ISSUE


“The fundamental problem
of operations management is
balancing capacity and
demand …”
Manufacturing Planning and Control
Marketing       Strategic            Financial
 Planning       Planning             Planning




Resource        Aggregate              Demand
Planning        Production            Management
                 Planning


            Master Production     Rough-Cut Capacity
             Schedule (MPS)        Planning (RCCP)


                Material               Capacity
              Requirements           Requirements
             Planning (MRP)            Planning

            Production Activity         Capacity
                 Control                Control
Processes in Production Planning
               and Control
•   DEMAND MANAGEMENT
•   AGGREGATE PRODUCTION PLAN
•   MASTER PRODUCTION SCHEDULE
•   CAPACITY REQUIREMENT PLAN
•   MATERIAL REQUIREMENT PLAN
•   OPERATIONS SCHEDULING
•   SHOP FLOOR CONTROL
•   INPUT OUTPUT CONTROL
INTERFACES TO PRODUCTION
   PLANNING AND CONTROL
• TO ARRIVE AT MPS WE NEED FIRM ORDERS FROM
  CUSTOMERS OR FORECAST OF DEMAND FROM Sales
  /CUSTOMERS
• TO ARRIVE AT CAPACITY REQUIREMENT PLANNING WE
  NEED TO KNOW THE AVAILABILITY OF THE MACHINE
  CAPACITY WITH RESPECT TO THE DEMAND LOAD ON THE
  CAPACITY
• TO ARRIVE AT THE MATERIAL REQUIREMENT PLAN WE
  NEED THE MPS,ENGG DESIGN CHANGES,BILL OF MATERIAL
  AND INVENTORY RECORDS
• MRP OUTPUTS PLANNED ORDER SCHEDULES FOR
  INVENTORY AND PRODUCTION CONTROL
MASTER PRODUCTION
         SCHEDULE
• MASTER PRODUCTION SCHEDULER
  SHOULD:
  -INCLUDE ALL DEMANDS FROM PRODUCT
  SALES WAREHOUSE REPLENISHMENT
  SPARES AND INTER PLANT REQUIREMENT
                   -KEEP SIGHT OF
  AGGREGATE PLAN         -KEEP
  CUSTOMER ORDER PROMISES IN MIND

 -IDENTIFY AND COMMUNICATE ALL
 PROBLEMS
CAPACITY PLANNING
• CAPACITY IS A MEASURE OF ABILITY TO
  PROVIDE CAPABILITY TO MEET MKT
  DEMAND
• CAPACITY DECISIONS USE FOLLOWING
  STEPS:
  -MEASURE DEMAND
   -MEASURE FINITE CAPACITY
          -RECONCILE CAPACITY&
  DEMAND
  -EVALUATE ALTERNATIVES INCLUDING
  SUBCONTRACTING
Managing Capacity
• Disaggregate the capacity management problems …
• Example:
   – Resource requirements planning -- check the
     production plan in aggregate units. Done before
     MPS
   – Rough cut capacity planning -- check the master
     schedule in shop hours and MPS reworked if
     required.
   – Capacity requirements planning -- check the
     materials plan in shop hours By default infinite
     capacity is assumed. A separate exercise done on
MATERIAL REQUIREMENT
        PLANNING
• MRP DRIVEN BY MPS
• WHAT MATRL TO BE ORDERED FROM
  OUTSIDE AND WHAT MATRL TO BE MFG
  INHOUSE TAKING INTO ACCOUNT
  CURRENT INVENTORY LEVELS
• MRP RUN RESULTS IN CALCULATION OF
  NET REQMNT AND RELEASE OF
  PURCHASE ORDER OR WORK ORDER
• MRP USES A BILL OF MATERIAL FOR
  PRODUCTS TO CALCULATE REQMNTS
OPERATIONS SCHEDULING
• SCHEDULING INVOLVES PREPARATION OF
  TIME TABLE FOR WORK THAT NEEDS TO
  BE DONE TO MEET CLIENT DATES OR TO
  ACHIEVE DESIRED OBJECTIVE
• EFFECTIVE SCHEDULING DONE TO AVOID
  BOTTLENECKS AND TO OPTIMIZE
  UTILISATION OF SHOP FLOOR RESOURCES
• SHEDULING RULES REQUIRED TO
  OPTIMIZE OPERATIONS
SCHEDULING RULES
•   FIRST COME FIRST SERVED
•   EARLIEST DUE DATE
•   SHORTEST PROCESSING TIME
•   LONGEST PROCESSING TIME
•   LAST ARRIVED FIRST PROCESSED
•   LEAST SLACK TIME
•   LEAST CHANGEOVER COST
OPERATIONS SCHEDULING
•   SCHEDULING SYSTEMS USE EITHER FINITE OR INFINITE LOADING
    TECHNIQUES TO DETERMINE HOW MACHINE CAPACITY SHOULD
    BE USED
•   INFINITE CAPACITY OCCURS WHEN WORK IS ASSIGNED TO A
    WORK CENTRE BASED ON WHAT IS NEEDED .IT IS PRESUMED
    THAT CAPACITY IS ALWAYS AVAILABLE AND NO
    CONSIDERATION IS GIVEN DIRECTLY TO WHETHER THERE IS
    SUFFICIENT CAPACITY AT THE RESOURCES REQD TO DO WORK.
    IN INFINITE LOADING SYSTEMS LEAD TIME IS ESTIMATED BY
    TAKING MULTIPLE OF OPERATING TIME(SETUP +RUN TIME) PLUS
    QUEUE DELAY IN MATRL MOVEMENT
•   FINITE LOADING SCHEDULES IN DETAIL EACH RESOURCE
      USING THE SETUP AND RUNTIME REQD FOR EACH ORDER
    .SYSTEM DETERMINES EXACTLY WHAT EACH RESOURCE WILL
    DO AT EACH MOMENT OF THE DAY
SCHEDULING AND CONTROL
       FUNCTIONS
• ALLOCATING ORDERS TO WORK CENTRES
• DETERMINING SEQUENCE OF ORDER
  OPERATIONS
• DISPATCHING OF ORDERS
• SHOP FLOOR CONTROL OF ORDERS
  INVOLVING CONTROLLING PROGRESS OF
  ORDERS AND EXPEDITING LATE AND
  CRITICAL ORDERS

More Related Content

What's hot

material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
Amalia Syafitri
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
ejalgfer
 
Simulation Project in ARENA
Simulation Project in ARENASimulation Project in ARENA
Simulation Project in ARENA
Aditya Nakate
 

What's hot (20)

Production Planning Control Overview
Production Planning Control OverviewProduction Planning Control Overview
Production Planning Control Overview
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Production planning-and-control
Production planning-and-controlProduction planning-and-control
Production planning-and-control
 
Production planning and_control-an_introduction
Production planning and_control-an_introductionProduction planning and_control-an_introduction
Production planning and_control-an_introduction
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
7_production-activity-control.pptx
7_production-activity-control.pptx7_production-activity-control.pptx
7_production-activity-control.pptx
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
Production Planning
Production PlanningProduction Planning
Production Planning
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Production management
Production managementProduction management
Production management
 
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead TimesMRP Theory: Master Production Schedule, Bill of Material and Lead Times
MRP Theory: Master Production Schedule, Bill of Material and Lead Times
 
Production Management
Production Management Production Management
Production Management
 
Inventory Management And Mrp Erp
Inventory Management And Mrp   ErpInventory Management And Mrp   Erp
Inventory Management And Mrp Erp
 
Lean vs agile manufacturing
Lean vs agile manufacturingLean vs agile manufacturing
Lean vs agile manufacturing
 
Production management
Production managementProduction management
Production management
 
production planning and control
production planning and controlproduction planning and control
production planning and control
 
Simulation Project in ARENA
Simulation Project in ARENASimulation Project in ARENA
Simulation Project in ARENA
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 

Viewers also liked

Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
Karthik Yadav
 
07 Am09 Presentations Hamburger & Lawson
07 Am09 Presentations   Hamburger & Lawson07 Am09 Presentations   Hamburger & Lawson
07 Am09 Presentations Hamburger & Lawson
Simon Prince
 
Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer study
Haider Alkaisy
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
Nityanand Yadav
 

Viewers also liked (20)

Manufacturing planning and control systems
Manufacturing planning and control systemsManufacturing planning and control systems
Manufacturing planning and control systems
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) system
 
Láminas desarrollo theoretical framework[1]
Láminas desarrollo theoretical framework[1]Láminas desarrollo theoretical framework[1]
Láminas desarrollo theoretical framework[1]
 
Close Loop MRP
Close Loop MRPClose Loop MRP
Close Loop MRP
 
Manufacturing plng and control
Manufacturing plng and controlManufacturing plng and control
Manufacturing plng and control
 
07 Am09 Presentations Hamburger & Lawson
07 Am09 Presentations   Hamburger & Lawson07 Am09 Presentations   Hamburger & Lawson
07 Am09 Presentations Hamburger & Lawson
 
Production planning hierarchy
Production planning hierarchy Production planning hierarchy
Production planning hierarchy
 
J199 theoretical framework
J199 theoretical frameworkJ199 theoretical framework
J199 theoretical framework
 
Supply chain
Supply chainSupply chain
Supply chain
 
Manufacturing Cost (2.008x Lecture Slides)
Manufacturing Cost (2.008x Lecture Slides)Manufacturing Cost (2.008x Lecture Slides)
Manufacturing Cost (2.008x Lecture Slides)
 
Objective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer studyObjective of MRP and MRP II in computer study
Objective of MRP and MRP II in computer study
 
Flexible Manufacturing System
Flexible Manufacturing SystemFlexible Manufacturing System
Flexible Manufacturing System
 
Manufacturing systems
Manufacturing systems Manufacturing systems
Manufacturing systems
 
Manufacturing cost accounting ppt @ mba finance
Manufacturing cost accounting ppt @ mba financeManufacturing cost accounting ppt @ mba finance
Manufacturing cost accounting ppt @ mba finance
 
Theoretical Framework
Theoretical FrameworkTheoretical Framework
Theoretical Framework
 
Cellular LayOut
Cellular LayOutCellular LayOut
Cellular LayOut
 
Flexible manufacturing systems
Flexible manufacturing systems Flexible manufacturing systems
Flexible manufacturing systems
 
Process And Layout Strategies
Process And Layout StrategiesProcess And Layout Strategies
Process And Layout Strategies
 
Production planning & control & Forecasting
Production planning & control & ForecastingProduction planning & control & Forecasting
Production planning & control & Forecasting
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 

Similar to Manufacturing plng and control

Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
videoaakash15
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Laxmikant Deshmukh
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011
honeysethi
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
samjune
 
Production planning and scheduling
Production planning and schedulingProduction planning and scheduling
Production planning and scheduling
New Nabin Shrestha
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
ManiMj6
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
videoaakash15
 
Measuring Modeling and Managing Supply Chain Capacity
Measuring Modeling and Managing Supply Chain CapacityMeasuring Modeling and Managing Supply Chain Capacity
Measuring Modeling and Managing Supply Chain Capacity
BBK
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
Akash Maurya
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
varun0610
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
samjune
 

Similar to Manufacturing plng and control (20)

Production management
Production managementProduction management
Production management
 
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_siesOm lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
Om lect 05_a(r0-aug-08)_manufacturing planning & scheduling_mms_sies
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
7 -managing_capacity
7  -managing_capacity7  -managing_capacity
7 -managing_capacity
 
Ppc 07.06.2011
Ppc 07.06.2011Ppc 07.06.2011
Ppc 07.06.2011
 
CRP & DRP.pptx
CRP & DRP.pptxCRP & DRP.pptx
CRP & DRP.pptx
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Production Planning
Production Planning Production Planning
Production Planning
 
Material Requirement Planning (mrp)
Material Requirement Planning (mrp)Material Requirement Planning (mrp)
Material Requirement Planning (mrp)
 
Production planning and scheduling
Production planning and schedulingProduction planning and scheduling
Production planning and scheduling
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
Supply Chain Management in ERP
Supply Chain Management in ERPSupply Chain Management in ERP
Supply Chain Management in ERP
 
128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt128233736-ASCP-Training-Day1.ppt
128233736-ASCP-Training-Day1.ppt
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
 
Measuring Modeling and Managing Supply Chain Capacity
Measuring Modeling and Managing Supply Chain CapacityMeasuring Modeling and Managing Supply Chain Capacity
Measuring Modeling and Managing Supply Chain Capacity
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019Capacity requirement planning sure 12mt07ind019
Capacity requirement planning sure 12mt07ind019
 
Rough cut planning
Rough cut planningRough cut planning
Rough cut planning
 

Recently uploaded

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 

Manufacturing plng and control

  • 2. ISSUE “The fundamental problem of operations management is balancing capacity and demand …”
  • 3. Manufacturing Planning and Control Marketing Strategic Financial Planning Planning Planning Resource Aggregate Demand Planning Production Management Planning Master Production Rough-Cut Capacity Schedule (MPS) Planning (RCCP) Material Capacity Requirements Requirements Planning (MRP) Planning Production Activity Capacity Control Control
  • 4. Processes in Production Planning and Control • DEMAND MANAGEMENT • AGGREGATE PRODUCTION PLAN • MASTER PRODUCTION SCHEDULE • CAPACITY REQUIREMENT PLAN • MATERIAL REQUIREMENT PLAN • OPERATIONS SCHEDULING • SHOP FLOOR CONTROL • INPUT OUTPUT CONTROL
  • 5. INTERFACES TO PRODUCTION PLANNING AND CONTROL • TO ARRIVE AT MPS WE NEED FIRM ORDERS FROM CUSTOMERS OR FORECAST OF DEMAND FROM Sales /CUSTOMERS • TO ARRIVE AT CAPACITY REQUIREMENT PLANNING WE NEED TO KNOW THE AVAILABILITY OF THE MACHINE CAPACITY WITH RESPECT TO THE DEMAND LOAD ON THE CAPACITY • TO ARRIVE AT THE MATERIAL REQUIREMENT PLAN WE NEED THE MPS,ENGG DESIGN CHANGES,BILL OF MATERIAL AND INVENTORY RECORDS • MRP OUTPUTS PLANNED ORDER SCHEDULES FOR INVENTORY AND PRODUCTION CONTROL
  • 6. MASTER PRODUCTION SCHEDULE • MASTER PRODUCTION SCHEDULER SHOULD: -INCLUDE ALL DEMANDS FROM PRODUCT SALES WAREHOUSE REPLENISHMENT SPARES AND INTER PLANT REQUIREMENT -KEEP SIGHT OF AGGREGATE PLAN -KEEP CUSTOMER ORDER PROMISES IN MIND -IDENTIFY AND COMMUNICATE ALL PROBLEMS
  • 7. CAPACITY PLANNING • CAPACITY IS A MEASURE OF ABILITY TO PROVIDE CAPABILITY TO MEET MKT DEMAND • CAPACITY DECISIONS USE FOLLOWING STEPS: -MEASURE DEMAND -MEASURE FINITE CAPACITY -RECONCILE CAPACITY& DEMAND -EVALUATE ALTERNATIVES INCLUDING SUBCONTRACTING
  • 8. Managing Capacity • Disaggregate the capacity management problems … • Example: – Resource requirements planning -- check the production plan in aggregate units. Done before MPS – Rough cut capacity planning -- check the master schedule in shop hours and MPS reworked if required. – Capacity requirements planning -- check the materials plan in shop hours By default infinite capacity is assumed. A separate exercise done on
  • 9. MATERIAL REQUIREMENT PLANNING • MRP DRIVEN BY MPS • WHAT MATRL TO BE ORDERED FROM OUTSIDE AND WHAT MATRL TO BE MFG INHOUSE TAKING INTO ACCOUNT CURRENT INVENTORY LEVELS • MRP RUN RESULTS IN CALCULATION OF NET REQMNT AND RELEASE OF PURCHASE ORDER OR WORK ORDER • MRP USES A BILL OF MATERIAL FOR PRODUCTS TO CALCULATE REQMNTS
  • 10. OPERATIONS SCHEDULING • SCHEDULING INVOLVES PREPARATION OF TIME TABLE FOR WORK THAT NEEDS TO BE DONE TO MEET CLIENT DATES OR TO ACHIEVE DESIRED OBJECTIVE • EFFECTIVE SCHEDULING DONE TO AVOID BOTTLENECKS AND TO OPTIMIZE UTILISATION OF SHOP FLOOR RESOURCES • SHEDULING RULES REQUIRED TO OPTIMIZE OPERATIONS
  • 11. SCHEDULING RULES • FIRST COME FIRST SERVED • EARLIEST DUE DATE • SHORTEST PROCESSING TIME • LONGEST PROCESSING TIME • LAST ARRIVED FIRST PROCESSED • LEAST SLACK TIME • LEAST CHANGEOVER COST
  • 12. OPERATIONS SCHEDULING • SCHEDULING SYSTEMS USE EITHER FINITE OR INFINITE LOADING TECHNIQUES TO DETERMINE HOW MACHINE CAPACITY SHOULD BE USED • INFINITE CAPACITY OCCURS WHEN WORK IS ASSIGNED TO A WORK CENTRE BASED ON WHAT IS NEEDED .IT IS PRESUMED THAT CAPACITY IS ALWAYS AVAILABLE AND NO CONSIDERATION IS GIVEN DIRECTLY TO WHETHER THERE IS SUFFICIENT CAPACITY AT THE RESOURCES REQD TO DO WORK. IN INFINITE LOADING SYSTEMS LEAD TIME IS ESTIMATED BY TAKING MULTIPLE OF OPERATING TIME(SETUP +RUN TIME) PLUS QUEUE DELAY IN MATRL MOVEMENT • FINITE LOADING SCHEDULES IN DETAIL EACH RESOURCE USING THE SETUP AND RUNTIME REQD FOR EACH ORDER .SYSTEM DETERMINES EXACTLY WHAT EACH RESOURCE WILL DO AT EACH MOMENT OF THE DAY
  • 13. SCHEDULING AND CONTROL FUNCTIONS • ALLOCATING ORDERS TO WORK CENTRES • DETERMINING SEQUENCE OF ORDER OPERATIONS • DISPATCHING OF ORDERS • SHOP FLOOR CONTROL OF ORDERS INVOLVING CONTROLLING PROGRESS OF ORDERS AND EXPEDITING LATE AND CRITICAL ORDERS