistant project man- ager; responsible from preliminary design, statu- tory submission, documentation, site supervision and contract and administration of a total con- tract sum of 30 million Hong Kong. BMW Service Centre David Au & Associates 1996 - Acted as architec- tural designer and assistant project manager; responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 30 million Hong Kong.
  • 8. Li Fung Centre Refurbishment Richards Basmajian Ltd 1996 to 1997 - Acted as architectural designer; responsible from prelimi- nary design to documentation of a total contract sum of 30 million Hong Kong. Stanley Court Refurbishment Richards Basmajian Ltd 1996 to 1997 - Acted as architectural designer and project manager; responsible from preliminary design, documen- tation, supervision and contract administration of a total contract sum of 20 million Hong Kong. HKJC Shatin Membership Grandstand Refurbish ment Richards Basmajian Ltd 1997 to 1998 - Acted as architectural designer; responsible from prelimi- nary design, statutory submission and documen- tation of a total contract sum of 250 million Hong Kong. Nokia Beijing Factory Samson Wong & Associates Property Consultan- cy Ltd. 1998 to 2000 - Acted as team leader of the architectural team responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 150 million Hong Kong. Smartone Teleport Samson Wong & Associates Property Consultan- cy Ltd. 1999 to 2001 - Acted as team leader of the architectural team responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 100 million Hong Kong. IBM-GKI Chips Factory Samson Wong & Associates Property Consultan- cy Ltd. 2000 to 2002 - Acted as team leader of the architectural team responsible from preliminary design, documentation, site supervision and contract & administration of a total contract sum of 100 million RMB.
  • 9. World Wide House Multi-media Display Samson Wong & Associates Property Consultan- cy Ltd. 2002 - Acted as architectural designer; responsible from design, statutory submission and documentation of a total contract sum of 200 million Hong Kong. Apec Plaza Renovation Samson Wong & Associates Property Consultan- cy Ltd. 2002 - Acted as architectural designer; responsible from design, documentation and contract and administration of a total contract sum of 10 million Hong Kong. Verbena Heights - New Covered Walkway Samson Wong & Associates Property Consultan- cy Ltd. 2002 - Acted as architectural designer; responsible from design, documentation and contract and administration of a total contract sum of 10 million Hong Kong. Vikings & Ellison Factory Renovation Samson Wong & Associates Property Consultan- cy Ltd. 2000 - Acted as architectural designer; responsible from design, and documentation of a total contract sum of 10 million Hong Kong. Shunde Fortuna Hotel, Kenneth Mak & Associates 2004 to 2005 - acted as team leader of the architectural team responsible from preliminary design to documentation. Park Island Development Phase 1 - Blue Blue Club Kenneth Mak & Associates 2002 to 2004 - acted as team leader of the architectural team and project manager; responsible from preliminary design, documentation, site supervision and contract & administration for 2 club houses, bus station and ferry terminal of a total contract sum of 200 mil- lion Hong Kong.
  • 10. Park Island Development Phase 1 - Green Green Club Kenneth Mak & Associates 2002 to 2004 - Acted as team leader of the architectural team and pro- ject manager; responsible from preliminary design, documentation, site supervision and contract & administration for 2 club houses, bus station and ferry terminal of a total contract sum of 200 million Hong Kong. Park Island Development Phase 1 - Angsana Spa Kenneth Mak & Associates 2002 to 2004 - Acted as team leader of the architectural team and pro- ject manager; responsible from preliminary design, documentation, site supervision and contract & administration for Angsana Spa at Park Island of a total contract sum of 10 million Fashionwalk at Causeway Bay SL HO & Associates Limited 2006 to 2008 - Acted as architectural designer and project manager; responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 35 million Hong Kong. Renovation Works for Choi Yuen Shopping Arcade Samson Wong & Associates Property Consultan- cy Ltd. 2008 t0 2009 - Acted as architectural designer and AP representative; responsible from preliminary design, statutory submission, docu- mentation to site supervision of a total contract Hong Kong’s Urban Best Practices Area Exhibi- tion, Expo 2010, Shanghai Samson Wong & Associates Property Consultan- cy Ltd. 2009 to 2010 - Acted as architectural designer from preliminary design to documenta- Tai Po Waterfront Park - Covered Walkway Samson Wong & Associates Property Consultan- cy Ltd. 2009 to 2011 - Acted as architectural designer and team leader of architectural design team for over 50 projects of a total contract sum of 10 million Hong Kong.
  • 11. Luen Cheong Street Public Toilet Samson Wong & Associates Property Consultan- cy Ltd. 2009 to 2012 - Acted as architectural designer and team leader of architectural design team for over 50 projects of a total contract sum of 10 million Hong Kong. POE for Siu Sai Wan Complex Samson Wong & Associates Property Consultan- cy Ltd. 2013 to 2014 - Responsible for architectur- al part of the POE study report and overall coordi- nation with the consultancy team. Proposed Transferred Lift and Covered Walkway at Jat Ming Chuen Samson Wong & Associates Property Consultan- cy Ltd. 2014 to 2015 - Acted as architectural designer from preliminary design, statutory sub- mission to documentation of a total contract sum of 10 million Hong Kong. Jeongok Prehistory Museum Competition in South Korea (2005) The Harbourview Hotel for YMCA (2006) The Humphreys: To convert a 50-year-old build- ing in Tsim Sha Tsui to a service apartment for Sino Group. Construction will start in July 2016.
  • 12. Renovation to 1063 King’s Road Lobby for Hous- ing Authority. The project was completed in October 2015. New residential development in Albania for join developers from Albania and Hong Kong. Con- struction was started in March 2016. Proposed Facade, G/F & 1/F Renovation for Lok Sing Centre at Causeway Bay for China Resources Enterprise. Construction will start in July 2016. Proposed Facade & shopping arcade renovation for Housing Authority. Construction will start in July 2016. Proposed renovation for students inactive space at Acedemic 1, Cuty-U. Construction will be com- pleted in July 2016. To transform existing Tin Yiu Market to shopping arcade for Link. Construction will be completed in January 2017.