SlideShare uma empresa Scribd logo
1 de 2
GENERAL RISK ASSESSMENT


                                                                 All college Sites
PROGRAMME AREA                                                                                              REF NO.     RA 2



TASK/OPERATION BEING ASSESSED                             CURRICULUM LESSONS IN A GENERAL CLASSROOM



                                                     PURPOSE/METHOD OF WORK
For: All Programme Areas

Purpose:
To provide lessons to students covering those parts of the curriculum requiring little or no practical elements.

Lessons take place within a standard classroom environment.

Method:
1. Ensure that the classroom and layout are appropriate for the type of lesson to be taught.
2. Ensure that adequate materials and work equipment are available to hand in accordance with the lesson plan.
3. Ensure that appropriate fire precautions/extinguishers are in place.
4. Ensure adequate supervision and/or assistance available for the projected work.
5. Ensure that in the case of a practical session, only sufficient material is available to each pupil to enable the objective to be achieved.
6. Instruct the student in the methods to be adopted.




          SPECIFIC LEGISLATIVE REQUIREMENTS                                               LEVEL OF SKILL/TRAINING REQUIRED
Health & Safety at Work etc. Act                                                  Qualified Lecturer
Management of Health & Safety at Work Regulations
Control of Substances Hazardous to Health Regulations
Electricity at Work Regulations
Personal Protective Equipment at Work Regulations
Provision and Use of Work Equipment Regulations
Workplace (Health, Safety & Welfare) Regulations



CHEMICALS/MATERIALS               HSC NO.       ASSESSMENT                              SPECIFIC WORK EQUIPMENT PROVIDED
INVOLVED                                        DATE
                                                                                  Writing materials and implements
                                                                                  Visual teaching aids (smart boards, whiteboards, OHP’s,
                                                                                  TV, Video, etc.)
                                                                                  Art materials
                                                                                  Computer and Peripherals




MAIN HAZARDS IDENTIFIED                  WHO WILL BE AFFECTED                    CONTROL MEASURES TO REDUCE THE RISK
Substances                               Students                                Only non-toxic paints and glues etc. to be used.

                                         Students and Lecturer                   Ensure adequate lighting.
General
                                                                                 Ensure classroom temperature appropriate. Appropriate
                                                                                 clothing to be worn. Sensible footwear to be worn (not
                                                                                 sandals, high heels etc.)
                                                                                 Each student to have adequate workspace.




Sharp implements (scissors)              Students
Instruction given to students regarding hazards present
                                                                       within the classroom. Art materials and implements to be
                                                                       kept out of reach of students when not in use.
                                                                       A person qualified to administer first aid should be
                                                                       identifiable and available. First aid box must be available
                                                                       and stocked according to the list supplied.

Electricity                              Students and Lecturer         All mains powered portable electrical appliances to be in
                                                                       good working order and tested for electrical safety.

                                                                       Leads should be visually examined for damage before
                                                                       using. Damaged electrical leads must not be used.
                                                                       Equipment must be removed from service and repaired
                                                                       before re-use.
                                                                       Avoid trailing leads around edges of furniture or
                                                                       equipment that may cause damage. When transporting
                                                                       equipment, take care not to damage the lead.
                                                                       Mains leads etc. not to be permitted to trail across
                                                                       walkways, near heated surfaces etc.
                                                                       Each item of electrical equipment to have its own 240 volt
                                                                       socket. All 240 volt outlets to be connected via an ELCB
                                                                       or equivalent.

Manual handling                          Students                      Where moving equipment may involve risk to students
                                                                       (e.g. moving music equipment), an assessment must be
                                                                       undertaken to establish a safe working procedure for
                                                                       lifting and carrying.

Slip/Trip hazards                        Students and Staff
                                                                       Keep all gangways clear of obstructions. Coats, bags etc.
                                                                       to be hung on pegs.
                                                                       Floors to be maintained in good, clean condition, without
                                                                       missing tiles, rips in linoleum etc.
                                                                       Trailing leads not permitted to cross travel areas etc.
                                                                       Materials to be stacked safely out of travel areas.
                                                                       Keep floors and gangways dry and free from slip hazards.
                                                                       Clear up any spillage’s immediately.
Fire                                     Students and Staff
                                                                       Fire escape routes and exits to be kept clear of
                                                                       obstructions at all times and clearly marked with approved
                                                                       signs.
                                                                       Fire extinguishers and alarm points to be kept clear of
                                                                       obstruction at all times.
                                                                       Learners to be instructed in emergency evacuation
                                                                       procedure.


                    MANUAL HANDLING RISK                             PERSONAL PROTECTIVE EQUIPMENT REQUIRED

Has a manual handling risk been identified?            YES           N/A
Is the risk considered to be                           Low
Is a further detailed assessment required?              NO

If the answer to the above question is YES a separate manual         Is training and instruction required             NO
handling assessment will be required to fulfil the requirements of   Is there need for special accommodation          NO
the Manual Handling Operations Regulations 1992.                     Is there need for test/examination               NO
                                                                     Is all P. P. E. compatible                       N/A


                  FREQUENCY OF MONITORING                                         ASSESSMENT REVIEW PERIOD

  N/A         3           6 Months     1 Year         > 1 Year       < 1 Year     2 Years     3 Years      4 Years      >4
                     M                                                                                                  Years
                     o
                     nt
                     hs

                              X                                                      X

Mais conteúdo relacionado

Semelhante a Classrooms 09

Classrooms 09
Classrooms 09Classrooms 09
Classrooms 09Jason
 
Risk Assessment Classrooms
Risk Assessment ClassroomsRisk Assessment Classrooms
Risk Assessment ClassroomsJoshuaGillypoop
 
Risk assessment classrooms_09
Risk assessment classrooms_09Risk assessment classrooms_09
Risk assessment classrooms_09Fryers
 
Class risk assessment
Class risk assessmentClass risk assessment
Class risk assessmentConnahTilley
 
Risk assessment classrooms_09
Risk assessment classrooms_09Risk assessment classrooms_09
Risk assessment classrooms_09dontask5555
 
Risk assessment classrooms_09
Risk assessment classrooms_09Risk assessment classrooms_09
Risk assessment classrooms_09JoeBrannigan
 
Module 5 Electrical Safety Protective Methods.pdf
Module 5 Electrical Safety Protective Methods.pdfModule 5 Electrical Safety Protective Methods.pdf
Module 5 Electrical Safety Protective Methods.pdfFrancisco Laddaran
 
Hs safety contract 2011 2012
Hs safety contract 2011 2012Hs safety contract 2011 2012
Hs safety contract 2011 2012sbarkanic
 
Module 3 Safety Related Work Practices.pdf
Module 3 Safety Related Work Practices.pdfModule 3 Safety Related Work Practices.pdf
Module 3 Safety Related Work Practices.pdfFrancisco Laddaran
 
civil tech learning module.docx
civil tech learning module.docxcivil tech learning module.docx
civil tech learning module.docxjohnvincentmanalo5
 
Wt4603 outline2010 11
Wt4603 outline2010 11Wt4603 outline2010 11
Wt4603 outline2010 11JOE LYSTER
 
Task 3.2 greifenberg
Task 3.2 greifenbergTask 3.2 greifenberg
Task 3.2 greifenbergSLOPE Project
 

Semelhante a Classrooms 09 (19)

Classrooms 09
Classrooms 09Classrooms 09
Classrooms 09
 
Classrooms 09
Classrooms 09Classrooms 09
Classrooms 09
 
Risk Assessment Classrooms
Risk Assessment ClassroomsRisk Assessment Classrooms
Risk Assessment Classrooms
 
Risk assessment classrooms_09
Risk assessment classrooms_09Risk assessment classrooms_09
Risk assessment classrooms_09
 
Class risk assessment
Class risk assessmentClass risk assessment
Class risk assessment
 
Classrooms
ClassroomsClassrooms
Classrooms
 
Risk assessment classrooms_09
Risk assessment classrooms_09Risk assessment classrooms_09
Risk assessment classrooms_09
 
Risk assessment classrooms_09
Risk assessment classrooms_09Risk assessment classrooms_09
Risk assessment classrooms_09
 
DLL_TLE ICT CSS 10_Q1_D3final.docx
DLL_TLE  ICT CSS 10_Q1_D3final.docxDLL_TLE  ICT CSS 10_Q1_D3final.docx
DLL_TLE ICT CSS 10_Q1_D3final.docx
 
DLL_TLE ICT CSS 10_Q1_D3.docx
DLL_TLE  ICT CSS 10_Q1_D3.docxDLL_TLE  ICT CSS 10_Q1_D3.docx
DLL_TLE ICT CSS 10_Q1_D3.docx
 
Module 5 Electrical Safety Protective Methods.pdf
Module 5 Electrical Safety Protective Methods.pdfModule 5 Electrical Safety Protective Methods.pdf
Module 5 Electrical Safety Protective Methods.pdf
 
Hs safety contract 2011 2012
Hs safety contract 2011 2012Hs safety contract 2011 2012
Hs safety contract 2011 2012
 
Module 3 Safety Related Work Practices.pdf
Module 3 Safety Related Work Practices.pdfModule 3 Safety Related Work Practices.pdf
Module 3 Safety Related Work Practices.pdf
 
Tle 9 week 3
Tle 9 week 3Tle 9 week 3
Tle 9 week 3
 
civil tech learning module.docx
civil tech learning module.docxcivil tech learning module.docx
civil tech learning module.docx
 
Wt4603 outline2010 11
Wt4603 outline2010 11Wt4603 outline2010 11
Wt4603 outline2010 11
 
Task 3.2 greifenberg
Task 3.2 greifenbergTask 3.2 greifenberg
Task 3.2 greifenberg
 
DLL_TLE ICT CSS 9_Q1_D_3.docx
DLL_TLE  ICT CSS 9_Q1_D_3.docxDLL_TLE  ICT CSS 9_Q1_D_3.docx
DLL_TLE ICT CSS 9_Q1_D_3.docx
 
DLL_TLE ICT CSS 10_Q1_D2.docx
DLL_TLE  ICT CSS 10_Q1_D2.docxDLL_TLE  ICT CSS 10_Q1_D2.docx
DLL_TLE ICT CSS 10_Q1_D2.docx
 

Mais de munroAnimations

Final Major Project Task 2
Final Major Project Task 2Final Major Project Task 2
Final Major Project Task 2munroAnimations
 
Unit 78 digital graphics for computer games
Unit 78 digital graphics for computer gamesUnit 78 digital graphics for computer games
Unit 78 digital graphics for computer gamesmunroAnimations
 
Figurative artist research
Figurative artist researchFigurative artist research
Figurative artist researchmunroAnimations
 
Unit 78 digital graphics for computer games
Unit 78 digital graphics for computer gamesUnit 78 digital graphics for computer games
Unit 78 digital graphics for computer gamesmunroAnimations
 
Game Maker Sound Proggraming
Game Maker Sound Proggraming Game Maker Sound Proggraming
Game Maker Sound Proggraming munroAnimations
 
Questionnaire 23 01-2012
Questionnaire 23 01-2012Questionnaire 23 01-2012
Questionnaire 23 01-2012munroAnimations
 
CREATING A SAMPLE LIBRARY
CREATING A SAMPLE LIBRARYCREATING A SAMPLE LIBRARY
CREATING A SAMPLE LIBRARYmunroAnimations
 
Value chain presentation
Value chain presentationValue chain presentation
Value chain presentationmunroAnimations
 
Game development industry
Game development industryGame development industry
Game development industrymunroAnimations
 

Mais de munroAnimations (15)

Presentation
PresentationPresentation
Presentation
 
Final Major Project Task 2
Final Major Project Task 2Final Major Project Task 2
Final Major Project Task 2
 
Ident research
Ident researchIdent research
Ident research
 
Unit 78 technical file
Unit 78 technical fileUnit 78 technical file
Unit 78 technical file
 
Unit 78 digital graphics for computer games
Unit 78 digital graphics for computer gamesUnit 78 digital graphics for computer games
Unit 78 digital graphics for computer games
 
Figurative artist research
Figurative artist researchFigurative artist research
Figurative artist research
 
Unit 78 digital graphics for computer games
Unit 78 digital graphics for computer gamesUnit 78 digital graphics for computer games
Unit 78 digital graphics for computer games
 
HA5 article plan
HA5 article planHA5 article plan
HA5 article plan
 
Art book
Art book Art book
Art book
 
Game Maker Sound Proggraming
Game Maker Sound Proggraming Game Maker Sound Proggraming
Game Maker Sound Proggraming
 
Questionnaire 23 01-2012
Questionnaire 23 01-2012Questionnaire 23 01-2012
Questionnaire 23 01-2012
 
Sims schedule completed
Sims schedule completedSims schedule completed
Sims schedule completed
 
CREATING A SAMPLE LIBRARY
CREATING A SAMPLE LIBRARYCREATING A SAMPLE LIBRARY
CREATING A SAMPLE LIBRARY
 
Value chain presentation
Value chain presentationValue chain presentation
Value chain presentation
 
Game development industry
Game development industryGame development industry
Game development industry
 

Classrooms 09

  • 1. GENERAL RISK ASSESSMENT All college Sites PROGRAMME AREA REF NO. RA 2 TASK/OPERATION BEING ASSESSED CURRICULUM LESSONS IN A GENERAL CLASSROOM PURPOSE/METHOD OF WORK For: All Programme Areas Purpose: To provide lessons to students covering those parts of the curriculum requiring little or no practical elements. Lessons take place within a standard classroom environment. Method: 1. Ensure that the classroom and layout are appropriate for the type of lesson to be taught. 2. Ensure that adequate materials and work equipment are available to hand in accordance with the lesson plan. 3. Ensure that appropriate fire precautions/extinguishers are in place. 4. Ensure adequate supervision and/or assistance available for the projected work. 5. Ensure that in the case of a practical session, only sufficient material is available to each pupil to enable the objective to be achieved. 6. Instruct the student in the methods to be adopted. SPECIFIC LEGISLATIVE REQUIREMENTS LEVEL OF SKILL/TRAINING REQUIRED Health & Safety at Work etc. Act Qualified Lecturer Management of Health & Safety at Work Regulations Control of Substances Hazardous to Health Regulations Electricity at Work Regulations Personal Protective Equipment at Work Regulations Provision and Use of Work Equipment Regulations Workplace (Health, Safety & Welfare) Regulations CHEMICALS/MATERIALS HSC NO. ASSESSMENT SPECIFIC WORK EQUIPMENT PROVIDED INVOLVED DATE Writing materials and implements Visual teaching aids (smart boards, whiteboards, OHP’s, TV, Video, etc.) Art materials Computer and Peripherals MAIN HAZARDS IDENTIFIED WHO WILL BE AFFECTED CONTROL MEASURES TO REDUCE THE RISK Substances Students Only non-toxic paints and glues etc. to be used. Students and Lecturer Ensure adequate lighting. General Ensure classroom temperature appropriate. Appropriate clothing to be worn. Sensible footwear to be worn (not sandals, high heels etc.) Each student to have adequate workspace. Sharp implements (scissors) Students
  • 2. Instruction given to students regarding hazards present within the classroom. Art materials and implements to be kept out of reach of students when not in use. A person qualified to administer first aid should be identifiable and available. First aid box must be available and stocked according to the list supplied. Electricity Students and Lecturer All mains powered portable electrical appliances to be in good working order and tested for electrical safety. Leads should be visually examined for damage before using. Damaged electrical leads must not be used. Equipment must be removed from service and repaired before re-use. Avoid trailing leads around edges of furniture or equipment that may cause damage. When transporting equipment, take care not to damage the lead. Mains leads etc. not to be permitted to trail across walkways, near heated surfaces etc. Each item of electrical equipment to have its own 240 volt socket. All 240 volt outlets to be connected via an ELCB or equivalent. Manual handling Students Where moving equipment may involve risk to students (e.g. moving music equipment), an assessment must be undertaken to establish a safe working procedure for lifting and carrying. Slip/Trip hazards Students and Staff Keep all gangways clear of obstructions. Coats, bags etc. to be hung on pegs. Floors to be maintained in good, clean condition, without missing tiles, rips in linoleum etc. Trailing leads not permitted to cross travel areas etc. Materials to be stacked safely out of travel areas. Keep floors and gangways dry and free from slip hazards. Clear up any spillage’s immediately. Fire Students and Staff Fire escape routes and exits to be kept clear of obstructions at all times and clearly marked with approved signs. Fire extinguishers and alarm points to be kept clear of obstruction at all times. Learners to be instructed in emergency evacuation procedure. MANUAL HANDLING RISK PERSONAL PROTECTIVE EQUIPMENT REQUIRED Has a manual handling risk been identified? YES N/A Is the risk considered to be Low Is a further detailed assessment required? NO If the answer to the above question is YES a separate manual Is training and instruction required NO handling assessment will be required to fulfil the requirements of Is there need for special accommodation NO the Manual Handling Operations Regulations 1992. Is there need for test/examination NO Is all P. P. E. compatible N/A FREQUENCY OF MONITORING ASSESSMENT REVIEW PERIOD N/A 3 6 Months 1 Year > 1 Year < 1 Year 2 Years 3 Years 4 Years >4 M Years o nt hs X X