Mais conteúdo relacionado
Semelhante a Civils & buildings_part_2 (20)
Mais de AHMED NADIM JILANI (20)
Civils & buildings_part_2
- 1. Not Protectively Marked - New Nuclear Opportunities © 13 September 2010 EDF Energy plc. All rights Reserved. Welcome to New Nuclear Opportunities UK National Supplier Day Event
- 2. Not Protectively Marked - New Nuclear Opportunities © 13 September 2010 EDF Energy plc. All rights Reserved. Client’s Specifications for Civil Works Frederic COPPEL – EDF/CEIDRE Lee BROCKLEHURST - AMEC
- 4. Not Protectively Marked - New Nuclear Opportunities © 13 September 2010 EDF Energy plc. All rights Reserved. Part 1 ETC-C and Client’s Family of Documents Client’s General Specification Adaptation to UK context
- 5. ETC-C and Client’s Family of Documents ETC-C For a given domain based on standards For a given material or equipment « with » standards For a given material or equipement« without » standards Part 1: Conception Part 2: Construction Part 3: Testing CGS + CPS BTS or + CPS CST CRT + CPS Safety Authorities Contracts For safety classified buildings Earthworks Preliminary works Marine works Steelwork Concrete pipes Main Civil works contract (nuclear island) Metalwork fabrication Access for materials Control system for injection of construction joint seals Turbine Pumps Pipes Not Protectively Marked- New Nuclear Opportunities © 13 September 2010 EDF Energy plc. All rights Reserved.
- 9. Not Protectively Marked - New Nuclear Opportunities © 13 September 2010 EDF Energy plc. All rights Reserved. Part 2 Discussion of Notable Requirements - Concrete - Reinforcement - Pre-stressing system