CONTENTS
•
•
•
•
•
•

What is a risk?
What is risk management?
Principles for managing risk?
Types of software risk?
Risk Analysis
How to control risk in project

2
What is RISK
•
•
•
•

Risk is the probability of suffering loss (an uncertainty)
Risk exposure = Size (loss) * probability of (loss)
There is difference between problem and risk
Problem is some event which has already occurred but risk is
something that is unpredictable.
• Risk provides opportunity to develop the project better
• Example: developer leaving out from a team which is ongoing
with a project

3
RISK MANAGEMENT
• Risk we encounter in a project be reduced so that we
are able to deliver the desired project to customer.
• The project should be managed in such a way that
the risk don’t effect the project in a big way.
• The art of managing the risk effectively so that the
winning situation and friendly situation is established
between team and the customer is called Risk
management
• By using various principles we can manage risk
4
PRINCIPLES OF RISK MANAGEMENT
• Global Perspective: In this we look at the larger system
definitions, design and implementation. We look at the
opportunity and the impact the risk is going to have .
• Forward Looking View: Looking at the possible uncertainties
that might creep up. We also think for the possible solutions
for those risks that might occur in the future.
• Open Communication: This is to enable the free flow of
communication between in the customers and the team
members so that they have clarity about the risks.
5
PRINCIPLES OF RISK MANAGEMENT contd.
• Integrated management: In this phase risk
management is made an integral part of
project management.

• Continuous process :In this phase the risks are
tracked continuously throughout the risk
management paradigm.

6
SOFTWARE RISK
• Project Risks: Threaten the project plan
• Technical Risks: Threaten product quality and the
timeliness of the schedule
• Business Risks: Threaten the viability of the software to
be built (market risks, strategic risks, management
risks, budget risks)
• Known Risks: Predictable from careful evaluation of
current project plan and those extrapolated from past
project experience
• Unknown Risks: Some problems will simply occur
without warning
7
RISK ANALYSIS
• Risk identification
• Risk projection-(impact of risks)
• Risk assessment-(what will change if risk
becomes problem)
• Risk management

8
RISK IDENTIFICATION
• Product-specific risks
– The project plan and software statement of scope are
examined to identify any special characteristics of the
product that may threaten the project plan

• Generic risks
– are potential threats to every software product
•
•
•
•

product size
customer characteristics
development environment
technology to be built

9
RISK PROJECTION
• The risk drivers affecting each risk component
are
– classified according to their impact category
– potential consequences of each undetected
software fault or unachieved project outcome are
described

10
RISK IMPACT
• Risk components
–
–
–
–

performance
cost
support
schedule

• Risk impact
–
–
–
–

negligible
marginal
critical
catastrophic

11
RISK ASSESSMENT
• Define referent levels for each project risk that can
cause project termination
–
–
–
–

performance degradation
cost overrun
support difficulty
schedule slippage

• Attempt to develop a relationship between each risk
triple (risk, probability, impact) and each of the
reference levels
12
RISK TABLE CONSTRUCTION
• List all risks in the first column of the table
• Classify each risk and enter the category label
in second column
• Determine a probability for each risk and
enter it into column three
• Enter the severity of each risk
(negligible, marginal, critical, catastrophic) in
column four.
13
RISK TABLE CONSTRUCTION (contd.)
• Sort the table by probability and impact value
• Determine the criteria for deciding where the
sorted table will be divided into the first
priority concerns and the second priority
concerns
• First priority concerns must be managed (a
fifth column can be added to contain a pointer
into the RMMM document)
14
RISK TABLE MODEL
Risks

Category

Probability

Impact

RMMM

PS

80%

2

**

ST

50%

2

**

DE

50%

2

**

DE

35%

3

Components developed separately cannot be integrated
easily, requiring redesign
Development of the wrong software functions requires
redesign and implementation
Development of extra software functions that are not
needed
Strict requirements for compatibility with existing system
require more testing, design, and implementation than
expected
Operation in unfamiliar software environment causes
unforeseen problems
Team members do not work well together

DE

25%

3

DE

25%

3

DE

20%

3

DE

20%

3

EV

25%

4

ST

20%

4

Key personnel are available only part-time

ST

20%

4

Estimated size of project in LOC or FP
Lack of needed specialization increases defects and
reworks
Unfamiliar areas of the product take more time than
expected to design and implement
Does the environment make use of a database

15
RISK TABLE MODEL

16
RMMM
• Risk Mitigation- Planning
• Risk Monitoring- Assessing, Ensuring,
Collecting information, Determining
• Risk Management- Contingency planning,
Action

17
RISK MANAGEMENT PARADIGM
• Identify: Search for the risks before they create a major problem.

• Analyze: understand the nature , kind of risk and gather information about
the risk.
• Plan: Involves developing actions to address individual risks, prioritizing
• risk actions and creating a Risk Management Plan.
• Track: Monitoring the status of risk.
• Control: Correct the deviation and make any necessary amendments.
• Communicate: Discuss about the emerging risks and the current risks and
the plans to be undertaken.

18
RISK MANAGEMENT PARADIGM

19
CONCLUSION
• To manage the risks we need to establish a strong bond
between the customers and the team members.
• A strong base about risk management would help a great
deal in tackling the risks.

• Software metrics and tools can be developed to manage
the risks.
• Risk necessarily need not be negative and it can be
viewed as an opportunity to develop our projects in a
better way.
20
QUERIES

21
THANK YOU
22

More Related Content

What's hot

Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk ManagementSAJJAD KHUDHUR ABBAS
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentationRaven Morgan
 
Risk Overview & Risk management
Risk Overview & Risk managementRisk Overview & Risk management
Risk Overview & Risk managementSubhendu Datta
 
Risk analysis and management
Risk analysis and managementRisk analysis and management
Risk analysis and managementgnitu
 
Risk identification
Risk identificationRisk identification
Risk identificationmurukkada
 
Risk Management
Risk ManagementRisk Management
Risk Managementcgeorgeo
 
Risk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesRisk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesILRI
 
Risk Management (1) (1).ppt
Risk Management (1) (1).pptRisk Management (1) (1).ppt
Risk Management (1) (1).pptAjjuSingh2
 
Operational risk & incident reporting
Operational risk &  incident reportingOperational risk &  incident reporting
Operational risk & incident reportingShivaLeela Choudary
 

What's hot (20)

Episode 25 : Project Risk Management
Episode 25 :  Project Risk ManagementEpisode 25 :  Project Risk Management
Episode 25 : Project Risk Management
 
Risk strategies presentation
Risk strategies presentationRisk strategies presentation
Risk strategies presentation
 
Risk Overview & Risk management
Risk Overview & Risk managementRisk Overview & Risk management
Risk Overview & Risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Risk analysis and management
Risk analysis and managementRisk analysis and management
Risk analysis and management
 
Risk identification
Risk identificationRisk identification
Risk identification
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Risk management
Risk managementRisk management
Risk management
 
Risk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniquesRisk management: Principles, methodologies and techniques
Risk management: Principles, methodologies and techniques
 
Enterprise Risk Management
Enterprise Risk ManagementEnterprise Risk Management
Enterprise Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Risk management
Risk management Risk management
Risk management
 
Introduction to Risk Management
Introduction to Risk ManagementIntroduction to Risk Management
Introduction to Risk Management
 
Risk Management (1) (1).ppt
Risk Management (1) (1).pptRisk Management (1) (1).ppt
Risk Management (1) (1).ppt
 
Risk Management Training
Risk Management TrainingRisk Management Training
Risk Management Training
 
Operational risk & incident reporting
Operational risk &  incident reportingOperational risk &  incident reporting
Operational risk & incident reporting
 

Viewers also liked

Human Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceHuman Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceThe Windsdor Consulting Group, Inc.
 
Online voting system project
Online voting system projectOnline voting system project
Online voting system projectsnauriyal1994
 
RMMM-Risk Management,Mitigation and Monitoring.
RMMM-Risk Management,Mitigation and Monitoring.RMMM-Risk Management,Mitigation and Monitoring.
RMMM-Risk Management,Mitigation and Monitoring.Aparna Nayak
 
Risk Management and FInancial Engineering_Final Report
Risk Management and FInancial Engineering_Final ReportRisk Management and FInancial Engineering_Final Report
Risk Management and FInancial Engineering_Final ReportMoises Jules Martinez
 
FSA tips for CFA Preparation by Pristine (Annotated)
FSA tips for CFA Preparation by Pristine (Annotated)FSA tips for CFA Preparation by Pristine (Annotated)
FSA tips for CFA Preparation by Pristine (Annotated)Pristine Careers
 
Final 2015 07-16 cfa concept design review
Final 2015 07-16 cfa concept design reviewFinal 2015 07-16 cfa concept design review
Final 2015 07-16 cfa concept design reviewDCPublicLibrary
 
Hse principles and practises [compatibility mode]
Hse principles and practises [compatibility mode]Hse principles and practises [compatibility mode]
Hse principles and practises [compatibility mode]Ali Irfan Kh. (LION)
 
Cfa l1 exam formula & concepts sheet 2013
Cfa l1 exam formula & concepts sheet 2013Cfa l1 exam formula & concepts sheet 2013
Cfa l1 exam formula & concepts sheet 2013analystbuddy
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 
Online voting system
Online voting systemOnline voting system
Online voting systemPooja Jain
 
John Charnes - Financial Modeling with Crystal Ball and Excel - 2007.pdf
John Charnes - Financial Modeling with Crystal Ball and Excel - 2007.pdfJohn Charnes - Financial Modeling with Crystal Ball and Excel - 2007.pdf
John Charnes - Financial Modeling with Crystal Ball and Excel - 2007.pdfAnil
 
Managerial Accounting Mid-term Cheat Sheet
Managerial Accounting  Mid-term Cheat Sheet Managerial Accounting  Mid-term Cheat Sheet
Managerial Accounting Mid-term Cheat Sheet UCFPMBA
 
Basic Risk Identification Techniques
Basic Risk Identification TechniquesBasic Risk Identification Techniques
Basic Risk Identification TechniquesRicardo Viana Vargas
 
Financial Ratios and Formulas for Analysis
Financial Ratios and Formulas for AnalysisFinancial Ratios and Formulas for Analysis
Financial Ratios and Formulas for AnalysisBFSI academy
 
Risk assessment and internal controls - Internal Audit
Risk assessment and internal controls - Internal AuditRisk assessment and internal controls - Internal Audit
Risk assessment and internal controls - Internal AuditSmitesh Bhosale
 
Online voting system ppt by anoop
Online voting system ppt by anoopOnline voting system ppt by anoop
Online voting system ppt by anoopAnoop Kumar
 

Viewers also liked (20)

Human Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk GovernanceHuman Factors as Driver for Safety Management, Engineering, and Risk Governance
Human Factors as Driver for Safety Management, Engineering, and Risk Governance
 
Online voting system project
Online voting system projectOnline voting system project
Online voting system project
 
RMMM-Risk Management,Mitigation and Monitoring.
RMMM-Risk Management,Mitigation and Monitoring.RMMM-Risk Management,Mitigation and Monitoring.
RMMM-Risk Management,Mitigation and Monitoring.
 
Risk Management and FInancial Engineering_Final Report
Risk Management and FInancial Engineering_Final ReportRisk Management and FInancial Engineering_Final Report
Risk Management and FInancial Engineering_Final Report
 
FSA tips for CFA Preparation by Pristine (Annotated)
FSA tips for CFA Preparation by Pristine (Annotated)FSA tips for CFA Preparation by Pristine (Annotated)
FSA tips for CFA Preparation by Pristine (Annotated)
 
Final 2015 07-16 cfa concept design review
Final 2015 07-16 cfa concept design reviewFinal 2015 07-16 cfa concept design review
Final 2015 07-16 cfa concept design review
 
Hse principles and practises [compatibility mode]
Hse principles and practises [compatibility mode]Hse principles and practises [compatibility mode]
Hse principles and practises [compatibility mode]
 
Human Factors
Human FactorsHuman Factors
Human Factors
 
Electronic Voting System
Electronic Voting SystemElectronic Voting System
Electronic Voting System
 
Windsor Consulting Group 2017 OSHA Outreach Training Schedule
Windsor Consulting Group 2017 OSHA Outreach Training ScheduleWindsor Consulting Group 2017 OSHA Outreach Training Schedule
Windsor Consulting Group 2017 OSHA Outreach Training Schedule
 
E voting
E voting E voting
E voting
 
Cfa l1 exam formula & concepts sheet 2013
Cfa l1 exam formula & concepts sheet 2013Cfa l1 exam formula & concepts sheet 2013
Cfa l1 exam formula & concepts sheet 2013
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Online voting system
Online voting systemOnline voting system
Online voting system
 
John Charnes - Financial Modeling with Crystal Ball and Excel - 2007.pdf
John Charnes - Financial Modeling with Crystal Ball and Excel - 2007.pdfJohn Charnes - Financial Modeling with Crystal Ball and Excel - 2007.pdf
John Charnes - Financial Modeling with Crystal Ball and Excel - 2007.pdf
 
Managerial Accounting Mid-term Cheat Sheet
Managerial Accounting  Mid-term Cheat Sheet Managerial Accounting  Mid-term Cheat Sheet
Managerial Accounting Mid-term Cheat Sheet
 
Basic Risk Identification Techniques
Basic Risk Identification TechniquesBasic Risk Identification Techniques
Basic Risk Identification Techniques
 
Financial Ratios and Formulas for Analysis
Financial Ratios and Formulas for AnalysisFinancial Ratios and Formulas for Analysis
Financial Ratios and Formulas for Analysis
 
Risk assessment and internal controls - Internal Audit
Risk assessment and internal controls - Internal AuditRisk assessment and internal controls - Internal Audit
Risk assessment and internal controls - Internal Audit
 
Online voting system ppt by anoop
Online voting system ppt by anoopOnline voting system ppt by anoop
Online voting system ppt by anoop
 

Similar to Risk management

Software Engineering (Risk Management)
Software Engineering (Risk Management)Software Engineering (Risk Management)
Software Engineering (Risk Management)ShudipPal
 
pressman-ch-25-risk-management.ppt
pressman-ch-25-risk-management.pptpressman-ch-25-risk-management.ppt
pressman-ch-25-risk-management.pptMuhammadKashif703372
 
Unit 8-risk manaegement (1) -
Unit 8-risk manaegement (1) - Unit 8-risk manaegement (1) -
Unit 8-risk manaegement (1) - Shashi Kumar
 
OOSE-PRESENTATION.pptx
OOSE-PRESENTATION.pptxOOSE-PRESENTATION.pptx
OOSE-PRESENTATION.pptxRanjitKdk
 
Risk Management
Risk ManagementRisk Management
Risk ManagementSaqib Raza
 
Project Planning and Management.pptx
Project Planning and Management.pptxProject Planning and Management.pptx
Project Planning and Management.pptxvishnupriyapm4
 
Project risk management
Project risk managementProject risk management
Project risk managementMohsin Azam
 
GER_Project_Management_Ch22_summary.pdf
GER_Project_Management_Ch22_summary.pdfGER_Project_Management_Ch22_summary.pdf
GER_Project_Management_Ch22_summary.pdfTigabu Yaya
 
Risk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptRisk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptYasirShaikh34
 
12. Software Project Management.pptx
12. Software Project Management.pptx12. Software Project Management.pptx
12. Software Project Management.pptxmsohail37
 
Risk Mitigation, Monitoring and Management Plan (RMMM)
Risk Mitigation, Monitoring and Management Plan (RMMM)Risk Mitigation, Monitoring and Management Plan (RMMM)
Risk Mitigation, Monitoring and Management Plan (RMMM)Navjyotsinh Jadeja
 
riskanalysis-120305101118-phpapp02.pdf
riskanalysis-120305101118-phpapp02.pdfriskanalysis-120305101118-phpapp02.pdf
riskanalysis-120305101118-phpapp02.pdfWilliamTom9
 

Similar to Risk management (20)

Software Engineering (Risk Management)
Software Engineering (Risk Management)Software Engineering (Risk Management)
Software Engineering (Risk Management)
 
pressman-ch-25-risk-management.ppt
pressman-ch-25-risk-management.pptpressman-ch-25-risk-management.ppt
pressman-ch-25-risk-management.ppt
 
Unit 8-risk manaegement (1) -
Unit 8-risk manaegement (1) - Unit 8-risk manaegement (1) -
Unit 8-risk manaegement (1) -
 
OOSE-PRESENTATION.pptx
OOSE-PRESENTATION.pptxOOSE-PRESENTATION.pptx
OOSE-PRESENTATION.pptx
 
lec6.ppt
lec6.pptlec6.ppt
lec6.ppt
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Project risk analysis
Project risk analysisProject risk analysis
Project risk analysis
 
Unit 7
Unit 7Unit 7
Unit 7
 
Project Planning and Management.pptx
Project Planning and Management.pptxProject Planning and Management.pptx
Project Planning and Management.pptx
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Risk analysis
Risk analysisRisk analysis
Risk analysis
 
Risk Analysis.pdf
Risk Analysis.pdfRisk Analysis.pdf
Risk Analysis.pdf
 
GER_Project_Management_Ch22_summary.pdf
GER_Project_Management_Ch22_summary.pdfGER_Project_Management_Ch22_summary.pdf
GER_Project_Management_Ch22_summary.pdf
 
risk managment and quality
risk managment and qualityrisk managment and quality
risk managment and quality
 
Risk management lec. 06
Risk management lec. 06Risk management lec. 06
Risk management lec. 06
 
Risk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptRisk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.ppt
 
12. Software Project Management.pptx
12. Software Project Management.pptx12. Software Project Management.pptx
12. Software Project Management.pptx
 
Risk Mitigation, Monitoring and Management Plan (RMMM)
Risk Mitigation, Monitoring and Management Plan (RMMM)Risk Mitigation, Monitoring and Management Plan (RMMM)
Risk Mitigation, Monitoring and Management Plan (RMMM)
 
Bai giang-spm-06mar14
Bai giang-spm-06mar14Bai giang-spm-06mar14
Bai giang-spm-06mar14
 
riskanalysis-120305101118-phpapp02.pdf
riskanalysis-120305101118-phpapp02.pdfriskanalysis-120305101118-phpapp02.pdf
riskanalysis-120305101118-phpapp02.pdf
 

Recently uploaded

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 

Recently uploaded (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 

Risk management

  • 2. CONTENTS • • • • • • What is a risk? What is risk management? Principles for managing risk? Types of software risk? Risk Analysis How to control risk in project 2
  • 3. What is RISK • • • • Risk is the probability of suffering loss (an uncertainty) Risk exposure = Size (loss) * probability of (loss) There is difference between problem and risk Problem is some event which has already occurred but risk is something that is unpredictable. • Risk provides opportunity to develop the project better • Example: developer leaving out from a team which is ongoing with a project 3
  • 4. RISK MANAGEMENT • Risk we encounter in a project be reduced so that we are able to deliver the desired project to customer. • The project should be managed in such a way that the risk don’t effect the project in a big way. • The art of managing the risk effectively so that the winning situation and friendly situation is established between team and the customer is called Risk management • By using various principles we can manage risk 4
  • 5. PRINCIPLES OF RISK MANAGEMENT • Global Perspective: In this we look at the larger system definitions, design and implementation. We look at the opportunity and the impact the risk is going to have . • Forward Looking View: Looking at the possible uncertainties that might creep up. We also think for the possible solutions for those risks that might occur in the future. • Open Communication: This is to enable the free flow of communication between in the customers and the team members so that they have clarity about the risks. 5
  • 6. PRINCIPLES OF RISK MANAGEMENT contd. • Integrated management: In this phase risk management is made an integral part of project management. • Continuous process :In this phase the risks are tracked continuously throughout the risk management paradigm. 6
  • 7. SOFTWARE RISK • Project Risks: Threaten the project plan • Technical Risks: Threaten product quality and the timeliness of the schedule • Business Risks: Threaten the viability of the software to be built (market risks, strategic risks, management risks, budget risks) • Known Risks: Predictable from careful evaluation of current project plan and those extrapolated from past project experience • Unknown Risks: Some problems will simply occur without warning 7
  • 8. RISK ANALYSIS • Risk identification • Risk projection-(impact of risks) • Risk assessment-(what will change if risk becomes problem) • Risk management 8
  • 9. RISK IDENTIFICATION • Product-specific risks – The project plan and software statement of scope are examined to identify any special characteristics of the product that may threaten the project plan • Generic risks – are potential threats to every software product • • • • product size customer characteristics development environment technology to be built 9
  • 10. RISK PROJECTION • The risk drivers affecting each risk component are – classified according to their impact category – potential consequences of each undetected software fault or unachieved project outcome are described 10
  • 11. RISK IMPACT • Risk components – – – – performance cost support schedule • Risk impact – – – – negligible marginal critical catastrophic 11
  • 12. RISK ASSESSMENT • Define referent levels for each project risk that can cause project termination – – – – performance degradation cost overrun support difficulty schedule slippage • Attempt to develop a relationship between each risk triple (risk, probability, impact) and each of the reference levels 12
  • 13. RISK TABLE CONSTRUCTION • List all risks in the first column of the table • Classify each risk and enter the category label in second column • Determine a probability for each risk and enter it into column three • Enter the severity of each risk (negligible, marginal, critical, catastrophic) in column four. 13
  • 14. RISK TABLE CONSTRUCTION (contd.) • Sort the table by probability and impact value • Determine the criteria for deciding where the sorted table will be divided into the first priority concerns and the second priority concerns • First priority concerns must be managed (a fifth column can be added to contain a pointer into the RMMM document) 14
  • 15. RISK TABLE MODEL Risks Category Probability Impact RMMM PS 80% 2 ** ST 50% 2 ** DE 50% 2 ** DE 35% 3 Components developed separately cannot be integrated easily, requiring redesign Development of the wrong software functions requires redesign and implementation Development of extra software functions that are not needed Strict requirements for compatibility with existing system require more testing, design, and implementation than expected Operation in unfamiliar software environment causes unforeseen problems Team members do not work well together DE 25% 3 DE 25% 3 DE 20% 3 DE 20% 3 EV 25% 4 ST 20% 4 Key personnel are available only part-time ST 20% 4 Estimated size of project in LOC or FP Lack of needed specialization increases defects and reworks Unfamiliar areas of the product take more time than expected to design and implement Does the environment make use of a database 15
  • 17. RMMM • Risk Mitigation- Planning • Risk Monitoring- Assessing, Ensuring, Collecting information, Determining • Risk Management- Contingency planning, Action 17
  • 18. RISK MANAGEMENT PARADIGM • Identify: Search for the risks before they create a major problem. • Analyze: understand the nature , kind of risk and gather information about the risk. • Plan: Involves developing actions to address individual risks, prioritizing • risk actions and creating a Risk Management Plan. • Track: Monitoring the status of risk. • Control: Correct the deviation and make any necessary amendments. • Communicate: Discuss about the emerging risks and the current risks and the plans to be undertaken. 18
  • 20. CONCLUSION • To manage the risks we need to establish a strong bond between the customers and the team members. • A strong base about risk management would help a great deal in tackling the risks. • Software metrics and tools can be developed to manage the risks. • Risk necessarily need not be negative and it can be viewed as an opportunity to develop our projects in a better way. 20