1. MELWIN SAMUEL.W
# 1254, 1st Cross Shankaracharya Road
Vidhyanagar, Hassan-573 201.
Mobile: +91 7411119788.
Email : melwin.samuel096@gmail.com.
Objective
Seeking an innovation and challenging career in a reputed organization, which allows professional
growth while working.
Education
Piping Engineering form INDIAN INSTITUTE OF TECHNOLOGY (IIT) IN 2015, BOMBAY.
PG-Diploma in process piping design and engineering from PETROCON INSTITUTE OF PIPING
ENGINEERING IN 2013.
Hold BACHELOR OF ENGINEER [BE] in MECHANICAL with 59% aggregate from VISVESVARAYA
TECHNOLOGICAL UNIVERSITY IN 2012, BELGAUM ,KARNATAKA.
12th
standard (PUC) with 45% of marks from ST Joseph’s composit PU College IN 2008, Hassan.
10th
standard (SSLC) with 68% of marks from Sri Aravinda High School IN 2006, Hassan.
Achievements
Three times participated in STATE LEVEL TABLE TENNIS tournament held at CHICKMAGALURU
AND BELLARY.
SOFTWARE PROFICIENCY
PDMS (Plant design management system).
Auto CAD.
Trainings Undergone
Process Piping Engineering as per ASME B31.3, with knowledge on the following
Pipe sizes, Schedule No.
Codes and Standards.
Familiar with Piping Components, Fittings.
Process Flow Diagrams, Utility Flow Diagrams, Piping and Instrumentation diagrams
2. HAZOP study.
Development of Plot Plan.
Development of Piping Layout, Equipment Layout.
GA Drawings, Isometric Drawings, GA to ISO conversion.
Pipe Supports and its selection criteria.
Pipe rack load calculation.
Various types of piping like Compressor piping, Steam piping, Utility piping, Fire Fighting lines,
Vessel trims, Flare Piping, Cooler Piping, Column piping.
Personal Skills
Ability to work individually and closely with others to accomplish assigned goals.
Time punctuality, sincere and hard worker.
Ability to learn and adapt to new techniques.
Comprehensive problem solving abilities.
PROFESSIONAL EXPERIENCE
VERTEX PIPING ENGINEERS PVT LTD, Bangalore, KA. (Nov 2014 till date)
Designation : Piping Designer – Planning and Design department
Projects handled:
Mo 99: Supply, Installation, Testing & Commissioning of exempt low activity liquid water
collection and disposal system for Medical use of Fission based M099 production facility for
BRIT near BARC South Gate at Trombay, Mumbai.
Prepared and modified As Built piping arrangement.
ICTS FIRE FIGHTING: Supply, Installation, Testing & Commissioning of Fire fighting, Domestic
and Flushing water supply system for ICTS TIFR Campus, Bangalore.
Prepared and modified As Built piping arrangement.
HIGH PRESSURE HIGH TEMPARATURE – WATER CIRCULATION SYSTEM: Fabrication,
installation, commissioning and testing of high pressure high temperature closed loop water
circulation system for high heat flux test facility at Bhat, Gandhinagar, Gujarat
Developed and prepared optimized equipment layouts from conceptual stage through the
conceptual study and FEED phases of project.
Prepared and modified piping arrangement, pipe support location with reference of P&ID and
finalization by utilizing AutoCAD 2D and PDMS 3D software.
3. Development of layout with cost efficient focus that minimizes installing plant operation
costs, whilst ensuring that constructability, operational, safety and maintenance requirements
with prior intension.
Indicate Platform Elevation, ladder & staircase arrangement & hand railing.
Discussing about plant layout issues with project manager, in a highly professional manner
and exchanged sound constructive ideas and advice.
Prepared piping Isometric Drawing with individual BOM.
Preparation and review of Line index and Equipment list.
Maintaining production system records. Material take-off for individual isometrics for
particular process areas.
Preparing and monitoring of fabrication sequencing as per codes and standards during
fabrication work, is performed in accordance with the approved construction procedure,
latest IFC drawings, specifications and correct materials.
Fabrication and Erection of Structural steel.
Installation of process for utility & process pipelines, erection of pressure vessels, receivers,
heat exchangers, pumps, heaters etc.
Prepared and modified As Built piping arrangement.
Performing the job according to fabrication drawings and project client specifications and also
after completion of fit up, arranging for QC inspectors and third party inspector according to
approved ITP.
Sending feed backs to the line managers for maintaining the project schedule on time.
Performing Hydro Testing & Pneumatic Testing for process and utility piping.
Worked with pre-commissioning activities.
FALCON TYRES LIMITED, Mysore, KA. (DUNLOP TYRES) (Nov 2013 till May 2014)
Designation : Senior management trainee – Production department
Production Engineer
Analyzing the requirement of the different sized tyres in each shift.
Reviewing the inventory left out by the previous shift.
Ensuring the timely production of different size of treads and passing forward next to green
tyres building section as per requirement.
Interacting with other sections like 4 roll calendar, tread extruder, bead winding, green tyres
building for proper flow of materials.
Coordinating with planning, technical, quality & maintenance departments.
Making final report of the output achieved in the particular shift and hand over of follow ups
to the relieving in-charge.
INDO CYLINDERSS, Bangalore, KA. (Sep 2012 till Oct 2013)
Designation : Trainee – Quality control and Production department
Quality Control and Production Engineer:
Creation of visual work instruction, Process flow chart and Control Plan.
4. Inspection of components as per drawing using UTM (Universal testing Machine) & standard
measuring instruments.
Identify the non conformance, find the corrective action and measure their effectiveness root
cause analysis.
Maintaining the records as per the ISO standards (9001-2008)
Conducting NDT (Non Destructive Tests) like Hydrostatic test, Hydrostatic stretch test,
Pneumatic test, Paint thickness measurement, Torque inspection.
Conducting DT (Destructive Tests) like Acceptance test, burst test.
Preparation of test samples for Acceptance test, testing of samples in presence of BIS officer
and Clearance of test certificate.
Formation of the required gang by allotment of man power.
Scheduling for the gang job.
Personal details
Date of birth : 09 December 1990
Father’s name : William Francis S
Nationality : Indian
Languages known : English, Kannada, Hindi.
Declaration
I hereby solemnly declare and affirm that all statements made in this application are true and correct
to the best of my knowledge and belief.
Place: Bangalore, India. Yours Faithfully
Date: W Melwin Samuel