SlideShare uma empresa Scribd logo
1 de 4
MELWIN SAMUEL.W
# 1254, 1st Cross Shankaracharya Road
Vidhyanagar, Hassan-573 201.
Mobile: +91 7411119788.
Email : melwin.samuel096@gmail.com.
Objective
Seeking an innovation and challenging career in a reputed organization, which allows professional
growth while working.
Education
 Piping Engineering form INDIAN INSTITUTE OF TECHNOLOGY (IIT) IN 2015, BOMBAY.
 PG-Diploma in process piping design and engineering from PETROCON INSTITUTE OF PIPING
ENGINEERING IN 2013.
 Hold BACHELOR OF ENGINEER [BE] in MECHANICAL with 59% aggregate from VISVESVARAYA
TECHNOLOGICAL UNIVERSITY IN 2012, BELGAUM ,KARNATAKA.
 12th
standard (PUC) with 45% of marks from ST Joseph’s composit PU College IN 2008, Hassan.
 10th
standard (SSLC) with 68% of marks from Sri Aravinda High School IN 2006, Hassan.
Achievements
 Three times participated in STATE LEVEL TABLE TENNIS tournament held at CHICKMAGALURU
AND BELLARY.
SOFTWARE PROFICIENCY
 PDMS (Plant design management system).
 Auto CAD.
Trainings Undergone
Process Piping Engineering as per ASME B31.3, with knowledge on the following
 Pipe sizes, Schedule No.
 Codes and Standards.
 Familiar with Piping Components, Fittings.
 Process Flow Diagrams, Utility Flow Diagrams, Piping and Instrumentation diagrams
 HAZOP study.
 Development of Plot Plan.
 Development of Piping Layout, Equipment Layout.
 GA Drawings, Isometric Drawings, GA to ISO conversion.
 Pipe Supports and its selection criteria.
 Pipe rack load calculation.
 Various types of piping like Compressor piping, Steam piping, Utility piping, Fire Fighting lines,
Vessel trims, Flare Piping, Cooler Piping, Column piping.
Personal Skills
 Ability to work individually and closely with others to accomplish assigned goals.
 Time punctuality, sincere and hard worker.
 Ability to learn and adapt to new techniques.
 Comprehensive problem solving abilities.
PROFESSIONAL EXPERIENCE
VERTEX PIPING ENGINEERS PVT LTD, Bangalore, KA. (Nov 2014 till date)
Designation : Piping Designer – Planning and Design department
Projects handled:
Mo 99: Supply, Installation, Testing & Commissioning of exempt low activity liquid water
collection and disposal system for Medical use of Fission based M099 production facility for
BRIT near BARC South Gate at Trombay, Mumbai.
 Prepared and modified As Built piping arrangement.
ICTS FIRE FIGHTING: Supply, Installation, Testing & Commissioning of Fire fighting, Domestic
and Flushing water supply system for ICTS TIFR Campus, Bangalore.
 Prepared and modified As Built piping arrangement.
HIGH PRESSURE HIGH TEMPARATURE – WATER CIRCULATION SYSTEM: Fabrication,
installation, commissioning and testing of high pressure high temperature closed loop water
circulation system for high heat flux test facility at Bhat, Gandhinagar, Gujarat
 Developed and prepared optimized equipment layouts from conceptual stage through the
conceptual study and FEED phases of project.
 Prepared and modified piping arrangement, pipe support location with reference of P&ID and
finalization by utilizing AutoCAD 2D and PDMS 3D software.
 Development of layout with cost efficient focus that minimizes installing plant operation
costs, whilst ensuring that constructability, operational, safety and maintenance requirements
with prior intension.
 Indicate Platform Elevation, ladder & staircase arrangement & hand railing.
 Discussing about plant layout issues with project manager, in a highly professional manner
and exchanged sound constructive ideas and advice.
 Prepared piping Isometric Drawing with individual BOM.
 Preparation and review of Line index and Equipment list.
 Maintaining production system records. Material take-off for individual isometrics for
particular process areas.
 Preparing and monitoring of fabrication sequencing as per codes and standards during
fabrication work, is performed in accordance with the approved construction procedure,
latest IFC drawings, specifications and correct materials.
 Fabrication and Erection of Structural steel.
 Installation of process for utility & process pipelines, erection of pressure vessels, receivers,
heat exchangers, pumps, heaters etc.
 Prepared and modified As Built piping arrangement.
 Performing the job according to fabrication drawings and project client specifications and also
after completion of fit up, arranging for QC inspectors and third party inspector according to
approved ITP.
 Sending feed backs to the line managers for maintaining the project schedule on time.
 Performing Hydro Testing & Pneumatic Testing for process and utility piping.
Worked with pre-commissioning activities.
FALCON TYRES LIMITED, Mysore, KA. (DUNLOP TYRES) (Nov 2013 till May 2014)
Designation : Senior management trainee – Production department
Production Engineer
 Analyzing the requirement of the different sized tyres in each shift.
 Reviewing the inventory left out by the previous shift.
 Ensuring the timely production of different size of treads and passing forward next to green
tyres building section as per requirement.
 Interacting with other sections like 4 roll calendar, tread extruder, bead winding, green tyres
building for proper flow of materials.
 Coordinating with planning, technical, quality & maintenance departments.
 Making final report of the output achieved in the particular shift and hand over of follow ups
to the relieving in-charge.
INDO CYLINDERSS, Bangalore, KA. (Sep 2012 till Oct 2013)
Designation : Trainee – Quality control and Production department
Quality Control and Production Engineer:
 Creation of visual work instruction, Process flow chart and Control Plan.
 Inspection of components as per drawing using UTM (Universal testing Machine) & standard
measuring instruments.
 Identify the non conformance, find the corrective action and measure their effectiveness root
cause analysis.
 Maintaining the records as per the ISO standards (9001-2008)
 Conducting NDT (Non Destructive Tests) like Hydrostatic test, Hydrostatic stretch test,
Pneumatic test, Paint thickness measurement, Torque inspection.
 Conducting DT (Destructive Tests) like Acceptance test, burst test.
 Preparation of test samples for Acceptance test, testing of samples in presence of BIS officer
and Clearance of test certificate.
 Formation of the required gang by allotment of man power.
 Scheduling for the gang job.
Personal details
 Date of birth : 09 December 1990
 Father’s name : William Francis S
 Nationality : Indian
 Languages known : English, Kannada, Hindi.
Declaration
I hereby solemnly declare and affirm that all statements made in this application are true and correct
to the best of my knowledge and belief.
Place: Bangalore, India. Yours Faithfully
Date: W Melwin Samuel

Mais conteúdo relacionado

Mais procurados (19)

RAJNISH_RANJAN-1 (1).PDF
RAJNISH_RANJAN-1 (1).PDFRAJNISH_RANJAN-1 (1).PDF
RAJNISH_RANJAN-1 (1).PDF
 
CV_1
CV_1CV_1
CV_1
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
Maintenance Manager - CV
Maintenance Manager - CVMaintenance Manager - CV
Maintenance Manager - CV
 
Updated Resume 2015
Updated Resume 2015Updated Resume 2015
Updated Resume 2015
 
Sandeep Suryavanshi CoverLetter and Resume
Sandeep Suryavanshi  CoverLetter and ResumeSandeep Suryavanshi  CoverLetter and Resume
Sandeep Suryavanshi CoverLetter and Resume
 
Mohd Imran CV
Mohd Imran CVMohd Imran CV
Mohd Imran CV
 
Facilities maintenance _manager_resume
Facilities maintenance _manager_resumeFacilities maintenance _manager_resume
Facilities maintenance _manager_resume
 
CV
CVCV
CV
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
Martin-CV- M.Tech
Martin-CV- M.TechMartin-CV- M.Tech
Martin-CV- M.Tech
 
Akbar Resume (1)
Akbar Resume (1)Akbar Resume (1)
Akbar Resume (1)
 
resume (1)
resume (1)resume (1)
resume (1)
 
jsw resume
jsw resumejsw resume
jsw resume
 
resume new
resume newresume new
resume new
 
David Resume'
David Resume'David Resume'
David Resume'
 
ilayaraja_piping designer
ilayaraja_piping designerilayaraja_piping designer
ilayaraja_piping designer
 
Pranav resume
Pranav resumePranav resume
Pranav resume
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisor
 

Semelhante a Cv melwin samuel w lt

Semelhante a Cv melwin samuel w lt (20)

resume updated
resume updatedresume updated
resume updated
 
Metri Plant With utility
Metri Plant With utilityMetri Plant With utility
Metri Plant With utility
 
Arun_Resume
Arun_ResumeArun_Resume
Arun_Resume
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Resume
ResumeResume
Resume
 
MONIKANDAN-RESUME - B
MONIKANDAN-RESUME - BMONIKANDAN-RESUME - B
MONIKANDAN-RESUME - B
 
Piping Purushothaman.k Resume
Piping Purushothaman.k ResumePiping Purushothaman.k Resume
Piping Purushothaman.k Resume
 
RESUME_Chelladurai
RESUME_ChelladuraiRESUME_Chelladurai
RESUME_Chelladurai
 
P.MAHADEVAN - RESUME------
P.MAHADEVAN - RESUME------P.MAHADEVAN - RESUME------
P.MAHADEVAN - RESUME------
 
RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA RESUME BHAGATSINH VERMA
RESUME BHAGATSINH VERMA
 
swapnil cv
swapnil cvswapnil cv
swapnil cv
 
Hedayatullah CV
Hedayatullah CVHedayatullah CV
Hedayatullah CV
 
CV-Tamilmaran-B.E (Mechanical)
CV-Tamilmaran-B.E (Mechanical)CV-Tamilmaran-B.E (Mechanical)
CV-Tamilmaran-B.E (Mechanical)
 
Amol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docxAmol Sawant (Piping Engineer with 10 years experience) docx
Amol Sawant (Piping Engineer with 10 years experience) docx
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Profile Details (CV)
Profile Details (CV)Profile Details (CV)
Profile Details (CV)
 
NEW RESUME AUG-16
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
CV SAIF UR REHMAN
CV SAIF UR REHMANCV SAIF UR REHMAN
CV SAIF UR REHMAN
 

Último

Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate productionChinnuNinan
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxachiever3003
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Último (20)

Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Crushers to screens in aggregate production
Crushers to screens in aggregate productionCrushers to screens in aggregate production
Crushers to screens in aggregate production
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Crystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptxCrystal Structure analysis and detailed information pptx
Crystal Structure analysis and detailed information pptx
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

Cv melwin samuel w lt

  • 1. MELWIN SAMUEL.W # 1254, 1st Cross Shankaracharya Road Vidhyanagar, Hassan-573 201. Mobile: +91 7411119788. Email : melwin.samuel096@gmail.com. Objective Seeking an innovation and challenging career in a reputed organization, which allows professional growth while working. Education  Piping Engineering form INDIAN INSTITUTE OF TECHNOLOGY (IIT) IN 2015, BOMBAY.  PG-Diploma in process piping design and engineering from PETROCON INSTITUTE OF PIPING ENGINEERING IN 2013.  Hold BACHELOR OF ENGINEER [BE] in MECHANICAL with 59% aggregate from VISVESVARAYA TECHNOLOGICAL UNIVERSITY IN 2012, BELGAUM ,KARNATAKA.  12th standard (PUC) with 45% of marks from ST Joseph’s composit PU College IN 2008, Hassan.  10th standard (SSLC) with 68% of marks from Sri Aravinda High School IN 2006, Hassan. Achievements  Three times participated in STATE LEVEL TABLE TENNIS tournament held at CHICKMAGALURU AND BELLARY. SOFTWARE PROFICIENCY  PDMS (Plant design management system).  Auto CAD. Trainings Undergone Process Piping Engineering as per ASME B31.3, with knowledge on the following  Pipe sizes, Schedule No.  Codes and Standards.  Familiar with Piping Components, Fittings.  Process Flow Diagrams, Utility Flow Diagrams, Piping and Instrumentation diagrams
  • 2.  HAZOP study.  Development of Plot Plan.  Development of Piping Layout, Equipment Layout.  GA Drawings, Isometric Drawings, GA to ISO conversion.  Pipe Supports and its selection criteria.  Pipe rack load calculation.  Various types of piping like Compressor piping, Steam piping, Utility piping, Fire Fighting lines, Vessel trims, Flare Piping, Cooler Piping, Column piping. Personal Skills  Ability to work individually and closely with others to accomplish assigned goals.  Time punctuality, sincere and hard worker.  Ability to learn and adapt to new techniques.  Comprehensive problem solving abilities. PROFESSIONAL EXPERIENCE VERTEX PIPING ENGINEERS PVT LTD, Bangalore, KA. (Nov 2014 till date) Designation : Piping Designer – Planning and Design department Projects handled: Mo 99: Supply, Installation, Testing & Commissioning of exempt low activity liquid water collection and disposal system for Medical use of Fission based M099 production facility for BRIT near BARC South Gate at Trombay, Mumbai.  Prepared and modified As Built piping arrangement. ICTS FIRE FIGHTING: Supply, Installation, Testing & Commissioning of Fire fighting, Domestic and Flushing water supply system for ICTS TIFR Campus, Bangalore.  Prepared and modified As Built piping arrangement. HIGH PRESSURE HIGH TEMPARATURE – WATER CIRCULATION SYSTEM: Fabrication, installation, commissioning and testing of high pressure high temperature closed loop water circulation system for high heat flux test facility at Bhat, Gandhinagar, Gujarat  Developed and prepared optimized equipment layouts from conceptual stage through the conceptual study and FEED phases of project.  Prepared and modified piping arrangement, pipe support location with reference of P&ID and finalization by utilizing AutoCAD 2D and PDMS 3D software.
  • 3.  Development of layout with cost efficient focus that minimizes installing plant operation costs, whilst ensuring that constructability, operational, safety and maintenance requirements with prior intension.  Indicate Platform Elevation, ladder & staircase arrangement & hand railing.  Discussing about plant layout issues with project manager, in a highly professional manner and exchanged sound constructive ideas and advice.  Prepared piping Isometric Drawing with individual BOM.  Preparation and review of Line index and Equipment list.  Maintaining production system records. Material take-off for individual isometrics for particular process areas.  Preparing and monitoring of fabrication sequencing as per codes and standards during fabrication work, is performed in accordance with the approved construction procedure, latest IFC drawings, specifications and correct materials.  Fabrication and Erection of Structural steel.  Installation of process for utility & process pipelines, erection of pressure vessels, receivers, heat exchangers, pumps, heaters etc.  Prepared and modified As Built piping arrangement.  Performing the job according to fabrication drawings and project client specifications and also after completion of fit up, arranging for QC inspectors and third party inspector according to approved ITP.  Sending feed backs to the line managers for maintaining the project schedule on time.  Performing Hydro Testing & Pneumatic Testing for process and utility piping. Worked with pre-commissioning activities. FALCON TYRES LIMITED, Mysore, KA. (DUNLOP TYRES) (Nov 2013 till May 2014) Designation : Senior management trainee – Production department Production Engineer  Analyzing the requirement of the different sized tyres in each shift.  Reviewing the inventory left out by the previous shift.  Ensuring the timely production of different size of treads and passing forward next to green tyres building section as per requirement.  Interacting with other sections like 4 roll calendar, tread extruder, bead winding, green tyres building for proper flow of materials.  Coordinating with planning, technical, quality & maintenance departments.  Making final report of the output achieved in the particular shift and hand over of follow ups to the relieving in-charge. INDO CYLINDERSS, Bangalore, KA. (Sep 2012 till Oct 2013) Designation : Trainee – Quality control and Production department Quality Control and Production Engineer:  Creation of visual work instruction, Process flow chart and Control Plan.
  • 4.  Inspection of components as per drawing using UTM (Universal testing Machine) & standard measuring instruments.  Identify the non conformance, find the corrective action and measure their effectiveness root cause analysis.  Maintaining the records as per the ISO standards (9001-2008)  Conducting NDT (Non Destructive Tests) like Hydrostatic test, Hydrostatic stretch test, Pneumatic test, Paint thickness measurement, Torque inspection.  Conducting DT (Destructive Tests) like Acceptance test, burst test.  Preparation of test samples for Acceptance test, testing of samples in presence of BIS officer and Clearance of test certificate.  Formation of the required gang by allotment of man power.  Scheduling for the gang job. Personal details  Date of birth : 09 December 1990  Father’s name : William Francis S  Nationality : Indian  Languages known : English, Kannada, Hindi. Declaration I hereby solemnly declare and affirm that all statements made in this application are true and correct to the best of my knowledge and belief. Place: Bangalore, India. Yours Faithfully Date: W Melwin Samuel