13. Hampers Economic Growth Lower Corporate Investments Affects Country’s Global Competitiveness Affects the profitability of production, levels of income, output and employment Slows down the pace with which a country can integrate its’ economy into the global system Hinders expansion in areas with poor infrastructure and lesser developed areas Poor Urban Infrastructure AEON Consultants Poor urban service coverage is the main hindrance to a city’s ability to attract investments which promote economic development Inadequate Indian Urban Infrastructure – Impact ?
14. Source: Economic Forum’s Global Competitive Report of FY07; *From a list of 14 factors, respondents were asked to select the five most problematic for doing business in India and to rank them from 1 to 5. Figure 27 shows responses weighted according to their rankings, where higher the figure the more problematic the factor AEON Consultants Inadequate Indian Urban Infrastructure – Impact ? Total 4 11 1.2 3.1 1 27 3 18 1.3 4.5 3.2 15 5 7 0 5 10 15 20 25 30 Access to finance Corruption Crime and theft Foreign currency regulations Government instability/coups Inadequate supply of infrastructure Inadequately educated w orkforce inefficient government Inflation Policy instability Poor w ork ethic in national labor Restrictive labor regulations Tax rates Tax regulations Total weighted responses Bottlenecks
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26. AEON Consultants PPP – Public Private Partnership ? Types of Contracts Asset Ownership O&M Capital Investment Commercial Risk Duration (Yrs) Service Contract Public Private & Public Public Public 1-2 Management Contract Public Private Public Public 3-5 Lease Public Private Public Private 8-15 Concession Public Private Private Private 25-30 BOT/BOOT Private & Public Private Private Private 25-30
31. AEON Consultants Traffic & Capacity for major ports for last 6 years YEAR TRAFFIC (Million Tonnes) GROWTH CAPACITY (Million Tonnes) GROWTH 2001-02 287.59 343.95 2002-03 313.55 9.03 362.75 5.47 2003-04 344.8 9.97 389.5 7.37 2004-05 383.75 11.30 397.5 2.05 2005-06 463 20.57 457.125 15 2006-07 519 12.09 660 15 AVERAGE GROWTH (%) 12.52 AVERAGE GROWTH (%) 8.97
32. AEON Consultants PROJECTED TRAFFIC (Million Tonnes) @ 15% growth per annum PROJECTED CAPACITY (Million Tonnes) 2007-08 583.64 2007-08 758.73 2008-09 671.18 2008-09 872.54 2009-10 771.86 2009-10 1003.42 2010-11 887.64 2010-11 1153.93 2011-12 1020.78 2011-12 1327.00 2012-13 1173.90 2012-13 1526.00 Projected traffic & capacity for major ports for next 6 years
33.
34.
35.
36.
37.
38.
39.
40.
41.
42. Source : INCAP (Infrastructure Corporation of Andhra Pradesh) AEON Consultants SECTOR SKLM VZM VSP EAST GODV. TRANSPORTATION TOTAL PROJECT 1. a) Coastal Roads 130 km 52 km 100 km 156 km 438 KM Pre-feasibility study on 1.existing road pattern a. nature, serviceability, land availability, New alignment with connectivity to other salient units under, the proposed corridor b) Link roads 0 68 80 80 228 KM 130 120 180 236 666 KM 2. Rail Network 2 track Port link Railwayline 60 km 20 km 60 km 60 km 200 KM Study on existing rail links between ports and feasibility for further requirement in the light of goods & cargo handling in the ports. 3. Coastal Sea route Establishment of sea route along the North coastal districts. Preliminary report prepared for total investment of Rs. 4628.80 crores(~USD1.028 billion) 4. Air Links a) Air Ports 0 0 2 1 3 Pre-feasibility study to be done for each air port. b) Helistations 2 2 2 4 10 PORTS Port wise feasibility study to be conducted for its initial feasibility. 1.Major Ports 0 0 1 1 2 2. Minor Ports 4 1 4 5 14 POWER Pre-feasibility study to be done for each power plant for its potential features. Power Plants a) Conventional 2 2 2 2 8 b) Barge based 1 1 1 1 4 c) Non-conventional 6 6 6 6 24 AP NORTH COASTAL CORRIDOR – Development Plans