PRINCE2® & take a walk on the Agile side!
    (Release 1.2)

    The training and consultancy team at Attra Partners writes:

    The recent economic crisis has lead to increasing cost and delivery pressures. Although from a
    governance perspective PRINCE2 is one of the project management methodologies, there is an (incorrect)
    impression that PRINCE2 is expensive, heavy handed and inflexible.

    The latest edition of PRINCE2 (released June 2009) does facilitate the use of an Agile delivery approach.
    PRINCE2 defined six aspects of project‟s performance that must be agreed and monitored:

    PRINCE2 also recommends that tolerances are specified for                                                   Time
    each of these six aspects.
                                                                                              Benefits                   Cost
    Let‟s see how the SCOPE aspect can be used to “go Agile” –
    diagrams on the next pages summarise the fusion of these.
    (knowledge of PRINCE2 & Agile concepts are assumed.)

    If you have any questions or comments please email
                                                                                               Risk                     Quality
    sales@attrapartners.com

                                                                                                                Scope



     Copyright © 2009 Attra Partners Limited. All rights reserved. Reproduction in whole or in part in any form or medium without
                                    express written permission of Attra Partners Ltd is prohibited

Attra Partners Limited is an affiliate of Rovsing Management A/S.   PRINCE2® is a Registered Trademark of the
Rovsing Management A/S is an accredited ATO by the APMG on          Office of Government Commerce in the
behalf of the OGC (Office of Government Commerce U.K.).             United Kingdom and other countries.
PRINCE2
   PRINCE2®              in an Agile mode                                                                                                  (Processes)

                                                                                           Agile               Agile                  Agile


                                                                    Stage #1             Stage #2           Stage #3                 Stage n
                                       Starting-up a                Initiation
     Project                              Project                                          Measure
                                                                                            Delivery             Delivery             Delivery
     Mandate                            Pre-project
                                                                      Stage


            Directing              DP                                Give ad-hoc Direction                              Authorize Project Closure

            Executive                     Authorize                   Authorize the                    Authorize a Stage
         Senior Supplier(s)               Initiation                     Project                       or Exception Plan
          Senior User(s)

                                                                                                                        ...
           Managing                    SU                                     SB               SB                SB     ...                    CP
         Project Manager                                                 IP                     CS               CS
                                                                                                                        ...                      CS


           Delivering
          Team Manager
            Scrum Master
                                                                                                MP               MP     ...                      MP


                           SU – Staring       MP – Managing         IP – Initiating   SB – Stage       DP – Directing   CS – Controlling   CP – Closing
          PRINCE2          up a Project       Product Delivery      a Project         Boundaries       a Project        a Stage            a Project




Attra Partners Limited is an affiliate of Rovsing Management A/S.             PRINCE2® is a Registered Trademark of the
Rovsing Management A/S is an accredited ATO by the APMG on                    Office of Government Commerce in the
behalf of the OGC (Office of Government Commerce U.K.).                       United Kingdom and other countries.
PRINCE2
   PRINCE2®              in an Agile mode                                                                                (Notes)

    NOTES:
     Agile mode can be adopted within a Stage to deliver products based on a priority order (such as the MOSCOW principle).
      SCOPE tolerance can be used to remain within the PRINCE2 philosophy.
     The Managing a Stage Boundary (SB) process includes the “Plan the Next Stage” activity. It is here where we would
      create or refine all Product Descriptions (Specifications) for the next stage. In Agile mode and using SCOPE tolerance we
      can get Board Agreement to deliver as many of the important Products as possible within a Scrum Cycle (typically 4
      weeks).
     If the Product Breakdown Structure is not granular enough, then one can adapt the Product Description „s themselves
      indicating that some f the product‟s features are optional and will only be delivered if there is sufficient time within the
      Scrum cycle. If this is the case, then the same Product gets worked upon in the following Stage(s) or Scrum Cycles.
     One difference between PRINCE2 and Agile is that in the later, the Users are heavily engaged as part of iterative
      development (equivalent of the MP – Managing Product Delivery process in PRINCE2). This would be acceptable as long
      as a reasonable agreement is reached before the beginning of the Stage (or Scrum cycle) on the key deliverables (even
      though not all features may be known). This is where a compromise needs to be reached as PRINCE2 needs the
      possible features/Scope tolerance to be determined, while pure Agile would entail developing potentially new features (or
      fine tuning them) during a Scrum cycle.


                                                                     Project Product
                                                                       Description


                                                         PD1                 PD2              PD3                   Must have



                                                                                                                   Nice to have


Attra Partners Limited is an affiliate of Rovsing Management A/S.   PRINCE2® is a Registered Trademark of the
Rovsing Management A/S is an accredited ATO by the APMG on          Office of Government Commerce in the
behalf of the OGC (Office of Government Commerce U.K.).             United Kingdom and other countries.
PRINCE2
                                                                                                                                (Organization)
   PRINCE2® in an Agile mode
                                                  Corporate or programme management


                                                          Project Board

                                                                                                      Senior Supplier(s)    1
                      Senior User(s)                                Executive
                                                                                                   (inc Design Authority)




               Business, User & Supplier                                                              Change Authority
          4       Project Assurance
              Emphasis on Documentation
                                                              Project Manager
                                                                                                       Project Support
                                                               Team Manager
                                                   2           (Scrum Master)


                                              3                Team members

      1    It is important to include a Design Authority/Architects as           2    Scrum Mater takes the role of the Team Manager
           part of the Senior Supplier representation. This is to address
                                                                                 3    User involvement working within the product
           one of the pitfalls of Agile where iterative development may
                                                                                      development team(s)
           lead to solutions that does not conform to design blue-prints
           leading to products that are very difficult to subsequently           4    Project Assurance should make special provision to
           upgrade/enhance to meet future business need.                              ensure the Products are properly documented (frequently
                                                                                      a downside of Agile - “abuse of the Agile method”)
Attra Partners Limited is an affiliate of Rovsing Management A/S.        PRINCE2® is a Registered Trademark of the
Rovsing Management A/S is an accredited ATO by the APMG on               Office of Government Commerce in the
behalf of the OGC (Office of Government Commerce U.K.).                  United Kingdom and other countries.

Mais conteúdo relacionado

Mais procurados

David Weir And Graham Fisher - Scaling Agility Across the Enterprise
David Weir And Graham Fisher - Scaling Agility Across the EnterpriseDavid Weir And Graham Fisher - Scaling Agility Across the Enterprise
David Weir And Graham Fisher - Scaling Agility Across the EnterpriseAgile Lietuva
 
Agile tour 2011 ralph jocham
Agile tour 2011   ralph jochamAgile tour 2011   ralph jocham
Agile tour 2011 ralph jochamAgora Group
 
Planning with timeline
Planning with timelinePlanning with timeline
Planning with timelineOleg Seriaga
 
Evolution of Longer-Term Planning in a Large Scale Agile Project – F-Secure’s...
Evolution of Longer-Term Planning in a Large Scale Agile Project – F-Secure’s...Evolution of Longer-Term Planning in a Large Scale Agile Project – F-Secure’s...
Evolution of Longer-Term Planning in a Large Scale Agile Project – F-Secure’s...Gabor Gunyho
 
An argument for moving the requirements out of user hands - The CMS Experience
An argument for moving the requirements out of user hands - The CMS ExperienceAn argument for moving the requirements out of user hands - The CMS Experience
An argument for moving the requirements out of user hands - The CMS ExperienceIgor Sfiligoi
 
110605=holy grail cmmi_scrum
110605=holy grail cmmi_scrum110605=holy grail cmmi_scrum
110605=holy grail cmmi_scrumIsabel Ferreira
 
Introduction To Agile
Introduction To AgileIntroduction To Agile
Introduction To AgileTony Deng
 
Attra Partners Prince2 Intro
Attra Partners Prince2 IntroAttra Partners Prince2 Intro
Attra Partners Prince2 Introchouha
 

Mais procurados (11)

David Weir And Graham Fisher - Scaling Agility Across the Enterprise
David Weir And Graham Fisher - Scaling Agility Across the EnterpriseDavid Weir And Graham Fisher - Scaling Agility Across the Enterprise
David Weir And Graham Fisher - Scaling Agility Across the Enterprise
 
Juha 1999 2013 -
Juha 1999 2013 -Juha 1999 2013 -
Juha 1999 2013 -
 
Agile tour 2011 ralph jocham
Agile tour 2011   ralph jochamAgile tour 2011   ralph jocham
Agile tour 2011 ralph jocham
 
5 why en
5 why en5 why en
5 why en
 
Planning with timeline
Planning with timelinePlanning with timeline
Planning with timeline
 
Lead funnel bbs_v3-nb
Lead funnel bbs_v3-nbLead funnel bbs_v3-nb
Lead funnel bbs_v3-nb
 
Evolution of Longer-Term Planning in a Large Scale Agile Project – F-Secure’s...
Evolution of Longer-Term Planning in a Large Scale Agile Project – F-Secure’s...Evolution of Longer-Term Planning in a Large Scale Agile Project – F-Secure’s...
Evolution of Longer-Term Planning in a Large Scale Agile Project – F-Secure’s...
 
An argument for moving the requirements out of user hands - The CMS Experience
An argument for moving the requirements out of user hands - The CMS ExperienceAn argument for moving the requirements out of user hands - The CMS Experience
An argument for moving the requirements out of user hands - The CMS Experience
 
110605=holy grail cmmi_scrum
110605=holy grail cmmi_scrum110605=holy grail cmmi_scrum
110605=holy grail cmmi_scrum
 
Introduction To Agile
Introduction To AgileIntroduction To Agile
Introduction To Agile
 
Attra Partners Prince2 Intro
Attra Partners Prince2 IntroAttra Partners Prince2 Intro
Attra Partners Prince2 Intro
 

Semelhante a PRINCE2 and Agile project management

Prince2 Six Sigma
Prince2 Six SigmaPrince2 Six Sigma
Prince2 Six Sigmachouha
 
PRINCE2 and Six-Sigma
PRINCE2 and Six-SigmaPRINCE2 and Six-Sigma
PRINCE2 and Six-Sigmamchouha
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSJens Hoffmann
 
Prince 2 + XLPM - Semcon - Bert Hedeman
Prince 2 + XLPM - Semcon - Bert HedemanPrince 2 + XLPM - Semcon - Bert Hedeman
Prince 2 + XLPM - Semcon - Bert HedemanSvenskt Projektforum
 
A real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMA real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMTraining Bytesize
 
How "AgilePM" and PRINCE2 were used in the same project
How "AgilePM" and PRINCE2 were used in the same projectHow "AgilePM" and PRINCE2 were used in the same project
How "AgilePM" and PRINCE2 were used in the same projectAntony della Porta MBA GPM-m
 
Agile transformation best practices
Agile transformation best practicesAgile transformation best practices
Agile transformation best practicesAllyson Chiarini
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefitsPOTIFOB1
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondekLucie Budíková
 
Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2Martin Ellemann Olesen
 
PRINCE2 Timeline Slides
PRINCE2 Timeline SlidesPRINCE2 Timeline Slides
PRINCE2 Timeline SlidesFrank Turley
 
Aras PLM Software Implementation Methodology
Aras PLM Software Implementation MethodologyAras PLM Software Implementation Methodology
Aras PLM Software Implementation MethodologyAras
 
Agile Lean Conference 2016 - Cagliesi - Agile like the queen
Agile Lean Conference 2016 - Cagliesi - Agile like the queenAgile Lean Conference 2016 - Cagliesi - Agile like the queen
Agile Lean Conference 2016 - Cagliesi - Agile like the queenAgile Lean Conference
 
PRINCE2 and SCRUM (AGILE)
PRINCE2 and SCRUM (AGILE)PRINCE2 and SCRUM (AGILE)
PRINCE2 and SCRUM (AGILE)Johann Tambayah
 
Big agile - It's not just for small projects anymore
Big agile - It's not just for small projects anymoreBig agile - It's not just for small projects anymore
Big agile - It's not just for small projects anymoreJesse Fewell
 
Envisioning improving productivity and qaulity through better backlogs agi...
Envisioning   improving productivity and qaulity through better backlogs  agi...Envisioning   improving productivity and qaulity through better backlogs  agi...
Envisioning improving productivity and qaulity through better backlogs agi...Tatlock
 
Scrum Project Management
Scrum Project ManagementScrum Project Management
Scrum Project ManagementJordan Chung
 
prince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdfprince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdfEduardoMena35
 

Semelhante a PRINCE2 and Agile project management (20)

Prince2 Six Sigma
Prince2 Six SigmaPrince2 Six Sigma
Prince2 Six Sigma
 
PRINCE2 and Six-Sigma
PRINCE2 and Six-SigmaPRINCE2 and Six-Sigma
PRINCE2 and Six-Sigma
 
PRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESSPRINCE2 + AGILE = SUCCESS
PRINCE2 + AGILE = SUCCESS
 
Prince 2 + XLPM - Semcon - Bert Hedeman
Prince 2 + XLPM - Semcon - Bert HedemanPrince 2 + XLPM - Semcon - Bert Hedeman
Prince 2 + XLPM - Semcon - Bert Hedeman
 
A real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePMA real life case study of using Agile and PRINCE2 together - AgilePM
A real life case study of using Agile and PRINCE2 together - AgilePM
 
How "AgilePM" and PRINCE2 were used in the same project
How "AgilePM" and PRINCE2 were used in the same projectHow "AgilePM" and PRINCE2 were used in the same project
How "AgilePM" and PRINCE2 were used in the same project
 
Agile transformation best practices
Agile transformation best practicesAgile transformation best practices
Agile transformation best practices
 
Prince2 2009 & its benefits
Prince2 2009 & its benefitsPrince2 2009 & its benefits
Prince2 2009 & its benefits
 
Ahmad Hammoud Resume
Ahmad Hammoud ResumeAhmad Hammoud Resume
Ahmad Hammoud Resume
 
Prince2 2009 & its benefits potifob stefan ondek
Prince2 2009 & its benefits   potifob stefan ondekPrince2 2009 & its benefits   potifob stefan ondek
Prince2 2009 & its benefits potifob stefan ondek
 
Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2Nordic project zone talk on Agile and PRINCE2
Nordic project zone talk on Agile and PRINCE2
 
PRINCE2 Timeline Slides
PRINCE2 Timeline SlidesPRINCE2 Timeline Slides
PRINCE2 Timeline Slides
 
Aras PLM Software Implementation Methodology
Aras PLM Software Implementation MethodologyAras PLM Software Implementation Methodology
Aras PLM Software Implementation Methodology
 
Agile Lean Conference 2016 - Cagliesi - Agile like the queen
Agile Lean Conference 2016 - Cagliesi - Agile like the queenAgile Lean Conference 2016 - Cagliesi - Agile like the queen
Agile Lean Conference 2016 - Cagliesi - Agile like the queen
 
PRINCE2 and SCRUM (AGILE)
PRINCE2 and SCRUM (AGILE)PRINCE2 and SCRUM (AGILE)
PRINCE2 and SCRUM (AGILE)
 
Big agile - It's not just for small projects anymore
Big agile - It's not just for small projects anymoreBig agile - It's not just for small projects anymore
Big agile - It's not just for small projects anymore
 
Envisioning improving productivity and qaulity through better backlogs agi...
Envisioning   improving productivity and qaulity through better backlogs  agi...Envisioning   improving productivity and qaulity through better backlogs  agi...
Envisioning improving productivity and qaulity through better backlogs agi...
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrum
 
Scrum Project Management
Scrum Project ManagementScrum Project Management
Scrum Project Management
 
prince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdfprince2_practitioner_resource_book _v3.5.pdf
prince2_practitioner_resource_book _v3.5.pdf
 

PRINCE2 and Agile project management

  • 1. PRINCE2® & take a walk on the Agile side! (Release 1.2) The training and consultancy team at Attra Partners writes: The recent economic crisis has lead to increasing cost and delivery pressures. Although from a governance perspective PRINCE2 is one of the project management methodologies, there is an (incorrect) impression that PRINCE2 is expensive, heavy handed and inflexible. The latest edition of PRINCE2 (released June 2009) does facilitate the use of an Agile delivery approach. PRINCE2 defined six aspects of project‟s performance that must be agreed and monitored: PRINCE2 also recommends that tolerances are specified for Time each of these six aspects. Benefits Cost Let‟s see how the SCOPE aspect can be used to “go Agile” – diagrams on the next pages summarise the fusion of these. (knowledge of PRINCE2 & Agile concepts are assumed.) If you have any questions or comments please email Risk Quality sales@attrapartners.com Scope Copyright © 2009 Attra Partners Limited. All rights reserved. Reproduction in whole or in part in any form or medium without express written permission of Attra Partners Ltd is prohibited Attra Partners Limited is an affiliate of Rovsing Management A/S. PRINCE2® is a Registered Trademark of the Rovsing Management A/S is an accredited ATO by the APMG on Office of Government Commerce in the behalf of the OGC (Office of Government Commerce U.K.). United Kingdom and other countries.
  • 2. PRINCE2 PRINCE2® in an Agile mode (Processes) Agile Agile Agile Stage #1 Stage #2 Stage #3 Stage n Starting-up a Initiation Project Project Measure Delivery Delivery Delivery Mandate Pre-project Stage Directing DP Give ad-hoc Direction Authorize Project Closure Executive Authorize Authorize the Authorize a Stage Senior Supplier(s) Initiation Project or Exception Plan Senior User(s) ... Managing SU SB SB SB ... CP Project Manager IP CS CS ... CS Delivering Team Manager Scrum Master MP MP ... MP SU – Staring MP – Managing IP – Initiating SB – Stage DP – Directing CS – Controlling CP – Closing PRINCE2 up a Project Product Delivery a Project Boundaries a Project a Stage a Project Attra Partners Limited is an affiliate of Rovsing Management A/S. PRINCE2® is a Registered Trademark of the Rovsing Management A/S is an accredited ATO by the APMG on Office of Government Commerce in the behalf of the OGC (Office of Government Commerce U.K.). United Kingdom and other countries.
  • 3. PRINCE2 PRINCE2® in an Agile mode (Notes) NOTES:  Agile mode can be adopted within a Stage to deliver products based on a priority order (such as the MOSCOW principle). SCOPE tolerance can be used to remain within the PRINCE2 philosophy.  The Managing a Stage Boundary (SB) process includes the “Plan the Next Stage” activity. It is here where we would create or refine all Product Descriptions (Specifications) for the next stage. In Agile mode and using SCOPE tolerance we can get Board Agreement to deliver as many of the important Products as possible within a Scrum Cycle (typically 4 weeks).  If the Product Breakdown Structure is not granular enough, then one can adapt the Product Description „s themselves indicating that some f the product‟s features are optional and will only be delivered if there is sufficient time within the Scrum cycle. If this is the case, then the same Product gets worked upon in the following Stage(s) or Scrum Cycles.  One difference between PRINCE2 and Agile is that in the later, the Users are heavily engaged as part of iterative development (equivalent of the MP – Managing Product Delivery process in PRINCE2). This would be acceptable as long as a reasonable agreement is reached before the beginning of the Stage (or Scrum cycle) on the key deliverables (even though not all features may be known). This is where a compromise needs to be reached as PRINCE2 needs the possible features/Scope tolerance to be determined, while pure Agile would entail developing potentially new features (or fine tuning them) during a Scrum cycle. Project Product Description PD1 PD2 PD3 Must have Nice to have Attra Partners Limited is an affiliate of Rovsing Management A/S. PRINCE2® is a Registered Trademark of the Rovsing Management A/S is an accredited ATO by the APMG on Office of Government Commerce in the behalf of the OGC (Office of Government Commerce U.K.). United Kingdom and other countries.
  • 4. PRINCE2 (Organization) PRINCE2® in an Agile mode Corporate or programme management Project Board Senior Supplier(s) 1 Senior User(s) Executive (inc Design Authority) Business, User & Supplier Change Authority 4 Project Assurance Emphasis on Documentation Project Manager Project Support Team Manager 2 (Scrum Master) 3 Team members 1 It is important to include a Design Authority/Architects as 2 Scrum Mater takes the role of the Team Manager part of the Senior Supplier representation. This is to address 3 User involvement working within the product one of the pitfalls of Agile where iterative development may development team(s) lead to solutions that does not conform to design blue-prints leading to products that are very difficult to subsequently 4 Project Assurance should make special provision to upgrade/enhance to meet future business need. ensure the Products are properly documented (frequently a downside of Agile - “abuse of the Agile method”) Attra Partners Limited is an affiliate of Rovsing Management A/S. PRINCE2® is a Registered Trademark of the Rovsing Management A/S is an accredited ATO by the APMG on Office of Government Commerce in the behalf of the OGC (Office of Government Commerce U.K.). United Kingdom and other countries.