Managing Risk and Cost in Mining
Infrastructure Development
Sarah Thomas, Partner
Pinsent Masons LLP
Mining on Top
24 June 2014
Setting the Scene: (1) Key Drivers
• Dismal shareholder returns, uncertainty of future demand and
commodity pricing
• All leading to less funding & less projects – changes in marketplace?
• High capital costs of mining infrastructure - South African example -
infrastructure costs = 80% of mine development costs; cost inflation
(not matched by productivity gains) plus geological inflation (declining
grades = increasing tonnage mined)
• High bulk commodities – e.g. iron ore, coal, manganese - significant
transportation costs
• Wider costs of infrastructure development (ports, road, rail, water and
power availability)
• Focus on ‘back to basics’ – cost control, productivity gains &
protecting margins
2
Setting the Scene: (2)
Infrastructure Deficit: West Africa case study
3
Setting the Scene: (3) Physical , Regulatory and
Reputational Risks of Water
• Lack of available water
– Challenging physical conditions and
competition for use
• Forced shutdown
– Revenue losses
• Power outages
• Low quality water
– Leading to losses in mineral recovery or
reduction in quality of product
• Environmental impact/Resource Nationalism
• Australian regime sets example for other countries
• e.g. Ghana
• strict legislative requirements
• environmental sustainability
• licensing requirements
4
Source: http://www.infrastructurene.ws/3s-composition/uploads/2012/05/acid-
mine-water.jpg
Construction Stage: Current Market – EPCM
Model – trend towards more variability?
5
Traditional model
Client EPCM
Construction
contract
Construction
contract
Construction
contract
Equipment
Supply
Equipment
Supply
Equipment
Supply
Purchase order
and T’s & C’s
Split Contract Model
6
Split Model
ClientEPCM*
EPC
EPC
EPC
Construction
contract
Construction
contract
Construction
contract
Equipment
Supply
Equipment
Supply
Equipment
Supply
* “E” & “P” can be split from CM with CM undertaken by Client in house or by another consultant (for
cost savings)
Controlling costs in construction
• Main issue - delays and cost overruns –
• Unpredictability of local mine site/communications/labour force/ground and environmental
conditions/consenting regime
• Controlling manpower costs
– Starting point – manpower intensive and key contracts (e.g. EPCMs) reimbursable
plus Fee
– Doing the works ‘in house’ vs using third parties
• Balance cost vs capabilities vs terms imposed by host Government/sponsor
– Cost of expatriate personnel. Ability to impose detailed cost controls in EPCM
contracts limited – disallowed costs regime often relatively loose and fee relates to
man hours expended so no incentive not to inflate manpower costs
– Link fee to a target cost mechanism
– Include rate for drawing so EPCMs incentivised to be efficient
– Control inappropriate use of expat personnel/overloading: e.g. pre-agree allocation of
resources - organogram with manpower schedule – with any changes to be approved
by Client
– All difficult to negotiate but changing market?
7
What can be done to help manage delays
and cost overruns cont.?
• For construction packages - use of bills of quantities/remeasurement
or fixed price/EPC for discrete packages
• Detailed programme with milestones and consequences
• Regular reporting (linked to KPI measures)
• Liquidated Damages
• Incentive for finishing early
• Regular reporting to Head Office
• Early Warning system (similar to NEC)
• KPI Regime linked to % of Fee including re: programming,
forecasting and management setting deadlines
8
Design Responsibility and Defects
Management (1)
• Mining’s complex terrain and climate challenging; every mine site is
unique
• Third party engineers may have only designed discrete parts early
on – limited recourse
• Expiry of design responsibility or limited to re-performance
• Other Issues:
– Shortage of other skilled consultants/contractors to do the work
in country
– When things go wrong costs and delay mount up very quickly
(e.g. flying team experts to site paying premium to fast-track re-
design and replacement parts)
– Lack of integration between development and operations teams?
9
Design Responsibility and Defects
Management (2)
• Possible solutions:
– Ensure retention of experienced, competent personnel with Key Project
Personnel clauses
– Express design requirements in the contract & as detailed as possible
– Make any design breach/non compliance a “defect”, not just breaches of duty
of care/laws
– Require EPCM to redo a defective design without cost and uncapped (ensure
a Disallowed Cost)
– Design review at all stages – Client to approve design before proceeding to
next stage
– Longer warranty periods – e.g. 2 years post mechanical completion or longer
– Pro-active management and greater integration between construction and
operation teams; regular reporting to head office
• However, note that EPCM liability for rework difficult to obtain - therefore must
mitigate risk before design proceeds to implementation
10
Concluding Remarks
• Mining build by its nature is complex, challenging and costly
• Historically a limited marketplace and “seller’s” market
• Potential changes due to reduced project spend (consolidation of
EPCM’s and new entrants)
– JV’s with construction operators (influence of Chinese Investors)
– Bringing more expertise back in house
– Improved reporting and data collection (and interpretation)
– Utilise framework relationships with supply chain
– Mixed contract models – greater collaboration?
– Greater use of incentivisation models
• Key is pro-active management good stakeholder relationships
and quality of personnel
11
• “Project management can be defined as a way of
developing structure in a complex project, where the
independent variables of time, cost, resources and
human behavior come together.”
-– Rory Burke
Any Questions?
13
Sarah Thomas, Partner
Pinsent Masons LLP
T: +44 (0)20 7490 6273
E: sarah.thomas@pinsentmasons.com
Pinsent Masons LLP is a limited liability partnership registered in England & Wales (registered number: OC333653) authorised and regulated by
the Solicitors Regulation Authority, and by the appropriate regulatory body in the other jurisdictions in which it operates. The word ‘partner’, used in
relation to the LLP, refers to a member of the LLP or an employee or consultant of the LLP or any affiliated firm of equivalent standing. A list of the
members of the LLP, and of those non-members who are designated as partners, is displayed at the LLP’s registered office: 30 Crown Place,
London EC2A 4ES, United Kingdom. We use 'Pinsent Masons' to refer to Pinsent Masons LLP, its subsidiaries and any affiliates which it or its
partners operate as separate businesses for regulatory or other reasons. Reference to 'Pinsent Masons' is to Pinsent Masons LLP and/or one or
more of those subsidiaries or affiliates as the context requires. © Pinsent Masons LLP 2014
For a full list of our locations around the globe please visit our websites:
www.pinsentmasons.com www.Out-Law.com
15

Mais conteúdo relacionado

Destaque (7)

Topic 2 the mining cycle
Topic 2  the mining cycleTopic 2  the mining cycle
Topic 2 the mining cycle
 
Drilling and blasting powerpoint 2003
Drilling and blasting powerpoint 2003Drilling and blasting powerpoint 2003
Drilling and blasting powerpoint 2003
 
Mining ppt 2014
Mining ppt 2014Mining ppt 2014
Mining ppt 2014
 
Topic 5: Mining Methods-Part I-Surface mining
Topic 5: Mining Methods-Part I-Surface mining Topic 5: Mining Methods-Part I-Surface mining
Topic 5: Mining Methods-Part I-Surface mining
 
Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blasting
 
State of the Word 2011
State of the Word 2011State of the Word 2011
State of the Word 2011
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Semelhante a Managing Risk and Cost in Mining Infrastructure Development - Sarah Thomas, Pinsent Mason

Beyond Engineering: EPC Lessons learnt from a Lenders' Technical and Environm...
Beyond Engineering: EPC Lessons learnt from a Lenders' Technical and Environm...Beyond Engineering: EPC Lessons learnt from a Lenders' Technical and Environm...
Beyond Engineering: EPC Lessons learnt from a Lenders' Technical and Environm...Sailesh Patel
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Gregoire Lesecq
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016Sanjeewa Mahawedage
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...irvan septyan mulyana
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014Sanjeewa Mahawedage
 
CURRICULUM_VITAE 2
CURRICULUM_VITAE 2CURRICULUM_VITAE 2
CURRICULUM_VITAE 2Jason Lloyd
 
3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_PublicRichard B. Petch
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGCCordell Parvin
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015Mohamad Khalid Nawawi
 
Cost management and performance measurements for petroleum upstream industry ...
Cost management and performance measurements for petroleum upstream industry ...Cost management and performance measurements for petroleum upstream industry ...
Cost management and performance measurements for petroleum upstream industry ...Hamdy Rashed
 
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRail~Volution
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015Ronald Fung
 
Planning of Major Infrastructure Repairs – the Tamar Bridge webinar
Planning of Major Infrastructure Repairs – the Tamar Bridge webinarPlanning of Major Infrastructure Repairs – the Tamar Bridge webinar
Planning of Major Infrastructure Repairs – the Tamar Bridge webinarAssociation for Project Management
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers
 

Semelhante a Managing Risk and Cost in Mining Infrastructure Development - Sarah Thomas, Pinsent Mason (20)

Beyond Engineering: EPC Lessons learnt from a Lenders' Technical and Environm...
Beyond Engineering: EPC Lessons learnt from a Lenders' Technical and Environm...Beyond Engineering: EPC Lessons learnt from a Lenders' Technical and Environm...
Beyond Engineering: EPC Lessons learnt from a Lenders' Technical and Environm...
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
Best_Practices_in_CMM_Utilization_-_Achieving_Near-Zero_Methane_Emissions_fro...
 
Oman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendationsOman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendations
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014
 
Word Doc CV
Word Doc CVWord Doc CV
Word Doc CV
 
CURRICULUM_VITAE 2
CURRICULUM_VITAE 2CURRICULUM_VITAE 2
CURRICULUM_VITAE 2
 
3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public3rd_NDC_SL_Commercial_Strategy_Public
3rd_NDC_SL_Commercial_Strategy_Public
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Personal 3 CV 2015
Personal 3  CV 2015Personal 3  CV 2015
Personal 3 CV 2015
 
Contract administration iowa AGC
Contract administration iowa AGCContract administration iowa AGC
Contract administration iowa AGC
 
Sarmad CV_Oct'16
Sarmad CV_Oct'16Sarmad CV_Oct'16
Sarmad CV_Oct'16
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
 
Cost management and performance measurements for petroleum upstream industry ...
Cost management and performance measurements for petroleum upstream industry ...Cost management and performance measurements for petroleum upstream industry ...
Cost management and performance measurements for petroleum upstream industry ...
 
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory BenzRV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
RV 2014: Public Private Partnerships: The P3 Experience by Gregory Benz
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Planning of Major Infrastructure Repairs – the Tamar Bridge webinar
Planning of Major Infrastructure Repairs – the Tamar Bridge webinarPlanning of Major Infrastructure Repairs – the Tamar Bridge webinar
Planning of Major Infrastructure Repairs – the Tamar Bridge webinar
 
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman Eugene Eybers - CURRICULUM VITAE Rev 4 oman
Eugene Eybers - CURRICULUM VITAE Rev 4 oman
 

Mais de Mining On Top

Energold Investor Presentation
Energold Investor PresentationEnergold Investor Presentation
Energold Investor PresentationMining On Top
 
Mining Investment in Uganda
Mining Investment in UgandaMining Investment in Uganda
Mining Investment in UgandaMining On Top
 
Republic of South Sudan: Mining Investment Opportunities in South Sudan
Republic of South Sudan: Mining Investment Opportunities in South SudanRepublic of South Sudan: Mining Investment Opportunities in South Sudan
Republic of South Sudan: Mining Investment Opportunities in South SudanMining On Top
 
NW Province Republic of South Africa: A Land of Tourism, Trade and Investment...
NW Province Republic of South Africa: A Land of Tourism, Trade and Investment...NW Province Republic of South Africa: A Land of Tourism, Trade and Investment...
NW Province Republic of South Africa: A Land of Tourism, Trade and Investment...Mining On Top
 
Republic of Nigeria: Investment Opportunities in Nigeria’s Minerals And Metal...
Republic of Nigeria: Investment Opportunities in Nigeria’s Minerals And Metal...Republic of Nigeria: Investment Opportunities in Nigeria’s Minerals And Metal...
Republic of Nigeria: Investment Opportunities in Nigeria’s Minerals And Metal...Mining On Top
 
Republic of Namibia: Minerals, Mineral Potential, Exploration & Mining in Nam...
Republic of Namibia: Minerals, Mineral Potential, Exploration & Mining in Nam...Republic of Namibia: Minerals, Mineral Potential, Exploration & Mining in Nam...
Republic of Namibia: Minerals, Mineral Potential, Exploration & Mining in Nam...Mining On Top
 
The State of African Mining - Chris Hinde, SNL Metals & Mining
The State of African Mining - Chris Hinde, SNL Metals & MiningThe State of African Mining - Chris Hinde, SNL Metals & Mining
The State of African Mining - Chris Hinde, SNL Metals & MiningMining On Top
 
Republic of Ghana Mining Roundtable
Republic of Ghana Mining RoundtableRepublic of Ghana Mining Roundtable
Republic of Ghana Mining RoundtableMining On Top
 
Republic of Botswana: State of the Mineral Industry and Investment Opportunit...
Republic of Botswana: State of the Mineral Industry and Investment Opportunit...Republic of Botswana: State of the Mineral Industry and Investment Opportunit...
Republic of Botswana: State of the Mineral Industry and Investment Opportunit...Mining On Top
 
Republic of Angola: Governmental Strategy for its Mining Sector
Republic of Angola: Governmental Strategy for its Mining SectorRepublic of Angola: Governmental Strategy for its Mining Sector
Republic of Angola: Governmental Strategy for its Mining SectorMining On Top
 
Zambia Mining Roundtable
Zambia Mining RoundtableZambia Mining Roundtable
Zambia Mining RoundtableMining On Top
 
Mining in Ghana: A partnership - Endeavour Mining
Mining in Ghana: A partnership - Endeavour MiningMining in Ghana: A partnership - Endeavour Mining
Mining in Ghana: A partnership - Endeavour MiningMining On Top
 
Investor Presentation - Allana Potash
Investor Presentation - Allana PotashInvestor Presentation - Allana Potash
Investor Presentation - Allana PotashMining On Top
 
Infrastructure to Support Industrialisation in Africa - Antonio Pedro, UN ECA
Infrastructure to Support Industrialisation in Africa - Antonio Pedro, UN ECAInfrastructure to Support Industrialisation in Africa - Antonio Pedro, UN ECA
Infrastructure to Support Industrialisation in Africa - Antonio Pedro, UN ECAMining On Top
 
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMining On Top
 
Mabey Bridge - Transport considerations - Phil Bailey, Mabey Bridge
Mabey Bridge - Transport considerations - Phil Bailey,  Mabey BridgeMabey Bridge - Transport considerations - Phil Bailey,  Mabey Bridge
Mabey Bridge - Transport considerations - Phil Bailey, Mabey BridgeMining On Top
 
Mining’s legacy: thinking beyond the mine - Ian Satchwell, International Mini...
Mining’s legacy: thinking beyond the mine - Ian Satchwell, International Mini...Mining’s legacy: thinking beyond the mine - Ian Satchwell, International Mini...
Mining’s legacy: thinking beyond the mine - Ian Satchwell, International Mini...Mining On Top
 
Africa Mining Risks Assessment - James Lewis and Robert Follie, Holman Fenwic...
Africa Mining Risks Assessment - James Lewis and Robert Follie, Holman Fenwic...Africa Mining Risks Assessment - James Lewis and Robert Follie, Holman Fenwic...
Africa Mining Risks Assessment - James Lewis and Robert Follie, Holman Fenwic...Mining On Top
 
Investor Presentation - Endeavour Mining
Investor Presentation - Endeavour MiningInvestor Presentation - Endeavour Mining
Investor Presentation - Endeavour MiningMining On Top
 
The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeThe multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeMining On Top
 

Mais de Mining On Top (20)

Energold Investor Presentation
Energold Investor PresentationEnergold Investor Presentation
Energold Investor Presentation
 
Mining Investment in Uganda
Mining Investment in UgandaMining Investment in Uganda
Mining Investment in Uganda
 
Republic of South Sudan: Mining Investment Opportunities in South Sudan
Republic of South Sudan: Mining Investment Opportunities in South SudanRepublic of South Sudan: Mining Investment Opportunities in South Sudan
Republic of South Sudan: Mining Investment Opportunities in South Sudan
 
NW Province Republic of South Africa: A Land of Tourism, Trade and Investment...
NW Province Republic of South Africa: A Land of Tourism, Trade and Investment...NW Province Republic of South Africa: A Land of Tourism, Trade and Investment...
NW Province Republic of South Africa: A Land of Tourism, Trade and Investment...
 
Republic of Nigeria: Investment Opportunities in Nigeria’s Minerals And Metal...
Republic of Nigeria: Investment Opportunities in Nigeria’s Minerals And Metal...Republic of Nigeria: Investment Opportunities in Nigeria’s Minerals And Metal...
Republic of Nigeria: Investment Opportunities in Nigeria’s Minerals And Metal...
 
Republic of Namibia: Minerals, Mineral Potential, Exploration & Mining in Nam...
Republic of Namibia: Minerals, Mineral Potential, Exploration & Mining in Nam...Republic of Namibia: Minerals, Mineral Potential, Exploration & Mining in Nam...
Republic of Namibia: Minerals, Mineral Potential, Exploration & Mining in Nam...
 
The State of African Mining - Chris Hinde, SNL Metals & Mining
The State of African Mining - Chris Hinde, SNL Metals & MiningThe State of African Mining - Chris Hinde, SNL Metals & Mining
The State of African Mining - Chris Hinde, SNL Metals & Mining
 
Republic of Ghana Mining Roundtable
Republic of Ghana Mining RoundtableRepublic of Ghana Mining Roundtable
Republic of Ghana Mining Roundtable
 
Republic of Botswana: State of the Mineral Industry and Investment Opportunit...
Republic of Botswana: State of the Mineral Industry and Investment Opportunit...Republic of Botswana: State of the Mineral Industry and Investment Opportunit...
Republic of Botswana: State of the Mineral Industry and Investment Opportunit...
 
Republic of Angola: Governmental Strategy for its Mining Sector
Republic of Angola: Governmental Strategy for its Mining SectorRepublic of Angola: Governmental Strategy for its Mining Sector
Republic of Angola: Governmental Strategy for its Mining Sector
 
Zambia Mining Roundtable
Zambia Mining RoundtableZambia Mining Roundtable
Zambia Mining Roundtable
 
Mining in Ghana: A partnership - Endeavour Mining
Mining in Ghana: A partnership - Endeavour MiningMining in Ghana: A partnership - Endeavour Mining
Mining in Ghana: A partnership - Endeavour Mining
 
Investor Presentation - Allana Potash
Investor Presentation - Allana PotashInvestor Presentation - Allana Potash
Investor Presentation - Allana Potash
 
Infrastructure to Support Industrialisation in Africa - Antonio Pedro, UN ECA
Infrastructure to Support Industrialisation in Africa - Antonio Pedro, UN ECAInfrastructure to Support Industrialisation in Africa - Antonio Pedro, UN ECA
Infrastructure to Support Industrialisation in Africa - Antonio Pedro, UN ECA
 
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonaldMozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
Mozambique’s Moatize Coal Basin - David Hunter, Mott McDonald
 
Mabey Bridge - Transport considerations - Phil Bailey, Mabey Bridge
Mabey Bridge - Transport considerations - Phil Bailey,  Mabey BridgeMabey Bridge - Transport considerations - Phil Bailey,  Mabey Bridge
Mabey Bridge - Transport considerations - Phil Bailey, Mabey Bridge
 
Mining’s legacy: thinking beyond the mine - Ian Satchwell, International Mini...
Mining’s legacy: thinking beyond the mine - Ian Satchwell, International Mini...Mining’s legacy: thinking beyond the mine - Ian Satchwell, International Mini...
Mining’s legacy: thinking beyond the mine - Ian Satchwell, International Mini...
 
Africa Mining Risks Assessment - James Lewis and Robert Follie, Holman Fenwic...
Africa Mining Risks Assessment - James Lewis and Robert Follie, Holman Fenwic...Africa Mining Risks Assessment - James Lewis and Robert Follie, Holman Fenwic...
Africa Mining Risks Assessment - James Lewis and Robert Follie, Holman Fenwic...
 
Investor Presentation - Endeavour Mining
Investor Presentation - Endeavour MiningInvestor Presentation - Endeavour Mining
Investor Presentation - Endeavour Mining
 
The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, ValeThe multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
The multiplier effect of infrastructure - Marcio Senne de Moraes, Vale
 

Último

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000dlhescort
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceDamini Dixit
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Último (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

Managing Risk and Cost in Mining Infrastructure Development - Sarah Thomas, Pinsent Mason

  • 1. Managing Risk and Cost in Mining Infrastructure Development Sarah Thomas, Partner Pinsent Masons LLP Mining on Top 24 June 2014
  • 2. Setting the Scene: (1) Key Drivers • Dismal shareholder returns, uncertainty of future demand and commodity pricing • All leading to less funding & less projects – changes in marketplace? • High capital costs of mining infrastructure - South African example - infrastructure costs = 80% of mine development costs; cost inflation (not matched by productivity gains) plus geological inflation (declining grades = increasing tonnage mined) • High bulk commodities – e.g. iron ore, coal, manganese - significant transportation costs • Wider costs of infrastructure development (ports, road, rail, water and power availability) • Focus on ‘back to basics’ – cost control, productivity gains & protecting margins 2
  • 3. Setting the Scene: (2) Infrastructure Deficit: West Africa case study 3
  • 4. Setting the Scene: (3) Physical , Regulatory and Reputational Risks of Water • Lack of available water – Challenging physical conditions and competition for use • Forced shutdown – Revenue losses • Power outages • Low quality water – Leading to losses in mineral recovery or reduction in quality of product • Environmental impact/Resource Nationalism • Australian regime sets example for other countries • e.g. Ghana • strict legislative requirements • environmental sustainability • licensing requirements 4 Source: http://www.infrastructurene.ws/3s-composition/uploads/2012/05/acid- mine-water.jpg
  • 5. Construction Stage: Current Market – EPCM Model – trend towards more variability? 5 Traditional model Client EPCM Construction contract Construction contract Construction contract Equipment Supply Equipment Supply Equipment Supply Purchase order and T’s & C’s
  • 6. Split Contract Model 6 Split Model ClientEPCM* EPC EPC EPC Construction contract Construction contract Construction contract Equipment Supply Equipment Supply Equipment Supply * “E” & “P” can be split from CM with CM undertaken by Client in house or by another consultant (for cost savings)
  • 7. Controlling costs in construction • Main issue - delays and cost overruns – • Unpredictability of local mine site/communications/labour force/ground and environmental conditions/consenting regime • Controlling manpower costs – Starting point – manpower intensive and key contracts (e.g. EPCMs) reimbursable plus Fee – Doing the works ‘in house’ vs using third parties • Balance cost vs capabilities vs terms imposed by host Government/sponsor – Cost of expatriate personnel. Ability to impose detailed cost controls in EPCM contracts limited – disallowed costs regime often relatively loose and fee relates to man hours expended so no incentive not to inflate manpower costs – Link fee to a target cost mechanism – Include rate for drawing so EPCMs incentivised to be efficient – Control inappropriate use of expat personnel/overloading: e.g. pre-agree allocation of resources - organogram with manpower schedule – with any changes to be approved by Client – All difficult to negotiate but changing market? 7
  • 8. What can be done to help manage delays and cost overruns cont.? • For construction packages - use of bills of quantities/remeasurement or fixed price/EPC for discrete packages • Detailed programme with milestones and consequences • Regular reporting (linked to KPI measures) • Liquidated Damages • Incentive for finishing early • Regular reporting to Head Office • Early Warning system (similar to NEC) • KPI Regime linked to % of Fee including re: programming, forecasting and management setting deadlines 8
  • 9. Design Responsibility and Defects Management (1) • Mining’s complex terrain and climate challenging; every mine site is unique • Third party engineers may have only designed discrete parts early on – limited recourse • Expiry of design responsibility or limited to re-performance • Other Issues: – Shortage of other skilled consultants/contractors to do the work in country – When things go wrong costs and delay mount up very quickly (e.g. flying team experts to site paying premium to fast-track re- design and replacement parts) – Lack of integration between development and operations teams? 9
  • 10. Design Responsibility and Defects Management (2) • Possible solutions: – Ensure retention of experienced, competent personnel with Key Project Personnel clauses – Express design requirements in the contract & as detailed as possible – Make any design breach/non compliance a “defect”, not just breaches of duty of care/laws – Require EPCM to redo a defective design without cost and uncapped (ensure a Disallowed Cost) – Design review at all stages – Client to approve design before proceeding to next stage – Longer warranty periods – e.g. 2 years post mechanical completion or longer – Pro-active management and greater integration between construction and operation teams; regular reporting to head office • However, note that EPCM liability for rework difficult to obtain - therefore must mitigate risk before design proceeds to implementation 10
  • 11. Concluding Remarks • Mining build by its nature is complex, challenging and costly • Historically a limited marketplace and “seller’s” market • Potential changes due to reduced project spend (consolidation of EPCM’s and new entrants) – JV’s with construction operators (influence of Chinese Investors) – Bringing more expertise back in house – Improved reporting and data collection (and interpretation) – Utilise framework relationships with supply chain – Mixed contract models – greater collaboration? – Greater use of incentivisation models • Key is pro-active management good stakeholder relationships and quality of personnel 11
  • 12. • “Project management can be defined as a way of developing structure in a complex project, where the independent variables of time, cost, resources and human behavior come together.” -– Rory Burke
  • 14. Sarah Thomas, Partner Pinsent Masons LLP T: +44 (0)20 7490 6273 E: sarah.thomas@pinsentmasons.com
  • 15. Pinsent Masons LLP is a limited liability partnership registered in England & Wales (registered number: OC333653) authorised and regulated by the Solicitors Regulation Authority, and by the appropriate regulatory body in the other jurisdictions in which it operates. The word ‘partner’, used in relation to the LLP, refers to a member of the LLP or an employee or consultant of the LLP or any affiliated firm of equivalent standing. A list of the members of the LLP, and of those non-members who are designated as partners, is displayed at the LLP’s registered office: 30 Crown Place, London EC2A 4ES, United Kingdom. We use 'Pinsent Masons' to refer to Pinsent Masons LLP, its subsidiaries and any affiliates which it or its partners operate as separate businesses for regulatory or other reasons. Reference to 'Pinsent Masons' is to Pinsent Masons LLP and/or one or more of those subsidiaries or affiliates as the context requires. © Pinsent Masons LLP 2014 For a full list of our locations around the globe please visit our websites: www.pinsentmasons.com www.Out-Law.com 15