4. Who we are ?
Brilliant Automation Solutions specializes in Grid
synchronization, manufacturing, installation,
testing and commissioning of complete range
of Load Sharing/Synchronizing Panels
6. HT-GC500
Multiple paralleling gen-sets control with
internal load - sharing and synchronizer
Computed Measures
Active power meter, Reactive power meter, Apparent power meter, Power factor: Total and phase by
phase, Active and reactive energy counter, Hour counter, hour counter for main./rental. Start Counter.
Generator Protections
Under frequency (81U), Over frequency (81O), Under voltage (27),
Overvoltage (59), Power direction (32), Loss of excitation (Reverse reactive 32RQ), Time dependent
overcurrent (51),
Instantaneous overcurrent (50), Phase sequence, Current and Voltage unbalance, Ground Fault Protection
(51N) (alternative to Neutral current measurement). Phase overcurrent with voltage restraint/control (51V)
Loss of Mains Protections
Fast Underfrquency (81U), Over frequency (81O), Under voltage (27) and Overvoltage (59) protection.
Rate of change of frequency (df/dt, RoCoF, 81R).
Vector surge/jump
Inputs, and aux. functions
18 Programmable digital inputs
3 Analogue inputs, if not used, can be used as not insulated digital inputs
2 Analogical input (0...10V)
7. HT-GC500
Multiple paralleling Gen-sets control with
internal load - sharing and synchronizer
Embedded functions
•
•
•
•
•
•
•
•
•
•
Internal active and reactive Load-sharing
Power regulation
Reactive power sharing
Power factor regulation
Synchronization (via CAN or Via PWM)
Load Management
CAN interface for ECU interface (J1939 and MTU MDEC) and
Insulated CAN interface for PMCBUS application (LOAD– SHARING and parallel management)
Up to 16 generator sets connected together
Multilanguage display: English, Italian, French and Russian
Supported Plants
• SPM, SSB, SPtM, SSB+SSTP, SPtM+SSB, MPM, MSB, MPtM, MSB+MSTP, MPtM+MSB.
Other Technical data
•
•
•
•
•
Supply voltage: 7…32 Vdc
Power consumption: typical less than 2W (AUTO mode, STAND-BY, AMF active, LCD Lamp Saving active).
Nominal Gen-Set frequency: 50 or 60 Hz
LCD: transflective with LED backlight.
Operating temperature: -25 °C to 70 °C Protection degree: IP55
8. HT-MC100
PARALLEL SYSTEM SUPERVISOR
MC100 controller is aimed for managing multiple parallel systems. In particular MC100 is able to
control the global circuit breaker and generator functions operating as Master unit.
In particular MC100 controller is an automatic control unit born to safety manage the following
type of power plants with and without MCB and MGCB management:
• MPM (Multiple Prime Mover)
• MSB (Multiple Stand-by)
• MSB + MSTP (Multiple Stand-by + Multiple Short Time Parallel)
• MPtM (Multiple Parallel to Mains)
• MSB + MPtM (Multiple Stand-by + Multiple Parallel to Mains)
•
•
•
•
•
•
•
•
•
•
•
•
•
True RMS readings on bus and mains voltages and currents
Additional current measurement for neutral or differential protection
Active, Reactive and apparent power measurement for Mains and, Load Generators
MCB and MGCB synchronization of multiple generators
Graphic display
18+3 programmable digital input
18 programmable digital output
RS232 interface port with MODBUS RTU protocol
Additional RS232 or RS485 interface port Real Time Clock
Events and data logging (100)
Engine speed measurement by pick-up or W
Optional external Ethernet interface
Load shedding (it’s possible to set many thresholds in base of the nominal power available on the bus. In case of
that threshold is exceeded in island mode operation, not privileged loads are enabled).
9. HT-MC100
PARALLEL SYSTEM SUPERVISOR
PEAK-SHAVING mode. This mode allows to automatically starts to run the generator sets and to operate
in Import/Export only if the threshold of imported power is exceeded.
Import/Export for MPtM (Multiple Parallel to Mains) plants
Base load management for MPtM (Multiple Parallel to Mains)plants.
Power factor management/regulation for MPtM (Multiple Parallel to Mains) plants
Soft Load transfer from Mains to Gen sets and vice versa
Loss of mains protections for gen sets running in parallel with the Mains
Computed Measures
Active power meter, Reactive power meter, Apparent power meter, power factor: Total and phase
by phase.
Active and reactive energy counter. Total active and reactive power of all generator sets with GCB
closed.
Total active and reactive Energy counter of all generator sets with GCB closed.
Max. nominal power available on the bus bar.
Load percentage of generators running with GCB closed
Loss of Mains protections
Undervoltage (27)
Overvoltage (59)
Underfrequency (81U)
Overfrequency (81O)
ROCOF (df/dt, 81R),
Vector jump