CORPORATE PRESENTATION
SEPTEMBER 2006
COMPANY PROFILE                   COMPANY OVERVIEW




MMX was created by a team of mining specialists led by Eike Batista

Experienced management team

Majority of Board of Directors members are independent

Audit Committee already installed - members appointed by Board of Directors

Focus on iron ore provided by high-quality products

Integrated mining operations and metallics plants connected to independent
logistics, structured in self-sufficient systems

Environmental and social responsibility

Listed in the Novo Mercado - BOVESPA




                                                                              1
COMPANY PROFILE                           CORPORATE STRUCTURE




             70%                 70%                  70%                99.9%


           MMX                 MMX                 MMX
                                                                       MMX
          Corumbá             Amapá              Minas-Rio
                          (Mine+Railway+Port)   (Mine+Railway+Port)   Metálicos




Cleveland Cliffs proposes to buy 30% stake in MMX Amapá for US$ 133 million

 Centennial Asset is negotiating with strategic partners a 30% stake interest
                                in each System.



                                                                                   2
COMPANY PROFILE          MMXM3 IN NOVO MERCADO - BOVESPA



                                                                        IPO at the BOVESPA – July/2006
    Successful IPO                                                          Largest offering held in Brazil
                                                                                              (US$ terms)
        R$ 1,119 million (US$ 509 million)

        1,373,000 subscribed shares

         Free float 32% of capital, 91%
        foreign-held

      Capital Stock – 3,804,000 common shares



Controlling
                                      Free Float   Stock Split Program           IPO price
Shareholder and
Management                   32%                   July 2006                     R$ 815.00
                                                   January 2007                  R$ 407.50
                    68%                            July 2007                     R$ 203.75
                                                   January 2008                  R$ 20.40


                                                   MMXM3 = price per share, minimum lot of 100 shares.

                                                                                                              3
COMPANY PROFILE             MMX INTEGRATED SYSTEMS



                                                          MMX Amapá System
                                                           Iron Ore Fines: 6.5 Mtpy
                                                           Pig Iron:       2.0 Mtpy
                                                           Semi-finished: 0.5 Mtpy



                                                           MMX Minas-Rio System
                                                              Iron Ore:      26.6 Mtpy
                                                              Pellets:        7.0 Mtpy


MMX Corumbá System
 Iron Ore:        4.9 Mtpy
 Pig Iron:        0.4 Mtpy
                                                             Natural Reserve
 Semi-finished:   0.5 Mtpy
                                                             Engineer Eliezer Batista


                                          MMX Integrated Systems develop and operate iron-
                                          ore mines, pig-iron and semi-finished plants and a
                                          pelletizing plant.



                                                                                               4
OPERATIONAL STATUS                  MMX SYSTEMS EVOLUTION




Auditing of the System’s resources and mineral reserves (as of March 2006)
  under way - Canadian Standard NI-43.101 – disclosure is expected in November;



Improvements in the mineral resource drilling campaign (August, 2006):

  Corumbá – 1,583 additional meters to the 831 meters reported in March, 2006

  Amapá –    7,916 additional meters to the 12,062 meters reported in March, 2006

  Minas-Rio – 6,847 additional meters to the 9,286 meters reported in March, 2006




Centralized monitoring of engineering studies and projects – new office in Belo
  Horizonte;



                                                                                    5
OPERATIONAL STATUS                        MMX SYSTEMS EVOLUTION




Engineer Eliezer Batista Heritage Reserve – a private protect area of 17,000 hectares
  in the most preserved area of the Pantanal, in an unique ecological corridor;



Corumbá MMX System:

  Mine 63 operational, first iron ore exports in July, 2006

  Increasing pace of production, in line with expectations ( 1Mt )

  Pig Iron Plant – Installation Permitt granted in August, construction of blast furnace begins
  in September, 2006

  9 additional mining rights (total of 21), 18 rights to be measured




                                                                                                  6
OPERATIONAL STATUS                  MMX SYSTEMS EVOLUTION


Amapá MMX System:

  Amapá Mine – Installation Permitt granted in August, 2006, outsourced engineering company
  has been retained

    - Leveling and barrage works to begin in September – 500 indirect jobs

    - Acquisition of 100% of the equipment for the operation – delivery in March 2007

  Railway – Operating Permitt granted in August, 2006

    - Progress in equipment and railway repairs

  Santana Port – Preliminary Permitt granted in August, 2006

    - Port terminal to be built on a 71 hectare site – start-up scheduled for December 2006

Minas-Rio MMX System:

  Iron ore Pipeline – IBAMA approved the EIA-RIMA in September, construction is expected to
  begin in mid-2007

  3 additional mining rights (27), 22 rights to be measured
                                                                                              7
OPERATIONAL STATUS                              MMX PROJECTS TIMELINE




Vertically Integrated High Value-Added Projects

                                                                                                                             37
                                                                                                           31

                                                                                          19


  Production of Iron ore (Mt)
                                                                          9
   Production of pig iron (Mt)
                                                             4                                                  1.5                1.5 1.0
   Production of semi-finished (Mt)                                            0.7 0.1          1.3 0.5                1.0
                                                  1               0.2

   2003              2004           2005           2006          2007         2008             2009             2010              2011
                                 Engineering;   Amapá        Start-up                                      Start-up Pellet
                                                                          Start-up Mini   Start-up Minas   Plant
       Asset acquisitions        beginning of   Railway      Amapá Mine   Mill Corumbá    -Rio System      Minas-Rio
                                 drilling       Concession                                                 System

                                 Start-up                    Start-up     Start-up Pig    Start-up Mini
                                 Corumbá                     Pig Iron     Iron Amapá      Mill Amapá
                                 Mine                        Corumbá




                                                                                                                                             8
OPERATIONAL STATUS                      ENVIRONMENTAL PERMITT TIMELINE



MMX Systems

Corumbá
Mine and processing
Pig Iron Mill
Mini Mill

Amapá
Mine and processing
Port
Pig Iron Mill
Mini Mill

Minas-Rio
Mine
 Processing
Pipeline
Port
Pellet Plant
                         2005   Q1    Q2   Q3    Q4     Q1    Q2   Q3   Q4   Q1   Q2   Q3   Q4   Q1   Q2     Q3   Q4   Q1   Q2
                                       2006                    2007                2008                   2009          2010



     Preliminary Permitt – approves project studies                                    PERMITT GRANTED
     Installation Permitt– authorizes infra-structure works                            PERMITT EXPECTED
     Operating Permitt – authorizes project operation                                  OPERATIONAL START-UP


                                                                                                                            9
OPERATIONAL STATUS                                   CAPEX DISBURSEMENT TIMETABLE


                                                                                                        MMX Corumbá
          CAPEX – MMX Integrated Systems
                                                     1,132.9
                                                                                                45.9
                                                                                                               79.6                         Metallics
                                                                                                                                22.9
                                                                                                                                            Mine
                                   771.6                                                        41.6
                                                                                                               13.0

                                                                                                2006           2007             2008
                                                                          427.4
                                             381.8                                                       MMX Amapá
                           293.8
                                                                    153                       5.4
               134.3
   87.5 86.6           92.6
                                           22.9                                                        180.5
                                                                0                                                     303.8
                                                                                             81.2                                 153        Metallics
          2006                2007            2008              2009-2013                                                                    Mine
                                                                                                       113.3
                                                            Minas-Rio                                                  78
             Corumbá                  Amapá
                                                                                             2006      2007           2008     2009-2013
                       Total (*)     2006           2007         2008      2009 - 2013
Total                  3,601.9       308.4        1,158.0      1,537.6           580.4                 MMX Minas-Rio
 Mine & logistics      2,377.4       254.1         827.9        994.7             283.2      3.0
                                                                                                        70        216.2
 Metallics             1,224.5        54.3         330.1        542.9             297.2      31.3                               144.2
                                                                                                       420                      42.1       Pellet Plant
                                                                                                                  568.5
                                                                                             100                                           Logistics
    As of June 2006, expenditure of US$ 47.5 million.                                                                           241.1      Mine
                                                                                                       281.6      348.2
    Disbursement timetable under review, payments postponed to
  2007.                                                                                      2006      2007       2008        2009-2013
                                                                                                                                                    10
OPERATIONAL STATUS                               FINANCING




Financing arranged to carry out execution of Business Plan

                                 US$ million

         Project              CAPEX       Financing       Potential Lenders           Status
                                                                                        (1)
                                                                                      Status       Term

 Mine                          2,378           1,744
   Corumbá                       72              26    ABC/Unibanco/Itaú/BNDES       Disbursed     3 years
   Amapá                        273             200    Itaú BBA, ABC/BNDES (2)           -         7 years
   Minas-Rio                   2,033           1,518      Unibanco/BNDES (2)        Bridge Loan   12 years
                                                                                    US$ 50 mm

 Metallics                     1,224           985
                                                                                    Bridge Loan
  Corumbá                       148            150            Credit Suisse         US$50 mm       7 years
  Amapá                         643            510          Itaú/BNDES (2)               -        10 years
  Minas-Rio (Pellet Plant)      433            325          Itaú/BNDES (2)               -        10 years


 TOTAL                         3,602           2,729




                                                                                                             11
MMX CORUMBÁ SYSTEM                                                     CORUMBÁ SYSTEM




   High quality lump iron ore in Mine 63 – fines (85%) and sinter feed (15%)
   MMX expects to produce metals at very low cash cost levels
   Proven logistics in place



                                                                                                        RESOURCES CORUMB
                                                                                                                       ÁPROJECT
                                                                                            GEOLOGICAL RESOURCES – as of March 31, 2006
                                                 Porto
                                     Paraguai River

                                                Ladário                                                    Resource
                           Corumbá                                   Barge transportation      Area                       Tonnage (MT)
                                                   20km                                          AREA    Classification
                                               MMX                   by the Paraguay
                                               Mines 63
                           Railroad                                  River waterway
                                                   15km
                               Integrated Semi-           Corumbá                            Mine 63       Indicated          65
                                Finished Plant

                                                           km
                                                      2022
                                                                                                       TOTAL                  65
                                                                     San Nicolas Port
                                                                    Capable of receiving
                                             San Nicolas
                                                                     Panamax vessels



MMX is currently undertaking a drilling campaign with 3 drill rigs
      Drilling performed: 2,414 meters as of August 2006, 40% of drilling campaign
      Planned drilling increased to 6,102 meters to be concluded in March, 2007
      Of the 21 mining rights, 3 were measured as of August 2006


                                                                                                                                         12
MMX AMAPÁ SYSTEM                                             AMAPÁ SYSTEM




   More than 370 million tonnes of iron ore resources as of March 2006
   20-years supply contract with GIIC (Gulf Industrial Investment Co.) – already signed
   Aggressive drilling campaign, on a 200m x 50m grid
   Existing logistics in place, including operating railway
   Capacity to export 6.5 Mtpy of high-grade sinter and pellet feed in capesize vessels, through
   transshipping
   Tax incentives available, reducing income tax by 75% until 10 years of operation


                                                       EFA Railway
                                                                                GEOLOGICAL RESOURCES – as of March 31, 2006
                                                                                            RESOURCES CORUMB
                                                                                                           ÁPROJECT

                                  AMAPÁ
                                         20                EFA Railway             Area          Resource       Tonnage (MT)
                                           0k
                                                m                                    AREA      Classification
                                     Mina                Capable of receiving
                                     MMX                  Capesize vessels
                                 Santana Port                                   Taboca and       Indicated          220
                                                    Pig Iron                    Vila do Meio      Inferred          155
                                                    Mini-Mill Plant
                                                                                          TOTAL                     375


MMX is currently undertaking a drilling campaign with 8 drill rigs
     Drilling performed: 19.978 meters as of August 2006, 62% of drilling campaign
     Planned drilling: 32.180 meters to be concluded on March 2007

                                                                                                                               13
MMX MINAS-RIO SYSTEM                                            MINAS-RIO SYSTEM



The MMX Minas-Rio System integrates world-class iron ore deposits with a port via a 26.6 Mtpy pipeline
MMX has acquired high-grade iron ore properties in Minas Gerais. with 0.7 billion tons of resources as of
March 2006
MMX has also acquired an extensive port area of 1,900 hectares, enough to accommodate a 7 Mtpy
pelletizing plant


                            MMX                         MMX Pipeline           GEOLOGICAL RESOURCES – CORUMB
                                                                                            RESOURCES as of March 31, 2006
                                                                                                          ÁPROJECT
                           Mines                       Connecting MMX
                                                       Mines to Açu Port
                                                                                                  Resource
                                                                                    Area                         Tonnage (MT)
                                     55
                                                                                      AREA      Classification
                                        0Km                   Açu Port
                                                        Capable of receiving                       Indicated         408
                                                                               Itapanhoacanga
                                                         capesize vessels                           Inferred         159
                                     Açu Port
                                    Steel Plant
                                                                                           TOTAL                     567
                                              Steel Plant
                  Process Area, Filtering                     Storage Piles    João Monlevade      Inferred          147
                   Area and Steel Plant

                                                                                           TOTAL                     714

                        Administrative
                                                   Açu Port
                          Services



 MMX is currently undertaking a drilling campaign with 14 drill rigs
       Drilling performed: 16.133 meters as of August 2006, 57% of drilling campaign
       Planned drilling: 28.274 meters to be concluded on March 2007
       Of the 27 mining rights, 6 were measured until August, 2006
                                                                                                                                14
MMX MINAS-RIO SYSTEM   ITAPANHOACANGA AND SERRA DO SAPO AIRVIEW
MMX MINAS-RIO SYSTEM   AÇU SUPER PORT
COMPANY PROFILE                  MULTIPLYING VALUE




                          Environmental
                           and Social
                          Responsibility
  Integrated and                                      Long term
   Independent                                         supply
     Logistics                                      relationships




Low production                                    High value-added
    cost at                                      projects, vertically
  competitive                                        integrated
    capital
  expenditure
     levels                   High quality
                               products



                                                                        16
COMPANY PROFILE                                        DISCLAIMER



This presentation may contain certain forward-looking statements and information relating to MMX
Mineração e Metálicos S.A. (“MMX” or the “Company”) that reflect the current views and/or
expectations of the Company and its management with respect to its business plan. Forward-looking
statements include. without limitation. any statement that may predict. forecast. indicate or imply
future results. performance or achievements. and may contain words like “believe”. “anticipate”.
“expect”. “envisage”. “will likely result”. or any other words or phrases of similar meaning. Such
statements are subject to a number of significant risks. uncertainties and assumptions. We caution
that a number of important factors could cause actual results to differ materially from the plans.
objectives. expectations. estimates and intentions expressed in this presentation. In any event. neither
the Company nor any of its affiliates. directors. officers. agents or employees shall be liable before
any third party (including investors) for any investment or business decision made or action taken in
reliance on the information and statements contained in this presentation or for any consequential.
special or similar damages. The Company does not intend to provide eventual holders of shares with
any revised forward-looking statements of analysis of the differences between any forward-looking
statements and actual results.

This presentation and its contents are proprietary information and may not be reproduced or
otherwise disseminated in whole or in part without MMX’s prior written consent.




                                                                                              Investor Relations
                                                                      Rodolfo Landim – Investor Relations Officer
                                                                                     Elizabeth Cruz – Specialist
                                                                                    Tel. 55 21 2555-5634 / 5563
                                                                                                 ri@mmx.com.br
                                                                                       http://www.mmx.com.br/ri
Corporate presentation sep 06 – mmx integrated...

More Related Content

Viewers also liked

Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Apresentação 2 q10
Apresentação 2 q10Apresentação 2 q10
Apresentação 2 q10mmxriweb
 
Presentation steel & mining day (deutsche bank)
Presentation   steel & mining day (deutsche bank)Presentation   steel & mining day (deutsche bank)
Presentation steel & mining day (deutsche bank)mmxriweb
 
Apresentação teleconferência – llx & otpp (em inlgês)
Apresentação teleconferência – llx & otpp (em inlgês)Apresentação teleconferência – llx & otpp (em inlgês)
Apresentação teleconferência – llx & otpp (em inlgês)mmxriweb
 
Corporate presentation april 2011
Corporate presentation   april 2011Corporate presentation   april 2011
Corporate presentation april 2011mmxriweb
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinalmmxriweb
 
Conference call webcast 2010 results
Conference call webcast   2010 resultsConference call webcast   2010 results
Conference call webcast 2010 resultsmmxriweb
 
Presentation – meeting with analysts
Presentation – meeting with analystsPresentation – meeting with analysts
Presentation – meeting with analystsmmxriweb
 

Viewers also liked (8)

Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Apresentação 2 q10
Apresentação 2 q10Apresentação 2 q10
Apresentação 2 q10
 
Presentation steel & mining day (deutsche bank)
Presentation   steel & mining day (deutsche bank)Presentation   steel & mining day (deutsche bank)
Presentation steel & mining day (deutsche bank)
 
Apresentação teleconferência – llx & otpp (em inlgês)
Apresentação teleconferência – llx & otpp (em inlgês)Apresentação teleconferência – llx & otpp (em inlgês)
Apresentação teleconferência – llx & otpp (em inlgês)
 
Corporate presentation april 2011
Corporate presentation   april 2011Corporate presentation   april 2011
Corporate presentation april 2011
 
Mmx junho 2013 - ingles - vfinal
Mmx   junho 2013 - ingles - vfinalMmx   junho 2013 - ingles - vfinal
Mmx junho 2013 - ingles - vfinal
 
Conference call webcast 2010 results
Conference call webcast   2010 resultsConference call webcast   2010 results
Conference call webcast 2010 results
 
Presentation – meeting with analysts
Presentation – meeting with analystsPresentation – meeting with analysts
Presentation – meeting with analysts
 

Similar to Corporate presentation sep 06 – mmx integrated...

Corporate presentation – june 2007
Corporate presentation – june 2007Corporate presentation – june 2007
Corporate presentation – june 2007mmxriweb
 
Corporate presentation – may 2007
Corporate presentation – may 2007Corporate presentation – may 2007
Corporate presentation – may 2007mmxriweb
 
Corporate presentation – august 2008
Corporate presentation – august 2008Corporate presentation – august 2008
Corporate presentation – august 2008mmxriweb
 
Corporate presentation – september 2008
Corporate presentation – september 2008Corporate presentation – september 2008
Corporate presentation – september 2008mmxriweb
 
Corporate presentation – october 2009
Corporate presentation – october 2009Corporate presentation – october 2009
Corporate presentation – october 2009mmxriweb
 
Corporate presentation – october 2008
Corporate presentation – october 2008Corporate presentation – october 2008
Corporate presentation – october 2008mmxriweb
 
Mmx fevereiro 2013 - ingles
Mmx   fevereiro 2013 - inglesMmx   fevereiro 2013 - ingles
Mmx fevereiro 2013 - inglesmmxriweb
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2mmxriweb
 
Mmx setembro 2012 - ingles v final 2
Mmx   setembro 2012 - ingles v final 2Mmx   setembro 2012 - ingles v final 2
Mmx setembro 2012 - ingles v final 2mmxriweb
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012mmxriweb
 
Corporate presentation march
Corporate presentation   marchCorporate presentation   march
Corporate presentation marchMPX_RI
 
Corporate Presentation - May 2012
Corporate Presentation - May 2012Corporate Presentation - May 2012
Corporate Presentation - May 2012mmxriweb
 
Mmx junho 2012 - ingles
Mmx   junho 2012 - inglesMmx   junho 2012 - ingles
Mmx junho 2012 - inglesmmxriweb
 
Mmx agosto 2012 - ingles
Mmx   agosto 2012 - inglesMmx   agosto 2012 - ingles
Mmx agosto 2012 - inglesmmxriweb
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2mmxriweb
 
Corporate Presentation – March 2012
Corporate Presentation – March 2012Corporate Presentation – March 2012
Corporate Presentation – March 2012mmxriweb
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012mmxriweb
 

Similar to Corporate presentation sep 06 – mmx integrated... (18)

Corporate presentation – june 2007
Corporate presentation – june 2007Corporate presentation – june 2007
Corporate presentation – june 2007
 
Corporate presentation – may 2007
Corporate presentation – may 2007Corporate presentation – may 2007
Corporate presentation – may 2007
 
Corporate presentation – august 2008
Corporate presentation – august 2008Corporate presentation – august 2008
Corporate presentation – august 2008
 
Corporate presentation – september 2008
Corporate presentation – september 2008Corporate presentation – september 2008
Corporate presentation – september 2008
 
Corporate presentation – october 2009
Corporate presentation – october 2009Corporate presentation – october 2009
Corporate presentation – october 2009
 
2
22
2
 
Corporate presentation – october 2008
Corporate presentation – october 2008Corporate presentation – october 2008
Corporate presentation – october 2008
 
Mmx fevereiro 2013 - ingles
Mmx   fevereiro 2013 - inglesMmx   fevereiro 2013 - ingles
Mmx fevereiro 2013 - ingles
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2
 
Mmx setembro 2012 - ingles v final 2
Mmx   setembro 2012 - ingles v final 2Mmx   setembro 2012 - ingles v final 2
Mmx setembro 2012 - ingles v final 2
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
 
Corporate presentation march
Corporate presentation   marchCorporate presentation   march
Corporate presentation march
 
Corporate Presentation - May 2012
Corporate Presentation - May 2012Corporate Presentation - May 2012
Corporate Presentation - May 2012
 
Mmx junho 2012 - ingles
Mmx   junho 2012 - inglesMmx   junho 2012 - ingles
Mmx junho 2012 - ingles
 
Mmx agosto 2012 - ingles
Mmx   agosto 2012 - inglesMmx   agosto 2012 - ingles
Mmx agosto 2012 - ingles
 
Mmx julho 2012 - ingles atualizado v2
Mmx   julho 2012 - ingles atualizado v2Mmx   julho 2012 - ingles atualizado v2
Mmx julho 2012 - ingles atualizado v2
 
Corporate Presentation – March 2012
Corporate Presentation – March 2012Corporate Presentation – March 2012
Corporate Presentation – March 2012
 
Corporate Presentation - January 2012
Corporate Presentation - January 2012Corporate Presentation - January 2012
Corporate Presentation - January 2012
 

More from mmxriweb

Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014mmxriweb
 
Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014mmxriweb
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal novammxriweb
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal novammxriweb
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1mmxriweb
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vfmmxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal novammxriweb
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal novammxriweb
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal novammxriweb
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal novammxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal novammxriweb
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalmmxriweb
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalmmxriweb
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal novammxriweb
 

More from mmxriweb (20)

Corporate Presentation - August 2014
Corporate Presentation - August 2014Corporate Presentation - August 2014
Corporate Presentation - August 2014
 
Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014Apresentação Corporativa - Agosto 2014
Apresentação Corporativa - Agosto 2014
 
Mmx julho - en - vfinal nova
Mmx   julho - en - vfinal novaMmx   julho - en - vfinal nova
Mmx julho - en - vfinal nova
 
Mmx julho - pt - vfinal nova
Mmx   julho - pt - vfinal novaMmx   julho - pt - vfinal nova
Mmx julho - pt - vfinal nova
 
Mmx webcast ingles 1 t14 v1
Mmx webcast ingles 1 t14   v1Mmx webcast ingles 1 t14   v1
Mmx webcast ingles 1 t14 v1
 
Mmx webcast portugues 1 t14 vf
Mmx webcast portugues 1 t14   vfMmx webcast portugues 1 t14   vf
Mmx webcast portugues 1 t14 vf
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx junho - en - vfinal nova
Mmx   junho - en - vfinal novaMmx   junho - en - vfinal nova
Mmx junho - en - vfinal nova
 
Mmx junho - pt - vfinal nova
Mmx   junho - pt - vfinal novaMmx   junho - pt - vfinal nova
Mmx junho - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - en - vfinal nova
Mmx   maio - en - vfinal novaMmx   maio - en - vfinal nova
Mmx maio - en - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx maio - pt - vfinal nova
Mmx   maio - pt - vfinal novaMmx   maio - pt - vfinal nova
Mmx maio - pt - vfinal nova
 
Mmx abril - en - vfinal nova
Mmx   abril - en - vfinal novaMmx   abril - en - vfinal nova
Mmx abril - en - vfinal nova
 
Mmx abril - pt - vfinal nova
Mmx   abril - pt - vfinal novaMmx   abril - pt - vfinal nova
Mmx abril - pt - vfinal nova
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 
Mmx março - pt - vfinal nova
Mmx   março - pt - vfinal novaMmx   março - pt - vfinal nova
Mmx março - pt - vfinal nova
 
Mmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinalMmx webcast ingles 2013 vfinal
Mmx webcast ingles 2013 vfinal
 
Mmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinalMmx webcast portugues 2013 vfinal
Mmx webcast portugues 2013 vfinal
 
Mmx março - en - vfinal nova
Mmx   março - en - vfinal novaMmx   março - en - vfinal nova
Mmx março - en - vfinal nova
 

Recently uploaded

Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Recently uploaded (20)

Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Corporate presentation sep 06 – mmx integrated...

  • 2.
  • 3. COMPANY PROFILE COMPANY OVERVIEW MMX was created by a team of mining specialists led by Eike Batista Experienced management team Majority of Board of Directors members are independent Audit Committee already installed - members appointed by Board of Directors Focus on iron ore provided by high-quality products Integrated mining operations and metallics plants connected to independent logistics, structured in self-sufficient systems Environmental and social responsibility Listed in the Novo Mercado - BOVESPA 1
  • 4. COMPANY PROFILE CORPORATE STRUCTURE 70% 70% 70% 99.9% MMX MMX MMX MMX Corumbá Amapá Minas-Rio (Mine+Railway+Port) (Mine+Railway+Port) Metálicos Cleveland Cliffs proposes to buy 30% stake in MMX Amapá for US$ 133 million Centennial Asset is negotiating with strategic partners a 30% stake interest in each System. 2
  • 5. COMPANY PROFILE MMXM3 IN NOVO MERCADO - BOVESPA IPO at the BOVESPA – July/2006 Successful IPO Largest offering held in Brazil (US$ terms) R$ 1,119 million (US$ 509 million) 1,373,000 subscribed shares Free float 32% of capital, 91% foreign-held Capital Stock – 3,804,000 common shares Controlling Free Float Stock Split Program IPO price Shareholder and Management 32% July 2006 R$ 815.00 January 2007 R$ 407.50 68% July 2007 R$ 203.75 January 2008 R$ 20.40 MMXM3 = price per share, minimum lot of 100 shares. 3
  • 6. COMPANY PROFILE MMX INTEGRATED SYSTEMS MMX Amapá System Iron Ore Fines: 6.5 Mtpy Pig Iron: 2.0 Mtpy Semi-finished: 0.5 Mtpy MMX Minas-Rio System Iron Ore: 26.6 Mtpy Pellets: 7.0 Mtpy MMX Corumbá System Iron Ore: 4.9 Mtpy Pig Iron: 0.4 Mtpy Natural Reserve Semi-finished: 0.5 Mtpy Engineer Eliezer Batista MMX Integrated Systems develop and operate iron- ore mines, pig-iron and semi-finished plants and a pelletizing plant. 4
  • 7. OPERATIONAL STATUS MMX SYSTEMS EVOLUTION Auditing of the System’s resources and mineral reserves (as of March 2006) under way - Canadian Standard NI-43.101 – disclosure is expected in November; Improvements in the mineral resource drilling campaign (August, 2006): Corumbá – 1,583 additional meters to the 831 meters reported in March, 2006 Amapá – 7,916 additional meters to the 12,062 meters reported in March, 2006 Minas-Rio – 6,847 additional meters to the 9,286 meters reported in March, 2006 Centralized monitoring of engineering studies and projects – new office in Belo Horizonte; 5
  • 8. OPERATIONAL STATUS MMX SYSTEMS EVOLUTION Engineer Eliezer Batista Heritage Reserve – a private protect area of 17,000 hectares in the most preserved area of the Pantanal, in an unique ecological corridor; Corumbá MMX System: Mine 63 operational, first iron ore exports in July, 2006 Increasing pace of production, in line with expectations ( 1Mt ) Pig Iron Plant – Installation Permitt granted in August, construction of blast furnace begins in September, 2006 9 additional mining rights (total of 21), 18 rights to be measured 6
  • 9. OPERATIONAL STATUS MMX SYSTEMS EVOLUTION Amapá MMX System: Amapá Mine – Installation Permitt granted in August, 2006, outsourced engineering company has been retained - Leveling and barrage works to begin in September – 500 indirect jobs - Acquisition of 100% of the equipment for the operation – delivery in March 2007 Railway – Operating Permitt granted in August, 2006 - Progress in equipment and railway repairs Santana Port – Preliminary Permitt granted in August, 2006 - Port terminal to be built on a 71 hectare site – start-up scheduled for December 2006 Minas-Rio MMX System: Iron ore Pipeline – IBAMA approved the EIA-RIMA in September, construction is expected to begin in mid-2007 3 additional mining rights (27), 22 rights to be measured 7
  • 10. OPERATIONAL STATUS MMX PROJECTS TIMELINE Vertically Integrated High Value-Added Projects 37 31 19 Production of Iron ore (Mt) 9 Production of pig iron (Mt) 4 1.5 1.5 1.0 Production of semi-finished (Mt) 0.7 0.1 1.3 0.5 1.0 1 0.2 2003 2004 2005 2006 2007 2008 2009 2010 2011 Engineering; Amapá Start-up Start-up Pellet Start-up Mini Start-up Minas Plant Asset acquisitions beginning of Railway Amapá Mine Mill Corumbá -Rio System Minas-Rio drilling Concession System Start-up Start-up Start-up Pig Start-up Mini Corumbá Pig Iron Iron Amapá Mill Amapá Mine Corumbá 8
  • 11. OPERATIONAL STATUS ENVIRONMENTAL PERMITT TIMELINE MMX Systems Corumbá Mine and processing Pig Iron Mill Mini Mill Amapá Mine and processing Port Pig Iron Mill Mini Mill Minas-Rio Mine Processing Pipeline Port Pellet Plant 2005 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 2006 2007 2008 2009 2010 Preliminary Permitt – approves project studies PERMITT GRANTED Installation Permitt– authorizes infra-structure works PERMITT EXPECTED Operating Permitt – authorizes project operation OPERATIONAL START-UP 9
  • 12. OPERATIONAL STATUS CAPEX DISBURSEMENT TIMETABLE MMX Corumbá CAPEX – MMX Integrated Systems 1,132.9 45.9 79.6 Metallics 22.9 Mine 771.6 41.6 13.0 2006 2007 2008 427.4 381.8 MMX Amapá 293.8 153 5.4 134.3 87.5 86.6 92.6 22.9 180.5 0 303.8 81.2 153 Metallics 2006 2007 2008 2009-2013 Mine 113.3 Minas-Rio 78 Corumbá Amapá 2006 2007 2008 2009-2013 Total (*) 2006 2007 2008 2009 - 2013 Total 3,601.9 308.4 1,158.0 1,537.6 580.4 MMX Minas-Rio Mine & logistics 2,377.4 254.1 827.9 994.7 283.2 3.0 70 216.2 Metallics 1,224.5 54.3 330.1 542.9 297.2 31.3 144.2 420 42.1 Pellet Plant 568.5 100 Logistics As of June 2006, expenditure of US$ 47.5 million. 241.1 Mine 281.6 348.2 Disbursement timetable under review, payments postponed to 2007. 2006 2007 2008 2009-2013 10
  • 13. OPERATIONAL STATUS FINANCING Financing arranged to carry out execution of Business Plan US$ million Project CAPEX Financing Potential Lenders Status (1) Status Term Mine 2,378 1,744 Corumbá 72 26 ABC/Unibanco/Itaú/BNDES Disbursed 3 years Amapá 273 200 Itaú BBA, ABC/BNDES (2) - 7 years Minas-Rio 2,033 1,518 Unibanco/BNDES (2) Bridge Loan 12 years US$ 50 mm Metallics 1,224 985 Bridge Loan Corumbá 148 150 Credit Suisse US$50 mm 7 years Amapá 643 510 Itaú/BNDES (2) - 10 years Minas-Rio (Pellet Plant) 433 325 Itaú/BNDES (2) - 10 years TOTAL 3,602 2,729 11
  • 14. MMX CORUMBÁ SYSTEM CORUMBÁ SYSTEM High quality lump iron ore in Mine 63 – fines (85%) and sinter feed (15%) MMX expects to produce metals at very low cash cost levels Proven logistics in place RESOURCES CORUMB ÁPROJECT GEOLOGICAL RESOURCES – as of March 31, 2006 Porto Paraguai River Ladário Resource Corumbá Barge transportation Area Tonnage (MT) 20km AREA Classification MMX by the Paraguay Mines 63 Railroad River waterway 15km Integrated Semi- Corumbá Mine 63 Indicated 65 Finished Plant km 2022 TOTAL 65 San Nicolas Port Capable of receiving San Nicolas Panamax vessels MMX is currently undertaking a drilling campaign with 3 drill rigs Drilling performed: 2,414 meters as of August 2006, 40% of drilling campaign Planned drilling increased to 6,102 meters to be concluded in March, 2007 Of the 21 mining rights, 3 were measured as of August 2006 12
  • 15. MMX AMAPÁ SYSTEM AMAPÁ SYSTEM More than 370 million tonnes of iron ore resources as of March 2006 20-years supply contract with GIIC (Gulf Industrial Investment Co.) – already signed Aggressive drilling campaign, on a 200m x 50m grid Existing logistics in place, including operating railway Capacity to export 6.5 Mtpy of high-grade sinter and pellet feed in capesize vessels, through transshipping Tax incentives available, reducing income tax by 75% until 10 years of operation EFA Railway GEOLOGICAL RESOURCES – as of March 31, 2006 RESOURCES CORUMB ÁPROJECT AMAPÁ 20 EFA Railway Area Resource Tonnage (MT) 0k m AREA Classification Mina Capable of receiving MMX Capesize vessels Santana Port Taboca and Indicated 220 Pig Iron Vila do Meio Inferred 155 Mini-Mill Plant TOTAL 375 MMX is currently undertaking a drilling campaign with 8 drill rigs Drilling performed: 19.978 meters as of August 2006, 62% of drilling campaign Planned drilling: 32.180 meters to be concluded on March 2007 13
  • 16. MMX MINAS-RIO SYSTEM MINAS-RIO SYSTEM The MMX Minas-Rio System integrates world-class iron ore deposits with a port via a 26.6 Mtpy pipeline MMX has acquired high-grade iron ore properties in Minas Gerais. with 0.7 billion tons of resources as of March 2006 MMX has also acquired an extensive port area of 1,900 hectares, enough to accommodate a 7 Mtpy pelletizing plant MMX MMX Pipeline GEOLOGICAL RESOURCES – CORUMB RESOURCES as of March 31, 2006 ÁPROJECT Mines Connecting MMX Mines to Açu Port Resource Area Tonnage (MT) 55 AREA Classification 0Km Açu Port Capable of receiving Indicated 408 Itapanhoacanga capesize vessels Inferred 159 Açu Port Steel Plant TOTAL 567 Steel Plant Process Area, Filtering Storage Piles João Monlevade Inferred 147 Area and Steel Plant TOTAL 714 Administrative Açu Port Services MMX is currently undertaking a drilling campaign with 14 drill rigs Drilling performed: 16.133 meters as of August 2006, 57% of drilling campaign Planned drilling: 28.274 meters to be concluded on March 2007 Of the 27 mining rights, 6 were measured until August, 2006 14
  • 17. MMX MINAS-RIO SYSTEM ITAPANHOACANGA AND SERRA DO SAPO AIRVIEW
  • 18. MMX MINAS-RIO SYSTEM AÇU SUPER PORT
  • 19.
  • 20. COMPANY PROFILE MULTIPLYING VALUE Environmental and Social Responsibility Integrated and Long term Independent supply Logistics relationships Low production High value-added cost at projects, vertically competitive integrated capital expenditure levels High quality products 16
  • 21. COMPANY PROFILE DISCLAIMER This presentation may contain certain forward-looking statements and information relating to MMX Mineração e Metálicos S.A. (“MMX” or the “Company”) that reflect the current views and/or expectations of the Company and its management with respect to its business plan. Forward-looking statements include. without limitation. any statement that may predict. forecast. indicate or imply future results. performance or achievements. and may contain words like “believe”. “anticipate”. “expect”. “envisage”. “will likely result”. or any other words or phrases of similar meaning. Such statements are subject to a number of significant risks. uncertainties and assumptions. We caution that a number of important factors could cause actual results to differ materially from the plans. objectives. expectations. estimates and intentions expressed in this presentation. In any event. neither the Company nor any of its affiliates. directors. officers. agents or employees shall be liable before any third party (including investors) for any investment or business decision made or action taken in reliance on the information and statements contained in this presentation or for any consequential. special or similar damages. The Company does not intend to provide eventual holders of shares with any revised forward-looking statements of analysis of the differences between any forward-looking statements and actual results. This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without MMX’s prior written consent. Investor Relations Rodolfo Landim – Investor Relations Officer Elizabeth Cruz – Specialist Tel. 55 21 2555-5634 / 5563 ri@mmx.com.br http://www.mmx.com.br/ri