SlideShare uma empresa Scribd logo
1 de 16
Baixar para ler offline
EDEN A BUILDING

HO CHI MINH CITY - VIETNAM




       (Source: www.skyscrapercity.com)




                                            Advisor: Pro. Dr. Karl Kluegel

                          Subject: Urban Planning and Real Estate Market

                                          Student name: Nguyen Thuy Linh

                                    VIETNAMESE – GERMAN University

                                                         Class: UDP 2010




     Ho Chi Minh City – Vietnam – 08/2011
Table of contents:

          I. INTRODUCTION.…………………………………………………………………………………2

         II. BUILDING OVERVIEW/DESCRIPTION…...…………………………………………………..3

              1.   Building overview……………………………………………………………………………….3

              2.   Building description……...……………………………………………………………………...3

                   2.1 Location...………………………………………………………………………………..….4

                   2.2 Building functions......................... …......……………….…….…………….……………...5

                   2.3 Architecture and Planning characters ……………………………….……………………...6

        III. METHODS OF EVALUATION…………………………….……………….…………………….6

        IV. EVALUATION………………………………..……………………………………...…………..…7

              1.   Market analysis......…………………………………………………………………..…..……...7

                   1.1. Retail market.…………………………………………………………………...…………7

                   1.2. Hotel market.………………………………………………………...…………………....8

                   1.3. Parking market.……………………………………………………………………..…….9

              2.   Location………….…………………………………………………………………………….10

              3.   Architecture and Planning design…...………………………………………………………...10

              4.   Parking capacity………………………………………………..……………………………....11

                   4.1. The demand of the building……………………………………………………………...11

                   4.2. The supply of the building……………………………………………………………….11

              5.   Environment friendly…………………………………………………………………………..12

              6.   The economic feasibility ………………...…………………..………………………..……….12

              7.   Social impact…………………………………………………………………………………...13

         V. CONCLUSION…………………………………………………………………………………….13

    REFERENCES……………………………………………………………………………………...………15




                                                                                                  1


Nguyen Thuy Linh-Eden A Building
I.         INTRODUCTION:

             As reported by CBRE(1) in 2011, Ho Chi Minh City is currently having 30 key projects under

        development, mainly in District 1. Among these 30 key projects, the Eden A is considered as one of the

        most important projects, which will be the complex function building of 5-star Hotel - Commercial Center –

        Parking in Ho Chi Minh.




                                           Figure 1: Map of the key project’s locations.

                                   (Source: Fearless Forecast Report in January 2011, CBRE)

             Whether this project should be built or not still remains the controversial issue. Some people think that

        with the current situation of retail or hotel market in Ho Chi Minh City, there should not have one additional

        commercial building or 5-star hotel like the Eden A project. However, there is also another group of people

        think that the parking function of this building is one of the reasons why should people implement this

        project.




(1)
      CB Richard Ellis is Vietnam’s market leader in real estate sales, lettings, research, valuation and property management
                                                                                                                                2


Nguyen Thuy Linh-Eden A Building
By focusing on describing and analyzing the needed criteria to evaluate the technical feasibility (location,

    architecture and planning design, parking capacity, environmental friendly) and economic feasibility (Break

    Even ROR) of the Eden A building, this short paper will help people to understand the feasibility of this

    project as well as to provide the reasons for building this project from the view of the investor.

    II.        BUILDING OVERVIEW/DESCRIPTION:

               1.   Building overview:

                         Project’s name: The Vincom Commercial Center – Hotel – Underground parking (site A);

                         Investor: Vincom Join Stock Company;

                         Location: Eden quadrangular – Ben Nghe Ward - District 1 – Ho Chi Minh City;

                         Legal base:

                             o     Document No. 202/SXD/-CPXD dated 12-01-2011 of Ho Chi Minh City

                                   Construction Department;

                             o     Construction license No. 40/GPXD dated 23-03-2011 of Ho Chi Minh City

                                   Construction Department;

                         Project team:

                             o     Architectural design: Site Asia;

                             o     Interior design: AEDAS Interior LTD;

                             o     Construction:

                                            DELTA       Civil   and    industrial   engineering     Company       (for

                                            construction of the 6 basements);

                                            Unicons Construction Company (for construction of 9 floors)

                             o     Consulting – Supervising Company: PCM JSC;

               2.   Building Description:

          The Eden A project, which is located on site A, is one of two parts of the project “The group of

    buildings of Commercial Center – Services – Hotel – Office – Luxury Apartment and underground

    parking”-at District 1 – is under construction and expected to be completed in Q3/2012; while the another

    part of the project, which is located on site B, have finished and operated since the date 30th April 2010 with

    the function: Apartment for rent, Shopping Mall, Offices and underground parking. These buildings, both on

    site A and site B, are invested by Vincom Join Stock Company with the concept is that to combine these two

    buildings to create a place having a close model of service’s activities such as shopping, entertainment,

                                                                                                                     3


Nguyen Thuy Linh-Eden A Building
offices, apartment for rent, hotels, etc. It is predicted that these complex buildings with high standards will

        be enjoyable places to satisfy people not only domestic but also foreign.




                                                Figure 2: Map of site A and site B

                                                       (Source: Google map)

                      2.1. Location:

           This project is located at a quadrangular area named Eden in District 1 of Ho Chi Minh City, which is

        limited by four famous streets, namely Dong Khoi, Le Thanh Ton, Nguyen Hue and Le Loi and is

        considered as one of the “golden positions” of the city. With an area of land is about 8,800m², the location

        associated with the Sai Gon(2) historical thickness of more than 300 years. In addition, this location is also

        nearby some City important buildings such as City people’s Committee, City Opera-house, 5 stars Rex Hotel

        and 4 stars Continental Hotel.




(2)
      Sai Gon is an old name of Ho Chi Minh City was call before 2nd July 1976.
                                                                                                                     4


Nguyen Thuy Linh-Eden A Building
Figure 3: Map of the Eden project’s location.

                                   (Source: Department of Planning and Architecture)

                    2.2. Building function:

        This Eden A project is a complex building having three main functions. Firstly, with its function is

    commercial center, Eden building is an ideal place will bring new shopping experiences and relaxing areas

    for local people as well as tourists. Secondly, 5-star hotel with 300 rooms is also one of the main functions

    of this building with international standard services. Finally, underground parking function is considered as

    a solution in order to help to solve the parking issues of Ho Chi Minh City at the present.

              No.     Function                Area (m²)                       Note
                1     Hotel                       32,581   Put from level 5 to level 9
                2     Commercial Center           23,456   Put from basements No. 3 to level 4.
                3     Parking                     22,800   Put at basements No. 4, 5, and 6.
                4     Technical and others        26,829
                5     Total floor area          105,666



                                      Table 1: The Commercial and Service Area

                                                                                                                5


Nguyen Thuy Linh-Eden A Building
2.3. Architecture and planning characters:

          With the land plot is about 8,800m², the Eden A building includes 9 floors with about 53,437m² and 6

    basements with nearly 52,229m². One remarkable point of this project is there will have tunnels to connect

    the buildings on site A and site B when this Eden A project have finished.

                      No.      Item                          Information
                        1      Land area                                                     8,800m²
                       2       Building Density                                                  75%
                       3       Floor Area Ratio (FAR)                                               6
                       4       Scale of building                                6 basements + 9 floors
                       5       Height of building                                                36m
                       6       Gross Floor Area (GFA)                                     105,666 m²



                                              Table 2: Planning Information

    III.       METHODS OF EVALUATION:

          Since the purpose of this paper is to evaluate the technical and economic feasibility of the Eden A

    building from the investor’s view, hence the all collected information will focus only on the 7 criteria were

    chosen and used by all 15 members of class (see table 3)

          To start with, in the stage of background research, Internet research methods for finding most of

    information that relevant this Eden A building was used, especially focus on the information which related

    to 7 defined criteria. Secondly, for qualitative field survey, the method was to go directly to the site of this

    project to have physical see about the surrounding areas and adjoining landuse, as well as cross-checking the

    background. Due to the limited time available, no quantitative surveys was used in this research. Thirdly,

    collected data were analyzed and ranked with 5 different levels from 1 to 5; and finally, the research ended

    with a clear conclusion from the view of investor.

      No.      Criteria                                 Notes on method                            Applied
      1        Market analysis                          Current situation of Ho Chi Minh
      2        Location                                 Surrounding areas
                                                        Accessibility, Mobility
      3        Architecture and Planning Design         Harmony with surrounding
                                                        buildings
      4        Parking capacity                         Cars
      5        Environmental friendly                   Saving energy
      6        The economic feasibility                 Break Even ROR

      7        Social impact                            Traffic (analyze at 500m radius)


                                                    Table 3: List of criteria
                                                                                                                  6


Nguyen Thuy Linh-Eden A Building
Expected output:


          1. Background Research:
                                                                              Overview
          Government offices
                                                                              General information
          Internet




          2. Qualitative Assessment:                                            Having physical see
          Go to the site of building                                            Having     general     information:
          Go around the surrounding areas of the                                land-use, market…

          building                                                              Cross-checking background




                                                                               Identifying strong/weak         points
          3. Data analysis:                                                    related to 7 criteria
                                                                               The impact of 7criteria on the
                                                                               project



          4. Conclusion:                                                      To invest this project or not?




                                             Diagram 1: The Research Method

    IV.        EVALUATION:

               1.    Market analysis in Ho Chi Minh city:

                       1.1. Retail market:




                                       Source: Savills Research & Consultancy
                                                                                                                    7


Nguyen Thuy Linh-Eden A Building
(3)
           According to Savills’s report         , about the supply, there are 93 retail centers in the city which providing

        630,000m² of retail space. The occupancy of the whole market reached 85%, a decrease of -5 percentage

        point compared with last quarter. Furthermore, the average rent decreased by -4% compared with Q1/2011.

        About the demand, retail density is relatively low across 24 districts demonstrating strong potential demand

        of modern retail formats. For future supply, from 2012 onward, it is predicted that 12,000m² of new supply

        will be built, and the total supply will double as compared with the year 2010.




                                             Source: Savills Research & Consultancy

           Besides, with the current situation in Ho Chi Minh City, due to the difficult economic situation, tenants in

        modern retail centers might try to low their costs by seeking other locations or streets front stores, which

        have more reasonable rents. Besides, the consumer confidence index has decreased and people have a

        pessimistic view about the economy, which is the negative sign for the retail market. It should be noted that

        the turnover growth in retail and services in the first five months of the year 2011 was only 6.4% when

        adjusted for inflation.

           However, if the economy rehabilitates in the next four quarters, rents in locations of the city center could

        increase due to the supply sources are limited at here.

           With these above judgments, for long-term view, the commercial project of Eden A will be a good

        business, however, it certainly will have some difficulties in the initial stage due to the economic difficulties.

                    1.2.     Hotel market:

           As reported by CBRE, in 2010, there were many hotel renovations in Ho Chi Minh City, such as

        Movenpick Hotel, Rex Hotel and Grand Hotel. Even though the occupancy rates went up year of year, there

(3)
      HCMC Retail Briefing Q2-2011; 06/07/2011; published by Savills.

                                                                                                                          8


Nguyen Thuy Linh-Eden A Building
was a decrease in room rates due to the increased competition. The new hotels tend to favor 3-star hotel

        serving business travelers, while almost none of new 4-5 star hotel are being built until 2012. Turn into
                                                       (4)
        2011, according also to CBRE’s report                , there are 9 hotels are under construction in District 1 and many

        new hotel (3-start hotel or higher) serving business travelers are planning to build next year.

            Also in the past three months, all from 3-star to 5-star hotel worked and accounted for 80% occupancy,

        rose about 5%, compared with the previous quarter; and 10%, compared with the same period of last year.
                                        (5)
        Base on statistics of Savills         , currently, the whole Ho Chi Minh City has about 4,000 hotel rooms having

        5-star standard, 2,000 hotel rooms having 4-star standard and 3,500 hotel rooms having 3-start standard. It is

        predicted that the city supply of hotel rooms will be plentiful in the future. In the period 2011-2012, it is

        expected that approximately 750 hotel rooms having 5-star standard, 628 hotel rooms having 4-star standard

        and 170 hotel rooms having 3-star standard will be put in the market for operating.

            With the current situation and the forecasts of hotel market in Ho Chi Minh City, an additional number of

        hotel rooms of Eden A building is an issue need have enough consideration. However, there are many

        factors contributing to the development of hotel business; and with international standard services, the

        luxury in both of interior and landscape design, and the favorable location, this hotel will satisfy all the

        demands of customers and politicians.

                     1.3.      Parking market:

            Firstly, the number of private vehicles in Ho Chi Minh City accounted for one-third of the total amount

        of Vietnam. In recent years, Ho Chi Minh City has dominated by cars and motorcycles, and its rapid

        economic development is bringing more cars and monocycles. According to the statistics, in the end of

        2008, the whole City had about 371,000 cars and 3.1 million motorcycles (increased 9.5% and 11.9%

        respectively, compared with the beginning of the year 2008), and in 2009, these number increased sharply to

        more than 400,000 cars and more than 4.5 million motorcycles. The number of cars and motorcycle are also

        expected go up in the future.

            Secondly, at the present day, there is a shortage of parking in Ho Chi Minh City in general and in district

        1 in particular. The reason for this is that the City Urban Planning did not have much space for cars parking

        as well as motorcycles parking. According to City urban planning, Ho Chi Minh City needs about 520ha for

        cars parking, however, the fact is that the existing cars parking of the City is about 3.3 ha. For solving this



(4)
      HCMC Market View Q2/2011; publishes by CBRE.
(5)
      Savills plc is a global real estate services provider listed on the London Stock Exchange.
                                                                                                                             9


Nguyen Thuy Linh-Eden A Building
problem, the City has painted the road, both on roadways and roadsides, with the prescriptive size for each

    car parking and people will pay fee for parking at these plot. Many roads frequently filled with a lot of cars

    parking in single file, however, it is still not satisfy the ever-increasing parking demand of people in district

    1 in general and in surrounding area of Eden A building in particular; and lead to congestions happen

    everyday.

        From these above conditions, one might ask, what should people do under the present circumstances of

    the city? For answering this question, Eden A building, which will provide a undergrounding parking place

    serving customers not only for itself but also for the surrounding areas in district 1, will be an ideal solution.

              2.   Location:

        Located at the most favorable position in Ho Chi Minh City with four fronts facing directly four main

    streets namely Dong Khoi, Le Thanh Ton, Nguyen Hue and Le Loi, Eden A is one of buildings having the

    most convenient traffic condition in the largest city center in Vietnam.

        Only two minutes from Eden A, tourists and customers can easily take walks to famous points of the city

    such as Notre Dame Cathedral, City Post office, etc. Additionally, they can go and enjoy city urban

    landscape with many buildings which were influenced by France architecture like City opera-house,

    people’s Committee; as well as drop step to the near food streets and enjoy Vietnamese traditional delicious

    foods.

        This is considered as the strongest point of this project.

              3.   Architecture and planning design:

        The most important factor of this building is it can go along with the surrounding buildings; however,

    there is nothing special about this building and some architecture features are not suitable. For example, it

    should be a red roof instead of blue roof in order to fit with the other buildings in this area.

        One remarkable point of this project is there will have tunnels to connect the buildings on site A and site

    B at the 3rd, 4th, and 5th basement to create a close model of service’s activities when this Eden A project

    have finished.

       To sum up, this is a particularly important project and will eventually be a landmark of the general

    architecture of City Center – district 1- when it has finished. Overall, this architecture design is in harmony

    with the surrounding landscape.




                                                                                                                    10


Nguyen Thuy Linh-Eden A Building
Figure 4: the perspective of the Eden A building

                                                  (Source: www.skyscrapercity.com)

                   4.       Parking capacity:

                              4.1. The demand of the building:

           According to QCXDVN 1:2008(6):

                        No.         Type of building         Minimum demand on car parking
                        1           3-star hotel or higher   1 parking lot for each 4 rooms
                        2           Commercial Center        1 parking lot for each 100m² used floor



                                               Table 4: The minimum number of parking lots

           There for, in Eden A building, the parking lots will be needed as the table below:

               No.           Item                      Information                   The needed parking lot
               1             Hotel                     5-star hotel with 300 rooms              75 lots
               2             Commercial Center         23,456                                  235 lots
               3             Total parking lots                                                310 lots



                                          Table 5: the needed parking lot in Eden A Building

                              4.2. The supply of the building (assume parking for cars use only):

                   The parking area: 22,800m²

                   The area for car parking after minus corridor area (30%): 22,800m² * 70% = 15,960m²




(6)
      QCXDVN 01:2008/BXD: Vietnam Building Code – Regional and Urban Planning and Rural Residential Planning
                                                                                                               11


Nguyen Thuy Linh-Eden A Building
According to QCXDVN 01:2008, each car parking plot is 25m² the car parking plots of the

                   building: 15,960 / 25m² = 638.4      about 640 car parking plots will be provided.

           In conclusion, this building will provide an efficient parking area for customers not only of this building

        but also of the surrounding area in District 1. Therefore, this is a good point of the Eden A building to help

        Ho Chi Minh City to solve the parking issue which is considered as one of the most difficult tasks of the

        local government at the current situation.

                   5.    Environmental friendly:

           This Eden a building will use low-E glass, which save energy and fuel. By using low-E glass, it will help

        to reduce cost of air conditioning, increase longevity and durability of furniture, equipment, and especially

        to protect people’s health in this building during hot days. Low-E glass having special coating, can prevent

        the building from of 10% sunlight intensity, slowly radiate heat, reduce emissivity, slowly absorb heat and

        slow heat transmission but guarantee enough brightness inside. Not just that, the whole device system of this

        building is also used advanced technologies of the world about energy saving and environmental protection.

        Moreover, it also contributes to reduction of greenhouse gas emission, which leads to environmental

        protection. This is one of outstanding advantages of the project.

                   6.    The economic feasibility assessment (rough estimate):

                             Total development:

             No.                         Item                    Amount (billion VND)         Amount (USD)
              1         Land cost                                        2,500                  119,047,619
                        Construction cost and others cost
              2         (GFA=105,666m²)                                 1,480(7)                70,476,190
              3         Total project cost                               3,980                  189,523,810



                                                             (1 USD = 21.000VND)

                                          Table 6: the total development cost of the Eden A building

                             Gross Rental Revenue at 100% occupation = (1) + (2) + (3):

                                    -   Hotel:

                                    300 rooms * 118 USD(8)/room/day* 365 days = 12,921,000 (USD) (1)

                                    -   Commercial Center:

(7)
    According to Project Status_Report for Shareholder’s meeting of Vincom JSC in 01/2011: construction price was
estimated 14million/1m²
(8)
      According to the current hotel market of Ho Chi Minh

                                                                                                                    12


Nguyen Thuy Linh-Eden A Building
23,456m² * 125USD(9)/m²/month* 12months = 35,184,000 (USD) (2)

                                -    Parking:

                                640 cars * 2USD(10)/car/day* 365 days = 467,200 (USD) (3)

                            Conclusion:

                    No.      Item                                                    Amount (USD)
                    1        Project cost                                                    189,523,810
                    2        Gross Rental Revenue at 100% Occupancy                           48,572,200
                    3        - 5% Vacancy Rate                                                  2,428,610
                    4        - 35% Operating Cost                                             17,000,270
                    5        Net Operating Income                                             29,143,320
                    6        Break Even ROR                                                        15.4%



                                                         Table 7: Rough estimate

             As can be seen form the table 5, the project is economically feasible if investors require ROR ≤ 15.4%,

        and it generates substantial Development Profit at 15% required ROR:

             (29,143,320/0.15) – 189,523,810 = 4,764,990 (USD)         Profit.

                   7.   Social impacts:

             It is clear to see that, the implementation of this project will bring many social impacts, both negative and

        positive. Overall, there are more advantages than disadvantages.

             On the one hand, bringing many job opportunities to the local people is one of positive impacts of this

        building. Additionally, with the parking function of the Eden A building, it will help the local government to

        solve the parking problem of the City.

             On the other hand, this building also causes some negative effects on society and one thing can be listed

        is that the concentration of cars and motorcycles in the building can lead to congestions in its surrounding

        areas, especially at the rush hours.

        V.         CONCLUSION:

             It can be seen that, the combination of Eden A building and the building on site B will create a complex

        building with the largest commercial center, the 5-star hotel having a largest number of rooms and the




(9)
      According to the current price of Vincom JSC

(10)
       According to the current price of Vincom JSC

                                                                                                                       13


Nguyen Thuy Linh-Eden A Building
largest underground parking in Ho Chi Minh City in the future, which will be the brand of not only Vincom

    JSC but also Ho Chi Minh City.

        As the urbanization trend and the living standard of people is increasing in Ho Chi Minh City, the

    creation of an ideal place to satisfy perfectly the needs of shopping, living, working of the people is a

    necessary thing. Therefore, the Eden A project as well as the building on site B will attract more people to

    use their services, which leads to the investor’s sale will have high results. Furthermore, based on the future

    urban planning of the City as well as the problems Ho Chi Minh City are facing, this building will bring

    solutions to solve the parking problem of the City as the number of cars and motorcycles is increasingly and

    has made the offices and commercial centers become scare in parking space; or to meet the need of the city

    when it is facing a lack of high-grade hotel, especially at the City Center.

          No.     Criteria                             Ranking                               Applied
                                                       1   2   3       4  5
                                                       Good              Bad
          1       Market analysis                      1   2   3       4  5

          2       Location                             1     2    3    4    5

          3       Architecture and Planning design     1     2    3    4    5

          4       Parking capacity                     1     2    3    4    5

          6       Environmental friendly               1     2    3    4    5

          7       The feasibility assessment            1    2    3    4    5

          8       Social impact                        1     2    3    4    5

          9       Total Score                          15


                                        Table 8: Summary results of the evaluation

        Eventually, though this business will have some difficulties and challenges at the beginning period, this is

    a potential investment.




                                                                                                                 14


Nguyen Thuy Linh-Eden A Building
REFERENCES:

              Website:

    http://vincom.com.vn

    http://www.cbrevietnam.com

    http://www.savills.com.vn

    http://vneconomy.vn

    http://www.skyscrapercity.com

    Phan, Tran; (2011); Khung hoang bai dau xe (Parking crisis); http://laodong.com.vn/Tin-Tuc/Khung-hoang-

    bai-dau-xe/38143

              Document:

    Vincom (2011); Project Status_Report for Shareholder’s meeting; published by Vincom

    CBRE (2011); HCMC Market View Q2/2011; publishes by CBRE

    Savills (2011);HCMC Retail Briefing; published by Savills

    QCXDVN 01:2008/BXD;(2008);Vietnam Building Code – Regional and Urban Planning and Rural

    Residential Planning; published by Vietnam Ministry of Construction; Hanoi




                                                                                                         15


Nguyen Thuy Linh-Eden A Building

Mais conteúdo relacionado

Mais procurados

2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase Book2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase BookAutodesk AEC
 
Be Report Finalize
Be Report FinalizeBe Report Finalize
Be Report FinalizeShze Hwa Lee
 
Architect Portfolio Mohie Fanoun
Architect Portfolio  Mohie FanounArchitect Portfolio  Mohie Fanoun
Architect Portfolio Mohie FanounMohi Fannoun
 
SITE ANALYSIS REPORT
SITE ANALYSIS REPORTSITE ANALYSIS REPORT
SITE ANALYSIS REPORTong93
 
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINALemad farrag
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2ong93
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamEhab Abdelmoneam
 

Mais procurados (9)

2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase Book2016 AEC Excellence Awards Showcase Book
2016 AEC Excellence Awards Showcase Book
 
Be Report Finalize
Be Report FinalizeBe Report Finalize
Be Report Finalize
 
Total 2017
Total 2017Total 2017
Total 2017
 
Architect Portfolio Mohie Fanoun
Architect Portfolio  Mohie FanounArchitect Portfolio  Mohie Fanoun
Architect Portfolio Mohie Fanoun
 
SITE ANALYSIS REPORT
SITE ANALYSIS REPORTSITE ANALYSIS REPORT
SITE ANALYSIS REPORT
 
emadosmancv-FINAL
emadosmancv-FINALemadosmancv-FINAL
emadosmancv-FINAL
 
Loewe Store Selection Dec 05 Jun 06 III
Loewe Store Selection Dec 05 Jun 06 IIILoewe Store Selection Dec 05 Jun 06 III
Loewe Store Selection Dec 05 Jun 06 III
 
Advanced Design Studio 2
Advanced Design Studio 2Advanced Design Studio 2
Advanced Design Studio 2
 
CV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _AbdelmoneamCV for Eng_Ehab _Abdelmoneam
CV for Eng_Ehab _Abdelmoneam
 

Destaque

Indicators measurment cit
Indicators measurment citIndicators measurment cit
Indicators measurment citNguyễn Khoa
 
G2. chuong duong quay week 2
G2. chuong duong quay   week 2G2. chuong duong quay   week 2
G2. chuong duong quay week 2Nguyễn Khoa
 
22. Global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
22. Global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...22. Global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...
22. Global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...Nguyễn Khoa
 
Nguyen dinh khoa's assignment adaptation - the city of cape town
Nguyen dinh khoa's assignment   adaptation - the city of cape townNguyen dinh khoa's assignment   adaptation - the city of cape town
Nguyen dinh khoa's assignment adaptation - the city of cape townNguyễn Khoa
 
Nguyen dinh khoa's assignment prof. rod burgess' subjects
Nguyen dinh khoa's assignment    prof. rod burgess' subjectsNguyen dinh khoa's assignment    prof. rod burgess' subjects
Nguyen dinh khoa's assignment prof. rod burgess' subjectsNguyễn Khoa
 
Udp2010 introduction
Udp2010 introductionUdp2010 introduction
Udp2010 introductionNguyễn Khoa
 
22. global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
22. global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...22. global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...
22. global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...Nguyễn Khoa
 
Prof. karl's assignment
Prof. karl's assignmentProf. karl's assignment
Prof. karl's assignmentNguyễn Khoa
 
15. ha vietcombank-tower
15. ha vietcombank-tower15. ha vietcombank-tower
15. ha vietcombank-towerNguyễn Khoa
 
Indicator measurment cities from Asian development Bank.
Indicator measurment cities from Asian development Bank.Indicator measurment cities from Asian development Bank.
Indicator measurment cities from Asian development Bank.Nguyễn Khoa
 
Vietnamese German University - Udp2010 introduction
Vietnamese German University - Udp2010 introductionVietnamese German University - Udp2010 introduction
Vietnamese German University - Udp2010 introductionNguyễn Khoa
 
Introduction of Climate map and applicaiton in planning of Ho Chi Minh City
Introduction of Climate map and applicaiton in planning of Ho Chi Minh CityIntroduction of Climate map and applicaiton in planning of Ho Chi Minh City
Introduction of Climate map and applicaiton in planning of Ho Chi Minh CityNguyễn Khoa
 
Udp2010 introduction
Udp2010 introductionUdp2010 introduction
Udp2010 introductionNguyễn Khoa
 
Nguyen dinh khoa's assignment prof. rod burgess' subjects
Nguyen dinh khoa's assignment    prof. rod burgess' subjectsNguyen dinh khoa's assignment    prof. rod burgess' subjects
Nguyen dinh khoa's assignment prof. rod burgess' subjectsNguyễn Khoa
 
Graduate project nguyen dinh khoa
Graduate project   nguyen dinh khoaGraduate project   nguyen dinh khoa
Graduate project nguyen dinh khoaNguyễn Khoa
 
Saigon m&c an overview hung t.nguyen
Saigon m&c an overview hung t.nguyenSaigon m&c an overview hung t.nguyen
Saigon m&c an overview hung t.nguyenNguyễn Khoa
 

Destaque (20)

Indicators measurment cit
Indicators measurment citIndicators measurment cit
Indicators measurment cit
 
G2. chuong duong quay week 2
G2. chuong duong quay   week 2G2. chuong duong quay   week 2
G2. chuong duong quay week 2
 
22. Global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
22. Global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...22. Global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...
22. Global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
 
N.anh lim tower
N.anh lim towerN.anh lim tower
N.anh lim tower
 
Nguyen dinh khoa's assignment adaptation - the city of cape town
Nguyen dinh khoa's assignment   adaptation - the city of cape townNguyen dinh khoa's assignment   adaptation - the city of cape town
Nguyen dinh khoa's assignment adaptation - the city of cape town
 
Nguyen dinh khoa's assignment prof. rod burgess' subjects
Nguyen dinh khoa's assignment    prof. rod burgess' subjectsNguyen dinh khoa's assignment    prof. rod burgess' subjects
Nguyen dinh khoa's assignment prof. rod burgess' subjects
 
Udp2010 introduction
Udp2010 introductionUdp2010 introduction
Udp2010 introduction
 
Portlofio large
Portlofio largePortlofio large
Portlofio large
 
22. global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
22. global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...22. global city & city marketing   prof. huang luixin - g2 - d khoa, t xuan, ...
22. global city & city marketing prof. huang luixin - g2 - d khoa, t xuan, ...
 
Mumbai city
Mumbai cityMumbai city
Mumbai city
 
Prof. karl's assignment
Prof. karl's assignmentProf. karl's assignment
Prof. karl's assignment
 
Presentation1
Presentation1Presentation1
Presentation1
 
15. ha vietcombank-tower
15. ha vietcombank-tower15. ha vietcombank-tower
15. ha vietcombank-tower
 
Indicator measurment cities from Asian development Bank.
Indicator measurment cities from Asian development Bank.Indicator measurment cities from Asian development Bank.
Indicator measurment cities from Asian development Bank.
 
Vietnamese German University - Udp2010 introduction
Vietnamese German University - Udp2010 introductionVietnamese German University - Udp2010 introduction
Vietnamese German University - Udp2010 introduction
 
Introduction of Climate map and applicaiton in planning of Ho Chi Minh City
Introduction of Climate map and applicaiton in planning of Ho Chi Minh CityIntroduction of Climate map and applicaiton in planning of Ho Chi Minh City
Introduction of Climate map and applicaiton in planning of Ho Chi Minh City
 
Udp2010 introduction
Udp2010 introductionUdp2010 introduction
Udp2010 introduction
 
Nguyen dinh khoa's assignment prof. rod burgess' subjects
Nguyen dinh khoa's assignment    prof. rod burgess' subjectsNguyen dinh khoa's assignment    prof. rod burgess' subjects
Nguyen dinh khoa's assignment prof. rod burgess' subjects
 
Graduate project nguyen dinh khoa
Graduate project   nguyen dinh khoaGraduate project   nguyen dinh khoa
Graduate project nguyen dinh khoa
 
Saigon m&c an overview hung t.nguyen
Saigon m&c an overview hung t.nguyenSaigon m&c an overview hung t.nguyen
Saigon m&c an overview hung t.nguyen
 

Semelhante a Eden a nguyen thuy linh

DE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesDE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesMelvin Lim
 
Building Economics Assignment Report
Building Economics Assignment ReportBuilding Economics Assignment Report
Building Economics Assignment Reportashleyyeap
 
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptxPLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptxBaharAnjum
 
Building economics final assignment report
Building economics final assignment reportBuilding economics final assignment report
Building economics final assignment reportlucaschinsheng
 
C Wyatt Project Portfolio 2016
C Wyatt Project Portfolio 2016C Wyatt Project Portfolio 2016
C Wyatt Project Portfolio 2016Colin W.
 
supreme court additonal complex project
supreme court additonal complex projectsupreme court additonal complex project
supreme court additonal complex projectAbhishek singh
 
Golden profitune company
Golden profitune companyGolden profitune company
Golden profitune companymalditamarie
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfAlasAlthaher
 
新大好项目 English
新大好项目  English新大好项目  English
新大好项目 Englishlus0006
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineerhamdyhussien
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV fullAmr Moussa
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTareq Eladawi
 

Semelhante a Eden a nguyen thuy linh (20)

DE/BE Workshop Presentation Slides
DE/BE Workshop Presentation SlidesDE/BE Workshop Presentation Slides
DE/BE Workshop Presentation Slides
 
BE Compiled
BE Compiled BE Compiled
BE Compiled
 
Cv & Portfolio
Cv & PortfolioCv & Portfolio
Cv & Portfolio
 
Building Economics Assignment Report
Building Economics Assignment ReportBuilding Economics Assignment Report
Building Economics Assignment Report
 
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptxPLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
 
haitham cv
haitham cvhaitham cv
haitham cv
 
Building economics final assignment report
Building economics final assignment reportBuilding economics final assignment report
Building economics final assignment report
 
C Wyatt Project Portfolio 2016
C Wyatt Project Portfolio 2016C Wyatt Project Portfolio 2016
C Wyatt Project Portfolio 2016
 
A.Hussein - C.V
A.Hussein - C.VA.Hussein - C.V
A.Hussein - C.V
 
eng. Samir Eid. CV
eng. Samir Eid. CVeng. Samir Eid. CV
eng. Samir Eid. CV
 
supreme court additonal complex project
supreme court additonal complex projectsupreme court additonal complex project
supreme court additonal complex project
 
Golden profitune company
Golden profitune companyGolden profitune company
Golden profitune company
 
March-2015
March-2015March-2015
March-2015
 
ENG Gamal CV
ENG Gamal CVENG Gamal CV
ENG Gamal CV
 
CAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdfCAPITAL GATE CASE STUDY -regional case study.pdf
CAPITAL GATE CASE STUDY -regional case study.pdf
 
新大好项目 English
新大好项目  English新大好项目  English
新大好项目 English
 
CHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdf
 
Hamdy hussien cv resident engineer
Hamdy hussien cv resident engineerHamdy hussien cv resident engineer
Hamdy hussien cv resident engineer
 
eng. Amr Mousa CV full
eng. Amr Mousa  CV fulleng. Amr Mousa  CV full
eng. Amr Mousa CV full
 
Tarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - FinalTarek Hassanain Eladawi - Final
Tarek Hassanain Eladawi - Final
 

Mais de Nguyễn Khoa

Shanghai global city
Shanghai global cityShanghai global city
Shanghai global cityNguyễn Khoa
 
Project prposal vo my y
Project prposal   vo my yProject prposal   vo my y
Project prposal vo my yNguyễn Khoa
 
Ngoc anh hcmc_mitigation
Ngoc anh hcmc_mitigationNgoc anh hcmc_mitigation
Ngoc anh hcmc_mitigationNguyễn Khoa
 
Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Nguyễn Khoa
 
Vietnam Water resources.
Vietnam Water resources.Vietnam Water resources.
Vietnam Water resources.Nguyễn Khoa
 
Green economy in the City of Toronto
Green economy in the City of TorontoGreen economy in the City of Toronto
Green economy in the City of TorontoNguyễn Khoa
 

Mais de Nguyễn Khoa (7)

Shanghai global city
Shanghai global cityShanghai global city
Shanghai global city
 
Project prposal vo my y
Project prposal   vo my yProject prposal   vo my y
Project prposal vo my y
 
Ngoc anh hcmc_mitigation
Ngoc anh hcmc_mitigationNgoc anh hcmc_mitigation
Ngoc anh hcmc_mitigation
 
Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)
 
Vietnam Water resources.
Vietnam Water resources.Vietnam Water resources.
Vietnam Water resources.
 
Green economy in the City of Toronto
Green economy in the City of TorontoGreen economy in the City of Toronto
Green economy in the City of Toronto
 
Vietnam profile
Vietnam profileVietnam profile
Vietnam profile
 

Último

Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour PackageVisit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour PackageDhruv Sharma
 
The Genuine Student Requirement for Australian Student Visas
The Genuine Student Requirement for Australian Student VisasThe Genuine Student Requirement for Australian Student Visas
The Genuine Student Requirement for Australian Student VisasAmit Kakkar
 
Sizzling Summer Adventures Unforgettable Tours Under the Sun
Sizzling Summer Adventures Unforgettable Tours Under the SunSizzling Summer Adventures Unforgettable Tours Under the Sun
Sizzling Summer Adventures Unforgettable Tours Under the SunSnowshoe Tahoe
 
Top Five Best Places to Visit in India.pdf
Top Five Best Places to Visit in India.pdfTop Five Best Places to Visit in India.pdf
Top Five Best Places to Visit in India.pdfonlinevisaindia
 
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiLucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiCab Bazar
 
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptxBusy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptxRezStream
 
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To GraspWhat Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To GraspHanalei Surf School
 
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdfTransportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdfGlobalbustours
 
Melanie Smith Tourism, Wellbeing and Happiness
Melanie Smith Tourism, Wellbeing and HappinessMelanie Smith Tourism, Wellbeing and Happiness
Melanie Smith Tourism, Wellbeing and HappinessEDGAR TARRÉS FALCÓ
 
What Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
What Safety Precautions Are Recommended For Na Pali Snorkeling AdventureWhat Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
What Safety Precautions Are Recommended For Na Pali Snorkeling AdventureHanalei Charters
 
What Are Some Tips For A Safe White River Rafting Experience
What Are Some Tips For A Safe White River Rafting ExperienceWhat Are Some Tips For A Safe White River Rafting Experience
What Are Some Tips For A Safe White River Rafting ExperienceTahoe Whitewater Tours
 
László Puczkó Wellbeing Tourism and Economy
László Puczkó Wellbeing Tourism and EconomyLászló Puczkó Wellbeing Tourism and Economy
László Puczkó Wellbeing Tourism and EconomyEDGAR TARRÉS FALCÓ
 
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdfNewChandigarhTravels
 
It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldParagliding Billing Bir
 
What Are The Must-Know Tips For First-Time Jet Skiers In Aruba
What Are The Must-Know Tips For First-Time Jet Skiers In ArubaWhat Are The Must-Know Tips For First-Time Jet Skiers In Aruba
What Are The Must-Know Tips For First-Time Jet Skiers In ArubaDelphi Watersports
 
Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir
 
Explore the best of Varanasi buddhist temple.pptx
Explore the best of Varanasi buddhist temple.pptxExplore the best of Varanasi buddhist temple.pptx
Explore the best of Varanasi buddhist temple.pptxIRCTCBuddhisttrain
 
5 beautyfull places visiting in uttrakhand
5 beautyfull places visiting in uttrakhand5 beautyfull places visiting in uttrakhand
5 beautyfull places visiting in uttrakhandaradhya3287
 
Discover the Magic of Sicily: Your Travel Guide
Discover the Magic of Sicily: Your Travel GuideDiscover the Magic of Sicily: Your Travel Guide
Discover the Magic of Sicily: Your Travel GuideTime for Sicily
 
Canada PR - Eligibility, Steps to apply.pptx
Canada PR - Eligibility, Steps to apply.pptxCanada PR - Eligibility, Steps to apply.pptx
Canada PR - Eligibility, Steps to apply.pptxY-Axis Overseas Careers
 

Último (20)

Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour PackageVisit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
Visit the Famous Temples of Dev Bhoomi by Uttarakhand tour Package
 
The Genuine Student Requirement for Australian Student Visas
The Genuine Student Requirement for Australian Student VisasThe Genuine Student Requirement for Australian Student Visas
The Genuine Student Requirement for Australian Student Visas
 
Sizzling Summer Adventures Unforgettable Tours Under the Sun
Sizzling Summer Adventures Unforgettable Tours Under the SunSizzling Summer Adventures Unforgettable Tours Under the Sun
Sizzling Summer Adventures Unforgettable Tours Under the Sun
 
Top Five Best Places to Visit in India.pdf
Top Five Best Places to Visit in India.pdfTop Five Best Places to Visit in India.pdf
Top Five Best Places to Visit in India.pdf
 
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur TaxiLucknow to Sitapur Cab | Lucknow to Sitapur Taxi
Lucknow to Sitapur Cab | Lucknow to Sitapur Taxi
 
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptxBusy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
Busy Season Mastery Simple Strategies to Optimize Your Lodging Business!.pptx
 
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To GraspWhat Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
What Unwritten Rules Of Surfing Etiquette Are Crucial For Beginners To Grasp
 
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdfTransportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
Transportation Options_ Getting to Keukenhof Gardens from Amsterdam.pdf
 
Melanie Smith Tourism, Wellbeing and Happiness
Melanie Smith Tourism, Wellbeing and HappinessMelanie Smith Tourism, Wellbeing and Happiness
Melanie Smith Tourism, Wellbeing and Happiness
 
What Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
What Safety Precautions Are Recommended For Na Pali Snorkeling AdventureWhat Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
What Safety Precautions Are Recommended For Na Pali Snorkeling Adventure
 
What Are Some Tips For A Safe White River Rafting Experience
What Are Some Tips For A Safe White River Rafting ExperienceWhat Are Some Tips For A Safe White River Rafting Experience
What Are Some Tips For A Safe White River Rafting Experience
 
László Puczkó Wellbeing Tourism and Economy
László Puczkó Wellbeing Tourism and EconomyLászló Puczkó Wellbeing Tourism and Economy
László Puczkó Wellbeing Tourism and Economy
 
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
_Unforgettable Chandigarh to Himachal Pradesh Tour Package.pdf
 
It’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The WorldIt’s Time Get Refresh Travel Around The World
It’s Time Get Refresh Travel Around The World
 
What Are The Must-Know Tips For First-Time Jet Skiers In Aruba
What Are The Must-Know Tips For First-Time Jet Skiers In ArubaWhat Are The Must-Know Tips For First-Time Jet Skiers In Aruba
What Are The Must-Know Tips For First-Time Jet Skiers In Aruba
 
Paragliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal PardeshParagliding Billing Bir at Himachal Pardesh
Paragliding Billing Bir at Himachal Pardesh
 
Explore the best of Varanasi buddhist temple.pptx
Explore the best of Varanasi buddhist temple.pptxExplore the best of Varanasi buddhist temple.pptx
Explore the best of Varanasi buddhist temple.pptx
 
5 beautyfull places visiting in uttrakhand
5 beautyfull places visiting in uttrakhand5 beautyfull places visiting in uttrakhand
5 beautyfull places visiting in uttrakhand
 
Discover the Magic of Sicily: Your Travel Guide
Discover the Magic of Sicily: Your Travel GuideDiscover the Magic of Sicily: Your Travel Guide
Discover the Magic of Sicily: Your Travel Guide
 
Canada PR - Eligibility, Steps to apply.pptx
Canada PR - Eligibility, Steps to apply.pptxCanada PR - Eligibility, Steps to apply.pptx
Canada PR - Eligibility, Steps to apply.pptx
 

Eden a nguyen thuy linh

  • 1. EDEN A BUILDING HO CHI MINH CITY - VIETNAM (Source: www.skyscrapercity.com) Advisor: Pro. Dr. Karl Kluegel Subject: Urban Planning and Real Estate Market Student name: Nguyen Thuy Linh VIETNAMESE – GERMAN University Class: UDP 2010 Ho Chi Minh City – Vietnam – 08/2011
  • 2. Table of contents: I. INTRODUCTION.…………………………………………………………………………………2 II. BUILDING OVERVIEW/DESCRIPTION…...…………………………………………………..3 1. Building overview……………………………………………………………………………….3 2. Building description……...……………………………………………………………………...3 2.1 Location...………………………………………………………………………………..….4 2.2 Building functions......................... …......……………….…….…………….……………...5 2.3 Architecture and Planning characters ……………………………….……………………...6 III. METHODS OF EVALUATION…………………………….……………….…………………….6 IV. EVALUATION………………………………..……………………………………...…………..…7 1. Market analysis......…………………………………………………………………..…..……...7 1.1. Retail market.…………………………………………………………………...…………7 1.2. Hotel market.………………………………………………………...…………………....8 1.3. Parking market.……………………………………………………………………..…….9 2. Location………….…………………………………………………………………………….10 3. Architecture and Planning design…...………………………………………………………...10 4. Parking capacity………………………………………………..……………………………....11 4.1. The demand of the building……………………………………………………………...11 4.2. The supply of the building……………………………………………………………….11 5. Environment friendly…………………………………………………………………………..12 6. The economic feasibility ………………...…………………..………………………..……….12 7. Social impact…………………………………………………………………………………...13 V. CONCLUSION…………………………………………………………………………………….13 REFERENCES……………………………………………………………………………………...………15 1 Nguyen Thuy Linh-Eden A Building
  • 3. I. INTRODUCTION: As reported by CBRE(1) in 2011, Ho Chi Minh City is currently having 30 key projects under development, mainly in District 1. Among these 30 key projects, the Eden A is considered as one of the most important projects, which will be the complex function building of 5-star Hotel - Commercial Center – Parking in Ho Chi Minh. Figure 1: Map of the key project’s locations. (Source: Fearless Forecast Report in January 2011, CBRE) Whether this project should be built or not still remains the controversial issue. Some people think that with the current situation of retail or hotel market in Ho Chi Minh City, there should not have one additional commercial building or 5-star hotel like the Eden A project. However, there is also another group of people think that the parking function of this building is one of the reasons why should people implement this project. (1) CB Richard Ellis is Vietnam’s market leader in real estate sales, lettings, research, valuation and property management 2 Nguyen Thuy Linh-Eden A Building
  • 4. By focusing on describing and analyzing the needed criteria to evaluate the technical feasibility (location, architecture and planning design, parking capacity, environmental friendly) and economic feasibility (Break Even ROR) of the Eden A building, this short paper will help people to understand the feasibility of this project as well as to provide the reasons for building this project from the view of the investor. II. BUILDING OVERVIEW/DESCRIPTION: 1. Building overview: Project’s name: The Vincom Commercial Center – Hotel – Underground parking (site A); Investor: Vincom Join Stock Company; Location: Eden quadrangular – Ben Nghe Ward - District 1 – Ho Chi Minh City; Legal base: o Document No. 202/SXD/-CPXD dated 12-01-2011 of Ho Chi Minh City Construction Department; o Construction license No. 40/GPXD dated 23-03-2011 of Ho Chi Minh City Construction Department; Project team: o Architectural design: Site Asia; o Interior design: AEDAS Interior LTD; o Construction: DELTA Civil and industrial engineering Company (for construction of the 6 basements); Unicons Construction Company (for construction of 9 floors) o Consulting – Supervising Company: PCM JSC; 2. Building Description: The Eden A project, which is located on site A, is one of two parts of the project “The group of buildings of Commercial Center – Services – Hotel – Office – Luxury Apartment and underground parking”-at District 1 – is under construction and expected to be completed in Q3/2012; while the another part of the project, which is located on site B, have finished and operated since the date 30th April 2010 with the function: Apartment for rent, Shopping Mall, Offices and underground parking. These buildings, both on site A and site B, are invested by Vincom Join Stock Company with the concept is that to combine these two buildings to create a place having a close model of service’s activities such as shopping, entertainment, 3 Nguyen Thuy Linh-Eden A Building
  • 5. offices, apartment for rent, hotels, etc. It is predicted that these complex buildings with high standards will be enjoyable places to satisfy people not only domestic but also foreign. Figure 2: Map of site A and site B (Source: Google map) 2.1. Location: This project is located at a quadrangular area named Eden in District 1 of Ho Chi Minh City, which is limited by four famous streets, namely Dong Khoi, Le Thanh Ton, Nguyen Hue and Le Loi and is considered as one of the “golden positions” of the city. With an area of land is about 8,800m², the location associated with the Sai Gon(2) historical thickness of more than 300 years. In addition, this location is also nearby some City important buildings such as City people’s Committee, City Opera-house, 5 stars Rex Hotel and 4 stars Continental Hotel. (2) Sai Gon is an old name of Ho Chi Minh City was call before 2nd July 1976. 4 Nguyen Thuy Linh-Eden A Building
  • 6. Figure 3: Map of the Eden project’s location. (Source: Department of Planning and Architecture) 2.2. Building function: This Eden A project is a complex building having three main functions. Firstly, with its function is commercial center, Eden building is an ideal place will bring new shopping experiences and relaxing areas for local people as well as tourists. Secondly, 5-star hotel with 300 rooms is also one of the main functions of this building with international standard services. Finally, underground parking function is considered as a solution in order to help to solve the parking issues of Ho Chi Minh City at the present. No. Function Area (m²) Note 1 Hotel 32,581 Put from level 5 to level 9 2 Commercial Center 23,456 Put from basements No. 3 to level 4. 3 Parking 22,800 Put at basements No. 4, 5, and 6. 4 Technical and others 26,829 5 Total floor area 105,666 Table 1: The Commercial and Service Area 5 Nguyen Thuy Linh-Eden A Building
  • 7. 2.3. Architecture and planning characters: With the land plot is about 8,800m², the Eden A building includes 9 floors with about 53,437m² and 6 basements with nearly 52,229m². One remarkable point of this project is there will have tunnels to connect the buildings on site A and site B when this Eden A project have finished. No. Item Information 1 Land area 8,800m² 2 Building Density 75% 3 Floor Area Ratio (FAR) 6 4 Scale of building 6 basements + 9 floors 5 Height of building 36m 6 Gross Floor Area (GFA) 105,666 m² Table 2: Planning Information III. METHODS OF EVALUATION: Since the purpose of this paper is to evaluate the technical and economic feasibility of the Eden A building from the investor’s view, hence the all collected information will focus only on the 7 criteria were chosen and used by all 15 members of class (see table 3) To start with, in the stage of background research, Internet research methods for finding most of information that relevant this Eden A building was used, especially focus on the information which related to 7 defined criteria. Secondly, for qualitative field survey, the method was to go directly to the site of this project to have physical see about the surrounding areas and adjoining landuse, as well as cross-checking the background. Due to the limited time available, no quantitative surveys was used in this research. Thirdly, collected data were analyzed and ranked with 5 different levels from 1 to 5; and finally, the research ended with a clear conclusion from the view of investor. No. Criteria Notes on method Applied 1 Market analysis Current situation of Ho Chi Minh 2 Location Surrounding areas Accessibility, Mobility 3 Architecture and Planning Design Harmony with surrounding buildings 4 Parking capacity Cars 5 Environmental friendly Saving energy 6 The economic feasibility Break Even ROR 7 Social impact Traffic (analyze at 500m radius) Table 3: List of criteria 6 Nguyen Thuy Linh-Eden A Building
  • 8. Expected output: 1. Background Research: Overview Government offices General information Internet 2. Qualitative Assessment: Having physical see Go to the site of building Having general information: Go around the surrounding areas of the land-use, market… building Cross-checking background Identifying strong/weak points 3. Data analysis: related to 7 criteria The impact of 7criteria on the project 4. Conclusion: To invest this project or not? Diagram 1: The Research Method IV. EVALUATION: 1. Market analysis in Ho Chi Minh city: 1.1. Retail market: Source: Savills Research & Consultancy 7 Nguyen Thuy Linh-Eden A Building
  • 9. (3) According to Savills’s report , about the supply, there are 93 retail centers in the city which providing 630,000m² of retail space. The occupancy of the whole market reached 85%, a decrease of -5 percentage point compared with last quarter. Furthermore, the average rent decreased by -4% compared with Q1/2011. About the demand, retail density is relatively low across 24 districts demonstrating strong potential demand of modern retail formats. For future supply, from 2012 onward, it is predicted that 12,000m² of new supply will be built, and the total supply will double as compared with the year 2010. Source: Savills Research & Consultancy Besides, with the current situation in Ho Chi Minh City, due to the difficult economic situation, tenants in modern retail centers might try to low their costs by seeking other locations or streets front stores, which have more reasonable rents. Besides, the consumer confidence index has decreased and people have a pessimistic view about the economy, which is the negative sign for the retail market. It should be noted that the turnover growth in retail and services in the first five months of the year 2011 was only 6.4% when adjusted for inflation. However, if the economy rehabilitates in the next four quarters, rents in locations of the city center could increase due to the supply sources are limited at here. With these above judgments, for long-term view, the commercial project of Eden A will be a good business, however, it certainly will have some difficulties in the initial stage due to the economic difficulties. 1.2. Hotel market: As reported by CBRE, in 2010, there were many hotel renovations in Ho Chi Minh City, such as Movenpick Hotel, Rex Hotel and Grand Hotel. Even though the occupancy rates went up year of year, there (3) HCMC Retail Briefing Q2-2011; 06/07/2011; published by Savills. 8 Nguyen Thuy Linh-Eden A Building
  • 10. was a decrease in room rates due to the increased competition. The new hotels tend to favor 3-star hotel serving business travelers, while almost none of new 4-5 star hotel are being built until 2012. Turn into (4) 2011, according also to CBRE’s report , there are 9 hotels are under construction in District 1 and many new hotel (3-start hotel or higher) serving business travelers are planning to build next year. Also in the past three months, all from 3-star to 5-star hotel worked and accounted for 80% occupancy, rose about 5%, compared with the previous quarter; and 10%, compared with the same period of last year. (5) Base on statistics of Savills , currently, the whole Ho Chi Minh City has about 4,000 hotel rooms having 5-star standard, 2,000 hotel rooms having 4-star standard and 3,500 hotel rooms having 3-start standard. It is predicted that the city supply of hotel rooms will be plentiful in the future. In the period 2011-2012, it is expected that approximately 750 hotel rooms having 5-star standard, 628 hotel rooms having 4-star standard and 170 hotel rooms having 3-star standard will be put in the market for operating. With the current situation and the forecasts of hotel market in Ho Chi Minh City, an additional number of hotel rooms of Eden A building is an issue need have enough consideration. However, there are many factors contributing to the development of hotel business; and with international standard services, the luxury in both of interior and landscape design, and the favorable location, this hotel will satisfy all the demands of customers and politicians. 1.3. Parking market: Firstly, the number of private vehicles in Ho Chi Minh City accounted for one-third of the total amount of Vietnam. In recent years, Ho Chi Minh City has dominated by cars and motorcycles, and its rapid economic development is bringing more cars and monocycles. According to the statistics, in the end of 2008, the whole City had about 371,000 cars and 3.1 million motorcycles (increased 9.5% and 11.9% respectively, compared with the beginning of the year 2008), and in 2009, these number increased sharply to more than 400,000 cars and more than 4.5 million motorcycles. The number of cars and motorcycle are also expected go up in the future. Secondly, at the present day, there is a shortage of parking in Ho Chi Minh City in general and in district 1 in particular. The reason for this is that the City Urban Planning did not have much space for cars parking as well as motorcycles parking. According to City urban planning, Ho Chi Minh City needs about 520ha for cars parking, however, the fact is that the existing cars parking of the City is about 3.3 ha. For solving this (4) HCMC Market View Q2/2011; publishes by CBRE. (5) Savills plc is a global real estate services provider listed on the London Stock Exchange. 9 Nguyen Thuy Linh-Eden A Building
  • 11. problem, the City has painted the road, both on roadways and roadsides, with the prescriptive size for each car parking and people will pay fee for parking at these plot. Many roads frequently filled with a lot of cars parking in single file, however, it is still not satisfy the ever-increasing parking demand of people in district 1 in general and in surrounding area of Eden A building in particular; and lead to congestions happen everyday. From these above conditions, one might ask, what should people do under the present circumstances of the city? For answering this question, Eden A building, which will provide a undergrounding parking place serving customers not only for itself but also for the surrounding areas in district 1, will be an ideal solution. 2. Location: Located at the most favorable position in Ho Chi Minh City with four fronts facing directly four main streets namely Dong Khoi, Le Thanh Ton, Nguyen Hue and Le Loi, Eden A is one of buildings having the most convenient traffic condition in the largest city center in Vietnam. Only two minutes from Eden A, tourists and customers can easily take walks to famous points of the city such as Notre Dame Cathedral, City Post office, etc. Additionally, they can go and enjoy city urban landscape with many buildings which were influenced by France architecture like City opera-house, people’s Committee; as well as drop step to the near food streets and enjoy Vietnamese traditional delicious foods. This is considered as the strongest point of this project. 3. Architecture and planning design: The most important factor of this building is it can go along with the surrounding buildings; however, there is nothing special about this building and some architecture features are not suitable. For example, it should be a red roof instead of blue roof in order to fit with the other buildings in this area. One remarkable point of this project is there will have tunnels to connect the buildings on site A and site B at the 3rd, 4th, and 5th basement to create a close model of service’s activities when this Eden A project have finished. To sum up, this is a particularly important project and will eventually be a landmark of the general architecture of City Center – district 1- when it has finished. Overall, this architecture design is in harmony with the surrounding landscape. 10 Nguyen Thuy Linh-Eden A Building
  • 12. Figure 4: the perspective of the Eden A building (Source: www.skyscrapercity.com) 4. Parking capacity: 4.1. The demand of the building: According to QCXDVN 1:2008(6): No. Type of building Minimum demand on car parking 1 3-star hotel or higher 1 parking lot for each 4 rooms 2 Commercial Center 1 parking lot for each 100m² used floor Table 4: The minimum number of parking lots There for, in Eden A building, the parking lots will be needed as the table below: No. Item Information The needed parking lot 1 Hotel 5-star hotel with 300 rooms 75 lots 2 Commercial Center 23,456 235 lots 3 Total parking lots 310 lots Table 5: the needed parking lot in Eden A Building 4.2. The supply of the building (assume parking for cars use only): The parking area: 22,800m² The area for car parking after minus corridor area (30%): 22,800m² * 70% = 15,960m² (6) QCXDVN 01:2008/BXD: Vietnam Building Code – Regional and Urban Planning and Rural Residential Planning 11 Nguyen Thuy Linh-Eden A Building
  • 13. According to QCXDVN 01:2008, each car parking plot is 25m² the car parking plots of the building: 15,960 / 25m² = 638.4 about 640 car parking plots will be provided. In conclusion, this building will provide an efficient parking area for customers not only of this building but also of the surrounding area in District 1. Therefore, this is a good point of the Eden A building to help Ho Chi Minh City to solve the parking issue which is considered as one of the most difficult tasks of the local government at the current situation. 5. Environmental friendly: This Eden a building will use low-E glass, which save energy and fuel. By using low-E glass, it will help to reduce cost of air conditioning, increase longevity and durability of furniture, equipment, and especially to protect people’s health in this building during hot days. Low-E glass having special coating, can prevent the building from of 10% sunlight intensity, slowly radiate heat, reduce emissivity, slowly absorb heat and slow heat transmission but guarantee enough brightness inside. Not just that, the whole device system of this building is also used advanced technologies of the world about energy saving and environmental protection. Moreover, it also contributes to reduction of greenhouse gas emission, which leads to environmental protection. This is one of outstanding advantages of the project. 6. The economic feasibility assessment (rough estimate): Total development: No. Item Amount (billion VND) Amount (USD) 1 Land cost 2,500 119,047,619 Construction cost and others cost 2 (GFA=105,666m²) 1,480(7) 70,476,190 3 Total project cost 3,980 189,523,810 (1 USD = 21.000VND) Table 6: the total development cost of the Eden A building Gross Rental Revenue at 100% occupation = (1) + (2) + (3): - Hotel: 300 rooms * 118 USD(8)/room/day* 365 days = 12,921,000 (USD) (1) - Commercial Center: (7) According to Project Status_Report for Shareholder’s meeting of Vincom JSC in 01/2011: construction price was estimated 14million/1m² (8) According to the current hotel market of Ho Chi Minh 12 Nguyen Thuy Linh-Eden A Building
  • 14. 23,456m² * 125USD(9)/m²/month* 12months = 35,184,000 (USD) (2) - Parking: 640 cars * 2USD(10)/car/day* 365 days = 467,200 (USD) (3) Conclusion: No. Item Amount (USD) 1 Project cost 189,523,810 2 Gross Rental Revenue at 100% Occupancy 48,572,200 3 - 5% Vacancy Rate 2,428,610 4 - 35% Operating Cost 17,000,270 5 Net Operating Income 29,143,320 6 Break Even ROR 15.4% Table 7: Rough estimate As can be seen form the table 5, the project is economically feasible if investors require ROR ≤ 15.4%, and it generates substantial Development Profit at 15% required ROR: (29,143,320/0.15) – 189,523,810 = 4,764,990 (USD) Profit. 7. Social impacts: It is clear to see that, the implementation of this project will bring many social impacts, both negative and positive. Overall, there are more advantages than disadvantages. On the one hand, bringing many job opportunities to the local people is one of positive impacts of this building. Additionally, with the parking function of the Eden A building, it will help the local government to solve the parking problem of the City. On the other hand, this building also causes some negative effects on society and one thing can be listed is that the concentration of cars and motorcycles in the building can lead to congestions in its surrounding areas, especially at the rush hours. V. CONCLUSION: It can be seen that, the combination of Eden A building and the building on site B will create a complex building with the largest commercial center, the 5-star hotel having a largest number of rooms and the (9) According to the current price of Vincom JSC (10) According to the current price of Vincom JSC 13 Nguyen Thuy Linh-Eden A Building
  • 15. largest underground parking in Ho Chi Minh City in the future, which will be the brand of not only Vincom JSC but also Ho Chi Minh City. As the urbanization trend and the living standard of people is increasing in Ho Chi Minh City, the creation of an ideal place to satisfy perfectly the needs of shopping, living, working of the people is a necessary thing. Therefore, the Eden A project as well as the building on site B will attract more people to use their services, which leads to the investor’s sale will have high results. Furthermore, based on the future urban planning of the City as well as the problems Ho Chi Minh City are facing, this building will bring solutions to solve the parking problem of the City as the number of cars and motorcycles is increasingly and has made the offices and commercial centers become scare in parking space; or to meet the need of the city when it is facing a lack of high-grade hotel, especially at the City Center. No. Criteria Ranking Applied 1 2 3 4 5 Good Bad 1 Market analysis 1 2 3 4 5 2 Location 1 2 3 4 5 3 Architecture and Planning design 1 2 3 4 5 4 Parking capacity 1 2 3 4 5 6 Environmental friendly 1 2 3 4 5 7 The feasibility assessment 1 2 3 4 5 8 Social impact 1 2 3 4 5 9 Total Score 15 Table 8: Summary results of the evaluation Eventually, though this business will have some difficulties and challenges at the beginning period, this is a potential investment. 14 Nguyen Thuy Linh-Eden A Building
  • 16. REFERENCES: Website: http://vincom.com.vn http://www.cbrevietnam.com http://www.savills.com.vn http://vneconomy.vn http://www.skyscrapercity.com Phan, Tran; (2011); Khung hoang bai dau xe (Parking crisis); http://laodong.com.vn/Tin-Tuc/Khung-hoang- bai-dau-xe/38143 Document: Vincom (2011); Project Status_Report for Shareholder’s meeting; published by Vincom CBRE (2011); HCMC Market View Q2/2011; publishes by CBRE Savills (2011);HCMC Retail Briefing; published by Savills QCXDVN 01:2008/BXD;(2008);Vietnam Building Code – Regional and Urban Planning and Rural Residential Planning; published by Vietnam Ministry of Construction; Hanoi 15 Nguyen Thuy Linh-Eden A Building