I.     Existing Conditions
II.    Who Is Impacted
III.   The Challenge – Satisfy Everyone!
IV.    Construction
V.     Summary
VI.    Questions
– Built in 1934, Posted for 17 tons

– Jack arch structure with concrete and steel
  deterioration

– Insufficient bridge width for use
   • Vehicles, pedestrians, snowmobiles
   • Existing rail-to-rail – 26’; Proposed Width – 34’
– Abutment footing undermining

– Asbestos paint on girders and railings

– Poor drainage

– No record plans for bridge
– Subsurface Conditions – Sand

– Locate septic systems

– New Deck at Restaurant - installed prior to
  construction
Project Influences
     Community
•   Businesses                             Agencies
•   Residences                          • Funding
•   Schedule              Project       • Permitting
                                        • Utilities
•   Pedestrians
•   Recreational
    vehicles
• Funding
  – FHWA, NYSDOT and County

• Utility Companies
  – National Grid, Frontier, Time Warner Cable, Turkey
    Water Works (Local Water) – all relocated

• Permitting
  – NYSDOT, APA, NYSDEC and USACE
• Adjacent Private Residences
  – Driveways, septic systems
• Adjacent Business owners
  – Need to stay open during tourist season
• Waterway Under Bridge
• Pedestrians, Snowmobile Trail
CHURCH

                                  MARINA

                 HOTEL



         SOUTH SHORE ROAD

                PRIVATE

                         SEPTIC

                         WELL
Schedule
  – Tourist season - July and August
     • Town - no construction
  – No Detour Route
     • Staged Construction
  – Shortened construction
     • Mid April to Mid September
Schedule
  – Minimize Concrete Pours
    • Cure time impact
  – Snowmobile Trail
    • Open December 1 to March 31
• Goal
  – Bridge open by July 4th
     • (Schedule April 1 to July 1)


  – 13 weeks???
• Alternatives Considered
  – Superstructure Replacement
     •   Existing abutment widened
     •   75 year old concrete
     •   No record plans
     •   Cost 95% of replacement
  – Replacement Structure Built Under Existing
     • Town – no reduction to clearance of navigable
       waterway
• Alternatives Considered
  – Replacement w/ C.I.P. Concrete Abutments with
    Spread Footings
     • Footings below stream bed for scour prevention
     • Cofferdams needed
  – Replacement w/ Integral Abutments
     • Steel H-Piles
     • Prestressed concrete beams
     • Asphalt Wearing Surface
• Replacement with Integral Abutments

   – Precast saves time

   – Limited demolition/excavation



• How can we build within constraints of schedule?
• Contractor and Town                      Now what?



  – Insufficient space for crane staging

  – Traffic Control
     • Too close to Route 28


  – Too much time needed for staged construction
• Eureka!!!
  – Town Highway Superindendent
     • Existing snowmobile trail for detour route
     • Town owns majority of R.O.W.

                       Time to pull out
                        the ACE up my
                            sleeve!
Piece
  of
Cake!
•   Build Detour in Fall before December 1
•   Relocate overhead utilities prior to April 1
•   Open Detour - April 1
•   Close Bridge - April 1
•   Open New Bridge - July 1
•   Project Completion - July 31
Design Speed - 20 MPH
2 – 10 ft travel lanes
Detour Profile




• Horizontal & Vertical close to existing

  • Helps keep vehicle speed down!
• Project completed on June 30
• Project also included:
  – Separate C.I.P. u-wings with spread footings
  – 60 ft long, 8 ft high tapered C.I.P retaining wall
    with spread footing
  – Closed drainage
  – Thermoplastic Snowmobile Crossing
• Permits
  – APA – wetlands along detour
  – NYSDEC – stream restrictions for salmon spawning
  – USACE – waterway
  – NYSDOT Highway Work Permit – new drainage
    structure on Route 28 and construction signs
• Financials
  – Engineers Estimate:        $1.4 M
  – Low Bid:                   $1.2 M
  – Final Construction Cost:   $1.1 M
Thorough Planning
  – Construction Schedule discussed with contractor
    before design
  – Utility Agreements – relocated prior to April 1
  – Bid late summer allowing contractor time to plan
    for spring construction
  – Liquidated damages provisions
     • Detour completion December 1
     • Bridge open July 1
Team Effort
  – County – overall project management
  – NYSDOT – R.O.W. acquisition
  – Town – agreement with Marina and local public
    relations
Public Involvement
  – Design - 2 public meetings
  – Construction – Town Hall meetings
• You can never have too much communication
  with your team
• Don’t be afraid to talk to local people
• Think outside the box
• Construction schedule is VERY important!
1. What is the name of the unique environmental
   agency involved with this project?
  –   APA
2. Who contributed to the “solution” for the
   project detour?
  –   Town Highway Superintendent & Dick Payne
3. What was the design speed used for the detour
   road?
  –   20 MPH
4. Besides vehicles and pedestrians, what else
   used the bridge for a crossing?
  – Snowmobiles
5. How many weeks did the bridge construction
   take?
  – 13 weeks
6. What material was the temporary pedestrian
   bridge made out of?
  – Aluminum
7. What was the existing span of the bridge?
  – 49 feet
8. How long were the new steel h-piles?
  – 100 feet
9. What type of abutment was used for the new
   bridge?
  – Integral
10. How many liquidated damage provisions
   were used?
  – 2 (1 – detour completion , 1 – bridge opening)
Big Challenge, Big Success

Mais conteúdo relacionado

Mais procurados

Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
Crosstown TO
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
Crosstown TO
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
Crosstown TO
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
Crosstown TO
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
Crosstown TO
 
Science centre station open house
Science centre station open houseScience centre station open house
Science centre station open house
Crosstown TO
 
Forest hill station open house
Forest hill station open house Forest hill station open house
Forest hill station open house
Crosstown TO
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017
Crosstown TO
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
Crosstown TO
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
Crosstown TO
 

Mais procurados (20)

Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Fairfax Community Leaders Conference
Fairfax Community Leaders ConferenceFairfax Community Leaders Conference
Fairfax Community Leaders Conference
 
Laird Station Open House - April 2017
Laird Station Open House - April 2017Laird Station Open House - April 2017
Laird Station Open House - April 2017
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Science centre station open house
Science centre station open houseScience centre station open house
Science centre station open house
 
Forest hill station open house
Forest hill station open house Forest hill station open house
Forest hill station open house
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017Fairbank & Oakwood Stations Open House - April 2017
Fairbank & Oakwood Stations Open House - April 2017
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design Review
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Eglinton Park
Eglinton ParkEglinton Park
Eglinton Park
 
The Highline
 The Highline The Highline
The Highline
 

Destaque (8)

الجزء العاشر صيانة الطرق
الجزء العاشر صيانة الطرقالجزء العاشر صيانة الطرق
الجزء العاشر صيانة الطرق
 
الجزء السادس التصميم الانشائى للطرق
الجزء السادس التصميم الانشائى للطرقالجزء السادس التصميم الانشائى للطرق
الجزء السادس التصميم الانشائى للطرق
 
هندسة مرور 1
هندسة مرور 1هندسة مرور 1
هندسة مرور 1
 
Highway _airport_lectures_2014_10_19_22_00_46_310
Highway  _airport_lectures_2014_10_19_22_00_46_310Highway  _airport_lectures_2014_10_19_22_00_46_310
Highway _airport_lectures_2014_10_19_22_00_46_310
 
هندسة مرور 2
هندسة مرور 2هندسة مرور 2
هندسة مرور 2
 
Road Design and Safety
Road Design and SafetyRoad Design and Safety
Road Design and Safety
 
نبذة عن الاجهزة المساحية
نبذة عن الاجهزة المساحيةنبذة عن الاجهزة المساحية
نبذة عن الاجهزة المساحية
 
دليل التصميم الهندسي للطرق.Pdf (
دليل التصميم الهندسي للطرق.Pdf (دليل التصميم الهندسي للطرق.Pdf (
دليل التصميم الهندسي للطرق.Pdf (
 

Semelhante a Big Challenge, Big Success

North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
Association for Project Management
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
Crosstown TO
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
Crosstown TO
 
Capital Improvement Projects Update 2013
Capital Improvement Projects Update 2013Capital Improvement Projects Update 2013
Capital Improvement Projects Update 2013
StateCollegePA
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
Crosstown TO
 
Capital Improvement Project Highlights for Downtown Merchants
Capital Improvement Project Highlights for Downtown MerchantsCapital Improvement Project Highlights for Downtown Merchants
Capital Improvement Project Highlights for Downtown Merchants
StateCollegePA
 
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
City of College Station
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Crosstown TO
 

Semelhante a Big Challenge, Big Success (20)

Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891
 
Display boards
Display boardsDisplay boards
Display boards
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridge
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley RoadPublic Information Meeting: Realignment of Old Courthouse Road at Besley Road
Public Information Meeting: Realignment of Old Courthouse Road at Besley Road
 
Capital Improvement Projects Update 2013
Capital Improvement Projects Update 2013Capital Improvement Projects Update 2013
Capital Improvement Projects Update 2013
 
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction ProjectCommunity Meeting - Indian Run Gravity Sewer Replacement Construction Project
Community Meeting - Indian Run Gravity Sewer Replacement Construction Project
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Tunneling
TunnelingTunneling
Tunneling
 
Capital Improvement Project Highlights for Downtown Merchants
Capital Improvement Project Highlights for Downtown MerchantsCapital Improvement Project Highlights for Downtown Merchants
Capital Improvement Project Highlights for Downtown Merchants
 
State of the Trails 2015
State of the Trails 2015State of the Trails 2015
State of the Trails 2015
 
transportation
transportationtransportation
transportation
 
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
Rezoning of Property at 410 Texas Ave. (former site of Plaza Hotel)
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation Engineering
 

Mais de mecocca5

Local Roads Matter Photo Slideshow
Local Roads Matter Photo SlideshowLocal Roads Matter Photo Slideshow
Local Roads Matter Photo Slideshow
mecocca5
 
Innovative Retaining Wall Systems
Innovative Retaining Wall SystemsInnovative Retaining Wall Systems
Innovative Retaining Wall Systems
mecocca5
 
Beach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then SomeBeach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then Some
mecocca5
 
Subsurface Investigation and Geotechnical Evaluation
Subsurface Investigation and Geotechnical EvaluationSubsurface Investigation and Geotechnical Evaluation
Subsurface Investigation and Geotechnical Evaluation
mecocca5
 
The Way We Were -The Way We Are
The Way We Were -The Way We AreThe Way We Were -The Way We Are
The Way We Were -The Way We Are
mecocca5
 
Fwd thinking
Fwd thinkingFwd thinking
Fwd thinking
mecocca5
 
Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
mecocca5
 
Pavement preservation john curley and dane mellon
Pavement preservation john curley and dane mellonPavement preservation john curley and dane mellon
Pavement preservation john curley and dane mellon
mecocca5
 
What the complete streets legislation means for you ed stachura
What the complete streets legislation means for you ed stachuraWhat the complete streets legislation means for you ed stachura
What the complete streets legislation means for you ed stachura
mecocca5
 
Impacts of energy development on low volume roads paul wilke, pe
Impacts of energy development on low volume roads paul wilke, peImpacts of energy development on low volume roads paul wilke, pe
Impacts of energy development on low volume roads paul wilke, pe
mecocca5
 
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOTNYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
mecocca5
 
What would you do ethical choices questions and responses
What would you do ethical choices questions and responsesWhat would you do ethical choices questions and responses
What would you do ethical choices questions and responses
mecocca5
 
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
mecocca5
 
Quality Based Road Program
Quality Based Road ProgramQuality Based Road Program
Quality Based Road Program
mecocca5
 
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance FacilitiesOvercoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
mecocca5
 
Maintaining Compliance with Right to Know Law
Maintaining Compliance with Right to Know LawMaintaining Compliance with Right to Know Law
Maintaining Compliance with Right to Know Law
mecocca5
 
Mechanistic Empirical Pavement Design
Mechanistic Empirical Pavement Design Mechanistic Empirical Pavement Design
Mechanistic Empirical Pavement Design
mecocca5
 
Construction Materials Engineering and Testing
Construction Materials Engineering and TestingConstruction Materials Engineering and Testing
Construction Materials Engineering and Testing
mecocca5
 
Stretching Dollars with Bridge Maintenance
Stretching Dollars with Bridge Maintenance Stretching Dollars with Bridge Maintenance
Stretching Dollars with Bridge Maintenance
mecocca5
 
Asset Management - Data Collection, Prioritization, Estimating, Funding
Asset Management - Data Collection, Prioritization, Estimating, FundingAsset Management - Data Collection, Prioritization, Estimating, Funding
Asset Management - Data Collection, Prioritization, Estimating, Funding
mecocca5
 

Mais de mecocca5 (20)

Local Roads Matter Photo Slideshow
Local Roads Matter Photo SlideshowLocal Roads Matter Photo Slideshow
Local Roads Matter Photo Slideshow
 
Innovative Retaining Wall Systems
Innovative Retaining Wall SystemsInnovative Retaining Wall Systems
Innovative Retaining Wall Systems
 
Beach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then SomeBeach Road, Porous Pavement and Then Some
Beach Road, Porous Pavement and Then Some
 
Subsurface Investigation and Geotechnical Evaluation
Subsurface Investigation and Geotechnical EvaluationSubsurface Investigation and Geotechnical Evaluation
Subsurface Investigation and Geotechnical Evaluation
 
The Way We Were -The Way We Are
The Way We Were -The Way We AreThe Way We Were -The Way We Are
The Way We Were -The Way We Are
 
Fwd thinking
Fwd thinkingFwd thinking
Fwd thinking
 
Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
 
Pavement preservation john curley and dane mellon
Pavement preservation john curley and dane mellonPavement preservation john curley and dane mellon
Pavement preservation john curley and dane mellon
 
What the complete streets legislation means for you ed stachura
What the complete streets legislation means for you ed stachuraWhat the complete streets legislation means for you ed stachura
What the complete streets legislation means for you ed stachura
 
Impacts of energy development on low volume roads paul wilke, pe
Impacts of energy development on low volume roads paul wilke, peImpacts of energy development on low volume roads paul wilke, pe
Impacts of energy development on low volume roads paul wilke, pe
 
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOTNYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
NYS DEC PSRT Program-Tom Blanchard, NYSDEC and Andy Stiles, NYSDOT
 
What would you do ethical choices questions and responses
What would you do ethical choices questions and responsesWhat would you do ethical choices questions and responses
What would you do ethical choices questions and responses
 
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
Best Practices for Management of Traffic Signs: Town of Clifton Park as a Cas...
 
Quality Based Road Program
Quality Based Road ProgramQuality Based Road Program
Quality Based Road Program
 
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance FacilitiesOvercoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
Overcoming the Hurdles of Improving Outdated Vehicle Maintenance Facilities
 
Maintaining Compliance with Right to Know Law
Maintaining Compliance with Right to Know LawMaintaining Compliance with Right to Know Law
Maintaining Compliance with Right to Know Law
 
Mechanistic Empirical Pavement Design
Mechanistic Empirical Pavement Design Mechanistic Empirical Pavement Design
Mechanistic Empirical Pavement Design
 
Construction Materials Engineering and Testing
Construction Materials Engineering and TestingConstruction Materials Engineering and Testing
Construction Materials Engineering and Testing
 
Stretching Dollars with Bridge Maintenance
Stretching Dollars with Bridge Maintenance Stretching Dollars with Bridge Maintenance
Stretching Dollars with Bridge Maintenance
 
Asset Management - Data Collection, Prioritization, Estimating, Funding
Asset Management - Data Collection, Prioritization, Estimating, FundingAsset Management - Data Collection, Prioritization, Estimating, Funding
Asset Management - Data Collection, Prioritization, Estimating, Funding
 

Último

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Último (20)

Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 

Big Challenge, Big Success

  • 1.
  • 2. I. Existing Conditions II. Who Is Impacted III. The Challenge – Satisfy Everyone! IV. Construction V. Summary VI. Questions
  • 3.
  • 4. – Built in 1934, Posted for 17 tons – Jack arch structure with concrete and steel deterioration – Insufficient bridge width for use • Vehicles, pedestrians, snowmobiles • Existing rail-to-rail – 26’; Proposed Width – 34’
  • 5. – Abutment footing undermining – Asbestos paint on girders and railings – Poor drainage – No record plans for bridge
  • 6. – Subsurface Conditions – Sand – Locate septic systems – New Deck at Restaurant - installed prior to construction
  • 7.
  • 8.
  • 9. Project Influences Community • Businesses Agencies • Residences • Funding • Schedule Project • Permitting • Utilities • Pedestrians • Recreational vehicles
  • 10. • Funding – FHWA, NYSDOT and County • Utility Companies – National Grid, Frontier, Time Warner Cable, Turkey Water Works (Local Water) – all relocated • Permitting – NYSDOT, APA, NYSDEC and USACE
  • 11. • Adjacent Private Residences – Driveways, septic systems • Adjacent Business owners – Need to stay open during tourist season • Waterway Under Bridge • Pedestrians, Snowmobile Trail
  • 12. CHURCH MARINA HOTEL SOUTH SHORE ROAD PRIVATE SEPTIC WELL
  • 13. Schedule – Tourist season - July and August • Town - no construction – No Detour Route • Staged Construction – Shortened construction • Mid April to Mid September
  • 14. Schedule – Minimize Concrete Pours • Cure time impact – Snowmobile Trail • Open December 1 to March 31
  • 15. • Goal – Bridge open by July 4th • (Schedule April 1 to July 1) – 13 weeks???
  • 16. • Alternatives Considered – Superstructure Replacement • Existing abutment widened • 75 year old concrete • No record plans • Cost 95% of replacement – Replacement Structure Built Under Existing • Town – no reduction to clearance of navigable waterway
  • 17. • Alternatives Considered – Replacement w/ C.I.P. Concrete Abutments with Spread Footings • Footings below stream bed for scour prevention • Cofferdams needed – Replacement w/ Integral Abutments • Steel H-Piles • Prestressed concrete beams • Asphalt Wearing Surface
  • 18. • Replacement with Integral Abutments – Precast saves time – Limited demolition/excavation • How can we build within constraints of schedule?
  • 19. • Contractor and Town Now what? – Insufficient space for crane staging – Traffic Control • Too close to Route 28 – Too much time needed for staged construction
  • 20. • Eureka!!! – Town Highway Superindendent • Existing snowmobile trail for detour route • Town owns majority of R.O.W. Time to pull out the ACE up my sleeve!
  • 22. Build Detour in Fall before December 1 • Relocate overhead utilities prior to April 1 • Open Detour - April 1 • Close Bridge - April 1 • Open New Bridge - July 1 • Project Completion - July 31
  • 23. Design Speed - 20 MPH
  • 24. 2 – 10 ft travel lanes
  • 25. Detour Profile • Horizontal & Vertical close to existing • Helps keep vehicle speed down!
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42. • Project completed on June 30 • Project also included: – Separate C.I.P. u-wings with spread footings – 60 ft long, 8 ft high tapered C.I.P retaining wall with spread footing – Closed drainage – Thermoplastic Snowmobile Crossing
  • 43. • Permits – APA – wetlands along detour – NYSDEC – stream restrictions for salmon spawning – USACE – waterway – NYSDOT Highway Work Permit – new drainage structure on Route 28 and construction signs
  • 44. • Financials – Engineers Estimate: $1.4 M – Low Bid: $1.2 M – Final Construction Cost: $1.1 M
  • 45. Thorough Planning – Construction Schedule discussed with contractor before design – Utility Agreements – relocated prior to April 1 – Bid late summer allowing contractor time to plan for spring construction – Liquidated damages provisions • Detour completion December 1 • Bridge open July 1
  • 46. Team Effort – County – overall project management – NYSDOT – R.O.W. acquisition – Town – agreement with Marina and local public relations Public Involvement – Design - 2 public meetings – Construction – Town Hall meetings
  • 47. • You can never have too much communication with your team • Don’t be afraid to talk to local people • Think outside the box • Construction schedule is VERY important!
  • 48.
  • 49. 1. What is the name of the unique environmental agency involved with this project? – APA 2. Who contributed to the “solution” for the project detour? – Town Highway Superintendent & Dick Payne 3. What was the design speed used for the detour road? – 20 MPH
  • 50. 4. Besides vehicles and pedestrians, what else used the bridge for a crossing? – Snowmobiles 5. How many weeks did the bridge construction take? – 13 weeks 6. What material was the temporary pedestrian bridge made out of? – Aluminum
  • 51. 7. What was the existing span of the bridge? – 49 feet 8. How long were the new steel h-piles? – 100 feet 9. What type of abutment was used for the new bridge? – Integral
  • 52. 10. How many liquidated damage provisions were used? – 2 (1 – detour completion , 1 – bridge opening)