SlideShare uma empresa Scribd logo
1 de 2
Baixar para ler offline
Many CAD designers, managers and Design directors in the apparel and retailing field 	
		 are aware of color management or have heard of it, but they don’t know its capabilities or
		 how it can be implemented. Color is critical in design. But, without specific instruction		
		 or reference, color evaluation and validation can be an expensive process. For more than 	
		 a decade, experts at Lectra have gained extensive experience in working together with		
		 customers to propose and apply a color managed process in their design areas.
DEFINING THE PROCESS AND EXPECTATIONS
The following overview is intended as a guideline regarding the services that Lectra offers to customers
who use Lectra’s Design Solution (Kaledo) and/or other 3rd party design and graphic arts solutions.
The service is completely flexible and customized to the customer’s specific needs with the following
goals:
- Capture and communicate accurate color through the design and production process.
- Obtain accurate color on output devices with little or no color tweaking needed.
- Obtain consistent color on output devices
- Achieve this at various customer’s brands and 3rd party partners where applicable or possible.
Discovery: The purpose of this phase is to allow the Lectra project manager, a Senior Design Consultant,
who has experience in managing software implementation projects, as well as ongoing customer support
experience with our largest accounts, to assess the customers current workflows, pain points and
needs. Also to identify possible areas of improvement.
After the onsite review, the project manager will also develop and deliver a report detailing recommedations
for improving the customer’s processes. If desired, the project manager can provide a demo to illustrate
the benefits of color management using customer’s own color swatches or standards. The project manager
can also include a proposed on-site project to match customer’s needs.
Deliverables: After the onsite audit the Lectra project manager will deliver a report addressing the
following points:
- Printer and output workflows.
- Device Setup and Use, including spectrophotometers.
- Best Practices.
Lectra Process Assessment
Color Management
- Primer on Color Perception.
- High precision printer, monitor calibration and profiling.
- Where applicable, use of a spectrophotometer for capturing color.
- Other color sourcing and communication workflows.
- Calibration and profiling at multiple sites and/or business partners.
- Configuration of 3rd party RIP software.
- Assembly and ink charging of new printers.
   Customized Action Plan: In addition, the Lectra Project Manager will provide a plan that supports
the implementation and new methodologies recommended ensuring the new processes can be integrated
successfully.
The scope of the plan can vary depending on the size of installation, complexity of processes and the
level of expertise in design software applications, etc.
Post Implementation Review: Once training has been completed, the Lectra Project Manager will
schedule a post follow-up review to ensure the project has been successfully implemented and expec-
tations met.
New printer profiles are typically needed every 6 to 12 mo. Usually, customers would rather have Lectra
create new printer profiles since we do it often and apply best practices.
Prerequisites: Lectra’s Design Solution (Kaledo) and/or other 3rd party design and graphic arts
solutions.
Lectra Process Assessment
Color Management

Mais conteúdo relacionado

Destaque

Resolución interna 107 suspensión de clases en Miraflores
Resolución interna 107 suspensión de clases en MirafloresResolución interna 107 suspensión de clases en Miraflores
Resolución interna 107 suspensión de clases en MirafloresIván Cea Rojas
 
Guitar Hero: Warriors of Rock
Guitar Hero: Warriors of RockGuitar Hero: Warriors of Rock
Guitar Hero: Warriors of RockMZ_ ANV11L
 
Kaledo new york-&-company_customer-success-story_en
Kaledo new york-&-company_customer-success-story_enKaledo new york-&-company_customer-success-story_en
Kaledo new york-&-company_customer-success-story_enMelissa Vidakovic
 
항공권예약여행사
항공권예약여행사항공권예약여행사
항공권예약여행사jerywe
 
Summer fun by_asmaa_azba
Summer fun by_asmaa_azbaSummer fun by_asmaa_azba
Summer fun by_asmaa_azbaDanielle T
 
Homenaje al décimo tercer aniversario
Homenaje al décimo tercer aniversarioHomenaje al décimo tercer aniversario
Homenaje al décimo tercer aniversariomikezavaleta
 
Eurocave delivery-charges-from-wineware
Eurocave delivery-charges-from-winewareEurocave delivery-charges-from-wineware
Eurocave delivery-charges-from-winewarechirag8813
 
Informações para blog
Informações para blogInformações para blog
Informações para blogcnisbrasil
 
Public notices for June 26, 2012
Public notices for June 26, 2012Public notices for June 26, 2012
Public notices for June 26, 2012Post-Bulletin Co.
 
Calendario mujeres eneltiempo_2012 4
Calendario mujeres eneltiempo_2012 4Calendario mujeres eneltiempo_2012 4
Calendario mujeres eneltiempo_2012 4moteros153
 
Your accounting partner for success
Your accounting partner for successYour accounting partner for success
Your accounting partner for successKris Hogan
 
Calendario mujeres eneltiempo_2012 2
Calendario mujeres eneltiempo_2012 2Calendario mujeres eneltiempo_2012 2
Calendario mujeres eneltiempo_2012 2moteros153
 
Fshati turistik i Zogajt, gjëndet 9 km larg qytetit të Shkodrës
Fshati turistik i Zogajt, gjëndet 9 km larg qytetit të ShkodrësFshati turistik i Zogajt, gjëndet 9 km larg qytetit të Shkodrës
Fshati turistik i Zogajt, gjëndet 9 km larg qytetit të ShkodrësAlbanian Tourism Low-Cost
 
Ludin A Molina Resume 2016
Ludin A Molina Resume 2016Ludin A Molina Resume 2016
Ludin A Molina Resume 2016Ludin Molina
 
Antropologia (1)
Antropologia (1)Antropologia (1)
Antropologia (1)andylm
 

Destaque (19)

Lectra acma 2010_final
Lectra acma 2010_finalLectra acma 2010_final
Lectra acma 2010_final
 
Resolución interna 107 suspensión de clases en Miraflores
Resolución interna 107 suspensión de clases en MirafloresResolución interna 107 suspensión de clases en Miraflores
Resolución interna 107 suspensión de clases en Miraflores
 
Guitar Hero: Warriors of Rock
Guitar Hero: Warriors of RockGuitar Hero: Warriors of Rock
Guitar Hero: Warriors of Rock
 
Kaledo new york-&-company_customer-success-story_en
Kaledo new york-&-company_customer-success-story_enKaledo new york-&-company_customer-success-story_en
Kaledo new york-&-company_customer-success-story_en
 
항공권예약여행사
항공권예약여행사항공권예약여행사
항공권예약여행사
 
Summer fun by_asmaa_azba
Summer fun by_asmaa_azbaSummer fun by_asmaa_azba
Summer fun by_asmaa_azba
 
Homenaje al décimo tercer aniversario
Homenaje al décimo tercer aniversarioHomenaje al décimo tercer aniversario
Homenaje al décimo tercer aniversario
 
Eurocave delivery-charges-from-wineware
Eurocave delivery-charges-from-winewareEurocave delivery-charges-from-wineware
Eurocave delivery-charges-from-wineware
 
Informações para blog
Informações para blogInformações para blog
Informações para blog
 
Public notices for June 26, 2012
Public notices for June 26, 2012Public notices for June 26, 2012
Public notices for June 26, 2012
 
Jeankarlos
JeankarlosJeankarlos
Jeankarlos
 
Calendario mujeres eneltiempo_2012 4
Calendario mujeres eneltiempo_2012 4Calendario mujeres eneltiempo_2012 4
Calendario mujeres eneltiempo_2012 4
 
Your accounting partner for success
Your accounting partner for successYour accounting partner for success
Your accounting partner for success
 
Calendario mujeres eneltiempo_2012 2
Calendario mujeres eneltiempo_2012 2Calendario mujeres eneltiempo_2012 2
Calendario mujeres eneltiempo_2012 2
 
Fshati turistik i Zogajt, gjëndet 9 km larg qytetit të Shkodrës
Fshati turistik i Zogajt, gjëndet 9 km larg qytetit të ShkodrësFshati turistik i Zogajt, gjëndet 9 km larg qytetit të Shkodrës
Fshati turistik i Zogajt, gjëndet 9 km larg qytetit të Shkodrës
 
Play station
Play stationPlay station
Play station
 
Ludin A Molina Resume 2016
Ludin A Molina Resume 2016Ludin A Molina Resume 2016
Ludin A Molina Resume 2016
 
Antropologia (1)
Antropologia (1)Antropologia (1)
Antropologia (1)
 
Modelos de gestion
Modelos de gestionModelos de gestion
Modelos de gestion
 

Semelhante a 05 color managementps

C# Developer- Product Development- R&D- Fixed location- Permanent Contract
C# Developer- Product Development- R&D- Fixed location- Permanent ContractC# Developer- Product Development- R&D- Fixed location- Permanent Contract
C# Developer- Product Development- R&D- Fixed location- Permanent ContractMario John
 
C# Developer- Product Development- R&D- Fixed location- Permanent Contract
C# Developer- Product Development- R&D- Fixed location- Permanent ContractC# Developer- Product Development- R&D- Fixed location- Permanent Contract
C# Developer- Product Development- R&D- Fixed location- Permanent ContractMario John Lemmers
 
ROI Driven Digital Development
ROI Driven Digital DevelopmentROI Driven Digital Development
ROI Driven Digital DevelopmentRobbie Burns
 
evaluate a software developers performance.pptx
evaluate a software developers performance.pptxevaluate a software developers performance.pptx
evaluate a software developers performance.pptxMarkZen
 
Toby Smith CV v4
Toby Smith CV v4Toby Smith CV v4
Toby Smith CV v4Toby Smith
 
Product lead
Product leadProduct lead
Product leadMark Long
 
GraphTour 2020 - Customer Journey with Neo4j Services
GraphTour 2020 - Customer Journey with Neo4j ServicesGraphTour 2020 - Customer Journey with Neo4j Services
GraphTour 2020 - Customer Journey with Neo4j ServicesNeo4j
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani Shekhar
 
GGoldsmith Résumé DM 2016
GGoldsmith Résumé DM 2016GGoldsmith Résumé DM 2016
GGoldsmith Résumé DM 2016Gerri Goldsmith
 
Design & Drafting work profile-14
Design  & Drafting work profile-14Design  & Drafting work profile-14
Design & Drafting work profile-14Avinash Katkar
 
Design & Drafting work profile-14
Design  & Drafting work profile-14Design  & Drafting work profile-14
Design & Drafting work profile-14Avinash Katkar
 
SCG Sales Tech Guide
SCG Sales Tech Guide SCG Sales Tech Guide
SCG Sales Tech Guide Robbie Burns
 
GraphTour London 2020 - Customer Journey
GraphTour London 2020  - Customer Journey GraphTour London 2020  - Customer Journey
GraphTour London 2020 - Customer Journey Neo4j
 
Big data analytics fas trak solution overview
Big data analytics fas trak solution overviewBig data analytics fas trak solution overview
Big data analytics fas trak solution overviewMarc St-Pierre
 
The Highest-Paying AutoCAD Careers & Job Roles - NetCom Learning
The Highest-Paying AutoCAD Careers & Job Roles - NetCom LearningThe Highest-Paying AutoCAD Careers & Job Roles - NetCom Learning
The Highest-Paying AutoCAD Careers & Job Roles - NetCom LearningNetCom Learning
 
The Highest-Paying AutoCAD Careers & Job Roles
The Highest-Paying AutoCAD Careers & Job RolesThe Highest-Paying AutoCAD Careers & Job Roles
The Highest-Paying AutoCAD Careers & Job RolesStaciBassett
 

Semelhante a 05 color managementps (20)

C# Developer- Product Development- R&D- Fixed location- Permanent Contract
C# Developer- Product Development- R&D- Fixed location- Permanent ContractC# Developer- Product Development- R&D- Fixed location- Permanent Contract
C# Developer- Product Development- R&D- Fixed location- Permanent Contract
 
C# Developer- Product Development- R&D- Fixed location- Permanent Contract
C# Developer- Product Development- R&D- Fixed location- Permanent ContractC# Developer- Product Development- R&D- Fixed location- Permanent Contract
C# Developer- Product Development- R&D- Fixed location- Permanent Contract
 
Devinder resume v6
Devinder resume v6Devinder resume v6
Devinder resume v6
 
ROI Driven Digital Development
ROI Driven Digital DevelopmentROI Driven Digital Development
ROI Driven Digital Development
 
evaluate a software developers performance.pptx
evaluate a software developers performance.pptxevaluate a software developers performance.pptx
evaluate a software developers performance.pptx
 
Toby Smith CV v4
Toby Smith CV v4Toby Smith CV v4
Toby Smith CV v4
 
Product lead
Product leadProduct lead
Product lead
 
GraphTour 2020 - Customer Journey with Neo4j Services
GraphTour 2020 - Customer Journey with Neo4j ServicesGraphTour 2020 - Customer Journey with Neo4j Services
GraphTour 2020 - Customer Journey with Neo4j Services
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_Consultant
 
GGoldsmith Résumé DM 2016
GGoldsmith Résumé DM 2016GGoldsmith Résumé DM 2016
GGoldsmith Résumé DM 2016
 
Jasmine Gomillion Resume
Jasmine Gomillion ResumeJasmine Gomillion Resume
Jasmine Gomillion Resume
 
Design & Drafting work profile-14
Design  & Drafting work profile-14Design  & Drafting work profile-14
Design & Drafting work profile-14
 
Design & Drafting work profile-14
Design  & Drafting work profile-14Design  & Drafting work profile-14
Design & Drafting work profile-14
 
SCG Sales Tech Guide
SCG Sales Tech Guide SCG Sales Tech Guide
SCG Sales Tech Guide
 
Project management software consulting
Project management software consultingProject management software consulting
Project management software consulting
 
GraphTour London 2020 - Customer Journey
GraphTour London 2020  - Customer Journey GraphTour London 2020  - Customer Journey
GraphTour London 2020 - Customer Journey
 
Big data analytics fas trak solution overview
Big data analytics fas trak solution overviewBig data analytics fas trak solution overview
Big data analytics fas trak solution overview
 
The Highest-Paying AutoCAD Careers & Job Roles - NetCom Learning
The Highest-Paying AutoCAD Careers & Job Roles - NetCom LearningThe Highest-Paying AutoCAD Careers & Job Roles - NetCom Learning
The Highest-Paying AutoCAD Careers & Job Roles - NetCom Learning
 
The Highest-Paying AutoCAD Careers & Job Roles
The Highest-Paying AutoCAD Careers & Job RolesThe Highest-Paying AutoCAD Careers & Job Roles
The Highest-Paying AutoCAD Careers & Job Roles
 
IT Outsourcing
IT OutsourcingIT Outsourcing
IT Outsourcing
 

05 color managementps

  • 1. Many CAD designers, managers and Design directors in the apparel and retailing field are aware of color management or have heard of it, but they don’t know its capabilities or how it can be implemented. Color is critical in design. But, without specific instruction or reference, color evaluation and validation can be an expensive process. For more than a decade, experts at Lectra have gained extensive experience in working together with customers to propose and apply a color managed process in their design areas. DEFINING THE PROCESS AND EXPECTATIONS The following overview is intended as a guideline regarding the services that Lectra offers to customers who use Lectra’s Design Solution (Kaledo) and/or other 3rd party design and graphic arts solutions. The service is completely flexible and customized to the customer’s specific needs with the following goals: - Capture and communicate accurate color through the design and production process. - Obtain accurate color on output devices with little or no color tweaking needed. - Obtain consistent color on output devices - Achieve this at various customer’s brands and 3rd party partners where applicable or possible. Discovery: The purpose of this phase is to allow the Lectra project manager, a Senior Design Consultant, who has experience in managing software implementation projects, as well as ongoing customer support experience with our largest accounts, to assess the customers current workflows, pain points and needs. Also to identify possible areas of improvement. After the onsite review, the project manager will also develop and deliver a report detailing recommedations for improving the customer’s processes. If desired, the project manager can provide a demo to illustrate the benefits of color management using customer’s own color swatches or standards. The project manager can also include a proposed on-site project to match customer’s needs. Deliverables: After the onsite audit the Lectra project manager will deliver a report addressing the following points: - Printer and output workflows. - Device Setup and Use, including spectrophotometers. - Best Practices. Lectra Process Assessment Color Management
  • 2. - Primer on Color Perception. - High precision printer, monitor calibration and profiling. - Where applicable, use of a spectrophotometer for capturing color. - Other color sourcing and communication workflows. - Calibration and profiling at multiple sites and/or business partners. - Configuration of 3rd party RIP software. - Assembly and ink charging of new printers. Customized Action Plan: In addition, the Lectra Project Manager will provide a plan that supports the implementation and new methodologies recommended ensuring the new processes can be integrated successfully. The scope of the plan can vary depending on the size of installation, complexity of processes and the level of expertise in design software applications, etc. Post Implementation Review: Once training has been completed, the Lectra Project Manager will schedule a post follow-up review to ensure the project has been successfully implemented and expec- tations met. New printer profiles are typically needed every 6 to 12 mo. Usually, customers would rather have Lectra create new printer profiles since we do it often and apply best practices. Prerequisites: Lectra’s Design Solution (Kaledo) and/or other 3rd party design and graphic arts solutions. Lectra Process Assessment Color Management